KR20120077529A KR1020100139512A KR20100139512A KR20120077529A KR 20120077529 A KR20120077529 A KR 20120077529A KR 1020100139512 A KR1020100139512 A KR 1020100139512A KR 20100139512 A KR20100139512 A KR 20100139512A KR 20120077529 A KR20120077529 A KR 20120077529A
Authority
KR
South Korea
Prior art keywords
steel box
moment
alternating
piers
reaction force
Prior art date
Application number
KR1020100139512A
Other languages
Korean (ko)
Inventor
최동천
김혜숙
Original Assignee
산이건설 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 산이건설 주식회사 filed Critical 산이건설 주식회사
Priority to KR1020100139512A priority Critical patent/KR20120077529A/en
Publication of KR20120077529A publication Critical patent/KR20120077529A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C2003/0404Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects
    • E04C2003/0443Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects characterised by substantial shape of the cross-section
    • E04C2003/0465Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects characterised by substantial shape of the cross-section square- or rectangular-shaped

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE: A structure for installing a continuous steel box girder is provided to prevent the buckling and deformation by preventing stress concentration caused by positive moment and negative moment at a join part. CONSTITUTION: A structure for installing a continuous steel box girder comprises a steel box unit(10), a unit(20) for restricting negative reaction, an abutment(30), a pier(40), and a deck(50). The steel box unit comprises a continuous shape and supported form upper parts of the abutment and pier. The deck is installed on the upper part of the steel box unit. As to the steel box unit, both upper sides of a lower flange(11) is welded on a lower part of a web plate(12). The upper part of the web plate is welded on the lower part of an upper flange(13), such that a space(14) inside the steel box is integrally formed. The upper flange comprises a main opening(131) and a sub opening(132). The main opening is formed at the part where the maximum positive moment is applied. The sub opening is separately formed in both sides of the main opening at a constant interval. The unit for restricting the negative reaction is formed inside the steal box unit.

Description

연속형 강상자형교의 설치구조{INSTALLATION STRUCTURE OF CONTINUANCE TYPE STEEL BOX GIRDERBRIDGES}INSTALLATION STRUCTURE OF CONTINUANCE TYPE STEEL BOX GIRDERBRIDGES}

본 발명은 연속형 강상자형교의 설치구조에 관한 것으로서, 특히 측경간 보다 중앙경간이 길게 배열된 교대와 교각의 상부에 연속된 형태를 갖는 강상자부의 하부가 지지되게 설치되어지는 과정에서 측경간 사이의 강상자부 내부로 소정 무게를 갖는 부반력억제부가 구비되어지도록 한 것이다.The present invention relates to an installation structure of a continuous steel box girder bridge, and in particular, the steel plate between the side spans in the process of being installed to support the lower portion of the steel box portion having a continuous form in the upper portion of the bridge and the alternating center arranged longer than the side spans The sub-reaction force suppressing portion having a predetermined weight is provided inside the magnetic part.

일반적으로 도로, 철로, 수로, 파이프 라인 등이 하천, 호수, 해협이나 다른 교통로 위를 건널 수 있도록 하기 위한 방안으로 교량이 시공되어 있다. 교량은 교통을 위하여 가설된 도로교, 궤도가 시공된 철도전용의 철로교 및 수도, 관개용수, 발전용수 등이 지나는 수로교, 하천, 해협, 호수, 습지 등을 넘도록 가설한 하천교, 도시내고속도로, 입체교차로에 적용된 고가교 등 그 용도에 따라 시공되어있다.In general, bridges are constructed to allow roads, railroads, waterways and pipelines to cross rivers, lakes, straits and other traffic routes. The bridge is a road bridge constructed for transportation, a railroad bridge dedicated to orbiting, a waterway bridge through which water, irrigation water, power generation water, rivers, straits, lakes, wetlands, etc. It is constructed according to its purpose, such as overpasses applied to three-dimensional intersections.

이러한 교량은 강성이 적어서 소요강성을 확보하기 위해 단면 높이를 확보하는 과정에서 자중이 큰 구조물로 되며, 활하중의 영향이 적은 콘크리트로 시공된 콘크리트 교량과, 강성이 콘크리트에 비해 우수하며 전체적으로 자중이 적은 것으로 강판으로 이루어진 격벽, 수직보강재, 수평보강재 및 횡보강재가 결합된 강상자가 교대 및 교대 사이의 교각에 받쳐지게 시공된 강재 교량(이하, "강상자형교"라 함)이 있다.These bridges have a low rigidity and thus have a large self-weight in the process of securing the cross-sectional height to secure the required rigidity.The concrete bridges constructed of concrete with less influence of live loads, and the rigidity are superior to the concrete, and have low overall weight. There are steel bridges (hereinafter referred to as "steel box bridges") in which steel boxes in which steel bulkheads, vertical stiffeners, horizontal stiffeners and lateral stiffeners are combined to be supported by alternating and pier bridges.

한편, 도심지의 입체교차로내에 지장물 출현을 극복하기 위한 불규칙한 경간장 연출과 하천에서 유심부에 교각을 세우지 않고 육상부 또는 고수부지만 교각을 설치하여 기초공사를 육상화할 수 있고, 수상공사 대신에 육상공사를 실시하여 시공성을 증가시키고, 안전성을 향상시키기 위한 방안으로 경간 장이 길어진 형태를 갖는 연속형 강상자형교가 사용되어지고 있다.On the other hand, in order to overcome the emergence of obstacles in the three-dimensional crossroads of the downtown area, it is possible to land the foundation work by installing the pier in the land or coriander site without setting a pier at the center of the river, and land construction instead of a waterworks. Continuous steel box bridges with long spans have been used as a means to increase workability and improve safety.

도1은 종래 기술에 따른 연속형 강상자형교 설치에 따른 변위와 모멘트를 도시한 예시도로서, 강상자형교(60)는 교대(30)와 교각(40) 사이의 측경간 보다 교각(40)과 교각(40) 사이의 중앙경간 길이가 더 길도록 형성되어진 상태에서 모멘트는 모멘트도에 도시된 바와 같이, 양측단의 교대(30)로부터 교각(40)을 향하여 부모멘트가 전짐적으로 증가하여 교각(40)에서 최대치가 발생하게 되며, 교각(40)과 교각(40) 사이에서는 중앙을 향하여 부모멘트가 급속하게 감소한 후 중앙에서 최대의 정모멘트가 발생하게 된다.1 is an exemplary view showing displacement and moment according to the installation of a continuous steel box bridge according to the prior art, the steel box bridge 60 is the pier 40 and the side bridge between the alternating 30 and the pier 40 In the state in which the center span length between the pier 40 is formed longer, the moment is increased as the parent moment increases from the alternating 30 at both ends toward the pier 40 as shown in the moment diagram. The maximum value is generated at 40, and the parent moment rapidly decreases toward the center between the piers 40 and the piers 40, and the maximum positive moment is generated at the center.

또한, 모멘트에 따라 강상자형교에서 발생된 변위량은 교대(30)와 교각(40) 사이에는 부반력인 들뜸현상이 발생됨과 동시에 교각(40)과 교각(40) 사이에는 하부로 처짐이 발생하게 된다.In addition, the amount of displacement generated in the steel box girder bridge according to the moment causes the floating phenomenon, which is a negative force, between the alternating 30 and the pier 40, and at the same time, the deflection occurs downward between the pier 40 and the pier 40. do.

이러한 연속형 강상자형교는 통상, 측경간 보다 중앙경간이 1.3~1.7 정도 더 길게 형성되어짐으로써, 구조적으로 안정되고, 부반력이 발생되는 것을 방지하는 가운데 경제성이 높게 된다.Such continuous steel box girder bridges are generally formed with 1.3 to 1.7 longer lengths than the side spans, so that they are structurally stable and economical while preventing side reactions from occurring.

그러나 중앙경간이 1.7 이상이 되면 중앙부에 처짐이 커지고, 이로 인하여 진동이 커짐과 동시에 교대에 의하여 지지된 부분에서 부반력으로 인한 들뜸현상이 발생되어 교량 전체의 안전성이 낮아지는 문제점이 있었다. 즉, 중앙경간장이 길다는 것을 중앙부에 모멘트가 증가되고, 그 모멘트를 감당하기 위한 큰 단면이 필요해져 교량형고가 높아지고, 미관이 나빠지며 전반적인 경제성이 낮아지는 문제점이 있었다.However, when the center span is 1.7 or more, the deflection increases in the center part. As a result, the vibration increases and at the same time, the lifting phenomenon due to the negative reaction is generated at the part supported by the shift, thereby lowering the safety of the entire bridge. That is, the longer the center span, the greater the moment in the central part, the larger cross section is required to cover the moment, the higher the bridge-type height, the poor aesthetics and the overall economical problems.

또한, 교대와 교각 사이로 위치된 즉, 측경간에서 발생되는 정모멘트와 부모멘트에 의하여 강상자의 지점부위에 응력이 집중됨으로써, 국부적인 좌굴현상이 발생됨과 동시에 변형이 발생되는 문제점이 있었다.In addition, the stress is concentrated at the point of the steel box by the moment and the parent moment located between the alternating and pier, that is, the local buckling phenomenon and the deformation occurs at the same time.

그리고 진동과 처짐이 발생하여 사용자에게 심리적 불안감을 주며, 동시에 거동이 매우 복잡하여 제어하기에 어려움에 따라 안전성이 낮은 문제점이 있었다.In addition, vibration and deflection occur to give the user psychological anxiety, and at the same time, the behavior is very complicated, and there is a problem of low safety due to difficulty in controlling.

본 발명은 중앙경간에서 발생되는 처짐량을 줄일 수 있도록 하는 가운데 진동과 부반력으로 인한 들뜸현성을 줄여 교량의 안전성을 높일 수 있도록 하고, 이와 동시에 측경간에서 발생되는 정모멘트와 부모멘트에 의하여 지점부위에서 응력이 집중되는 것을 방지하여 국부적인 좌굴현상의 발생과 이로 인한 변형을 방지할 수 있도록 하고, 이를 통해 교량 형고가 낮아질 수 있도록 하여 사용자에게 심리적 편안함을 주는 가운데 주변과 조화를 이룰 수 있도록 한 것이다.The present invention is to reduce the amount of deflection generated in the center span to reduce the lifting phenomena due to vibration and buoyancy force to increase the safety of the bridge, and at the same time at the point by the moment and parent moment generated in the side span By preventing stress from being concentrated, it is possible to prevent the occurrence of local buckling phenomenon and its deformation, and through this, the height of the bridge can be lowered so that it can be harmonized with the surroundings while giving the user psychological comfort.

본 발명은 측경간 보다 중앙경간이 길게 배열된 교대(30)와 교각(40)의 상부에 연속된 강상자부(10)의 하부가 지지되게 설치되어지고, 상기 강상자부(10)의 상부에 바닥판(50)이 설치된 연속형 강상자형교의 설치구조에 있어서, 상기 강상자부(10)는 하부플랜지(11)의 상부 양측에 복부판(12)의 하부가 맞대어져 용접이음되어지고, 상기 복부판(12)의 상부에 상부플랜지(13)의 하부가 맞대어지게 용접이음되어 내부에 길이방향을 갖는 공간부(14)가 형성되어지고, 상기 상부플랜지(13)는 교대(30)와 교각(40) 및 교각(40)과 교각(40) 사이의 중간인 정모멘트가 최대치로 작용하는 부분에 메인개구부(131)가 형성되어지고, 상기 메인개구부(131)의 양측에 일정 간격으로 이격된 서브개구부(132)가 형성되어지고, 상기 강상자부(10)의 양측 내부에 무게를 갖는 부반력억제부(20)가 구비됨을 특징으로 한다.The present invention is installed so that the lower portion of the continuous steel box portion 10 is supported in the upper portion of the alternating 30 and the piers 40 arranged longer than the side span, the bottom plate on the upper portion of the steel box portion 10 In the installation structure of the continuous steel box girder bridge 50 is provided, the steel box portion 10 is the lower portion of the abdominal plate 12 against the upper sides of the lower flange 11 is welded joint, the abdominal plate 12 The upper portion of the upper flange 13 is welded so that the lower portion of the upper flange 13 is formed in the space portion 14 having a longitudinal direction therein, the upper flange 13 is alternate 30 and the pier 40 and piers The main opening 131 is formed at a portion at which the static moment, which is intermediate between the 40 and the piers 40, acts as the maximum value, and the sub openings 132 spaced at regular intervals on both sides of the main opening 131. Is formed, the secondary reaction force suppressing portion 20 having a weight on both sides of the steel box portion 10 And in that the provided features.

또한, 상기 부반력억제부(20)는 교대(30)와 교각(40)에 의하여 지지되는 강상자부(10) 내부로 충진재(C)가 충전되어 경화되어지되, 상기 강상자부(10) 내부에 스터드(S)가 구비되어 강결구조로 형성되어지고, 상기 부반력억제부(20)는 정모멘트가 부모멘트로 전환되어지는 변곡점까지의 길이(L)를 갖도록 구성됨을 특징으로 한다.In addition, the secondary reaction force suppressing unit 20 is filled with a filler (C) inside the steel box portion 10 supported by the alternating 30 and the pier 40 is hardened, the inside of the steel box portion 10 Stud (S) is provided is formed of a rigid structure, the negative reaction force suppressing unit 20 is characterized in that it is configured to have a length (L) to the inflection point is converted to the parent moment the positive moment.

또한, 상기 부반력억제부(20)는 교대(30)와 교각(40)에 의하여 지지되는 강상자부(10) 내부로 웨이트강상자(21)가 삽입되어지고, 상기 강상자부(10) 내부와 웨이트강상자(21)의 외부 사이로 제공되는 제1충진공간부(22)에 충전재(C)가 충진 및 경화되어지되, 상기 웨이트강상자(21)는 정모멘트가 부모멘트로 전환되어지는 변곡점까지의 길이(L)을 갖도록 구성됨을 특징으로 한다.In addition, the secondary reaction force suppressing unit 20 is the weight of the steel box 21 is inserted into the steel box portion 10 is supported by the alternating 30 and the piers 40, and the inside of the steel box portion 10 The filling material C is filled and cured in the first filling space 22 provided between the outside of the weight steel box 21, and the weight steel box 21 is an inflection point at which the positive moment is converted into a parent moment. Characterized in that configured to have a length (L) of.

또한, 상기 부반력억제부(20)는 교대(30)와 교각(40)에 의하여 지지되는 강상자부(10) 내부로 충진재(C)가 충전되어 경화되어지고, 상기 강상자부(10) 내부에 스터드(S)가 구비되어 강결구조로 형성되어지고, 상기 부반력억제부(20)의 내측에 중공웨이트(23)가 결합되어지되, 상기 중공웨이트(23)는 변곡점에서 부모멘트가 작용하는 교각(40)을 지나 다른 변곡점까지 연장되어지고, 상기 중공웨이트(23)는 강상자부(10) 내부로 중공웨이트강상자(231)가 삽입되어지고, 상기 강상자부(10) 내부와 중공웨이트강상자(231)의 외부 사이로 제공되는 제2충진공간부(232)에 충전재(C)가 충진 및 경화되어짐을 특징으로 한다.In addition, the secondary reaction force suppressing unit 20 is filled with the filler (C) inside the steel box portion 10 supported by the alternating 30 and the piers 40 is cured, the inside of the steel box portion 10 Stud (S) is provided is formed of a rigid structure, the hollow weight 23 is coupled to the inner side of the negative reaction force suppressing portion 20, the hollow weight 23 is the piers that the parent moment acts at the inflection point 40 extends to another inflection point, the hollow weight 23 is a hollow weight steel box 231 is inserted into the steel box portion 10, the hollow box steel box and the hollow weight steel box Filler C is filled and cured in the second filling space portion 232 provided between the outside of the (231).

그리고 상기 부반력억제부(20)는 강상자부(10)의 양단부에 피씨에스박스(25)의 일측이 각각 맞대어지게 결합되어지고, 상기 피씨에스박스(25)의 타측이 교대(30)에 의하여 지지됨을 특징으로 한다.In addition, the side reaction force suppressing unit 20 is coupled to one end of each of the PC box 25 to the opposite ends of the steel box portion 10, the other side of the PC box 25 by the alternating (30) It is characterized by being supported.

본 발명은 부반력이 발생되는 부분에 부반력억제부가 설치되어 기초부의 상부로 돌출된 각각의 지지부 상단에 안착되어지도록 함으로써, 중앙경간에서 발생되는 처짐량을 줄일 수 있도록 하는 가운데 진동 및 부반력으로 인한 들뜸현성을 줄여 교량의 안전성을 높일 수 있는 효과를 얻을 수 있다.According to the present invention, a negative reaction force suppressing part is installed at a portion where the negative reaction force is generated, so that it is seated on the upper end of each supporting part protruding to the upper part of the foundation part, thereby reducing the amount of deflection generated in the center span. It is possible to obtain an effect that can increase the safety of the bridge by reducing the lift.

또한, 측경간에서 발생되는 정모멘트와 부모멘트에 의하여 지점부위에서 응력이 집중되는 것을 방지할 수 있도록 함으로써, 국부적인 좌굴현상의 발생과 이로 인한 변형을 방지할 수 있는 효과를 더 얻을 수 있다.In addition, it is possible to prevent the stress from being concentrated at the point by the constant moment and the parent moment generated in the side span, it is possible to further obtain the effect of preventing the occurrence of local buckling phenomenon and the resulting deformation.

그리고 이를 통해 교량의 형고가 낮아질 수 있도록 함으로써, 사용자에게 심리적 편안함을 주는 가운데 주변과 조화를 이룰 수 있는 효과를 더 얻을 수 있다.And through this, the height of the bridge can be lowered, thereby providing more psychological comfort to the user and achieving harmony with the surroundings.

도1은 종래 기술에 따른 연속형 강상자형교 설치에 따른 변위와 모멘트를 도시한 예시도.
도2는 본 발명에 따른 연속형 강상자형교 설치에 따른 변위와 모멘트를 도시한 예시도.
도3은 본 발명에 따른 연속형 강상자형교를 도시한 사시도.
도4는 본 발명에 따른 연속형 강상자형교를 도시한 분해 사시도.
도5는 도3의 A-A선 확대 단면도.
도6은 도3의 B-B선 확대 단면도.
도7은 본 발명에 따른 연속형 강상자형교의 다른 설치의 변위와 모멘트를 도시한 예시도.
도8은 본 발명에 따른 연속형 강상자형교의 다른 실시예를 도시한 분해 사시도.
도9은 도8의 C-C선 확대 단면도.
도10은 본 발명에 따른 연속형 강상자형교의 또 다른 실시예를 도시한 분해 사시도.
도11은 도10의 D-D선 확대 단면도.
Figure 1 is an illustration showing the displacement and moment according to the installation of a continuous steel box girder bridge according to the prior art.
Figure 2 is an exemplary view showing the displacement and moment according to the installation of the continuous steel box girder bridge according to the present invention.
Figure 3 is a perspective view showing a continuous steel box girder bridge according to the present invention.
Figure 4 is an exploded perspective view showing a continuous steel box girder bridge according to the present invention.
5 is an enlarged sectional view taken along the line AA of FIG.
6 is an enlarged sectional view taken along line BB of FIG.
Figure 7 is an illustration showing the displacement and moment of the other installation of the continuous steel box girder bridge according to the present invention.
8 is an exploded perspective view showing another embodiment of the continuous steel box girder bridge according to the present invention.
9 is an enlarged sectional view taken along line CC of FIG. 8;
10 is an exploded perspective view showing another embodiment of the continuous steel box girder bridge according to the present invention.
FIG. 11 is an enlarged sectional view taken along the line DD of FIG. 10; FIG.

본 발명의 실시예를 첨부 도면을 참조하여 설명하면 다음과 같다.An embodiment of the present invention will be described with reference to the accompanying drawings.

본 발명에 따른 연속형 강상자형교의 구조는 도2 내지 도6에 도시된 바와 같이, 강상자부(10), 부반력억제부(20), 교대(30), 교각(40) 및 바닥판(50)으로 구성되진 것으로 측경간 보다 중앙경간이 길게 배열된 상기 교대(30)와 교각(40)의 상부에 연속된 형태를 갖는 강상자부(10)의 하부가 지지되게 설치되어지고, 상기 강상자부(10)의 상부에 바닥판(50)이 설치되어지게 구성되어 있다As shown in Figures 2 to 6, the structure of the continuous steel box girder bridge according to the present invention, the steel box portion 10, the negative reaction force suppressing portion 20, the alternating 30, the pier 40 and the bottom plate 50 The lower portion of the steel box portion 10 having a continuous shape is installed on the upper portion of the alternating portion 30 and the pier 40 arranged longer than the side span, and the steel box portion 10 Bottom plate 50 is configured to be installed on the top of

여기에서, 상기 강상자부(10)는 소정 두께를 가지면서 길이 방향을 따라 길게 절단된 강판이 결합되어진 것으로 하부플랜지(11)의 양측에 동일한 길이를 갖는 복부판(12)의 하부가 수직되게 맞대어진 상태에서 용접이음으로 결합되어지고, 상기 복부판(12)의 상부에 상부플랜지(13)의 하부가 맞대어져 용접이음으로 결합되어짐으로써, 내부에 길이 방향을 갖는 공간부(14)가 일체로 제공되어지게 구성되어 있다.Here, the steel box portion 10 is a steel plate cut along the length direction while having a predetermined thickness is coupled to the lower portion of the abdominal plate 12 having the same length on both sides of the lower flange 11 vertically butted In the state is coupled to the welded joint, the lower portion of the upper flange 13 to the upper portion of the abdominal plate 12 is joined to the welded joint, the space portion 14 having a longitudinal direction therein is provided integrally It is composed of fork.

또한, 상기 상부플랜지(13)는 교대(30)와 교각(40) 및 교각(40)과 교각(40) 사이의 중간인 정모멘트가 최대치로 작용하는 부분에 메인개구부(131)가 형성되어지고, 상기 메인개구부(131)의 양측에 일정 간격으로 이격된 서브개구부(132)가 형성되어 강재의 사용량을 줄여 상부구조의 중량을 경감할 수 있게 구성되어 있다.In addition, the upper flange 13 has a main opening portion 131 is formed in the portion where the alternating 30 and the pier 40 and the constant moment between the pier 40 and the pier 40 to the maximum value to act The sub-openings 132 spaced apart at regular intervals are formed on both sides of the main opening 131 to reduce the amount of steel used to reduce the weight of the superstructure.

상기 상부플랜지(13)에 형성된 메인개구부(131)는 서부개구부(132)의 면적 보다 크게 형성되어지도록 하는 것이 바람직하다. 이는 측경간 및 중앙경간에 작용하게 되는 정모멘트에 의하여 상부플랜지(13)에 압축응력만이 작용하게 됨에 따라 강재 사용량을 줄여도 강도가 낮아지는 것을 찾아 볼 수 없다. 즉, 강성저하방지와 형상관리가 용이하게 이루어질 수 있게 구성되어 있다.The main opening 131 formed in the upper flange 13 is preferably larger than the area of the western opening 132. This is because only the compressive stress acts on the upper flange 13 by the positive moment acting on the side span and the center span can not be found that the strength is reduced even if the amount of steel used. In other words, it is configured to facilitate the reduction of rigidity and shape management.

그리고 상기 강상자부(10)의 양측 내부에는 들뜸현상에 의한 부반력이 발생되도록 하는 기능을 갖는 상기 부반력억제부(20)가 구비되어지게 구성되어 있다. 이러한 부반력억제부(20)는 소정 무게를 갖도록 하는 것으로 교대(30)와 교각(40)에 의하여 지지되는 강상자부(10) 내부로 충진재(C)가 충전되어진 상태에서 경화되어지게 구성되어 있다. 이때, 상기 강상자부(10) 내부에는 다수개의 스터드(S)가 구비되어 충전재(C)와 강결구조가 형성되어지도록 구성되고, 상기 부반력억제부(20)의 길이는 정모멘트가 부모멘트로 전환되어지는 변곡점까지의 길이(L)를 갖도록 구성되어 있다.And both sides of the steel box portion 10 is configured to be provided with the negative reaction force suppressing portion 20 having a function to generate a negative reaction force due to the lifting phenomenon. The negative reaction force suppressing part 20 is configured to have a predetermined weight and to be cured in a state in which the filler C is filled into the steel box part 10 supported by the shift 30 and the pier 40. . In this case, a plurality of studs (S) are provided in the steel box part 10 so that the filler C and the steel grain structure are formed. The length of the negative reaction force suppressing part 20 is a positive moment as a parent moment. It is comprised so that it may have length L to the inflection point to be switched.

상기 교대(30)와 교각(40)은 강상자부(10) 및 강상자부(10)의 상부로 설치되어지는 바닥판(50)의 하중을 분산시켜 안정되게 지지되도록 하는 기능을 갖는 것으로 기초부(31)(41)의 상부로 지지부(32)(42)가 돌출되게 형성되어지고, 상기 지지부(32)(42)의 상부에 수평방향을 갖는 안착부(33)(43)가 일체로 형성되어지게 구성되어 있다.The shift 30 and the pier 40 have a function of dispersing loads of the steel box 10 and the bottom plate 50 installed above the steel box 10 so as to be stably supported. 31 and 41, the support parts 32 and 42 are formed to protrude, and the seating parts 33 and 43 having a horizontal direction are integrally formed on the support parts 32 and 42. It is composed of fork.

이러한 교대(30)와 교각(40)은 연속형 교량을 지지하기 위해서는 교대(30)와 교각(40)의 간격인 측경간에 비해서 교각(40)과 교각(40) 사이인 중앙경간의 길이가 더 넓게 구비되어 있다.In order to support the continuous bridge, the shift 30 and the pier 40 have a longer length of the center span between the pier 40 and the pier 40 than the side span, which is an interval between the alternate 30 and the pier 40. It is widely equipped.

상기 바닥판(50)은 교대(30)와 교각(40)에 받쳐지게 구비된 강상자부(10)의 상부에 콘크리트가 타설되게 설치되는 것으로 상기 상부플랜지(13)의 상부에 구비된 미도시한 다수개의 스터드에 철근이 배근되어진 상태에서 시공되어지게 구성되어 있다.The bottom plate 50 is to be installed on the upper portion of the steel box portion 10 provided to support the alternating 30 and the pier 40 is not shown provided in the upper portion of the upper flange 13 It is constructed to be constructed in the state where reinforcing bars are arranged in a plurality of studs.

본 발명에서 강상자부(10)의 양측 내부에 구비된 부반력억제부(20)가 정모멘트가 부모멘트로 전환되어지는 변곡점까지의 길이(L)를 갖도록 하였으나, 도7 및 도8에 도시된 바와 같이, 이러한 형태 이외에 교대(30)에 의하여 지지된 강상자부(10)의 양끝에 소정 길이로 더 인출 또는 연장된 형태를 취하도록 할 수 있다. 이러한 경우, 교대(30)에 의하여 지지된 부분은 중공형태를 갖도록 하는 가운데 교대(30)에 의하여 지지된 부분으로부터 외측으로 연장된 부분에만 하중이 작용되어지도록 하는 것이 바람직하다. 이때 연장된 부분의 내부에는 충전재(C)가 모두 충전되어지거나 중공형태를 갖는 별도의 강상자(21)가 삽입되어진 상태에서 연장된 부분의 내부와 강상자(21)의 외부 사이에 충전재(C)가 충전되어지도록 하는 것이 바람직하고, 이때 충전되어지는 부분의 내,외부로 접하는 각각의 접촉면 또는 충전면에는 다수개의 스터드가 미리 결합되어지도록 함으로써, 충진재인 콘크리트와 강재 또는 강재와 충진재인 콘크리트와의 복합적인 구조로 합리적이고 경제적인 교량을 가설할 수있게 된다.In the present invention, the sub-reaction force suppressing unit 20 provided on both sides of the steel box portion 10 has a length L to the inflection point at which the positive moment is converted into the parent moment, but is shown in FIGS. 7 and 8. As such, in addition to this form, both ends of the steel box portion 10 supported by the shift 30 may be further drawn or extended to a predetermined length. In this case, the portion supported by the alternating 30 preferably has a hollow shape so that the load is applied only to the portion extending outward from the portion supported by the alternating 30. At this time, the filling material (C) is all filled in the inside of the extended portion or the separate (box) having a hollow shape is inserted between the inside of the extended portion and the outside of the steel box 21 in the state is inserted ) Is preferably filled, and a plurality of studs are pre-coupled to each contact surface or filling surface in contact with the inside and the outside of the portion to be filled, so that the concrete and the steel or the steel and the filler and the concrete It is possible to construct rational and economic bridges through the complex structure of.

한편, 본 발명에서는 강상자부(10)가 하나인 일렬의 형태를 갖는 구조를 설명하였으나, 이러한 일렬 이외에 이렬 또는 그 이상에 복층렬이 구비되어지도록 할 수 있다. 이러한 경우, 각각의 강상자부(10) 사이에는 가로보(70)가 적정 간격으로 결합되어지도록 하는 것이 바람직하다.On the other hand, in the present invention has been described a structure having a form of a single row of the steel box unit 10, in addition to such a line may be provided with a double layer or more than two rows. In this case, it is preferable that the cross beams 70 are coupled at appropriate intervals between the respective steel box portions 10.

이와 같은 연속형 강상자형교의 설치는 먼저, 교대(30) 또는 교각(40)의 기초부(31)(41)가 매립되어진 상태에서 그 상부로 소정 높이를 갖는 지지부(32)(42)가 돌출되어지도록 한 후 강상자부(10)의 하부가 지지부(32)(42)의 상부에 구비된 안착부(33)(43)에 안착된 상태로 지지되어지도록 한다.In the installation of the continuous steel box girder bridge, first, the support portions 32 and 42 having a predetermined height protrude in the state where the foundation portions 31 and 41 of the alternation 30 or the pier 40 are embedded. After the lower portion of the steel box 10 is to be supported in a state seated on the seating portion (33) (43) provided on the upper portion of the support (32) (42).

다음, 교대(30)와 교각(40) 및 교각(40)과 교각(40) 사이로 위치된 상부플랜지(13)에 메인개구부(131)와 서부개구부(132)가 관통된 형태를 갖게 형성되어지도록 한다.Next, the main opening 131 and the western opening 132 are formed to have a shape in which the shift 30 and the pier 40 and the upper flange 13 positioned between the pier 40 and the pier 40 are penetrated. do.

다음, 교대(30)와 교각(40)에 의하여 받쳐진 강상자부(10)의 끝단 부분의 내측으로 즉, 정모멘트가 부모멘트로 전환되어지는 변곡점까지의 길이(L)를 갖는 곳까지 충전재(C)가 충전 경화되어지도록 한다.Next, to the inside of the end portion of the steel box portion 10 supported by the alternating 30 and the pier 40, that is, to a place having a length L to the inflection point at which the static moment is converted into the parent moment ( Allow C) to harden by charge.

다음, 충전재(C)가 충전 경화되어진 상태에서 강상자부(10)를 구성하는 상부플랜지(13)의 상부에 미도시한 철근이 배근되어진 상태에서 콘크리트를 타설하여 바닥판(50)이 설치되어지도록 하는 것으로 연속형 강상자형교가 시공되어지게 된다.Next, the bottom plate 50 is installed by placing concrete in a state where reinforcing bars are not placed on the upper flange 13 constituting the steel box part 10 while the filler C is filled and cured. The continuous steel box bridge will be constructed.

이와 같은 과정을 통해 시공된 연속형 강상자형교는 도2에 도시된 바와 같이, 종래 기술에 비하여 교대(30)와 교각(40)에 의하여 지지되는 지점(A1)(P1) (P2)(A2)에서 발생되는 변위량은 모멘트도에서 도시된 바와 같이 중앙경간에서는 정모멘트가 감소하게 되는 가운데 측경간에서는 부모멘트가 감소하고, 동시에 정모멘트가 발생됨에 따라 중앙경간에서 처점의 변위량이 감소하게 되고, 측경간에서는 하부로 누르는 형태를 갖는 처짐이 발생하게 된다.As shown in FIG. 2, the continuous steel box girder bridge constructed through such a process is a point A1 (P1) (P2) (A2) supported by the shift 30 and the pier 40 as compared to the conventional art. As shown in the moment diagram, the amount of displacement generated in the) decreases the positive moment in the center span, while the parent moment decreases in the side span, and at the same time, the displacement amount of the puncture point in the center span decreases as the static moment is generated. In the sag of the pressing down form occurs.

본 발명에서는 교대(30)로부터 교각(40) 사이인 측경간으로 위치된 강상자부(10)의 단부 내측에 단순한 형태를 갖도록 충진재(C)가 충전 및 경화되어지도록 하였으나, 이러한 형태 이외에 도7 내지 도9에 도시된 바와 같이, 상기 부반력억제부(20)는 교대(30)와 교각(40)에 의하여 지지되는 강상자부(10) 내부로 웨이트강상자(21)가 삽입되어지도록 하고, 상기 강상자부(10) 내부와 웨이트강상자(21)의 외부 사이로 제공되는 제1충진공간부(22)에 충전재(C)가 충진 및 경화되어지도록 할 수 있다. 이러한 경우, 상기 웨이트강상자(21)는 정모멘트가 부모멘트로 전환되어지는 변곡점까지의 길이(L)을 갖도록 하는 것이 바람직하다.In the present invention, the filler (C) is to be filled and cured so as to have a simple shape inside the end of the steel box portion 10 located in the side span between the alternating 30 to the piers 40, in addition to these forms Figure 7 to Figure As illustrated in FIG. 9, the sub-reaction force suppressing unit 20 allows the weight steel box 21 to be inserted into the steel box unit 10 supported by the shift 30 and the pier 40, and the steel plate The filler C may be filled and cured in the first filling space 22 provided between the inside of the magnetic part 10 and the outside of the weight steel box 21. In this case, it is preferable that the weight steel box 21 has a length L up to the inflection point at which the static moment is converted into the parent moment.

이러한 경우, 도7에 도시된 변위도와 모멘트도에 도시된 바와 같이, 교대(30)와 교각(40)에 의하여 지지되는 지점(A1)(P1)(P2)(A2)에서 발생되는 변위량은 중앙경간의 중앙과 지점(P1)(P2) 사이의 내측으로 정모멘트가 크게 감소하게 되는 가운데 중앙경간의 양측의 지점(P1)(P2)에서 부모멘트가 증가하게 되며, 측경간의 지점인(A1)(P1),(A2)(P2)에서는 정모멘트와 부모멘트가 발생하게 됨으로써, 부반력으로 인한 들뜸현상을 방지할 수 있게 된다.In this case, as shown in the displacement diagram and the moment diagram shown in FIG. 7, the displacement amount generated at the points A1, P1, P2 and A2 supported by the alternating 30 and the pier 40 is centered. In the middle between the center of the span and the points P1 and P2, the moment of the static moment decreases significantly, and the parent moment increases at the points P1 and P2 on both sides of the center span. In (P1) and (A2) and (P2), since the positive moment and the parent moment are generated, it is possible to prevent the lifting phenomenon due to the negative reaction force.

한편, 본 발명에서는 교대(30)로부터 교각(40) 사이인 측경간으로 위치된 강상자부(10)의 단부 내측에 단순한 형태를 갖도록 충진재(C)가 충전 및 경화되어지도록 하였으나, 이러한 형태 이외에 도10 내지 도11에 도시된 바와 같이, 상기 부반력억제부(20)는 강상자부(10)의 양단부에 피씨에스박스(25)의 일측이 각각 맞대어지게 결합되어지고, 상기 피씨에스박스(25)의 타측이 교대(30)에 의하여 지지되어지도록 구성되어 있다. 이때, 피씨에스박스(25)와 교대(30) 사이에는 별도의 인서트 조인트 등에 의하여 결합되어지도록 하는 것이 바람직하다. 이러한 인서트는 피씨에스박스(25)에 소정 깊이로 타공되어진 상태에서 매립되는 앵커볼트 등을 이용할 수 있고, 타공이 필요치 않은 상태 즉, 피씨에스박스(25)가 시공되어지는 과정에서 기초볼트의 헤드가 그 내부에 매립되어지는 형태를 갖도록 하는 것이 바람직하다.On the other hand, in the present invention, the filler (C) is to be filled and cured so as to have a simple form inside the end of the steel box portion 10 located in the side span between the alternating 30 to the piers 40, in addition to this form Figure 10 As shown in FIG. 11, the side reaction force suppressing unit 20 is coupled to one end of each of the PC box 25 to each end of the steel box part 10, and the side of the PC box 25. The other side is comprised so that it may be supported by the alternate 30. At this time, it is preferable to be coupled between the PC box 25 and the shift 30 by a separate insert joint or the like. Such inserts may use anchor bolts embedded in the PC box 25 at a predetermined depth, and do not require drilling, that is, the head of the foundation bolt in the process of constructing the PC box 25. It is desirable to have a form in which is embedded therein.

10:강상자부 11:하부플랜지
12:복부판 13:상부플랜지
14:공간부 20:부반력억제부
30:교대 40:교각
50:바닥판 131:메인개구부
132:서브개구부
10: Strong box part 11: Lower flange
12: abdomen 13: upper flange
14: space part 20: buoyancy suppression unit
30: Shift 40: Pier
50: bottom plate 131: main opening
132: sub-opening

Claims (5)

측경간 보다 중앙경간이 길게 배열된 교대(30)와 교각(40)의 상부에 연속된 강상자부(10)의 하부가 지지되게 설치되어지고, 상기 강상자부(10)의 상부에 바닥판(50)이 설치된 연속형 강상자형교의 설치구조에 있어서,
상기 강상자부(10)는 하부플랜지(11)의 상부 양측에 복부판(12)의 하부가 맞대어져 용접이음되어지고, 상기 복부판(12)의 상부에 상부플랜지(13)의 하부가 맞대어지게 용접이음되어 내부에 길이방향을 갖는 공간부(14)가 형성되어지고, 상기 상부플랜지(13)는 교대(30)와 교각(40) 및 교각(40)과 교각(40) 사이의 중간인 정모멘트가 최대치로 작용하는 부분에 메인개구부(131)가 형성되어지고, 상기 메인개구부(131)의 양측에 일정 간격으로 이격된 서브개구부(132)가 형성되어지고, 상기 강상자부(10)의 양측 내부에 무게를 갖는 부반력억제부(20)가 구비됨을 특징으로 하는 연속형 강상자형교의 설치구조.
The lower portion of the continuous steel box portion 10 is installed to be supported at the upper portion of the alternating 30 and the bridge 40 arranged longer than the side span, and the bottom plate 50 on the upper portion of the steel box portion 10. In the installation structure of the installed continuous steel box bridge,
The steel box part 10 is welded by welding the lower part of the abdominal plate 12 to the upper both sides of the lower flange 11, the lower part of the upper flange 13 to the upper part of the abdominal plate 12 is welded And a space portion 14 having a longitudinal direction therein is formed, and the upper flange 13 has an alternating moment 30 between the alternating 30 and the piers 40 and between the piers 40 and the piers 40. The main opening portion 131 is formed at a portion serving as a maximum value, and sub-opening portions 132 spaced at regular intervals are formed on both sides of the main opening portion 131, and inside both sides of the steel box portion 10. The installation structure of the continuous steel box girder bridge, characterized in that provided with a negative force suppressing portion 20 having a weight.
제1항에 있어서,
상기 부반력억제부(20)는 교대(30)와 교각(40)에 의하여 지지되는 강상자부(10) 내부로 충진재(C)가 충전되어 경화되어지되, 상기 강상자부(10) 내부에 스터드(S)가 구비되어 강결구조로 형성되어지고, 상기 부반력억제부(20)는 정모멘트가 부모멘트로 전환되어지는 변곡점까지의 길이(L)를 갖도록 구성됨을 특징으로 하는 연속형 강상자형교의 설치구조.
The method of claim 1,
The secondary reaction force suppressing unit 20 is filled with a filler (C) inside the steel box portion 10 supported by the alternating 30 and the piers 40 is hardened, but the studs inside the steel box portion 10 ( S) is provided is formed of a steel structure, the secondary reaction force suppressing unit 20 is installed of the continuous steel box-shaped bridge, characterized in that it is configured to have a length (L) to the inflection point at which the constant moment is converted to the parent moment rescue.
상기 제1항에 있어서,
상기 부반력억제부(20)는 교대(30)와 교각(40)에 의하여 지지되는 강상자부(10) 내부로 웨이트강상자(21)가 삽입되어지고, 상기 강상자부(10) 내부와 웨이트강상자(21)의 외부 사이로 제공되는 제1충진공간부(22)에 충전재(C)가 충진 및 경화되어지되, 상기 웨이트강상자(21)는 정모멘트가 부모멘트로 전환되어지는 변곡점까지의 길이(L)을 갖도록 구성됨을 특징으로 하는 연속형 강상자형교의 설치구조.
The method of claim 1,
The secondary reaction force suppressing unit 20 is a weight steel box 21 is inserted into the steel box portion 10 supported by the alternating 30 and the piers 40, the inside of the steel box portion 10 and the weight steel The filling material C is filled and cured in the first filling space 22 provided between the outside of the box 21, and the weight steel box 21 has a length to an inflection point at which the positive moment is converted into a parent moment. Installation structure of the continuous steel box girder bridge characterized in that it is configured to have (L).
제1항에 있어서,
상기 부반력억제부(20)는 교대(30)와 교각(40)에 의하여 지지되는 강상자부(10) 내부로 충진재(C)가 충전되어 경화되어지고, 상기 강상자부(10) 내부에 스터드(S)가 구비되어 강결구조로 형성되어지고, 상기 부반력억제부(20)의 내측에 중공웨이트(23)가 결합되어지되, 상기 중공웨이트(23)는 변곡점에서 부모멘트가 작용하는 교각(40)을 지나 다른 변곡점까지 연장되어지고, 상기 중공웨이트(23)는 강상자부(10) 내부로 중공웨이트강상자(231)가 삽입되어지고, 상기 강상자부(10) 내부와 중공웨이트강상자(231)의 외부 사이로 제공되는 제2충진공간부(232)에 충전재(C)가 충진 및 경화되어짐을 특징으로 하는 연속형 강상자형교의 설치구조.
The method of claim 1,
The secondary reaction force suppressing unit 20 is filled with the filler (C) inside the steel box portion 10 supported by the alternating 30 and the piers 40 is cured, the stud () inside the steel box portion (10) S) is provided to be formed in a rigid structure, the hollow weight 23 is coupled to the inner side of the negative reaction force suppressing portion 20, the hollow weight 23 is a piers 40 in which the parent moment acts at the inflection point ) And extends to another inflection point, the hollow weight 23 is a hollow weight steel box 231 is inserted into the steel box portion 10, and the hollow weight steel box 231 inside the steel box portion 10 The structure of the continuous steel box girder bridge, characterized in that the filler (C) is filled and cured in the second filling space portion 232 provided between the outside.
제1항에 있어서,
상기 부반력억제부(20)는 강상자부(10)의 양단부에 피씨에스박스(25)의 일측이 각각 맞대어지게 결합되어지고, 상기 피씨에스박스(25)의 타측이 교대(30)에 의하여 지지됨을 특징으로 하는 연속형 강상자형교의 설치구조.
The method of claim 1,
The side reaction force suppressing unit 20 is coupled to each side of the PC box 25 to each end of the strong box portion 10, the other side of the PC box 25 is supported by the shift (30) Installation structure of the continuous steel box girder bridge characterized in that.
KR1020100139512A 2010-12-30 2010-12-30 Installation structure of continuance type steel box girderbridges KR20120077529A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100139512A KR20120077529A (en) 2010-12-30 2010-12-30 Installation structure of continuance type steel box girderbridges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100139512A KR20120077529A (en) 2010-12-30 2010-12-30 Installation structure of continuance type steel box girderbridges

Publications (1)

Publication Number Publication Date
KR20120077529A true KR20120077529A (en) 2012-07-10

Family

ID=46710993

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100139512A KR20120077529A (en) 2010-12-30 2010-12-30 Installation structure of continuance type steel box girderbridges

Country Status (1)

Country Link
KR (1) KR20120077529A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180058971A (en) * 2016-11-25 2018-06-04 정제평 Concrete steel box girder with arch web double plate and its construction method
CN109930749A (en) * 2017-12-19 2019-06-25 南宁学院 A kind of skeleton structure of beam

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180058971A (en) * 2016-11-25 2018-06-04 정제평 Concrete steel box girder with arch web double plate and its construction method
CN109930749A (en) * 2017-12-19 2019-06-25 南宁学院 A kind of skeleton structure of beam

Similar Documents

Publication Publication Date Title
KR101310039B1 (en) Corrugated steel web box girder bridge, and continuous support structure thereof
KR101954727B1 (en) Steel plate girder through bridge for noise reduction and the construction method thereof
JP2015200158A (en) Steel concrete composite structure of using sandwich type composite pile cap
KR101263370B1 (en) Precast end-block with girder connection member and bridge construction method using ths same
JP2008261137A (en) Rigid-frame bridge structure
KR101255027B1 (en) Precast rahmen type box culvert
JP4897643B2 (en) Reinforced concrete composite steel slab girder bridge
KR20170131604A (en) Rigid connection structure for bottom end of pillar and concrete pile
JP4765965B2 (en) Revetment integrated ramen bridge and its construction method
KR20120077529A (en) Installation structure of continuance type steel box girderbridges
KR101031180B1 (en) Infilled type steel box bridge holder
JP4585614B1 (en) Method for constructing synthetic steel slab bridge, ribbed steel slab, and synthetic steel slab bridge
CN208899347U (en) A kind of box bracket suitable for Sarasota overarm brace
KR101034337B1 (en) Steel box bridge of hardness radation
JP5157433B2 (en) Composite hollow structure of bridge column head or girder end
CN211368652U (en) Pile platform structure based on thick riprap foundation
KR100995832B1 (en) A slit debris barrier
KR101045656B1 (en) Steel box bridge which rahmen type hardness is gradation
JP2017057701A (en) Concrete wall structure for reinforcing fill-integrated bridge, and construction method
JP2012241337A (en) Reinforcement structure of aquatic structure and construction method
CN109440629A (en) Assembled steel web plate composite box joist steel web and precast slab connecting structure
KR20080004752U (en) Composite bridge
KR100588446B1 (en) continuity bridge conversion structure of bridge and construction method thereof
KR100656428B1 (en) A precast railing
KR20060115699A (en) Construction Method of Composite Slab Bridge Using Composite Truss Girder

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application