KR20110124431A - The fence building method which uses and the establishment structure - Google Patents

The fence building method which uses and the establishment structure Download PDF

Info

Publication number
KR20110124431A
KR20110124431A KR1020100043789A KR20100043789A KR20110124431A KR 20110124431 A KR20110124431 A KR 20110124431A KR 1020100043789 A KR1020100043789 A KR 1020100043789A KR 20100043789 A KR20100043789 A KR 20100043789A KR 20110124431 A KR20110124431 A KR 20110124431A
Authority
KR
South Korea
Prior art keywords
retaining wall
layer
vegetation
tonic
greening
Prior art date
Application number
KR1020100043789A
Other languages
Korean (ko)
Inventor
김진태
Original Assignee
김진태
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김진태 filed Critical 김진태
Priority to KR1020100043789A priority Critical patent/KR20110124431A/en
Publication of KR20110124431A publication Critical patent/KR20110124431A/en

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G25/00Watering gardens, fields, sports grounds or the like
    • A01G25/02Watering arrangements located above the soil which make use of perforated pipe-lines or pipe-lines with dispensing fittings, e.g. for drip irrigation
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • A01G9/022Pots for vertical horticulture
    • A01G9/025Containers and elements for greening walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • E02D29/0233Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0291Retaining or protecting walls characterised by constructional features made up of filled, bag-like elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/046Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/02Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements

Abstract

The present invention is a greening method and the greening retaining wall is installed on the slope of the road to improve the road environment by making the retaining wall by recording the vegetation ton on the outside of the retaining wall is installed to prevent the collapse of the slope Regarding,
As it is possible to complete the retaining wall with the necessary materials to complete the work quickly, mainly used soil and sand can be easily used around the site, the vegetation ton 100 and greenery forming the retaining wall 300, the first step (S10) having a fixing means 500 and seeds;
In the step of forming the base layer (10), the range to build the retaining wall is determined, and then the ground which is the foundation of the retaining wall is firmly compacted using equipment such as compaction rollers, vibration compacts, and rammers (not shown). Forming a second step (S20);
As the soil and sand is filled in the sack provided by the first step (S10), through the open opening 110 of the sack of ordinary weight (not shown), that is, of the weight set by the quantitative filling device It detects the signal and operates the on / off valve installed in the filling hopper by this signal to automatically control the discharge of soil, fills the soil with the quantity of soil and seals the upper part and puts it in the standard molding machine (not shown). A third step (S30) of forming a plurality of vegetative tonic 100 having excellent strength by molding into a rectangular parallelepiped shape having a predetermined height by applying vibration and pressure;
To form a first layer by installing a plurality of vegetation tonic 100 in the longitudinal direction on the base layer, the end is hitting at least two to four fixing means 500 at regular intervals on the vegetation tonic 100 As well as penetrating the vegetation ton 100 and digging to a predetermined depth of the foundation layer to fix the vegetation ton firmly, and to secure the end by alternatively anchoring bolts, earth anchors, small rails or similar fixing structure to the retaining wall fixing means ( A fourth step S40 of allowing one end of the 500 to penetrate through the anchor bolt B to prevent the vegetation tonic 100 from collapsing;
Forming the second layer 30 on the first layer formed by the fourth step (S40), the vegetation tonic 100 forming the first layer is different vegetation tonic (100) on the upper side of the portion interlocking with each other (100) 2) to 4 to 4 to the top of each vegetation ton 100 forming the second layer after forming a second row by stacking the central portion of the) to be arranged in a staggered manner. Hitting the dog to penetrate the vegetation tonic 100 of the second layer and at the same time the end of the fixing means 500 to the middle point of the vegetation tonic 100 located on the first layer to penetrate the first layer and the second Connect and fix the vegetation ton of the layer integrally, and install a sprinkler or water supply device 700 between the layers to be laminated to supply water to the recording paper 300 to maintain the recording of the recorded retaining wall A fifth step (S50);
A sixth step (S60) of constructing a plurality of vegetation tonics 100 to a desired height by repeatedly performing the process of the fifth step (S50) on the second layer formed by the fifth step (S50);
By planting the greening retaining wall 40 by installing the greening paper 300 so as to green the surface of the stacked retaining wall, the greening paper 300 is put on the surface of the stacked vegetation tonic 100 and the vegetative tonal 100 A seventh step S70 of fixing using the fixing means 500 in such a manner as to fix the fixing means 500;
As the greening layer 50 is formed on the retaining wall, the fine soil and the seed and plant extract of the plant to be planted on the green paper 300 fixed to the vegetation tonic 100 stacked by the seventh step (S70). Moisturizer, fiber (Fiber), colorant in a certain proportion of the mixture was stirred by using a pumping equipment provided separately on the surface of the retaining wall, the green paper 300 is installed in a predetermined thickness by pouring a retaining wall over time An eighth step (S80) to record the surface of the film;
Planting on the retaining wall is installed on the slope, comprising a ninth step (S90) to increase the greening by planting the greening layer 60 of the retaining wall by planting hwahye, joiner on the top of the retaining wall

Description

Greening method and greening wall structure of hard retaining wall using vegetation ton and fixed structure {the fence building method which uses and the establishment structure}

The present invention relates to the greening method and the greening retaining wall structure of the hard retaining wall (incision rock, concrete retaining wall, reinforced earth block retaining wall, gabion retaining wall, stone retaining wall) using the vegetation ton and the fixed structure, more specifically, incision, Greening the hard retaining wall using vegetation ton and fixing structure by recording vegetation ton and fixing structure on the outside of the retaining wall to prevent collapse. It relates to a method and a green retaining wall structure.

Retaining walls are classified according to the topography, the condition of the ground, the height of the cut and fill, the site and construction conditions, and the importance of the structure. However, generally, the retaining walls, the antigravity retaining walls, the cantilevered retaining walls and the subaxial retaining walls are constructed.

During civil engineering, conventional rock, concrete retaining wall, reinforced earth block retaining wall, gabion retaining wall, and stone masonry cannot be vegetated, and the gray-white wall is exposed as it is, which greatly damages the surrounding environment or urban aesthetics and increases atmospheric temperature by increasing radiant heat. It is a situation that works.

Until now, greening methods such as retaining walls have been planted with plants or plants by attaching potted vegetation zones at certain intervals on the construction surface or by fixing additional relief angles. There is a problem that it is difficult to settle as the plant grows or greens in the long term because the plant lacks a soil component that can grow on its own.

The present invention has been invented to solve the conventional problems as described above has the following object.

The present invention is greening the construction retaining wall using the vegetation crypt and the fixed structure on the outside of the hard retaining wall (incision rock, concrete retaining wall, reinforced soil block retaining wall, gabion retaining wall, stone retaining wall) installed to prevent the collapse of incision, fill land, etc. The purpose of the present invention is to provide a greening method and greening retaining wall structure of a hard retaining wall using vegetation tonic and fixed structures that strengthen the retaining wall and improve the greening environment by recording the retaining wall.

In addition, the purpose of the present invention is to provide a greening method and greening retaining wall structure of a hard retaining wall using vegetation tons and fixed structures that allow the structure and surroundings to be opened by imposing the structure on the exterior by greening the retaining wall.

The present invention for achieving the above object is implemented by an embodiment having the following configuration.

According to the first embodiment of the present invention, the method of greening the hard retaining wall using the vegetation ton and the fixed structure of the present invention

As it is possible to complete the retaining wall with the necessary materials to complete the work quickly, mainly used soil and sand can be easily used around the site, the vegetation ton 100 and greenery forming the retaining wall 300, the first step (S10) having a fixing means 500 and seeds;

In the step of forming the base layer (10), the range to build the retaining wall is determined, and then the ground which is the foundation of the retaining wall is firmly compacted using equipment such as compaction rollers, vibration compacts, and rammers (not shown). Forming a second step (S20);

Filling the soil and sand in the ton provided by the first step (S10), the weight set by a conventional quantifier (not shown), that is, the metering filling device through the open opening 110 of the ton The signal is detected and the on / off valve installed in the filling hopper is operated to automatically control the discharge of soil. The soil is filled with the quantitative soil in the bag, and the top is sealed. A third step (S30) of forming a plurality of vegetation tonics 100 having excellent strength by molding into a rectangular parallelepiped shape having a predetermined height by applying vibration and pressure;

To form a first layer by installing a plurality of vegetation tonic 100 in the longitudinal direction on the base layer, the end is hitting at least two to four fixing means 500 at regular intervals on the vegetation tonic 100 As well as penetrating the vegetation ton 100 and digging to a predetermined depth of the base layer to fix the vegetation ton firmly, and to secure the end by selecting an anchor bolt, earth anchor, small nail or similar fixing structure on the retaining wall A fourth step S40 of allowing one end of the 500 to pass through the anchor bolt B to prevent the vegetation tonic 100 from collapsing;

As the second layer 30 is formed on the first layer formed by the fourth step (S40), the vegetation tonic 100 forming the first layer, the other side vegetation tonic (100) The central portion of the stack 100 is positioned to be arranged in a staggered manner to form a second row, and then two fixing means 500 are provided on the top of each vegetation tonic 100 forming the second layer. Strike the four to penetrate the vegetation tonic 100 of the second layer and at the same time the end of the fixing means 500 to the middle point of the vegetation tonic 100 located in the first layer to penetrate the first layer and the first To connect and fix the vegetation tonang of the second floor integrally, install a sprinkler or water supply 700 between the layers to be laminated to supply water to the recording paper 300 to maintain the recording of the retaining wall recorded One fifth step (S50) and;

The sixth step (S60) for constructing a plurality of vegetation tonic 100 to the desired height by repeatedly performing the process of the fifth step (S50) on the second layer formed by the fifth step (S50) and ;

By planting the greening retaining wall 40 by installing the greening paper 300 so as to green the surface of the stacked retaining wall, the greening paper 300 is put on the surface of the stacked vegetation tonic 100 and the vegetative tonal 100 A seventh step S70 of fixing using the fixing means 500 in such a manner as to fix the fixing means 500;

As the greening layer 50 is formed on the retaining wall, the fine soil and the seed and plant extract of the plant to be planted on the green paper 300 fixed to the vegetation tonic 100 stacked by the seventh step (S70). Moisturizer, fiber (Fiber), colorant in a certain proportion of the mixture was stirred by using a pumping equipment provided separately on the surface of the retaining wall, the green paper 300 is installed in a predetermined thickness by pouring a retaining wall over time An eighth step (S80) to record the surface of the film;

Planting on the retaining wall, it is characterized in that it comprises a ninth step (S90) to increase the greening by making the greening layer 60 of the retaining wall by planting hwahye and joiner on the top of the retaining wall.

According to the second embodiment of the present invention, the greening retaining wall structure using the vegetation ton and the fixed structure of the present invention is

A base layer 10 which is formed to be flat and firmly grounded by using equipment (not shown) such as a compaction roller, a compact vibration, and a rammer, after setting the range to build the retaining wall;

To form a first layer by installing a plurality of vegetation tonic 100 in the longitudinal direction on the base layer, the end is hitting at least two to four fixing means 500 at regular intervals on the vegetation tonic 100 As well as penetrating the vegetation ton 100 and digging to a predetermined depth of the base layer to fix the vegetation ton firmly, and to secure the end by selecting an anchor bolt, earth anchor, a small rail or similar fixing structure on the retaining wall A first layer 20 through which one end of the 500 is passed through the anchor bolt B to prevent the vegetation tonic 100 from collapsing;

 Both sides of the vegetation tonic 100 forming the first layer are stacked so that the central portion of the other vegetation tonic 100 is positioned on the upper part of the interlocking portion and arranged in a staggered manner to form a second row. The vegetation tonic is located on the first layer while penetrating the vegetation tonic 100 of the second layer by hitting two to four fixing means 500 on the top of each vegetation tonic 100 forming the second layer. The end of the fixing means 500 is penetrated to the intermediate point of the 100 so as to connect and fix the vegetation tonic of the first layer and the second layer integrally, and install the sprinkler water supply device 700 between the stacked layers. A second layer 30 to supply water to the recording paper 300 so as to continue recording the recorded retaining wall;

A green retaining wall 40 formed by stacking a plurality of vegetation tonic 100 to a desired height by repeatedly performing the above process on the second layer;

Put the green paper 300 on the surface of the stacked vegetation ton 100 and mix the seed to be planted on the green paper 300 and the plant extracting moisturizer at a predetermined ratio by applying a predetermined thickness by the seed over time Germinated greening layer 50;

At the top of the retaining wall is characterized in that it comprises a planting layer (60) made by planting hwahye, joiner.

According to the third embodiment of the present invention, the greening retaining wall structure using the vegetation tonang and the fixed structure

One end is fixed to the retaining wall between the stacked whitening toner 100, and provided with anchor bolts B through which the fixing means 500 penetrates to prevent the greening retaining wall from collapsing, and the layer of the vegetation tonic 100 stacked. It is characterized by having a sprinkler or a water supply device 700 in between to supply water to the greening 300 so that the greening of the recorded retaining wall can be maintained.

The present invention has the following effects by the above configuration.

The greening method and the greening retaining wall structure of the hard retaining wall using the raw ton and the fixed structure of the present invention is a hard retaining wall (incision rock, concrete retaining wall, reinforced retaining block retaining wall, gabion retaining wall, stone retaining wall) installed to prevent the collapse of the incision and the fill land. Using vegetation ton and fixed structure on the outside of the planting, the planting retaining wall is recorded to strengthen the retaining wall, and the retaining wall has the effect of improving the green environment.

In addition, by recording the retaining wall has an effect that can improve the structure and the environment by imposing aesthetic appearance on the structure.

1 is a perspective view of the article used in the construction of the retaining wall according to the present invention,
2 is a flow chart showing a retaining wall construction process according to the invention,
3 is a side view showing a constructed state according to the present invention;
4 is a block diagram showing a construction process according to the present invention;

DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The applicant will now describe in detail the construction of the embodiments with reference to the accompanying drawings.

Detailed descriptions of well-known functions and configurations that are determined to unnecessarily obscure the subject matter of the present invention will be omitted.

The present invention can be largely divided into a component for recording a retaining wall, a method of recording a retaining wall using the component, and a retaining wall structure thereof.

Looking at the components for recording the retaining wall is a vegetation stacked with the green paper 300 for recording the retaining wall by covering the outside of the vegetation ton 100 and stacked vegetation ton 100 stacked in a plurality of layers It consists of a fixing means 500 for fixing together the tonic 100 and vegetation tonic 100 and the greenery 300.

The vegetation ton 100 is to contain the soil and sand around the site, the non-woven fabric of polypropylene material or aborted fibrous paper is cut in a predetermined form to sew into a bag of a predetermined size with an open top.

The opening 110 of the vegetation tonang is provided with a closing band 130 so as to close the opening 110 after receiving soil.

That is, after receiving the soil is to tie the opening 110 of the vegetation ton 100 by using the band 130 to finish.

Vegetation tonic 100 provided as described above is stacked in a plurality of layers.

The vegetation ton 100 is a substantial main body constituting the retaining wall by a plurality of staggered from the top of the base layer in a staggered manner, the forming process is processed to a non-woven fabric made of synthetic resin to form an open top of the bag To form a vegetation ton 100, fill the vegetation ton 100 with soil and sand quantitatively and then put the vegetation ton 100 in a state filled with soil and sand in a predetermined mold and vibrating press from the top Vibration and pressure can be used to form a rectangular parallelepiped having excellent durability.

The greening paper 300 is to cover the outer side of the stacked vegetation ton 100, the greening, is to select any one from the roll grass, turf, row grass, coronet, live mat and the like germinated seeds in advance.

After being built into the retaining wall, the grass grows to record the retaining wall.

At this time, the seeds and soil to be planted in the greenery 300 and mixed with a moisturizer to a certain thickness by placing a certain thickness by a pumping device (not shown) by the time the seeds germinate over the surface of the retaining wall It may be green.

The fixing means 500 is for fixing the vegetation ton 100 and the greening paper 300 is stacked, it consists of a fixing rod 510 and a fixing band 530.

The fixed rod 510 is provided with a support 511 in the lower end in the form of a cone so as to easily penetrate the vegetation ton 100 and the greening paper 300 when hitting.

At this time, a plurality of protrusions 5111 are formed at both lower sides of the support 511 to protrude and be formed integrally so that the support 511 is not separated from the vegetation ton 100 and the greenery 300.

The fixing piece 513 is integrally formed at the upper end of the support 511 so as to have a “T” shape, and the vegetation ton 100 and the greenery 300 are disposed at both lower portions of the fixing piece 513. Fixed cones 5151 in the form of cones are formed integrally with each other so as to support the support 511.

The fixed rod 510 is preferably injection molded with excellent strength synthetic resin or metal material.

The fixing band 530 is positioned between the fixing means 500 when the fastening and fastening the vegetation tonic 100 and the greening paper 300 to be stacked, the end of each of the fixing means 500 It is fastened to the support 511.

That is, one end is fixed to the fixing means 500, the tartan is fixed to the other fixing means 500 to fasten the vegetation tonic 100 and the greenery 300 with the fixing means 500, When fixing, the vegetation tonic 100 and the greenery 300 of one layer is connected with the vegetation tonic 100 and the greenery 300 of another layer to prevent the vegetation tonic 100, which is stacked in multiple layers, from being collapsed. do.

In addition, the vegetation tonic 100 and the greenery 300 in the same layer is connected to each other to prevent the vegetation tonic 100 is separated.

At this time, one end is fixed to the retaining wall between the stacked tonic 100, and the anchor bolt (B) through which the fixing means 500 is provided to prevent collapse by the anchor bolt (B).

And it is provided between the layers of the vegetation tonic 100, the sprinkler or the water supply device 700 is laminated to supply the moisture to the greenery 300 to maintain the greening of the green retaining wall.

The retaining wall construction process using the above components is as follows.

In constructing the retaining wall, the first step S10 is

As a means to complete the retaining wall is completely equipped with the necessary materials to achieve a quick operation, mainly used soil and sand can be easily used around the site, the vegetation ton 100 and greening to form the retaining wall The branch 300, the fixing means 500 and the seed is to be provided.

The second step (S20) is the step of forming the foundation layer 10, and determines the range to build the retaining wall, and then equipment (not shown) such as compacting rollers, vibration compacts and rammers as the foundation of the retaining wall What is necessary is just to solidify and to form a base layer.

The third step (S30) is to fill the soil and sand in the sack provided by the first step (S10), a conventional quantifier (not shown), that is, through the open opening 110 of the sack Detects the signal of the weight set by the filling device and operates the on / off valve installed in the filling hopper according to this signal to automatically control the discharge of soil. Put into a molding machine (not shown) is applied to the vibration and pressure to form a rectangular parallelepiped having a certain height to form a large number of vegetation tonic 100 is excellent.

The fourth step (S40) is to form a first layer 20, a plurality of vegetation tonic 100 is installed in the longitudinal direction in the base layer.

After hitting at least two to four fixing means 500 at regular intervals on the top of the vegetation tonic 100, the end penetrates the vegetation tonic 100, as well as penetrates to a predetermined depth of the foundation layer to firmly vegetation tonic To fix it.

At this time, by anchoring bolts, earth anchors, soil rails or similar fixing structure to the retaining wall and fixing one end, the one end of the fixing means 500 passes through the anchor bolt B to prevent the vegetation tonic 100 from collapse. .

The fifth step (S50) is to form a second layer 30 on top of the first layer formed by the fourth step (S40), the both sides of the vegetation tonic 100 forming the first layer is engaged with each other. The central portion of the other vegetation ton 100 is stacked on the upper portion to be arranged in a staggered manner to form a second row.

After hitting two to four fixing means 500 on each vegetation ton 100 forming the second layer and penetrating the vegetation ton 100 of the second layer and at the same time on the first layer End portion of the fixing means 500 to the middle point of the vegetation ton 100 located is to penetrate and connect the vegetation tonang of the first layer and the second layer integrally.

At this time, by installing a sprinkler or a water supply device 700 between the layers to be laminated to supply water to the recording paper 300 so that the greening of the recorded retaining wall can be maintained.

The sixth step (S60) is to repeat the process of the fifth step (S50) on the top of the second layer formed by the fifth step (S50) to build a plurality of vegetation ton 100 to the desired height do.

The seventh step (S70) is to build the greening retaining wall 40 by installing the greening paper 300 so as to green the surface of the laminated retaining wall, the greening paper 300 on the surface of the stacked vegetation ton 100 Put on and fix the vegetation tonic 100 by using the fixing means 500 in a manner to fix.

The eighth step (S80) is to form a greening layer 50 on the retaining wall, and the fine soil and greenery on the green paper 300 fixed to the vegetation tonic 100 stacked by the seventh step (S70) The seed and plant extract moisturizer, fiber, fiber and colorant are poured into a certain thickness by using a pumping equipment provided separately on the surface of the retaining wall on which the greenery 300 is installed. In this case, the seeds are preferably aged for 2 to 3 days at 30 ~ 35 ℃ to increase the germination rate.

The ninth step is planting in the terminal, and planting the planting layer 60 of the retaining wall to increase the rust by planting hwahye and joiner on the top of the retaining wall.

The present invention described above is not limited to the above-described embodiments and the accompanying drawings, and it is common in the art that various substitutions, modifications, and changes can be made without departing from the technical spirit of the present invention. It will be evident to those who have knowledge of.

100: vegetation ton 300: greenery
500: fixing means 700: sprinkler or water supply device

Claims (3)

As it is possible to complete the retaining wall with the necessary materials to complete the work quickly, mainly used soil and sand can be easily used around the site, the vegetation ton 100 and greenery forming the retaining wall 300, the first step (S10) having a fixing means 500 and seeds;
In the step of forming the base layer (10), the range to build the retaining wall is determined, and then the ground which is the foundation of the retaining wall is firmly compacted using equipment such as compaction rollers, vibration compacts, and rammers (not shown). Forming a second step (S20);
As the soil and sand is filled in the sack provided by the first step (S10), through the open opening 110 of the sack of ordinary weight (not shown), that is, of the weight set by the quantitative filling device It detects the signal and operates the on / off valve installed in the filling hopper by this signal to automatically control the discharge of soil, fills the soil with the quantity of soil and seals the upper part and puts it in the standard molding machine (not shown). A third step (S30) of forming a plurality of vegetative tonic 100 having excellent strength by molding into a rectangular parallelepiped shape having a predetermined height by applying vibration and pressure;
To form a first layer by installing a plurality of vegetation tonic 100 in the longitudinal direction on the base layer, the end is hitting at least two to four fixing means 500 at regular intervals on the vegetation tonic 100 As well as penetrating the vegetation ton 100 and digging to a predetermined depth of the foundation layer to fix the vegetation ton firmly, and to secure the end by alternatively anchoring bolts, earth anchors, small rails or similar fixing structure to the retaining wall fixing means ( A fourth step S40 of allowing one end of the 500 to penetrate through the anchor bolt B to prevent the vegetation tonic 100 from collapsing;
Forming the second layer 30 on the first layer formed by the fourth step (S40), the vegetation tonic 100 forming the first layer is different vegetation tonic (100) on the upper side of the portion interlocking with each other (100) 2) to 4 to 4 to the top of each vegetation ton 100 forming the second layer after forming a second row by stacking the central portion of the) to be arranged in a staggered manner. Hitting the dog to penetrate the vegetation tonic 100 of the second layer and at the same time the end of the fixing means 500 to the middle point of the vegetation tonic 100 located on the first layer to penetrate the first layer and the second Connect and fix the vegetation ton of the layer integrally, and install a sprinkler or water supply device 700 between the layers to be laminated to supply water to the recording paper 300 to maintain the recording of the recorded retaining wall A fifth step (S50);
A sixth step (S60) of constructing a plurality of vegetation tonics 100 to a desired height by repeatedly performing the process of the fifth step (S50) on the second layer formed by the fifth step (S50);
By planting the greening retaining wall 40 by installing the greening paper 300 so as to green the surface of the stacked retaining wall, the greening paper 300 is put on the surface of the stacked vegetation tonic 100 and the vegetative tonal 100 A seventh step S70 of fixing using the fixing means 500 in such a manner as to fix the fixing means 500;
As the greening layer 50 is formed on the retaining wall, the fine soil and the seed and plant extract of the plant to be planted on the green paper 300 fixed to the vegetation tonic 100 stacked by the seventh step (S70). Moisturizer, fiber (Fiber), colorant in a certain proportion of the mixture was stirred by using a pumping equipment provided separately on the surface of the retaining wall, the green paper 300 is installed in a predetermined thickness by pouring a retaining wall over time An eighth step (S80) to record the surface of the film;
Planting on the retaining wall is installed on the slope, comprising a ninth step (S90) to increase the greening by planting the greening layer 60 of the retaining wall by planting hwahye, joiner on the top of the retaining wall .
A base layer 10 which is formed to be flat and firmly grounded by using equipment (not shown) such as a compaction roller, a compact vibration, and a rammer, after setting the range to build the retaining wall;
To form a first layer by installing a plurality of vegetation tonic 100 in the longitudinal direction on the base layer, the end is hitting at least two to four fixing means 500 at regular intervals on the vegetation tonic 100 As well as penetrating the vegetation ton 100 and digging to a predetermined depth of the foundation layer to fix the vegetation ton firmly, and to secure the end by alternatively anchoring bolts, earth anchors, small rails or similar fixing structure to the retaining wall fixing means ( A first layer 20 through which one end of the 500 is passed through the anchor bolt B to prevent the vegetation tonic 100 from decaying;
Both sides of the vegetation tonic 100 forming the first layer are stacked so that the central portion of the other vegetation tonic 100 is positioned on the upper part of the interlocking manner and arranged in a staggered manner to form a second row and then the second column. By hitting two to four of the fixing means 500 on each of the vegetation tonic 100 forming a layer to penetrate the vegetation tonic 100 of the second layer and at the same time the vegetation tonic 100 located on the first layer ( The end of the fixing means 500 is penetrated to an intermediate point of 100 so as to connect and fix the vegetation ton of the first and second layers integrally, and install a sprinkler or a water supply device 700 between the stacked layers. A second layer 30 to supply water to the recording paper 300 so as to continue recording the recorded retaining wall;
A green retaining wall 40 formed by stacking a plurality of vegetation tonic 100 to a desired height by repeatedly performing the above process on the second layer;
Put the green paper 300 on the surface of the stacked vegetation ton 100 and mix the seed to be planted on the green paper 300 and the plant extracting moisturizer at a predetermined ratio by applying a predetermined thickness by the seed over time Germinated greening layer 50;
Greening retaining wall, which is characterized by including a planting layer 60 obtained by planting hydration and joinery on the top of the retaining wall.
The method according to claim 1 and 2,
One end is fixed to the retaining wall between the stacked whitening toner 100, and provided with anchor bolts B through which the fixing means 500 penetrates to prevent the greening retaining wall from collapsing, and the layer of the vegetation tonic 100 stacked. Retaining method and greening retaining wall installed on the slope, characterized in that provided with a sprinkler or water supply device 700 between the water supply to the greening layer 300 to maintain the recording of the recorded retaining wall

KR1020100043789A 2010-05-11 2010-05-11 The fence building method which uses and the establishment structure KR20110124431A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100043789A KR20110124431A (en) 2010-05-11 2010-05-11 The fence building method which uses and the establishment structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100043789A KR20110124431A (en) 2010-05-11 2010-05-11 The fence building method which uses and the establishment structure

Publications (1)

Publication Number Publication Date
KR20110124431A true KR20110124431A (en) 2011-11-17

Family

ID=45394179

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100043789A KR20110124431A (en) 2010-05-11 2010-05-11 The fence building method which uses and the establishment structure

Country Status (1)

Country Link
KR (1) KR20110124431A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101366845B1 (en) * 2012-07-25 2014-02-21 김계순 Structure for planting slope

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101366845B1 (en) * 2012-07-25 2014-02-21 김계순 Structure for planting slope

Similar Documents

Publication Publication Date Title
KR100924933B1 (en) Construction method of retaining wall using soil sack block for vegetation and fixed device and Structure for installation thereof
CN106900342B (en) Integrated semi-lithologic high slope vegetation reconstruction protection method
CN104264692B (en) A kind of side slope ecological renovation method
US7850402B1 (en) Cement-treated soil blocks with vegetative faces
CN109403267A (en) A kind of cast-in-place green concrete of nutrition hole type and its construction method
US8596928B1 (en) Cement-treated soil blocks with vegetative faces
CN110839368A (en) Plant growth bag device for slope ecological restoration, protective structure and construction method
KR101137323B1 (en) Plant germination bag with plant germination pocket, retaining wall structure and packing plate for fixing plant germination bag
CN108677870A (en) A kind of cast-in-place green concrete hard ecological revetment and its construction method
KR100959828B1 (en) A vegetation slope structure
KR100752152B1 (en) Construction method of breast wall for tree planting
CN105178248A (en) Concrete plant planting and slope protecting method for soft soil river slope
CZ2008145A3 (en) Green roof, particularly inclined green roof and method of making the same
CN210031857U (en) Ecological embankment side slope structure
KR20110124431A (en) The fence building method which uses and the establishment structure
CN114457841B (en) Concrete retaining wall hard landscape ecological softening structure and construction method thereof
CN210900526U (en) Ecological planting pond system applied to rock slope vegetation restoration
KR101824416B1 (en) Retaining wall with vegetation Basis
CN113322895A (en) Three-dimensional water and soil protection revetment and construction method thereof
KR101334749B1 (en) Vegetation block in tiers for retaining wall and method for construction of retaining wall using the same
KR20110067661A (en) The enviro soilsack the fence building method which uses and the establishment structure
CN219343251U (en) Hydraulic engineering bank protection
JPS63284321A (en) Sheathing for inclined surface of filling
CN219508604U (en) Ecological concrete protection system in rock steep slope lattice protection frame
JP7022428B2 (en) Earth retaining method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application