KR20110124431A - The fence building method which uses and the establishment structure - Google Patents
The fence building method which uses and the establishment structure Download PDFInfo
- Publication number
- KR20110124431A KR20110124431A KR1020100043789A KR20100043789A KR20110124431A KR 20110124431 A KR20110124431 A KR 20110124431A KR 1020100043789 A KR1020100043789 A KR 1020100043789A KR 20100043789 A KR20100043789 A KR 20100043789A KR 20110124431 A KR20110124431 A KR 20110124431A
- Authority
- KR
- South Korea
- Prior art keywords
- retaining wall
- layer
- vegetation
- tonic
- greening
- Prior art date
Links
Images
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G25/00—Watering gardens, fields, sports grounds or the like
- A01G25/02—Watering arrangements located above the soil which make use of perforated pipe-lines or pipe-lines with dispensing fittings, e.g. for drip irrigation
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G9/00—Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
- A01G9/02—Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
- A01G9/022—Pots for vertical horticulture
- A01G9/025—Containers and elements for greening walls
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0225—Retaining or protecting walls comprising retention means in the backfill
- E02D29/0233—Retaining or protecting walls comprising retention means in the backfill the retention means being anchors
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0291—Retaining or protecting walls characterised by constructional features made up of filled, bag-like elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/046—Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/02—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
Abstract
The present invention is a greening method and the greening retaining wall is installed on the slope of the road to improve the road environment by making the retaining wall by recording the vegetation ton on the outside of the retaining wall is installed to prevent the collapse of the slope Regarding,
As it is possible to complete the retaining wall with the necessary materials to complete the work quickly, mainly used soil and sand can be easily used around the site, the vegetation ton 100 and greenery forming the retaining wall 300, the first step (S10) having a fixing means 500 and seeds;
In the step of forming the base layer (10), the range to build the retaining wall is determined, and then the ground which is the foundation of the retaining wall is firmly compacted using equipment such as compaction rollers, vibration compacts, and rammers (not shown). Forming a second step (S20);
As the soil and sand is filled in the sack provided by the first step (S10), through the open opening 110 of the sack of ordinary weight (not shown), that is, of the weight set by the quantitative filling device It detects the signal and operates the on / off valve installed in the filling hopper by this signal to automatically control the discharge of soil, fills the soil with the quantity of soil and seals the upper part and puts it in the standard molding machine (not shown). A third step (S30) of forming a plurality of vegetative tonic 100 having excellent strength by molding into a rectangular parallelepiped shape having a predetermined height by applying vibration and pressure;
To form a first layer by installing a plurality of vegetation tonic 100 in the longitudinal direction on the base layer, the end is hitting at least two to four fixing means 500 at regular intervals on the vegetation tonic 100 As well as penetrating the vegetation ton 100 and digging to a predetermined depth of the foundation layer to fix the vegetation ton firmly, and to secure the end by alternatively anchoring bolts, earth anchors, small rails or similar fixing structure to the retaining wall fixing means ( A fourth step S40 of allowing one end of the 500 to penetrate through the anchor bolt B to prevent the vegetation tonic 100 from collapsing;
Forming the second layer 30 on the first layer formed by the fourth step (S40), the vegetation tonic 100 forming the first layer is different vegetation tonic (100) on the upper side of the portion interlocking with each other (100) 2) to 4 to 4 to the top of each vegetation ton 100 forming the second layer after forming a second row by stacking the central portion of the) to be arranged in a staggered manner. Hitting the dog to penetrate the vegetation tonic 100 of the second layer and at the same time the end of the fixing means 500 to the middle point of the vegetation tonic 100 located on the first layer to penetrate the first layer and the second Connect and fix the vegetation ton of the layer integrally, and install a sprinkler or water supply device 700 between the layers to be laminated to supply water to the recording paper 300 to maintain the recording of the recorded retaining wall A fifth step (S50);
A sixth step (S60) of constructing a plurality of vegetation tonics 100 to a desired height by repeatedly performing the process of the fifth step (S50) on the second layer formed by the fifth step (S50);
By planting the greening retaining wall 40 by installing the greening paper 300 so as to green the surface of the stacked retaining wall, the greening paper 300 is put on the surface of the stacked vegetation tonic 100 and the vegetative tonal 100 A seventh step S70 of fixing using the fixing means 500 in such a manner as to fix the fixing means 500;
As the greening layer 50 is formed on the retaining wall, the fine soil and the seed and plant extract of the plant to be planted on the green paper 300 fixed to the vegetation tonic 100 stacked by the seventh step (S70). Moisturizer, fiber (Fiber), colorant in a certain proportion of the mixture was stirred by using a pumping equipment provided separately on the surface of the retaining wall, the green paper 300 is installed in a predetermined thickness by pouring a retaining wall over time An eighth step (S80) to record the surface of the film;
Planting on the retaining wall is installed on the slope, comprising a ninth step (S90) to increase the greening by planting the greening layer 60 of the retaining wall by planting hwahye, joiner on the top of the retaining wall
Description
The present invention relates to the greening method and the greening retaining wall structure of the hard retaining wall (incision rock, concrete retaining wall, reinforced earth block retaining wall, gabion retaining wall, stone retaining wall) using the vegetation ton and the fixed structure, more specifically, incision, Greening the hard retaining wall using vegetation ton and fixing structure by recording vegetation ton and fixing structure on the outside of the retaining wall to prevent collapse. It relates to a method and a green retaining wall structure.
Retaining walls are classified according to the topography, the condition of the ground, the height of the cut and fill, the site and construction conditions, and the importance of the structure. However, generally, the retaining walls, the antigravity retaining walls, the cantilevered retaining walls and the subaxial retaining walls are constructed.
During civil engineering, conventional rock, concrete retaining wall, reinforced earth block retaining wall, gabion retaining wall, and stone masonry cannot be vegetated, and the gray-white wall is exposed as it is, which greatly damages the surrounding environment or urban aesthetics and increases atmospheric temperature by increasing radiant heat. It is a situation that works.
Until now, greening methods such as retaining walls have been planted with plants or plants by attaching potted vegetation zones at certain intervals on the construction surface or by fixing additional relief angles. There is a problem that it is difficult to settle as the plant grows or greens in the long term because the plant lacks a soil component that can grow on its own.
The present invention has been invented to solve the conventional problems as described above has the following object.
The present invention is greening the construction retaining wall using the vegetation crypt and the fixed structure on the outside of the hard retaining wall (incision rock, concrete retaining wall, reinforced soil block retaining wall, gabion retaining wall, stone retaining wall) installed to prevent the collapse of incision, fill land, etc. The purpose of the present invention is to provide a greening method and greening retaining wall structure of a hard retaining wall using vegetation tonic and fixed structures that strengthen the retaining wall and improve the greening environment by recording the retaining wall.
In addition, the purpose of the present invention is to provide a greening method and greening retaining wall structure of a hard retaining wall using vegetation tons and fixed structures that allow the structure and surroundings to be opened by imposing the structure on the exterior by greening the retaining wall.
The present invention for achieving the above object is implemented by an embodiment having the following configuration.
According to the first embodiment of the present invention, the method of greening the hard retaining wall using the vegetation ton and the fixed structure of the present invention
As it is possible to complete the retaining wall with the necessary materials to complete the work quickly, mainly used soil and sand can be easily used around the site, the
In the step of forming the base layer (10), the range to build the retaining wall is determined, and then the ground which is the foundation of the retaining wall is firmly compacted using equipment such as compaction rollers, vibration compacts, and rammers (not shown). Forming a second step (S20);
Filling the soil and sand in the ton provided by the first step (S10), the weight set by a conventional quantifier (not shown), that is, the metering filling device through the
To form a first layer by installing a plurality of vegetation tonic 100 in the longitudinal direction on the base layer, the end is hitting at least two to four fixing means 500 at regular intervals on the vegetation tonic 100 As well as penetrating the
As the
The sixth step (S60) for constructing a plurality of vegetation tonic 100 to the desired height by repeatedly performing the process of the fifth step (S50) on the second layer formed by the fifth step (S50) and ;
By planting the greening retaining
As the
Planting on the retaining wall, it is characterized in that it comprises a ninth step (S90) to increase the greening by making the greening
According to the second embodiment of the present invention, the greening retaining wall structure using the vegetation ton and the fixed structure of the present invention is
A
To form a first layer by installing a plurality of vegetation tonic 100 in the longitudinal direction on the base layer, the end is hitting at least two to four fixing means 500 at regular intervals on the vegetation tonic 100 As well as penetrating the
Both sides of the vegetation tonic 100 forming the first layer are stacked so that the central portion of the other vegetation tonic 100 is positioned on the upper part of the interlocking portion and arranged in a staggered manner to form a second row. The vegetation tonic is located on the first layer while penetrating the vegetation tonic 100 of the second layer by hitting two to four fixing means 500 on the top of each vegetation tonic 100 forming the second layer. The end of the fixing means 500 is penetrated to the intermediate point of the 100 so as to connect and fix the vegetation tonic of the first layer and the second layer integrally, and install the sprinkler
A green
Put the
At the top of the retaining wall is characterized in that it comprises a planting layer (60) made by planting hwahye, joiner.
According to the third embodiment of the present invention, the greening retaining wall structure using the vegetation tonang and the fixed structure
One end is fixed to the retaining wall between the stacked
The present invention has the following effects by the above configuration.
The greening method and the greening retaining wall structure of the hard retaining wall using the raw ton and the fixed structure of the present invention is a hard retaining wall (incision rock, concrete retaining wall, reinforced retaining block retaining wall, gabion retaining wall, stone retaining wall) installed to prevent the collapse of the incision and the fill land. Using vegetation ton and fixed structure on the outside of the planting, the planting retaining wall is recorded to strengthen the retaining wall, and the retaining wall has the effect of improving the green environment.
In addition, by recording the retaining wall has an effect that can improve the structure and the environment by imposing aesthetic appearance on the structure.
1 is a perspective view of the article used in the construction of the retaining wall according to the present invention,
2 is a flow chart showing a retaining wall construction process according to the invention,
3 is a side view showing a constructed state according to the present invention;
4 is a block diagram showing a construction process according to the present invention;
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The applicant will now describe in detail the construction of the embodiments with reference to the accompanying drawings.
Detailed descriptions of well-known functions and configurations that are determined to unnecessarily obscure the subject matter of the present invention will be omitted.
The present invention can be largely divided into a component for recording a retaining wall, a method of recording a retaining wall using the component, and a retaining wall structure thereof.
Looking at the components for recording the retaining wall is a vegetation stacked with the
The
The opening 110 of the vegetation tonang is provided with a
That is, after receiving the soil is to tie the opening 110 of the
Vegetation tonic 100 provided as described above is stacked in a plurality of layers.
The
The
After being built into the retaining wall, the grass grows to record the retaining wall.
At this time, the seeds and soil to be planted in the
The
The
At this time, a plurality of
The fixing
The fixed
The fixing
That is, one end is fixed to the fixing means 500, the tartan is fixed to the other fixing means 500 to fasten the
In addition, the
At this time, one end is fixed to the retaining wall between the
And it is provided between the layers of the
The retaining wall construction process using the above components is as follows.
In constructing the retaining wall, the first step S10 is
As a means to complete the retaining wall is completely equipped with the necessary materials to achieve a quick operation, mainly used soil and sand can be easily used around the site, the
The second step (S20) is the step of forming the
The third step (S30) is to fill the soil and sand in the sack provided by the first step (S10), a conventional quantifier (not shown), that is, through the
The fourth step (S40) is to form a
After hitting at least two to four fixing means 500 at regular intervals on the top of the
At this time, by anchoring bolts, earth anchors, soil rails or similar fixing structure to the retaining wall and fixing one end, the one end of the fixing means 500 passes through the anchor bolt B to prevent the
The fifth step (S50) is to form a
After hitting two to four fixing means 500 on each
At this time, by installing a sprinkler or a
The sixth step (S60) is to repeat the process of the fifth step (S50) on the top of the second layer formed by the fifth step (S50) to build a plurality of
The seventh step (S70) is to build the
The eighth step (S80) is to form a
The ninth step is planting in the terminal, and planting the
The present invention described above is not limited to the above-described embodiments and the accompanying drawings, and it is common in the art that various substitutions, modifications, and changes can be made without departing from the technical spirit of the present invention. It will be evident to those who have knowledge of.
100: vegetation ton 300: greenery
500: fixing means 700: sprinkler or water supply device
Claims (3)
In the step of forming the base layer (10), the range to build the retaining wall is determined, and then the ground which is the foundation of the retaining wall is firmly compacted using equipment such as compaction rollers, vibration compacts, and rammers (not shown). Forming a second step (S20);
As the soil and sand is filled in the sack provided by the first step (S10), through the open opening 110 of the sack of ordinary weight (not shown), that is, of the weight set by the quantitative filling device It detects the signal and operates the on / off valve installed in the filling hopper by this signal to automatically control the discharge of soil, fills the soil with the quantity of soil and seals the upper part and puts it in the standard molding machine (not shown). A third step (S30) of forming a plurality of vegetative tonic 100 having excellent strength by molding into a rectangular parallelepiped shape having a predetermined height by applying vibration and pressure;
To form a first layer by installing a plurality of vegetation tonic 100 in the longitudinal direction on the base layer, the end is hitting at least two to four fixing means 500 at regular intervals on the vegetation tonic 100 As well as penetrating the vegetation ton 100 and digging to a predetermined depth of the foundation layer to fix the vegetation ton firmly, and to secure the end by alternatively anchoring bolts, earth anchors, small rails or similar fixing structure to the retaining wall fixing means ( A fourth step S40 of allowing one end of the 500 to penetrate through the anchor bolt B to prevent the vegetation tonic 100 from collapsing;
Forming the second layer 30 on the first layer formed by the fourth step (S40), the vegetation tonic 100 forming the first layer is different vegetation tonic (100) on the upper side of the portion interlocking with each other (100) 2) to 4 to 4 to the top of each vegetation ton 100 forming the second layer after forming a second row by stacking the central portion of the) to be arranged in a staggered manner. Hitting the dog to penetrate the vegetation tonic 100 of the second layer and at the same time the end of the fixing means 500 to the middle point of the vegetation tonic 100 located on the first layer to penetrate the first layer and the second Connect and fix the vegetation ton of the layer integrally, and install a sprinkler or water supply device 700 between the layers to be laminated to supply water to the recording paper 300 to maintain the recording of the recorded retaining wall A fifth step (S50);
A sixth step (S60) of constructing a plurality of vegetation tonics 100 to a desired height by repeatedly performing the process of the fifth step (S50) on the second layer formed by the fifth step (S50);
By planting the greening retaining wall 40 by installing the greening paper 300 so as to green the surface of the stacked retaining wall, the greening paper 300 is put on the surface of the stacked vegetation tonic 100 and the vegetative tonal 100 A seventh step S70 of fixing using the fixing means 500 in such a manner as to fix the fixing means 500;
As the greening layer 50 is formed on the retaining wall, the fine soil and the seed and plant extract of the plant to be planted on the green paper 300 fixed to the vegetation tonic 100 stacked by the seventh step (S70). Moisturizer, fiber (Fiber), colorant in a certain proportion of the mixture was stirred by using a pumping equipment provided separately on the surface of the retaining wall, the green paper 300 is installed in a predetermined thickness by pouring a retaining wall over time An eighth step (S80) to record the surface of the film;
Planting on the retaining wall is installed on the slope, comprising a ninth step (S90) to increase the greening by planting the greening layer 60 of the retaining wall by planting hwahye, joiner on the top of the retaining wall .
To form a first layer by installing a plurality of vegetation tonic 100 in the longitudinal direction on the base layer, the end is hitting at least two to four fixing means 500 at regular intervals on the vegetation tonic 100 As well as penetrating the vegetation ton 100 and digging to a predetermined depth of the foundation layer to fix the vegetation ton firmly, and to secure the end by alternatively anchoring bolts, earth anchors, small rails or similar fixing structure to the retaining wall fixing means ( A first layer 20 through which one end of the 500 is passed through the anchor bolt B to prevent the vegetation tonic 100 from decaying;
Both sides of the vegetation tonic 100 forming the first layer are stacked so that the central portion of the other vegetation tonic 100 is positioned on the upper part of the interlocking manner and arranged in a staggered manner to form a second row and then the second column. By hitting two to four of the fixing means 500 on each of the vegetation tonic 100 forming a layer to penetrate the vegetation tonic 100 of the second layer and at the same time the vegetation tonic 100 located on the first layer ( The end of the fixing means 500 is penetrated to an intermediate point of 100 so as to connect and fix the vegetation ton of the first and second layers integrally, and install a sprinkler or a water supply device 700 between the stacked layers. A second layer 30 to supply water to the recording paper 300 so as to continue recording the recorded retaining wall;
A green retaining wall 40 formed by stacking a plurality of vegetation tonic 100 to a desired height by repeatedly performing the above process on the second layer;
Put the green paper 300 on the surface of the stacked vegetation ton 100 and mix the seed to be planted on the green paper 300 and the plant extracting moisturizer at a predetermined ratio by applying a predetermined thickness by the seed over time Germinated greening layer 50;
Greening retaining wall, which is characterized by including a planting layer 60 obtained by planting hydration and joinery on the top of the retaining wall.
One end is fixed to the retaining wall between the stacked whitening toner 100, and provided with anchor bolts B through which the fixing means 500 penetrates to prevent the greening retaining wall from collapsing, and the layer of the vegetation tonic 100 stacked. Retaining method and greening retaining wall installed on the slope, characterized in that provided with a sprinkler or water supply device 700 between the water supply to the greening layer 300 to maintain the recording of the recorded retaining wall
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100043789A KR20110124431A (en) | 2010-05-11 | 2010-05-11 | The fence building method which uses and the establishment structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020100043789A KR20110124431A (en) | 2010-05-11 | 2010-05-11 | The fence building method which uses and the establishment structure |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20110124431A true KR20110124431A (en) | 2011-11-17 |
Family
ID=45394179
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020100043789A KR20110124431A (en) | 2010-05-11 | 2010-05-11 | The fence building method which uses and the establishment structure |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20110124431A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101366845B1 (en) * | 2012-07-25 | 2014-02-21 | 김계순 | Structure for planting slope |
-
2010
- 2010-05-11 KR KR1020100043789A patent/KR20110124431A/en not_active Application Discontinuation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101366845B1 (en) * | 2012-07-25 | 2014-02-21 | 김계순 | Structure for planting slope |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100924933B1 (en) | Construction method of retaining wall using soil sack block for vegetation and fixed device and Structure for installation thereof | |
CN106900342B (en) | Integrated semi-lithologic high slope vegetation reconstruction protection method | |
CN104264692B (en) | A kind of side slope ecological renovation method | |
US7850402B1 (en) | Cement-treated soil blocks with vegetative faces | |
CN109403267A (en) | A kind of cast-in-place green concrete of nutrition hole type and its construction method | |
US8596928B1 (en) | Cement-treated soil blocks with vegetative faces | |
CN110839368A (en) | Plant growth bag device for slope ecological restoration, protective structure and construction method | |
KR101137323B1 (en) | Plant germination bag with plant germination pocket, retaining wall structure and packing plate for fixing plant germination bag | |
CN108677870A (en) | A kind of cast-in-place green concrete hard ecological revetment and its construction method | |
KR100959828B1 (en) | A vegetation slope structure | |
KR100752152B1 (en) | Construction method of breast wall for tree planting | |
CN105178248A (en) | Concrete plant planting and slope protecting method for soft soil river slope | |
CZ2008145A3 (en) | Green roof, particularly inclined green roof and method of making the same | |
CN210031857U (en) | Ecological embankment side slope structure | |
KR20110124431A (en) | The fence building method which uses and the establishment structure | |
CN114457841B (en) | Concrete retaining wall hard landscape ecological softening structure and construction method thereof | |
CN210900526U (en) | Ecological planting pond system applied to rock slope vegetation restoration | |
KR101824416B1 (en) | Retaining wall with vegetation Basis | |
CN113322895A (en) | Three-dimensional water and soil protection revetment and construction method thereof | |
KR101334749B1 (en) | Vegetation block in tiers for retaining wall and method for construction of retaining wall using the same | |
KR20110067661A (en) | The enviro soilsack the fence building method which uses and the establishment structure | |
CN219343251U (en) | Hydraulic engineering bank protection | |
JPS63284321A (en) | Sheathing for inclined surface of filling | |
CN219508604U (en) | Ecological concrete protection system in rock steep slope lattice protection frame | |
JP7022428B2 (en) | Earth retaining method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application |