KR20110073845A - Construction method of yellow soil wall - Google Patents
Construction method of yellow soil wall Download PDFInfo
- Publication number
- KR20110073845A KR20110073845A KR1020090130611A KR20090130611A KR20110073845A KR 20110073845 A KR20110073845 A KR 20110073845A KR 1020090130611 A KR1020090130611 A KR 1020090130611A KR 20090130611 A KR20090130611 A KR 20090130611A KR 20110073845 A KR20110073845 A KR 20110073845A
- Authority
- KR
- South Korea
- Prior art keywords
- base frame
- filling
- ocher
- construction method
- frame
- Prior art date
Links
- 238000010276 construction Methods 0.000 title claims abstract description 60
- 239000002689 soil Substances 0.000 title claims abstract description 57
- 239000003610 charcoal Substances 0.000 claims abstract description 12
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims description 18
- 235000017491 Bambusa tulda Nutrition 0.000 claims description 18
- 241001330002 Bambuseae Species 0.000 claims description 18
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims description 18
- 239000011425 bamboo Substances 0.000 claims description 18
- 238000000034 method Methods 0.000 claims description 18
- JOYRKODLDBILNP-UHFFFAOYSA-N Ethyl urethane Chemical compound CCOC(N)=O JOYRKODLDBILNP-UHFFFAOYSA-N 0.000 claims description 6
- 239000004744 fabric Substances 0.000 claims description 6
- 239000000945 filler Substances 0.000 claims description 6
- 239000006260 foam Substances 0.000 claims description 6
- 239000011810 insulating material Substances 0.000 claims description 5
- 239000002023 wood Substances 0.000 claims description 4
- 239000004568 cement Substances 0.000 claims description 3
- 235000013372 meat Nutrition 0.000 claims description 2
- 238000009413 insulation Methods 0.000 abstract description 16
- 230000000694 effects Effects 0.000 abstract description 8
- 125000006850 spacer group Chemical group 0.000 abstract 3
- 238000009415 formwork Methods 0.000 description 6
- 239000011248 coating agent Substances 0.000 description 3
- 238000000576 coating method Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000005299 abrasion Methods 0.000 description 2
- 239000000853 adhesive Substances 0.000 description 2
- 230000001070 adhesive effect Effects 0.000 description 2
- 238000010030 laminating Methods 0.000 description 2
- 230000007774 longterm Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000004745 nonwoven fabric Substances 0.000 description 2
- 238000004321 preservation Methods 0.000 description 2
- 230000000903 blocking effect Effects 0.000 description 1
- 210000001217 buttock Anatomy 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/90—Curtain walls comprising panels directly attached to the structure
- E04B2/92—Sandwich-type panels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/82—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to sound only
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/88—Insulating elements for both heat and sound
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
- E04B2/965—Connections of mullions and transoms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Acoustics & Sound (AREA)
- Building Environments (AREA)
Abstract
Description
본 발명은 황토 벽체 시공방법에 관한 것으로, 더욱 상세하게는 황토 벽체 시공에 소요되는 시간을 단축할 수 있도록 할 뿐만 아니라 시공 이후 장기간 형태 보존이 이루어질 수 있도록 하고 단열 및 방음 효과를 높일 수 있도록 하는 황토 벽체 시공방법에 관한 것이다.The present invention relates to a loess wall construction method, and more particularly to the ocher wall not only to shorten the time required for the construction of the ocher wall, but also to allow long-term form preservation after construction and to increase insulation and sound insulation effects. It relates to a wall construction method.
최근 황토의 유익함이 널려 알려짐에 따라 건축 구조물에 황토 벽체 시공이 늘고 있다.As the benefits of loess have been widely known, the construction of ocher walls on building structures is increasing.
그러나 전통 황토 벽체의 시공은 콘크리트, 블럭 등을 이용하는 일반 벽체 시공에 비해 공정이 번거로워 벽체 시공에 상당한 인력과 시간이 소요되는 문제가 있었다.However, the construction of traditional ocher walls has a problem that it takes considerable manpower and time for the wall construction because the process is cumbersome compared to general wall construction using concrete, blocks, and the like.
상기와 같은 전통 황토 벽체 시공에 따르는 문제를 해소하고자 최근에는 황토블럭(50)을 적층하여 기본 벽체를 형성한 이후에 도 8에 도시된 바와 같이 적층된 황토블럭(50) 표면에 황토반죽(20)을 도포하는 방식의 황토블럭(50)을 이용한 황토 벽체 시공방법이 실시되고 있다.In order to solve the problems caused by the traditional ocher wall construction as described above, after forming the basic wall by laminating the
이와 같이 황토블럭(50)을 이용한 황토 벽체 시공방법은 전통 황토 벽체 시공방법에 비해 시공에 소요되는 시간을 단축할 수 있도록 하는 것이었으나 블럭 쌓기의 특성상 시공 이후 외부로부터 충격이 가해지는 경우 자칫 형태가 허물어지게 되는 문제가 있었고 단열 및 방음 효과가 미흡한 문제가 있었다.As such, the ocher wall construction method using the
본 출원인은 상기와 같은 황토블럭(50)을 이용한 황토 벽체 시공방법이 갖는 문제를 해소하고자 지지틀과 충진재를 이용하는 황토흙벽의 시공방법(특허출원 제10-2008-0035157호)을 제안한바 있다.The present applicant has proposed a construction method of the loess soil wall using the support frame and the filler (Patent Application No. 10-2008-0035157) to solve the problem of the loess wall construction method using the
본 출원인이 제안한 지지틀과 충진재를 이용하는 황토흙벽의 시공방법은 황토블럭(50)을 이용하여 황토 벽체를 시공하는 것에 비해 황토 벽체 시공에 소요되는 시간을 단축할 수 있도록 하고 단열 및 방음 효과를 높일 수 있도록 하는 것이었으나, 황토반죽(20)이 지지틀(60) 표면에 쉽게 부착되지 않아 지지틀(60) 표면에의 황토반죽(20) 부착을 위해 도 9에 도시된 바와 같이 지지틀(60) 전후방에 거푸집(70)을 설치한 이후 지지틀(60)과 거푸집(70) 사이에 황토반죽(20)을 채워넣어야 했던바, 거푸집(70) 설치 및 해체에 인력과 시간이 소요되는 문제가 있었다.The ocher soil wall construction method proposed by the present applicant using the support frame and the filling material can reduce the time required for the construction of the ocher wall, and increase the insulation and sound insulation effect, compared to the construction of the ocher wall using the
본 발명은 황토 벽체 시공에 소요되는 시간을 단축할 수 있도록 할 뿐만 아니라 시공 이후 장기간 형태 보존이 이루어질 수 있도록 하고 단열 및 방음 효과를 높일 수 있도록 하는 황토 벽체 시공방법을 제공하는데 그 목적이 있는 것이다.The present invention is not only to shorten the time required for the construction of the ocher wall, but also to provide a method for constructing the ocher wall to enable long-term form preservation after construction and to increase the insulation and sound insulation effect.
상기의 목적을 달성하기 위한 본 발명에 의한 황토 벽체 시공방법은,The ocher wall construction method according to the present invention for achieving the above object,
구조물의 벽면 설계 치수에 따라 8-12cm두께의 각목을 재단하여 격자형태의 기본틀을 형성하는 기본틀 형성단계와;A basic frame forming step of cutting a square of 8-12 cm thick according to the wall design dimension of the structure to form a grid-based base frame;
상기 기본틀 형성단계에 의해 형성된 기본틀의 전면에 통기 가능한 원단으로 된 피막을 부착하고, 피막이 부착된 기본틀 전면에 2-5cm두께의 각목으로 된 간격유지구를 횡으로 간격을 두고 연속하여 고정하며, 간격유지구와 간격유지구 사이에 5-10mm 두께의 대나무편으로 된 세로버팀살을 횡으로 간격을 두고 연속하여 고정하고, 좌우 양단의 간격유지구 사이에 5-10mm 두께의 대나무편으로 된 가로버팀살을 종으로 간격을 두고 연속하여 고정하는 전면 흙채움부 형성단계와;A film made of a ventilable fabric is attached to the front surface of the base frame formed by the base frame forming step, and a fixed interval of two to five centimeters of wood is maintained on the front of the base frame to which the film is attached at intervals laterally. Between the interval retaining zone and the interval retaining strips, the vertical braces of 5-10 mm thick bamboo streaks are fixed in succession laterally, and between 5 and 10 mm thick bamboo strips between the gap retaining strips at the left and right ends. Forming a front soil filling portion to continuously fix the lateral rib meat at intervals with the bell;
상기 전면 흙채움부 형성단계가 완료된 기본틀을 뒤집어 후방이 피막으로 막힌 기본틀 내측에 왕겨 또는 왕겨숯으로 된 충전물을 채워 넣는 기본틀 충전단계와;A basic frame filling step of filling a filling made of chaff or chaff charcoal inside the basic frame of which the rear surface is covered with a film by inverting the basic frame in which the front soil filling part is completed;
상기 기본틀 충전단계가 완료된 뒤집힌 상태의 기본틀 전면에 통기 가능한 원단으로 된 피막을 부착하고, 피막이 부착된 기본틀 전면에 2-5cm두께의 각목으로 된 간격유지구를 횡으로 간격을 두고 연속하여 고정하며, 간격유지구와 간격유지구 사이에 5-10mm 두께의 대나무편으로 된 세로버팀살을 횡으로 간격을 두고 연속하여 고정하고, 좌우 양단의 간격유지구 사이에 5-10mm 두께의 대나무편으로 된 가로버팀살을 종으로 간격을 두고 연속하여 고정하는 후면 흙채움부 형성단계와; After the filling of the base frame is completed, attach a film made of air permeable fabric to the front side of the base frame in the inverted state, and continuously space the horizontally spaced intervals of 2-5 cm thick on the front side of the base frame to which the film is attached. The vertical braces of 5-10mm thick bamboo pieces are continuously fixed between the gap retaining zones and the gap retaining zones laterally at intervals, and between 5 and 10mm thick bamboo pieces between the gap retaining zones at the left and right ends. Forming a rear soil fill portion to continuously fix the horizontal braces at intervals with the bell;
상기 후면 흙채움부 형성단계가 완료된 기본틀을 벽면 시공 부위에 세운 후 기본틀 가장자리와 구조물의 천장,바닥,기둥 사이에 우레탄폼을 충전하여 기본틀을 고정하는 기본틀 고정단계와;A base frame fixing step of fixing the base frame by filling a urethane foam between the edge of the base frame and the ceiling, the floor, and the pillar of the structure after setting up the base frame on which the rear soil filling part is completed;
상기 기본틀 고정단계가 완료된 기본틀의 전면 흙채움부와 후면 흙채움부에 황토반죽을 채워 황토반죽이 기본틀의 전면 흙채움부와 후면 흙채움부의 가로버팀살 이상으로 덮이도록 하는 황토 채움단계;로 이루어지는 것을 특징으로 하는 것이다.The ocher filling step of filling the ocher dough in the front soil filling portion and the rear soil filling portion of the base frame, in which the fixing of the basic frame is completed, so that the ocher dough is covered with more than the horizontal braces of the soil filling portion and the rear soil filling portion of the basic mold. It is characterized by consisting of.
본 발명에 의한 황토 벽체 시공 방법은, 기본틀로써 기본 벽체를 형성한 이후에 가로버팀살과 세로버팀살이 마련된 전후면 흙채움부에 황토반죽을 채워 마감하는 것인 바, 황토블럭을 적층하여 기본 벽체를 형성한 이후 기본 벽체 표면에 황토반죽을 도포하는 방식 또는 지지틀로써 기본 벽체를 형성한 이후 기본 벽체 전후방에 거푸집을 설치하여 기본 벽체와 거푸집 사이에 황토반죽을 채워넣는 방식에 비해 시공이 용이하고 견고하므로 황토 벽체 시공에 소요되는 시간을 단축할 수 있게 될 뿐만 아니라 장기간 형태 보존이 이루어질 수 있게 되고, 기본틀 내에 왕겨 또는 왕겨숯으로 된 충전물이 채워지는 것인 바, 왕겨 또는 왕겨숯으로 된 충전물에 의한 열전달 및 소음전달 차단을 통해 단열 및 방음 효과를 높일 수 있게 되는 것이다.The ocher wall construction method according to the present invention, after forming the basic wall as a base frame is to finish the filling of the ocher dough in the front and rear soil filling portion is provided with transverse brace and longitudinal brace, the base by laminating the ocher block After the wall is formed, it is easier to construct than the method of applying ocher dough on the surface of the basic wall or by installing the formwork in front and behind the basic wall after filling the basic wall with the supporting frame. It is not only able to shorten the time required for constructing the ocher wall, but also to preserve the shape for a long time, and the filling of chaff or chaff charcoal is filled in the base frame. It is possible to increase the heat insulation and sound insulation effect by blocking heat transfer and noise transfer by the filling material.
이하, 첨부 도면에 의거 본 발명에 대하여 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.
도 1은 본 발명에 의한 황토 벽체 시공방법의 공정도이고, 도 2는 본 발명에 의한 황토 벽체 시공방법에서 기본틀 형성단계를 설명하기 위한 사시도이며, 도 3은 본 발명에 의한 황토 벽체 시공방법에서 전면 흙채움부 형성단계를 설명하기 위한 분리 사시도이고, 도 4는 본 발명에 의한 황토 벽체 시공방법에서 기본틀 충전단계를 설명하기 위한 사시도이며, 도 5는 본 발명에 의한 황토 벽체 시공방법에서 후면 흙채움부 형성단계를 설명하기 위한 분리 사시도이고, 도 6은 본 발명에 의한 황토 벽체 시공방법에서 기본틀 고정단계를 설명하기 위한 정면도이며, 도 7은 본 발명에 의한 황토 벽체 시공방법에서 황토 채움단계를 설명하기 위한 단면도이다.1 is a process diagram of the ocher wall construction method according to the present invention, Figure 2 is a perspective view for explaining the basic frame forming step in the ocher wall construction method according to the present invention, Figure 3 is an ocher wall construction method according to the present invention Figure 4 is an exploded perspective view for explaining the forming step of the front soil, Figure 4 is a perspective view for explaining the basic frame filling step in the ocher wall construction method according to the present invention, Figure 5 is a rear surface in the ocher wall construction method according to the present invention Figure 6 is an exploded perspective view for explaining the step of forming the soil filling, Figure 6 is a front view for explaining the basic frame fixing step in the ocher wall construction method according to the present invention, Figure 7 is filled ocher in the ocher wall construction method according to the present invention It is sectional drawing for demonstrating a step.
도 1에 도시된 바와 같이 본 발명에 의한 황토 벽체 시공방법은 기본틀 형성단계(S1)와, 전면 흙채움부 형성단계(S2)와, 기본틀 충전단계(S3)와, 후면 흙채움부 형성단계(S4)와, 기본틀 고정단계(S5)와, 황토 채움단계(S6)로 이루어진다.As shown in FIG. 1, the ocher wall construction method according to the present invention includes a basic frame forming step (S1), a front soil filling part forming step (S2), a base filling step (S3), and a rear soil filling part forming. It consists of a step S4, a base frame fixing step S5, and an ocher filling step S6.
상기 기본틀 형성단계(S1)는 구조물의 벽면 설계 치수에 따라 8-12cm두께의 각목을 재단하여 도 2a에 도시된 바와 같은 격자형태의 기본틀(10)을 형성하는 것이다.The basic frame forming step (S1) is to form a grid-
이와 같은 기본틀 형성단계(S1)에서 창호가 마련되는 벽면의 시공을 위한 기본틀(10)의 경우 도 2b에 도시된 바와 같이 기본틀(10) 내측에 창호 안착을 위한 보조틀(10')이 마련되는 것이 바람직하다.In the case of the
기본틀(10) 내에 창호 안착을 위한 보조틀(10')이 마련됨으로써 황토 벽체 시공 이후 창호 설치가 용이하게 이루어질 수 있게 된다.Since the
이때, 창호 안착을 위한 보조틀(10')은 기본틀(10)과 마찬가지로 8-12cm두께의 각목으로 이루어지는 것이 바람직하다.At this time, it is preferable that the
한편, 기본틀(10) 내에는 연결막대(10")가 설치되어 연결막대(10")에 의해 기본틀(10)의 보강이 이루어지는 것이 바람직하다.On the other hand, it is preferable that the connecting
상기 전면 흙채움부 형성단계(S2)는 도 3에 도시된 바와 같이 기본틀 형성단계(S1)에 의해 형성된 기본틀(10)의 전면에 통기 가능한 원단으로 된 피막(11)을 부착하는 것이고, 피막(11)이 부착된 기본틀(10) 전면에 2-5cm두께의 각목으로 된 간격유지구(12)를 횡으로 간격을 두고 연속하여 고정하는 것이며, 간격유지구(12)와 간격유지구(12) 사이에 5-10mm 두께의 대나무편으로 된 세로버팀살(13)을 횡으로 간격을 두고 연속하여 고정하는 것이고, 좌우 양단의 간격유지구(12) 사이에 5-10mm 두께의 대나무편으로 된 가로버팀살(14)을 종으로 간격을 두고 연속하여 고정하는 것이다.The front soil fill portion forming step (S2) is to attach the
이와 같은 전면 흙채움부 형성단계(S2)에서 피막(11)은 통기 가능한 것이라면 어떠한 것이라도 무방하나, 피막(11) 자체가 기본틀(10) 내에 왕겨 또는 왕겨숯으로 된 충전물(15) 충전될 때 이를 지지하는 수단이 되는 것이고 그 외면이 황토반죽(20) 점착면이 되는 것이므로 부직포 또는 마포와 같이 질긴 것이면서 거친 조직으로 된 것임이 바람직하다.In the front soil filling step forming step (S2) as described above, the
그리고 전면 흙채움부 형성단계(S2)에서 대나무편으로 된 세로버팀살(13) 및 가로버팀살(14)은 상대적으로 거친 조직으로 된 일면이 전방을 향하도록 하여 세로버팀살(13)은 10-15cm간격으로 가로버팀살(14)는 5-10cm 간격으로 고정되는 것이 바람직하다.And in the front soil fill portion forming step (S2) of the bamboo vertebrae vertical ribs (13) and transverse ridges (14) is one side of the relatively rough tissue facing the front so that the longitudinal braces (13) is 10 The
대나무편으로 된 세로버팀살(13) 및 가로버팀살(14)의 상대적으로 거친 조직으로 된 일면이 전방을 향하도록 고정됨으로써 전면 흙채움부(10a)에 황토반죽(20)을 채울 때 세로버팀살(13) 및 가로버팀살(14)에 황토반죽(20) 점착이 용이하게 이루어질 수 있게 된다.One side of the relatively coarse tissue of the bamboo chopped
한편, 전면 흙채움부(10a)를 형성할 때 피막(11)과 간격유지구(12)와 세로버팀살(13)과 가로버팀살(14)의 고정방법은 고정 상태를 견고히 유지할 수 있는 것이 라면 어떠한 고정방법을 이용하여도 무방하며 그 예로는 못 박음 또는 타카핀 박음이 될 수 있다.On the other hand, when the front soil filling portion (10a) to form the
상기 기본틀 충전단계(S3)는 도 4에 도시된 바와 같이 전면 흙채움부 형성단계(S2)가 완료된 기본틀(10)을 뒤집어 후방이 피막(11)으로 막힌 기본틀(10) 내측에 왕겨 또는 왕겨숯으로 된 충전물(15)을 채워 넣는 것이다.The base filling step (S3) is inverted the
이와 같은 기본틀 충전단계(S3)에서 기본틀(10) 내측에 충전되는 왕겨 또는 왕겨숯으로 된 충전물(15)은 건조된 상태의 것이며, 충전물(15)은 기본틀(10)이 세워진 상태에서 기본틀(10) 내측에 공간이 발생하지 않도록 하는 분량으로 충전되는 것이다.Filling 15 made of chaff or chaff charcoal to be filled in the
한편, 기본틀 충전단계(S3)에서 기본틀(10) 내에 충전되는 충전물층의 표면에는 열반사필름과 같은 단열재(16)를 덧댈 수 있다.On the other hand, in the base frame filling step (S3) it may be added to the surface of the filler layer to be filled in the
기본틀(10) 내에 충전되는 충전물층의 표면에 열반사필름과 같은 단열재(16)를 덧댐으로써 단열 효과를 높일 수 있게 되는데, 충전물층의 표면에 단열재(16)를 덧대는 경우 통기 효과는 떨어지게 되므로 충전물층 표면에 단열재(16)를 덧대는 경우는 특히, 구조물의 설계 특성상 부득이하게 기본틀(10)의 두께를 8-12cm로 할 수 없어 기본틀(10)에 충전되는 충전물(15)에 의한 단열 효과가 저하될 때로 하는 것이 바람직하다.By adding an
상기 후면 흙채움부 형성단계(S4)는 도 5에 도시된 바와 같이 기본틀 충전단계(S3)가 완료된 뒤집힌 상태의 기본틀(10)의 전면에 통기 가능한 원단으로 된 피막(11)을 부착하는 것이고, 피막(11)이 부착된 기본틀 전면에 2-5cm두께의 각목으로 된 간격유지구(12)를 횡으로 간격을 두고 연속하여 고정하는 것이며, 간격유지구(12)와 간격유지구(12) 사이에 5-10mm 두께의 대나무편으로 된 세로버팀살(13)을 횡으로 간격을 두고 연속하여 고정하는 것이고, 좌우 양단의 간격유지구(12) 사이에 5-10mm 두께의 대나무편으로 된 가로버팀살(14)을 종으로 간격을 두고 연속하여 고정하는 것이다.The rear soil filling part forming step (S4) is to attach the
이와 같은 후면 흙채움부 형성단계(S4)에서 피막(11)은 통기 가능한 것이라면 어떠한 것이라도 무방하나, 피막(11) 자체가 기본틀(10) 내에 왕겨 또는 왕겨숯으로 된 충전물(15)이 충전될 때 이를 지지하는 수단이 되고 그 외면이 황토반죽(20) 점착면이 되는 것이므로 부직포 또는 마포와 같이 질긴 것이면서 거친 조직으로 된 것임이 바람직하다.In the rear soil filling step forming step (S4) as described above, the
그리고 후면 흙채움부 형성단계(S4)에서 대나무편으로 된 세로버팀살(13) 및 가로버팀살(14)은 상대적으로 거친 조직으로 된 일면이 전방을 향하도록 하여 세로버팀살(13)은 10-15cm간격으로 가로버팀살(14)는 5-10cm 간격으로 고정되는 것이 바람직하다.And in the rear soil filling part forming step (S4), the
대나무편으로 된 세로버팀살(13) 및 가로버팀살(14)의 상대적으로 거친 조직으로 된 일면이 전방을 향하도록 고정됨으로써 후면 흙채움부(10b)에 황토반죽(20)을 채울 때 세로버팀살(13) 및 가로버팀살(14)에 황토반죽(20)점착이 용이하게 이루어질 수 있게 된다.One side of the relatively coarse tissue of the
한편, 후면 흙채움부(10b)를 형성할 때 피막과 간격유지구와 세로버팀살과 가로버팀살의 고정방법은 고정 상태를 견고히 유지할 수 있는 것이라면 어떠한 고정방법을 이용하여도 무방하며 그 예로는 못 박음 또는 타카핀 박음이 될 수 있다.On the other hand, when forming the rear soil filling part (10b), the fixing method of the film, the gap retaining zone, the longitudinal buttress and the horizontal buttocks may be used as long as it can maintain a fixed state and may be used as an example. Or it may be taco pinch.
상기 기본틀 고정단계(S5)는 도 6에 도시된 바와 같이 후면 흙채움부 형성단계(S4)가 완료된 기본틀(10)을 벽면 시공 부위에 세운 후 기본틀(10) 가장자리와 구조물의 천장,바닥,기둥 사이에 우레탄폼(30)을 충전하여 기본틀(10)을 고정하는 것이다.The base frame fixing step (S5) is the
이와 같은 기본틀 고정단계(S5)에서 기본틀(10)은 못 박음 등에 의해 시공 부위에 임시 고정된 상태에서 우레탄폼(30) 충전이 실시되므로 기본틀(10) 가장자리와 구조물의 천장, 바닥, 기둥 사이에 우레탄폼(30)이 충전될 수 있게 된다.In the base frame fixing step (S5), the
상기 황토 채움단계(S6)는 도 7a에 도시된 바와 같이 기본틀 고정단계(S5)가 완료된 기본틀(10)의 전면 흙채움부(10a)와 후면 흙채움부(10b)에 황토반죽(20)을 채워 황토반죽(20)이 기본틀(10)의 전면 흙채움부(10a)와 후면 흙채움부(10b)의 가로버팀살(14) 이상으로 덮이도록 하는 것이다.The ocher filling step (S6) is the loess dough (20) in the front soil filling portion (10a) and the rear soil filling portion (10b) of the
이와 같은 황토 채움단계(S6)에서 벽체가 화장실과 같이 물과 접하는 곳에 시공되는 경우 시공 이후 기본틀(10)의 전면 흙채움부(10a) 또는 후면 흙채움부(10b)에 채워진 황토반죽(20)이 물과 접하여 흘러내릴 수 있으므로 벽체가 화장실과 같이 물과 접하는 곳에 시공되는 경우에는 도 7b에 도시된 바와 같이 기본틀(10)의 전면 흙채움부(10a) 또는 후면 흙채움부(10b)의 어느 일면을 시멘트반죽(40)으로 채우는 것이 바람직하다.When the wall is constructed in contact with water, such as a toilet in the ocher filling step (S6), the ocher dough (20) filled in the front soil filling portion (10a) or rear soil filling portion (10b) of the
상기와 같은 본 발명에 의한 황토 벽체 시공방법은 기본틀(10)의 전후면에 간격유지구(12)와 세로버팀살(13)과 가로버팀살(14)을 고정하는 공정으로 황토반죽(20)이 도포되기 이전의 기본 벽체의 시공이 간단히 이루어지게 되는바, 기본 벽체 시공에 소요되는 시간을 단축할 수 있어 전체 황토 벽체 시공에 소요되는 시간을 단축할 수 있게 될 뿐만 아니라 기본틀(10)의 전후면에 간격유지구(12)와 세로버팀살(13)과 가로버팀살(14)을 고정하는 과정에서 기본틀(10)의 구조가 보강되므로 황토 벽체가 시공되었을 때 내구성을 높일 수 있어 장기간 형태 보존이 이루어질 수 있게 되는 것이고, 전후면 흙채움부(10a, 10b)에 황토반죽(20)을 채워넣는 과정에서 간격유지구(12)에 의해 형성되는 기본틀(10) 전후방 공간 전후에 세로버팀살(13)과 가로버팀살(14)이 마련되어 전후면 흙채움부(10a, 10b)에 황토반죽(20)을 채워넣을 때 세로버팀살(13)과 가로버팀살(14)이 전후면 흙채움부(10a, 10b)에 채워지는 황토반죽(20)을 지지하게 되는바, 황토반죽(20)의 채움이 간편하고 견고하게 이루어질 수 있게 되는 것이며, 기본틀(10) 내에 왕겨 또는 왕겨숯으로 된 충전물(15)이 채워지는 것인 바, 황토 벽체 시공 이후 황토에 의한 열전달 및 소음전달 차단과 더불어 왕겨 또는 왕겨숯으로 된 충전물(15)에 의한 열전달 및 소음전달 차단이 더해지게 되므로 단열 및 방음 효과를 높일 수 있게 되는 것이다.The ocher wall construction method according to the present invention as described above in the process of fixing the
이상에서 설명한 바와 같은 본 발명은 상기한 실시예에 한정되지 아니하므로 청구범위에서 청구하는 본 발명의 요지를 벗어나지 않는 범위 안에서 변경 가능한 것이며, 그와 같은 변경은 기재된 청구범위 내에 있게 된다.Since the present invention as described above is not limited to the above-described embodiments, it can be changed within the scope not departing from the gist of the present invention claimed in the claims, such changes are within the claims described.
도 1은 본 발명에 의한 황토 벽체 시공방법의 공정도1 is a process chart of the ocher wall construction method according to the present invention
도 2는 본 발명에 의한 황토 벽체 시공방법에서 기본틀 형성단계를 설명하기 위한 사시도Figure 2 is a perspective view for explaining the basic frame forming step in the ocher wall construction method according to the present invention
도 3은 본 발명에 의한 황토 벽체 시공방법에서 전면 흙채움부 형성단계를 설명하기 위한 분리 사시도Figure 3 is an exploded perspective view for explaining the front soil filling portion forming step in the ocher wall construction method according to the present invention
도 4는 본 발명에 의한 황토 벽체 시공방법에서 기본틀 충전단계를 설명하기 위한 사시도Figure 4 is a perspective view for explaining the basic frame filling step in the ocher wall construction method according to the present invention
도 5는 본 발명에 의한 황토 벽체 시공방법에서 후면 흙채움부 형성단계를 설명하기 위한 분리 사시도Figure 5 is an exploded perspective view for explaining the step of forming the rear soil filling in the ocher wall construction method according to the present invention
도 6은 본 발명에 의한 황토 벽체 시공방법에서 기본틀 고정단계를 설명하기 위한 정면도Figure 6 is a front view for explaining the basic frame fixing step in the ocher wall construction method according to the present invention
도 7은 본 발명에 의한 황토 벽체 시공방법에서 황토 채움단계를 설명하기 위한 단면도Figure 7 is a cross-sectional view for explaining the ocher filling step in the ocher wall construction method according to the present invention
도 8은 기존 황토블럭을 이용한 황토 벽체 시공방법을 설명하기 위한 단면도8 is a cross-sectional view for explaining the ocher wall construction method using the existing ocher block
도 9는 기존 지지틀과 거푸집을 이용한 황토 벽체 시공방법을 설명하기 위한 단면도Figure 9 is a cross-sectional view for explaining the ocher wall construction method using the existing support frame and formwork
<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>
10 : 기본틀 10' : 보조틀10: basic frame 10 ': auxiliary frame
10a : 전면 흙채움부 10b : 후면 흙채움부10a: front
11 : 피막 12 : 간격유지구11: film 12: spacing area
13 : 세로버팀살 14 : 가로버팀살13: vertical brace 14: horizontal brace
15 : 충전물 16 : 단열재15: Filling 16: Insulation
20 : 황토반죽 30 : 우레탄폼20: ocher dough 30: urethane foam
40 : 시멘트반죽 50 : 황토블럭40: cement dough 50: ocher block
60 : 지지틀 70 : 거푸집60: support frame 70: formwork
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090130611A KR101177616B1 (en) | 2009-12-24 | 2009-12-24 | construction method of yellow soil wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090130611A KR101177616B1 (en) | 2009-12-24 | 2009-12-24 | construction method of yellow soil wall |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20110073845A true KR20110073845A (en) | 2011-06-30 |
KR101177616B1 KR101177616B1 (en) | 2012-08-27 |
Family
ID=44404313
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020090130611A KR101177616B1 (en) | 2009-12-24 | 2009-12-24 | construction method of yellow soil wall |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101177616B1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101380724B1 (en) * | 2011-09-23 | 2014-04-02 | 김민지 | Wall structure of korean style house |
KR102054145B1 (en) * | 2018-11-27 | 2019-12-10 | 우창섭 | Loess panels for construction |
KR20210019145A (en) * | 2019-08-12 | 2021-02-22 | 한성섭 | Insulating wall structure using chaff charcoal and method for manufacturing the same |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100459842B1 (en) * | 2001-06-30 | 2004-12-03 | 박준석 | Door flame and construction method for the same |
KR200391707Y1 (en) * | 2005-05-11 | 2005-08-08 | 김중천 | A panel for an outer wall of a building |
-
2009
- 2009-12-24 KR KR1020090130611A patent/KR101177616B1/en active IP Right Grant
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101380724B1 (en) * | 2011-09-23 | 2014-04-02 | 김민지 | Wall structure of korean style house |
KR102054145B1 (en) * | 2018-11-27 | 2019-12-10 | 우창섭 | Loess panels for construction |
KR20210019145A (en) * | 2019-08-12 | 2021-02-22 | 한성섭 | Insulating wall structure using chaff charcoal and method for manufacturing the same |
Also Published As
Publication number | Publication date |
---|---|
KR101177616B1 (en) | 2012-08-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2649450C (en) | Shower bench | |
KR101177616B1 (en) | construction method of yellow soil wall | |
KR101286774B1 (en) | Waterproof prefabricated wall and Installation Method using the same | |
RU91727U1 (en) | FRONT DECORATIVE HEAT-INSULATING PANEL | |
KR101380391B1 (en) | Yellow soil wall having insulation layer and manufacturing process of the same | |
KR101312975B1 (en) | Movable type wooden construction building | |
KR100749636B1 (en) | Acoustic isolation apparatus for construction | |
RU2632617C2 (en) | Method of facing facade of floors in monolithic construction of buildings | |
KR100874885B1 (en) | Completely dry structure between floors of apartment houses | |
RU79903U1 (en) | WALL PANEL | |
KR20090011682U (en) | An insulating dual lattice strip | |
RU157705U1 (en) | WALL MULTILAYER PANEL | |
KR102416871B1 (en) | Gypsum board support and the construction method using the same | |
KR100884931B1 (en) | Indoor wall structure of building | |
KR200419654Y1 (en) | Prefabricated sound insulation panel consisting of aluminum frame | |
RU89150U1 (en) | THERMOFACADE FOAM-POLYSTROLIC BLOCK WITH AN ARCHECEMENT FACING LAYER | |
JP3238213U (en) | Wall structure of an external heat-insulated building with a four-circle plate around the inner window frame | |
CN203049863U (en) | High-performance sound-absorption floor and geothermal system sound-absorption floor | |
KR101487693B1 (en) | Wall to block noise of apartment house | |
CA2722363C (en) | Wall facing system and devices for supporting and anchoring stone facing elements | |
JP4953482B2 (en) | Opening structure in the outer insulation wall of a reinforced concrete building | |
JP2012180677A (en) | Floor structure | |
KR20070074532A (en) | Noiseless of sand sealed floor | |
GB2559113A (en) | Cladding system | |
RU54975U1 (en) | DEVICE FOR THERMAL INSULATION OF EXTERIOR WALLS OF MULTI-STOREY BUILDINGS |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20150821 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20160822 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20170821 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20180821 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20190821 Year of fee payment: 8 |