KR20110073845A - Construction method of yellow soil wall - Google Patents

Construction method of yellow soil wall Download PDF

Info

Publication number
KR20110073845A
KR20110073845A KR1020090130611A KR20090130611A KR20110073845A KR 20110073845 A KR20110073845 A KR 20110073845A KR 1020090130611 A KR1020090130611 A KR 1020090130611A KR 20090130611 A KR20090130611 A KR 20090130611A KR 20110073845 A KR20110073845 A KR 20110073845A
Authority
KR
South Korea
Prior art keywords
base frame
filling
ocher
construction method
frame
Prior art date
Application number
KR1020090130611A
Other languages
Korean (ko)
Other versions
KR101177616B1 (en
Inventor
이기열
Original Assignee
이기열
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이기열 filed Critical 이기열
Priority to KR1020090130611A priority Critical patent/KR101177616B1/en
Publication of KR20110073845A publication Critical patent/KR20110073845A/en
Application granted granted Critical
Publication of KR101177616B1 publication Critical patent/KR101177616B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/90Curtain walls comprising panels directly attached to the structure
    • E04B2/92Sandwich-type panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/82Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to sound only
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/88Insulating elements for both heat and sound
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • E04B2/965Connections of mullions and transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Acoustics & Sound (AREA)
  • Building Environments (AREA)

Abstract

PURPOSE: A construction method of a yellow soil wall is provided to improve heat insulation and soundproof effects by filling a base frame with chaff or chaff charcoal. CONSTITUTION: A construction method of a yellow soil wall is as follows. A latticed base frame is formed by cutting lumber with an 8~12cm thickness(S1). A film is attached on the front surface of the base frame. Spacers are consecutively fixed to the front surface of the base frame in a transverse direction. Vertical support bars are consecutively fixed between the spacers in a transverse direction. Horizontal support bars are consecutively fixed between the spacers in a longitudinal direction. The inside the base frame is filled with chaff or chaff charcoal(S3).

Description

황토 벽체 시공방법{ construction method of yellow soil wall }Construction method of yellow soil wall

본 발명은 황토 벽체 시공방법에 관한 것으로, 더욱 상세하게는 황토 벽체 시공에 소요되는 시간을 단축할 수 있도록 할 뿐만 아니라 시공 이후 장기간 형태 보존이 이루어질 수 있도록 하고 단열 및 방음 효과를 높일 수 있도록 하는 황토 벽체 시공방법에 관한 것이다.The present invention relates to a loess wall construction method, and more particularly to the ocher wall not only to shorten the time required for the construction of the ocher wall, but also to allow long-term form preservation after construction and to increase insulation and sound insulation effects. It relates to a wall construction method.

최근 황토의 유익함이 널려 알려짐에 따라 건축 구조물에 황토 벽체 시공이 늘고 있다.As the benefits of loess have been widely known, the construction of ocher walls on building structures is increasing.

그러나 전통 황토 벽체의 시공은 콘크리트, 블럭 등을 이용하는 일반 벽체 시공에 비해 공정이 번거로워 벽체 시공에 상당한 인력과 시간이 소요되는 문제가 있었다.However, the construction of traditional ocher walls has a problem that it takes considerable manpower and time for the wall construction because the process is cumbersome compared to general wall construction using concrete, blocks, and the like.

상기와 같은 전통 황토 벽체 시공에 따르는 문제를 해소하고자 최근에는 황토블럭(50)을 적층하여 기본 벽체를 형성한 이후에 도 8에 도시된 바와 같이 적층된 황토블럭(50) 표면에 황토반죽(20)을 도포하는 방식의 황토블럭(50)을 이용한 황토 벽체 시공방법이 실시되고 있다.In order to solve the problems caused by the traditional ocher wall construction as described above, after forming the basic wall by laminating the ocher block 50, the ocher dough 20 on the surface of the ocher block 50 stacked as shown in FIG. 8. The ocher wall construction method using the ocher block 50 of the method of apply | coating ()) is implemented.

이와 같이 황토블럭(50)을 이용한 황토 벽체 시공방법은 전통 황토 벽체 시공방법에 비해 시공에 소요되는 시간을 단축할 수 있도록 하는 것이었으나 블럭 쌓기의 특성상 시공 이후 외부로부터 충격이 가해지는 경우 자칫 형태가 허물어지게 되는 문제가 있었고 단열 및 방음 효과가 미흡한 문제가 있었다.As such, the ocher wall construction method using the ocher block 50 was to shorten the time required for construction compared to the traditional ocher wall construction method. However, when the impact is applied from the outside after construction due to the nature of the block stacking, There was a problem of collapse and there was a problem of insufficient insulation and sound insulation.

본 출원인은 상기와 같은 황토블럭(50)을 이용한 황토 벽체 시공방법이 갖는 문제를 해소하고자 지지틀과 충진재를 이용하는 황토흙벽의 시공방법(특허출원 제10-2008-0035157호)을 제안한바 있다.The present applicant has proposed a construction method of the loess soil wall using the support frame and the filler (Patent Application No. 10-2008-0035157) to solve the problem of the loess wall construction method using the ocher block 50 as described above.

본 출원인이 제안한 지지틀과 충진재를 이용하는 황토흙벽의 시공방법은 황토블럭(50)을 이용하여 황토 벽체를 시공하는 것에 비해 황토 벽체 시공에 소요되는 시간을 단축할 수 있도록 하고 단열 및 방음 효과를 높일 수 있도록 하는 것이었으나, 황토반죽(20)이 지지틀(60) 표면에 쉽게 부착되지 않아 지지틀(60) 표면에의 황토반죽(20) 부착을 위해 도 9에 도시된 바와 같이 지지틀(60) 전후방에 거푸집(70)을 설치한 이후 지지틀(60)과 거푸집(70) 사이에 황토반죽(20)을 채워넣어야 했던바, 거푸집(70) 설치 및 해체에 인력과 시간이 소요되는 문제가 있었다.The ocher soil wall construction method proposed by the present applicant using the support frame and the filling material can reduce the time required for the construction of the ocher wall, and increase the insulation and sound insulation effect, compared to the construction of the ocher wall using the ocher block 50. Although the ocher dough 20 is not easily attached to the surface of the support frame 60, the support frame 60 is shown in FIG. 9 for attaching the ocher dough 20 to the surface of the support frame 60. ) After installing the formwork 70 in the front and rear, and had to fill the ocher dough 20 between the support frame 60 and the formwork 70, the problem of manpower and time required to install and dismantle the formwork (70) there was.

본 발명은 황토 벽체 시공에 소요되는 시간을 단축할 수 있도록 할 뿐만 아니라 시공 이후 장기간 형태 보존이 이루어질 수 있도록 하고 단열 및 방음 효과를 높일 수 있도록 하는 황토 벽체 시공방법을 제공하는데 그 목적이 있는 것이다.The present invention is not only to shorten the time required for the construction of the ocher wall, but also to provide a method for constructing the ocher wall to enable long-term form preservation after construction and to increase the insulation and sound insulation effect.

상기의 목적을 달성하기 위한 본 발명에 의한 황토 벽체 시공방법은,The ocher wall construction method according to the present invention for achieving the above object,

구조물의 벽면 설계 치수에 따라 8-12cm두께의 각목을 재단하여 격자형태의 기본틀을 형성하는 기본틀 형성단계와;A basic frame forming step of cutting a square of 8-12 cm thick according to the wall design dimension of the structure to form a grid-based base frame;

상기 기본틀 형성단계에 의해 형성된 기본틀의 전면에 통기 가능한 원단으로 된 피막을 부착하고, 피막이 부착된 기본틀 전면에 2-5cm두께의 각목으로 된 간격유지구를 횡으로 간격을 두고 연속하여 고정하며, 간격유지구와 간격유지구 사이에 5-10mm 두께의 대나무편으로 된 세로버팀살을 횡으로 간격을 두고 연속하여 고정하고, 좌우 양단의 간격유지구 사이에 5-10mm 두께의 대나무편으로 된 가로버팀살을 종으로 간격을 두고 연속하여 고정하는 전면 흙채움부 형성단계와;A film made of a ventilable fabric is attached to the front surface of the base frame formed by the base frame forming step, and a fixed interval of two to five centimeters of wood is maintained on the front of the base frame to which the film is attached at intervals laterally. Between the interval retaining zone and the interval retaining strips, the vertical braces of 5-10 mm thick bamboo streaks are fixed in succession laterally, and between 5 and 10 mm thick bamboo strips between the gap retaining strips at the left and right ends. Forming a front soil filling portion to continuously fix the lateral rib meat at intervals with the bell;

상기 전면 흙채움부 형성단계가 완료된 기본틀을 뒤집어 후방이 피막으로 막힌 기본틀 내측에 왕겨 또는 왕겨숯으로 된 충전물을 채워 넣는 기본틀 충전단계와;A basic frame filling step of filling a filling made of chaff or chaff charcoal inside the basic frame of which the rear surface is covered with a film by inverting the basic frame in which the front soil filling part is completed;

상기 기본틀 충전단계가 완료된 뒤집힌 상태의 기본틀 전면에 통기 가능한 원단으로 된 피막을 부착하고, 피막이 부착된 기본틀 전면에 2-5cm두께의 각목으로 된 간격유지구를 횡으로 간격을 두고 연속하여 고정하며, 간격유지구와 간격유지구 사이에 5-10mm 두께의 대나무편으로 된 세로버팀살을 횡으로 간격을 두고 연속하여 고정하고, 좌우 양단의 간격유지구 사이에 5-10mm 두께의 대나무편으로 된 가로버팀살을 종으로 간격을 두고 연속하여 고정하는 후면 흙채움부 형성단계와; After the filling of the base frame is completed, attach a film made of air permeable fabric to the front side of the base frame in the inverted state, and continuously space the horizontally spaced intervals of 2-5 cm thick on the front side of the base frame to which the film is attached. The vertical braces of 5-10mm thick bamboo pieces are continuously fixed between the gap retaining zones and the gap retaining zones laterally at intervals, and between 5 and 10mm thick bamboo pieces between the gap retaining zones at the left and right ends. Forming a rear soil fill portion to continuously fix the horizontal braces at intervals with the bell;

상기 후면 흙채움부 형성단계가 완료된 기본틀을 벽면 시공 부위에 세운 후 기본틀 가장자리와 구조물의 천장,바닥,기둥 사이에 우레탄폼을 충전하여 기본틀을 고정하는 기본틀 고정단계와;A base frame fixing step of fixing the base frame by filling a urethane foam between the edge of the base frame and the ceiling, the floor, and the pillar of the structure after setting up the base frame on which the rear soil filling part is completed;

상기 기본틀 고정단계가 완료된 기본틀의 전면 흙채움부와 후면 흙채움부에 황토반죽을 채워 황토반죽이 기본틀의 전면 흙채움부와 후면 흙채움부의 가로버팀살 이상으로 덮이도록 하는 황토 채움단계;로 이루어지는 것을 특징으로 하는 것이다.The ocher filling step of filling the ocher dough in the front soil filling portion and the rear soil filling portion of the base frame, in which the fixing of the basic frame is completed, so that the ocher dough is covered with more than the horizontal braces of the soil filling portion and the rear soil filling portion of the basic mold. It is characterized by consisting of.

본 발명에 의한 황토 벽체 시공 방법은, 기본틀로써 기본 벽체를 형성한 이후에 가로버팀살과 세로버팀살이 마련된 전후면 흙채움부에 황토반죽을 채워 마감하는 것인 바, 황토블럭을 적층하여 기본 벽체를 형성한 이후 기본 벽체 표면에 황토반죽을 도포하는 방식 또는 지지틀로써 기본 벽체를 형성한 이후 기본 벽체 전후방에 거푸집을 설치하여 기본 벽체와 거푸집 사이에 황토반죽을 채워넣는 방식에 비해 시공이 용이하고 견고하므로 황토 벽체 시공에 소요되는 시간을 단축할 수 있게 될 뿐만 아니라 장기간 형태 보존이 이루어질 수 있게 되고, 기본틀 내에 왕겨 또는 왕겨숯으로 된 충전물이 채워지는 것인 바, 왕겨 또는 왕겨숯으로 된 충전물에 의한 열전달 및 소음전달 차단을 통해 단열 및 방음 효과를 높일 수 있게 되는 것이다.The ocher wall construction method according to the present invention, after forming the basic wall as a base frame is to finish the filling of the ocher dough in the front and rear soil filling portion is provided with transverse brace and longitudinal brace, the base by laminating the ocher block After the wall is formed, it is easier to construct than the method of applying ocher dough on the surface of the basic wall or by installing the formwork in front and behind the basic wall after filling the basic wall with the supporting frame. It is not only able to shorten the time required for constructing the ocher wall, but also to preserve the shape for a long time, and the filling of chaff or chaff charcoal is filled in the base frame. It is possible to increase the heat insulation and sound insulation effect by blocking heat transfer and noise transfer by the filling material.

이하, 첨부 도면에 의거 본 발명에 대하여 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 의한 황토 벽체 시공방법의 공정도이고, 도 2는 본 발명에 의한 황토 벽체 시공방법에서 기본틀 형성단계를 설명하기 위한 사시도이며, 도 3은 본 발명에 의한 황토 벽체 시공방법에서 전면 흙채움부 형성단계를 설명하기 위한 분리 사시도이고, 도 4는 본 발명에 의한 황토 벽체 시공방법에서 기본틀 충전단계를 설명하기 위한 사시도이며, 도 5는 본 발명에 의한 황토 벽체 시공방법에서 후면 흙채움부 형성단계를 설명하기 위한 분리 사시도이고, 도 6은 본 발명에 의한 황토 벽체 시공방법에서 기본틀 고정단계를 설명하기 위한 정면도이며, 도 7은 본 발명에 의한 황토 벽체 시공방법에서 황토 채움단계를 설명하기 위한 단면도이다.1 is a process diagram of the ocher wall construction method according to the present invention, Figure 2 is a perspective view for explaining the basic frame forming step in the ocher wall construction method according to the present invention, Figure 3 is an ocher wall construction method according to the present invention Figure 4 is an exploded perspective view for explaining the forming step of the front soil, Figure 4 is a perspective view for explaining the basic frame filling step in the ocher wall construction method according to the present invention, Figure 5 is a rear surface in the ocher wall construction method according to the present invention Figure 6 is an exploded perspective view for explaining the step of forming the soil filling, Figure 6 is a front view for explaining the basic frame fixing step in the ocher wall construction method according to the present invention, Figure 7 is filled ocher in the ocher wall construction method according to the present invention It is sectional drawing for demonstrating a step.

도 1에 도시된 바와 같이 본 발명에 의한 황토 벽체 시공방법은 기본틀 형성단계(S1)와, 전면 흙채움부 형성단계(S2)와, 기본틀 충전단계(S3)와, 후면 흙채움부 형성단계(S4)와, 기본틀 고정단계(S5)와, 황토 채움단계(S6)로 이루어진다.As shown in FIG. 1, the ocher wall construction method according to the present invention includes a basic frame forming step (S1), a front soil filling part forming step (S2), a base filling step (S3), and a rear soil filling part forming. It consists of a step S4, a base frame fixing step S5, and an ocher filling step S6.

상기 기본틀 형성단계(S1)는 구조물의 벽면 설계 치수에 따라 8-12cm두께의 각목을 재단하여 도 2a에 도시된 바와 같은 격자형태의 기본틀(10)을 형성하는 것이다.The basic frame forming step (S1) is to form a grid-shaped base frame 10 as shown in Figure 2a by cutting a square of 8-12cm thick according to the wall surface design dimensions of the structure.

이와 같은 기본틀 형성단계(S1)에서 창호가 마련되는 벽면의 시공을 위한 기본틀(10)의 경우 도 2b에 도시된 바와 같이 기본틀(10) 내측에 창호 안착을 위한 보조틀(10')이 마련되는 것이 바람직하다.In the case of the base frame 10 for the construction of the wall surface is provided in the window frame forming step (S1) as shown in Figure 2b as shown in Figure 2b the auxiliary frame 10 'for mounting the window inside the frame 10 It is preferable that this be provided.

기본틀(10) 내에 창호 안착을 위한 보조틀(10')이 마련됨으로써 황토 벽체 시공 이후 창호 설치가 용이하게 이루어질 수 있게 된다.Since the auxiliary frame 10 ′ for seating the windows in the base frame 10 is provided, the installation of the windows after the construction of the ocher wall can be easily performed.

이때, 창호 안착을 위한 보조틀(10')은 기본틀(10)과 마찬가지로 8-12cm두께의 각목으로 이루어지는 것이 바람직하다.At this time, it is preferable that the auxiliary frame 10 ′ for seating the windows and doors is made of a 8-12 cm thick square like the base frame 10.

한편, 기본틀(10) 내에는 연결막대(10")가 설치되어 연결막대(10")에 의해 기본틀(10)의 보강이 이루어지는 것이 바람직하다.On the other hand, it is preferable that the connecting rod 10 "is installed in the base frame 10 so that the base frame 10 is reinforced by the connecting rod 10".

상기 전면 흙채움부 형성단계(S2)는 도 3에 도시된 바와 같이 기본틀 형성단계(S1)에 의해 형성된 기본틀(10)의 전면에 통기 가능한 원단으로 된 피막(11)을 부착하는 것이고, 피막(11)이 부착된 기본틀(10) 전면에 2-5cm두께의 각목으로 된 간격유지구(12)를 횡으로 간격을 두고 연속하여 고정하는 것이며, 간격유지구(12)와 간격유지구(12) 사이에 5-10mm 두께의 대나무편으로 된 세로버팀살(13)을 횡으로 간격을 두고 연속하여 고정하는 것이고, 좌우 양단의 간격유지구(12) 사이에 5-10mm 두께의 대나무편으로 된 가로버팀살(14)을 종으로 간격을 두고 연속하여 고정하는 것이다.The front soil fill portion forming step (S2) is to attach the film 11 made of a ventilable fabric on the front surface of the base frame 10 formed by the base frame forming step (S1), as shown in FIG. It is to fix the interval retaining sphere 12 of 2-5cm thickness on the front side of the base frame 10 to which the coating 11 is attached in succession at intervals laterally, the interval retaining sphere 12 and the interval retaining sphere. (12) between 5-12 mm thick bamboo piece longitudinal brace (13) to be fixed in succession at intervals laterally, and 5-10 mm thick bamboo piece between the gap between the left and right ends (12) Horizontal braces (14) are to be fixed in succession at intervals of the bell.

이와 같은 전면 흙채움부 형성단계(S2)에서 피막(11)은 통기 가능한 것이라면 어떠한 것이라도 무방하나, 피막(11) 자체가 기본틀(10) 내에 왕겨 또는 왕겨숯으로 된 충전물(15) 충전될 때 이를 지지하는 수단이 되는 것이고 그 외면이 황토반죽(20) 점착면이 되는 것이므로 부직포 또는 마포와 같이 질긴 것이면서 거친 조직으로 된 것임이 바람직하다.In the front soil filling step forming step (S2) as described above, the film 11 may be any one as long as it is aerated, but the film 11 itself may be filled with a filling of chaff or chaff charcoal in the base frame 10. When it is a means to support this and the outer surface is to be the ocher dough (20) adhesive surface, it is preferable that it is made of tough tissue, such as non-woven fabric or abrasion.

그리고 전면 흙채움부 형성단계(S2)에서 대나무편으로 된 세로버팀살(13) 및 가로버팀살(14)은 상대적으로 거친 조직으로 된 일면이 전방을 향하도록 하여 세로버팀살(13)은 10-15cm간격으로 가로버팀살(14)는 5-10cm 간격으로 고정되는 것이 바람직하다.And in the front soil fill portion forming step (S2) of the bamboo vertebrae vertical ribs (13) and transverse ridges (14) is one side of the relatively rough tissue facing the front so that the longitudinal braces (13) is 10 The transverse braces 14 at intervals of -15 cm are preferably fixed at intervals of 5-10 cm.

대나무편으로 된 세로버팀살(13) 및 가로버팀살(14)의 상대적으로 거친 조직으로 된 일면이 전방을 향하도록 고정됨으로써 전면 흙채움부(10a)에 황토반죽(20)을 채울 때 세로버팀살(13) 및 가로버팀살(14)에 황토반죽(20) 점착이 용이하게 이루어질 수 있게 된다.One side of the relatively coarse tissue of the bamboo chopped ribs 13 and the lateral ribs 14 is fixed to face the front so that when filling the ocher dough 20 on the front soil filling portion 10a The loess dough 20 can be easily adhered to the flesh 13 and the cross brace 20.

한편, 전면 흙채움부(10a)를 형성할 때 피막(11)과 간격유지구(12)와 세로버팀살(13)과 가로버팀살(14)의 고정방법은 고정 상태를 견고히 유지할 수 있는 것이 라면 어떠한 고정방법을 이용하여도 무방하며 그 예로는 못 박음 또는 타카핀 박음이 될 수 있다.On the other hand, when the front soil filling portion (10a) to form the film 11, the gap retaining zone 12, the longitudinal brace (13) and the lateral brace (14) is a method of fixing that can be firmly maintained If it is possible to use any method of fixing, it may be nailing or takapin nailing.

상기 기본틀 충전단계(S3)는 도 4에 도시된 바와 같이 전면 흙채움부 형성단계(S2)가 완료된 기본틀(10)을 뒤집어 후방이 피막(11)으로 막힌 기본틀(10) 내측에 왕겨 또는 왕겨숯으로 된 충전물(15)을 채워 넣는 것이다.The base filling step (S3) is inverted the base frame 10, the front soil filling step forming step (S2) is completed, as shown in Figure 4, the chaff inside the base frame 10, the rear is blocked by the film (11) Or to fill the filling 15 of chaff charcoal.

이와 같은 기본틀 충전단계(S3)에서 기본틀(10) 내측에 충전되는 왕겨 또는 왕겨숯으로 된 충전물(15)은 건조된 상태의 것이며, 충전물(15)은 기본틀(10)이 세워진 상태에서 기본틀(10) 내측에 공간이 발생하지 않도록 하는 분량으로 충전되는 것이다.Filling 15 made of chaff or chaff charcoal to be filled in the base frame 10 in the base frame filling step (S3) is a dried state, the filling 15 is in a state in which the base frame 10 is erected It is filled with an amount such that a space does not occur inside the base frame 10.

한편, 기본틀 충전단계(S3)에서 기본틀(10) 내에 충전되는 충전물층의 표면에는 열반사필름과 같은 단열재(16)를 덧댈 수 있다.On the other hand, in the base frame filling step (S3) it may be added to the surface of the filler layer to be filled in the base frame 10, the heat insulating material 16, such as a heat reflection film.

기본틀(10) 내에 충전되는 충전물층의 표면에 열반사필름과 같은 단열재(16)를 덧댐으로써 단열 효과를 높일 수 있게 되는데, 충전물층의 표면에 단열재(16)를 덧대는 경우 통기 효과는 떨어지게 되므로 충전물층 표면에 단열재(16)를 덧대는 경우는 특히, 구조물의 설계 특성상 부득이하게 기본틀(10)의 두께를 8-12cm로 할 수 없어 기본틀(10)에 충전되는 충전물(15)에 의한 단열 효과가 저하될 때로 하는 것이 바람직하다.By adding an insulating material 16 such as a heat reflection film to the surface of the filler layer to be filled in the base frame 10, it is possible to increase the thermal insulation effect, if the insulating material 16 is added to the surface of the filler layer is less effective ventilation Therefore, when the insulating material 16 is padded on the surface of the filling layer, the thickness of the base frame 10 cannot be made 8-12 cm inevitably due to the design characteristics of the structure. It is preferable to make it the time when the heat insulation effect by this falls.

상기 후면 흙채움부 형성단계(S4)는 도 5에 도시된 바와 같이 기본틀 충전단계(S3)가 완료된 뒤집힌 상태의 기본틀(10)의 전면에 통기 가능한 원단으로 된 피막(11)을 부착하는 것이고, 피막(11)이 부착된 기본틀 전면에 2-5cm두께의 각목으로 된 간격유지구(12)를 횡으로 간격을 두고 연속하여 고정하는 것이며, 간격유지구(12)와 간격유지구(12) 사이에 5-10mm 두께의 대나무편으로 된 세로버팀살(13)을 횡으로 간격을 두고 연속하여 고정하는 것이고, 좌우 양단의 간격유지구(12) 사이에 5-10mm 두께의 대나무편으로 된 가로버팀살(14)을 종으로 간격을 두고 연속하여 고정하는 것이다.The rear soil filling part forming step (S4) is to attach the film 11 made of a ventilable fabric on the front of the base frame 10 in the inverted state, the base frame filling step (S3) is completed as shown in FIG. It is to be fixed in succession at intervals horizontally spaced interval holding spaces 12 to 2-5cm thick wood on the front of the base frame to which the coating 11 is attached, the space holding spaces 12 and the space holding space ( 12) between 5-10mm thick bamboo piece longitudinal brace (13) is fixed in succession at intervals laterally, with 5-10mm thick bamboo piece between the gap between the left and right ends (12). The horizontal braces (14) are fixed in succession at intervals with the bell.

이와 같은 후면 흙채움부 형성단계(S4)에서 피막(11)은 통기 가능한 것이라면 어떠한 것이라도 무방하나, 피막(11) 자체가 기본틀(10) 내에 왕겨 또는 왕겨숯으로 된 충전물(15)이 충전될 때 이를 지지하는 수단이 되고 그 외면이 황토반죽(20) 점착면이 되는 것이므로 부직포 또는 마포와 같이 질긴 것이면서 거친 조직으로 된 것임이 바람직하다.In the rear soil filling step forming step (S4) as described above, the film 11 may be any one as long as it can be ventilated, but the film 11 itself is filled with chaff or chaff charcoal 15 in the base frame 10. When it is a means to support this and the outer surface is to be the ocher dough (20) adhesive surface, it is preferable that it is made of tough tissue, such as non-woven fabric or abrasion.

그리고 후면 흙채움부 형성단계(S4)에서 대나무편으로 된 세로버팀살(13) 및 가로버팀살(14)은 상대적으로 거친 조직으로 된 일면이 전방을 향하도록 하여 세로버팀살(13)은 10-15cm간격으로 가로버팀살(14)는 5-10cm 간격으로 고정되는 것이 바람직하다.And in the rear soil filling part forming step (S4), the vertical ribs 13 and the horizontal ribs 14 made of bamboo pieces have one side made of relatively rough tissue facing forward so that the vertical ribs 13 are 10 The transverse braces 14 at intervals of -15 cm are preferably fixed at intervals of 5-10 cm.

대나무편으로 된 세로버팀살(13) 및 가로버팀살(14)의 상대적으로 거친 조직으로 된 일면이 전방을 향하도록 고정됨으로써 후면 흙채움부(10b)에 황토반죽(20)을 채울 때 세로버팀살(13) 및 가로버팀살(14)에 황토반죽(20)점착이 용이하게 이루어질 수 있게 된다.One side of the relatively coarse tissue of the bamboo chopsticks 13 and the horizontal braces 14 is fixed to face the front so that when filling the ocher dough 20 on the rear soil filling part 10b The loess dough 20 on the flesh 13 and the cross brace 14 can be easily adhered.

한편, 후면 흙채움부(10b)를 형성할 때 피막과 간격유지구와 세로버팀살과 가로버팀살의 고정방법은 고정 상태를 견고히 유지할 수 있는 것이라면 어떠한 고정방법을 이용하여도 무방하며 그 예로는 못 박음 또는 타카핀 박음이 될 수 있다.On the other hand, when forming the rear soil filling part (10b), the fixing method of the film, the gap retaining zone, the longitudinal buttress and the horizontal buttocks may be used as long as it can maintain a fixed state and may be used as an example. Or it may be taco pinch.

상기 기본틀 고정단계(S5)는 도 6에 도시된 바와 같이 후면 흙채움부 형성단계(S4)가 완료된 기본틀(10)을 벽면 시공 부위에 세운 후 기본틀(10) 가장자리와 구조물의 천장,바닥,기둥 사이에 우레탄폼(30)을 충전하여 기본틀(10)을 고정하는 것이다.The base frame fixing step (S5) is the base frame 10, the edge of the base frame 10 and the ceiling of the structure, after setting the base frame 10, the completion of the rear soil filling step (S4) as shown in Figure 6 on the wall construction site, Bottom, the pillar is to fill the urethane foam 30 to fix the base frame 10.

이와 같은 기본틀 고정단계(S5)에서 기본틀(10)은 못 박음 등에 의해 시공 부위에 임시 고정된 상태에서 우레탄폼(30) 충전이 실시되므로 기본틀(10) 가장자리와 구조물의 천장, 바닥, 기둥 사이에 우레탄폼(30)이 충전될 수 있게 된다.In the base frame fixing step (S5), the base frame 10 is filled with urethane foam 30 while temporarily fixed to the construction site by nailing, etc., so that the edge of the base frame 10 and the ceiling, floor, Urethane foam 30 can be filled between the pillars.

상기 황토 채움단계(S6)는 도 7a에 도시된 바와 같이 기본틀 고정단계(S5)가 완료된 기본틀(10)의 전면 흙채움부(10a)와 후면 흙채움부(10b)에 황토반죽(20)을 채워 황토반죽(20)이 기본틀(10)의 전면 흙채움부(10a)와 후면 흙채움부(10b)의 가로버팀살(14) 이상으로 덮이도록 하는 것이다.The ocher filling step (S6) is the loess dough (20) in the front soil filling portion (10a) and the rear soil filling portion (10b) of the base frame 10, the base frame fixing step (S5) is completed as shown in Figure 7a ) To fill the ocher dough 20 is covered with more than the transverse braces (14) of the front soil filling portion (10a) and rear soil filling portion (10b) of the base frame (10).

이와 같은 황토 채움단계(S6)에서 벽체가 화장실과 같이 물과 접하는 곳에 시공되는 경우 시공 이후 기본틀(10)의 전면 흙채움부(10a) 또는 후면 흙채움부(10b)에 채워진 황토반죽(20)이 물과 접하여 흘러내릴 수 있으므로 벽체가 화장실과 같이 물과 접하는 곳에 시공되는 경우에는 도 7b에 도시된 바와 같이 기본틀(10)의 전면 흙채움부(10a) 또는 후면 흙채움부(10b)의 어느 일면을 시멘트반죽(40)으로 채우는 것이 바람직하다.When the wall is constructed in contact with water, such as a toilet in the ocher filling step (S6), the ocher dough (20) filled in the front soil filling portion (10a) or rear soil filling portion (10b) of the base frame 10 after construction ) Can flow down in contact with the water, so when the wall is constructed in contact with the water, such as the toilet, as shown in Figure 7b, the front soil filling portion (10a) or rear soil filling portion (10b) of the base frame 10 It is preferable to fill any one surface of the cement dough (40).

상기와 같은 본 발명에 의한 황토 벽체 시공방법은 기본틀(10)의 전후면에 간격유지구(12)와 세로버팀살(13)과 가로버팀살(14)을 고정하는 공정으로 황토반죽(20)이 도포되기 이전의 기본 벽체의 시공이 간단히 이루어지게 되는바, 기본 벽체 시공에 소요되는 시간을 단축할 수 있어 전체 황토 벽체 시공에 소요되는 시간을 단축할 수 있게 될 뿐만 아니라 기본틀(10)의 전후면에 간격유지구(12)와 세로버팀살(13)과 가로버팀살(14)을 고정하는 과정에서 기본틀(10)의 구조가 보강되므로 황토 벽체가 시공되었을 때 내구성을 높일 수 있어 장기간 형태 보존이 이루어질 수 있게 되는 것이고, 전후면 흙채움부(10a, 10b)에 황토반죽(20)을 채워넣는 과정에서 간격유지구(12)에 의해 형성되는 기본틀(10) 전후방 공간 전후에 세로버팀살(13)과 가로버팀살(14)이 마련되어 전후면 흙채움부(10a, 10b)에 황토반죽(20)을 채워넣을 때 세로버팀살(13)과 가로버팀살(14)이 전후면 흙채움부(10a, 10b)에 채워지는 황토반죽(20)을 지지하게 되는바, 황토반죽(20)의 채움이 간편하고 견고하게 이루어질 수 있게 되는 것이며, 기본틀(10) 내에 왕겨 또는 왕겨숯으로 된 충전물(15)이 채워지는 것인 바, 황토 벽체 시공 이후 황토에 의한 열전달 및 소음전달 차단과 더불어 왕겨 또는 왕겨숯으로 된 충전물(15)에 의한 열전달 및 소음전달 차단이 더해지게 되므로 단열 및 방음 효과를 높일 수 있게 되는 것이다.The ocher wall construction method according to the present invention as described above in the process of fixing the gap retaining zone 12, the longitudinal buttresses (13) and the horizontal buttresses (14) on the front and rear surfaces of the base frame (10) The construction of the basic wall before the application of) is simply performed, the time required for the construction of the basic wall can be shortened, and the time required for the construction of the whole ocher wall can be shortened, as well as the basic frame (10). In the process of fixing the gap retaining zone (12) and the longitudinal brace (13) and transverse brace (14) on the front and back of the structure of the base frame (10) is reinforced so that durability can be increased when the ocher wall is constructed It will be possible to preserve the shape for a long time, before and after the base frame 10 formed by the gap retaining zone 12 in the process of filling the ocher dough 20 in the front and rear soil filling portion (10a, 10b) The longitudinal butts (13) and the transverse butts (14) are prepared before and after When the ocher dough (20) is filled into the soil filling portion (10a, 10b), the oak dough (20) is filled with the front and rear soil filling portions (10a, 10b) of the vertical brace (13) and the horizontal brace (14). ) Will be supported, the filling of the ocher dough (20) can be made easily and firmly, the filling (15) made of chaff or chaff charcoal in the base frame 10, the ocher wall After construction, the heat transfer and noise transfer blockage by the ocher, and the heat transfer and noise transfer blockage by the chaff or chaff charcoal filler 15 are added, thereby increasing the insulation and sound insulation effects.

이상에서 설명한 바와 같은 본 발명은 상기한 실시예에 한정되지 아니하므로 청구범위에서 청구하는 본 발명의 요지를 벗어나지 않는 범위 안에서 변경 가능한 것이며, 그와 같은 변경은 기재된 청구범위 내에 있게 된다.Since the present invention as described above is not limited to the above-described embodiments, it can be changed within the scope not departing from the gist of the present invention claimed in the claims, such changes are within the claims described.

도 1은 본 발명에 의한 황토 벽체 시공방법의 공정도1 is a process chart of the ocher wall construction method according to the present invention

도 2는 본 발명에 의한 황토 벽체 시공방법에서 기본틀 형성단계를 설명하기 위한 사시도Figure 2 is a perspective view for explaining the basic frame forming step in the ocher wall construction method according to the present invention

도 3은 본 발명에 의한 황토 벽체 시공방법에서 전면 흙채움부 형성단계를 설명하기 위한 분리 사시도Figure 3 is an exploded perspective view for explaining the front soil filling portion forming step in the ocher wall construction method according to the present invention

도 4는 본 발명에 의한 황토 벽체 시공방법에서 기본틀 충전단계를 설명하기 위한 사시도Figure 4 is a perspective view for explaining the basic frame filling step in the ocher wall construction method according to the present invention

도 5는 본 발명에 의한 황토 벽체 시공방법에서 후면 흙채움부 형성단계를 설명하기 위한 분리 사시도Figure 5 is an exploded perspective view for explaining the step of forming the rear soil filling in the ocher wall construction method according to the present invention

도 6은 본 발명에 의한 황토 벽체 시공방법에서 기본틀 고정단계를 설명하기 위한 정면도Figure 6 is a front view for explaining the basic frame fixing step in the ocher wall construction method according to the present invention

도 7은 본 발명에 의한 황토 벽체 시공방법에서 황토 채움단계를 설명하기 위한 단면도Figure 7 is a cross-sectional view for explaining the ocher filling step in the ocher wall construction method according to the present invention

도 8은 기존 황토블럭을 이용한 황토 벽체 시공방법을 설명하기 위한 단면도8 is a cross-sectional view for explaining the ocher wall construction method using the existing ocher block

도 9는 기존 지지틀과 거푸집을 이용한 황토 벽체 시공방법을 설명하기 위한 단면도Figure 9 is a cross-sectional view for explaining the ocher wall construction method using the existing support frame and formwork

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10 : 기본틀 10' : 보조틀10: basic frame 10 ': auxiliary frame

10a : 전면 흙채움부 10b : 후면 흙채움부10a: front soil fill portion 10b: rear soil fill portion

11 : 피막 12 : 간격유지구11: film 12: spacing area

13 : 세로버팀살 14 : 가로버팀살13: vertical brace 14: horizontal brace

15 : 충전물 16 : 단열재15: Filling 16: Insulation

20 : 황토반죽 30 : 우레탄폼20: ocher dough 30: urethane foam

40 : 시멘트반죽 50 : 황토블럭40: cement dough 50: ocher block

60 : 지지틀 70 : 거푸집60: support frame 70: formwork

Claims (7)

구조물의 벽면 설계 치수에 따라 8-12cm두께의 각목을 재단하여 격자형태의 기본틀을 형성하는 기본틀 형성단계와;A basic frame forming step of cutting a square of 8-12 cm thick according to the wall design dimension of the structure to form a grid-based base frame; 상기 기본틀 형성단계에 의해 형성된 기본틀의 전면에 통기 가능한 원단으로 된 피막을 부착하고, 피막이 부착된 기본틀 전면에 2-5cm두께의 각목으로 된 간격유지구를 횡으로 간격을 두고 연속하여 고정하며, 간격유지구와 간격유지구 사이에 5-10mm 두께의 대나무편으로 된 세로버팀살을 횡으로 간격을 두고 연속하여 고정하고, 좌우 양단의 간격유지구 사이에 5-10mm 두께의 대나무편으로 된 가로버팀살을 종으로 간격을 두고 연속하여 고정하는 전면 흙채움부 형성단계와;A film made of a ventilable fabric is attached to the front surface of the base frame formed by the base frame forming step, and a fixed interval of two to five centimeters of wood is maintained on the front of the base frame to which the film is attached at intervals laterally. Between the interval retaining zone and the interval retaining strips, the vertical braces of 5-10 mm thick bamboo streaks are fixed in succession laterally, and between 5 and 10 mm thick bamboo strips between the gap retaining strips at the left and right ends. Forming a front soil filling portion to continuously fix the lateral rib meat at intervals with the bell; 상기 전면 흙채움부 형성단계가 완료된 기본틀을 뒤집어 후방이 피막으로 막힌 기본틀 내측에 왕겨 또는 왕겨숯으로 된 충전물을 채워 넣는 기본틀 충전단계와;A basic frame filling step of filling a filling made of chaff or chaff charcoal inside the basic frame of which the rear surface is covered with a film by inverting the basic frame in which the front soil filling part is completed; 상기 기본틀 충전단계가 완료된 뒤집힌 상태의 기본틀 전면에 통기 가능한 원단으로 된 피막을 부착하고, 피막이 부착된 기본틀 전면에 2-5cm두께의 각목으로 된 간격유지구를 횡으로 간격을 두고 연속하여 고정하며, 간격유지구와 간격유지구 사이에 5-10mm 두께의 대나무편으로 된 세로버팀살을 횡으로 간격을 두고 연속하여 고정하고, 좌우 양단의 간격유지구 사이에 5-10mm 두께의 대나무편으로 된 가로버팀살을 종으로 간격을 두고 연속하여 고정하는 후면 흙채움부 형성단계와; After the filling of the base frame is completed, attach a film made of air permeable fabric to the front side of the base frame in the inverted state, and continuously space the horizontally spaced intervals of 2-5 cm thick on the front side of the base frame to which the film is attached. The vertical braces of 5-10mm thick bamboo pieces are continuously fixed between the gap retaining zones and the gap retaining zones laterally at intervals, and between 5 and 10mm thick bamboo pieces between the gap retaining zones at the left and right ends. Forming a rear soil fill portion to continuously fix the horizontal braces at intervals with the bell; 상기 후면 흙채움부 형성단계가 완료된 기본틀을 벽면 시공 부위에 세운 후 기본틀 가장자리와 구조물의 천장,바닥,기둥 사이에 우레탄폼을 충전하여 기본틀을 고정하는 기본틀 고정단계와;A base frame fixing step of fixing the base frame by filling a urethane foam between the edge of the base frame and the ceiling, the floor, and the pillar of the structure after setting up the base frame on which the rear soil filling part is completed; 상기 기본틀 고정단계가 완료된 기본틀의 전면 흙채움부와 후면 흙채움부에 황토반죽을 채워 황토반죽이 기본틀의 전면 흙채움부와 후면 흙채움부의 가로버팀살 이상으로 덮이도록 하는 황토 채움단계;로 이루어지는 것을 특징으로 하는 황토 벽체 시공방법.The ocher filling step of filling the ocher dough in the front soil filling portion and the rear soil filling portion of the base frame, in which the fixing of the basic frame is completed, so that the ocher dough is covered with more than the horizontal braces of the soil filling portion and the rear soil filling portion of the basic mold. Ocher wall construction method characterized in that consisting of; 제1항에 있어서,The method of claim 1, 상기 기본틀 형성단계에 의한 기본틀의 내측에 8-12cm두께의 각목으로 이루어지는 창호 안착을 위한 보조틀이 마련되는 것을 특징으로 하는 황토 벽체 시공방법.The ocher wall construction method, characterized in that the auxiliary frame for seating the window made of 8-12cm thick square wood inside the base frame by the step of forming the base frame is provided. 제1항에 있어서,The method of claim 1, 상기 전면 흙채움부 형성단계의 대나무편으로 된 세로버팀살 및 가로버팀살은 상대적으로 거친 조직으로 된 일면이 전방을 향하도록 하여 세로버팀살은 10-15cm간격으로 가로버팀살는 5-10cm 간격으로 고정되는 것을 특징으로 하는 황토 벽체 시공방법.The vertical buttresses of the bamboo pieces of the front soil filling part forming step have a relatively rough tissue facing one side, and the vertical butts are 10-15cm apart and the horizontal butts are 5-10cm apart. Ocher wall construction method characterized in that it is fixed. 제1항에 있어서,The method of claim 1, 상기 기본틀 충전단계의 기본틀 내측에 충전되는 왕겨 또는 왕겨숯으로 된 충전물은 건조된 상태의 것이며, 충전물은 기본틀이 세워진 상태에서 기본틀 내측에 공간이 발생하지 않도록 하는 분량으로 충전되는 것을 특징으로 하는 황토 벽체 시공방법.The filling of the chaff or chaff charcoal is filled in the base frame of the base filling step of the dried state, the filling is characterized in that the filling in the amount so that the space does not occur inside the base frame when the base frame is upright Ocher wall construction method. 제1항에 있어서,The method of claim 1, 상기 후면 흙채움부 형성단계의 대나무편으로 된 세로버팀살 및 가로버팀살은 상대적으로 거친 조직으로 된 일면이 전방을 향하도록 하여 세로버팀살은 10-15cm간격으로 가로버팀살는 5-10cm 간격으로 고정되는 것을 특징으로 하는 황토 벽체 시공방법.The vertical buttresses made of bamboo pieces in the rear soil filling part forming step have one side made of relatively coarse tissue facing forward, and the vertical butts are 10-15 cm apart and the horizontal butts are spaced 5-10 cm apart. Ocher wall construction method characterized in that it is fixed. 제1항 또는 제4항에 있어서,The method according to claim 1 or 4, 상기 기본틀 충전단계에 의해 기본틀 내에 충전되는 충전물층 표면에는 단열재가 덧대지는 것을 특징으로 하는 황토 벽체 시공방법.The ocher wall construction method characterized in that the insulating material is padded on the surface of the filler layer to be filled in the base frame by the filling step of the base frame. 제1항에 있어서,The method of claim 1, 상기 황토 채움단계에서 전면 흙채움부 또는 후면 흙채움부의 어느 일면은 시멘트반죽으로 채워지는 것을 특징으로 하는 황토 벽체 시공방법.The ocher wall construction method, characterized in that any one of the front soil filling portion or the rear soil filling portion in the ocher filling step is filled with cement dough.
KR1020090130611A 2009-12-24 2009-12-24 construction method of yellow soil wall KR101177616B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090130611A KR101177616B1 (en) 2009-12-24 2009-12-24 construction method of yellow soil wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090130611A KR101177616B1 (en) 2009-12-24 2009-12-24 construction method of yellow soil wall

Publications (2)

Publication Number Publication Date
KR20110073845A true KR20110073845A (en) 2011-06-30
KR101177616B1 KR101177616B1 (en) 2012-08-27

Family

ID=44404313

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090130611A KR101177616B1 (en) 2009-12-24 2009-12-24 construction method of yellow soil wall

Country Status (1)

Country Link
KR (1) KR101177616B1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101380724B1 (en) * 2011-09-23 2014-04-02 김민지 Wall structure of korean style house
KR102054145B1 (en) * 2018-11-27 2019-12-10 우창섭 Loess panels for construction
KR20210019145A (en) * 2019-08-12 2021-02-22 한성섭 Insulating wall structure using chaff charcoal and method for manufacturing the same

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100459842B1 (en) * 2001-06-30 2004-12-03 박준석 Door flame and construction method for the same
KR200391707Y1 (en) * 2005-05-11 2005-08-08 김중천 A panel for an outer wall of a building

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101380724B1 (en) * 2011-09-23 2014-04-02 김민지 Wall structure of korean style house
KR102054145B1 (en) * 2018-11-27 2019-12-10 우창섭 Loess panels for construction
KR20210019145A (en) * 2019-08-12 2021-02-22 한성섭 Insulating wall structure using chaff charcoal and method for manufacturing the same

Also Published As

Publication number Publication date
KR101177616B1 (en) 2012-08-27

Similar Documents

Publication Publication Date Title
CA2649450C (en) Shower bench
KR101177616B1 (en) construction method of yellow soil wall
KR101286774B1 (en) Waterproof prefabricated wall and Installation Method using the same
RU91727U1 (en) FRONT DECORATIVE HEAT-INSULATING PANEL
KR101380391B1 (en) Yellow soil wall having insulation layer and manufacturing process of the same
KR101312975B1 (en) Movable type wooden construction building
KR100749636B1 (en) Acoustic isolation apparatus for construction
RU2632617C2 (en) Method of facing facade of floors in monolithic construction of buildings
KR100874885B1 (en) Completely dry structure between floors of apartment houses
RU79903U1 (en) WALL PANEL
KR20090011682U (en) An insulating dual lattice strip
RU157705U1 (en) WALL MULTILAYER PANEL
KR102416871B1 (en) Gypsum board support and the construction method using the same
KR100884931B1 (en) Indoor wall structure of building
KR200419654Y1 (en) Prefabricated sound insulation panel consisting of aluminum frame
RU89150U1 (en) THERMOFACADE FOAM-POLYSTROLIC BLOCK WITH AN ARCHECEMENT FACING LAYER
JP3238213U (en) Wall structure of an external heat-insulated building with a four-circle plate around the inner window frame
CN203049863U (en) High-performance sound-absorption floor and geothermal system sound-absorption floor
KR101487693B1 (en) Wall to block noise of apartment house
CA2722363C (en) Wall facing system and devices for supporting and anchoring stone facing elements
JP4953482B2 (en) Opening structure in the outer insulation wall of a reinforced concrete building
JP2012180677A (en) Floor structure
KR20070074532A (en) Noiseless of sand sealed floor
GB2559113A (en) Cladding system
RU54975U1 (en) DEVICE FOR THERMAL INSULATION OF EXTERIOR WALLS OF MULTI-STOREY BUILDINGS

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150821

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20160822

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20170821

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20180821

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20190821

Year of fee payment: 8