KR20110055041A - 클러스터 시스템의 전력 제어 장치 및 방법 - Google Patents
클러스터 시스템의 전력 제어 장치 및 방법 Download PDFInfo
- Publication number
- KR20110055041A KR20110055041A KR1020090111903A KR20090111903A KR20110055041A KR 20110055041 A KR20110055041 A KR 20110055041A KR 1020090111903 A KR1020090111903 A KR 1020090111903A KR 20090111903 A KR20090111903 A KR 20090111903A KR 20110055041 A KR20110055041 A KR 20110055041A
- Authority
- KR
- South Korea
- Prior art keywords
- power
- cluster
- limit value
- battery
- node
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 79
- 238000012544 monitoring process Methods 0.000 claims abstract description 38
- 230000006870 function Effects 0.000 claims description 19
- 238000004458 analytical method Methods 0.000 claims description 11
- 238000005457 optimization Methods 0.000 claims description 3
- 230000002159 abnormal effect Effects 0.000 claims 2
- 238000005516 engineering process Methods 0.000 abstract description 13
- 238000010586 diagram Methods 0.000 description 6
- 238000012545 processing Methods 0.000 description 6
- 238000004891 communication Methods 0.000 description 4
- 238000004590 computer program Methods 0.000 description 4
- 230000007958 sleep Effects 0.000 description 4
- 230000006266 hibernation Effects 0.000 description 3
- 230000001105 regulatory effect Effects 0.000 description 3
- 230000001276 controlling effect Effects 0.000 description 2
- 230000007423 decrease Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000018109 developmental process Effects 0.000 description 2
- 108010028984 3-isopropylmalate dehydratase Proteins 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
- G06F1/32—Means for saving power
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
- G06F1/32—Means for saving power
- G06F1/3203—Power management, i.e. event-based initiation of a power-saving mode
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
- G06F1/263—Arrangements for using multiple switchable power supplies, e.g. battery and AC
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
- G06F1/28—Supervision thereof, e.g. detecting power-supply failure by out of limits supervision
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
- G06F1/30—Means for acting in the event of power-supply failure or interruption, e.g. power-supply fluctuations
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Power Engineering (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Power Sources (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
Description
Claims (20)
- 배터리가 장착된 다수의 노드들로 이루어진 클러스터와,상기 클러스터와 네트워크를 통해 연결되어 상기 클러스터의 전력 관리 정보 및 성능 정보를 모니터링하고, 모니터링되는 상기 클러스터의 전력 관리 정보 및 성능 정보에 따라 전력 제한 폭을 설정하여 시스템의 전력이 상기 전력 제한 폭까지 상승하였을 경우 상기 배터리를 온/오프 제어하여 상기 클러스터의 전력을 제한하는 전력 제어부를 포함하는클러스터 시스템의 전력 제어 장치.
- 제 1 항에 있어서,상기 다수의 노드들 중 임의의 노드는,상기 배터리와,상기 배터리의 온/오프를 제어하는 배터리 제어기와,디바이스 드라이버를 통해 제어되는 하드웨어 장치와,상기 배터리에 대한 정보 수집 기능 및 상기 하드웨어에 대한 제어 기능을 수행하며, 상기 정보 수집 기능 및 상기 하드웨어에 대한 제어 기능에 의한 전력 관리 정보 및 성능 정보를 상기 전력 제어부로 전달하는 관리 에이전트를 포함하는클러스터 시스템의 전력 제어 장치.
- 제 1 항에 있어서,상기 배터리는 무정전 전력 공급부(Uninterruptible Power Supply, UPS)인클러스터 시스템의 전력 제어 장치.
- 제 2 항에 있어서,상기 배터리는,상기 임의의 노드의 전력이 상기 전력 제한 폭까지 상승하는 경우, 상기 임의의 노드의 가용량 정도에 따라 기 설정된 시간 동안 동작됨으로써, 상기 임의의 노드의 전력을 낮추는클러스터 시스템의 전력 제어 장치.
- 제 1 항에 있어서,상기 전력 제어부는,네트워크를 통해 전달되는 상기 클러스터의 전력 관리 정보 및 성능 정보를 모니터링하는 모니터링부와,상기 모니터링부를 통해 모니터링되는 상기 클러스터의 전력 관리 정보 및 성능 정보를 임시 저장하는 히스토리 데이터베이스와,상기 히스토리 데이터베이스에 임시 저장되는 상기 클러스터의 전력 관리 정보 및 성능 정보를 분석하는 분석부와,상기 분석부를 통해 분석되는 상기 클러스터의 전력 관리 정보 및 성능 정보를 최적화하는 최적화부와,상기 최적화부를 통해 최적화된 상기 클러스터의 전력 관리 정보 및 성능 정보를 토대로 전력 제한 값을 결정하는 전력 결정부를 포함하는클러스터 시스템의 전력 제어 장치.
- 제 5 항에 있어서,상기 클러스터의 성능 정보는 상기 클러스터의 프로세서의 사용량, 메모리 사용량, 네트워크 사용량, 하드디스크 사용량으로 계산되는 가용량 정보인클러스터 시스템의 전력 제어 장치.
- 제 5 항에 있어서,상기 전력 결정부는,상기 클러스터 내의 모니터링 전력 및 성능 히스토리 정보를 통하여 상기 전력 제한 값을 제공하고 설정하는클러스터 시스템의 전력 제어 장치.
- 제 5 항에 있어서,상기 전력 결정부는,상기 클러스터 내의 임의의 노드의 배터리의 기능을 기 설정된 시간만큼 제어하여 상기 임의의 노드의 전력을 낮추는클러스터 시스템의 전력 제어 장치.
- 제 1 항 내지 제 8 항 중 어느 한 항에 있어서,상기 클러스터 시스템은 적어도 하나 이상의 데이터 센터인클러스터 시스템의 전력 제어 장치.
- 제 1 항 내지 제 8 항 중 어느 한 항에 있어서,상기 클러스터 시스템은 적어도 하나 이상의 컴퓨팅 시스템인클러스터 시스템의 전력 제어 장치.
- 네트워크를 통해 클러스터의 전력 관리 정보 및 성능 정보를 모니터링하는 과정과,모니터링되는 상기 클러스터의 전력 관리 정보 및 성능 정보를 데이터베이스화하는 과정과,데이터베이스화되는 상기 클러스터의 전력 관리 정보 및 성능 정보를 분석 및 최적화하는 과정과,상기 분석 및 최적화하는 과정에 의한 결과에 따라 상기 클러스터의 전력 제한 값을 결정하는 과정과,결정되는 상기 전력 제한 값에 따라 상기 클러스터에 대한 전력 제한 모드를 수행하는 과정을 포함하는클러스터 시스템의 전력 제어 방법.
- 제 11 항에 있어서,상기 전력 제한 값을 결정하는 과정은,상기 클러스터 시스템의 최대 전력 제한 값과 최소 전력 제한 값을 설정하고, 상기 최대 전력 제한 값 및 최소 전력 제한 값 사이에서 동작되는 동작 전력 제한 값(driving point)으로 구분하여 설정하는 과정과,상기 클러스터 시스템이 상기 동작 전력 제한 값을 넘어 전력 제한 모드가 동작하고 있으나 상기 클러스터 시스템의 부하로 인해 상기 전력 제한 폭 밑으로 상기 클러스터 시스템의 전력을 낮출 수 없는 경우, 기 설정 제한 폭까지 상기 동작 전력 제한 값을 올려주는 과정을 포함하는클러스터 시스템의 전력 제어 방법.
- 제 11 항에 있어서,상기 클러스터는 배터리를 갖는 적어도 하나의 노드로 이루어진클러스터 시스템의 전력 제어 방법.
- 제 11 항에 있어서,상기 전력 제한 모드를 수행하는 과정은,상기 적어도 하나의 노드의 배터리의 용량을 충전하고 이를 모니터링하는 제 1 과정과,모니터링되는 상기 배터리의 용량이 기 설정된 사용 한계 값 이상일 경우, 상기 전력 제한 모드를 수행하기 위하여 상기 적어도 하나의 노드의 전력 관리 정보 및 성능 정보를 모니터링하는 제 2 과정과,상기 적어도 하나의 노드의 전력량이 상기 전력 제한 값 이상인지를 판단하는 제 3 과정과,상기 적어도 하나의 노드의 전력량이 상기 전력 제한 값 이상이면, 상기 적어도 하나의 노드의 서버 가용량을 모니터링하는 제 4 과정과,상기 제 4 과정을 통한 정보를 이용하여 상기 적어도 하나의 노드를 선택하 여 ACPI 상태 변화나 DVFS를 동작시키는 제 5 과정과,상기 전력 제한 값 이상인지를 판단하여 이상일 경우 상기 적어도 하나의 노드의 배터리를 지정된 시간 동안 온(on)시키는 제 6 과정과,상기 지정된 시간 동안 상기 전력 제한 모드가 수행된 이후 현재 전력이 상기 전력 제한 값 이상인지를 판단하여 이상일 경우 상기 제 2 과정으로 피드백하는 제 7 과정과,상기 지정된 시간 동안 상기 배터리의 현재 용량과 상기 기 설정된 사용 한계 값을 비교하여 상기 배터리의 현재 용량이 상기 기 설정된 사용 한계 값 미만일 경우에 상기 배터리를 오프(off)시키는 제 8 과정을 포함하는클러스터 시스템의 전력 제어 방법.
- 제 14 항에 있어서,상기 전력 제한 모드를 수행하는 과정은,상기 배터리를 오프시킨 후 상기 동작 전력 제한 값 이상인 경우 상기 동작 전력 제한 값보다 전력을 낮출 수 있는지 판단하는 과정과,상기 제한 값보다 전력을 낮출 수 없을 경우 상기 동작 전력 제한 값을 상향 조정하는 과정과,상기 상향 조정된 동작 전력 제한 값이 최대 전력 제한 값과 같은지를 비교하는 과정과,상기 최대 전력 제한 값에 도달하였을 때 현재 전력 상태를 공지하는 리포팅 과정을 포함하는클러스터 시스템의 전력 제어 방법.
- 제 15 항에 있어서,상기 리포팅 과정은 사용자에게 현재 수행 가능한 동작 전력 값, 시스템의 전력 상태 및 과거 상태를 나타내는 종합적인 통계 정보를 제공하는 과정인클러스터 시스템의 전력 제어 방법.
- 제 14 항 또는 제 15 항에 있어서,상기 배터리는 무정전 전력 공급부인클러스터 시스템의 전력 제어 방법.
- 제 14 항 또는 제 15 항에 있어서,상기 배터리는,상기 적어도 하나의 노드의 전력이 기 설정된 전력 제한 폭까지 상승하는 경우, 상기 적어도 하나의 노드의 가용량 정도에 따라 기 설정된 시간 동안 동작됨으 로써, 상기 적어도 하나의 노드의 전력을 낮추는클러스터 시스템의 전력 제어 방법.
- 제 11 항 내지 제 16 항 중 어느 한 항에 있어서,상기 클러스터 시스템은 적어도 하나 이상의 데이터 센터인클러스터 시스템의 전력 제어 방법.
- 제 11 항 내지 제 16 항 중 어느 한 항에 있어서,상기 클러스터 시스템은 적어도 하나 이상의 컴퓨팅 시스템인클러스터 시스템의 전력 제어 방법.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090111903A KR101282199B1 (ko) | 2009-11-19 | 2009-11-19 | 클러스터 시스템의 전력 제어 장치 및 방법 |
US12/649,241 US8473768B2 (en) | 2009-11-19 | 2009-12-29 | Power control apparatus and method for cluster system |
CN2010100009332A CN102076064A (zh) | 2009-11-19 | 2010-01-21 | 用于簇系统的功率控制装置和方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090111903A KR101282199B1 (ko) | 2009-11-19 | 2009-11-19 | 클러스터 시스템의 전력 제어 장치 및 방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20110055041A true KR20110055041A (ko) | 2011-05-25 |
KR101282199B1 KR101282199B1 (ko) | 2013-07-04 |
Family
ID=44012210
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020090111903A KR101282199B1 (ko) | 2009-11-19 | 2009-11-19 | 클러스터 시스템의 전력 제어 장치 및 방법 |
Country Status (3)
Country | Link |
---|---|
US (1) | US8473768B2 (ko) |
KR (1) | KR101282199B1 (ko) |
CN (1) | CN102076064A (ko) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20130097366A (ko) * | 2012-02-24 | 2013-09-03 | 한양대학교 에리카산학협력단 | 온톨로지 기반 데이터 센터 관리 시스템 |
KR101306995B1 (ko) * | 2011-08-16 | 2013-09-09 | 한국과학기술정보연구원 | 작업 관리를 이용한 그린 컴퓨팅 제어 장치 및 방법 |
US9588578B2 (en) | 2013-11-11 | 2017-03-07 | Samsung Electronics Co., Ltd. | Method of changing an operating frequency for performing a dynamic voltage and frequency scaling, system on-chip, and mobile device having the same |
US9886079B2 (en) | 2013-11-29 | 2018-02-06 | Canon Kabushiki Kaisha | Information processing apparatus and method for supplying power to information processing apparatus |
KR101962409B1 (ko) * | 2017-12-14 | 2019-03-26 | 한전케이디엔주식회사 | 메시지 큐를 이용한 프로세스 간 통신을 구현하는 전력시스템 |
Families Citing this family (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011086055A (ja) * | 2009-10-14 | 2011-04-28 | Internatl Business Mach Corp <Ibm> | ネットワーク上の機器の動作状態を、ネットワークの利用者数に応じて変化させる、機器管理方法、コンピュータ・プログラム及び装置 |
US9134783B2 (en) | 2010-03-24 | 2015-09-15 | Hewlett-Packard Development Company, L.P. | Power capping feedback normalization |
US8738970B2 (en) * | 2010-07-23 | 2014-05-27 | Salesforce.Com, Inc. | Generating performance alerts |
US9317098B2 (en) * | 2011-06-22 | 2016-04-19 | Nec Corporation | Server, power management system, power management method, and program |
US8533514B2 (en) * | 2011-06-26 | 2013-09-10 | Microsoft Corporation | Power-capping based on UPS capacity |
US8924781B2 (en) | 2011-06-30 | 2014-12-30 | Microsoft Corporation | Power capping based on generator capacity |
EP2645256B1 (en) | 2012-03-30 | 2014-04-30 | Alcatel Lucent | Method and apparatus for determining power consumption per input/output port of a telecommunications network node |
CN103455120A (zh) * | 2012-05-28 | 2013-12-18 | 鸿富锦精密工业(深圳)有限公司 | 电源控制系统及方法 |
US20130345887A1 (en) * | 2012-06-20 | 2013-12-26 | Microsoft Corporation | Infrastructure based computer cluster management |
US9141923B2 (en) * | 2012-09-25 | 2015-09-22 | Bloom Energy Corporation | Optimizing contractual management of the total output of a fleet of fuel cells |
CN103905212A (zh) * | 2012-12-25 | 2014-07-02 | 鸿富锦精密工业(深圳)有限公司 | 降低功耗系统及方法 |
CN103389791B (zh) * | 2013-06-25 | 2016-10-05 | 华为技术有限公司 | 数据系统的功率控制方法及装置 |
US9618996B2 (en) | 2013-09-11 | 2017-04-11 | Electronics And Telecommunications Research Institute | Power capping apparatus and method |
US20150113300A1 (en) * | 2013-10-22 | 2015-04-23 | Nvidia Corporation | Battery operated computer system |
US9389675B2 (en) * | 2013-12-19 | 2016-07-12 | International Business Machines Corporation | Power management for in-memory computer systems |
WO2016050221A1 (en) * | 2014-10-02 | 2016-04-07 | Mediatek Inc. | Hardware-accelerated dynamic voltage and frequency scaling |
KR20160112792A (ko) * | 2015-03-20 | 2016-09-28 | 한국전자통신연구원 | 데이터 센터의 전력 분산공유 장치 및 분산공유 방법 |
CN110687997B (zh) * | 2019-09-06 | 2021-06-11 | 苏州浪潮智能科技有限公司 | 一种动态调整fpga的功耗的方法及装置 |
US11429176B2 (en) * | 2020-05-14 | 2022-08-30 | Dell Products L.P. | Intelligent and predictive optimization of power needs across virtualized environments |
US11916430B2 (en) * | 2021-01-21 | 2024-02-27 | Dell Products L.P. | Optimization of low power states while AC line power availability is limited |
US20220261059A1 (en) * | 2021-02-05 | 2022-08-18 | Stanislav Rostislavovych Bobovych | System and Method for Automated Adaptive Operation to Achieve Optimized Power Management on Internet of Things Devices |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0991254A (ja) * | 1995-09-20 | 1997-04-04 | Nec Corp | 消費電力低減制御システム及びその方法 |
KR100553876B1 (ko) | 1999-04-10 | 2006-02-24 | 삼성전자주식회사 | 에이.씨.피.아이 스펙에서 지원하는 슬리핑 모드 선택 기능을 갖는 컴퓨터 시스템 및 그 방법 |
US20030065497A1 (en) * | 2001-09-28 | 2003-04-03 | Rhoads Monte J. | Power management system to select a power state for a network computer system based on load |
US7237131B2 (en) * | 2003-12-30 | 2007-06-26 | Intel Corporation | Transaction-based power management in a computer system |
US7487371B2 (en) * | 2005-12-16 | 2009-02-03 | Nvidia Corporation | Data path controller with integrated power management to manage power consumption of a computing device and its components |
CN100471153C (zh) * | 2007-02-05 | 2009-03-18 | 南京邮电大学 | 一种高效的无线传感器网络拓扑控制方法 |
US20080263375A1 (en) * | 2007-04-23 | 2008-10-23 | Sundstrom Robert J | Method And System For Managing Activities In A Battery Powered Device |
US20090037162A1 (en) * | 2007-07-31 | 2009-02-05 | Gaither Blaine D | Datacenter workload migration |
US8250382B2 (en) * | 2007-08-22 | 2012-08-21 | International Business Machines Corporation | Power control of servers using advanced configuration and power interface (ACPI) states |
US8001402B2 (en) * | 2007-12-05 | 2011-08-16 | International Business Machines Corporation | Method for power capping with co-operative dynamic voltage and frequency scaling via shared p-state table |
KR100968202B1 (ko) | 2007-12-12 | 2010-07-06 | 한국전자통신연구원 | 소비전력 감소를 위한 클러스터 시스템 및 그의 전원 관리방법 |
US7441135B1 (en) * | 2008-01-14 | 2008-10-21 | International Business Machines Corporation | Adaptive dynamic buffering system for power management in server clusters |
US8041976B2 (en) * | 2008-10-01 | 2011-10-18 | International Business Machines Corporation | Power management for clusters of computers |
-
2009
- 2009-11-19 KR KR1020090111903A patent/KR101282199B1/ko not_active IP Right Cessation
- 2009-12-29 US US12/649,241 patent/US8473768B2/en active Active
-
2010
- 2010-01-21 CN CN2010100009332A patent/CN102076064A/zh active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101306995B1 (ko) * | 2011-08-16 | 2013-09-09 | 한국과학기술정보연구원 | 작업 관리를 이용한 그린 컴퓨팅 제어 장치 및 방법 |
KR20130097366A (ko) * | 2012-02-24 | 2013-09-03 | 한양대학교 에리카산학협력단 | 온톨로지 기반 데이터 센터 관리 시스템 |
US9588578B2 (en) | 2013-11-11 | 2017-03-07 | Samsung Electronics Co., Ltd. | Method of changing an operating frequency for performing a dynamic voltage and frequency scaling, system on-chip, and mobile device having the same |
US9886079B2 (en) | 2013-11-29 | 2018-02-06 | Canon Kabushiki Kaisha | Information processing apparatus and method for supplying power to information processing apparatus |
KR101962409B1 (ko) * | 2017-12-14 | 2019-03-26 | 한전케이디엔주식회사 | 메시지 큐를 이용한 프로세스 간 통신을 구현하는 전력시스템 |
Also Published As
Publication number | Publication date |
---|---|
KR101282199B1 (ko) | 2013-07-04 |
US20110119514A1 (en) | 2011-05-19 |
US8473768B2 (en) | 2013-06-25 |
CN102076064A (zh) | 2011-05-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101282199B1 (ko) | 클러스터 시스템의 전력 제어 장치 및 방법 | |
Pierson et al. | Datazero: Datacenter with zero emission and robust management using renewable energy | |
US10289184B2 (en) | Methods of achieving cognizant power management | |
US8127298B2 (en) | Operations management apparatus of information-processing system | |
US7779276B2 (en) | Power management in a power-constrained processing system | |
CN109116970A (zh) | 一种动态电压频率调节系统及方法 | |
CN111625080B (zh) | 一种服务器节能方法、装置及电子设备和存储介质 | |
CN112801331B (zh) | 利用虚拟容量和优选位置实时调度进行计算负载的整形 | |
CN107239127A (zh) | 一种基于服务器bmc的vrm电源管理方法 | |
US20170242466A1 (en) | Standby power controller for computer installation | |
US20220261059A1 (en) | System and Method for Automated Adaptive Operation to Achieve Optimized Power Management on Internet of Things Devices | |
JP2016226099A (ja) | エネルギー管理システム、エネルギー管理方法、およびエネルギー管理装置 | |
CN107465219B (zh) | 电力使用模式收集器和充电控制器 | |
CN103149908B (zh) | 一种供电控制方法、装置及设备 | |
CN114221329A (zh) | 一种基于大数据的电网负荷管理方法及系统 | |
EP2147362B1 (en) | Electronic device and method of performing a power management in an electronic device | |
Cai et al. | GreenHetero: Adaptive power allocation for heterogeneous green datacenters | |
Kolisnyk et al. | A Markov model of IoT system availability considering DDoS attacks, patching and energy modes | |
Canon et al. | Assessing power needs to run a workload with quality of service on green datacenters | |
JP6007763B2 (ja) | 座席集約装置、座席集約方法および座席集約プログラム | |
Moghaddam | Dynamic energy and reliability management in network-on-chip based chip multiprocessors | |
Zhang et al. | Dynamic energy storage control for reducing electricity cost in data centers | |
CN114997058B (zh) | 一种用于空调智能控制的辅助方法 | |
Li et al. | Techniques for Efficiently Handling Power Surges in Fuel Cell Powered Data Centers: Modeling, Analysis, Results | |
WO2025032312A1 (en) | Reserve power optimisation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20091119 |
|
PA0201 | Request for examination | ||
PG1501 | Laying open of application | ||
E902 | Notification of reason for refusal | ||
PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20130129 Patent event code: PE09021S01D |
|
E701 | Decision to grant or registration of patent right | ||
PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20130626 |
|
GRNT | Written decision to grant | ||
PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20130628 Patent event code: PR07011E01D |
|
PR1002 | Payment of registration fee |
Payment date: 20130701 End annual number: 3 Start annual number: 1 |
|
PG1601 | Publication of registration | ||
LAPS | Lapse due to unpaid annual fee | ||
PC1903 | Unpaid annual fee |
Termination category: Default of registration fee Termination date: 20170509 |