KR20110034481A - Jig for mast cylinder packing replacement of electric furnace - Google Patents

Jig for mast cylinder packing replacement of electric furnace Download PDF

Info

Publication number
KR20110034481A
KR20110034481A KR1020090092012A KR20090092012A KR20110034481A KR 20110034481 A KR20110034481 A KR 20110034481A KR 1020090092012 A KR1020090092012 A KR 1020090092012A KR 20090092012 A KR20090092012 A KR 20090092012A KR 20110034481 A KR20110034481 A KR 20110034481A
Authority
KR
South Korea
Prior art keywords
jig
cylinder
mast
packing
cylinder rod
Prior art date
Application number
KR1020090092012A
Other languages
Korean (ko)
Other versions
KR101109905B1 (en
Inventor
이상훈
박승도
Original Assignee
현대제철 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대제철 주식회사 filed Critical 현대제철 주식회사
Priority to KR1020090092012A priority Critical patent/KR101109905B1/en
Publication of KR20110034481A publication Critical patent/KR20110034481A/en
Application granted granted Critical
Publication of KR101109905B1 publication Critical patent/KR101109905B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D99/00Subject matter not provided for in other groups of this subclass
    • F27D99/0073Seals
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D11/00Arrangement of elements for electric heating in or on furnaces
    • F27D11/08Heating by electric discharge, e.g. arc discharge
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B3/00Hearth-type furnaces, e.g. of reverberatory type; Tank furnaces
    • F27B3/08Hearth-type furnaces, e.g. of reverberatory type; Tank furnaces heated electrically, with or without any other source of heat
    • F27B3/085Arc furnaces
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D99/00Subject matter not provided for in other groups of this subclass
    • F27D2099/0085Accessories
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D2201/00Manipulation of furnace parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

PURPOSE: A jig for pacing replacement of a mast cylinder of an electric furnace is provided to facilitate the replacement of packing without the disassembly of a cylinder by preventing the falling of a cylinder rod. CONSTITUTION: A jig for pacing replacement of a mast cylinder of an electric furnace comprises a top jig(10) and a bottom jig(20). The top jig comprises a body(11), a junction flange(12), and a chain connection arm(14). The body has the shape of a half circle. The junction flange is formed at the front end and rear end of the body. The chain connection arm is formed at the middle of the body. The top jig fixes the junction flange with the cylinder rod(41) of the mast cylinder. The top jig connects the chain connection arm to a mast(50) through the chain block. The bottom jig comprises an upper body(21), a lower body, and a cover support board(23). The lower body connects to the upper body. The cover supporting board is formed on the outer circumference of the upper body.

Description

전기로 마스트 실린더의 패킹 교체용 지그{jig for mast cylinder packing replacement of electric furnace}Jig for mast cylinder packing replacement of electric furnace

본 발명은 전기로 마스트 실린더의 패킹 교체용 지그에 관한 것으로, 마스트 와 실린더 및 주변 배관을 분리 해체하지 않고 실린더의 패킹을 간편하게 교체할 수 있도록 하는 전기로 마스트 실린더의 패킹 교체용 지그에 관한 것이다.The present invention relates to an electric jig for replacing the packing of the mast mast cylinder, and to an electric jig for replacing the packing of the cylinder mast cylinder so that the packing of the cylinder can be easily replaced without removing the mast and the cylinder and the surrounding pipe.

일반적으로 제강공장의 전기로는 노 속으로 삽입된 전극봉과 스크랩 사이에 발생하는 아크열에 의해 스크랩을 용융시켜 용강을 제조한다.In general, an electric furnace of a steel making factory manufactures molten steel by melting scrap by arc heat generated between an electrode rod inserted into a furnace and scrap.

상기 전극봉은 마스트에 장착된 아암에 장착되는데, 상기 마스트가 유압실린더에 의해 상하로 이동함으로써 전극봉의 승강이 이루어진다.The electrode is mounted on an arm mounted on the mast, the electrode is raised and lowered by moving the mast up and down by a hydraulic cylinder.

한편, 상기 유압실린더에 고장이 발생하면 마스트의 승강 작동이 불가하므로 즉시 이를 수리해야 하는데, 유압실린더의 고장은 주로 실린더와 실린더로드 사이를 실링하는 패킹(다수의 V패킹이 사용된다.)의 마모에 의한 누유로서, 누유를 방지하기 위하여 주기적으로 상기 패킹을 교체해 주어야만 한다.On the other hand, if a failure occurs in the hydraulic cylinder, the lifting operation of the mast is impossible, so it must be repaired immediately. The failure of the hydraulic cylinder is mainly caused by abrasion of the packing (many V packings are used) sealing between the cylinder and the cylinder rod. As leakage by oil, the packing should be replaced periodically to prevent leakage.

그런데, 상기 패킹을 교체하기 위해서는 실린더에 연결된 유압 배관을 모두 해체하고, 상기 마스트로부터 실린더를 분해해야만 하였다.However, in order to replace the packing, all hydraulic piping connected to the cylinder had to be dismantled and the cylinder had to be disassembled from the mast.

실린더를 세워 둔 상태에서는 작업시 고중량의 실린더로드가 하방으로 떨어져 내려 안전사고의 위험이 있고, 작업을 방해하기 때문이다.This is because when the cylinder is upright, a heavy cylinder rod falls down during operation, which may cause a safety accident and interfere with the operation.

따라서, 패킹 교체 작업에 수반되는 준비 및 사후 작업(재 조립 및 배관 연결)이 대단히 복잡하고 시간이 많이 걸림으로써 패킹 교체 작업을 매우 어렵게 하는 문제점이 있었다.Therefore, the preparation and post-work (reassembly and pipe connection) involved in the packing replacement operation is very complicated and time-consuming, there was a problem that makes the packing replacement operation very difficult.

이에 본 발명은 상기와 같은 문제점을 해결하기 위해 안출된 것으로, 실린더로드의 낙하를 방지할 수 있게 됨으로써 실린더를 분해하지 않고 장착상태에서 패킹을 간편하게 교체할 수 있도록 된 전기로 마스트 실린더의 패킹 교체용 지그를 제공함에 그 목적이 있다.Accordingly, the present invention has been made to solve the above problems, it is possible to prevent the fall of the cylinder rod to replace the packing of the electric mast cylinder to be able to easily replace the packing in the mounted state without disassembling the cylinder The purpose is to provide a jig.

상기와 같은 목적을 달성하기 위한 본 발명은,The present invention for achieving the above object,

반원형상의 바디와, 상기 바디의 전,후단에 형성된 접합플랜지와, 상기 바디의 중간에 형성된 체인연결아암으로 이루어지고, 상기 접합플랜지가 상호 볼트 결합되어 마스트 실린더의 실린더로드에 고정되고, 상기 체인연결아암이 체인블럭을 매개로 상기 마스트에 연결되는 한 쌍의 상부지그와;It consists of a semi-circular body, a joint flange formed in the front and rear of the body, and a chain connecting arm formed in the middle of the body, the joint flange is bolted to each other fixed to the cylinder rod of the mast cylinder, the chain connection A pair of upper jigs whose arms are connected to the mast via a chain block;

상부바디와, 상기 상부바디에 연결된 하부바디와, 상기 상부바디의 외주에 형성된 커버받침대를 포함하고, 실린더로드 고정브라켓에 장착되어 상기 실린더로드를 지지하는 하부지그;A lower jig including an upper body, a lower body connected to the upper body, and a cover base formed on an outer circumference of the upper body, and mounted to a cylinder rod fixing bracket to support the cylinder rod;

를 포함한다.It includes.

또한, 상기 상부지그의 체인연결아암에 전후방향으로 샤클연결홀이 형성된 것을 특징으로 한다.In addition, the chain connecting arm of the upper jig characterized in that the shackle connecting hole is formed in the front and rear direction.

또한, 상기 상부지그의 체인연결아암에 상하방향으로 아이볼트체결홀이 형성된 것을 특징으로 한다.In addition, the eye bolt fastening holes are formed in the chain connecting arm of the upper jig in the vertical direction.

또한, 상기 하부지그의 상부바디 상단에 실린더로드의 하단이 삽입 안착되는 안착홈이 형성된 것을 특징으로 한다.In addition, the bottom of the upper jig of the lower jig characterized in that the seating groove is formed is inserted into the lower end of the cylinder rod.

또한, 상기 하부지그의 하부바디 측면에 상기 실린더로드 고정브라켓에 용접되는 용접단이 형성된 것을 특징으로 한다.In addition, a welding end welded to the cylinder rod fixing bracket is formed on the lower body side of the lower jig.

이상 설명한 바와 같은 본 발명에 따르면,According to the present invention as described above,

마스트와 실린더를 분리하지 않고 실린더 장착 상태에서 그대로 패킹 교체 작업을 실시할 수 있게 된다.It is possible to replace the packing without removing the mast and the cylinder.

따라서, 실린더 분리 작업과, 그에 수반되는 주변 배관 해체 작업을 실시할 필요가 없게 되어 패킹 교체 작업이 매우 간편해지고, 작업시간이 대폭 감소되는 효과가 있다.Therefore, it is not necessary to perform the cylinder separating operation and the accompanying dismantling of the surrounding pipes, so that the packing replacement operation becomes very simple, and the working time is greatly reduced.

또한, 중량물인 실린더를 분리하여 이송하고 작업자세로 정위치 시키는 작업을 실시하지 않아도 되므로 작업이 안전하여 작업자의 안전성이 향상된다.In addition, it is not necessary to perform the operation of separating and transporting the cylinder, which is a heavy object, by the operator posture, so that the work is safe and the safety of the worker is improved.

이하, 본 발명을 첨부된 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, the present invention will be described in detail.

도 1은 본 발명에 따른 실린더 패킹 교체용 지그 중 상부지그의 실 실시예를 도시한 것으로서, 본 발명에 따른 상부지그(10)는 반원형상의 바디(11)와, 상기 바디(11)의 전방 단부와 후방 단부에 반경방향으로 연장 성형된 접합플랜지(12,13)와, 상기 바디(11)의 중간 부분에 반경방향으로 연장 성형된 체인연결아암(14)을 포함하여 이루어지며, 상기 상부지그(10) 한 쌍이 상호 결합되어 사용된다.1 shows an embodiment of the upper jig of the cylinder packing replacement jig according to the present invention, the upper jig 10 according to the present invention is a semi-circular body 11 and the front end of the body 11 And a coupling flange 12 and 13 radially extending at the rear end and a chain connection arm 14 extending radially in the middle portion of the body 11, wherein the upper jig ( 10) A pair is used in conjunction with each other.

또한, 상기 바디(11)의 내주면(11a)은 실린더(40)의 실린더로드(41)와 동일하거나 그 보다 미세하게 작은(1~2mm 정도) 반경으로 형성된다.(도 5 참조)In addition, the inner circumferential surface 11a of the body 11 is formed with a radius smaller than or equal to (about 1 to 2 mm) the cylinder rod 41 of the cylinder 40 (see Fig. 5).

또한, 양쪽 상부지그의 결합을 위하여 상기 접합플랜지(12,13)들에는 관통홀(12a,13a)이 형성된다.In addition, through holes 12a and 13a are formed in the joining flanges 12 and 13 to couple both upper jigs.

따라서, 양쪽 상부지그를 서로 맞댄 후 일치한 관통홀을 통해 볼트를 삽입하고 반대쪽에서 너트를 조임으로써 한 쌍의 상부지그를 서로 결합할 수 있다.Accordingly, the pair of upper jigs can be coupled to each other by inserting bolts through the matching through holes and then tightening the nuts on opposite sides after the upper jigs face each other.

한편, 양쪽 상부지그 중에서 어느 한쪽 상부지그의 접합플랜지(12,13)에는 단순 관통홀(12a,13a)이 형성되고, 이에 맞대어지는 다른 한쪽 상부지그의 접합플랜지에는 내주면에 나사산이 형성된 탭홀(12a′,13a′)이 형성될 수 있다.Meanwhile, simple through holes 12a and 13a are formed in the joining flanges 12 and 13 of one of the upper jigs, and tap holes 12a having a thread formed in the inner circumferential surface of the joining flanges of the other upper jig. ′, 13a ′ may be formed.

이 경우에도 동일한 방식으로 볼트를 이용하여 양쪽 상부지그를 결합할 수 있으나, 이 때는 별도의 너트를 사용할 필요없이 볼트를 상기 탭홀(12a′,13a′)에 고정할 수 있다.In this case, both upper jigs may be coupled using bolts in the same manner, but in this case, the bolts may be fixed to the tab holes 12a 'and 13a' without using a separate nut.

한편, 상기 체인연결아암(14)에는 전후방향으로 샤클연결홀(14a)이 형성된 다.Meanwhile, the chain connecting arm 14 has a shackle connecting hole 14a in the front-rear direction.

따라서, 상기 샤클연결홀(14a)에 샤클을 직접 연결하고, 상기 샤클에 후술할 체인블럭의 고리를 연결할 수 있다.Therefore, the shackle may be directly connected to the shackle connecting hole 14a, and the ring of the chain block to be described later may be connected to the shackle.

한편, 도 2에 도시된 바와 같이, 상기 체인연결아암(14)에 체인블럭을 연결하기 위해서 상기 샤클연결홀(14a) 대신 아이볼트체결홀(14b)를 형성할 수 있다.Meanwhile, as shown in FIG. 2, an eye bolt fastening hole 14b may be formed instead of the shackle connection hole 14a to connect the chain block to the chain connection arm 14.

상기 아이볼트체결홀(14b)는 체인연결아암(14)에 상하방향으로 관통 형성되고, 그 내부에는 아이볼트가 나사체결될 수 있도록 나사산이 형성된다.The eye bolt fastening hole 14b is formed to penetrate the chain connecting arm 14 in the vertical direction, and a thread is formed therein so that the eye bolt can be screwed in.

도 3은 본 발명에 따른 실린더 패킹 교체용 지그 중 하부지그를 나타낸 것으로, 상기 하부지그(20)는 원통형의 상부바디(21)와, 상기 상부바디(21)의 하부에 연장되고 양측면이 평면으로 형성된 하부바디(22)와, 상기 상부바디(21)의 하단 둘레에 형성된 원형의 커버받침대(23)를 포함한다.Figure 3 shows a lower jig of the cylinder packing replacement jig according to the present invention, the lower jig 20 is a cylindrical upper body 21, and extends in the lower portion of the upper body 21 and both sides formed in a plane It includes a lower body 22, and a circular cover support 23 formed around the lower end of the upper body (21).

또한, 상기 하부바디(22) 양 측면의 중간 부분에는 수평으로 용접단(24)이 설치된다.In addition, the welding end 24 is horizontally installed at the middle portions of both side surfaces of the lower body 22.

또한, 상기 상부바디(21)의 상면에는 상기 실린더로드(41)의 하단부 형상과 동일한 형상의 오목한 안착홈(21a)이 형성된다.In addition, the upper surface of the upper body 21 is formed with a recessed recess 21a having the same shape as the lower end of the cylinder rod 41.

도 5에 도시된 바와 같이 실린더로드(41)의 하단은 둥근 곡면으로 형성되어 있으므로 상기 안착홈(21a)의 저면은 둥근 곡면으로 형성되고, 고정핀이 관통되는 양측 면은 평면으로 형성되므로 이에 대응되는 상기 안착홈(21a)의 양측면도 평면으로 형성된다.As shown in FIG. 5, since the lower end of the cylinder rod 41 is formed with a rounded curved surface, the bottom surface of the seating groove 21a is formed with a rounded curved surface, and both side surfaces through which the fixing pin is formed are formed in a flat surface. Both sides of the seating groove 21a are also formed in a plane.

한편, 정상적인 사용 상태에서 상기 실린더로드(41)는 실린더로드 고정브라 켓(30)에 고정핀으로 연결되는데, 패킹 교체를 위해 상기 하부지그(20)가 사용될때 상기 하부지그(20)는 도 4에 도시된 바와 같이 상기 용접단(24)이 상기 실린더로드 고정브라켓(30)의 보강판(31) 상단에 용접된다.Meanwhile, in the normal use state, the cylinder rod 41 is connected to the cylinder rod fixing bracket 30 by a fixing pin. When the lower jig 20 is used to replace the packing, the lower jig 20 is shown in FIG. 4. As shown in the weld end 24 is welded to the upper end of the reinforcing plate 31 of the cylinder rod fixing bracket (30).

도 5에는 상기 상부지그(10)와 하부지그(20)의 사용 상태 사시도가 도시되어 있다.FIG. 5 is a perspective view illustrating the use state of the upper jig 10 and the lower jig 20.

즉, 상기 한 쌍의 상부지그(10)는 실린더로드(41)의 양쪽에서 상호 접합되어 볼트로 체결된다.That is, the pair of upper jigs 10 are joined to both sides of the cylinder rod 41 and fastened with bolts.

이때 상기 바디(11)의 내주면(11a)이 실린더로드(41)와 같은 직경의 원주면으로 형성되어 볼트가 강하게 체결됨으로써 상부지그(10)는 실린더로드(41)를 강하게 파지하여 위치 고정된다.At this time, the inner circumferential surface 11a of the body 11 is formed as a circumferential surface of the same diameter as the cylinder rod 41 so that the bolt is fastened strongly so that the upper jig 10 is firmly gripped by the cylinder rod 41 and is fixed in position.

그리고, 상기 상부지그(10)는 체인블럭(60)을 매개로 마스트(50)에 연결된다.In addition, the upper jig 10 is connected to the mast 50 via the chain block 60.

상기 마스트(50)의 양쪽에는 체인블럭(60)의 상부고리를 연결하기 위해 관통공이 형성된 브라켓(51)이 형성된다.Both sides of the mast 50 are formed with a bracket 51 formed with a through hole for connecting the upper ring of the chain block 60.

상기 체인블럭(60)의 연결체인은 상기 상부지그(10)의 체인연결아암(14)에 연결된다.The connecting chain of the chain block 60 is connected to the chain connecting arm 14 of the upper jig 10.

전술한 바와 같이, 도 1처럼 샤클연결홀(14a)이 형성된 경우에는 상기 샤클연결홀(14a)에 샤클을 연결하고 그 샤클에 상기 연결체인의 하단을 연결한다.As described above, when the shackle connecting hole 14a is formed as shown in FIG. 1, the shackle is connected to the shackle connecting hole 14a and the lower end of the connecting chain is connected to the shackle.

또한, 도 2처럼 아이볼트체결홀(14b)가 형성된 경우에는 상기 아이볼트체결홀(14b)에 아이볼트(E)를 체결하고, 상기 아이볼트(E)의 고리에 샤클(S)을 연결하 며, 상기 샤클(S)에 상기 연결체인을 연결한다.(도 5에 도시된 경우임)In addition, when the eye bolt fastening hole 14b is formed as shown in FIG. 2, the eye bolt E is fastened to the eye bolt fastening hole 14b, and the shackle S is connected to the ring of the eye bolt E. The connecting chain is connected to the shackle S (if shown in FIG. 5).

어떠한 방식으로 체인을 연결하여도 무방하며, 단지 마스트(50)의 브라켓(51)에 상부지그(10)를 견고히 연결하기만 하면 된다.The chain may be connected in any way, and only the upper jig 10 is firmly connected to the bracket 51 of the mast 50.

한편, 상기 체인블럭(60)은 상기 연결체인 외에 구비된 조작체인을 잡아당기면 상기 연결체인의 길이를 조절할 수 있도록 된 것으로 상품으로 판매되는 것이다.On the other hand, the chain block 60 is to be sold as a product to be able to adjust the length of the connection chain by pulling the operation chain provided in addition to the connection chain.

이제, 도 6을 참조하여 상기 상부지그(10)와 하부지그(20)를 이용하여 실린더(40)의 패킹(43)을 교체하는 방법을 설명한다.Now, a method of replacing the packing 43 of the cylinder 40 by using the upper jig 10 and the lower jig 20 will be described with reference to FIG. 6.

교체전 보통의 상태에서 실린더로드(41)는 설비의 고정부(70;도 6참조)에 장착된 실린더로드 고정브라켓(30)에 고정핀으로 연결되어 있다.In the normal state before replacement, the cylinder rod 41 is connected to the cylinder rod fixing bracket 30 mounted on the fixing part 70 (see FIG. 6) of the facility by a fixing pin.

따라서, 상기 실린더로드(41)에 의해 실린더(40)와 그 외주의 마스트(50)가 모두 지지되어 있다.(S1)Therefore, both the cylinder 40 and the mast 50 of the outer periphery are supported by the cylinder rod 41. (S1)

패킹 교체를 위해서는 상기 S1의 상태처럼 실린더(40)와 마스트(50)가 하강상태에 있으면 안되므로 일단 실린더(40)에 유압을 공급하여 실린더(40) 및 마스트(50)를 상승시키고, 별도의 고정 수단(고정봉, 고정쐐기 등)을 이용하여 상기 마스트(50)를 상승된 위치에 견고히 고정시킨다.(S2)In order to replace the packing, the cylinder 40 and the mast 50 should not be in the lowered state as in the state of S1. Therefore, the cylinder 40 and the mast 50 are raised by supplying hydraulic pressure to the cylinder 40. Using the means (fixing rod, fixed wedge, etc.) is firmly fixed to the mast 50 in the raised position. (S2)

이후, 도 5에서 설명한 방식으로 상기 실린더로드(41)에 상부지그(10)를 설치하고, 상기 상부지그(10)를 체인블럭(60)을 매개로 마스트(50)에 연결한다.(S3)Thereafter, the upper jig 10 is installed on the cylinder rod 41 in the manner described in FIG. 5, and the upper jig 10 is connected to the mast 50 via the chain block 60.

다음 단계에서는 상기 실린더로드(41)를 실린더로드 고정브라켓(30)으로부터 분리(고정핀의 제거)하고, 상기 체인블럭(60)의 조작체인을 조작하여 연결체인을 끌어 올림으로써 상부지그(10)를 상승시켜 상부지그(10)에 잡혀 있는 실린더로드(41)를 상승시킨다.In the next step, the cylinder rod 41 is removed from the cylinder rod fixing bracket 30 (removing the fixing pin), and the operation chain of the chain block 60 is operated to pull up the connection chain, thereby causing the upper jig 10 to be removed. To raise the cylinder rod 41 held by the upper jig 10.

이어, 실린더로드(41)가 상승된 공간을 이용하여 상기 실린더로드 고정브라켓(30)에 상기 하부지그(20)를 올려놓고, 하부지그(20)의 용접단(24)을 실린더로드 고정브라켓(30)의 보강판(31) 상단면에 용접하여 하부지그(20)를 안정적으로 고정한다.(S4)Subsequently, the lower jig 20 is placed on the cylinder rod fixing bracket 30 by using the space in which the cylinder rod 41 is raised, and the welding end 24 of the lower jig 20 is fixed to the cylinder rod fixing bracket ( The lower jig 20 is stably fixed by welding to the upper surface of the reinforcing plate 31 of 30. (S4)

이어, 상기 체인블럭(60)을 역으로 조작하여 실린더로드(41)를 하강시켜 상기 하부지그(20) 상단의 안착홈(21a)에 실린더로드(41)의 하단을 삽입, 안착시킨다.Subsequently, the chain block 60 is operated in reverse to lower the cylinder rod 41 so that the lower end of the cylinder rod 41 is inserted and seated in the seating groove 21a at the upper end of the lower jig 20.

따라서, 실린더로드(41)가 상기 하부지그(20)에 의해 안정적으로 지지된다.Therefore, the cylinder rod 41 is stably supported by the lower jig 20.

그리고, 이 단계에서 상기 실린더로드(41)에 고정되어 있는 상부지그(10)는 제거한다.(S5)In this step, the upper jig 10 fixed to the cylinder rod 41 is removed.

이어, 실린더(40)의 하단에 볼트체결되어 있는 실린더커버(42)를 해체하여, 실린더로드(41)를 따라 하강시켜 상기 하부지그(20)의 커버받침대(23)에 올려놓는다.Subsequently, the cylinder cover 42 bolted to the lower end of the cylinder 40 is dismantled and lowered along the cylinder rod 41 and placed on the cover base 23 of the lower jig 20.

이때 상기 실린더커버(42)의 안쪽에 있던 패킹(43,다수의 브이패킹)이 동시에 실린더로드(41)를 따라 하강된다.(S6)At this time, the packing 43 (a plurality of v-packings) inside the cylinder cover 42 is simultaneously lowered along the cylinder rod 41. (S6)

실린더(40)로부터 상기와 같이 실린더커버(42)와 패킹(43)을 분리한 후에는 다시 실린더로드(41)에 상부지그(10)를 설치하고, 상부지그(10)를 마스트(50)에 체인블럭(60)으로 연결한다.After separating the cylinder cover 42 and the packing 43 from the cylinder 40 as described above, the upper jig 10 is installed on the cylinder rod 41 again, and the upper jig 10 is attached to the mast 50. It is connected to the chain block (60).

이후, 상기 체인블럭(60)을 조작하여 다시 실린더로드(41)를 들어 올린 후, 그때 실린더로드(41)와 하부지그(20) 사이에 형성된 공간으로 패킹(43)을 인출하여 새것으로 교체한다. 필요에 따라서는 상기 실린더커버(42)도 인출하여 수리하거나 교체할 수 있다.Thereafter, the chain block 60 is operated to lift the cylinder rod 41 again, and then the packing 43 is drawn out and replaced with a new one by a space formed between the cylinder rod 41 and the lower jig 20. . If necessary, the cylinder cover 42 may also be taken out to be repaired or replaced.

이후, 체인블럭(60)을 조절하여 실린더로드(41)를 하부지그(20)에 지지시키고 상부지그(10)를 제거하면 상기 S6과 동일한 상태가 된다.Thereafter, the cylinder block 41 is supported on the lower jig 20 by adjusting the chain block 60 and the upper jig 10 is removed to be in the same state as S6.

따라서, 새로 교체된 패킹(43)을 실린더로드(41)를 따라 상승시켜 실린더(40)의 내부로 삽입하고, 실린더커버(42)를 다시 장착한다. 이로써 마스트 실린더의 패킹 교체가 이루어졌다.Therefore, the newly replaced packing 43 is raised along the cylinder rod 41 and inserted into the cylinder 40, and the cylinder cover 42 is mounted again. This resulted in a packing replacement of the mast cylinder.

이후, 전술한 단계를 역순으로 실시하여 처음의 상태로 되돌림으로써 패킹 교체 작업을 마무리한다.Thereafter, the above steps are performed in the reverse order to return the packing state to the original state.

이상 설명한 바와 같이, 본 발명에 따른 상부지그와 하부지그를 이용함으로써 작업단계에 따라 적절하게 실린더로드를 지지하거나 승,하강 시킬 수 있게 되었다.As described above, by using the upper jig and the lower jig according to the present invention it is possible to appropriately support or lift the cylinder rod according to the working step.

따라서, 마스트로부터 실린더를 분리하여 수평상태로 위치시키지 않고도 설치 상태에 있는 실린더로부터 직접 패킹을 인출하여 새 것으로 교체할 수 있다.Therefore, the packing can be taken out directly from the cylinder in the installed state and replaced with a new one without removing the cylinder from the mast and positioning the cylinder horizontally.

따라서, 실린더의 분리 및 실린더 분리를 위한 주변 배관의 선 분리 작업을 실시할 필요가 없게 되고, 패킹 교체 후 상기 배관과 실린더를 재조립하는 작업이 필요 없게 되므로 패킹 교체 작업이 매우 간편해지고, 그 작업시간이 단축되는 효과가 있다.Therefore, there is no need to perform the line separation operation of the peripheral pipe for separating the cylinder and the cylinder, and the packing replacement operation becomes very simple since the operation of reassembling the pipe and the cylinder after the packing replacement is unnecessary. The time is shortened.

도 1은 본 발명에 따른 지그 중 상부지그의 평면도와 정면도 및 측면도,1 is a plan view and a front view and a side view of an upper jig of the jig according to the present invention;

도 2는 도 1에 도시된 상부지그의 일부 변형 실시예,FIG. 2 is a partial modified embodiment of the upper jig illustrated in FIG. 1;

도 3은 본 발명에 따른 지그 중 하부지그의 정면도와 측면도, 평면도와 저면도,3 is a front view and a side view, a plan view and a bottom view of a lower jig of the jig according to the present invention;

도 4는 상기 하부지그의 설치 상태도,4 is an installation state of the lower jig,

도 5는 상기 상부지그와 하부지그의 설치 상태 사시도,5 is a perspective view of an installation state of the upper jig and the lower jig,

도 6은 상기 상부지그와 하부지그를 이용하여 마스트 실린더의 패킹을 교체하는 방법을 단계적으로 도시한 도면이다.6 is a diagram illustrating a step-by-step method of replacing the packing of the mast cylinder using the upper jig and the lower jig.

*도면의 주요 부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

10 : 상부지그 11 : 바디10: upper jig 11: body

12,13 : 접합플랜지 14 : 체인연결아암12,13: joint flange 14: chain connection arm

20 : 하부지그 21 : 상부바디20: lower jig 21: upper body

22 : 하부바디 23 : 커버받침대22: lower body 23: cover support

24 : 용접단 30 : 실린더로드 고정브라켓24: welding end 30: cylinder rod fixing bracket

31 : 보강판 40 : 실린더31: reinforcement plate 40: cylinder

41 : 실린더로드 42 : 실린더커버41: cylinder rod 42: cylinder cover

43 : 패킹 50 : 마스트43: Packing 50: Mast

51 : 브라켓 60 : 체인블럭51: bracket 60: chain block

70 : 고정부70: fixed part

Claims (5)

반원형상의 바디와, 상기 바디의 전,후단에 형성된 접합플랜지와, 상기 바디의 중간에 형성된 체인연결아암으로 이루어지고, 상기 접합플랜지가 상호 볼트 결합되어 마스트 실린더의 실린더로드에 고정되고, 상기 체인연결아암이 체인블럭을 매개로 상기 마스트에 연결되는 한 쌍의 상부지그와;It consists of a semi-circular body, a joint flange formed in the front and rear of the body, and a chain connecting arm formed in the middle of the body, the joint flange is bolted to each other fixed to the cylinder rod of the mast cylinder, the chain connection A pair of upper jigs whose arms are connected to the mast via a chain block; 상부바디와, 상기 상부바디에 연결된 하부바디와, 상기 상부바디의 외주에 형성된 커버받침대를 포함하고, 실린더로드 고정브라켓에 장착되어 상기 실린더로드를 지지하는 하부지그;A lower jig including an upper body, a lower body connected to the upper body, and a cover base formed on an outer circumference of the upper body, and mounted to a cylinder rod fixing bracket to support the cylinder rod; 를 포함하는 전기로 마스트 실린더의 패킹 교체용 지그.Packing jig for the furnace mast cylinder comprising a. 청구항 1에 있어서,The method according to claim 1, 상기 상부지그의 체인연결아암에 전후방향으로 샤클연결홀이 형성된 것을 특징으로 하는 전기로 마스트 실린더의 패킹 교체용 지그.The jig for replacing the packing of the electric furnace mast cylinder, characterized in that the shackle connecting hole is formed in the front and rear chain connecting arm of the upper jig. 청구항 1에 있어서, The method according to claim 1, 상기 상부지그의 체인연결아암에 상하방향으로 아이볼트체결홀이 형성된 것을 특징으로 하는 전기로 마스트 실린더의 패킹 교체용 지그.The jig for replacing the packing of the electric furnace mast cylinder, characterized in that the eye bolt fastening hole is formed in the chain connecting arm of the upper jig in the vertical direction. 청구항 1에 있어서,The method according to claim 1, 상기 하부지그의 상부바디 상단에 실린더로드의 하단이 삽입 안착되는 안착홈이 형성된 것을 특징으로 하는 전기로 마스트 실린더의 패킹 교체용 지그.The jig for the packing of the electric furnace mast cylinder, characterized in that the seating groove is formed in the upper end of the lower jig is inserted into the lower end of the cylinder rod. 청구항 1에 있어서,The method according to claim 1, 상기 하부지그의 하부바디 측면에 상기 실린더로드 고정브라켓에 용접되는 용접단이 형성된 것을 특징으로 하는 전기로 마스트 실린더의 패킹 교체용 지그.The jig for the packing of the electric furnace mast cylinder, characterized in that the welding end is formed on the lower body side of the lower jig welded to the cylinder rod fixing bracket.
KR1020090092012A 2009-09-28 2009-09-28 jig for mast cylinder packing replacement of electric furnace KR101109905B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090092012A KR101109905B1 (en) 2009-09-28 2009-09-28 jig for mast cylinder packing replacement of electric furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090092012A KR101109905B1 (en) 2009-09-28 2009-09-28 jig for mast cylinder packing replacement of electric furnace

Publications (2)

Publication Number Publication Date
KR20110034481A true KR20110034481A (en) 2011-04-05
KR101109905B1 KR101109905B1 (en) 2012-01-31

Family

ID=44043083

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090092012A KR101109905B1 (en) 2009-09-28 2009-09-28 jig for mast cylinder packing replacement of electric furnace

Country Status (1)

Country Link
KR (1) KR101109905B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101500135B1 (en) * 2013-09-04 2015-03-06 주식회사 포스코 Packing assembling apparatus of blow tube

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5765881A (en) * 1996-08-21 1998-06-16 Perner; Guenther H. Interlocking split flange connector
JP2000171344A (en) * 1998-12-07 2000-06-23 Mitsubishi Heavy Ind Ltd Shock testing device
KR100939888B1 (en) * 2008-04-25 2010-01-29 현대제철 주식회사 A jig for assembling hydraulic coupling in electric furnace

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101500135B1 (en) * 2013-09-04 2015-03-06 주식회사 포스코 Packing assembling apparatus of blow tube

Also Published As

Publication number Publication date
KR101109905B1 (en) 2012-01-31

Similar Documents

Publication Publication Date Title
CN102756019B (en) Device for roundness adjustment and supporting of penstock
US20130058748A1 (en) Apparatus and method for reinforcement of a load bearing structure
CN104439877A (en) Method for repairing converter supporting ring
CN105499891A (en) Mounting assisting device for three-point spherical bearing and mounting-welding method of mounting assisting device
KR101109905B1 (en) jig for mast cylinder packing replacement of electric furnace
CN103791156B (en) LARGE DIAMETER FRP pipeline superaltitude method for rapidly mounting
JP2008133690A (en) Attaching-detaching device of joint part
CN205342318U (en) 3 self -aligning spherical support installation auxiliary device
JP7098361B2 (en) How to assemble a hanger and a structure using it
CN111644794A (en) Inner wall supporting and disassembling method of large-diameter shell
JPH1029090A (en) Surface aligning jig for cylindrical structure
JP2012144753A (en) Method of joining electrode and stub in remelting furnace
CN214142425U (en) Blast furnace hot blast valve quick replacement auxiliary device
CN212398589U (en) Chain type self-locking device
CN209380188U (en) A kind of large diameter pipeline pipe fitting pairing device
CN110076515B (en) Pipeline aligning device
JP2017160480A (en) Exchange method of converter body
CN217122232U (en) Low temperature liquid tank container barrel assembly welding roundness keeps frock
CN219359354U (en) Frock is disassembled to circular piece
CN213084499U (en) Simple and easy frock is dismantled in screw conveyer hole
JP2013253395A (en) Clamp device for front piping
CN217833481U (en) Blast furnace cooling wall disassembling tool
CN108907596A (en) The auxiliary device and its welding method connect for biomass boiler Pipeline butt
US20240082993A1 (en) Service tool
CN202851013U (en) Connecting device between arch frame sections of tunnel steel arch frame

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee