KR20110024619A - Apparatus for installing a grouting mortar supply pipe in tunnel - Google Patents

Apparatus for installing a grouting mortar supply pipe in tunnel Download PDF

Info

Publication number
KR20110024619A
KR20110024619A KR1020090082690A KR20090082690A KR20110024619A KR 20110024619 A KR20110024619 A KR 20110024619A KR 1020090082690 A KR1020090082690 A KR 1020090082690A KR 20090082690 A KR20090082690 A KR 20090082690A KR 20110024619 A KR20110024619 A KR 20110024619A
Authority
KR
South Korea
Prior art keywords
leak
reinforcing
tunnel
steel
reinforcement
Prior art date
Application number
KR1020090082690A
Other languages
Korean (ko)
Other versions
KR101133214B1 (en
Inventor
정재형
이성원
신휴성
이규필
황재홍
Original Assignee
한국건설기술연구원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국건설기술연구원 filed Critical 한국건설기술연구원
Priority to KR1020090082690A priority Critical patent/KR101133214B1/en
Publication of KR20110024619A publication Critical patent/KR20110024619A/en
Application granted granted Critical
Publication of KR101133214B1 publication Critical patent/KR101133214B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Structural Engineering (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

PURPOSE: An apparatus for fixing a water leakage repair structure in a tunnel is provided to improve the work efficiency in tunnel construction by simply and quickly attaching a water leakage repair structure to a steel rib using a connector. CONSTITUTION: An apparatus for fixing a water leakage repair structure in a tunnel(100) includes a connector(110). The connector comprises a first fixing part(120) which is inserted and fastened in a steel rib and a second fixing part(130) which is inserted and fixed in a water leakage repair structure.

Description

터널 누수보강공 장착장치{APPARATUS FOR INSTALLING A GROUTING MORTAR SUPPLY PIPE IN TUNNEL}Tunnel Leak Reinforcement Equipment {APPARATUS FOR INSTALLING A GROUTING MORTAR SUPPLY PIPE IN TUNNEL}

본 발명은 터널에서 발생되는 누수를 제어하기 위하여 누수보강공을 설치하는 장치에 관한 것으로, 보다 상세히는 발파 등을 이용하여 형성된 터널 막장의 굴착 내측면에 강지보재를 설치하고, 상기 강지보재가 굴착 내측면과 일체화되도록 숏-크리트를 타설하여 경화시키는 터널시공 공법에서 누수발생을 방지하기 위하여 경화성 누수방지재를 주입하는 누수보강공을 강지보재에 쉽고 빠르게 설치할 수 있는 터널 누수보강공 장착장치에 관한 것이다.The present invention relates to a device for installing a leak reinforcing hole for controlling the leakage occurring in the tunnel, more specifically, to install the stiffeners on the inner side of the excavation of the tunnel membrane formed by blasting, and the stiffeners excavation A tunnel leak reinforcement mounting device for easily and quickly installing a leak reinforcement injecting a hard leak prevention material into a stiffener to prevent leakage in the tunnel construction method in which the shot-crete is cast and hardened to be integrated with the inner surface. will be.

도 1a 및 도 1b는 종래 숏-크리트 및 강지보재에 의해서 시공된 터널의 단면도 및 그 A-A 선 단면도를 도시한 것이다.1A and 1B show a cross-sectional view of a tunnel constructed by conventional shotcrete and stiffener and its A-A cross-sectional view.

일반적으로 터널(1)의 시공순서를 개략적으로 살펴보면, 먼저 발파 등의 방법을 이용하여 터널 진행방향으로 막장(10)을 형성시키게 된다.In general, looking at the construction sequence of the tunnel (1), first to form the membrane 10 in the tunnel progress direction using a method such as blasting.

이와 같은 막장(10)은 인위적으로 형성시킨 것이기 때문에, 막장(10)의 이완에 따른 붕괴의 위험성이 발생하게 된다. 이에 막장(10)의 내측 굴착면(12)에는 1차 숏-크리트(Shot-Crete)(31)를 타설하여 내측 굴착면(10)의 붕괴가 방지되도록 한다.Since the membrane 10 is artificially formed, there is a risk of collapse due to the relaxation of the membrane 10. Accordingly, the first shot-crete 31 is poured on the inner drilling surface 12 of the membrane 10 to prevent the collapse of the inner drilling surface 10.

그 다음으로는 상기 1차 숏-크리트(31)를 지지하도록 H 형강, 또는 삼각단면으로 결속된 철근 프레임을 포함하는 강지보재(20)를 설치하게 되는데, 이러한 강지보재(20)는 통상 H 형강, 또는 삼각단면으로 결속된 철근 프레임을 이용하여 내측 굴착면(12)에 다수를 연결시켜 가면서 설치하게 되며, 막장(10)이 형성될 때마다 시공된다. 이러한 강지보재(20)는 결국 이완되려고 하는 막장(10)을 내측에서 지지하는 지지부재의 역할을 하게 된다.Then, to support the primary shot-crete 31 is to install a steel retaining material including a H-shaped steel, or a reinforcing frame bound to a triangular cross-section, such a steel retaining material 20 is usually H-shaped steel Or by installing a plurality of connecting to the inner drilling surface 12 by using a reinforcing bar frame bound by a triangular cross section, and is constructed every time the curtain 10 is formed. Such rigid retainer 20 serves as a supporting member for supporting the membrane 10 to be relaxed from the inside.

이러한 강지보재(20)는 막장(10) 내부에 그대로 노출되도록 하지 않고, 다시 추가적인 2차 숏-크리트(32)를 타설하여 매립되도록 하는데, 통상 이러한 숏-크리트(30)는 고압으로 뿜어치기 방식으로 시공되기 때문에 리바운드율이 상당히 높게 마련이고, 특히 강지보재(20)는 강재이기 때문에 숏-크리트(30) 타설시, 내측 굴착면(12) 보다 리바운드율이 커질 수 있어 숏-크리트(30)가 강지보재(20)에 충분히 밀착되어 형성되도록 품질관리에 신경을 써야 한다.The paper retainer 20 is not exposed to the interior of the curtain 10 as it is, and the additional secondary shot-crete 32 is poured again to be embedded, such a shot-crete 30 is usually sprayed at high pressure Since the rebound ratio is prepared to be quite high, in particular, since the steel retaining material 20 is a steel material, when the shot-crete 30 is placed, the rebound rate may be greater than that of the inner drilling surface 12. Care should be taken in quality control so that the steel sheet 20 is formed in close contact with the steel sheet.

이와 같은 숏-크리트는 1회 시공에 의하여 전부가 형성되는 것이 아니라 현장 여건 등에 따라 그 회수 및 시기를 달리하여 반복하고, 다수 횟수에 의해서 형성시키게 된다. Such shot-crete is not formed by a single construction, but is repeated by varying the number and timing of the shot-creation depending on the site conditions, and is formed by a plurality of times.

이와 같이 다수 회에 걸친 숏-크리트(30)의 타설 작업이 최종 완료되면, 마지막 숏-크리트(33)의 완성면에 부직포(40)를 포설하게 되며, 이러한 최종 부직포(40)에 콘크리트 라이닝(50)을 추가 형성시킴으로써 최종 터널 내측 굴착면(12)의 이완에 의한 보강이 완성될 수 있도록 하는 것이다.As such, when the finishing work of the shot-crete 30 is completed a plurality of times, the nonwoven fabric 40 is laid on the finished surface of the last shot-crete 33, and the concrete non-woven fabric 40 is placed on the final nonwoven fabric 40. The additional formation of 50) allows the reinforcement by the relaxation of the final tunnel inner drilling surface 12 to be completed.

하지만, 상기에서 살펴본 바와 같이, 특히 2차 숏-크리트(32)를 타설하는 경우, 강지보재(20)에 대한 리바운드율이 커지는 등 그 시공관리 및 품질관리는 완벽할 수 없기 때문에, 특히 강지보재(20)의 주위에는 숏-크리트(30)가 밀실하게 채워지지 않음에 따라 다수의 공극이 형성될 수 있다.However, as described above, in particular, when the secondary shot-crete 32 is poured, since the construction management and quality control, such as the rebound rate for the steel retaining material 20, cannot be perfect, in particular, the steel retaining material As the shot-crete 30 is not tightly filled around the periphery 20, a plurality of voids may be formed.

이와 같은 공극은 도 1b에 도시된 바와 같이, 결국 내측 굴착면(12)으로부터의 유수가 침투되는 누수로의 역할을 하게 되며, 이와 같은 누수현상이 지속되다 보면, 터널(1) 내측면에는 상당량의 물이 유입될 수 있게 되며, 라이닝(50) 배면에 수압이 작용하여 터널(1)의 콘크리트 라이닝(50) 파손 또는 변형을 유발시킬 수 있다.As shown in FIG. 1B, the air gap serves as a leak path through which water flows from the inner drilling surface 12 to penetrate. If such leakage is continued, a considerable amount is present in the inner surface of the tunnel 1. Water may be introduced, the hydraulic pressure acts on the back lining 50 may cause breakage or deformation of the concrete lining 50 of the tunnel (1).

또한 동절기에는 이러한 누수로 인해 터널(1) 내부의 도로에 결빙, 고드름 등으로 인한 안전사고의 위험성되 커지게 된다. 이에 터널 시공 완성 이후에 추후 누수방지를 위한 보수시공이 필요하게 된다.In addition, during the winter season, the leakage increases the risk of safety accidents due to icing and icicles on the road inside the tunnel 1. Therefore, after the completion of the tunnel construction, it is necessary to repair for later leakage prevention.

하지만 이러한 보수시공은 터널(1)의 통행을 일정시간 막아야 하는 등의 시간적, 경제적 문제점 때문에 바람직하지 않아, 미리 이러한 터널(1)의 누수로를 폐색시키기 위한 기술 개발이 요청되는 실정이다. However, such a repair construction is not preferable because of the time and economic problems such as blocking the passage of the tunnel 1 for a certain time, so that the development of technology for blocking the leak path of the tunnel 1 in advance is required.

이와 같은 문제점을 해소하기 위하여 상기 강지보재(20)를 따라 형성되는 공극에 의한 누수로를 폐색시키기 위하여 누수로를 따라 누수보강공을 설치하고, 상기 누수보강공에 그라우팅용 밀크액을 포함하는 경화성 누수방지재를 공급하여 공극내에서 경화시킴으로써 누수방지재가 누수로를 충전시켜 폐색시키는 기술이 제안되어 있다.In order to solve such a problem, to install a leak reinforcing hole along the leaking path in order to close the leaking path by the gap formed along the stiffeners 20, the hardening property including the grouting milk solution in the leak reinforcing hole A technique has been proposed in which a leak preventing material is filled and cured in the voids so that the leak preventing material fills and closes the leak path.

그러나, 이와 같이 강지보재(20)를 따라서 누수보강공을 설치하는 기술은 터널 현장에서 이루어지는 긴박한 공정과 작업여건을 고려하다 보면 누수보강공을 강지보재(20)에 신속하게 결속시키는 공정이 여의치 못하여 후속 공정의 진행에 차질이 이루어지고, 결과적으로 터널 시공작업의 생산성을 크게 저하시키는 문제점을 갖는 것이었다. 따라서 터널 작업 현장에서는 강지보재(20)에 누수보강공을 쉽고 빠르게 설치할 수 있는 기술개발이 절실하게 요청되는 실정이었다.However, the technique of installing the leak reinforcement along the stiffeners 20 is not a process to bind the leak reinforcement to the stiffeners 20 quickly considering the imminent process and working conditions made in the tunnel site. Disruption of the subsequent process was made, and as a result, there was a problem of significantly lowering the productivity of the tunnel construction work. Therefore, in the tunnel work site was a situation that is urgently requested technology development that can be easily and quickly install the leak reinforcement in the steel retaining material (20).

본 발명은 상기와 같은 종래의 문제점을 해소하기 위한 것으로서, 그 목적은 터널 막장의 굴착 내측면에 강지보재를 설치하고, 강지보재를 따라서 형성되는 공극에 경화성 누수방지재를 주입하기 위한 누수보강공을 설치하는 공정에서 누수보강공을 강지보재에 쉽고 빠르게 설치하고, 후속 공정을 실행할 수 있음으로써 터널공사 현장의 작업 생산성을 크게 향상시킬 수 있도록 개선된 터널 누수보강공 장착장치를 제공함에 있다. The present invention is to solve the conventional problems as described above, the purpose is to install a rigid holding material on the inner surface of the excavation of the tunnel membrane, the leakage reinforcement for injecting a curable leakage preventing material into the gap formed along the rigid holding material In the process of installing the leak reinforcement in the river retainer can be installed quickly and easily, and the subsequent process can be carried out to provide an improved tunnel leak reinforcement mounting device to greatly improve the work productivity of the tunnel construction site.

상기와 같은 목적을 달성하기 위하여 본 발명은, 강지보재가 굴착 내측면에 설치되고, 상기 강지보재가 타설된 숏-크리트에 의해서 매설되어 굴착 내측면에 일체화 시공되는 터널구조에 있어서, 상기 강지보재를 따라 형성되는 공극에 의한 누수로를 폐색시키기 위하여 누수로를 따라 누수보강공을 설치하되, 상기 강지보재와 누수보강공의 사이에는 일측단부가 상기 강지보재에 끼워져서 결속되는 제1 고정부가 형성되고, 타측단부는 상기 누수보강공에 끼워져서 고정되는 제2 고정부가 형성된 연결구가 배치되어 상기 강지보재와 누수보강공을 끼워맞춤식으로 결속시키고, 상기 숏-크리트가 경화된 후, 상기 누수보강공에 그라우팅용 밀크액을 포함하는 경화성 누수방지재를 주입하여 누수로를 충전시켜 폐색시키는 것이다.In order to achieve the above object, the present invention, in the tunnel structure is installed in the excavation inner surface, the steel retaining material is buried by the shot-crete in which the steel retaining material is placed, integrated construction on the inner surface of the excavation, the steel retaining material A leak reinforcing hole is installed along the leaking path in order to close the leaking path due to the gap formed along the gap, and a first fixing part is formed between one side end of the steel retaining material and the leaking reinforcing hole by being fitted into the steel retaining material. The other end portion is provided with a connector formed with a second fixing portion fixed to the leakage reinforcement hole is fixed to the binding material and the leakage reinforcement by fitting, and the hardened the short-crete, the leak reinforcement Injecting a curable leakage preventing material containing a grouting milk solution to the filling by filling the leak path to blockage.

이와 같이 본 발명은 연결구를 이용하여 강지보재와 누수보강공을 끼워맞춤식으로 결속시켜서 누수보강공을 강지보재에 쉽고 빠르게 설치할 수 있기 때문에, 후속 공정을 원활하게 진행할 수 있어서 터널공사 현장의 작업 생산성을 크게 향상시킬 수 있는 것이다.As described above, the present invention can easily and quickly install the leak reinforcement to the river retainer by fitting the retainer retainer and the leak reinforcement by fitting the connector, so that the subsequent process can be performed smoothly, thereby improving the work productivity of the tunnel construction site. It can be greatly improved.

그리고 본 발명은 바람직하게는 상기 연결구는 제1 고정부가 H 형상을 포함하는 강지보재의 상부플랜지를 가로질러서 걸쳐지는 걸림홈을 내측에 형성하고, 제2 고정부가 상기 누수보강공이 끼워지는 고정홈을 내측에 형성하여 상기 강지보재의 상부플랜지와 복부의 연결구 모서리에 누수보강공을 위치시키도록 강재로 절곡 형성된 것이다. 따라서 본 발명은 연결구를 이용하여 H 형상을 포함하는 강지보재와 누수보강공을 끼워맞춤식으로 결속시켜서 누수보강공을 강지보재에 쉽고 빠르게 설치할 수 있다.And the present invention is preferably the connector is formed in the engaging groove that extends across the upper flange of the steel retainer having a first fixing portion H shape, the second fixing portion is a fixing groove into which the leak reinforcement is fitted Formed on the inside is bent and formed to be a steel reinforcement to position the leak reinforcement hole in the upper flange and the abdominal connector corner of the steel retainer. Therefore, the present invention can easily and quickly install the leak reinforcement to the river retainer by binding the retaining retainer including the H shape and the leak reinforcement by fitting the fitting.

또한 본 발명은 바람직하게는 상기 연결구는 제1 고정부가 삼각단면으로 결속된 철근 프레임을 포함하는 강지보재의 철근부재에 끼워 결합되는 걸림홈을 내측에 형성하고, 제2 고정부가 상기 누수보강공이 끼워지는 고정홈을 내측에 형성하여 상기 강지보재의 철근부재에 인접하여 누수보강공을 위치시키도록 강재로 "S"자형으로 절곡 형성된 것이다. 이를 통하여 본 발명은 연결구를 이용하여 삼각단면으로 결속된 철근 프레임을 포함하는 강지보재와 누수보강공을 끼워맞춤식으로 결속시켜서 누수보강공을 강지보재에 쉽고 빠르게 설치할 수 있다.In addition, the present invention preferably the connector is formed in the engaging groove coupled to the reinforcing member of the steel retainer including a reinforcing frame, the first fixing portion is bound in a triangular cross section, the second fixing portion is fitted with the leak reinforcement The paper is formed bent in the "S" shape of the steel to form a fixing groove on the inside to position the leak reinforcement hole adjacent to the reinforcing member of the steel retaining material. Through this, the present invention can easily and quickly install the leak reinforcement to the stiffener by binding the stiffener and the leak reinforcement, including the reinforcing frame bound in a triangular cross-section using a connector.

그리고 본 발명은 바람직하게는 상기 연결구는 제1 고정부가 삼각단면으로 결속된 철근 프레임을 포함하는 강지보재의 철근부재에 끼워 결합되는 걸림홈을 내측에 형성하고, 제2 고정부가 상기 누수보강공이 끼워지는 고정홈을 내측에 형성하여 상기 강지보재의 철근부재에 인접하여 누수보강공을 위치시키도록 강판을 프레 스 절단하여 형성된 것이다. 따라서 본 발명은 연결구를 이용하여 삼각단면으로 결속된 철근 프레임을 포함하는 강지보재와 누수보강공을 끼워맞춤식으로 결속시켜서 누수보강공을 강지보재에 쉽고 빠르게 설치할 수 있다. And the present invention preferably the connector is formed in the engaging groove coupled to the reinforcing member of the steel retainer including a reinforcing frame, the first fixing portion is bound in a triangular cross section, the second fixing portion is fitted with the leak reinforcement The paper is formed by press-cutting the steel sheet to form a fixing groove inward to position the leak reinforcing hole adjacent to the reinforcing member of the steel retaining member. Therefore, the present invention can easily and quickly install the leak reinforcement to the stiffener by binding the stiffener and the leak reinforcement, including the reinforcing frame bound in a triangular cross-section using a connector.

또한 본 발명은 바람직하게는 상기 연결구가 장착되는 철근부재의 위치는 삼각단면으로 결속된 철근 프레임의 상부측이며, 누수보강공은 철근 프레임의 삼각단면 내측 공간에 위치되는 것이다. 이를 통하여 본 발명은 강지보재의 주위에 형성되는 공극에 대해 보다 효과적으로 경화성 누수방지재를 주입하고, 공극을 폐색시켜서 누수를 방지할 수 있다.In addition, the present invention preferably is the position of the reinforcing member to which the connector is mounted is the upper side of the reinforcing frame bound in a triangular cross section, the leak reinforcement is located in the inner space of the triangular cross section of the reinforcing frame. Through this, the present invention can more effectively inject a curable leakage preventing material to the voids formed around the steel retaining material, it is possible to prevent the leakage by closing the voids.

본 발명에 따른 터널 누수보강공 장착장치에 의하면 터널 막장의 굴착 내측면에 강지보재를 설치하고, 강지보재를 따라서 형성되는 공극에 경화성 누수방지재를 주입하기 위한 누수보강공을 설치하는 공정에서 연결구를 이용하여 강지보재와 누수보강공을 끼워맞춤식으로 결속시켜서 누수보강공을 강지보재에 쉽고 빠르게 설치할 수 있기 때문에, 후속 공정을 원활하게 진행할 수 있어서 터널공사 현장의 작업 생산성을 크게 향상시킬 수 있는 우수한 효과가 얻어진다.According to the tunnel leak reinforcement mounting apparatus according to the present invention, the connector is installed in the process of installing a leak retainer to install a hard retainer on the inner surface of the tunnel membrane excavation, and inject a hard leak prevention material into the gap formed along the strong retainer By fitting the stiffeners and the leak reinforcement by using the fitting method, the leak reinforcement can be easily and quickly installed in the stiffeners, so that the subsequent process can be smoothly performed, which can greatly improve the work productivity of the tunnel construction site. Effect is obtained.

이하, 본 발명의 바람직한 실시 예를 도면을 참조하여 보다 상세히 설명하기로 한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings.

도 2는 본 발명에 따른 터널 누수보강공 장착장치(100)가 전체적으로 상세히 도시되어 있다. 2 is a tunnel leakage reinforcement mounting apparatus 100 according to the present invention is shown in detail as a whole.

본 발명에 따른 터널 누수보강공 장착장치(100)는 도 2에 도시된 바와 같은 연결구(110)를 구비하는데, 이와 같은 연결구(110)는 그 일측단부가 강지보재(140)에 끼워져서 결속되는 제1 고정부(120)가 형성되고, 타측단부는 상기 누수보강공(150)에 끼워져서 고정되는 제2 고정부(130)가 형성된 구조이다.Tunnel leak reinforcement mounting apparatus 100 according to the present invention is provided with a connector 110 as shown in Figure 2, such a connector 110 is coupled to one side end is fitted in the stiffener (140). The first fixing part 120 is formed, and the other end thereof has a structure in which a second fixing part 130 is inserted and fixed to the leak reinforcing hole 150.

이와 같은 연결구(110)는 제1 고정부(120)와 제2 고정부(130)를 이용하여 강지보재(140)와, 누수보강공(150)을 끼워맞춤식으로 결속시키게 되는데, 이를 통하여 누수보강공(150)을 강지보재(140)에 쉽고 빠르게 설치할 수 있다.Such a connector 110 is used to bind the retaining material 140 and the leak reinforcing ball 150 by using the first fixing part 120 and the second fixing part 130, through which the leak reinforcement Ball 150 can be easily and quickly installed in the retainer (140).

상기 연결구(110)는 바람직하게는 제1 고정부(120)가 H 형강(140a)을 포함하는 강지보재(140)의 상부플랜지(142a)를 가로질러서 걸쳐지는 걸림홈(122)을 내측에 형성하고, 제2 고정부(130)가 상기 누수보강공(150)이 끼워지는 고정홈(132)을 내측에 형성하는 구조이다. The connector 110 preferably includes a locking groove 122 in which the first fixing part 120 spans the upper flange 142a of the steel retainer 140 including the H-shaped steel 140a. The second fixing part 130 has a structure in which a fixing groove 132 into which the leak reinforcing hole 150 is fitted is formed inside.

이와 같은 구조에서 제2 고정부(130)는 상기 누수보강공(150)이 강지보재(140)의 상부플랜지(142a)와 복부(142b)의 연결부 모서리(142c)에 위치시키도록 강재로 절곡 형성된 구조이다.In such a structure, the second fixing part 130 is formed by bending the steel so that the leak reinforcing hole 150 is positioned at the connection edge 142c of the upper flange 142a and the abdomen 142b of the steel retainer 140. Structure.

이와 같은 연결구(110)를 이용하여 강지보재(140)와, 누수보강공(150)을 끼워맞춤식으로 결속시킨 장착구조가 도 4a에 단면으로 도시되어 있다.The mounting structure in which the rigid retaining member 140 and the leak reinforcing hole 150 are fitted to each other by using the connector 110 is shown in cross section in FIG. 4A.

즉 상기 연결구(110)는 상부측에 형성된 제1 고정부(120)의 걸림홈(122)을 이용하여 H 형강(140a)으로 이루어진 강지보재(140)의 상부플랜지(142a)를 횡방향으로 가로질러서 끼우고, 제2 고정부(130)의 고정홈(132)에는 누수보강공(150)을 끼워서 고정한다.That is, the connector 110 horizontally crosses the upper flange 142a of the steel retaining member 140 made of the H-shaped steel 140a by using the locking groove 122 of the first fixing part 120 formed on the upper side. Squeezed and fitted, the fixing groove 132 of the second fixing part 130 is fixed by inserting a leak reinforcing hole 150.

이와 같은 구조에서 상기 연결구(110)는 제1 고정부(120)의 걸림홈(122)이 횡방향으로 길게 "―"자형으로 형성된 구조이고, 제2 고정부(130)의 고정홈(132)은 상기 걸림홈(122)의 중앙 하부측에서 원형으로 형성되어 상기 고정홈(132)에 끼워지는 누수보강공(150)은 강지보재(140)의 상부플랜지(142a)와 복부(142b)의 연결부 모서리(142c)에 위치하게 된다.In this structure, the connector 110 is a structure in which the locking groove 122 of the first fixing part 120 is formed in a long shape in the transverse direction to have a “-” shape, and the fixing groove 132 of the second fixing part 130 is formed. Is formed in a circular shape at the center lower side of the locking groove 122, the leakage reinforcement hole 150 is fitted into the fixing groove 132 is the connection portion of the upper flange 142a and the abdomen 142b of the retaining member 140 It is located at the edge 142c.

또한 본 발명에 따른 터널 누수보강공 장착장치(100)의 연결구(110)는 도 3a에 도시된 바와 같은 구조로 형성되는데, 이는 제1 고정부(120)가 삼각단면으로 결속된 철근 프레임(140b)을 포함하는 강지보재(140)의 철근부재(146)에 끼워 결합되는 걸림홈(122)을 내측에 형성하고, 제2 고정부(130)가 상기 누수보강공(150)이 끼워지는 고정홈(132)을 내측에 형성하여 "S"자형으로 절곡 형성된 구조이다.In addition, the connector 110 of the tunnel leakage reinforcement mounting apparatus 100 according to the present invention is formed in a structure as shown in Figure 3a, which is the first fixing portion 120 is bound to a triangular cross-section reinforcing frame 140b The locking groove 122 is inserted into the reinforcing member 146 of the steel retaining member 140, including the inner side, and the second fixing part 130 is a fixing groove into which the leak reinforcing hole 150 is fitted. 132 is formed on the inner side to form a "S" shape.

이와 같은 연결구(110)의 구조에서는 이를 이용하여 삼각단면으로 결속된 철근 프레임(140b)을 포함하는 강지보재(140)와, 누수보강공(150)을 끼워맞춤식으로 결속시켜서 누수보강공(150)을 강지보재(140)에 쉽고 빠르게 설치할 수 있다.In such a structure of the connector 110, by using this to bind the rigid retaining member 140, including the reinforcing frame (140b) bound to the triangular cross-section, the leak reinforcement ball 150 by fitting the leak reinforcement ball 150 It can be easily and quickly installed on the paper holding (140).

이와 같은 연결구(110)를 이용하여 강지보재(140)와, 누수보강공(150)을 끼워맞춤식으로 결속시킨 장착구조가 도 4b에 단면으로 도시되어 있다.A mounting structure in which the rigid retainer 140 and the leak reinforcing hole 150 are fitted to each other by using the connector 110 is shown in cross section in FIG. 4B.

즉 상기 연결구(110)는 상부측에 형성된 제1 고정부(120)의 걸림홈(122)을 이용하여 삼각단면으로 결속된 철근 프레임(140b)으로 이루어진 강지보재(140)의 철근부재(146)를 끼우고, 제2 고정부(130)의 고정홈(132)에는 누수보강공(150)을 끼워서 고정한다.That is, the connector 110 is a reinforcing member 146 of the steel retaining member 140 made of a reinforcing frame 140b bound to a triangular cross-section using the locking groove 122 of the first fixing part 120 formed on the upper side. Insert the fixed to the fixing groove 132 of the second fixing part 130, the leakage reinforcing hole 150 is fixed.

이와 같은 구조에서 상기 연결구(110)는 제1 고정부(120)의 걸림홈(122)이 철근부재(146)의 고정이 용이한 원형으로 형성된 구조이고, 제2 고정부(130)의 고정홈(132)도 상기 걸림홈(122)의 중앙하부측에서 원형으로 형성되어 상기 고정홈(132)에 끼워지는 누수보강공(150)은 강지보재(140)의 철근부재(146)에 인접하여 위치하게 된다. 이와 같은 경우, 상기 연결구(110)가 장착되는 철근부재(146)의 위치는 삼각단면으로 결속된 철근 프레임(140b)의 상부측이 바람직하며, 누수보강공(110)은 철근 프레임(140b)의 삼각단면 내측 공간에 위치되는 것이 바람직하다.In this structure, the connector 110 has a structure in which the locking groove 122 of the first fixing part 120 is formed in a circular shape to easily fix the reinforcing member 146, and the fixing groove of the second fixing part 130 is provided. 132 is also formed in the center of the lower side of the locking groove 122 in the circular leakage reinforcing hole 150 is fitted in the fixing groove 132 is located adjacent to the reinforcing member 146 of the retainer (140) Done. In this case, the position of the reinforcing member 146 to which the connector 110 is mounted is preferably the upper side of the reinforcing frame 140b bound by a triangular cross section, and the leak reinforcing hole 110 is the reinforcing frame of the reinforcing frame 140b. It is preferably located in the triangular cross-section inner space.

그리고 본 발명에 따른 터널 누수보강공 장착장치(100)의 연결구(110)는 도 3b에 도시된 바와 같은 구조로 형성되는데, 이는 예를 들면 강판을 프레스 절단하여 형성된 것이다. 이와 같은 연결구(110)는 제1 고정부(120)가 삼각단면으로 결속된 철근 프레임(140b)을 포함하는 강지보재(140)의 철근부재(146)에 끼워 결합되는 걸림홈(122)을 내측에 형성하고, 제2 고정부(130)가 상기 누수보강공(150)이 끼워지는 고정홈(132)을 내측에 형성하여 상기 강지보재(140)의 철근부재(146)에 인접하여 위치된다. And the connector 110 of the tunnel leak reinforcement mounting apparatus 100 according to the present invention is formed in a structure as shown in Figure 3b, for example, is formed by pressing a steel sheet. The connector 110, the first fixing portion 120 is engaged with the reinforcing groove 122 is fitted into the reinforcing member 146 of the steel retaining member 140, including the reinforcing frame 140b bound to a triangular cross-section inside. And a second fixing part 130 is formed adjacent to the reinforcing member 146 of the stiffener 140 by forming a fixing groove 132 into which the leak reinforcing hole 150 is fitted.

이와 같은 연결구(110)의 구조에서도 이를 이용하여 삼각단면으로 결속된 철근 프레임(140b)을 포함하는 강지보재(140)와, 누수보강공(150)을 끼워맞춤식으로 결속시켜서 누수보강공(150)을 강지보재(140)에 쉽고 빠르게 설치할 수 있다. 이를 이용하여 강지보재(140)와, 누수보강공(150)을 끼워맞춤식으로 결속시킨 장착구조가 도 4c에 단면으로 도시되어 있다.In this structure of the connector 110, using the same, the rigid retaining member 140 and the leak reinforcing member 150, including the reinforcing frame (140b) bound to the triangular cross-section by fitting to the leak reinforcing reinforcement 150 It can be easily and quickly installed on the paper holding (140). A mounting structure in which the rigid retainer 140 and the leak reinforcing hole 150 are fitted to each other by using the fitting is shown in cross section in FIG. 4C.

따라서 상기 연결구(110)는 상부측에 형성된 제1 고정부(120)의 걸림홈(122)을 이용하여 삼각단면으로 결속된 철근 프레임(140b)으로 이루어진 강지보재(140) 의 철근부재(146)를 끼우고, 제2 고정부(130)의 고정홈(132)에는 누수보강공(150)을 끼워서 고정한다.Therefore, the connector 110 is a reinforcing member 146 of the steel retaining member 140 made of a reinforcing frame 140b bound to a triangular cross-section using the locking groove 122 of the first fixing part 120 formed on the upper side. Insert the fixed to the fixing groove 132 of the second fixing part 130, the leakage reinforcing hole 150 is fixed.

이와 같은 구조에서도 상기 연결구(110)는 제1 고정부(120)의 걸림홈(122)이 철근부재(146)의 고정이 용이한 원형으로 형성된 구조이고, 제2 고정부(130)의 고정홈(132)도 상기 걸림홈(122)의 중앙하부측에서 원형으로 형성되어 상기 고정홈(132)에 끼워지는 누수보강공(150)은 강지보재(140)의 철근부재에 인접하여 위치하게 된다. 이때에도 상기 연결구(110)가 장착되는 철근부재(146)의 위치는 삼각단면으로 결속된 철근 프레임(140b)의 상부측이 바람직하며, 누수보강공(110)은 철근 프레임(140b)의 삼각단면 내측 공간에 위치되는 것이 바람직하다.Even in such a structure, the connector 110 has a structure in which the locking groove 122 of the first fixing part 120 is formed in a circular shape to easily fix the reinforcing member 146, and the fixing groove of the second fixing part 130 is provided. 132 is also formed in a circular shape at the center lower side of the locking groove 122, the leak reinforcing hole 150 is fitted to the fixing groove 132 is positioned adjacent to the reinforcing member of the retainer (140). In this case, the position of the reinforcing member 146 to which the connector 110 is mounted is preferably an upper side of the reinforcing frame 140b bound to a triangular cross section, and the leak reinforcing hole 110 is a triangular cross section of the reinforcing frame 140b. It is preferably located in the inner space.

따라서 본 발명은 이와 같은 연결구(110)를 이용하여 삼각단면으로 결속된 철근 프레임(140b)을 포함하는 강지보재(140)와, 누수보강공(150)을 끼워맞춤식으로 결속시켜서 누수보강공(150)을 강지보재(140)에 쉽고 빠르게 설치할 수 있다. Therefore, the present invention by using the connector 110 such that the rigid retaining member 140 and the leakage reinforcing ball 150, including the reinforcing frame (140b) bound to the triangular cross-section by fitting the leakage reinforcing ball 150 ) Can be easily and quickly installed on the retainer (140).

이하, 본 발명에 따른 터널 누수보강공 장착장치(100)를 이용하여 터널(200)의 강지보재(140)에 누수보강공(150)을 설치하고 내부의 누수를 차단시키는 공정에 대해서 보다 상세히 설명하기로 한다. Hereinafter, a process of installing a leak reinforcing hole 150 in the retaining material 140 of the tunnel 200 by using the tunnel leak reinforcing device mounting device 100 according to the present invention and blocking the leakage of water therein will be described in more detail. Let's do it.

도 5a는 본 발명에 따른 터널 누수보강공 장착장치(100)가 적용되는 터널(200)의 단면도를 도시한 것이며, 도 5b는 상기 도 5a의 B-B 단면을 도시한 도면이다.Figure 5a is a cross-sectional view of the tunnel 200 to which the tunnel leakage reinforcement mounting apparatus 100 according to the present invention is applied, Figure 5b is a view showing a cross-sectional view B-B of FIG.

먼저, 본 발명에 따른 터널 누수보강공 장착장치(100)는 터널(200)을 시공하기 위한 막장(210)이 형성되도록 함에 있어서, 막장(210)은 발파 등에 의해서 내측 굴착면(212)이 형성되도록 한다. 이러한 내측 굴착면(212)은 화약 장약에 의하여 형성될 수 있고, 굴착기 또는 쉴드 선단부에 의한 굴착면이 될 수 있다.First, in the tunnel leak reinforcement mounting apparatus 100 according to the present invention to form a membrane 210 for constructing the tunnel 200, the membrane 210 is formed in the inner drilling surface 212 by blasting, etc. Be sure to The inner drilling surface 212 may be formed by the gunpowder charge, and may be an excavation surface by an excavator or a shield tip.

이와 같은 내측 굴착면(212)에 1차 숏-크리트(221)가 타설되며, 이는 내측 굴착면(212)이 형성되자 마자 타설되어 내측 굴착면(212)의 이완에 따른 붕괴현상을 방지하게 된다.The primary shot-crete 221 is poured on the inner drilling surface 212, which is poured as soon as the inner drilling surface 212 is formed to prevent collapse of the inner drilling surface 212. .

그리고 상기와 같이 1차 숏-크리트(221)가 타설된 이후에는 H 형강(140a), 또는 삼각단면으로 결속된 철근 프레임(140b)과 같은 강지보재(140)를 설치하게 되며, 이러한 강지보재(140)는 내측 굴착면(212)에 형성된 1차 숏-크리트(221)를 따라서 반원형으로 설치된다.Then, after the first shot-crete 221 is poured as described above, the steel retaining member 140, such as the H-shaped steel 140a, or the reinforcing frame 140b bound to a triangular cross section, is installed. 140 is installed in a semicircular shape along the primary shot-crete 221 formed on the inner drilling surface 212.

이와 같은 강지보재(140)는 H 형강(140a), 또는 삼각단면으로 결속된 철근 프레임(140b)을 가공하여 다수의 세그멘트 강지보재(140)를 먼저 제작한 다음, 막장(210)에 운반하고, 막장(210)에서 내측 굴착면(212)에 형성된 1차 숏-크리트(221)를 따라서 일체로 조립하는 방식을 통해서 설치된다.Such stiffeners 140 is processed by H-shaped steel (140a), or reinforced steel frame (140b) bound by a triangular cross-section to produce a plurality of segment stiffeners (140) first, and then transported to the membrane 210, The membrane 210 is installed through an integral assembly along the primary shot-crete 221 formed on the inner drilling surface 212.

그 다음으로는 본 발명에 의한 터널 누수보강공 장착장치(100)를 설치하게 되는데, 본 발명의 터널 누수보강공 장착장치(100)에 구비된 연결구(110)를 이용하여 제1 고정부(120)가 H 형강(140a) 또는 삼각단면으로 결속된 철근 프레임(140b)을 포함하는 강지보재(140)에 끼워 결합되도록 한다. 이때 상기 연결구(110)들은 강지보재(140)의 전체 길이에 걸쳐서 일정간격을 유지하면서 다수 설치하면 된다.Next, the tunnel leak reinforcement mounting apparatus 100 according to the present invention is installed, by using the connector 110 provided in the tunnel leak reinforcement mounting apparatus 100 according to the present invention. ) Is fitted to the rigid member (140) including the H-shaped steel (140a) or the reinforcing frame (140b) bound in a triangular cross-section. At this time, the connector 110 may be installed a plurality while maintaining a constant interval over the entire length of the retainer (140).

예를 들면, H 형강(140a)의 강지보재(140)는 그 상부플랜지(142a)에 걸림홈(122)을 걸어서 고정하고, 삼각단면으로 결속된 철근 프레임(140b)의 강지보 재(140)에는 상부측 철근부재(146)에 제1 고정부(120)의 걸림홈(122)을 걸어서 고정한다.For example, the steel retaining member 140 of the H-shaped steel 140a is fixed to the upper flange 142a by the locking grooves 122, and the steel retaining member 140 of the reinforcing frame 140b bound to a triangular cross section. The hook groove 122 of the first fixing part 120 is fixed to the upper reinforcing member 146 by walking.

그리고, 이와 같이 설치된 각각의 연결구(110)에는 제2 고정부(130)의 고정홈(132)에 각각 누수보강공(150)을 차례차례 끼워서 누수보강공(150)이 강지보재(140)의 전체 길이를 따라서 연장되도록 설치한다.In addition, the leakage reinforcing hole 150 is inserted into the fixing grooves 132 of the second fixing part 130, respectively, in each of the connector 110 installed as described above, and the leakage reinforcing hole 150 is formed of the stiffeners 140. Install to extend along its entire length.

이와 같은 누수보강공(150)은 누수방지재(P)의 원활한 방출을 위하여 다수의 관통공(152)을 길이방향으로 형성한 것으로서, 그 일단에는 누수방지재(P)의 주입을 위한 주입장치(160)가 연결된다. 한편, 이와 같은 누수방지재 주입장치(160)는 도 5a에 도시된 바와 같이, 주입밸브(164) 및 주입 배관(162)을 포함하는 주입구(166)가 일측에 형성되고, 상기 주입밸브(164)가 연결된 주입 배관(162)에는 누수방지재(P)를 누수보강공(150)에 압송하기 위한 컴프레셔(190) 및 누수방지재 믹싱장치(180)가 연결된 것이다.Such a leak reinforcing hole 150 is formed with a plurality of through holes 152 in the longitudinal direction for the smooth discharge of the leakage preventing material (P), one end of the injection device for injection of the leakage preventing material (P) 160 is connected. On the other hand, the leakage preventing material injection device 160 as shown in Figure 5a, the injection port 166 including the injection valve 164 and the injection pipe 162 is formed on one side, the injection valve 164 ) Is connected to the compressor 190 and the leakage preventing material mixing device 180 for pumping the leakage preventing material (P) to the leak reinforcing hole 150 is connected.

상기와 같이 본 발명에 의한 터널 누수보강공 장착장치(100)를 통하여 강지보재(140)에 누수보강공(150)의 설치가 완료되면, 2차 숏-크리트(222)를 타설함으로써 강지보재(140)와, 누수보강공(150)이 매립되도록 하고, 상기 2차 숏-크리트(222)의 형성 두께에 따라 3차 숏-크리트(223)를 더 타설하여 전체 숏-크리트(220)를 형성할 수 있다.As described above, when the installation of the leak reinforcing hole 150 is completed through the tunnel leak reinforcing reinforcement mounting apparatus 100 according to the present invention, the secondary short-crete 222 is poured into the steel support ( 140 and the leak reinforcing hole 150 is embedded, and the third shot-crete 223 is further poured according to the thickness of the second shot-crete 222 to form the entire shot-crete 220. can do.

그리고 다음으로는 3차 숏-크리트(223)에 부직포(240)를 더 설치한 다음, 콘크리트 라이닝(250)을 타설하고 양생시킴으로써 최종 터널 내측 굴착면(212)의 보강작업을 완료한다.Next, after the nonwoven fabric 240 is further installed on the third shot-crete 223, the concrete lining 250 is poured and cured to complete reinforcement of the final tunnel inner excavation surface 212.

이와 같은 공정 후에 누수방지재 주입장치(160)를 통해서 누수보강공(150)에 누수방지재(P)가 투입되는데, 이는 컴프레셔(190)의 작동으로 주입 배관(162) 및 주입밸브(164)의 개방 조작에 의해서 누수보강공(150)에 압송되는 방식으로 주입된다.After this process, the leakage preventing material P is introduced into the leakage reinforcing hole 150 through the leakage preventing material injection device 160, which is operated by the compressor 190, and the injection pipe 162 and the injection valve 164 are operated. It is injected in a manner that is pumped into the leak reinforcing hole 150 by the opening operation of the.

이와 같은 경우, 누수보강공(150)의 일단으로 누수방지재(P)가 압송 주입되고, 강지보재(140)의 주위에 형성된 공극으로, 도 5b에 도시된 바와 같이, 배출되어 누수로의 폐색이 가능하게 되고, 경화되어 누수를 효과적으로 방지할 수 있게 된다.In this case, the leakage preventing material (P) is pressure-injected into one end of the leak reinforcing hole 150, the voids formed around the retaining material 140, as shown in Figure 5b, is discharged to block the leak path This becomes possible and hardens | cures and it becomes possible to effectively prevent a leak.

이와 같이 본 발명은 연결구(110)를 이용하여 강지보재(140)와, 누수보강공(150)을 끼워맞춤식으로 결속시켜서 누수보강공(150)을 강지보재(140)에 쉽고 빠르게 설치할 수 있다. 따라서 누수보강공(150)을 설치한 다음, 그 후속 공정을 신속하고 원활하게 진행할 수 있어서 터널공사 현장의 작업 생산성을 크게 향상시킬 수 있는 것이다.As described above, the present invention can be easily and quickly installed in the stiffeners 140 by fitting the stiffeners 140 and the leaky reinforcement holes 150 by using the connector 110. Therefore, after installing the leak reinforcement (150), it is possible to proceed quickly and smoothly the subsequent process can greatly improve the work productivity of the tunnel construction site.

앞에서 설명되고, 도면에 도시된 본 발명의 일 실시예는 본 발명의 기술적사상을 한정하는 것으로 해석되어서는 안 된다. 본 발명의 보호범위는 청구범위에 기재된 사항에 의하여만 제한되고, 본 발명의 기술분야에서 통상의 지식을 가진 자는 본 발명의 기술적 사상을 다양한 형태로 개량 변경하는 것이 가능하다. 따라서 이러한 개량 및 변경은 통상의 지식을 가진 자에게 자명한 것인 한 본 발명의 보호범위에 속하게 된다.An embodiment of the present invention described above and shown in the drawings should not be construed as limiting the technical idea of the present invention. The protection scope of the present invention is limited only by the matters described in the claims, and those skilled in the art can change and change the technical idea of the present invention in various forms. Accordingly, such improvements and modifications are within the scope of the present invention as long as they are obvious to those skilled in the art.

도 1a는 종래의 기술에 따른 터널 구조를 도시한 단면도이다.Figure 1a is a cross-sectional view showing a tunnel structure according to the prior art.

도 1b는 도 1a의 A-A선 단면도이다.FIG. 1B is a cross-sectional view taken along the line A-A of FIG. 1A.

도 2는 본 발명에 따른 터널 누수보강공 장착장치를 도시한 사시도이다.Figure 2 is a perspective view showing a tunnel leak reinforcement mounting apparatus according to the present invention.

도 3a 및 도 3b는 본 발명에 따른 터널 누수보강공 장착장치의 변형 구조를 도시한 사시도이다.3A and 3B are perspective views illustrating a modified structure of the tunnel leak reinforcement mounting apparatus according to the present invention.

도 4a는 본 발명에 따른 터널 누수보강공 장착장치가 H 형강으로 이루어진 강지보재에 고정되어 누수보강공을 결속시킨 구조를 도시한 단면도이다.Figure 4a is a cross-sectional view showing a structure in which the tunnel leak reinforcement mounting apparatus according to the present invention is fixed to the steel retaining material made of H-beams to bind the leak reinforcement.

도 4b 및 도 4c는 본 발명에 따른 터널 누수보강공 장착장치가 삼각단면으로 결속된 철근 프레임의 강지보재에 고정되어 누수보강공을 결속시킨 구조를 도시한 단면도이다.4B and 4C are cross-sectional views illustrating a structure in which a tunnel leak reinforcement mounting apparatus according to the present invention is fixed to a rigid retainer of a reinforcing frame bound by a triangular cross section to bind a leak reinforcement hole.

도 5a는 본 발명에 따른 터널 누수보강공 장착장치를 이용하여 터널의 강지보재에 누수보강공을 고정시킨 구조를 도시한 터널 단면도이다.Figure 5a is a tunnel cross-sectional view showing a structure in which the leak reinforcing hole is fixed to the retaining material of the tunnel using the tunnel leak reinforcement mounting apparatus according to the present invention.

도 5b는 도 5a의 B-B선 단면도이다.5B is a cross-sectional view taken along the line B-B in FIG. 5A.

< 도면의 주요부분에 대한 부호의 설명 >Description of the Related Art

1,200...... 터널 10,210..... 막장1,200 ...... Tunnel 10,210 ....

12,212..... 내측 굴착면 20,140..... 강지보재12,212 ..... Inner Excavation Surface 20,140 .....

30,220..... 숏-크리트 31,221..... 1차 숏-크리트30,220 ..... Short-crete 31,221 ..... Primary shot-crete

32,222..... 2차 숏-크리트 33,223..... 3차 숏-크리트32,222 ..... 2nd shot-crete 33,223 ..... 3rd shot-crete

40,240..... 부직포 50,250..... 콘크리트 라이닝40,240 ..... Nonwoven 50,250 ..... Concrete lining

100.... 본 발명에 따른 터널 누수보강공 장착장치100 .... Tunnel leak reinforcement mounting apparatus according to the present invention

110.... 연결구 120.... 제1 고정부110 .... End connection 120 .... First fixing part

122.... 걸림홈 130.... 제2 고정부122 .... Hanging groove 130 .... Second fixing part

132.... 고정홈 140a.... H 형강132 .... Retaining groove 140a .... H section steel

140b... 삼각단면으로 결속된 철근 프레임140b ... Reinforcing bar frame in triangular cross section

142a.... 상부플랜지 142b.... 복부142a .... upper flange 142b .... abdomen

142c.... 연결부 모서리 146.... 철근부재 142c .... Connection corner 146 .... Rebar members

150.... 누수보강공 160.... 누수방지재 주입장치150 .... Leak reinforcement 160 .... Leak prevention material injection device

162.... 주입 배관 164.... 주입밸브162 .... Injection pipe 164 .... Injection valve

166.... 주입구 180.... 누수방지재 믹싱장치166 .... Inlet 180 .... Leak-proof material mixing device

190.... 컴프레셔 P.... 누수방지재 190 .... Compressor P .... Leakproof material

Claims (5)

강지보재가 굴착 내측면에 설치되고, 상기 강지보재가 타설된 숏-크리트에 의해서 매설되어 굴착 내측면에 일체화 시공되는 터널구조에 있어서, In the tunnel structure is installed in the excavation inner surface, the steel retaining material is buried by the shot-crete in which the steel retaining material is poured and integrated construction on the inner surface of the excavation, 상기 강지보재(140)를 따라 형성되는 공극에 의한 누수로를 폐색시키기 위하여 누수로를 따라 누수보강공(150)을 설치하되, 상기 강지보재(140)와, 누수보강공(150)의 사이에는 일측단부가 상기 강지보재(140)에 끼워져서 결속되는 제1 고정부(120)가 형성되고, 타측단부는 상기 누수보강공(150)에 끼워져서 고정되는 제2 고정부(130)가 형성된 연결구(110)가 배치되어 상기 강지보재(140)와, 누수보강공(150)을 끼워맞춤식으로 결속시키고, 상기 숏-크리트(220)가 경화된 후, 상기 누수보강공(150)에 그라우팅용 밀크액을 포함하는 경화성 누수방지재(P)를 주입하여 누수로를 충전시켜 폐색시키는 것을 특징으로 하는 터널 누수보강공 장착장치. A leak reinforcing hole 150 is installed along the leaking path in order to close the leaking path due to the gap formed along the retaining material 140, between the retaining material 140 and the leak reinforcing hole 150. One end portion is coupled to the rigid retaining material 140 is formed, the first fixing part 120 is formed, the other end is connected to the leakage reinforcing hole 150 is formed with a second fixing part 130 is formed (110) is arranged to fit the stiffeners 140 and the leak reinforcement 150 to fit, and after the shot-crete 220 is cured, the leaking reinforcing holes 150 for grouting milk Tunnel leak reinforcement mounting device, characterized in that to fill the leaking path by injecting a curable leakage preventing material (P) containing a liquid. 제1항에 있어서, 상기 연결구(110)는 제1 고정부(120)가 H 형강(140a)을 포함하는 강지보재(140)의 상부플랜지(142a)를 가로질러서 걸쳐지는 걸림홈(122)을 내측에 형성하고, 제2 고정부(130)가 상기 누수보강공(150)이 끼워지는 고정홈(132)을 내측에 형성하여 상기 강지보재(140)의 상부플랜지(142a)와 복부(142b)의 연결부 모서리(142c)에 누수보강공(150)을 위치시키도록 강재로 절곡 형성된 것임을 특징으로 하는 터널 누수보강공 장착장치. According to claim 1, The connector 110 is the first fixing part 120 is a locking groove 122 that spans the upper flange 142a of the steel retaining member 140 including the H-shaped steel (140a) It is formed on the inside, the second fixing portion 130 is formed in the inner fixing grooves 132 into which the leak reinforcing hole 150 is fitted, the upper flange 142a and the abdomen 142b of the retaining material 140 Tunnel leak reinforcement mounting device, characterized in that formed bent in steel to position the leak reinforcement hole 150 in the connection corner (142c) of the. 제1항에 있어서, 상기 연결구(110)는 제1 고정부(120)가 삼각단면으로 결속된 철근 프레임(140b)을 포함하는 강지보재(140)의 철근부재(146)에 끼워 결합되는 걸림홈(122)을 내측에 형성하고, 제2 고정부(130)가 상기 누수보강공(150)이 끼워지는 고정홈(132)을 내측에 형성하여 상기 강지보재(140)의 철근부재(146)에 인접하여 누수보강공(150)을 위치시키도록 강재로 "S"자형으로 절곡 형성된 것임을 특징으로 하는 터널 누수보강공 장착장치. According to claim 1, The connector 110 is a locking groove coupled to the reinforcing member 146 of the steel retaining member 140, including the reinforcing frame 140b is coupled to the first fixing portion 120 in a triangular cross-section. (122) is formed on the inside, and the second fixing part (130) forms a fixing groove (132) into which the leak reinforcing holes 150 are fitted, and to the reinforcing member (146) of the steel holding material (140). Tunnel leak reinforcement mounting apparatus, characterized in that formed to be bent in the "S" shape to the steel to position the reinforcement reinforcement 150 adjacent to. 제1항에 있어서, 상기 연결구(110)는 제1 고정부(120)가 삼각단면으로 결속된 철근 프레임(140b)을 포함하는 강지보재(140)의 철근부재(146)에 끼워 결합되는 걸림홈(122)을 내측에 형성하고, 제2 고정부(130)가 상기 누수보강공(150)이 끼워지는 고정홈(132)을 내측에 형성하여 상기 강지보재(140)의 철근부재(146)에 인접하여 누수보강공(150)을 위치시키도록 강판을 프레스 절단하여 형성된 것임을 특징으로 하는 터널 누수보강공 장착장치. According to claim 1, The connector 110 is a locking groove coupled to the reinforcing member 146 of the steel retaining member 140, including the reinforcing frame 140b is coupled to the first fixing portion 120 in a triangular cross-section. (122) is formed on the inside, and the second fixing part (130) forms a fixing groove (132) into which the leak reinforcing holes 150 are fitted, and to the reinforcing member (146) of the steel holding material (140). Tunnel leak reinforcement mounting apparatus, characterized in that formed by press-cutting the steel sheet to position the leak reinforcement hole 150 adjacent to. 제4항 또는 제5항에 있어서, 상기 연결구(110)가 장착되는 철근부재(146)의 위치는 삼각단면으로 결속된 철근 프레임(140b)의 상부측이며, 누수보강공(110)은 철근 프레임(140b)의 삼각단면 내측 공간에 위치되는 것임을 특징으로 하는 터널 누수보강공 장착장치. According to claim 4 or 5, wherein the position of the reinforcing member 146 to which the connector 110 is mounted is the upper side of the reinforcing frame (140b) bound by a triangular cross-section, the leak reinforcing hole 110 is a reinforcing frame Tunnel leak reinforcement mounting apparatus, characterized in that located in the inner space of the triangular cross section (140b).
KR1020090082690A 2009-09-02 2009-09-02 Apparatus for installing a grouting mortar supply pipe in tunnel KR101133214B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020090082690A KR101133214B1 (en) 2009-09-02 2009-09-02 Apparatus for installing a grouting mortar supply pipe in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020090082690A KR101133214B1 (en) 2009-09-02 2009-09-02 Apparatus for installing a grouting mortar supply pipe in tunnel

Publications (2)

Publication Number Publication Date
KR20110024619A true KR20110024619A (en) 2011-03-09
KR101133214B1 KR101133214B1 (en) 2012-04-05

Family

ID=43932419

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020090082690A KR101133214B1 (en) 2009-09-02 2009-09-02 Apparatus for installing a grouting mortar supply pipe in tunnel

Country Status (1)

Country Link
KR (1) KR101133214B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252880A (en) * 2018-11-14 2019-01-22 天津三建建筑工程有限公司 The component of leak at a kind of shield duct piece for preventing shield tunnel
KR20190074626A (en) 2017-12-20 2019-06-28 양경옥 Method for Alternate Basement Vertical Structure Construction Method in Top Down Construction Project
CN111005743A (en) * 2019-11-24 2020-04-14 中铁十九局集团第二工程有限公司 Comprehensive treatment method for secondary lining water leakage
KR20210000234A (en) 2019-06-24 2021-01-04 양경옥 Method for Alternate Basement Vertical Structure Construction Method in Top Down Construction Project

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS50136921U (en) 1974-04-25 1975-11-11
JPS5245086Y2 (en) 1974-11-18 1977-10-13
JP2004060216A (en) 2002-07-26 2004-02-26 Takenaka Doboku Co Ltd Construction method for waterproof sheet with injection pipe
KR100901804B1 (en) * 2007-09-03 2009-06-11 한국건설기술연구원 Tunnel leakage controlling method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20190074626A (en) 2017-12-20 2019-06-28 양경옥 Method for Alternate Basement Vertical Structure Construction Method in Top Down Construction Project
CN109252880A (en) * 2018-11-14 2019-01-22 天津三建建筑工程有限公司 The component of leak at a kind of shield duct piece for preventing shield tunnel
CN109252880B (en) * 2018-11-14 2024-03-19 天津三建建筑工程有限公司 A component for preventing shield segment department of shield tunnel leaks
KR20210000234A (en) 2019-06-24 2021-01-04 양경옥 Method for Alternate Basement Vertical Structure Construction Method in Top Down Construction Project
CN111005743A (en) * 2019-11-24 2020-04-14 中铁十九局集团第二工程有限公司 Comprehensive treatment method for secondary lining water leakage

Also Published As

Publication number Publication date
KR101133214B1 (en) 2012-04-05

Similar Documents

Publication Publication Date Title
KR100988457B1 (en) The back feel grouting method for upper part of tunnel
KR100701633B1 (en) Load dispersing plate for supporting central part of a twin tunnel and a construction method of a twin tunnel using the load dispersing plate
CN109707415B (en) Joint construction method and joint structure of subway shield tunnel and station
KR100978314B1 (en) Reinforced Concrete Tunnels by Using Corrugated Steel Plate and the Construction Method thereof
EA035418B1 (en) Tunnel construction method using a pre-support member and a post-support member
WO2001084037A1 (en) Duct repairing material, repairing structure, and repairing method
KR101133214B1 (en) Apparatus for installing a grouting mortar supply pipe in tunnel
KR101842208B1 (en) Construction method of retaining wall
KR20220030686A (en) Construction method and construction structure of water expansion index to prevent leakage of underground continuous wall
KR101677017B1 (en) construction methods of close-twin tunnel using tube hollow
KR100785459B1 (en) Method for constructing tunnel using precast concrete tunnel lining
KR100901804B1 (en) Tunnel leakage controlling method
KR101038945B1 (en) A filling structure of upper part of a tunnel and its procedure
KR100909569B1 (en) Mortar repair method of pipe non-excavation part
KR20100045855A (en) Earth retaining wall and it&#39;s construction method using the precast pile and ground reinforcement
KR101133215B1 (en) Tunnel leakage controlling apparatus
KR101745363B1 (en) complex Temporary utility and its construction Method
KR100310457B1 (en) Waterproofing method of concrete structure
CN112459130A (en) Drainable externally-adhered water stop with adhesion timeliness and application
CN208441115U (en) A kind of diaphram wall piping plugging structure
KR102505365B1 (en) Support for tunnel shotcrete drop prevention
CN111075481A (en) Construction method for primary support and secondary lining of underground excavation construction transverse channel
KR101188709B1 (en) Anchor hole sealing apparatus in an diaphragm walls
CN110593918A (en) Freezing method based tunnel connection channel pump house construction method
KR101512031B1 (en) Method for reinforcing ground using grouting

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150306

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20170302

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20180302

Year of fee payment: 7