KR20100058939A - Natural gas pressure regulating equipment and operating methods of it - Google Patents
Natural gas pressure regulating equipment and operating methods of it Download PDFInfo
- Publication number
- KR20100058939A KR20100058939A KR1020080117536A KR20080117536A KR20100058939A KR 20100058939 A KR20100058939 A KR 20100058939A KR 1020080117536 A KR1020080117536 A KR 1020080117536A KR 20080117536 A KR20080117536 A KR 20080117536A KR 20100058939 A KR20100058939 A KR 20100058939A
- Authority
- KR
- South Korea
- Prior art keywords
- valve
- pipe
- diaphragm
- pressure
- constant pressure
- Prior art date
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17D—PIPE-LINE SYSTEMS; PIPE-LINES
- F17D3/00—Arrangements for supervising or controlling working operations
- F17D3/01—Arrangements for supervising or controlling working operations for controlling, signalling, or supervising the conveyance of a product
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16K—VALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
- F16K31/00—Actuating devices; Operating means; Releasing devices
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16K—VALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
- F16K7/00—Diaphragm valves or cut-off apparatus, e.g. with a member deformed, but not moved bodily, to close the passage ; Pinch valves
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L41/00—Branching pipes; Joining pipes to walls
- F16L41/02—Branch units, e.g. made in one piece, welded, riveted
- F16L41/021—T- or cross-pieces
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F17—STORING OR DISTRIBUTING GASES OR LIQUIDS
- F17D—PIPE-LINE SYSTEMS; PIPE-LINES
- F17D5/00—Protection or supervision of installations
- F17D5/005—Protection or supervision of installations of gas pipelines, e.g. alarm
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Control Of Fluid Pressure (AREA)
Abstract
Description
본 발명은 천연가스를 도시가스사에 공급하는 공급관리소의 정압설비 및 그 운영방법에 관한 것으로, 특히 슬램셧밸브의 점검을 빠른 시간 내에 용이하게 실시할 수 있고, 모니터의 차단 속도를 향상시킬 수 있도록 된 천연가스 정압설비 및 그 운영방법에 관한 것이다.The present invention relates to a static pressure facility of a supply control station for supplying natural gas to a city gas company, and a method of operating the same. In particular, the inspection of the slam shut valve can be easily performed in a short time, and the breaking speed of the monitor can be improved. The present invention relates to a natural gas constant pressure system and a method of operating the same.
LNG 운반선을 통해 수입된 천연가스는 하역설비를 통해 저장탱크에 저장되었다가 기화설비에서 기화되어 공급관리소로 공급되고, 이로부터 발전소 및 도시가스사로 공급이 이루어지며, 이때 정압설비를 통하여 일정한 압력으로 감압되어 공급된다.Natural gas imported through LNG carriers is stored in storage tanks through unloading equipment, vaporized in vaporization equipment, and supplied to supply control stations. From this, it is supplied to power plants and city gas companies. It is supplied under reduced pressure.
도 1에 개략적으로 도시된 바와 같이, 상기 정압설비는 슬램셧밸브(SSV ; Slam Shut Valve, 1)와, 2대의 정압기(2,3)가 직렬로 연결되어 구성되어 있다. 이중 앞쪽의 정압기를 모니터(Monitor ; 2), 뒤쪽의 정압기를 워커(worker ; 3)로 지칭한다.As schematically shown in FIG. 1, the static pressure facility includes a slam shutt valve (SSV) 1 and two
상기 슬램셧밸브(1)는 정압기의 이상 발생 등으로 정압기 후단 압력(정압기 후단 압력이란 워커(3)의 출구와 연결된 정압기 후단 배관(5)의 압력을 말한다.)이 설정 압력 이상으로 증가하면 자동으로 닫힘으로써 상기 정압기 후단 배관(5) 즉, 도시가스사 쪽으로의 공급배관의 압력이 위험수준으로 상승하는 것을 방지한다.The slam shut valve (1) is automatic when the constant pressure after the constant pressure riser (the pressure after the constant pressure refers to the pressure of the rear end pipe (5) connected to the outlet of the walker 3) more than the set pressure. This prevents the pressure of the
즉, 도 2에 도시된 바와 같이, 슬램셧밸브(1)는 파일럿(pliot;4)을 구비하는데, 파일럿(4)에 전달된 정압기 후단 압력이 설정값 이상(조절볼트(4a)를 조절하여 스프링(4b)의 압축 정도를 조절함으로써 슬램셧밸브(1)의 작동압력을 조절할 수 있다.)으로 상승하면, 상기 정압기 후단 압력이 파일럿(4)을 통해 슬램셧밸브(1)의 작동기구(1a)로 전달되어 이를 작동시킴으로써 고정 상태가 해제되면서 스프링(1b)의 복원력에 의해 밸브(1c)가 관로를 차단하도록 되어 있다.That is, as shown in Figure 2, the slam shut valve (1) is provided with a pilot (pliot) 4, the pressure after the constant pressure delivered to the pilot (4) by adjusting the adjustment bolt (4a) When the operating pressure of the slam shut valve 1 can be adjusted by adjusting the degree of compression of the
한편, 종래에 상기 슬램셧밸브(1)의 이상 여부를 검사하거나 작동압을 세팅(setting)하기 위해서는 정압기 후단의 배관(5)에 구비된 차단밸브를 잠그고, 상기 모니터(2)와 워커(3)를 조작하여 정압기 후단 압력을 인위적으로 상승시키면서, 슬램셧밸브(1)가 정상적으로 작동하는지를 테스트하고, 작동압을 재세팅하였다.On the other hand, in order to inspect the abnormality of the slam shut valve (1) or to set the operating pressure in the prior art, the shut-off valve provided in the pipe (5) at the rear end of the constant pressure regulator, the monitor (2) and the worker (3) ), The slam shut valve (1) was tested normally by artificially raising the pressure after the constant pressure, and the operating pressure was reset.
또한, 이때 정압설비를 통한 천연가스의 흐름은 지속되어야만 하므로 상기 정압기 후단 배관에 설치된 퍼지차단밸브를 열어 테스트가 진행되는 동안 가스를 대기중으로 배출하였다.(인위적으로 상승되어 적정 공급압력 보다 큰 압력을 가지고 있으므로 공급처로 공급할 수 없다.)In addition, since the flow of natural gas through the constant pressure facility must be continued, the purge shutoff valve installed in the rear end pipe of the constant pressure was opened to discharge the gas into the atmosphere during the test. Cannot be supplied to the source of supply.)
따라서, 종래에는 슬램셧밸브(1)의 테스트를 위해 모니터(2)와 워커(3)를 조작해야만 했고, 테스트를 마친 후에는 상기 모니터(2)와 워커(3) 및 슬램셧밸브(1)를 다시 정상 상태로 세팅하기 위해서 이들의 재조작이 필요하여 작업이 번거로울 뿐만 아니라 시간(30분 이상)이 많이 소요되는 문제점이 있었다.Therefore, conventionally, the
더욱이 시험 진행 동안 퍼지밸브(7)를 통해 가스가 계속 배출되고 있는 상태이므로 다량의 가스 소모가 불필요하게 이루어지는 문제점이 있었다.(분기당 1회 테스트로 연간 약 186Nm3 소모됨)Moreover, there has been a problem because it is made of the state unnecessarily large amount of gas being consumed in the gas via the
한편, 상기 모니터(2)와 워커(3)는 동일한 구조의 정압기로서, 정압기 2대를 직렬 연결함으로써 워커(3)가 고장날 경우에도 모니터(2)가 작동하여 가스 공급이 중단되는 것을 방지할 수 있도록 되어 있다.On the other hand, the monitor (2) and the worker (3) is a constant pressure of the same structure, by connecting the two constant pressure in series can prevent the operation of the gas supply is stopped by the monitor (2) even if the
또한, 상기 모니터(2)는 정압기 후단 압력이 설정 압력 이상으로 증가하면 닫히도록 되어 있는데, 이때 모니터(2) 내부의 가스(모니터 내부 다이어프램의 일측 공간에 존재하는 가스)를 강제 배출함으로써 차단 작동이 보다 신속히 이루어지도록 되어 있다.In addition, the
즉, 도 3에 도시된 바와 같이, 상기 모니터(2)는 원통형상의 밸브몸체(2a)가 다이어프램(2b)에 연동하도록 설치되고, 상기 다이어프램(2b)을 중심으로 챔버(2c,2d)가 형성되며, 이 중 1차챔버(2c)는 정압기 후단 배관(5)에 연결되고, 2차챔버(2d ; Monitor Motorization Chamber)는 상기 정압기 후단 배관(5)에 액셀러레이터(Accelerator; 8)를 경유하여 연결되어 있다.That is, as shown in FIG. 3, the
따라서, 정압기 후단 배관(5)의 압력이 상승하였을 때 상기 1차챔버(2c)에 상승 압력이 전달되어 다이어프램(2b)을 밸브(2a') 닫힘 방향으로 밀고, 이때 정압기 후단 배관(5) 압력에 의해 액셀러레이터(8)의 밸브(8a)가 개방되어 상기 2차챔 버(2d)의 압력이 액셀러레이터(8)를 통해 정압기 후단 배관(5) 쪽으로 배출됨으로써 다이어프램(2b)의 작동이 가속되어 모니터(2)의 차단 작동이 보다 신속하게 이루어지도록 되어 있었다.Therefore, when the pressure in the rear end of the
이때 상기 액셀러레이터(8)의 상부챔버(8b)와 정압기 후단 배관(5)의 연결관로(8c)에는 분지관(8d)이 형성되고, 그 분지관(8d)의 단부 및 상기 분지관(8d) 형성 부분 이후 지점(액셀러레이터에서 정압기 후단 배관 쪽 방향으로)에 각각 액셀러레이터(8) 세팅(setting)시 벤트(vent) 여부를 확인하기 위한 개폐밸브(8e,8f)가 설치된다.At this time, a
상기 분지관(8d)의 개폐밸브(8e)는 노멀클로즈(Normal close) 상태로 유지되고 연결관로(8c)의 개폐밸브(8f)는 노멀오픈(Normal open) 상태로 유지되다가 전술한 바와 같이 액셀러레이터(8) 세팅시 벤트 여부를 확인할 때만 각각 노멀오픈 상태와 노멀클로즈 상태로 전환되어 사용된다.The opening /
그런데, 상기와 같은 모니터 차단 방식에서는 모니터(2)내 2차챔버(2d)의 가스가 액셀러레이터(8)를 거쳐 상기 정압기 후단 배관(5)으로 배출되는 배관내부배출 방식이어서, 비록 상기 2차챔버(2d)가 다이어프램(2b)에 의해 가압되어 정압기 후단 배관(5)에 비해 상대적으로 고압이긴 하지만 정압기 후단 배관(5)은 이미 도시가스 공급압력(0.083MPa) 이상으로 상승한 이상 압력(1.02Mpa)이 형성되어 있기 때문에 2차챔버(2d)의 가스 배출이 그리 신속하게 이루어지지 않았다.However, in the monitor blocking method as described above, since the gas of the
따라서, 모니터(2)의 차단 작동이 신속하게 이루어지지 않음으로써 안전성과 공급압력 제어의 정밀성이 저하되는 문제점이 있었다.Therefore, there is a problem that the safety of the supply and the control of the supply pressure are deteriorated because the shut-off operation of the
이에 본 발명은 상기와 같은 문제점들을 해결하기 위해 안출된 것으로, 슬램셧밸브 테스트시 정압기 후단 배관의 밸브를 잠그고 모니터와 워커를 조작하여 정압기 후단 배관의 압력을 인위적으로 상승시킬 필요가 없게 됨으로써 슬램셧밸브 테스트 및 세팅 작업을 매우 간편하고 신속하게 진행할 수 있으며, 작업 중 불필요한 가스의 소모가 발생하지 않도록 된 천연가스 정압설비 및 그 운영방법을 제공함에 그 목적이 있다.Therefore, the present invention was devised to solve the above problems, and when the slam shut valve test, the slam shut valve is not necessary to artificially increase the pressure in the rear pipe of the constant pressure by locking the valve of the pipe after the constant pressure and operating the monitor and the walker. The purpose of the valve testing and setting process is very simple and quick, and the purpose is to provide a natural gas constant pressure facility and its operation method to prevent unnecessary gas consumption during the operation.
또한, 본 발명은 모니터 차단시 모니터의 2차챔버내 가스 배출이 보다 신속하게 이루어짐으로써 모니터 차단 속도가 향상되어 설비의 안전성과 가스 공급압력 제어의 정밀성이 향상될 수 있도록 된 천연가스 정압설비 운영방법을 제공함에 또 다른 목적이 있다.In addition, the present invention is a method of operating a natural gas constant pressure facility to be more quickly discharged gas in the secondary chamber of the monitor when the monitor is shut off, so that the monitor blocking speed is improved to improve the safety of the equipment and the precision of gas supply pressure control There is another purpose in providing this.
상기와 같은 목적을 달성하기 위한 본 발명에 따른 천연가스 정압설비는,Natural gas constant pressure equipment according to the present invention for achieving the above object,
직렬로 연결된 슬램셧밸브와 모니터와 워커와;A slam shut valve, a monitor and a worker connected in series;
조절볼트와 스프링에 탄지되는 상부다이어프램과, 그 상부다이어프램과 일체로 연동되는 하부다이어프램을 갖추고, 상기 상부다이어프램의 하부챔버와 슬램셧밸브의 작동기구가 연결되며, 상기 상부다이어프램의 하부챔버와 상기 하부다이어프램의 상부챔버가 연통되고, 상기 상부다이어프램의 하부챔버와 상기 하부다이어프램의 하부챔버가 정압기 후단 배관에 연결되며, 상기 상부다이어프램에 상부다이 어프램의 하부챔버와 연결된 연결관로를 개폐하는 밸브가 구비된 파일럿과;An upper diaphragm supported by an adjustment bolt and a spring, and a lower diaphragm integrally interlocked with the upper diaphragm, and a lower chamber of the upper diaphragm and an operation mechanism of a slam shut valve are connected, and a lower chamber of the upper diaphragm and the lower diaphragm. The upper chamber of the diaphragm is in communication with each other, the lower chamber of the upper diaphragm and the lower chamber of the lower diaphragm are connected to the rear end pipe of the pressure regulator, and the valve is provided to open and close a connecting pipe connected to the lower chamber of the upper diaphragm. Pilots;
상기 하부다이어프램 하부챔버의 연결관로에 설치된 제1개폐밸브와;A first opening / closing valve installed in a connection pipe of the lower diaphragm lower chamber;
상기 제1개폐밸브와 상기 파일럿 사이에 형성된 분지관 및;A branch pipe formed between the first open / close valve and the pilot;
상기 분지관에 설치된 제2개폐밸브;A second open / close valve installed in the branch pipe;
를 포함한다.It includes.
또한, 상기 하부다이어프램 하부챔버의 연결관로에 설치된 제1개폐밸브는 노멀오픈 상태로 유지되고, 상기 분지관에 설치된 제2개폐밸브는 노멀클로즈 상태로 유지되는 것을 특징으로 한다.In addition, the first opening and closing valve is installed in the connecting pipe of the lower diaphragm lower chamber is maintained in a normal open state, the second opening and closing valve installed in the branch pipe is characterized in that it is maintained in a normal closed state.
한편, 본 발명에 따른 천연가스 정압설비 운영방법은,On the other hand, natural gas constant pressure equipment operating method according to the present invention,
상기와 같은 구성의 천연가스 정압설비에서, 상기 제1개폐밸브를 클로즈 상태로 조작하는 제1개폐밸브 차단단계와;A first opening / closing valve blocking step of operating the first opening / closing valve in a closed state in the natural gas constant pressure facility having the above configuration;
상기 분지관의 단부에 핸드펌프를 연결하는 핸드펌프 연결단계와;A hand pump connecting step of connecting a hand pump to an end of the branch pipe;
상기 제2개폐밸브를 오픈 상태로 조작하는 제2개폐밸브 개방단계와;A second opening / closing valve opening step of operating the second opening / closing valve in an open state;
상기 핸드펌프를 조작하여 상기 하부다이어프램 하부챔버를 가압하는 파일럿 가압단계와;A pilot pressurizing step of pressing the lower diaphragm lower chamber by operating the hand pump;
상기 하부다이어프램 하부챔버의 압력이 상승하여 설정 압력에 이를 때 상기 슬램셧밸브가 차단되는지의 여부에 따라 슬램셧밸브의 상태를 확인하는 슬램셧밸브 이상여부 판단단계;Determining whether the slam shut valve is abnormal or not according to whether the slam shut valve is shut off when the pressure of the lower diaphragm lower chamber reaches a set pressure;
를 포함한다.It includes.
또한, 상기 슬램셧배브 이상여부 판단단계 이후에,In addition, after the step of determining whether or not the slam shutbab abnormality,
상기 핸드펌프를 조작하여 상기 하부다이어프램 하부챔버에 목표 압력을 형성시키면서 그 목표 압력값에서 상기 상부다이어프램의 밸브가 열리도록 상기 조절볼트를 조절하여 스프링의 압축정도를 조절하는 슬램셧밸브 작동압력 세팅단계;Slam shut valve operating pressure setting step of adjusting the compression degree of the spring by adjusting the adjusting bolt to open the valve of the upper diaphragm at the target pressure value while forming a target pressure in the lower diaphragm lower chamber by operating the hand pump. ;
를 더 포함하는 것을 특징으로 한다.It characterized in that it further comprises.
또한, 본 발명에 따른 천연가스 정압설비 운영방법은,In addition, the method for operating a natural gas constant pressure facility according to the present invention,
직렬로 연결된 슬램셧밸브와 모니터와 워커와; 상기 모니터의 액셀러레이터;를 포함하고, 상기 모니터의 내부에 다이어프램으로 구분되는 1차챔버와 2차챔버가 형성되며, 상기 1차챔버는 정압기 후단 배관에 연결되고, 상기 2차챔버는 상기 액셀러레이터를 통해 정압기 후단 배관으로 연결되며, 상기 액셀러레이터는 상부챔버와 정압기 후단 배관의 연결관로에 분지관이 형성되고, 상기 연결관로와 분지관에 각각 개폐밸브가 설치되며, 그 중 연결관로의 개폐밸브는 액셀러레이터로부터 정압기 후단 배관쪽 방향으로 분지관 형성 지점 이후에 설치된 천연가스 정압설비에서, A slam shut valve, a monitor and a worker connected in series; And an accelerator of the monitor, wherein a primary chamber and a secondary chamber, each of which is divided into a diaphragm, are formed in the monitor, and the primary chamber is connected to a rear end pipe of the pressure regulator, and the secondary chamber is connected to the accelerator. The accelerator is connected to the rear end pipe, and the accelerator is formed with a branch pipe in the connecting pipe of the upper chamber and the rear of the constant pressure pipe, and the opening and closing valve is installed in the connecting pipe and the branch pipe, respectively, wherein the opening and closing valve of the connecting pipe from the accelerator In the natural gas constant pressure equipment installed after the branch pipe formation point toward the pipe after the constant pressure,
상기 분지관의 개폐밸브를 노멀오픈 상태로 조작하고, 상기 연결관로의 개폐밸브를 노멀클로즈 상태로 조작하여, 상기 모니터 2차챔버의 가스를 상기 분지관의 개폐밸브를 통해 대기 중으로 배출하는 것을 특징으로 한다.By operating the on-off valve of the branch pipe in the normal open state, by operating the on-off valve of the connecting pipe in the normal closed state, the gas of the monitor secondary chamber is discharged to the atmosphere through the on-off valve of the branch pipe. It is done.
이상 설명한 바와 같은 본 발명에 따르면, 슬램셧밸브 테스트시 정압기 후단 배관의 밸브를 잠그고 모니터와 워커를 조작하여 정압기 후단 배관의 압력을 인위적으로 상승시킬 필요가 없이 간단하게 핸드펌프를 사용하여 파일럿 압력을 직접 상승시킴으로써 슬램셧밸브 테스트 및 세팅 작업을 매우 간편하고 신속하게 진행할 수 있을 뿐만 아니라, 작업 중 불필요한 가스의 소모가 발생하지 않게 되는 효과가 있다.According to the present invention as described above, it is not necessary to artificially increase the pressure in the rear end of the constant pressure pipe by operating the monitor and the worker by locking the valve of the rear end of the constant pressure pipe during the slam shut valve test, and simply using the hand pump to increase the pilot pressure. By directly raising, the slam shut valve test and setting operation can be performed very simply and quickly, and unnecessary gas consumption is not generated during the operation.
또한, 모니터 차단시, 모니터의 2차챔버내 가스가 대기중으로 신속하게 배출되어 모니터 차단 속도가 향상됨으로써 정압설비의 안전성이 향상되고, 더불어 천연가스 공급압력 제어가 보다 정밀하게 이루어지게 되는 효과가 있다.In addition, when the monitor is shut off, the gas in the secondary chamber of the monitor is quickly discharged to the atmosphere, thereby improving the shut-off speed of the monitor, thereby improving the safety of the static pressure facility and controlling the natural gas supply pressure more precisely. .
이하, 본 발명을 첨부된 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, the present invention will be described in detail.
도 4는 도 2의 대응도로서, 본 발명에 따른 천연가스 정압설비의 구성을 나타낸 도면이다. 종래와 동일한 부분에는 동일한 참조번호를 부여한다.4 is a diagram showing the configuration of a natural gas constant pressure facility according to the present invention, corresponding to FIG. The same reference numerals are given to the same parts as in the prior art.
정압설비는 슬램셧밸브(SSV ; Slam Shut Valve, 1)와, 모니터(Monitor ; 2)와, 워커(worker ; 3)가 직렬로 연결되어 이루어진다.(전체적으로는 상기와 같은 정압설비 열이 복수 열로 설치되어 있다.)The static pressure facility is composed of a slam shutt valve (SSV) 1, a
상기 슬램셧밸브(1)는 스프링(1b)에 의해 탄지되는 밸브(1c)를 구비하고, 상기 밸브(1c)는 작동기구(1a)에 의해 고정되어 스프링(1b)이 압축된 개방상태를 유지한다.The slam shut valve 1 has a
또한, 상기 슬램셧밸브(1)는 정압기 후단 배관(5)에 연결된 파일럿(4)을 구비한다. 정압기 후단 압력이 설정 압력 이상으로 상승되면 상기 파일럿(4)을 통해 작동압력이 작동기구(1a)에 전달되고, 이에 작동기구(1a)가 작동되어 고정상태가 해제됨으로써 상기 밸브(1c)가 이동하여 유로를 차단하도록 되어 있다.In addition, the slam shut valve (1) has a pilot (4) connected to the
상기 파일럿(4)은 일체로 연동되는 상부다이어프램(4c)과 하부다이어프 램(4d)을 구비하며, 각 다이어프램의 하부 공간이 정압기 후단 배관(5)에 연결되어 있다.The
상기 상부다이어프램(4c)에는 밸브(4c')가 구비되어 정압기 후단 배관(5)과의 연결관로를 개방 및 차단한다.The
상부다이어프램(4c)의 하부챔버는 상기 작동기구(1a)에 연결되어 있으며, 또한 하부다이어프램(4d)의 하부챔버와 연통되어 있다.The lower chamber of the
상기 하부다이어프램(4d)의 하부챔버에 연결된 연결관로(4e)에는 제1개폐밸브(4f)가 설치된다.The first opening /
또한, 상기 연결관로(4e)에서 파일럿(4)과 상기 제1개폐밸브(4f)의 사이에 분지관(4g)이 연결되고, 그 분지관(4g)에는 제2개폐밸브(4h)가 설치된다.Further, a
그 중, 상기 연결관로(4e)에 설치된 제1개폐밸브(4f)는 노멀오픈(normal open) 상태로 유지되고, 상기 분지관(4g)에 설치된 제2개폐밸브(4h)는 노멀클로즈(normal close) 상태로 유지된다.Among them, the first opening /
상기 제1,2개폐밸브(4f,4h)들로는 니들밸브(needle valve)를 사용할 수 있다.Needle valves may be used as the first and second open /
또한, 상기 분지관(4g)의 단부에는 핸드펌프(9)가 연결된다.In addition, a
상기 핸드펌프(9)는 상시 연결해 둘 수도 있으나 슬램셧밸브(1) 테스트 및 세팅 시에만 연결하여 사용하는 것이 바람직하다.The
상기와 같은 본 발명에 따른 천연가스 정압설비를 이용한 슬램셧밸브(1) 테스트 및 세팅 방법은 다음과 같다.The slam shut valve (1) test and setting method using the natural gas constant pressure equipment according to the present invention as described above are as follows.
먼저, 노멀오픈 상태에 있는 연결관로(4e)의 제1개폐밸브(4f)를 클로즈 상태로 전환한다.(제1개폐밸브 차단단계(S1))First, the first opening /
다음은 상기 분지관(4g)의 단부에 핸드펌프(9)를 연결한다.(핸드펌프 연결단계(S2))Next, the
이어, 노멀클로즈 상태에 있는 상기 분지관(4g)의 제2개폐밸브(4h)를 오픈 상태로 전환한다.(제2개폐밸브 개방단계(S3))Subsequently, the second open /
상기와 같이 핸드펌프(9)가 연결되고 제2개폐밸브(4h)가 개방되면, 핸드펌프(9)를 조작하여 상기 하부다이어프램(4d)의 하부챔버에 에어(air)를 가압하여 압력을 상승시킨다.(파일럿 가압단계(S4))When the
상기 파일럿 가압단계(S4)의 진행에 의하여 파일럿(4)의 하부다이어프램(4d) 하부챔버의 압력이 설정압력 이상으로 상승되면, 하부다이어프램(4d)이 상승함에 따라 이에 일체로 연동되는 상부다이어프램(4c)이 상승되면서 상부다이어프램(4c)의 밸브(4c')가 연결관로(상부챔버와 정압기 후단 배관과의 연결관로)를 개방하여 정압기 후단 압력이 상기 작동기구(1a)로 전달된다.When the pressure of the lower chamber of the
이때 정압기 후단 압력은 설정 압력 이상으로 상승되지 않은 상태로서 일반적인 상태에서는 파일럿(4) 스프링(4b)의 반력을 이기지 못하여 작동기구(1a)로 전달될 수 없으므로 작동기구(1a)를 작동시킬 수 없었으나, 본 발명에 따르면 핸드펌프(9)에 의한 에어 가압력에 의해 상기 하부다이어프램(4d)에 연동하여 상부다이어프램(4c)이 강제로 상승됨으로써 밸브(4c')가 개방되어 정압기 후단 압력이 작동기구(1a)로 전달될 수 있게 되며, 이 압력은 상기 작동기구(1a)를 작동시키는데는 충 분한 크기의 압력이다.At this time, the back pressure of the constant pressure was not raised above the set pressure, and in the normal state, the reaction force of the
따라서, 상기 작동기구(1a)가 작동되면, 밸브(1c) 고정상태가 해제되어 스프링(1b)의 복원력에 의해 상기 밸브(1c)가 이동하여 슬램셧밸브(1)의 내부 관로를 차단하게 된다.Therefore, when the
이로써 슬램셧밸브(1)의 상태가 정상 상태임을 확인할 수 있다.(슬램셧밸브 이상여부 판단단계(S5))As a result, it is possible to confirm that the state of the slam shut valve 1 is in a normal state.
한편, 상기 슬램셧밸브(1)의 작동 조건 즉, 슬램셧밸브(1)를 작동시키는 정압기 후단 압력값을 조정하기 위해서는 핸드펌프(9)를 이용하여 하부다이어프램(4d) 하부챔버에 목표값대로 압력을 형성시키면서 그 목표값에서 밸브(4c')가 열리도록 상기 조절볼트(4a)를 조절하여 스프링(4b)의 압축정도를 조절하면 된다.On the other hand, in order to adjust the operating conditions of the slam shut valve (1), that is, the pressure value after the constant pressure for operating the slam shut valve (1), by using the hand pump (9) as the target value in the lower chamber of the lower diaphragm (4d) The pressure of the
상기와 같은 슬램셧밸브(1)의 테스트 및 세팅 작업은 10분 이내에 실시 가능하다.Such a test and setting operation of the slam shut valve (1) can be carried out within 10 minutes.
이와 같이 본 발명에 따르면, 슬램셧밸브(1)의 이상 여부를 점검하고, 작동 압력을 조정(정확한 세팅을 위해 필요함)함에 있어서, 모니터(2)와 워커(3) 등의 정압기 조작을 행할 필요가 없게 되므로 작업이 매우 간편하고 소요 시간도 종래의 30분 이상에서 10분 이내로 크게 단축되는 효과가 있다.As described above, according to the present invention, it is necessary to perform constant pressure operation such as the
또한, 종래와 같이 정압기 후단 배관(5)의 차단밸브를 차단한 상태에서 퍼지밸브(7)를 통해 가스를 배출시킬 필요가 없으므로 슬램셧밸브 테스트 및 세팅 시마다 발생하던 가스의 소모(버림)를 방지할 수 있게 된다.In addition, since it is not necessary to discharge the gas through the
한편, 정압기 트러블 발생시 상기 모니터(2)의 차단속도를 상승시키기 위한 설비 운영 방법은 다음과 같다.On the other hand, the facility operating method for increasing the breaking speed of the
도 3을 참조하여 설명한 바와 같이, 상기 모니터(2)의 밸브몸체(2a)는 다이어프램(2b)에 설치되어 있으며, 상기 다이어프램(2b)에 의해 모니터(2)의 내부 공간은 1차챔버(1c)와 2차챔버(2d)로 구획되고, 상기 1차챔버(2c)는 정압기 후단 배관(5)에 직접 연결되고, 상기 2차챔버(2d)는 상기 액셀러레이터(8)를 통해서 정압기 후단 배관(5)에 연결되어 있다.As described with reference to FIG. 3, the
또한, 상기 모니터(2)의 액셀러레이터(8)는 상부챔버(8b)와 정압기 후단 배관(5)의 연결관로(8c)에 분지관(8d)이 형성되고, 상기 연결관로(8c)와 분지관(8d)에 각각 액셀러레이터(8) 세팅시 벤트 여부를 확인하기 위한 개폐밸브(8e,8f)가 설치된다.In addition, the
그 중 연결관로(8c)의 개폐밸브(8f)는 액셀러레이터(8)로부터 정압기 후단 배관(5)쪽 방향으로 분지관(8d) 형성 지점 이후에 설치된다.Among them, the opening /
또한, 평상시 분지관(8d)의 개폐밸브(8e)는 노멀클로즈 상태로 유지되고, 연결관로(8c)의 개폐밸브(8f)는 노멀오픈 상태로 유지되고 있다.In addition, the open /
본 발명은 상기 분지관(8d)의 개폐밸브(8e)와 연결관로(8c)의 개폐밸브(8f)의 노멀 상태를 반대로 전환하는 것에 그 특징이 있다.The present invention is characterized in that the normal state of the on / off
즉, 상기 분지관(8d)의 개폐밸브(8e)를 노멀오픈(normal open) 상태로 조작하고, 상기 연결관로(8c)의 개폐밸브(8f)를 노멀클로즈(normal close) 상태로 조작하는 것이다.That is, the on / off
상기의 상태에서 정압기 후단 배관(5)의 압력이 설정값 이상으로 상승하면, 그 압력이 액셀러레이터(8)의 하부챔버(8g)에만 작용하고, 연결관로(8c)의 개폐밸브(8f)가 차단되어 있는 상태이므로 상부챔버(8b)에는 작용하지 않는다.In the above state, when the pressure of the constant pressure
따라서, 하부다이어프램의 상승에 의해 이에 연동되는 상부다이어프램에 설치된 밸브(8a)가 상승하여 연결관로(8c)의 입구가 개방됨으로써 모니터(2) 2차챔버(2d)의 가스가 액셀러레이터(8)의 상부챔버(8b)와 상기 연결관로(8c) 및 분지관(8d)을 통해서 이의 개폐밸브(8e)를 통해 대기중으로 배출된다.Accordingly, as the lower diaphragm rises, the
대기압은 상기 정압기 후단 배관(5)의 압력에 비하여 크게 낮으므로 모니터(2) 2차챔버(2d)의 가스는 종래에 비하여 매우 신속하게 제거된다.Atmospheric pressure is significantly lower than the pressure of the constant pressure
도 5에 종래의 배관내부배출방식(a)과 본 발명에 따른 대기배출방식(b)을 보다 쉽게 알 수 있도록 비교하여 도시하였다.5 shows a comparison of the conventional internal pipe discharge method (a) and the air discharge method (b) according to the present invention so as to be more easily understood.
다음은 액셀러레이터에 가해지는 압력(정압기 후단 압력)을 인위적으로 상승시킨 후 종래의 경우와 본 발명의 경우 모니터가 차단되는 시간을 측정한 비교 데이터이다.The following is comparative data measuring the time when the monitor is shut off after artificially raising the pressure applied to the accelerator (rear pressure after the constant pressure).
(상기에서 각 시험횟수마다 소요시간이 상이한 것은 워커 리모트 세터(Worker remote setter) 수동 조작에 의한 정압기 후단 압력 상승 재현 시 동일한 시험 조건을 반복하여 형성하기가 불가능하여 시험 시마다 시험조건에 다소 차이가 발생하기 때문이다.)(The time required for each test number is different because it is impossible to repeat the same test condition when reproducing the pressure rise after the constant pressure by the worker remote setter manual operation. Because)
상기의 표에서 종래의 경우보다 본 발명의 경우에 모니터 차단 시간이 크게 감소하였음을 확인할 수 있다.In the above table it can be seen that the monitor cut-off time is significantly reduced in the case of the present invention than the conventional case.
이와 같이, 모니터(2) 2차챔버(2d)의 가스를 배관 내부로 배출하지 않고 대기 중으로 배출하여 모니터 차단 시간이 크게 감소됨으로써 정압기 후단 압력이 상승하는 것을 신속히 방지할 수 있게 된다.In this way, the gas of the
따라서, 정압설비의 안전성과 가스 공급압력 제어의 정밀성이 한층 향상된다.Therefore, the safety of the constant pressure equipment and the precision of the gas supply pressure control are further improved.
도 1은 천연가스 정압설비의 개략 구성도,1 is a schematic configuration diagram of a natural gas constant pressure facility,
도 2는 슬램셧밸브와 그의 파일럿의 단면 및 연결 상태도,2 is a cross-sectional view and a connection state diagram of a slam shut valve and a pilot thereof;
도 3은 모니터와 그의 액셀러레이터의 단면 및 연결 상태도,3 is a cross-sectional view of the monitor and its accelerator and a connection state diagram;
도 4는 도 2의 대응도로서, 본 발명에 따른 슬램셧밸브와 그의 파일럿의 단면 및 연결 상태도,4 is a cross-sectional view of the slam shut valve and its pilot according to the present invention, and a connection diagram of FIG.
도 5의 (a)는 종래기술에 따른 모니터 내부 가스의 배출 방식 모식도,Figure 5 (a) is a schematic diagram of the discharge method of the gas inside the monitor according to the prior art,
(b)는 본 발명에 따른 모니터 내부 가스의 배출 방식 모식도이다. (b) is a schematic diagram of the discharge system of the internal gas of the monitor according to the present invention.
*도면의 주요 부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *
1 : 슬램셧밸브 2 : 모니터1: Slam shut valve 2: Monitor
3 : 워커 4 : 파일럿3: Walker 4: Pilot
5 : 정압기 후단 배관 6 : 차단밸브5: Constant pressure rear end pipe 6: Shut-off valve
7 : 퍼지밸브 8 : 액셀러레이터7: Purge Valve 8: Accelerator
9 : 핸드펌프9: hand pump
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080117536A KR101048332B1 (en) | 2008-11-25 | 2008-11-25 | Natural gas constant pressure equipment and its operation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020080117536A KR101048332B1 (en) | 2008-11-25 | 2008-11-25 | Natural gas constant pressure equipment and its operation method |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20100058939A true KR20100058939A (en) | 2010-06-04 |
KR101048332B1 KR101048332B1 (en) | 2011-07-15 |
Family
ID=42360312
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020080117536A KR101048332B1 (en) | 2008-11-25 | 2008-11-25 | Natural gas constant pressure equipment and its operation method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101048332B1 (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101284419B1 (en) * | 2011-11-14 | 2013-07-09 | 한국가스공사 | Device to prevent malfunction of regulator motor operated valve |
CN103867900A (en) * | 2014-03-13 | 2014-06-18 | 中国海洋石油总公司 | Method for simulating flow safety assurance of oil-gas-water mixture transportation pipeline with high height difference |
CN108223965A (en) * | 2018-01-03 | 2018-06-29 | 武汉都市环保工程技术股份有限公司 | Coal gas automatic blowing diffusion system |
CN108592156A (en) * | 2015-12-02 | 2018-09-28 | 慈溪市天行电器有限公司 | Fuel gas heating apparatus |
CN108679449A (en) * | 2018-07-30 | 2018-10-19 | 天津市津能工程管理有限公司 | A kind of pressure charging system of gas-steam combined unit |
CN110319260A (en) * | 2019-07-09 | 2019-10-11 | 武汉羽芒智能科技有限公司 | A kind of gas inlet speed autocontrol valve and its control method |
CN110513558A (en) * | 2018-08-21 | 2019-11-29 | 浙江长兴杭华玻璃有限公司 | A kind of air delivering pipeline is died automatic switching control equipment |
CN116447518A (en) * | 2023-04-03 | 2023-07-18 | 广东港能新能源科技有限公司 | Natural gas conveying pipeline pressure regulating device |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104565831B (en) * | 2014-12-30 | 2017-09-12 | 特瑞斯能源装备股份有限公司 | Explosion-proof pressure regulation casing |
KR101992640B1 (en) * | 2017-11-30 | 2019-06-25 | 한국가스공사 | Natural Gas Pressure Regulating Eqiupment Commissioning System |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU650950B2 (en) * | 1991-03-14 | 1994-07-07 | Dresser Industries Inc. | Method and apparatus for determining set pressure of pilot operated pressure relief valve |
JP3488712B2 (en) * | 2002-03-27 | 2004-01-19 | 株式会社ヨシタケ | Pressure reducing valve for steam used in steam boiler equipment |
KR101060902B1 (en) * | 2003-12-04 | 2011-08-30 | 주식회사 포스코 | Silencer integrated gas pressure regulator |
-
2008
- 2008-11-25 KR KR1020080117536A patent/KR101048332B1/en active IP Right Grant
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101284419B1 (en) * | 2011-11-14 | 2013-07-09 | 한국가스공사 | Device to prevent malfunction of regulator motor operated valve |
CN103867900A (en) * | 2014-03-13 | 2014-06-18 | 中国海洋石油总公司 | Method for simulating flow safety assurance of oil-gas-water mixture transportation pipeline with high height difference |
CN108592156A (en) * | 2015-12-02 | 2018-09-28 | 慈溪市天行电器有限公司 | Fuel gas heating apparatus |
CN108626774A (en) * | 2015-12-02 | 2018-10-09 | 慈溪市天行电器有限公司 | Fuel gas heating apparatus |
CN108223965A (en) * | 2018-01-03 | 2018-06-29 | 武汉都市环保工程技术股份有限公司 | Coal gas automatic blowing diffusion system |
CN108679449A (en) * | 2018-07-30 | 2018-10-19 | 天津市津能工程管理有限公司 | A kind of pressure charging system of gas-steam combined unit |
CN110513558A (en) * | 2018-08-21 | 2019-11-29 | 浙江长兴杭华玻璃有限公司 | A kind of air delivering pipeline is died automatic switching control equipment |
CN110319260A (en) * | 2019-07-09 | 2019-10-11 | 武汉羽芒智能科技有限公司 | A kind of gas inlet speed autocontrol valve and its control method |
CN116447518A (en) * | 2023-04-03 | 2023-07-18 | 广东港能新能源科技有限公司 | Natural gas conveying pipeline pressure regulating device |
CN116447518B (en) * | 2023-04-03 | 2023-11-10 | 广东港能新能源科技有限公司 | Natural gas conveying pipeline pressure regulating device |
Also Published As
Publication number | Publication date |
---|---|
KR101048332B1 (en) | 2011-07-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101048332B1 (en) | Natural gas constant pressure equipment and its operation method | |
KR102126942B1 (en) | Methods for semi-automatic replacement of high-pressure gas cylinders | |
US5769113A (en) | Dual pilot manifold assembly for a safety relief valve | |
US8847103B2 (en) | Electronic pressure regulator | |
US20090222233A1 (en) | Partial stroke testing system coupled with fuel control valve | |
CN109538936A (en) | Equipped with the device of tank | |
US20160379857A1 (en) | Vacuum processing apparatus | |
US20060034673A1 (en) | Semiconductor manufacturing apparatus and control method thereof | |
CN105759862B (en) | The compress control method of the small capacity high pressure pipe-line system automatic deflation process of satellite | |
US2769912A (en) | Shut-off valve | |
KR20220081032A (en) | Performance test system and test method for valve | |
KR102130639B1 (en) | Inspection device for pressure control cap | |
CN115306586A (en) | Propellant storage tank pressure control device and control method thereof | |
JPH0831369A (en) | Gas supplying device | |
JP4287989B2 (en) | Abnormality detection method for gas turbine fuel supply system | |
US7591276B2 (en) | Expansion valve block with coordinated high- and low-pressure circuit control means | |
CN220821484U (en) | Vacuum system and machine | |
CN210956184U (en) | Two-loop cooling system | |
KR102456937B1 (en) | LNG supply system transfer process control method | |
US20220364679A1 (en) | Methane Retention System | |
US12015180B2 (en) | Fuel cell valve configuration | |
CN216008846U (en) | Go out lotus machine system | |
CN117404517A (en) | Pneumatic stop valve fault processing method and system | |
KR200182401Y1 (en) | An apparatus for controlling press | |
KR0155142B1 (en) | Ion implant apparatus of semiconductor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20140611 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20150702 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20160627 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20170703 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20190701 Year of fee payment: 9 |