KR20100030702A - Land-side protection wall and the method for constrcting thereof - Google Patents

Land-side protection wall and the method for constrcting thereof Download PDF

Info

Publication number
KR20100030702A
KR20100030702A KR1020080089548A KR20080089548A KR20100030702A KR 20100030702 A KR20100030702 A KR 20100030702A KR 1020080089548 A KR1020080089548 A KR 1020080089548A KR 20080089548 A KR20080089548 A KR 20080089548A KR 20100030702 A KR20100030702 A KR 20100030702A
Authority
KR
South Korea
Prior art keywords
support pile
square support
wall
continuous wall
casing
Prior art date
Application number
KR1020080089548A
Other languages
Korean (ko)
Other versions
KR101116045B1 (en
Inventor
박이근
김성수
오승율
Original Assignee
(주)지오알앤디
오승율
박이근
김성수
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)지오알앤디, 오승율, 박이근, 김성수 filed Critical (주)지오알앤디
Priority to KR1020080089548A priority Critical patent/KR101116045B1/en
Publication of KR20100030702A publication Critical patent/KR20100030702A/en
Application granted granted Critical
Publication of KR101116045B1 publication Critical patent/KR101116045B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • E02D17/083Shoring struts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2220/00Temporary installations or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PURPOSE: A land-side protection wall which prevents a slope from caving and a construction method thereof are provided to improve a waterproof function by forming a wall body. CONSTITUTION: A cylindrical casing is punched on the ground. A rectangular bearing pile(50) in which a water-barrier injection hose is inserted inside the punched casing. A process of drawing the punched casing is reiterated and a continuous wall body is formed. A liner material is injected into a connection part of the rectangular bearing pile. The excavation of the formed highly-rigid continuous wall body is dug in predetermined depth.

Description

사각지지말뚝을 이용한 연속벽체 흙막이 및 그 시공방법{land-side protection wall and the method for constrcting thereof}Continuous wall mudguard using square support pile and its construction method {land-side protection wall and the method for constrcting

본 발명은 사각지지말뚝을 이용한 연속벽체 흙막이 및 그 시공방법에 관한 것으로, 보다 상세하게는 수개의 차수주입구와 양측이 오목부와 볼록부의 곡면으로 이루어진 사각형상의 지지말뚝을 구성하여 연속적인 시공방법으로 흙막이 벽체를 형성할 수 있고, 지지말뚝간의 연결부에 최소한의 차수용 주입재를 사용하여 효과적인 차수처리를 실시할 수 있는 지지말뚝을 이용한 연속벽체 형성방법에 관한 것이다.The present invention relates to a continuous wall soil barrier using a rectangular support pile and a construction method thereof, and more particularly, to a continuous construction method by forming a rectangular support pile consisting of a plurality of order inlets and both sides of the concave and convex surface The present invention relates to a method of forming a continuous wall using support piles, which can form an earth wall, and can perform effective order treatment using a minimum degree of filler in the connection portion between support piles.

일반적으로, 지하구조물을 구축하고자 할 경우에는 소정의 깊이까지 터파기에 요구되는 부지 여유가 부족하기 때문에 수직으로 벽체(가설 또는 영구)를 형성하여 굴착 배면의 안정성을 확보한 후 지하구조물의 기초를 형성하고 지하구조물, 지상구조물 순으로 공사를 진행한다. In general, when the underground structure is to be constructed, since there is a lack of site space required for digging to a predetermined depth, a wall (temporary or permanent) is formed vertically to secure stability of the excavation back and then form the foundation of the underground structure. The construction works in the order of underground structures and ground structures.

또한 흙막이 공사시에는 인접대지를 침범하여 앵커나 버팀대로 지지하게 되고, 특히 경사가 급하고 부지여유가 없는 절개지에 부지를 조성하고 옹벽을 시공하 고자 할 때에는 흙막이 가시설이 필요하게 된다.In addition, when constructing the retaining wall, the adjacent site is invaded and supported by anchors or braces. In particular, when the site is to be constructed and the retaining wall is constructed in an incline where there is a steep slope and there is no free space, the retaining wall is needed.

상기와 같은 흙막이 시공은 도1에 도시한 바와 같이, 종래에는 지지말뚝(H-pile, PHC지지말뚝)(201)을 연직 설치하고 굴착하는 과정에서 지지말뚝 (201)사이의 토사를 지지하는 벽체(토류판, 토류콘크리트,202)를 굴착단계로 형성하고 차수를 필요로 할 경우에는 벽체 배면에 차수시공(205)을 별도로 하여 흙막이 가시설을 형성한 후 굴착측에 띠장(203), 버팀대(204)와 같은 구조물을 형성하는 것이 일반적이며 이러한 시공은 굴착단계에 따라 토류판(202)의 설치, 토류콘크리트의 시공 등으로 인하여 공사기간이 증가되고 배면에 따로이 차수시공을 하여야 하는 등 시공성 불량과 공사비 증가에 따른 경제성의 불리와 차수시공시에 지반내 주입이 어려움으로 인해 자수효과를 기대하기 어려운 문제점이 발생되었다.As shown in Figure 1, the construction of the earthenware wall, which supports the soil between the support pile 201 in the process of vertically installing and excavating the support pile (H-pile, PHC support pile) 201 in the prior art (The earth plate, the earth concrete, 202) is formed in the excavation step, and if the order is required, the order construction 205 is separately formed on the back surface of the wall to form a temporary wall temporary facility, and then the strip 203 and the prop 204 on the excavation side. It is common to form a structure such as the construction period is increased due to the installation of the earth plate 202, the construction of the earth concrete, etc. according to the excavation step, and the construction work must be carried out separately on the back, such as poor construction properties and construction cost increase Due to the disadvantages of economic feasibility and the difficulty of injecting in the ground during the order construction, it was difficult to expect the embroidery effect.

상기와 같은 제반 문제점을 해결하기 위해 지지기둥을 이용하여 강성을 높이고 공사면적을 최소화하여 인접대지를 침범하지 않고 용이하게 시공할 수 있으며 공사비를 절감하고 공사기간을 단축할 수 있는 흙막이 겸용 옹벽 및 그 시공방법이 안출된 바 있다.In order to solve the above problems, it is possible to easily construct without invading the adjacent site by increasing the rigidity and minimizing the construction area by using the support column, and retaining wall combined with retaining walls that can reduce construction cost and shorten the construction period. Construction method has been devised.

상기 지지기둥을 이용한 흙막이 겸용 옹벽 및 그 시공방법은 대한민국특허청 등록공보에 게시된 특허 제10-0544012호의 "흙막이 겸용 옹벽 및 그 시공방법" (이하 '인용발명' 이라 한다.)이 있다.Combined retaining wall and the construction method using the support pillar there is a "dirt combined retaining wall and its construction method" (hereinafter referred to as 'quoting invention') of Patent No. 10-0544012 published in the Republic of Korea Patent Office.

인용발명은 일측이 지반(1)에 삽입되고 외주면 일측이 배면토사(2)를 지지하는 다수개의 중공부(11)를 갖는 지지기둥(10)이 소정간격을 두고 구비되고, 상기 지지기둥(10)들의 사이에 콘크리트부(20)가 형성되고, 상기 지지기둥의 중공부(11)에 어 스앵커(30)가 삽입 설치되며, 상기 지지기둥(10)의 상단을 연결하는 보강부재(40)가 지지기둥(10)과 수직으로 결합되는 흙막이 겸용 옹벽을 구성한 것에 특징이 있다.Cited invention is provided with a support pillar 10 having a plurality of hollows 11 having one side inserted into the ground 1 and one side of the outer circumferential surface supporting the rear soil 2, with a predetermined interval, and the support pillar 10 Concrete portion 20 is formed between the), the air anchor 30 is inserted into the hollow portion 11 of the support pillar is installed, the reinforcing member 40 for connecting the upper end of the support pillar (10) Is characterized in that the soil retaining wall combined with the support pillar 10 is vertically coupled.

그러나, 상기 인용발명은 지지말뚝 사이의 콘크리트부를 형성하기 위해 토사를 제거하는 과정에서 배면토사(2)의 자립에 어려움이 크고, 토사유실의 우려가 있어 배면의 안정성 확보가 어려운 문제점이 있다.However, the cited invention has a problem that it is difficult to secure the rear soil (2) independence in the process of removing the soil to form a concrete portion between the support piles, there is a fear of soil loss, it is difficult to secure the stability of the back.

즉, 단계굴착과정에서 지지말뚝 사이의 콘크리트 타설로 인해 시간이 지연되고, 콘크리트부를 형성하기 위한 거푸집의 설치 등으로 작업상의 어려움 크다는 것이다.In other words, the time is delayed due to the concrete placing between the supporting piles during the step excavation process, and the difficulty of work is large due to the installation of formwork for forming the concrete part.

본 발명은 전술한 종래의 문제점을 해결하기 위해 안출한 것으로, 수개의 차수주입구와 양측이 오목부와 볼록부의 곡면으로 이루어진 사각형상의 사각지지말뚝을 구성하여 연속적인 시공에 의한 정확한 품질이 확보된 벽체를 형성하고, 사각지지말뚝 연결부위로 시멘트그라우트, 우레탄과 같은 차수용 주입재를 최소한으로 주입할 수 있도록 하는 차수처리를 통해 차수문제를 완벽하게 해결할 수 있어 굴착단계에 따라 토류판의 설치나 배면에 따로이 차수공을 실시하지 않는 등 공기단축과 비용절감에 매우 유리한 사각지지말뚝을 이용한 연속벽체 흙막이 및 그 시공방법을 제공하는데 그 목적이 있다.The present invention has been made in order to solve the above-mentioned conventional problems, a number of order inlet and both sides constitute a rectangular rectangular support pile consisting of the curved surface of the concave portion and the convex portion to ensure accurate quality by continuous construction wall Can be completely solved the order problem through the degree of treatment that allows to inject a minimum amount of filler material such as cement grout, urethane into the square support pile connection portion, depending on the installation or rear of the earth plate according to the excavation step It is an object of the present invention to provide a continuous wall retaining wall using a square support pile which is very advantageous for shortening the air and reducing the cost, such as not carrying out the work.

상술한 목적을 달성하기 위한 본 발명의 특징에 의하면, 본 발명은 양측면이 오목부(52)와 볼록부(51)로 이루어진 곡면형상으로 형성되며, 중앙에 중공부(56)가 형성된 사각지지말뚝(50)으로 흙막이 벽체를 구성하는 것을 특징으로 한다.According to a feature of the present invention for achieving the above object, the present invention is formed in a curved shape formed on both sides of the concave portion 52 and the convex portion 51, the square support pile formed with a hollow portion 56 in the center It is characterized by constituting the retaining wall with (50).

또한, 사각지지말뚝(50)은 콘크리트를 소재로 하여 기성 사각지지말뚝(50)으로 구성하되, 볼록부(51)가 형성되는 측면으로 근접되게 차수주입호스(53)가 내재되고, 차수주입호스(53)를 관통하는 배출구(54)가 볼록부(51) 곡면측으로 뚫린 것을 특징으로 한다.In addition, the square support pile 50 is composed of a concrete square support pile 50 made of a concrete material, the order injection hose 53 is embedded, the order injection hose to be close to the side where the convex portion 51 is formed, The discharge port 54 penetrating 53 is characterized in that the convex portion 51 is drilled toward the curved surface side.

또한, 사각지지말뚝(50)의 굴착전면으로 버팀대(204), 앵커(207)를 설치시에 시공이 용이하게 소정의 위치에 수개의 볼트구멍(55)을 구성한 것을 특징으로 한다.In addition, when installing the brace 204 and the anchor 207 to the excavation front surface of the square support pile 50, it is characterized in that several bolt holes 55 are formed at predetermined positions to facilitate construction.

또한, 본 발명은 지반에 구멍을 소정의 깊이까지 원통형상의 케이싱(60)을 지반으로 천공하게 되는 케이싱 천공(S10)하고; 케이싱(60) 내부에 사각지지말뚝을 삽입(S20)하며; 사각지지말뚝(50)이 삽입되어 지반으로 고정되어진 상태에서 케이싱(60)을 인발(S30)하고; 기삽입된 사각지지말뚝(50)의 오목부(52) 곡면측을 가이드면으로 하여 인접연속천공하며, S10~S30단계를 반복하는 과정을 통해 고강성 연속벽체를 형성(S40)하며; 연속벽체를 구성하는 사각지지말뚝(50)간의 연결부(A)로 차수재를 주입하며 차수처리(S50)하여 형성된 고강성 연속벽체의 굴착측을 소정의 깊이로 굴착(S60)하는 단계로 흙막이 벽체를 시공하는 것을 특징으로 한다.In addition, the present invention is the casing perforations (S10) to perforate the cylindrical casing 60 to the ground to a hole in the ground to a predetermined depth; Inserting the square support pile into the casing (60) (S20); A square support pile 50 is inserted into the casing 60 in a fixed state to the ground (S30); Adjacent continuous drilling using the curved surface side of the recess 52 of the pre-inserted square support pile 50 as a guide surface, and forms a high rigid continuous wall through the process of repeating steps S10 to S30 (S40); Injecting the material into the connection portion (A) between the square support pile 50 constituting the continuous wall and excavating the excavation side of the high rigid continuous wall formed by the order treatment (S50) to a predetermined depth (S60) in the soil wall Characterized in that the construction.

본 발명의 사각지지말뚝을 이용한 연속벽체 흙막이 및 그 시공방법 의하면 볼록부와 오목부의 곡률반경으로 이루어진 사각지지말뚝을 이용하여 굴착에 의한 흙막이벽체의 시공방법과 차수방법을 간략하고 완성도 높게 구성함으로써 버팀대, 앵커 등의 수평지지부재의 시공성을 크게 향상하여 흙막이 벽체의 안전성과 시공성, 경제성을 크게 높이며 극대화하는데 효과가 있다.According to the continuous wall soil film using the square support pile and the construction method of the present invention, the construction method and the order of construction of the wall wall by excavation using the square support pile composed of the curvature radius of the convex portion and the concave portion are simple and high degree of completion. By greatly improving the workability of horizontal support members such as anchors, it is effective to maximize and maximize the safety, workability, and economics of the wall.

이하, 본 발명의 바람직한 실시예를 첨부된 도면 도 3내지 도 10에 의거하여 상세히 설명하며, 도 2 내지 도 4에 있어서 동일한 기능을 수행하는 구성 요소에 대해서는 동일한 참조 번호를 병기한다. 한편, 각 도면에서 주요소들의 결합ㆍ고정을 위한 볼트 및 나사, 홀, 와셔, 너트 등의 도시는 간략히 하거나 생략하였으며, 통상 본 발명에 적용되는 수평지지부재, 앵커 등의 이 분야의 종사자들이 통상적으로 알 수 있는 부분들의 도시는 생략하거나 간단하게 도시하였고, 본 발명과 관련된 부분들을 중심으로 도시하였다. 특히, 요소들 사이의 크기 비가 다소 상이하게 표현되거나 서로 결합되는 구조물들의 크기가 상이하게 표현된 부분도 있으나, 이와 같은 도면의 표현 차이는 이 분야의 종사자들이 용이하게 이해할 수 있는 부분들이므로 별도의 설명을 생략한다.Hereinafter, a preferred embodiment of the present invention will be described in detail with reference to the accompanying drawings, Figs. 3 to 10, the same reference numerals are denoted with respect to the components performing the same function in Figs. On the other hand, in the drawings, the illustration of the bolts, screws, holes, washers, nuts, etc. for the coupling and fixing of the major elements are briefly or omitted, and those skilled in the art, such as horizontal support members and anchors, which are generally applied to the present invention, are typically used. Illustrations of the parts that can be seen are omitted or simply shown, and the parts that are related to the present invention are shown. In particular, there are parts in which the size ratio between the elements is somewhat different or the sizes of the structures coupled to each other are different. However, the difference in representation of these drawings is easily understood by those skilled in the art. Omit the description.

도 3은 본 발명의 따른 사각지지말뚝을 이용하여 흙막이벽체를 형성하는 시공방법을 보인 흐름도이며, 도 4는 본 발명의 따른 사각지지말뚝을 보인 사시도이고, 도 5는 본 발명의 바람직한 실시예에 따라 사각지지말뚝을 이용하여 연속벽체 흙막이를 보인 사시도이며, 도 6은 본 발명의 사각지지말뚝을 이용하여 연속벽체 흙막이를 형성하는 과정을 개략적으로 보인 개략도이고, 도 7은 본 발명의 바람직한 실시예에 따라 사각지지말뚝간의 연결부 차수처리를 정면에서 보인 단면도이며, 도 8내지 도 10은 본 발명의 바람직한 실시예에 따라 시공완료된 상태를 보인 측면도를 나타낸 것이다.Figure 3 is a flow chart showing a construction method for forming the earth wall using the square support pile according to the present invention, Figure 4 is a perspective view showing a square support pile according to the present invention, Figure 5 is a preferred embodiment of the present invention Figure 6 is a perspective view showing a continuous wall retainer using a square support pile, Figure 6 is a schematic diagram showing a process of forming a continuous wall retainer using a square support pile of the present invention, Figure 7 is a preferred embodiment of the present invention According to the cross-sectional view showing the order of the connection between the rectangular support piles from the front, Figures 8 to 10 shows a side view showing a completed state in accordance with a preferred embodiment of the present invention.

본 발명은 원통형상의 케이싱(60)을 지반으로 천공하고, 천공된 케이싱(60)의 관통되어진 내경으로 차수주입호스(53)가 내재된 사각지지말뚝(50)을 삽입하며 천공된 케이싱(60)은 다시 인발하게 되는 반복시공을 통해 사각지지말뚝(50)만이 지반으로 연직 고정시키면서 토사가 흘러내리거나 지반이 무너지는 것을 방지하기 위한 연속벽체 흙막이를 구성하는데 특징이 있다.The present invention perforates the cylindrical casing (60) to the ground, and inserts the rectangular support pile (50) in which the order injection hose (53) is embedded into the perforated inner diameter of the perforated casing (60) and perforated casing (60). It is characterized by configuring a continuous wall retaining wall to prevent the soil from flowing down or the ground collapses while only the vertical support pile 50 is vertically fixed to the ground through the repeated construction to be drawn again.

상기 본 발명의 연속벽체 흙막이를 구성하는 사각지지말뚝(50)은 도 4의 보 인바와 같이 수개의 차수주입호스(53)가 내재되고, 양측면이 오목부(52)와 볼록부(51)로 이루어진 곡면으로 형성되며, 볼록부(51) 곡면측에 차수주입호스(53)를 관통하는 배출구(54)가 뚫리며, 중앙에 관통된 중공부(56)가 형성되어 있다.Square support pile 50 constituting the continuous wall retaining wall of the present invention is embedded with a plurality of order injection hose 53, as shown in the bar shown in Figure 4, both sides of the concave portion 52 and the convex portion 51 It is formed into a curved surface, the discharge hole 54 penetrating through the order injection hose 53 is formed in the curved surface of the convex portion 51, the hollow portion 56 is formed in the center.

상기 사각지지말뚝(50)은 콘크리트를 소재로 하여 기성 사각지지말뚝(50)으로 구성되며, 제조시에 볼록부(51)가 형성되는 측면으로 근접되게 차수주입호스(53)가 내재되도록 하여 구성하게 된다. The square support pile 50 is composed of a ready-made square support pile 50 made of concrete, so that the order injection hose 53 is embedded in close proximity to the side on which the convex portion 51 is formed during manufacturing. Done.

또한, 상기 사각지지말뚝(50)은 원심력에 의해 공장제작되므로 중간에 일정크기의 중공부(56)가 형성되는데 이는 현장에서 벽체가 형성된 후 필요시 토사, 시멘트몰탈, 그라우트 등을 타설하여 메움되며, 일부 구멍을 통하여는 굴착과정에서 벽체의 거동을 점검하는 지중경사계의 설치구멍으로 활용할 수 있어 시공관리 비용측면에서 매우 유리할 수 있다.In addition, since the square support pile 50 is manufactured by a centrifugal force, a hollow portion 56 having a predetermined size is formed in the middle, which is filled with sand, cement mortar, grout, etc., if necessary after the wall is formed in the field. In addition, it can be very advantageous in terms of construction management cost because it can be used as an installation hole of the underground inclinometer which checks the wall behavior during the excavation process.

본 발명에 따른 사각지지말뚝(50)을 이용한 연속벽체 흙막이는 기존에 중공부(56)를 가지는 원통형상의 케이싱을 지반으로 천공시켜 케이싱 내경으로 콘크리트를 타설하여 콘크리트가 양생되기전 케이싱을 인발시켜 지지말뚝을 형성하며 반복적인 공정에 의해 흙막이 벽체를 구성하던 것과 달리, Continuous wall retaining wall using the square support pile 50 according to the present invention by drilling a cylindrical casing having a hollow portion 56 to the ground to cast concrete to the casing inner diameter to draw the casing before the concrete is cured Unlike the piling walls, which are piled up and formed by repetitive processes,

사각지지말뚝(50)을 기성말뚝으로 구성하여 천공된 케이싱(60)으로 삽입하여 지반으로 고정시키는식으로 연속적이고 반복적인 시공을 통해 벽체를 구성함과 동시에 벽체를 구성하는 사각지지말뚝(50)간에 형성되는 틈새(또는 오목부와 볼록부가 마주보는 연결부(A)로 사각지지말뚝(50)에 내재된 수개의 차수주입호스(53)로 차수재를 주입하며 연결부(A)를 차수처리하여 연속벽체 흙막이를 구성하는데 기술 적 특징이 있다.The square support pile 50 is composed of a ready-made pile and inserted into a perforated casing 60 to be fixed to the ground. The filler is injected into several order injection hoses 53 inherent in the square support pile 50 by the gap (or the concave portion and the convex portion facing the gap formed therebetween). There are technical features in constructing wall retainers.

상기와 같이 구성되는 본 발명의 사각지지말뚝(50)을 이용한 연속벽체 흙막이의 시공방법을 설명하면, Referring to the construction method of the continuous wall mud using the square support pile 50 of the present invention configured as described above,

도 3의 흐름도를 보인바와 같이 지반에 구멍을 소정의 깊이까지 원통형상의 케이싱(60)을 지반으로 천공하게 되는 케이싱 천공(S10)하고; As shown in the flowchart of Fig. 3, a hole in the ground is drilled through the casing (S10), which drills the cylindrical casing 60 to the ground to a predetermined depth;

케이싱(60) 내부에 사각지지말뚝을 삽입(S20)하며;Inserting the square support pile into the casing (60) (S20);

사각지지말뚝(50)이 삽입되어 지반으로 고정되어진 상태에서 케이싱(60)을 인발(S30)하고; A square support pile 50 is inserted into the casing 60 in a fixed state to the ground (S30);

기삽입된 사각지지말뚝(50)의 오목부(52) 곡면측을 가이드면으로 하여 인접연속천공하며, S10~S30단계를 반복하는 과정을 통해 고강성 연속벽체를 형성(S40)하며;Adjacent continuous drilling using the curved surface side of the recess 52 of the pre-inserted square support pile 50 as a guide surface, and forms a high rigid continuous wall through the process of repeating steps S10 to S30 (S40);

연속벽체를 구성하는 사각지지말뚝(50)간의 연결부(A)로 차수재를 주입하며 차수처리(S50)하며;Injecting the filler material into the connection portion (A) between the square support pile 50 constituting the continuous wall and the degree of treatment (S50);

형성된 고강성 연속벽체의 굴착측(또는 사각지지말뚝의 전면부)을 소정의 깊이로 굴착(S60)하는 단계로 사각지지말뚝(50)을 이용하여 연속벽체 흙막이를 구성하게 된다.The excavation side (or the front portion of the square support pile) of the formed high rigid continuous wall to excavation (S60) to a predetermined depth to form a continuous wall mud using the square support pile (50).

상기와 같이 본 발명은 연속벽체를 구성시에 사각지지말뚝(50)의 양측면의 형상이 일측은 볼록하고, 타측은 오목한 곡률반경으로 이루어짐에 따라 사각지지말뚝(50)을 삽입하기 전, 사각지지말뚝(50)을 지지하며 삽입할 수 있도록 하는 케이싱(60)의 선천공시에 케이싱(60)이 오복부(52) 곡면측을 따라 가이드되며 후속 천 공을 시행할 수 있다. 이에 볼록부(51) 곡면측에서 차수주입시에 오목부 곡면측과 만나는 면이 최소한의 틈이 형성하게 됨으로 인해 최소한의 차수용 주입재를 사용하여 차수처리할 수 있는 것이다.As described above, in the present invention, when the continuous wall is formed, the shape of both sides of the square support pile 50 is convex on one side, and the other side is made of a concave radius of curvature before the square support pile 50 is inserted into the square support. At the time of perforation of the casing 60 to support and insert the pile 50, the casing 60 is guided along the curved side 52 of the penis part 52, and subsequent drilling may be performed. In this case, since the convex portion 51 faces the concave portion curved side at the time of order injection, the minimum gap is formed so that it can be processed using the minimum amount of filler material.

상기 천공되는 케이싱(60)을 이용하여 사각지지말뚝(50)을 설치함에 따라 도 7에서 보인바와 같이 사각지지말뚝(50)간의 서로 연결되는 오목부(52)와 볼록부(51) 사이가 케이싱(60)의 두께만큼 연결부(A)가 형성됨에 따라 차수대책이 필요한 현장의 경우에는 볼록부(51) 곡면에 근접하여 내재된 소정의 간격으로 구멍이 뚫린 수개의 차수주입호스(53) 중 한 곳을 통하여 차수용 주입재(시멘트 밀크 또는 팽창성의 주입재)를 최소한으로 주입함으로써 주입되는 차수재가 볼록부(51) 곡면측면으로 뚫린 배수구(54)를 통해 연결부로 주입되며 차수의 목적을 달성하게 된다.As the rectangular support pile 50 is installed by using the perforated casing 60, as shown in FIG. 7, between the concave portion 52 and the convex portion 51 connected to each other between the square support piles 50 as shown in FIG. 7. In the case where the order measures are required as the connection portion A is formed to the thickness of 60, one of several order injection hoses 53 having holes drilled at predetermined intervals in proximity to the curved surface of the convex portion 51 is formed. By injecting a minimum amount of filler material (cement milk or expandable filler material) through the place, the filler material is injected into the connection portion through the drain hole 54 formed in the curved side surface of the convex part 51 to achieve the purpose of the degree.

한편 굴착과정에서 주입이 불량하여 차수가 불완전한 경우에는 다른 차수주입호스를 이용하여 2차, 3차 등의 추가 차수주입이 가능하므로 차수에 완벽성을 기할 수 있는 강성과 차수가 매우 우수한 연속벽체를 구성할 수 있는 것이다.On the other hand, if the order is incomplete due to poor injection during the excavation process, additional order injection such as 2nd and 3rd order is possible by using another order injection hose, so that the continuous wall with excellent rigidity and high degree of order can be obtained. It can be configured.

한편, 본 발명의 사각지지말뚝(50)에 의한 연속벽체 흙막이가 형성되면, 상부측으로 굴착전면과 배면 양측에서 수평지지부재(ㄷ-형강,70)를 볼트 조립으로 구성하게 된다. 이는 벽체 전체에 일률적인 토압을 받을 수 있도록 하여 다른 인장부재 없이 연속벽체 흙막이 자체만을 자립식 흙막이(도 8 참조)로 사용할 수 있도록 띠장의 역할과 같이 벽체의 상부측을 지지할 수 있도록 구성한 것이다. On the other hand, when the continuous wall retaining wall formed by the square support pile 50 of the present invention, the horizontal support member (c-shaped steel, 70) on both sides of the excavation front and back to the upper side is configured by bolt assembly. It is configured to support the upper side of the wall as a role of a band so that the continuous wall mud itself can be used as a self-supporting muddle (see Fig. 8) without any other tensioning member so as to receive a uniform earth pressure throughout the wall.

한편, 본 발명의 따른 사각지지말뚝(50)은 벽체 전면과 배면이 평면으로 형 성되어 있어 배면측은 케이싱(60)을 인발하기 전에 토사채움을 실시함으로써 배면측의 침하를 없앨 수 있고, On the other hand, the square support pile 50 according to the present invention is formed on the front surface and the back surface of the wall, the back side can eliminate the settlement of the back side by performing the soil filling before drawing the casing (60),

특히 현장에서 버팀대(204), 앵커용대좌(206)에 의한 앵커(207)(도 9내지 도 10 참조)를 설치시에 시공이 용이하게 사각지지말뚝(50)의 전면으로 소정의 위치에 볼트구멍(55)을 미리 형성하거나 현장에서 필요위치에 형성하여 굴착심도에 제한없이 시공하며 저렴한 비용으로 고품질의 연속벽체를 형성할 수 있는 우수한 흙막이 시공방법인 것이다.In particular, when installing the anchor 207 (see FIGS. 9 to 10) by the brace 204 and the anchor pedestal 206 at the site, the bolt is installed at a predetermined position toward the front of the square support pile 50 for easy construction. Forming the hole 55 in advance or formed in the required position in the field is an excellent earth film construction method that can be formed without restriction on the drilling depth and to form a high-quality continuous wall at low cost.

상술한 바와 같은, 본 발명의 바람직한 실시예에 따른 사각지지말뚝을 이용한 연속벽체 흙막이 및 그 시공방법을 상기한 설명 및 도면에 따라 도시하였지만, 이는 예를 들어 설명한 것에 불과하며 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 다양한 변화 및 변경가능하다는 것을 이 분야의 통상적인 기술자들은 잘 이해할 수 있을 것이다.As described above, although the continuous wall retaining wall and the construction method using the square support pile according to a preferred embodiment of the present invention according to the above description and the drawings, but this is just described for example and the technical spirit of the present invention Those skilled in the art will appreciate that various changes and modifications can be made without departing.

도 1은 종래의 기술에 따른 흙막이벽체 구성을 보인 상태도.1 is a state diagram showing a concave wall structure according to the prior art.

도 2는 인용발명의 흙막이 겸용 옹벽 및 그 시공방법을 보인 예시도.Figure 2 is an exemplary view showing a retaining wall and the construction method of the cinder of the invention.

도 3은 본 발명의 따른 사각지지말뚝을 이용하여 흙막이벽체를 형성하는 시공방법을 보인 흐름도. Figure 3 is a flow chart showing a construction method for forming a retaining wall using a square support pile according to the present invention.

도 4는 본 발명의 따른 사각지지말뚝을 보인 사시도Figure 4 is a perspective view of a square support pile according to the present invention

도 5는 본 발명의 바람직한 실시예에 따라 사각지지말뚝을 이용하여 연속벽체 흙막이를 보인 사시도5 is a perspective view showing a continuous wall retaining wall using a square support pile according to a preferred embodiment of the present invention

도 6은 본 발명의 사각지지말뚝을 이용하여 연속벽체 흙막이를 형성하는 과정을 개략적으로 보인 개략도Figure 6 is a schematic diagram showing a process of forming a continuous wall retaining wall using a square support pile of the present invention

도 7은 본 발명의 바람직한 실시예에 따라 사각지지말뚝간의 연결부 차수처리를 정면에서 보인 단면도Figure 7 is a cross-sectional view showing the order of the connection between the square support pile according to a preferred embodiment of the present invention

도 8내지 도 10은 본 발명의 바람직한 실시예에 따라 시공완료된 상태를 보인 측면도8 to 10 is a side view showing a completed state in accordance with a preferred embodiment of the present invention

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

201 : 지지말뚝 202 : 토류벽 203 : 띠장 204 : 버팀대 205 : 차수시공 206 : 앵커용 대좌 207 : 앵커201: support pile 202: earth wall 203: belt 204: brace 205: order construction 206: anchor base 207: anchor

1 : 지반 2 ; 배면토사1: ground 2; Cotton soil

70 : 수평지지대(또는 ㄷ-형강) 60 : 케이싱 50 : 사각지지말뚝70: horizontal support (or c-beam) 60: casing 50: square support pile

51 : 볼록부 52 : 오목부 53 : 차수주입호스 54 : 배출구 51: convex portion 52: concave portion 53: order injection hose 54: discharge port

55 : 볼트구멍 56 : 중공부55 bolt hole 56 hollow part

Claims (4)

말뚝부재를 이용한 흙막이 벽체를 구성함에 있어서,In constructing the retaining wall using the pile member, 양측면이 오목부(52)와 볼록부(51)로 이루어진 곡면형상으로 형성되며, 중앙에 중공부(56)가 형성된 사각지지말뚝(50)으로 흙막이 벽체를 구성하는 것을 특징으로 하는 사각지지말뚝을 이용한 연속벽체 흙막이.Both sides are formed in a curved shape consisting of the concave portion 52 and the convex portion 51, and the square support pile, characterized in that constitutes the wall of the wall with a square support pile 50 formed with a hollow portion 56 in the center Used continuous wall mudguard. 제 1항에 있어서, 사각지지말뚝(50)은 콘크리트를 소재로 하여 기성 사각지지말뚝(50)으로 구성하되, 볼록부(51)가 형성되는 측면으로 근접되게 차수주입호스(53)가 내재되고, 차수주입호스(53)를 관통하는 배출구(54)가 볼록부(51) 곡면측으로 뚫린 것을 특징으로 하는 사각지지말뚝을 이용한 연속벽체 흙막이.According to claim 1, wherein the square support pile 50 is made of a concrete square support pile 50 made of concrete, the order injection hose 53 is embedded in close proximity to the side where the convex portion 51 is formed; , Continuous wall mud using a square support pile, characterized in that the outlet 54 penetrating the order injection hose 53 is bored to the curved side 51. 제 1항에 있어서, 사각지지말뚝(50)의 굴착전면으로 버팀대(204), 앵커(207)를 설치시에 시공이 용이하게 소정의 위치에 수개의 볼트구멍(55)을 구성한 것을 특징으로 하는 사각지지말뚝을 이용한 연속벽체 흙막이.The method of claim 1, wherein when installing the brace 204 and the anchor 207 to the excavation front surface of the square support pile 50, several bolt holes 55 are formed at a predetermined position to facilitate construction. Continuous wall soil wall using square support pile. 지반에 구멍을 소정의 깊이까지 원통형상의 케이싱(60)을 지반으로 천공하게 되는 케이싱 천공(S10)하고; Casing perforations (S10) to perforate the cylindrical casing (60) to the ground to a predetermined depth in the ground; 케이싱(60) 내부에 사각지지말뚝을 삽입(S20)하며;Inserting the square support pile into the casing (60) (S20); 사각지지말뚝(50)이 삽입되어 지반으로 고정되어진 상태에서 케이싱(60)을 인발(S30)하고; A square support pile 50 is inserted into the casing 60 in a fixed state to the ground (S30); 기삽입된 사각지지말뚝(50)의 오목부(52) 곡면측을 가이드면으로 하여 인접연속천공하며, S10~S30단계를 반복하는 과정을 통해 고강성 연속벽체를 형성(S40)하며;Adjacent continuous drilling using the curved surface side of the recess 52 of the pre-inserted square support pile 50 as a guide surface, and forms a high rigid continuous wall through the process of repeating steps S10 to S30 (S40); 연속벽체를 구성하는 사각지지말뚝(50)간의 연결부(A)로 차수재를 주입하며 차수처리(S50)하여 형성된 고강성 연속벽체의 굴착측을 소정의 깊이로 굴착(S60)하는 단계로 이루어지는 것을 특징으로 하는 사각지지말뚝을 이용한 연속벽체 흙막이시공방법.It is made of a step of excavating (S60) the excavation side of the high rigidity continuous wall formed by the order treatment (S50) to the connection portion (A) between the square support pile 50 constituting the continuous wall to a predetermined depth (S60). Continuous wall soil construction method using a rectangular support pile characterized in that.
KR1020080089548A 2008-09-11 2008-09-11 land-side protection wall and the method for constrcting thereof KR101116045B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080089548A KR101116045B1 (en) 2008-09-11 2008-09-11 land-side protection wall and the method for constrcting thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080089548A KR101116045B1 (en) 2008-09-11 2008-09-11 land-side protection wall and the method for constrcting thereof

Publications (2)

Publication Number Publication Date
KR20100030702A true KR20100030702A (en) 2010-03-19
KR101116045B1 KR101116045B1 (en) 2012-03-14

Family

ID=42180543

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080089548A KR101116045B1 (en) 2008-09-11 2008-09-11 land-side protection wall and the method for constrcting thereof

Country Status (1)

Country Link
KR (1) KR101116045B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102747738A (en) * 2012-07-25 2012-10-24 中国水电顾问集团西北勘测设计研究院 Method for adopting high-pressure grouting steel pipe pile to perform covering layer side slope treatment
CN102912798A (en) * 2012-11-06 2013-02-06 山东兴华建设集团有限公司 Compound soil nail wall foundation pit supporting method
CN104594337A (en) * 2014-12-05 2015-05-06 福州市第三建筑工程公司 Cast-in-place pile provided with tangent surface pile segment and construction method thereof
CN105649011A (en) * 2016-01-12 2016-06-08 深圳市工勘岩土集团有限公司 Forming method for square pile hole
CN110344417A (en) * 2019-07-05 2019-10-18 深圳宏业基岩土科技股份有限公司 With the difunctional foundation pit prefabricated pile supporting construction of support water stop

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101221084B1 (en) * 2012-06-25 2013-01-11 민영미 Temporary pile using bending restoring force and temporary structure construction method therewith
KR101386558B1 (en) 2013-02-13 2014-04-17 (주)이피에치씨 Construction method of earth retaining wall using phc pile
KR101940587B1 (en) * 2018-04-16 2019-01-22 (주)에스앤씨산업 The Method of Producing of Prestressed Composite Pile that allows for the Control of the Rise by Concrete Separation Installation, the Prestressed Composite Pile and Construction Method using it
KR101988528B1 (en) 2018-06-12 2019-06-13 주식회사 은덕엔지니어링 Self-supporting pile structure using anchor
KR20200116779A (en) * 2019-04-02 2020-10-13 류치곤 Structure and method of preventing leakage of underground wall

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100415809B1 (en) * 2001-09-17 2004-01-24 이순호 precast pile for braced wall and the method using the same
KR100559978B1 (en) 2005-01-12 2006-03-21 허영숙 A pile for cofferdam and cofferdam method using it
JP2007138473A (en) 2005-11-16 2007-06-07 Oriental Construction Co Ltd Earth retaining wall comprising prestressed concrete member
KR100819453B1 (en) 2006-12-28 2008-04-04 (주)스틸엔콘크리트 Method for manufacturing a prestressed concrete composition pile filled with a weight reducing material in concrete section

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102747738A (en) * 2012-07-25 2012-10-24 中国水电顾问集团西北勘测设计研究院 Method for adopting high-pressure grouting steel pipe pile to perform covering layer side slope treatment
CN102912798A (en) * 2012-11-06 2013-02-06 山东兴华建设集团有限公司 Compound soil nail wall foundation pit supporting method
CN104594337A (en) * 2014-12-05 2015-05-06 福州市第三建筑工程公司 Cast-in-place pile provided with tangent surface pile segment and construction method thereof
CN105649011A (en) * 2016-01-12 2016-06-08 深圳市工勘岩土集团有限公司 Forming method for square pile hole
CN110344417A (en) * 2019-07-05 2019-10-18 深圳宏业基岩土科技股份有限公司 With the difunctional foundation pit prefabricated pile supporting construction of support water stop
CN110344417B (en) * 2019-07-05 2021-07-27 深圳宏业基岩土科技股份有限公司 Foundation ditch precast pile supporting construction with strut stagnant water dual function

Also Published As

Publication number Publication date
KR101116045B1 (en) 2012-03-14

Similar Documents

Publication Publication Date Title
KR101116045B1 (en) land-side protection wall and the method for constrcting thereof
KR101696916B1 (en) Construction method of permanent wall with retaining wall combined PHC pile and steel pipe
KR100913569B1 (en) Phc pile for retaining wall
KR101928054B1 (en) Construction method of retaining wall for underground structures with narrow edge space
KR101241566B1 (en) Method for Constructing Cap Beam Combined Wale For Retaining Wall
KR20100068597A (en) A shoring method using arch plate pile and h-pile
KR100927186B1 (en) Method of constructing cantilevered continuous wallsfor retaining earth and cutting off water
KR101612521B1 (en) Method for constructing underground structures restraining transformation and using external wall
KR20160088059A (en) CFT pile Construction Method and the Shoring Method using the same file
KR20180124795A (en) An Earth Retaining Wall with Underground Buttresses and A Method of Constructing the same
KR101065017B1 (en) A shoring method using arch plate pile and H-Pile
KR20050013659A (en) A pile for cofferdam and cofferdam method using it
KR102091646B1 (en) Ground improvement type composite pile construction method
KR20030024130A (en) precast pile for braced wall and the method using the same
KR20090007826A (en) Process of blocking water penetration and blocking earth collapsing by using impermeable wall without strut
KR101021915B1 (en) A method for constructing cut-off temporary structure for sheathing work
KR101078080B1 (en) Earth retaining wall and it&#39;s construction method using the precast pile and ground reinforcement
KR100897397B1 (en) Construction method of earth retaining wall
KR20070109436A (en) Method for constructing micropile
JP5124007B2 (en) Retaining wall construction method
KR101052363B1 (en) Freestanding Digging Method for Deep Excavation
KR20180112453A (en) Soil Retaining Wall using PHC Pile and Construction Method
KR20180091303A (en) Cast in place pile used self-retaining construction method
JP2011157719A (en) Earth retaining method
KR100637899B1 (en) Pier foundation temporarily structure and method for constructing it

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20150203

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20180207

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20190917

Year of fee payment: 8

R401 Registration of restoration
FPAY Annual fee payment

Payment date: 20200205

Year of fee payment: 9