KR20100012272A - Landfill gas exclusion really structure which uses the waste tire chip - Google Patents

Landfill gas exclusion really structure which uses the waste tire chip Download PDF

Info

Publication number
KR20100012272A
KR20100012272A KR1020080073578A KR20080073578A KR20100012272A KR 20100012272 A KR20100012272 A KR 20100012272A KR 1020080073578 A KR1020080073578 A KR 1020080073578A KR 20080073578 A KR20080073578 A KR 20080073578A KR 20100012272 A KR20100012272 A KR 20100012272A
Authority
KR
South Korea
Prior art keywords
gas
waste
well
layer
gas exclusion
Prior art date
Application number
KR1020080073578A
Other languages
Korean (ko)
Other versions
KR101016718B1 (en
Inventor
박봉현
조광식
김성훈
이운길
Original Assignee
주식회사 건화
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 건화 filed Critical 주식회사 건화
Priority to KR1020080073578A priority Critical patent/KR101016718B1/en
Publication of KR20100012272A publication Critical patent/KR20100012272A/en
Application granted granted Critical
Publication of KR101016718B1 publication Critical patent/KR101016718B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
    • B09B1/00Dumping solid waste
    • B09B1/008Subterranean disposal, e.g. in boreholes or subsurface fractures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
    • B09B3/00Destroying solid waste or transforming solid waste into something useful or harmless
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE NOT OTHERWISE PROVIDED FOR
    • B09B5/00Operations not covered by a single other subclass or by a single other group in this subclass
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

PURPOSE: A gas excluding well structure using a waste tire is provided to smoothly exhaust waste gas by filling the well structure with waste tire chips and installing waste tires on the circumferences of a gas excluding well while preventing damage to the bottom of the gas excluding well. CONSTITUTION: A gas excluding well structure using waste tires comprises the following: a water barrier(120) blocks the inflow of leachate inside a ground surface; a subsurface water collecting layer(110) forms the ground surface; a leachate collecting and discharging layer(130) is installed on the top of the water barrier; a leachate collecting and discharging pipe(140); a gas excluding well(160) installed on a concrete bed(150); a guiding member(270) consisting of a plurality of the waste tires; and waste tire chips buffering the load produced by waste(190).

Description

폐타이어를 이용한 가스 배제정 구조{landfill Gas exclusion really structure which uses the waste tire chip}Landfill Gas exclusion really structure which uses the waste tire chip}

본 발명은 폐타이어를 이용한 가스 배제정 구조에 관한 것으로서, 더욱 상세하게는 폐타이어 및 폐타이어칩을 이용하여 매립장 내부에 발생하는 가스를 유도하며 폐기물을 재활용함은 물론, 가스를 원활하게 배기시키고, 기초지반이 연약하거나 매립고가 높아 폐기물 침하시 부마찰력에 대응하여 매립장 저면에 설치된 차수층의 파손을 방지할 수 있는 폐타이어를 이용한 가스 배제정 구조에 관한 것이다.The present invention relates to a gas exclusion well structure using waste tires. More particularly, waste tires and waste tire chips are used to induce gas generated in a landfill and recycle waste, as well as to smoothly discharge gas. In addition, the present invention relates to a gas exclusion well structure using waste tires that can prevent breakage of the order layer installed on the bottom of a landfill in response to the subfriction force at the time of waste sinking due to the weak foundation or the high landfill height.

산업의 발전과 생활수준의 향상으로 폐기물의 발생량이 크게 증가하고 있고 이러한 폐기물을 처리하기 위한 소각 및 퇴비화 등 다양한 기술이 개발되고 있으나 이러한 노력에도 불구하고 많은 양의 잉여 폐기물과 부산물은 최종적으로 매립지에 매립되고 있으며 이러한 경향은 앞으로도 계속될 것으로 전망된다.Although the generation of waste is greatly increased due to the development of the industry and the improvement of living standards, various technologies such as incineration and composting are being developed to treat such waste, but despite such efforts, a large amount of surplus waste and by-products are finally collected in landfills. Landfills are expected and this trend is expected to continue.

현재 가장 많이 이용되고 있는 폐기물처리방법중의 하나인 폐기물을 매립하는 방법은 폐기물 처리가 매우 용이하며 폐기물을 처리하는 비용이 가장 저렴하여 특별한 기술을 필요로 하지 않을 뿐만 아니라 대량의 폐기물을 처리할 수 있다는 장점을 갖고 있기 때문이다.Landfilling, one of the most widely used waste disposal methods, is very easy to dispose of waste and has the lowest cost of waste disposal. This is because it has the advantage.

폐기물을 매립하는 지역에 따라 산간이나 계곡에 매립하는 산간, 계곡 매립지(valley or mountain area), 평평한 평지나 늪지에 웅덩이를 파서 폐기물을 투기하여 매립하는 평지 늪지 매립지(flat or swamp area), 해안에 매립하는 해안매립지(sea shore area)가 있고, 폐기물을 매립하는 방식에 따라 단순 복토식 매립방식과 위생매립방식이 있다.Depending on the landfill area, the mountainous or valley landfill, valley or mountain area, flat or swamp area where dumping is made by dumping waste into flat or flat land, and on the coast. There is a sea shore area to be reclaimed, and there are simple cover type landfills and sanitary landfills depending on the method of landfilling.

단순 복토식 매립방식이란 매립지에 폐기물을 단순 투기하여 가끔 흙으로 폐기물을 복토만하여 매립하는 방식이고, 위생매립방식이란 폐기물을 투기하기 전에 일정한 장소에 웅덩이를 파고, 그 웅덩이의 하부 표면에 폐기물로부터 방출되는 침출수의 지하침투를 막기 위한 토양을 다진 차수재(점토와 광물의 혼합물)와 차수막으로 이루어진 차수층으로 인하여 원지반으로 스며들지 못하고 차수층의 상부에 고인 침출수를 처리하는 시설, 복토 및 발생가스의 처리시설 등을 설치하는 매립방식을 말한다.A simple cover type landfill method is a method of dumping waste into a landfill by simply dumping the waste with soil, and a sanitary landfill method digs a puddle at a certain place before dumping the waste and removes waste from the waste surface on the lower surface of the puddle. A facility that treats the leachate accumulated in the soil and prevents the soil from being penetrated into the ground due to the ordered layer consisting of chopped soil (mixture of clay and minerals) and the membrane to prevent underground penetration of the leachate discharged. The landfill method of installing facilities.

이하에서는 첨부도면을 참조하여 종래의 위생매립방식을 설명하기로 한다.Hereinafter, with reference to the accompanying drawings will be described a conventional sanitary buried method.

도 1은 종래의 매립지를 나타낸 단면도이고, 도 2는 종래의 매립지에 침하가 발생하여 차수층이 파괴된 상태를 나타낸 단면도이다.1 is a cross-sectional view showing a conventional landfill, Figure 2 is a cross-sectional view showing a state in which the settlement layer is destroyed due to settlement of the conventional landfill.

여기에서 참조되는 바와 같이 폐기물을 매립하기 위한 공간이 형성되게 매립지를 조성 한 후 매립지 내부의 원지반(100)에 발생되는 지하수를 배수시키기 위한 지하수 집배수층(110)을 형성하되, 상기 지하수 집배수층(110)에는 지하수를 원활하게 배수시키기 위한 쇄석(101)을 충입하는 것이다.As described herein, after forming the landfill to form a space for landfill, there is formed a groundwater drainage layer 110 for draining the groundwater generated in the base 100 within the landfill, wherein the groundwater drainage layer ( 110 is to charge the crushed stone 101 for smoothly draining groundwater.

또한, 폐기물에서 발생되는 침출수가 원지반(100)으로 유입되는 것을 방지하 기 위한 차수층(120)이 형성되어 있되, 상기 지하수 집배수층(110)의 상부에 형성된 차수층(120)은 점토와 광물의 혼합물이 다져진 차수재(121)와, 그 차수재(121)의 표면에 설치된 차수시트(122)로 이루어져 있고, 매립지의 측면에 형성된 차수층(120)은 토목합성수지 라이너(123)와, 차수시트(122)로 이루어져 있다.In addition, the order layer 120 is formed to prevent the leachate generated from the waste flow into the base 100, the order layer 120 formed on the groundwater drainage layer 110 is a mixture of clay and minerals The compacted order member 121, and the order sheet 122 provided on the surface of the order member 121, and the order layer 120 formed on the side of the landfill are composed of a civil engineering resin liner 123 and an order sheet 122 )

한편, 지하수 집배수층(110)의 상부에 형성된 차수층(120)의 표면에는 침출수 집배수층(130)이 형성되어 있되, 그 침출수 집배수층(130)에는 쇄석(131)이 충입되는 것이고, 상기 쇄석(131)의 내부에는 침출수 집배수관(140)이 부설되어 있으며, 상기 침출수 집배수관(140)은 표면에 통공이 형성된 유공관으로 이루어져 있다.On the other hand, the leachate drainage layer 130 is formed on the surface of the order layer 120 formed on the groundwater drainage layer 110, the leachate 129 is filled with crushed stone (131), the crushed stone ( Inside the 131, a leachate drainage pipe 140 is installed, and the leachate drainage pipe 140 is formed of a perforated tube having a through-hole formed on its surface.

그리고, 상기 차수시트(122)의 상면 선택된 곳에는 콘크리트 구조물인 콘크리트 베드(150)가 설치되어 있고, 그 콘크리트 베드(150)의 상부에는 가스 배제정(160)이 설치되어 있으며, 상기 가스 배제정(160)은 표면에 통공이 형성된 유공관으로 이루어져 있다.In addition, a concrete bed 150, which is a concrete structure, is installed on the selected surface of the order sheet 122, and a gas exclusion well 160 is installed on an upper portion of the concrete bed 150. 160 is composed of a hole formed on the surface of the through-holes.

상기 가스 배제정(160)은 수직하게 설치되어 있다.The gas exclusion well 160 is installed vertically.

이러한 상태에서 각종 폐기물(190)을 매립지의 내부에 매립하는 것이고, 상기 폐기물(190)을 일정량 매립한 후 그 상부에 복토층(200)을 형성하고, 상기 복토층(200)의 상부에 또 다른 폐기물(190)을 매립하는 것이다.In this state, the various wastes 190 are embedded in the landfill, and after the waste 190 is buried in a predetermined amount, a cover layer 200 is formed thereon, and another waste (top) of the cover layer 200 is formed. 190) to reclaim.

즉, 폐기물(190)과 복토층(200)이 연속적으로 반복되게 폐기물(190)을 매립하는 것이다.That is, the waste 190 is buried so that the waste 190 and the cover layer 200 are continuously repeated.

이와 같이 매립된 폐기물(190)에서는 가스와 침출수가 발생되고, 이때 발생 되는 침출수는 가스 배제정(160)에 형성된 통공을 통하여 내부로 유입된 후 내측 하부에서 침출수 집배수관(140)을 통하여 배수된다.The landfilled waste 190 generates gas and leachate, and the leachate generated at this time is introduced into the through-hole formed in the gas exclusion well 160 and then drained through the leachate drainage pipe 140 at the inner bottom. .

또한, 가스 배제정(160)의 내부에 유입된 가스는 그 가스 배제정(160)에 안내를 받으면서 상부로 배기되거나, 간이소각기(161)에 의해 소각된다.In addition, the gas introduced into the gas exclusion well 160 is exhausted to the top while being guided by the gas exclusion well 160, or incinerated by the simple incinerator 161.

한편, 폐기물(190)을 매립한 후 기간이 경과되면, 폐기물(190)에 침하가 발생하게 되며, 이러한 침하는 가스 배제정(160)의 주변에 부 마찰력으로 인한 하중이 집중적으로 발생된다.On the other hand, when a period of time after the landfill of the waste 190, the settlement occurs in the waste 190, the load is caused by the negative friction force intensively around the gas exclusion well 160.

종래에는 폐기물(190)의 침하 발생시 폐기물(190)의 하중을 완충할 수 있는 어떠한 수단도 강구되지 않았으므로 가스 배제정(160) 주변의 부 마찰력으로 인한 집중하중은 상기 가스 배제정(160) 하부의 차수층(120)으로 전달되어 도 2에 나타낸 바와 같이 침하된 폐기물(190)에 의하여 차수층(120)이 파손되는 문제점이 있었다.Conventionally, since no means for buffering the load of the waste 190 has been devised when the settlement of the waste 190 occurs, the concentrated load due to the negative frictional force around the gas exclusion well 160 is lower than the gas exclusion well 160. There is a problem that the order layer 120 is damaged by the waste 190 that is transferred to the order layer 120 of the settled as shown in FIG.

상술한 바와 같이 차수층(120)이 파손되면, 폐기물(190)에서 발생되는 침출수가 파손된 차수층(120)을 통하여 주변지역으로 유입되거나 주변 지반으로 유출되며, 이러한 침출수로 인하여 주변토양 및 지하수가 오염되는 등의 문제점이 있었다.As described above, when the order layer 120 is broken, the leachate generated from the waste 190 flows into the surrounding area or flows into the surrounding ground through the damaged order layer 120, and the surrounding soil and groundwater are contaminated by the leachate. There was a problem such as being.

한편, 가스의 원활한 배제를 위하여 가스 배제정(160)의 둘레에 돌망태 (170)등 을 설치하고, 돌망태(170)와 가스 배제정(160)의 사이에 쇄석(180)이 충입하고 있다.On the other hand, the gabions 170 and the like are installed around the gas exclusion well 160 to smoothly remove the gas, and the crushed stone 180 is filled between the gabions 170 and the gas exclusion well 160.

이때에는 가스 배제정(160)의 둘레에 충입하기 위한 쇄석의 채취 및 파쇄를 위한 비용이 증가하는 문제점이 있었다.At this time, there was a problem in that the cost for collecting and crushing the crushed stone to fill the circumference of the gas exclusion well 160 increases.

또한, 쇄석을 이용할 경우에도 폐기물(190)의 침하시 가스 배제정(160)으로 전달되는 하중을 완충하지 못하여 차수층(120)의 파손을 방지하지 못하는 문제점이 있었다.In addition, there is a problem in that even when using the crushed stone does not buffer the load delivered to the gas exclusion well 160 when the waste 190 is settled, it may not prevent the breakage of the order layer 120.

본 발명은 상기한 문제점을 해결하기 위한 것으로서, 그 목적은 연결끈을 매개로 연결된 복수개의 폐타이어를 가스 배제정의 둘레에 설치하고, 가스 배제정 및 페타이어의 사이에 폐타이어 칩을 충입하여 폐기물에서 발생되는 가스를 가스 배제정으로 원활하게 유도하고, 폐기물 침하시 가스 배제정으로 전달되는 하중을 완충함은 물론, 폐타이어를 재 활용하게 되므로 비용을 절감하고, 환경오염을 최소화 할 수 있는 폐타이어를 이용한 가스 배제정구조를 제공함에 있다.The present invention is to solve the above problems, the object is to install a plurality of waste tires connected through a connecting strap around the gas exclusion well, and fill the waste tire chip between the gas exclusion well and the pet tire waste To smoothly guide the gas generated from the gas to the gas exclusion well, buffer the load transferred to the gas exclusion well when the waste is settled, and recycle the waste tires, thereby reducing costs and minimizing environmental pollution. It is to provide a gas exclusion well structure using a tire.

상기 목적을 달성하기 위한 본 발명의 특징적인 구성을 설명하면 다음과 같다.Referring to the characteristic configuration of the present invention for achieving the above object is as follows.

본 발명에 따른 폐타이어를 이용한 가스 배제정구조는 폐기물이 매립되는 매립지의 원지반에 형성된 지하수 집배수층; 상기 원지반의 내부로 침출수가 유입되는 것을 차단하도록 원지반의 표면에 설치된 차수층; 상기 차수층의 상면에 설치된 가스 집배수층; 상기 가스 집배수층에 내장되고 표면에 무수히 많은 통공을 갖는 유공관으로 이루어진 가스 집배수관; 상기 차수층의 상부에 타설된 콘크리트 베드 에 수직하게 설치되고, 표면에는 무수히 많은 통공을 갖는 유공관으로 이루어진 가스 배제정; 상기 가스 배제정의 외측 둘레면과 분리되게 설치되고, 표면에는 기공이 형성되며, 연결끈을 매개로 연결된 복수개의 폐타이어로 이루어진 유도부재; 상기 폐기물 침하시 발생되는 하중을 완충하도록 유도부재와 가스 배제정의 사이에 충입되는 폐타이어칩을 포함하여서 된 것이다.Gas exclusion well structure using the waste tire according to the present invention is groundwater drainage layer formed on the base of the landfill where the waste is embedded; An order layer disposed on the surface of the base to block the inflow of leachate into the base; A gas collecting and draining layer disposed on an upper surface of the order layer; A gas drainage pipe formed in the gas drainage layer and formed of a hole tube having a myriad of holes on the surface thereof; A gas exclusion well installed perpendicular to the concrete bed placed on the upper part of the order layer and formed of a hole tube having a myriad of holes in the surface thereof; An induction member, which is installed to be separated from an outer circumferential surface of the gas exclusion tablet and has pores formed on a surface thereof, the plurality of waste tires connected via a connection string; It includes a waste tire chip filled between the guide member and the gas exclusion well to buffer the load generated during the waste settlement.

또한, 가스 배제정 상부에 가스 헤더관과 간이 소각기를 설치하여 대기로 방출되는 매립가스를 소각하여 처리한다,In addition, a gas header tube and a simple incinerator are installed on the upper part of the gas exclusion well to incinerate and treat the landfill gas discharged to the atmosphere.

본 발명은 가스 배제정 둘레에 폐타이어가 설치됨과 동시에 폐타이어 칩이 충입되어 있으므로 가스 배제정 둘레에 모아진 가스를 원활하게 배기시킬 수 있는 특유의 효과가 있다.The present invention has a unique effect of smoothly exhausting the gas collected around the gas removal well because the waste tire is filled around the gas removal well and the waste tire chip is filled.

또한 본 발명은 가스 배제정 둘레에 폐타이어를 설치하고 폐타이어 칩을 충입하게 되므로 폐기물을 재활용하여 환경파괴를 방지함은 물론, 폐기물 침하시 가스 배제정으로 전달되는 하중을 완충하여 가스 배제정 하부의 차수층 파손을 미연에 방지되는 특유의 효과가 있다.In addition, the present invention installs the waste tires around the gas exclusion well and fills the waste tire chips, thereby recycling the waste to prevent environmental destruction, and buffering the load delivered to the gas exclusion well when the waste is settled. There is a distinctive effect of preventing the damage of the order layer in advance.

본 발명을 나타낸 첨부도면을 참조하여 설명하면 다음과 같다.When described with reference to the accompanying drawings showing the present invention.

도 3 및 도 4는 본 발명에 따른 가스 배제정이 설치된 매립지를 나타낸 단면도이고, 도 5는 본 발명에 따른 가스 유도부재를 나타낸 사시도이며, 도 6은 본 발명에 따른 가스 배수구조용 가이드의 다른 실시예를 나타낸 사시도이고, 도 7은 본 발명에 따른 가스 배수구조의 가스 유도부재를 나타낸 단면도이며, 도 8은 본 발명에 따른 가스 헤더관 및 간이 소각기를 나타낸 사시도이다.3 and 4 is a cross-sectional view showing a landfill is installed gas exclusion well according to the invention, Figure 5 is a perspective view showing a gas guide member according to the present invention, Figure 6 is another embodiment of a guide for gas drainage structure according to the present invention 7 is a cross-sectional view showing a gas guide member of the gas drainage structure according to the present invention, Figure 8 is a perspective view showing a gas header tube and a simple incinerator according to the present invention.

여기에서 참조 되는 바와 같이 본 발명은 폐기물을 매립하기 위한 공간이 형성되게 매립지를 조성하기 위해 매립지 내부의 원지반(100)에 발생되는 지하수를 배수시키기 위한 지하수 집배수층(110)을 형성하는 것이며, 상기 지하수 집배수층(110)에는 지하수가 원활하게 배수되게 하기 위해, 쇄석(101)을 충입한다.As referred to herein, the present invention is to form a groundwater collecting and draining layer 110 for draining the groundwater generated in the base 100 inside the landfill to form a landfill to form a space for landfill, The groundwater collecting and draining layer 110 is filled with crushed stone 101 in order to smoothly drain the groundwater.

또한, 폐기물에서 발생되는 침출수가 원지반(100)으로 유입되는 것을 방지하기 위하여 차수층(120)을 형성하되, 차수층(120)은 점토와 광물의 혼합물이 다져진 차수재(121)와, 그 차수재(121)의 표면에 설치된 차수시트(122)로 이루어져 있고, 매립지의 측면에 형성된 차수층(120)은 토목합성수지 라이너(123)와, 차수시트(122)로 이루어져 있다.In addition, in order to prevent the leachate generated from the waste inflow into the base 100, the order layer 120 is formed, the order layer 120 is the order member 121 is a mixture of clay and minerals, and the order member ( The order sheet 122 is formed on the surface of the 121, the order layer 120 formed on the side of the landfill is composed of a civil engineering resin liner 123, and the order sheet 122.

그리고, 차수층(120)의 표면에는 침출수 집배수층(130)을 형성하되, 그 침출수 집배수층(130)에는 쇄석(131)이 충입되는 것이고, 상기 쇄석(131)의 내부에는 침출수 집배수관(140)을 내장하는 것이며, 상기 침출수 집배수관(140)은 표면에 통공이 형성된 유공관으로 이루어져 있다.And, the leachate drainage layer 130 is formed on the surface of the order layer 120, the leachate drainage layer 130 is filled with crushed stone 131, the leachate drainage pipe 140 inside the crushed stone 131. The built-in, the leachate drainage pipe 140 is made of a hole formed on the surface of the through-holes.

한편, 상기 차수시트(122)의 상면 선택된 곳에는 콘크리트 구조물인 콘크리트 베드(150)를 설치하고, 그 콘크리트 베드(150)의 상부에는 가스 배제정(160)을 설치하는 것이며, 상기 가스 배제정(160)은 표면에 통공이 형성된 유공관으로 이루어져 있다On the other hand, the upper surface of the order sheet 122 is to install a concrete bed 150 of a concrete structure, the gas exclusion well 160 is installed on the upper portion of the concrete bed 150, the gas exclusion well ( 160 consists of a perforated tube with a hole formed on the surface

그리고, 가스 배제정(160)의 둘레에는 가스 유도부재(270)를 설치하는 것이 며, 상기 가스 유도부재(270)는 표면에 기공(272)이 형성된 복수개의 폐타이어(271)로 이루어져 있고, 상기 폐타이어(271)는 연결끈(273)을 매개로 연결되어 있다.In addition, a gas guide member 270 is installed around the gas exclusion well 160, and the gas guide member 270 includes a plurality of waste tires 271 having pores 272 formed on a surface thereof. The waste tires 271 are connected to each other via a connection string 273.

한편, 상기 유도부재(270)를 연속적으로 적층할 때 복수개의 유도부재(270)가 어긋나지 않고 수직한 상태로 적층될 수 있도록 지지하기 위하여 유도부재(270)의 상부 외측 둘레면에 복수개의 가이드(274)를 설치하는 것이 바람직하다.On the other hand, the plurality of guides on the upper outer peripheral surface of the guide member 270 to support the plurality of guide member 270 to be stacked in a vertical state without shifting when the guide member 270 is continuously stacked ( 274 is preferred.

이와 같이 가이드(274)를 설치할 경우에는 상기 가이드(274)의 상단에 견인홈(274a)을 형성하는 것도 가능하다.When the guide 274 is installed in this way, it is also possible to form a traction groove 274a at the upper end of the guide 274.

또한, 상기 유도부재(270)와 가스 배제정(160)의 사이에는 폐타이어 칩(280)을 충입하는 것이다.In addition, the waste tire chip 280 is filled between the induction member 270 and the gas exclusion well 160.

이러한 상태에서 각종 폐기물(190)을 매립지의 내부에 매립하는 것이고, 상기 폐기물(190)을 일정량 매립한 후 그 상부에 복토층(200)을 형성하고, 상기 복토층(200)의 상부에 또 다른 폐기물(190)을 매립하는 것이다.In this state, the various wastes 190 are embedded in the landfill, and after the waste 190 is buried in a predetermined amount, a cover layer 200 is formed thereon, and another waste (top) of the cover layer 200 is formed. 190) to reclaim.

한편, 상기 폐기물(190)에서 발생되는 가스를 효과적을 포집하기 위하여 폐기물(190)과 복토층(200)의 사이에 수평 배제정(290)을 설치하는 것도 가능하며, 그 수평 배제정(290)은 다공성 매질(잡석, 건설폐기물, 유공관등)로 형성하는 것이고, 일측 단부는 유도부재(270)에 삽입하거나 근접되게 설치하는 것이다.On the other hand, in order to effectively collect the gas generated in the waste 190, it is also possible to install a horizontal exclusion well 290 between the waste 190 and the cover layer 200, the horizontal exclusion well 290 It is formed of a porous medium (rubble, construction waste, perforated pipe, etc.), one end is to be inserted into or close to the guide member 270.

즉, 폐기물(190)과 복토층(200)이 연속적으로 반복되게 폐기물(190)을 매립하는 것이다.That is, the waste 190 is buried so that the waste 190 and the cover layer 200 are continuously repeated.

한편, 상기 가스 배제정(160)은 매립지의 깊이와 동일한 길이로 형성할 수도 있지만, 폐기물(190)을 충입하여 가스 배제정(160) 상부의 노출량이 감소될 때 또 다른 가스 배제정(160)을 연결 하는 것도 가능하며, 이때에는 가스 배제정(160)을 융착 등의 방법으로 연결하거나, 단부가 확장되게 형성된 흄관을 사용하는 것도 가능하다.Meanwhile, the gas exclusion well 160 may be formed to have the same length as the depth of the landfill, but when the exposure amount of the upper portion of the gas exclusion well 160 is reduced by filling the waste 190, another gas exclusion well 160 may be formed. It is also possible to connect, and in this case, it is possible to connect the gas exclusion well 160 by fusion or the like, or to use a fume tube formed to extend the end.

상기 폐기물(190) 또는 복토층(200)이 가스 유도부재(270)의 상부에 근접하면, 또 다른 가스 유도부재(270)를 설치한 후 가스 유도부재(270)와 가스 배제정(160)의 사이의 공간에 또 다른 폐타이어칩(280)을 충입하는 것이며, 폐기물(190)의 매립 및 복토층(200)의 형성을 연속적으로 수행하는 것이다.When the waste 190 or the cover layer 200 is close to the upper portion of the gas guide member 270, after installing another gas guide member 270 between the gas guide member 270 and the gas exclusion well 160 Another waste tire chip 280 is filled in the space of the waste, and the waste 190 is buried and the formation of the cover layer 200 is continuously performed.

이와 같이 매립된 폐기물(190)에서는 가스가 발생되고, 그 가스는 유도부재(270)에 형성된 기공(272)으로 유입된 후 폐타이어칩(280) 사이를 통과하고 가스 배제정(160)에 형성된 통공을 통하여 가스 배제정(160)의 상부로 배기되거나, 가스 배제정(160) 및 유도부재(270)를 수용하도록 설치된 가스 헤더관(162)에 포집된 후 간이 소각기(161)에서 소각하여 처리된다.The gas is generated in the waste 190 buried in this way, the gas flows into the pores 272 formed in the induction member 270, passes through the waste tire chips 280, and is formed in the gas exclusion well 160. The gas is discharged to the upper portion of the gas exclusion well 160 through the through hole or collected in the gas header tube 162 installed to accommodate the gas exclusion well 160 and the guide member 270 and then incinerated by the simple incinerator 161. do.

또는, 가스 배제정(160)의 상부로 배기되는 가스는 별도의 집수정(도면 미도시)에 모아지는 것이다.Alternatively, the gas exhausted to the upper portion of the gas exclusion well 160 is collected in a separate collecting well (not shown).

한편, 폐기물(190)을 매립한 후 기간이 경과되면, 폐기물(190)에 침하가 발생하게 되며, 이러한 침하는 가스 배제정(160)의 주변에 부 마찰력으로 인한 하중이 집중적으로 발생된다.On the other hand, when a period of time after the landfill of the waste 190, the settlement occurs in the waste 190, the load is caused by the negative friction force intensively around the gas exclusion well 160.

이와 같이 폐기물(190)의 침하 발생시 폐기물(190)에 의해서 가스 배제정(160) 주변의 부 마찰력으로 인한 집중하중은 상기 가스 배제정(160)의 둘레에 설치된 유도부재(270) 및 그 유도부재(270)와 가스 배제정(160)의 사이에 충입된 폐타이어칩(280)에 의해서 완충되므로 도 4에 나타낸 바와 같이 침하된 폐기물(190)에 의하여 차수층(120)이 파손되는 것이 방지된다.As such, when the settlement of the waste 190 occurs, the concentrated load due to the negative frictional force around the gas exclusion well 160 by the waste 190 is induced in the circumference of the gas exclusion well 160. Since it is buffered by the waste tire chip 280 filled between the 270 and the gas exclusion well 160, the order layer 120 is prevented from being damaged by the settled waste 190 as shown in FIG. 4.

또한, 유도부재(270)에 형성된 기공(272)은 슬릿 형상으로 형성되어 있으므로, 폐기물(190)은 차단되고 가스는 이동되어 폐기물이 폐타이어칩(280) 사이의 공간으로 유입되는 것이 차단되어 가스를 원활하게 배기시키게 되는 것이다.In addition, since the pores 272 formed in the induction member 270 is formed in a slit shape, the waste 190 is blocked and the gas is moved to block the inflow of the waste into the space between the waste tire chips 280. Will be exhausted smoothly.

도 1은 종래의 매립지를 나타낸 단면도.1 is a cross-sectional view showing a conventional landfill.

도 2는 종래의 매립지에 침하가 발생된 상태를 나타낸 단면도.2 is a cross-sectional view showing a state in which settlement occurs in a conventional landfill.

도 3 및 도 4는 본 발명에 따른 가스 배수구조가 설치된 매립지를 나타낸 단면도.3 and 4 are cross-sectional views showing a landfill installed gas drainage structure according to the present invention.

도 5는 본 발명에 따른 가스 배수구조의 가스 유도부재를 나타낸 사시도.5 is a perspective view showing a gas guide member of the gas drainage structure according to the present invention.

도 6은 본 발명에 따른 가스 배수구조용 가이드의 다른 실시예를 나타낸 사시도.Figure 6 is a perspective view showing another embodiment of the gas drainage structure guide according to the present invention.

도 7은 본 발명에 따른 가스 배수구조의 가스 유도부재를 나타낸 단면도.7 is a cross-sectional view showing a gas guide member of the gas drainage structure according to the present invention.

도 8은 본 발명에 따른 가스 헤더관 및 간이 소각기를 나타낸 사시도이다.8 is a perspective view showing a gas header tube and a simple incinerator according to the present invention.

*도면의 주요부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

100 : 원지반 110 : 지하수 집배수층100: base ground 110: groundwater collection and drainage layer

120 : 차수층 130 : 침출수 집배수층120: order layer 130: leachate collection layer

140 : 침출수 집배수관 150 : 콘크리트 베드140: leachate collection pipe 150: concrete bed

160 : 가스 배제정 161 : 간이 소각기160: gas exclusion well 161: simple incinerator

162 : 가스 헤더관 190 : 폐기물162 gas header tube 190 waste

270 : 유도부재 271 : 폐타이어270: guide member 271: waste tire

272 : 기공 273 : 연결끈272: pore 273: connecting string

274 : 가이드 280 : 폐타이어칩274 Guide 280: Waste tire chip

290 : 수평 배제정290 horizontal exclusion tablet

Claims (4)

폐기물(190)이 매립되는 매립지의 원지반(100)에 형성된 지하수 집배수층(110);A groundwater collecting and draining layer 110 formed in the base 100 of the landfill in which the waste 190 is buried; 상기 원지반(100)의 내부로 침출수가 유입되는 것을 차단하도록 원지반(100)의 표면에 설치된 차수층(120);An order layer 120 installed on the surface of the base 100 to block the inflow of leachate into the base 100; 상기 차수층(120)의 상면에 설치된 침출수 집배수층(130);A leachate drainage layer 130 disposed on an upper surface of the order layer 120; 상기 침출수 집배수층(130)에 내장되고 표면에 무수히 많은 통공을 갖는 유공관으로 이루어진 침출수 집배수관(140);A leachate drainage pipe 140 made of a perforated pipe embedded in the leachate drainage layer 130 and having a myriad of holes on its surface; 상기 차수층(120)의 상부에 타설된 콘크리트 베드(150)에 수직하게 설치되고, 표면에는 무수히 많은 통공을 갖는 유공관으로 이루어진 가스 배제정(160);A gas exclusion well 160 installed vertically on the concrete bed 150 placed on the upper portion of the order layer 120 and formed of a hole tube having a myriad of holes in the surface thereof; 상기 가스 배제정(160)의 외측 둘레면과 분리되게 설치되고, 표면에는 기공(272)이 형성되며, 연결끈(273)을 매개로 연결된 복수개의 폐타이어(271)와 상부 외측 둘레면에는 적어도 3개 이상 복수개의 가이드(274)가 설치된 유도부재(270);It is installed to be separated from the outer peripheral surface of the gas exclusion well 160, the surface is formed with pores 272, a plurality of waste tires 271 and at least on the upper outer peripheral surface connected via a connecting string 273. An induction member 270 having three or more guides 274 installed therein; 상기 폐기물(190) 침하시 발생되는 하중을 완충하도록 유도부재(270)와 가스 배제정(160)의 사이에 충입되는 폐타이어칩(280)을 포함함을 특징으로 하는 폐타이어를 이용한 가스 배제정 구조.Gas exclusion well using the waste tire, characterized in that it comprises a waste tire chip 280 filled between the guide member 270 and the gas exclusion well 160 to buffer the load generated when the waste 190 is settled rescue. 청구항 1에 있어서, 상기 기공(272)은 폐기물이 유입되는 것을 차단하는 슬릿 형상으로 형성됨을 특징으로 하는 폐타이어를 이용한 가스 배제정 구조.The method of claim 1, wherein the pores 272 is a gas exclusion well structure using waste tires, characterized in that formed in a slit shape to block the inflow of waste. 청구항 1에 있어서, 상기 유도부재(270)의 측면에는 폐기물에서 발생되는 가스를 포집하기 위하여 적어도 2개 이상 복수개의 수평 배제정(290)이 더 설치됨을 특징으로 하는 폐타이어를 이용한 가스 배제정 구조.The gas exclusion well structure of claim 1, wherein at least two or more horizontal exclusion wells 290 are further disposed on side surfaces of the induction member 270 to collect gas generated from the waste. . 청구항 1에 있어서, 상기 가스 배제정(160)을 통하여 배제되는 가스를 포집하도록 가스 배제정(160) 및 유도부재(170)의 상단에 설치된 가스 헤더관(162)과, 상기 가스 헤더관(162)에 포집된 가스를 소각시키도록 가스 헤더관(162)의 상부에 설치된 간이 소각기(161)를 더 포함함을 특징으로 하는 폐타이어를 이용한 가스 배제정 구조.The gas header tube 162 and the gas header tube 162 provided at an upper end of the gas exclusion well 160 and the induction member 170 to collect gas that is excluded through the gas exclusion well 160. And a simple incinerator 161 installed on the upper part of the gas header tube 162 to incinerate the gas collected in the above.
KR1020080073578A 2008-07-28 2008-07-28 landfill Gas exclusion really structure which uses the waste tire chip KR101016718B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080073578A KR101016718B1 (en) 2008-07-28 2008-07-28 landfill Gas exclusion really structure which uses the waste tire chip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080073578A KR101016718B1 (en) 2008-07-28 2008-07-28 landfill Gas exclusion really structure which uses the waste tire chip

Publications (2)

Publication Number Publication Date
KR20100012272A true KR20100012272A (en) 2010-02-08
KR101016718B1 KR101016718B1 (en) 2011-02-25

Family

ID=42086520

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080073578A KR101016718B1 (en) 2008-07-28 2008-07-28 landfill Gas exclusion really structure which uses the waste tire chip

Country Status (1)

Country Link
KR (1) KR101016718B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102400473A (en) * 2011-08-08 2012-04-04 南京大学 Construction method for gas suction vertical shaft of waste landfill gas and collection device
CN108149715A (en) * 2017-04-20 2018-06-12 北京昊海天际科技有限公司 A kind of garbage loading embeading heap body percolate and landfill gas discharge method
CN112681395A (en) * 2020-12-23 2021-04-20 武汉市园林建筑工程公司 Refuse landfill with seepage-proofing function
CN114031256A (en) * 2021-11-22 2022-02-11 湘潭大学 Sludge-water separation system for sludge landfill and construction method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103157641B (en) * 2013-02-26 2015-03-18 上海市环境工程设计科学研究院有限公司 Automatic rolling type non-point source pollution gas gathering device and application thereof

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06262157A (en) * 1993-03-10 1994-09-20 Hazama Gumi Ltd Water shielding structure for waste treatment plant
KR100329938B1 (en) * 1998-06-26 2002-11-22 이영상 Burning device for burning toxic gas in waste burying place
KR200246044Y1 (en) * 2001-06-20 2001-10-17 주식회사 그린랜드환경 Gas nozzle for sanitary landfill

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102400473A (en) * 2011-08-08 2012-04-04 南京大学 Construction method for gas suction vertical shaft of waste landfill gas and collection device
CN102400473B (en) * 2011-08-08 2014-02-26 南京大学 Construction method for gas suction vertical shaft of waste landfill gas and collection device
CN108149715A (en) * 2017-04-20 2018-06-12 北京昊海天际科技有限公司 A kind of garbage loading embeading heap body percolate and landfill gas discharge method
CN112681395A (en) * 2020-12-23 2021-04-20 武汉市园林建筑工程公司 Refuse landfill with seepage-proofing function
CN114031256A (en) * 2021-11-22 2022-02-11 湘潭大学 Sludge-water separation system for sludge landfill and construction method thereof

Also Published As

Publication number Publication date
KR101016718B1 (en) 2011-02-25

Similar Documents

Publication Publication Date Title
US5857807A (en) Municipal solid waste landfill system
CN1108883C (en) System and method for containing leachate using submerged counterflow sink
US8961073B2 (en) System and method for strengthening a sloped structure such as a berm, basin, levee, embankment, or the like
KR101016718B1 (en) landfill Gas exclusion really structure which uses the waste tire chip
CA2509740C (en) Multi-planar gas recovery bioreactor
CA2568491C (en) Landfill including highly permeable zones
KR20100012273A (en) Leachate draining structure of landfill which uses the waste tire chip
KR100558152B1 (en) Reclaimed land system of waste matters for promoting aerotropic fermentation
KR100459077B1 (en) A Method for construction of Waste landfills
CN209810895U (en) Horizontal drainage guide system of refuse landfill
CN218233688U (en) Leachate collecting system of ash slag backfilling open pit
RU2431530C1 (en) Method to reconstruct dump with its conversion into solid waste landfill
JP2500690B2 (en) Waste disposal structure and waste disposal method
KR100218901B1 (en) Construction method of filled-up-land
RU2235610C1 (en) Method of storing solid and water-saturated waste
KR0161639B1 (en) Method of tire bed for hygienic reclaimed land of waste with waste tires
JP2004237256A (en) Pit structure
CN110303022A (en) A kind of consumer waste filling and embedding system and method for impermeable pollution
KR101577187B1 (en) Water and sewage pipelines to prevent subsidence structure
US5820298A (en) Seamless landfill sump
CN210857298U (en) Water seepage prevention structure of refuse landfill
KR101057443B1 (en) Vertical drain pile containing reactive column for soft ground improvement of dredged soil field and soft ground improvement method using the same
Břenek et al. Decontamination of a waste dumpside of sp DIAMO.
JP2005270946A (en) Land-fill structure of final waste disposal ground
RU2294245C1 (en) Method of the environmental protection against pollution by the domestic and industrial wastes

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20140207

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20150130

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20160126

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20170203

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20180206

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20190129

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20200121

Year of fee payment: 10