KR20090117608A - Supporting apparatus having in between two belts and constructing method thereof - Google Patents
Supporting apparatus having in between two belts and constructing method thereof Download PDFInfo
- Publication number
- KR20090117608A KR20090117608A KR1020090025086A KR20090025086A KR20090117608A KR 20090117608 A KR20090117608 A KR 20090117608A KR 1020090025086 A KR1020090025086 A KR 1020090025086A KR 20090025086 A KR20090025086 A KR 20090025086A KR 20090117608 A KR20090117608 A KR 20090117608A
- Authority
- KR
- South Korea
- Prior art keywords
- plate
- support
- fixing
- anchor
- hole
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/06—Foundation trenches ditches or narrow shafts
- E02D17/08—Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2220/00—Temporary installations or constructions
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0061—Production methods for working underwater
- E02D2250/0069—Welding
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0026—Metals
- E02D2300/0029—Steel; Iron
- E02D2300/0034—Steel; Iron in wire form
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2600/00—Miscellaneous
- E02D2600/20—Miscellaneous comprising details of connection between elements
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
본 발명은 발명특허출원 제10-2008-0042639호의 분할출원으로, 보다 상세하게는 흙막이 벽체를 지지하는 띠장 및 앵커지지체를 구성시에 띠장 사이로 내설되는 앵커지지체 및 이를 이용한 설치방법에 관한 것이다.The present invention relates to a divided application of the invention patent application No. 10-2008-0042639, and more particularly, to an anchor support which is built between the strips when constructing a strip and an anchor support for supporting the earth wall and an installation method using the same.
본 발명의 특징은, 수평파일이 위. 아래 2단으로 구조되는 띠장과 띠장 사이에 끼워진 형태가 되어 일체가 되게 앵커지지체를 결합할 수 있도록 고정부재와 고정브라켓으로 이러우진 앵커지지체를 구성하여 각 띠장의 상면과 저면으로 고정부재를 장착하고, 상기 고정부재로 고정브라켓을 정착시켜 고정부재가 띠장을 지지함과 동시에 고정브라켓을 지지하게 되는 설치방법을 통하여 흙막이 벽체와 벽체를 지지하게 되는 지지체간의 간격을 최소화하는 것에 특징이 있다.Characteristic of the present invention, the horizontal pile is above. The anchor member is composed of the fixing member and the fixing bracket so that the anchor supporting member can be combined to be united by being inserted between the belt and the string member which are structured in the lower stage. By fixing the fixing bracket with the fixing member, the fixing member supports the belt and at the same time minimizes the distance between the retaining wall and the support for supporting the wall.
일반적으로, 토목공사시 지면을 굴착하는 작업을 할 경우, 굴착된 부분의 경계면으로 형성된 지반의 흙이 굴착된 부분으로 유입되거나, 무너지는 것을 방지하기 위해 굴착된 지면에 가설 흙막이 벽체(일명 : 토류벽)를 시공하여, 토사의 무너짐을 보완하도록 하고 있다.In general, in the case of excavation of the ground during civil engineering work, temporary soil wall on the excavated ground to prevent soil from entering or digging into the excavated portion formed as the boundary of the excavated portion (aka: earth wall Construction to compensate for the collapse of the soil.
상기 가설 흙막이 벽체는 다양한 방법에 의해 실시되고 있으나, 보편적으로는 H형 파일들을 일정 거리로 지반에 타설하고 H형 파일의 사이에 목재 토류판을 적층하여 설치함으로서 토류벽을 형성하고, 토류벽체가 시공이 되고나면 토류벽체 전체에 일률적인 토압을 받을 수 있도록 지지해주기 위하여 H형파일로된 수평지지대를 설치하여 띠장을 형성시키고, 띠장과 띠장 사이에 어스앵커를 설치하게 된다.The temporary wall is constructed by a variety of methods, but in general, the H-shaped piles are placed on the ground at a certain distance, and the earth wall is formed by stacking wooden earth plate between the H-shaped piles, and the earth wall is constructed. After that, in order to support the entire earth wall so as to receive uniform earth pressure, a horizontal support made of H-shaped pile is installed to form a band, and an earth anchor is installed between the band and the band.
도 1에 도시된 것처럼, 종래에는, 토류벽의 벽체에 가로 질러 설치된 2개의 띠장(101)에 강재로 이루어진 대좌(1)를 설치하고, 그 위에 지압판(2)을 설치한 상태에서, 앵커의 강선 단부를 정착구(3)에 물려, 상기 지압판(2)에 정착하였다. 그러나, 상기와 같은 종래의 시공에서는, 앵커의 단부를 지지하는 대좌(1)가 띠장(101)의 외측에 돌출되게 설치됨에 따라 대좌(1)가 돌출된 만큼 굴착공간이 줄어들게 되어 공간 활용이 효율적이지 못하게 되며, 대좌(1)가 설치된 토류벽 전면부로 거푸집을 쌓아 콘크리트를 타설시에 벽체의 타설 두께도 띠장으로부터 돌출된 대좌의 간격만큼 커져야 하므로, 그에 따른 콘크리트 물량이 많아져 시공비가 더 많이 소요됨은 물론 돌출된 대좌(1)의 간격만큼 터파기로 인한 사용부지를 더 확보해야 하는 문제점이 발생되었다.As shown in FIG. 1, conventionally, the steel wire of an anchor is provided in the state in which the
본 발명은 상기와 같이 흙막이 벽체로부터 앵커의 단부 정착 및 지지를 위해 설치되는 대좌가 2개의 띠장 외부에 돌출되게 설치함으로 인한 문제점을 해결하기 위해 안출된 것으로, 흙막이 벽체를 지지하며 앵커를 지지하게 되는 앵커지지체를 설치하되, 띠장과 띠장 사이 내측으로 일체가 되게 끼워진 형태로 설치할 수 있는 앵커지지체를 구성하여 굴착공간을 효율적으로 활용할 수 있게 됨은 물론 제공되는 앵커지지체를 통하여 앵커체로부터 얻게되는 인장력을 손실없이 흙막이 벽체로 그대로 전달하며 지지할 수 있는 앵커지지체 및 이를 이용한 설치방법를 제공하는데 그 목적이 있다.The present invention has been made to solve the problem caused by the pedestal installed for fixing the end of the anchor and support from the earth wall as described above to protrude to the outside of the two belts, to support the anchor wall and to support the anchor The anchor support is installed, but the anchor support can be installed in such a way that it can be installed integrally between the belt and the belt to make efficient use of the excavation space, as well as to lose the tensile force obtained from the anchor through the anchor support provided. The object of the present invention is to provide an anchor support and an installation method using the same, which can be transferred to and supported as an earthen wall.
본 발명은 상기와 같은 목적을 달성하기 위해 수개의 결합공이 뚫린 고정판이 마련되고, 고정판의 일단에 측면판이 용접결합하여 직각부위를 형성하고, 직삼각형 형상의 중앙에 관통공이 형성되고, 끼움공이 뚫린 전면판이 측면판과 고정판으로 형성되는 직각부위로 용접 결합되며, 전면판과 측면판을 배면에서 지지할 수 있게 수직바의 중앙부위에 수평바가 돌출되게 형성된 베이스지지판이 용접 결합되며 반쪽형상이 대칭되게 맞물림 구조로 설치되는 한 쌍의 고정브라켓과; 상기 고정브라켓의 전면판에 설치되며 배면에 끼움구가 형성되고 전면으로 각도조정구가 일체로 결합된 지압판과; 띠장의 상.하부측에서 고정브라켓을 결합할 수 있도록 수개의 결합공이 뚫린 받침판이 형성되고, 받침판의 일측으로 수직면과 경사면을 가지 는 한 쌍의 지지편이 소정 간격을 두고 일체로 돌출되게 형성된 제1고정부재로 이루어진 앵커지지체를 구성하여 앵커지지체가 수평파일이 2단으로 설치되는 띠장의 사이로 내설되도록 설치하여 흙막이 벽체를 지지하며 연약지반을 보강할 수 있도록 하는 새로운 앵커지지체 및 이를 이용한 설치방법를 제공할 수 있게 된다.In order to achieve the above object, the present invention is provided with a fixed plate through which several coupling holes are drilled, and a side plate is welded to one end of the fixing plate to form a right angled portion, and a through hole is formed at the center of the right triangular shape, and the front hole is fitted with holes. The plate is welded to the right angled part formed by the side plate and the fixed plate, and the base support plate formed with the horizontal bar protruding at the center of the vertical bar to weld the front plate and the side plate on the back is welded and the half shape is symmetrically engaged. A pair of fixing brackets installed in a structure; An acupressure plate installed on the front plate of the fixing bracket and having a fitting hole formed on a rear surface thereof, and having an angle adjustment tool integrally coupled to the front surface thereof; A support plate is formed through which a plurality of coupling holes are drilled so as to couple the fixing brackets at the upper and lower sides of the strip, and a pair of support pieces having a vertical plane and an inclined plane to one side of the support plate protrude integrally at predetermined intervals. It is possible to provide a new anchor support and an installation method using the same by constituting the anchor support composed of the fixing member so that the anchor support is installed in between the bands where the horizontal pile is installed in two stages. It becomes possible.
본 발명에 따른 앵커지지체를 구성함으로 인해 앵커를 지지하기 위한 부재가 띠장의 외부로 돌출되지 않고, 띠장 사이에 끼워진 형태로 설치되므로서 굴착 공간이 협소하게 되는 것을 방지하여 굴착공간을 효율적으로 활용할 수 있어 비용을 절감할 수 있게 된다.Due to the configuration of the anchor support according to the present invention, the member for supporting the anchor does not protrude to the outside of the belt, and is installed in a form sandwiched between the belts, thereby preventing the excavation space from being narrow and efficiently utilizing the drilling space. The cost can be reduced.
또한, 앵커체로부터 인장력을 손실 없이 흙막이 벽체로 그대로 전달할 수 있어 흙막이 벽체로 하여금 토압에 충분이 견딜 수 있도록 지지할 수 있게 된다. In addition, it is possible to transfer the tension force from the anchor to the retaining wall without loss, so that the retaining wall can be sufficiently supported to endure earth pressure.
본 발명은 띠장 사이로 내설되는 앵커지지체 및 이를 이용한 설치방법에 관한 것으로, 지면의 굴착으로 인해 굴착면이나 토사가 붕괴되는 것을 방지하기 위하여 일정한 간격으로 수개의 수직파일이 세워지고, 각 수직파일 사이로 토류판을 적층하여 흙막이 벽체를 설치하고, 토압으로부터 벽체가 자립할 수 있게 지지하도록 하는 수평파일로 된 띠장과 어스앵커로 이루어진 지지체를 벽체로 설치함에 있어 서,The present invention relates to an anchor support which is built between the belts and an installation method using the same. Several vertical piles are erected at regular intervals in order to prevent the drilling surface or soil from collapsing due to the excavation of the ground, and the earth plate between each vertical pile. In order to install a wall of mud wall by stacking the wall, and to install a support made of a horizontal pile strip and earth anchor to support the wall to be able to stand free from earth pressure,
천공홀로 내설되는 앵커를 지지하며, 강선을 고정하는 앵커지지체를 흙막이 벽체의 정면으로 구성하되, 수평파일이 위. 아래 2단으로 구조되는 띠장과 띠장 사 이에 일체가 되게 앵커지지체를 결합할 수 있도록 고정부재와 고정브라켓으로 이루어진 앵커지지체를 구성하여 각 띠장의 상면과 저면으로 고정부재를 장착시키고, 상기 고정부재로 고정브라켓을 정착시켜 고정부재가 띠장을 지지함과 동시에 고정브라켓을 지지하게 되는 설치구조를 구성하여 흙막이 벽체 시공시에 흙막이 벽체와 벽체를 지지하게 되는 지지체간의 간격을 최소화할 수 있어 콘크리트 타설시에 콘크리트 물량을 절감할 수 있고, 사용부지를 확보하기 위한 터파기시에 부지면적을 줄일 수 있는 것은 물론 사용부지가 증대되는 효과를 제공하는 것에 특징이 있다. Anchor support is built in the hole, and the anchor support for fixing the steel wire is composed of the front of the retaining wall, the horizontal pile is above. The anchor supporting member is composed of a fixing member and a fixing bracket so that the anchor supporting member can be integrally coupled between the belt and the belt structure having two stages below. It is possible to minimize the gap between the wall and the support to support the wall when constructing the wall by constructing the installation structure to fix the fixing bracket and to support the fixing bracket at the same time. It is possible to reduce the amount of concrete, to reduce the site area at the time of digging to secure the use site, as well as to provide an effect of increasing the use site.
이하, 본 발명을 첨부된 도면을 참조하여 이를 더욱더 상세히 설명하기로 한다.Hereinafter, with reference to the accompanying drawings the present invention will be described in more detail.
도 2는 본 발명의 실시예를 보인 분리 사시도를 나타낸 것이고, 도 3은 본 발명의 실시예에 따른 사용상태를 보인 사시도를 나타낸 것이며,도 4는 본 발명의 다른 실시예에 따른 정착구조를 보인 단면도를 나타낸 것으로, 2 is an exploded perspective view showing an embodiment of the present invention, Figure 3 is a perspective view showing a state of use according to an embodiment of the present invention, Figure 4 shows a fixing structure according to another embodiment of the present invention In cross section,
도 2내지 도 4의 본 발명의 일실시예를 보인바와 같이2 to 4 as shown in an embodiment of the present invention
본 발명은 수개의 결합공(41a)이 뚫린 고정판(41)이 마련되고, 고정판(41)의 일단에 측면판(42)이 용접결합하여 직각부위를 형성하고, 직삼각형 형상의 중앙에 관통공(43a)이 형성되고, 끼움공(43b)이 뚫린 전면판(43)이 측면판(42)과 고정판(41)으로 형성되는 직각부위로 용접 결합되며, 전면판(43)과 측면판(42)을 배면에서 지지할 수 있게 수직바(44a)의 중앙부위에 수평바(44b)가 돌출되게 형성된 베이스지지판(44)이 용접 결합되며 반쪽형상이 대칭되게 맞물림 구조로 설치되 는 한 쌍의 고정브라켓(40)과;The present invention is provided with a
상기 고정브라켓(40)의 전면판(43)에 설치되며 배면에 끼움구가 형성되고 전면으로 각도조정구(46)가 일체로 결합된 지압판(45)과; An
띠장의 상.하부측에서 고정브라켓(10)을 결합할 수 있도록 수개의 결합공(21a)이 뚫린 받침판(21)이 형성되고, 받침판(21)의 일측으로 수직면(22a)과 경사면(22b)을 가지는 한 쌍의 지지편(22)이 소정 간격을 두고 일체로 돌출되게 형성된 제1고정부재(20)로 이루어진 앵커지지체(100)를 구성한 것에 특징이 있다.A
본 발명에 따른 앵커지지체(100)는 고정브라켓(40) 자체를 띠장(101,101a) 사이에 내설되도록 바로 끼움시켜 띠장(10)의 외부측에서 설치되는 제1고정부재(20)에 의해 결합 및 고정시켜 흙막이 벽체(200)를 지지하며 연약지반을 보강할 수 있도록 구성한 것이다.Anchor support 100 according to the present invention is coupled by the
도 3 내지 도 4의 보인 바와 같이, 상기 한 쌍의 브라켓(40)은 띠장(101,101a)의 사이로 서로 대칭되는 맞물림 구조로 결합시에 전면판(43)의 형상이 직사각형의 구조로 가지게 되며, 전면판(43)의 경사부위가 서로 이음되는 구조를 통해 관통공(43a)이 형성되게 된다. 이는 띠장(101,101a) 사이에 끼워진 형태로 설치시에 띠장(101,101a) 사이의 간격과 브라켓(40)의 크기로 인한 끼움 작업시 불편함을 해소하기 위하여 반쪽형상이 되게 구성한 것이다. As shown in FIGS. 3 to 4, the pair of
본 발명의 따른 앵커지지체(100)를 띠장(101)으로 장착시에는 반쪽형상의 고정브라켓(40)을 띠장(101)과 띠장의 사이 내측에 끼움식으로 장착시켜 띠장의 외부측에 설치되는 1고정부재(20)로 브라켓(40)의 고정판(41)에 뚫린 결합공(41a)으로 볼팅체결하여 고정브라켓(40)이 띠장(101)의 내측에 고정 되게 장착하게 된다.When mounting the
상기 고정브라켓(40)은 반쪽형상의 한 쌍의 고정브라켓(40)을 하나씩 띠장(101,101a)의 내측으로 끼움시켜 거치시킨뒤 볼팅체결로 결합하는 것이 바람직하다.The
상기 브라켓(40)이 띠장(101)과 띠장(101a) 사이로 장착이 완료되면, 지압판(45)과 각도조정구(46), 정착구(47) 순으로 브라켓(40)의 전면판(43)으로 설치하며, 인장강선(204)은 전면판(43)의 관통공(43a)과, 지압판(45)의 인출공(45a)과, 각도조정구(46)의 관통공(46a)을 통과하여 정착구(47)로 연결하여 인장력을 가하게 된다.When the
상기 지압판(45)과 각도조정구(46)는 사전에 일체로 용접결합하여 구비하게 되는 것이 바람직하며, 작업에도 용이하다. The
상기 각도조정구(46)를 설치함으로 인해 인장력을 가할시에 인장강선(204)이 휘거나 꺽이는 것을 방지할 수 있게 되고, By installing the
상기 각도조정구(46)를 일체로 결합한 지압판(45)을 전면판(43)에 고정할 경우 지압판(45)에 형성된 끼움구(45b)를 고정브라켓(40)의 전면판(43)에 마련된 끼움공(43b)으로 끼움시켜 결합한뒤, 정착구(47)를 통해 인장강선(204)에 인장력을 가하게 되면 지압판(45)을 포함한 각도조정구(46)가 고정브라켓(40)의 전면판(43)으로 긴밀하게 정착하게 된다.When fixing the
또한 각도조정구(46)와 일체로 용접결합되는 지압판(45)으로 인장력이 전달되어 지압판(45)을 통해 고정브라켓(40)의 전면판(43)과 측면판(42)으로 전달되며, 분리된 구조의 전면판(43)에 의해 인장력이 분산되면서 각 반쪽형상의 고정브라켓(40)을 구성하는 측면판(42)과 베이스지지판(44)을 통해 띠장(101,101a)으로 인장력이 가해지게 되며, 고정브라켓(40)을 띠장 사이로 결합하여 고정시키게 되는 외부측 제1고정부재(20)로 인장력이 전달되게 되고, 이로 인해 띠장(101,101a) 전체로 인장력을 골고루 분산시켜 인장력이 손실됨이 없이 흙막이 벽체(200)로 그대로 전달되며 지지할수 있어 흙막이 벽체(200)로 하여금 토압에 충분이 견딜 수 있게 지지할 수 있게 된다. In addition, the tensile force is transmitted to the
또한, 고정브라켓(40)이 휘어지거나 뒤틀림이 없이 앵커체의 인장력을 충분히 발휘시킬 수도 있는 것이다.In addition, the
여기서 전면판(43)과 측면판(42)의 배면으로 결합되어진 베이스지지판(44)에 의해 전면판(43)으로 전해지는 인장력이 띠장(101,101a)으로 전달시에 골고루 전달될 수 있게 된다. 이는 베이스지지판(44)을 형성하는 수평바(44b)의 끝단면이 전면판(43)과 결합되어 전면판(43)을 지지하게 되고, 수평바(44b)의 일측면 테두리로 측면판(42)이 결합되어 측면판(42)을 지지하게 되며, 베이스지지판(44)의 타단면이 띠장(101)의 일단으로 맞닿이는 구조를 구성함으로써 가능하게 되는 것이다.In this case, the tensile force transmitted to the
상기와 같이 띠장(101)의 상부측에서 고정부재(20,30)에 의해 이 협소하게 되는 것을 방지할 수 있고, 굴착공간을 효율적으로 활용할 수 있는 것이다.As described above, the narrowing is prevented by the
도 1은 종래의 띠장부위로 구성되는 앵커체를 개략적으로 보인 단면도.1 is a cross-sectional view schematically showing an anchor body composed of a conventional strip-shaped portion.
도 2는 본 발명의 실시예를 보인 분리 사시도Figure 2 is an exploded perspective view showing an embodiment of the present invention
도 3은 본 발명의 실시예에 따른 사용상태를 보인 사시도3 is a perspective view showing a state of use according to an embodiment of the present invention
도 4는 본 발명의 다른 실시예에 따른 정착구조를 보인 단면도Figure 4 is a cross-sectional view showing a fixing structure according to another embodiment of the present invention
< 도면의 주요부분에 대한 부호의 설명><Description of reference numerals for main parts of the drawings>
300 : 천공홀 200 : 흙막이 벽체 201 : 수직파일 202 : 토류판 203 : 관통 204 : 인장강선300: drilling hole 200: earth wall 201: vertical pile 202: earth plate 203: through 204: tensile steel wire
100 : 앵커지지체 101 : 띠장100: anchor support 101: strip length
20 : 제1고정부재 21 : 받침판 22 : 지지편20: first fixing member 21: supporting plate 22: support piece
40 : 고정브라켓 41 : 고정판 42 : 측면판 43 : 전면판 44 : 베이스지지판 45 : 지압판 46 : 각도조정구 47 : 정착구40: fixing bracket 41: fixing plate 42: side plate 43: front plate 44: base support plate 45: pressure plate 46: angle adjuster 47: anchorage
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090025086A KR100989023B1 (en) | 2009-03-24 | 2009-03-24 | Supporting apparatus having in between two belts and constructing method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020090025086A KR100989023B1 (en) | 2009-03-24 | 2009-03-24 | Supporting apparatus having in between two belts and constructing method thereof |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020080042639A Division KR100901437B1 (en) | 2008-05-08 | 2008-05-08 | Supporting apparatus having in between two belts and constructing method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20090117608A true KR20090117608A (en) | 2009-11-12 |
KR100989023B1 KR100989023B1 (en) | 2010-10-20 |
Family
ID=41602047
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020090025086A KR100989023B1 (en) | 2009-03-24 | 2009-03-24 | Supporting apparatus having in between two belts and constructing method thereof |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100989023B1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101447889B1 (en) * | 2014-07-18 | 2014-10-10 | 휘성개발 주식회사 | Prefabricated revet construction and prefabricatedrevet construction method using thereof |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101251466B1 (en) * | 2010-10-27 | 2013-04-05 | 박이근 | Anchor supporting system |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3792392B2 (en) * | 1998-03-03 | 2006-07-05 | 株式会社熊谷組 | Anchor base for earth anchor for earth retaining |
KR100657655B1 (en) * | 2004-01-10 | 2006-12-14 | 불독 (주) | Assembly pile for method of ground improvement |
JP2007177517A (en) * | 2005-12-28 | 2007-07-12 | Tanaka Juken:Kk | Earth anchor method |
JP2008002059A (en) * | 2006-06-20 | 2008-01-10 | Tanaka Juken:Kk | Earth anchor construction method and linear body tension holding pedestal with upper and lower wale receivers |
-
2009
- 2009-03-24 KR KR1020090025086A patent/KR100989023B1/en active IP Right Grant
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101447889B1 (en) * | 2014-07-18 | 2014-10-10 | 휘성개발 주식회사 | Prefabricated revet construction and prefabricatedrevet construction method using thereof |
Also Published As
Publication number | Publication date |
---|---|
KR100989023B1 (en) | 2010-10-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101609805B1 (en) | Freestanding temporary retaining and its construction method with prestressed piles introduced | |
JP2002227204A (en) | Earth retaining method of excavation section | |
KR100698878B1 (en) | Y Type Connecting Structure of Steel Pipe Struts | |
KR100973601B1 (en) | Braket for supporting wale beam of soil retaining wall and excavation method using the same | |
KR20120013820A (en) | Method for Constructing Cap Beam Combined Wale For Retaining Wall | |
KR101382609B1 (en) | Earths wall for groundprotection and Construction Method thereof | |
KR20080005109A (en) | Structure for supporting retaining wall of earth with arch material and method constructing the arch structure | |
KR100642341B1 (en) | A pile for retaining wall | |
KR20110129657A (en) | Retaining wall using frame structure and method of making retaining wall using thereof | |
KR100916546B1 (en) | Underground temporary structure and constructing method thereof | |
KR20120076806A (en) | Wall construction structure in which wale angle is adjustable and wale for fixing tension cable for the same | |
KR20110098597A (en) | Guide frame for h-steel | |
KR20090116452A (en) | Composite wall using angled channel | |
KR100989023B1 (en) | Supporting apparatus having in between two belts and constructing method thereof | |
KR101287687B1 (en) | Wall construction structure in which wale angle is adjustable and wale for fixing tension cable for the same | |
KR101300078B1 (en) | Variable supporting device for sheathing work pile | |
KR101599931B1 (en) | Retaining Wall using Precast Panels and PHC Piles having Steel Bands, and Constructing Method of such Retaining Wall | |
KR200247053Y1 (en) | wale for construction method for defending earth using prestress | |
KR20120131996A (en) | Structure of temporary installation for land-side protection wall, and construction method thereof | |
KR20150010422A (en) | Mid supporting beam for temporary soil sheathing work | |
KR20150109207A (en) | Self-supported type earth retaining wall structure and construction method thereof | |
KR20020096596A (en) | construction method for defending earth using prestressed wale used therefor | |
KR102307510B1 (en) | Temporary earth retaining structure and Construction method using the same | |
KR101705785B1 (en) | Apparatus for Supporting Anchor box for Tie-Back Anchor of H-Pipe Pile used in the Panel Retaining Wall Method without Wale and Method for Installing Tie-Back Anchor of H-Pipe Pile without Wale | |
JP2000297590A (en) | Excavation wall construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A107 | Divisional application of patent | ||
A201 | Request for examination | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130903 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20180109 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20181106 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20191024 Year of fee payment: 10 |