Supporting apparatus having in between two belts and constructing method thereof Download PDF

Info

Publication number
KR100901437B1
KR100901437B1 KR1020080042639A KR20080042639A KR100901437B1 KR 100901437 B1 KR100901437 B1 KR 100901437B1 KR 1020080042639 A KR1020080042639 A KR 1020080042639A KR 20080042639 A KR20080042639 A KR 20080042639A KR 100901437 B1 KR100901437 B1 KR 100901437B1
Authority
KR
South Korea
Prior art keywords
plate
support
fixing
anchor
fixing member
Prior art date
Application number
KR1020080042639A
Other languages
Korean (ko)
Inventor
박이근
Original Assignee
박이근
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박이근 filed Critical 박이근
Priority to KR1020080042639A priority Critical patent/KR100901437B1/en
Application granted granted Critical
Publication of KR100901437B1 publication Critical patent/KR100901437B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2220/00Temporary installations or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater
    • E02D2250/0069Welding
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron
    • E02D2300/0034Steel; Iron in wire form
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

An anchor supporter which is placed inside a wale and an installation method using the same are provided to support a retaining wall and to deliver the tension gained from an anchor to the retaining wall. An anchor supporter(100) which is placed inside a wale comprises a pair of side plates(11) which has a first incline(11a) and a second incline(11b) which are distanced from each other, a stopping plate(13) in which a base plate(12) formed on the top of a pair of lateral plates and a hanger(13a) is formed in the bottom side are formed, a connection plate(14) which is welded and connected in the front side of the lateral plate, a pressure plate(15) in which a drawing hole(15a) is formed in center is equipped to the first inclined plane to weld, a fixed bracket(10) consisting of an anchorage(16) settling down a tension wire protruded from an anchor body, a support plate(21) in which a plurality of coupling holes(21a) are formed is formed, a first fixing member(20) which is formed so that the support piece(22) of the pair put the fixed interval and it be protruded to one side of the supporting plate into one body as long as one side has the vertical plane(22a) and an incline(22b), a support plate(31) in which a plurality of screw holes(31a) are formed is formed, and a second fixing member(30) which is formed so that a fixing piece(32) of the pair be protruded to one side of the supporting plate as long as a retreated groove(32a) is formed in one side vertical plane.

Description

띠장 사이로 내설되는 앵커지지체 및 이를 이용한 설치방법{Supporting apparatus having in between two belts and constructing method thereof}Anchor support built between the belts and installation method using the same {Supporting apparatus having in between two belts and constructing method

본 발명은 흙막이 벽체를 지지하는 띠장 및 앵커지지체를 구성시에 띠장 사이로 내설되는 앵커지지체 및 이를 이용한 설치방법에 관한 것으로, 수평파일이 위. 아래 2단으로 구조되는 띠장과 띠장 사이에 끼워진 형태가 되어 일체가 되게 앵커지지체를 결합할 수 있도록 고정부재와 고정브라켓으로 이루어진 앵커지지체를 구성하여 각 띠장의 상면과 저면으로 고정부재를 장착하고, 상기 고정부재로 고정브라켓을 정착시켜 고정부재가 띠장을 지지함과 동시에 고정브라켓을 지지하게 되는 설치방법를 통하여 흙막이 벽체와 벽체를 지지하게 되는 지지체간의 간격을 최소화하는 것에 특징이 있다.The present invention relates to an anchor support which is insulted between the strips when constructing a strip and an anchor support for supporting the wall, and an installation method using the same. The anchor member is composed of the fixing member and the fixing bracket so that the anchor support body can be combined to be integrally formed by being fitted between the belt and the belt structure having two stages below, and the fixing member is mounted to the upper and lower surfaces of each belt length. The fixing member is fixed to the fixing member to minimize the distance between the support wall supporting the wall and the wall through the installation method in which the fixing member supports the fixing bracket and the fixing bracket at the same time.

일반적으로, 토목공사시 지면을 굴착하는 작업을 할 경우, 굴착된 부분의 경계면으로 형성된 지반의 흙이 굴착된 부분으로 유입되거나, 무너지는 것을 방지하기 위해 굴착된 지면에 가설 흙막이 벽체(일명 : 토류벽)를 시공하여, 토사의 무너짐을 보완하도록 하고 있다.In general, in the case of excavation of the ground during civil engineering work, temporary soil wall on the excavated ground to prevent soil from entering or digging into the excavated portion formed as the boundary of the excavated portion (aka: earth wall Construction to compensate for the collapse of the soil.

상기 가설 흙막이 벽체는 다양한 방법에 의해 실시되고 있으나, 보편적으로는 H형 파일들을 일정 거리로 지반에 타설하고 H형 파일의 사이에 목재 토류판을 적층하여 설치함으로서 토류벽을 형성하고, 토류벽체가 시공이 되고나면 토류벽체 전체에 일률적인 토압을 받을 수 있도록 지지해주기 위하여 H형파일로된 수평지지대를 설치하여 띠장을 형성시키고, 띠장과 띠장 사이에 어스앵커를 설치하게 된다.The temporary wall is constructed by a variety of methods, but in general, the H-shaped piles are placed on the ground at a certain distance, and the earth wall is formed by stacking wooden earth plate between the H-shaped piles, and the earth wall is constructed. After that, in order to support the entire earth wall so as to receive uniform earth pressure, a horizontal support made of H-shaped pile is installed to form a band, and an earth anchor is installed between the band and the band.

도 1에 도시된 것처럼, 종래에는, 토류벽의 벽체에 가로 질러 설치된 2개의 띠장(101)에 강재로 이루어진 대좌(1)를 설치하고, 그 위에 지압판(2)을 설치한 상태에서, 앵커의 강선 단부를 정착구(3)에 물려, 상기 지압판(2)에 정착하였다. 그러나, 상기와 같은 종래의 시공에서는, 앵커의 단부를 지지하는 대좌(1)가 띠장(101)의 외측에 돌출되게 설치됨에 따라 대좌(1)가 돌출된 만큼 굴착공간이 줄어들게 되어 공간 활용이 효율적이지 못하게 되며, 대좌(1)가 설치된 토류벽 전면부로 거푸집을 쌓아 콘크리트를 타설시에 벽체의 타설 두께도 띠장으로부터 돌출된 대좌의 간격만큼 커져야 하므로, 그에 따른 콘크리트 물량이 많아져 시공비가 더 많이 소요됨은 물론 돌출된 대좌(1)의 간격만큼 터파기로 인한 사용부지를 더 확보해야 하는 문제점이 발생되었다.As shown in FIG. 1, conventionally, the steel wire of an anchor is provided in the state in which the base 1 made of steel was installed in the two strip | belt-lengths 101 provided across the wall of the earth wall, and the pressure plate 2 was installed on it. The edge part was bitten by the fixing tool 3, and was fixed to the said pressure plate 2. However, in the conventional construction as described above, as the pedestal 1 supporting the end of the anchor is installed to protrude to the outside of the belt strip 101, the excavation space is reduced as much as the pedestal 1 protrudes, so that space utilization is efficient. When the concrete is poured by stacking the formwork to the front of the earth wall where the pedestal (1) is installed, the thickness of the wall should be increased by the distance between the pedestals protruding from the belt, so that the construction cost is increased due to the large amount of concrete. Of course, a problem arises in that the use site due to the trench is further secured by the interval of the protruding pedestal 1.

본 발명은 상기와 같이 흙막이 벽체로부터 앵커의 단부 정착 및 지지를 위해 설치되는 대좌가 2개의 띠장 외부에 돌출되게 설치함으로 인한 문제점을 해결하기 위해 안출된 것으로, 흙막이 벽체를 지지하며 앵커를 지지하게 되는 앵커지지체를 설치하되, 띠장과 띠장 사이 내측으로 일체가 되게 끼워진 형태로 설치할 수 있는 앵커지지체를 구성하여 굴착공간을 효율적으로 활용할 수 있게 됨은 물론 제공되는 앵커지지체를 통하여 앵커체로부터 얻게되는 인장력을 손실없이 흙막이 벽체로 그대로 전달하며 지지할 수 있는 앵커지지체 및 이를 이용한 설치방법를 제공하는데 그 목적이 있다.The present invention has been made to solve the problem caused by the pedestal installed for fixing the end of the anchor and support from the earth wall as described above to protrude to the outside of the two belts, to support the anchor wall and to support the anchor The anchor support is installed, but the anchor support can be installed in such a way that it can be installed integrally between the belt and the belt to make efficient use of the excavation space, as well as to lose the tensile force obtained from the anchor through the anchor support provided. The object of the present invention is to provide an anchor support and an installation method using the same, which can be transferred to and supported as an earthen wall.

본 발명은 상기와 같은 목적을 달성하기 위해 The present invention to achieve the above object

소정의 각도로 경사지게 경사면을 가지는 한 쌍의 측면판이 소정의 간격으로 이격되게 구비되고, 측면판의 일단이 배면 상부측으로 마련된 베이스판과 하부측에 걸림구가 형성된 걸림판으로 용접 결합되고, 측면판의 경사면 상.하부로 연결판이 각각 용접 결합되며, 중앙에 인출공이 형성된 지압판이 경사면으로 용접결합할 수 있게 구비되고, 앵커체를 형성하는 강선을 정착시키는 정착구로 구성된 고정브라켓과;A pair of side plates having an inclined surface inclined at a predetermined angle are provided to be spaced apart at predetermined intervals, one end of the side plate is welded to the base plate provided on the rear upper side and the engaging plate formed on the lower side, and the engaging plate is welded, the side plate Connecting plates are welded to each of the upper and lower slopes of the inclined surface thereof, and a clamping plate is formed such that the pressure plate having a drawing hole in the center thereof is welded to the inclined surface, the fixing bracket being configured to fix the steel wire forming the anchor body;

수개의 결합공이 뚫린 받침판이 형성되고, 받침판의 일측으로 수직면과 경사면을 가지는 한 쌍의 지지편이 소정 간격을 두고 일체로 돌출되게 형성된 제1고정부재와;A first fixing member having a support plate having several coupling holes formed therein, wherein a pair of support pieces having a vertical surface and an inclined surface toward one side of the support plate protrude integrally at predetermined intervals;

수개의 나사공이 뚫린 받침판이 형성되고, 양측에 수직면과 경사면이 형성되고, 일측 수직면에 요입홈이 형성된 한 쌍의 고정편이 받침판의 일측에 돌출되게 형성된 제2고정부재로 앵커지지체를 구성하여 앵커지지체가 수평파일이 2단으로 설치되는 띠장의 사이로 내설되도록 설치하여 흙막이 벽체를 지지하며 연약지반을 보강할 수 있도록 하는 새로운 앵커지지체 및 이를 이용한 설치방법를 제공할 수 있게 된다.Anchor support body is formed by a second fixing member formed with a second fixing member formed with a supporting plate formed with several screw holes, a vertical surface and an inclined surface on both sides, and a pair of fixing pieces having recessed grooves formed on one vertical surface protruding on one side of the supporting plate. It is possible to provide a new anchor support and installation method using the same by installing the horizontal pile to be installed between two bands installed in two stages to support the retaining wall and to reinforce the soft ground.

본 발명에 따른 앵커지지체를 구성함으로 인해 앵커를 지지하기 위한 부재가 띠장의 외부로 돌출되지 않고, 띠장 사이에 끼워진 형태로 설치되므로서 굴착 공간이 협소하게 되는 것을 방지하여 굴착공간을 효율적으로 활용할 수 있어 비용을 절감할 수 있게 된다.Due to the configuration of the anchor support according to the present invention, the member for supporting the anchor does not protrude to the outside of the belt, and is installed in a form sandwiched between the belts, thereby preventing the excavation space from being narrow and efficiently utilizing the drilling space. The cost can be reduced.

또한, 앵커체로부터 인장력을 손실 없이 흙막이 벽체로 그대로 전달할 수 있어 흙막이 벽체로 하여금 토압에 충분이 견딜 수 있도록 지지할 수 있게 된다. In addition, it is possible to transfer the tension force from the anchor to the retaining wall without loss, so that the retaining wall can be sufficiently supported to endure earth pressure.

본 발명은 띠장 사이로 내설되는 앵커지지체 및 이를 이용한 설치방법에 관 한 것으로, 지면의 굴착으로 인해 굴착면이나 토사가 붕괴되는 것을 방지하기 위하여 일정한 간격으로 수개의 수직파일이 세워지고, 각 수직파일 사이로 토류판을 적층하여 흙막이 벽체를 설치하고, 토압으로부터 벽체가 자립할 수 있게 지지하도록 하는 수평파일로 된 띠장과 어스앵커로 이루어진 지지체를 벽체로 설치함에 있어 서,The present invention relates to an anchor support that is internally installed between the belts and an installation method using the same, in which several vertical piles are erected at regular intervals so as to prevent the excavation surface or soil from collapsing due to the excavation of the ground, and between each vertical pile. In stacking the earthen board to install the earth wall, and supporting the wall made of a horizontal pile strip and earth anchor to support the wall to be able to stand free from earth pressure,

천공홀로 내설되는 앵커를 지지하며, 강선을 고정하는 앵커지지체를 흙막이 벽체의 정면으로 구성하되, 수평파일이 위. 아래 2단으로 구조되는 띠장과 띠장 사이에 일체가 되게 앵커지지체를 결합할 수 있도록 고정부재와 고정브라켓으로 이루어진 앵커지지체를 구성하여 각 띠장의 상면과 저면으로 고정부재를 장착시키고, 상기 고정부재로 고정브라켓을 정착시켜 고정부재가 띠장을 지지함과 동시에 고정브라켓을 지지하게 되는 설치구조를 구성하여 흙막이 벽체 시공시에 흙막이 벽체와 벽체를 지지하게 되는 지지체간의 간격을 최소화할 수 있어 콘크리트 타설시에 콘크리트 물량을 절감할 수 있고, 사용부지를 확보하기 위한 터파기시에 부지면적을 줄일 수 있는 것은 물론 사용부지가 증대되는 효과를 제공하는 것에 특징이 있다. Anchor support is built in the hole, and the anchor support for fixing the steel wire is composed of the front of the retaining wall, the horizontal pile is above. The anchor support member is composed of a fixing member and a fixing bracket so that the anchor support member can be integrally coupled between the belt and the belt structure having two stages below. It is possible to minimize the gap between the wall and the support to support the wall when constructing the wall by constructing the installation structure to fix the fixing bracket and to support the fixing bracket at the same time. It is possible to reduce the amount of concrete, to reduce the site area at the time of digging to secure the use site, as well as to provide an effect of increasing the use site.

이하, 본 발명을 첨부된 도면을 참조하여 이를 더욱더 상세히 설명하기로 한다.Hereinafter, with reference to the accompanying drawings the present invention will be described in more detail.

도 2는 본 발명의 일실시예를 보인 전체 사시도를 나타낸 것이고, 도 3은 본 발명의 일실시예를 보인 확대 사시도를 나타낸 것이며,도 4는 본 발명의 일실시예에 따른 정착구조를 보인 사시도를 나타낸 것이고, 도 5는 본 발명의 일실시예에 따른 정착구조를 보인 단면도를 나타낸 것이며, 도 6은 본 발명의 다른실시예를 보인 확대 사시도를 나타낸 것이고, 도 7은 본 발명의 다른 실시예에 따른 정착구조를 보인 사시도를 나타낸 것이며, 도 8은 본 발명의 다른 실시예에 따른 정착구조를 보인 단면도를 나타낸 것으로, Figure 2 is a full perspective view showing an embodiment of the present invention, Figure 3 is an enlarged perspective view showing an embodiment of the present invention, Figure 4 is a perspective view showing a fixing structure according to an embodiment of the present invention 5 is a cross-sectional view showing a fixing structure according to an embodiment of the present invention, Figure 6 is an enlarged perspective view showing another embodiment of the present invention, Figure 7 is another embodiment of the present invention Figure 8 shows a perspective view showing a fixing structure according to, Figure 8 shows a cross-sectional view showing a fixing structure according to another embodiment of the present invention,

도 2내지 도 3의 본 발명의 일실시예를 보인바와 같이 2 to 3 as shown an embodiment of the present invention

본 발명은 소정의 각도로 경사지도록 전면 상.하부에 제1경사면(11a)과 제2경사면(11b)를 가지는 한 쌍의 측면판(11)이 소정의 간격으로 이격되게 구비되고, 이격된 한쌍의 측면판(11)의 배면 상부측에 베이스판(12)과 하부측에 걸림구(13a)가 형성된 걸림판(13)이 용접 결합되며, 측면판(11)의 전면 제1.2경사면(11a,11b)의 끝단부에 연결판(14)이 각각 용접 결합되며, 중앙에 인출공(15a)이 형성된 지압판(15)이 제1경사면(11a)으로 용접결합할 수 있게 구비되고, 앵커체로부터 돌출되는 인장강선(204)을 정착시키는 정착구(16)로 구성된 고정브라켓(10)과;The present invention is provided with a pair of side plates 11 having a first inclined surface 11a and a second inclined surface 11b at upper and lower surfaces so as to be inclined at a predetermined angle to be spaced at a predetermined interval, and a pair of spaced apart The base plate 12 and the locking plate 13 having a locking hole 13a formed at the lower side are welded to the upper side of the rear side plate 11 of the side plate 11, and the front 1.2th slope 11a of the side plate 11 is provided. The connecting plate 14 is welded to the end of 11b), respectively, and the pressure plate 15 having the drawing hole 15a formed at the center thereof is provided to be welded to the first inclined surface 11a and protrudes from the anchor body. A fixing bracket 10 composed of a fixing unit 16 for fixing the tensile steel wire 204 to be formed;

수개의 결합공(21a)이 뚫린 받침판(21)이 형성되고, 받침판(21)의 일측으로 수직면(22a)과 경사면(22b)을 가지는 한 쌍의 지지편(22)이 소정 간격을 두고 일체로 돌출되게 형성된 제1고정부재(20)와;A support plate 21 through which several coupling holes 21a are formed is formed, and a pair of support pieces 22 having a vertical surface 22a and an inclined surface 22b on one side of the support plate 21 are integrally spaced at a predetermined interval. A first fixing member 20 formed to protrude;

수개의 나사공(31a)이 뚫린 받침판(31)이 형성되고, 양측에 수직면(32b, 32c)과 경사면(32d)이 형성되고, 일측 수직면(32b)에 요입홈(32a)이 형성된 한 쌍의 고정편(32)이 받침판(31)의 일측으로 돌출되게 형성된 제2고정부재(30)로 앵커지지체(100)를 구성하여 앵커지지체(100)가 수평파일이 2단으로 설치되는 띠장(101)의 사이로 내설되도록 설치하여 흙막이 벽체(200)를 지지하며 연약지반을 보강할 수 있게 한 것이다.A pair of support plates 31 formed with several threaded holes 31a are formed, vertical surfaces 32b and 32c and inclined surfaces 32d are formed on both sides, and a pair of recessed grooves 32a are formed on one vertical surface 32b. The anchor member 100 is composed of the second fixing member 30 formed so that the fixing piece 32 protrudes to one side of the support plate 31 so that the anchor support 100 is installed with two stages of horizontal piles. It is installed so as to be installed in between to support the retaining wall 200 and to reinforce the soft ground.

상기 본 발명은 앵커체의 인장력에 대한 지지 압력을 고정브라켓(10)의 한 쌍의 측면판(11)과 베이스판(12), 걸림판(13)에 의해 지지편(22)을 가지는 제1고정부재(20)와 고정편(32)이 형성된 제2고정부재(30)로 전달하게 되고, 상기 지지편(22)에 의해 인장력을 고정부재(20,30)를 결합하는 띠장(101)으로도 균등하게 분산시킬 수 있는 구조로 형성되어 앵커체의 인장력을 충분히 극복할 수 있음은 물론, 이로 인해 앵커체의 인장력을 손실 없이 흙막이 벽체(200)로 그대로 전달할 수 있어 벽체(200)로 하여금 토압에 충분이 견딜 수 있게 지지할 수 있게 된다. According to the present invention, the support pressure against the tensile force of the anchor body is provided with the support piece 22 by the pair of side plates 11, the base plate 12, and the engaging plate 13 of the fixing bracket 10. The fixing member 20 and the fixing piece 32 is transmitted to the second fixing member 30 is formed, the support piece 22 to the belt length 101 to couple the fixing force to the fixing member (20,30) In addition, it is formed in a structure that can be evenly distributed to overcome the tensile force of the anchor body, as a result of this, it is possible to transfer the tensile force of the anchor body as it is without loss to the retaining wall 200, so that the wall 200 to earth pressure It can support enough to endure.

또한, 고정브라켓(10)이 휘어지거나 뒤틀림이 없이 앵커체의 인장력을 충분히 발휘시킬 수 있다.In addition, the fixing bracket 10 can fully exhibit the tensile force of the anchor body without bending or twisting.

본 발명의 구성을 정착과정을 통해 더욱 상세하게 설명하기로 한다.The configuration of the present invention will be described in more detail through the fixing process.

H형강으로 된 수직파일(201)을 굴착하게 되는 지중에 설치하며 지표면에서 소정깊이만큼 굴착한 다음 수직파일(201)과 수직파일(201) 사이에 토류판(202)을 삽입하여 설치한다.The vertical pile 201 made of H-beam is excavated in the ground to be excavated, and excavated by a predetermined depth from the ground surface, and then installed by inserting the earth plate 202 between the vertical pile 201 and the vertical pile 201.

상기의 굴착작업과 토류판(202)의 설치작업을 반복하여 지하층의 최종 굴착심도까지 터파기가 완료되면 흙막이 벽체(200)가 완성된다.When the excavation work and the installation of the earth plate 202 is repeated and the excavation is completed up to the final excavation depth of the basement layer, the earth wall 200 is completed.

흙막이 벽체(200)가 시공되면, 흙막이 벽체(200)가 토압으로부터 자립할 수 있도록 지지하기 위하여 토류판(202)을 관통(203)하여 연약지반 내측으로 천공홀(300)을 경사지게 뚫고, 천공된 천공홀(300)속으로 수개의 인장강선(204)을 포함한 앵커(미도시)를 삽입하며, 앵커(미도시)가 삽입된 상태에서 천공된 천공홀(300)속으로 그 라우트를 충전시켜 양생시키게 된다.When the soil wall 200 is constructed, the soil wall 200 is penetrated 203 through the earth plate 202 to support so that the soil wall 200 can stand free from earth pressure, and drills the drill hole 300 inclined to the inside of the soft ground, and drills the drilled hole. An anchor (not shown) including several tensile steel wires 204 is inserted into the hole 300, and the grout is filled and cured into the drilled hole 300 in the state where the anchor (not shown) is inserted. do.

상기 흙막이 벽체(200)를 관통하여 지반속으로 앵커가 정착되고, 천공홀(300)속으로 그라우트를 충전시킨 뒤, 흙막이 벽체(200)의 수평방향으로 수직파일과 동일하게 H형강으로 된 띠장(101)을 상기 흙막이 벽체(200)에서 소정높이마다 다수단 설치하되, 앵커가 설치된 천공홀을 중심으로 하여 수평방향을 가르지르며 일정간격 떨어진 나란한 위치에 설치하여 흙막이 벽체(200)를 지지하게 된다.Anchors are anchored into the ground by penetrating through the retaining wall 200 and filling the grout into the drilling hole 300, and then, in the horizontal direction of the retaining wall 200, a band made of H-shaped steel in the same direction as the vertical pile ( 101 is installed a plurality of stages at predetermined heights in the mud wall 200, the horizontal direction around the drilling hole is installed anchored in a horizontal position apart from the predetermined intervals to support the mud wall 200.

한편, 상기 띠장(101)을 수평방향으로 설치시에는 띠장(101)의 일측이 접촉하게 되는 흙막이 벽체(200)를 구성하는 수직파일(201)로 지지받침판(미도시)을 구성하여 띠장(101)을 안착시키거나, 수직파일(201)과 띠장(101)이 접촉되는 측면으로 볼트구(미도시)를 형성하여 볼팅체결로서 띠장(101)을 고정 및 용접하여 고정시키게 되는 것으로, 이는 시공시 환경여건에 따라 사용자가 선택하여 실시하는 것으로 상세한 설명 및 도면에 도시하지 아니 하였음을 밝혀두는 바이다.On the other hand, when the band 101 is installed in the horizontal direction, the support plate (not shown) constitutes the support plate (not shown) by the vertical pile 201 constituting the wall 200 to be in contact with one side of the band 101 101 ) Or to form a bolt hole (not shown) to the side in contact with the vertical pile 201 and the strip (101) to fix and weld the strip (101) as a bolting fastening, this is the construction As the user selects and performs according to environmental conditions, it will be apparent that the detailed description and drawings are not shown.

상기 흙막이 벽체(200)의 수평방향으로 띠장(101)이 형성되면, 지반속으로 내설된 앵커로 인장강선(204)을 통해 인장력을 가하여 띠장(101)과 흙막이 벽체(200)를 지지함과 동시에 인장강선(204)을 고정하기 위해 본 발명의 앵커지지체(100)를 설치하게 된다.  When the strip 101 is formed in the horizontal direction of the retaining wall 200, a tensile force is applied through the tensile steel wire 204 with an anchor embedded in the ground to support the strip 101 and the retaining wall 200. In order to fix the tensile steel wire 204 to install the anchor support 100 of the present invention.

도 5에서 본 발명의 일실시예에 따른 정착구조를 보인 단면도에 나타낸 바와 같이 먼저, 다단을 형성하는 각 띠장(101) 상면과 저면으로 제1고정부재(20)와 제2고정부재(30)가 각각 대응되도록 장착시키되, 제1고정부재(20)는 각 띠장(101)의 외부측에서 서로 대응되게 결합 되며, 제2고정부재(30)는 각 띠장(101)의 내부측에서 서로 대응되게 장착하게 된다.As shown in the cross-sectional view showing a fixing structure according to an embodiment of the present invention in Figure 5, first, the first fixing member 20 and the second fixing member 30 to the upper and lower surfaces of each strip length 101 forming a multi-stage Are mounted so as to correspond to each other, the first fixing member 20 is coupled to correspond to each other at the outer side of each belt 101, the second fixing member 30 to correspond to each other at the inner side of each belt 101 Will be installed.

상기, 제1고정부재(20)와 제2고정부재(30)는 각 고정부재를 형성하는 받침판(21,31)에 형성된 수개의 결합공(21a),나사공(31a)에 의해 띠장(101)을 중심으로 볼트체결에 의해 결합하게 되며, 제1,2고정부재(20,30)가 장착되는 띠장(101) 부위로 미리 볼트구(h)를 형성하는 것이 바람직하다.The first fixing member 20 and the second fixing member 30 are provided with a band 101 by a plurality of coupling holes 21a and screw holes 31a formed in the supporting plates 21 and 31 forming the fixing members. It is preferable to form a bolt sphere (h) in advance by the bolt fastening around the center, the band 101 portion to which the first and second fixing members 20 and 30 are mounted.

여기서, 각 띠장(101)의 외부측으로 대응되도록 장착되는 제1고정부재(20)는 받침판(21) 일측 상면으로 수직면(22a)과 경사면(22b)을 가지는 한 쌍의 지지편(22)이 소정 간격을 두고 일체로 돌출되게 형성되어 상기 지지편(22)의 일측 수직면(22a)이 흙막이 벽체(200)와 맞닿이는 띠장(101)의 일측면을 지지시키며 정착하게 된다.Here, the first fixing member 20 mounted to correspond to the outer side of each strip length 101 is a pair of support pieces 22 having a vertical surface 22a and an inclined surface 22b on one side of the support plate 21. It is formed to protrude integrally at intervals so that one vertical surface 22a of the support piece 22 supports and fixes one side surface of the strip 101 that is in contact with the earth wall 200.

또한 각 띠장(101)의 내부측으로 대응되게 장착되는 제2고정부재(30)는 양측에 수직면(32b,32c)과 경사면(32d)으로 형성된 고정편(32)이 받침판(31)의 일측에서 돌출되어 구조됨에 따라 일측 수직면(32b)이 흙막이 벽체(200)와 맞닿이는 띠장(101)의 일측면을 지지하며 정착하게 된다.In addition, the second fixing member 30 correspondingly mounted to the inner side of each of the strips 101 has a fixing piece 32 formed on both sides thereof with vertical surfaces 32b and 32c and an inclined surface 32d to protrude from one side of the support plate 31. As the structure is one side vertical surface (32b) is to support and fix one side surface of the strip 101 is in contact with the earth wall 200.

한편, 상기 제1,2고정부재(20,30)가 서로 대응되며 설치된다는 것은 다단으로 형성되는 두개의 띠장(101,101a)을 중심으로 하여 각 띠장(101,101a)마다 외측에서는 1고정부재(20)가, 내측에서는 제2고정부재(30)가 각각의 지지편(22)과 고정편(32)이 형성되지 않은 받침판(21,31)의 일단끼리 볼팅체결로 결합하게 되는 것이며, 각 띠장(101,101a)에 형성되는 제1,2고정부재(20,30)에 형성된 지지편(22)과 고정편(32)이 서로 대칭구조를 이루며 띠장(101)으로 장착되는 것인즉, 띠장의 내측으로 장착되는 제2고정부재(30)의 돌출된 고정편(32)이 서로 마주보는 대칭구조를 형성하게 되는 것이다. 그러므로, 제1.2고정부재(20,30)는 한 쌍씩이 장착되어지게 된다.Meanwhile, the first and second fixing members 20 and 30 correspond to each other and are installed so that the first and second fixing members 20 and 30 are positioned at the outside of each of the belts 101 and 101a formed in multiple stages. In the inner side, the second fixing member 30 is coupled to each other by bolting fastening of one end of each of the supporting plates 22 and the supporting plates 21 and 31 on which the fixing pieces 32 are not formed. The support pieces 22 and the fixing pieces 32 formed on the first and second fixing members 20 and 30 formed in the 101 and 101a are symmetrical with each other and are mounted as the bands 101 to the inside of the bands. The protruding fixing piece 32 of the second fixing member 30 to be mounted is to form a symmetrical structure facing each other. Therefore, the pair of 1.2 fixing members (20, 30) is mounted.

상기 띠장(101)으로 고정부재(20,30)의 장착이 완료되면, 한 쌍의 측면판(11)이 소정간격 이격된채 배면 상,하부측에 베이스판(12)과 걸림판(13)을 결합하고 경사면(11a) 상,하부측에 연결판(14)과 연결판(14)의 사이로 지압판(15)이 결합되어진 고정브라켓(10)을 각 띠장(101,101a)의 내측에서 대칭되게 장착된 제2고정부재(30)의 고정편(32)에 결합하게 된다.When the mounting of the fixing member (20, 30) is completed by the band 101, the base plate 12 and the locking plate 13 on the rear, upper and lower sides of the pair of side plates 11 are spaced a predetermined interval And a fixing bracket 10 to which the pressure plate 15 is coupled between the connecting plate 14 and the connecting plate 14 on the upper and lower sides of the inclined surface 11a to be symmetrically mounted on the inside of each of the strips 101 and 101a. It is coupled to the fixing piece 32 of the second fixing member 30.

이때에 고정브라켓(10)은 수직상태로는 각 띠장(101,101a)의 간격에 의해 띠장(101,101a)의 내측으로 끼우기가 용이하지 못하기에 고정브라켓(10)을 수평방향으로 비스듬하게 삽입하는 형식을 취하며, 고정브라켓(10)의 배면 하부측 걸림판(13)에 형성된 걸림구(13a)가 아랫쪽 제2고정부재(30)의 돌출된 고정편(32)의 경사면(32d)에 걸림되도록 하여 고정브라켓(10)을 거치시키게 된다.At this time, the fixing bracket 10 is inserted into the fixing bracket 10 at an angle in the horizontal direction because the fixing bracket 10 is not easily inserted into the inside of the belt sheets 101 and 101a by the interval between the respective strips 101 and 101a in the vertical state. It takes a form, and the locking hole (13a) formed on the lower lower side locking plate 13 of the fixing bracket 10 is caught on the inclined surface 32d of the protruding fixing piece 32 of the lower second fixing member (30). To be fixed to the fixing bracket (10).

고정브라켓(10)을 고정편(32)에 의해 거치하게 되면, 천공홀(300)로부터 돌출되어 있는 수개의 인장강선(204)에 인장력을 가하기 위해 고정브라켓(10)의 경사면으로 지압판(15)을 설치하며, 지압판(15)에 형성된 인출공(15a)으로 수개의 인장강선(204)을 통과시켜 지압판(15)을 고정브라켓(10)의 제1경사면(11a)으로 용접결합하거나 또는 인장강선(204)을 고정하는 정착구(16)를 통해 인장력을 가할 시 발생되는 인장력으로 인해 지압판(15)이 고정브라켓(10)의 경사면(11a)으로 고정되어지게 되는 것이다.When the fixing bracket 10 is mounted by the fixing piece 32, the pressure plate 15 is inclined to the inclined surface of the fixing bracket 10 to apply tensile force to several tensile steel wires 204 protruding from the drilling hole 300. The pressure plate 15 is welded to the first inclined surface 11a of the fixing bracket 10 by passing several tensile steel wires 204 through the drawing holes 15a formed in the pressure plate 15, or the tensile steel wire. The pressure plate 15 is fixed to the inclined surface 11a of the fixing bracket 10 due to the tensile force generated when the tensile force is applied through the fixing unit 16 fixing the 204.

한편, 상기 지압판(15)은 사용자의 편의에 따라 띠장(101) 사이에 고정브라켓(10)을 장착시키기 전에 고정브라켓(10)의 제1경사면(11a)으로 용접 결합하여도 무방하다.Meanwhile, the acupressure plate 15 may be welded to the first inclined surface 11a of the fixing bracket 10 before the fixing bracket 10 is mounted between the strips 101 according to the user's convenience.

상기 고정브라켓(10)으로 지압판(15)과 정착구(16)가 설치되어 인장강선(204)에 인장력을 가하게 되면 아랫쪽 제2고정부재(30)의 고정편(32)에 의해 거치되어 있던 고정브라켓(10)이 위,아래 제2고정부재(30)로 돌출된 고정편(32)으로 긴밀하게 정착될 수 있도록, 고정브라켓(10)의 배면에 마련된 베이스판(12),걸림판(13)이 접촉되는 제2고정부재(30)의 고정편(32) 일측 수직면(32c)으로 요입홈(32a)이 형성되어 인장력의 발생시에 고정편(32)의 요입홈(32a)으로 베이스판(12), 걸림판(13)이 긴밀하게 정착되어지게 된다. 이는 고정브라켓(10)이 유동되는 것을 방지하게 되는 역할 또한 충분히 수행할 수 있게 된다.  When the pressure plate 15 and the fixing device 16 are installed as the fixing bracket 10 and the tensile force is applied to the tensile steel wire 204, the fixing bracket was mounted by the fixing piece 32 of the lower second fixing member 30. Base plate 12, the catching plate 13 provided on the back of the fixing bracket 10 so that 10 can be tightly fixed to the fixing piece 32 protruding from the upper and lower second fixing member 30 The recessed groove 32a is formed in one vertical surface 32c of the fixed piece 32 of the second fixing member 30 in contact with the base plate 12 by the recessed groove 32a of the fixed piece 32 when a tension force is generated. ), The locking plate 13 is tightly fixed. This can also perform a sufficient role to prevent the fixed bracket 10 to flow.

상기와 같이 띠장(101)의 상.하부측으로 고정부재(20,30)를 장착시킨 뒤, 고정부재(20,30)에 의해 고정브라켓(10)을 띠장(101,101a) 사이에 끼워진 형태로 설치할 수 있어 띠장(101) 외부로 앵커지지체(100)가 돌출되지 않게 되며, 그에 따라 굴착 공간이 협소하게 되는 것을 방지할 수 있고, 굴착공간을 효율적으로 활용할 수 있는 것이다.After mounting the fixing members (20,30) to the upper and lower sides of the strip length 101 as described above, the fixing bracket 10 is installed between the strip lengths (101,101a) by the fixing members (20,30). It is possible to prevent the anchor support 100 from protruding to the outside of the strip 101, thereby preventing the excavation space is narrow, it is possible to effectively utilize the excavation space.

또한, 띠장(101) 자체에 고정부재(20,30)가 일체로 결합되고, 고정부재(20,30)에 형성된 각 지지편(22), 고정편(32)의 일측 수직면(22a,32b)이 흙막이 벽체(200)와 맞닿이는 띠장(101)의 일측면을 지지하는 구조를 형성함에 따라 앵커로 인장력을 가할시에 발생 되는 인장력이 지압판(15)으로 분산되면서 고정브라켓(10)의 양 측면판(11)을 통해, 제2 고정부재(30)의 고정편(32)으로 골고루 전달됨과 동시에 외부측으로 결합된 제1고정부재(20)로 인장력이 전달되게 되고, 이로 인한 띠장(101,101a) 전체로 인장력을 골고루 분산시켜 손실 없이 인장력을 흙막이 벽체(200)로 전달하여 지지할 수 있게 되는 것이다.In addition, the fixing members 20 and 30 are integrally coupled to the belt strip 101 itself, and each support piece 22 formed on the fixing members 20 and 30 and one vertical surface 22a and 32b of the fixing piece 32 are formed. By forming a structure for supporting one side of the strip 101 which is in contact with the earth wall 200, the tensile force generated when applying the tensile force to the anchor is distributed to the pressure plate 15 while the amount of the fixing bracket 10 Through the side plate 11, evenly transmitted to the fixing piece 32 of the second fixing member 30 and at the same time the tensile force is transmitted to the first fixing member 20 coupled to the outside, resulting in the bands 101, 101a By uniformly dispersing the tensile force as a whole, it is possible to support the tensile force transmitted to the earth wall 200 without loss.

한편, 본 발명의 구성을 도 6내지 도 8에 보인 바와 같이 다른 실시예를 나타낸 것으로 앵커지지체(100)를 구성하되, 띠장(101) 내측부에 별도의 제2고정부재(30)를 설치하지 않고, 브라켓(40) 자체를 띠장(101,101a) 사이에 바로 끼움시켜 띠장(10)의 외부측에서 설치되는 제1고정부재(20)와 함께 고정 결합할 수 있도록 구성한 것이다.    On the other hand, the configuration of the present invention as shown in Figure 6 to 8 showing another embodiment to configure the anchor support 100, without installing a separate second fixing member 30 on the inner side of the strip 101. To insert the bracket 40 itself between the strips 101 and 101a, the bracket 40 may be fixedly coupled with the first fixing member 20 installed at the outer side of the strip 10.

다른 실시예에 따른 본 발명의 구성을 보다 상세하게 설명하면, Referring to the configuration of the present invention in accordance with another embodiment in more detail,

수개의 결합공(41a)이 뚫린 고정판(41)이 마련되고, 고정판(41)의 일단에 측면판(42)이 용접결합하여 직각부위를 형성하고, 직삼각형 형상의 중앙에 관통공(43a)이 형성되고, 끼움공(43b)이 뚫린 전면판(43)이 측면판(42)과 고정판(41)으로 형성되는 직각부위로 용접 결합되며, 전면판(43)과 측면판(42)을 배면에서 지지할 수 있게 수직바(44a)의 중앙부위에 수평바(44b)가 돌출되게 형성된 베이스지지판(44)이 용접 결합된 반쪽형상의 브라켓(40) 한쌍을 서로 대칭되게 구성하여 맞물림 구조로 설치되게 한 것에 특징이 있다. A fixing plate 41 having several coupling holes 41a formed therein is provided, and a side plate 42 is welded to one end of the fixing plate 41 to form a right angled portion, and a through hole 43a is formed at the center of the right triangle shape. Is formed, the front plate 43 through which the fitting hole (43b) is welded to the right angle formed by the side plate 42 and the fixed plate 41, the front plate 43 and the side plate 42 in the back The base support plate 44 formed by protruding the horizontal bar 44b at the center portion of the vertical bar 44a so as to be supported is symmetrically configured with a pair of half-shaped brackets 40 welded to each other to be installed in an engagement structure. It is characteristic of one thing.

한편, 상기 브라켓(40)의 전면판(43)은 평평한 수직면으로 이루어짐에 따라 인장강선(204)의 꺽임을 방지하기 위한 배면에 끼움구가 형성된 지압판(45)과 일체로 결합되는 각도조정구(46)를 포함하여 구성하게 된다.On the other hand, the front plate 43 of the bracket 40 is made of a flat vertical surface, the angle adjusting tool 46 is integrally coupled with the pressure plate 45 formed with the fitting hole on the back to prevent the bending of the tensile steel wire 204 ) Will be configured.

도 7의 보인 바와 같이, 상기 한 쌍의 브라켓(40)은 띠장(101,101a)의 사이로 서로 대칭되는 맞물림 구조로 결합시에 전면판(43)의 형상이 직사각형의 구조로 가지게 되며, 전면판(43)의 경사부위가 서로 이음되는 구조를 통해 관통공(43a)이 형성되게 된다. 이는 띠장(101,101a) 사이에 끼워진 형태로 설치시에 띠장(101,101a) 사이의 간격과 브라켓(40)의 크기로 인한 끼움 작업시 불편함을 해소하기 위하여 반쪽형상이 되게 구성한 것이며, 상기 브라켓(40)을 띠장(101)으로 장착시에는 일실시예의 제1고정부재(20)만을 사용하여 띠장(101)의 내측에 끼움식으로 장착되는 브라켓(40)의 고정판(41)에 뚫린 결합공(41a)으로 볼팅체결하여 띠장(101)으로 일체가 되게 장착하게 된다.As shown in FIG. 7, the pair of brackets 40 have an engagement structure that is symmetrical with each other between the strips 101 and 101a so that the front plate 43 has a rectangular structure when joined. Through-hole 43a is formed through the structure in which the inclined portions of 43 are connected to each other. This is configured to be in the shape of a half in order to solve the discomfort during the fitting operation due to the gap between the strips (101, 101a) and the size of the bracket 40 when installed in the form sandwiched between the strips (101, 101a), the bracket ( When mounting the 40 as a band 101, the coupling hole drilled in the fixing plate 41 of the bracket 40 to be fitted in the inside of the band 101 using only the first fixing member 20 of one embodiment ( 41a) is bolted into the belt 101 to be integrally mounted.

상기 브라켓(40)은 반쪽형상의 브라켓(40)을 하나씩 띠장(101,101a)의 내측으로 끼움하여 거치시킨뒤 볼팅체결로 결합하는 것이 바람직하다.The bracket 40 is preferably fitted by mounting the half-shaped bracket (40) by fitting the inner side of the strips (101, 101a) one by one after bolting.

상기 브라켓(40)이 띠장(101)과 띠장(101a) 사이로 장착이 완료되면, 지압판(45)과 각도조정구(46), 정착구(47) 순으로 브라켓(40)의 전면판(43)으로 설치하며, 인장강선(204)은 전면판(43)의 관통공(43a)과, 지압판(45)의 인출공(45a)과, 각도조정구(46)의 관통공(46a)을 통과하여 정착구(47)로 연결하여 인장력을 가하게 된다.When the bracket 40 is completed between the belt length 101 and the length 101a, the acupressure plate 45, the angle adjuster 46, and the fixing hole 47 are installed in the front plate 43 of the bracket 40 in this order. The tensile steel wire 204 passes through the through hole 43a of the front plate 43, the withdrawal hole 45a of the shiatsu plate 45, and the through hole 46a of the angle adjustment hole 46 to fix the fixing hole 47. ) To apply tensile force.

상기 지압판(45)과 각도조정구(46)는 사전에 일체로 용접결합하여 구비하게 되는 것이 바람직하다. The pressure plate 45 and the angle adjustment tool 46 is preferably provided by welding integrally integrally in advance.

상기 각도조정구(46)를 설치함으로 인해 인장력을 가할시에 인장강선(204)이 휘거나 꺽이는 것을 방지할 수 있게 되고, By installing the angle adjusting tool 46, it is possible to prevent the tensile steel wire 204 from bending or bending when applying the tensile force,

상기 각도조정구(46)를 일체로 결합한 지압판(45)을 전면판(43)에 고정할 경우 지압판(45)의 형성된 끼움구(45b)를 브라켓(40)의 전면판(43)에 마련된 끼움공(43b)으로 끼움하여 결합한뒤, 정착구(47)를 통해 인장강선(204)에 인장력을 가하게 됨으로서 지압판(45)을 포함한 각도조정구(46)가 브라켓(40)의 전면판(43)으로 긴밀하게 정착할 수 있게 된다.When fixing the pressure plate 45 in which the angle adjuster 46 is integrally attached to the front plate 43, the fitting holes 45b formed on the pressure plate 45 are provided in the front plate 43 of the bracket 40. (43b) and then coupled, the tension adjusting device 46, including the pressure plate 45 is tightly applied to the front plate 43 of the bracket 40 by applying a tensile force to the tensile steel wire 204 through the anchorage (47). You can settle down.

또한 각도조정구(46)와 일체로 용접결합되는 지압판(45)으로 인장력이 전달되어 지압판(45)을 통해 브라켓(40)의 전면판(43)과 측면판(42)으로 전달되며, 분리된 구조의 전면판(43)에 의해 인장력이 분산되면서 각 반쪽형상의 브라켓(40)을 구성하는 측면판(42)과 베이스지지판(44)을 통해 띠장(101,101a)으로 인장력이 가해지게 되며, 브라켓(40)을 띠장 사이로 결합하여 고정시키게 되는 외부측 제1고정부(20)로 인장력이 전달되게 되고, 이로 인한 띠장(101,101a) 전체로 인장력을 골고루 분산시켜 손실없이 인장력을 흙막이 벽체로 전달하여 지지할 수 있게 된다.In addition, the tensile force is transmitted to the pressure plate 45 is welded integrally with the angle adjuster 46 is transmitted to the front plate 43 and the side plate 42 of the bracket 40 through the pressure plate 45, separated structure The tension is applied to the strips 101 and 101a through the side plate 42 and the base support plate 44 constituting the half-shaped bracket 40 while the tensile force is dispersed by the front plate 43 of the bracket ( Tensile force is transmitted to the outer side first fixing part 20 which is fixed by coupling between the strips 40, and the tensile force is evenly distributed throughout the strips 101 and 101a, thereby transferring the tensile force to the earth wall without loss. You can do it.

여기서 전면판(43)과 측면판(42)의 배면으로 결합되어진 베이스지지판(44)에 의해 전면판(43)으로 전해지는 인장력이 띠장(101,101a)으로 전달시에 골고루 전달될 수 있게 된다. 이는 베이스지지판(44)을 형성하는 수평바(44b)의 끝단면이 전면판(43)과 결합되어 전면판(43)을 지지하게 되고, 수평바(44b)의 일측면 테두리로 측면판(42)이 결합되어 측면판(42)을 지지하게 되며, 베이스지지판(44)의 타단면이 띠장(101)의 일단으로 맞닿이는 구조를 구성함으로써 가능하게 되는 것이다.In this case, the tensile force transmitted to the front plate 43 by the base support plate 44 coupled to the rear surfaces of the front plate 43 and the side plate 42 may be evenly transmitted when the transfer to the strips 101 and 101a. The end surface of the horizontal bar 44b forming the base support plate 44 is combined with the front plate 43 to support the front plate 43, and the side plate 42 as one side edge of the horizontal bar 44b. ) Is coupled to support the side plate 42, it is possible by configuring a structure in which the other end surface of the base support plate 44 abuts to one end of the strip 101.

삭제delete

도 1은 종래의 띠장부위로 구성되는 앵커체를 개략적으로 보인 단면도.1 is a cross-sectional view schematically showing an anchor body composed of a conventional strip-shaped portion.

도 2는 본 발명의 일실시예를 보인 전체 사시도.Figure 2 is an overall perspective view showing one embodiment of the present invention.

도 3은 본 발명의 일실시예를 보인 확대 사시도.Figure 3 is an enlarged perspective view showing an embodiment of the present invention.

도 4는 본 발명의 일실시예에 따른 정착구조를 보인 사시도.4 is a perspective view showing a fixing structure according to an embodiment of the present invention.

도 5는 본 발명의 일실시예에 따른 정착구조를 보인 단면도.5 is a cross-sectional view showing a fixing structure according to an embodiment of the present invention.

도 6은 본 발명의 다른실시예를 보인 확대 사시도.Figure 6 is an enlarged perspective view showing another embodiment of the present invention.

도 7은 본 발명의 다른실시예에 따른 정착구조를 보인 사시도.7 is a perspective view showing a fixing structure according to another embodiment of the present invention.

도 8은 본 발명의 다른실시예에 따른 정착구조를 보인 단면도.8 is a sectional view showing a fixing structure according to another embodiment of the present invention.

< 도면의 주요부분에 대한 부호의 설명><Description of reference numerals for main parts of the drawings>

300 : 천공홀 200 : 흙막이 벽체 201 : 수직파일 202 : 토류판 203 : 관통 204 : 인장강선300: drilling hole 200: earth wall 201: vertical pile 202: earth plate 203: through 204: tensile steel wire

100 : 앵커지지체 101 : 띠장100: anchor support 101: strip length

10 : 고정브라켓 11 : 측면판 12 : 베이스판 13 : 걸림판 14 : 연결판 15 : 지압판 16 : 정착구 DESCRIPTION OF SYMBOLS 10 Fixing bracket 11 Side plate 12 Base plate 13 Hanging board 14 Connection board 15 Acupressure plate 16 Fixture opening

20 : 제1고정부재 21 : 받침판 22 : 지지편20: first fixing member 21: supporting plate 22: support piece

30 : 제2고정부재 31 : 받침판 32 : 고정편30: second fixing member 31: supporting plate 32: fixed piece

40 : 브라켓 41 : 고정판 42 : 측면판 43 : 전면판 44 : 베이스지지판 45 : 지압판 46 : 각도조정구 47 : 정착구40 Bracket 41 Fixed plate 42 Side plate 43 Front plate 44 Base support plate 45 Acupressure plate 46 Angle adjuster 47 Fixture

Claims (3)

지반굴착시 굴착면의 붕괴를 방지하여 흙막이 벽체가 설치되고 흙막이 벽체가 굴착면의 토압으로부터 자립할 수 있게 흙막이 벽체를 지지하도록 하는 띠장이 설치되고, 지반 내측 천공홀(300)로 삽입되어진 앵커를 정착하고 지지하는 앵커 지지체를 구성함에 있어서, An earthquake wall is installed to prevent the collapse of the excavation surface during ground excavation, and a strip is installed to support the earthquake wall so that the earthquake wall can stand free from earth pressure of the excavation surface, and the anchor inserted into the ground inner perforation hole 300 is installed. In constructing anchor support for fixing and supporting, 수개의 결합공(21a)이 뚫린 받침판(21)이 형성되고, 받침판(21)의 일측으로 수직면(22a)과 경사면(22b)을 가지는 한 쌍의 지지편(22)이 소정 간격을 두고 일체로 돌출되게 형성되어 띠장(101)의 외부측에서 내부측의 제2고정부재(30)와 서로 대응되게 설치되는 제1고정부재(20)와;A support plate 21 through which several coupling holes 21a are formed is formed, and a pair of support pieces 22 having a vertical surface 22a and an inclined surface 22b on one side of the support plate 21 are integrally spaced at a predetermined interval. A first fixing member 20 which is formed to protrude and is installed to correspond to each other with the second fixing member 30 on the inner side from the outer side of the strip 101; 수개의 나사공(31a)이 뚫린 받침판(31)이 형성되고, 양측에 수직면(32b, 32c)과 경사면(32d)이 형성되고, 일측 수직면(32b)에 요입홈(32a)이 형성된 한 쌍의 고정편(32)이 받침판(31)의 일측으로 돌출되게 형성되어 띠장(101)의 내부측에서 외부측 제1고정부재(20)와 대응되게 설치되는 제2고정부재(30)와;A pair of support plates 31 formed with several threaded holes 31a are formed, vertical surfaces 32b and 32c and inclined surfaces 32d are formed on both sides, and a pair of recessed grooves 32a are formed on one vertical surface 32b. A second fixing member (30) formed to protrude toward one side of the support plate (31) so as to correspond to the first fixing member (20) on the inner side of the strip (101); 소정의 각도로 경사지도록 전면 상.하부에 제1경사면(11a)과 제2경사면(11b)를 가지는 한 쌍의 측면판(11)이 소정의 간격으로 이격되게 구비되고, 이격된 한쌍의 측면판(11)의 배면 상부측에 베이스판(12)과 하부측에 걸림구(13a)가 형성된 걸림판(13)이 용접 결합되며, 측면판(11)의 전면 제1.2경사면(11a,11b)의 끝단부에 연결판(14)이 각각 용접 결합되며, 중앙에 인출공(15a)이 형성된 지압판(15)이 제1경사면(11a)으로 용접결합할 수 있게 구비되고, 앵커체로부터 돌출되는 인장강선(204)을 정착시킬 수 있도록 지압판(15)의 전면에 설치되는 정착구(16)로 구성되어 상기 띠장(101)의 내측부에서 상.하부 대칭되도록 설치된 제2고정부재(30)의 고정편(32)에 설치되는 고정브라켓(10)으로 구성된 것을 특징으로 하는 띠장 사이로 내설되는 앵커지지체(100).A pair of side plates 11 having a first inclined surface 11a and a second inclined surface 11b at upper and lower sides of the front surface so as to be inclined at a predetermined angle are spaced at a predetermined interval, and the pair of side plates spaced apart from each other. The base plate 12 and the locking plate 13 having the locking holes 13a formed at the lower side are welded to the upper side of the rear surface 11, and the first and second slopes 11a and 11b of the front side of the side plate 11 are welded to each other. The connecting plate 14 is welded and coupled to the end, respectively, and the pressure plate 15 having the drawing hole 15a formed at the center thereof is provided to be welded to the first inclined surface 11a, and the tensile steel wire protrudes from the anchor body. The fixing piece 32 of the second fixing member 30 is composed of a fixing unit 16 is installed on the front surface of the pressure plate 15 so that the 204 can be fixed so that the upper and lower symmetry is installed on the inner side of the belt strip 101. Anchor support body 100 is installed between the strips, characterized in that consisting of a fixed bracket (10) installed in the). 삭제delete 삭제delete
KR1020080042639A 2008-05-08 2008-05-08 Supporting apparatus having in between two belts and constructing method thereof KR100901437B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080042639A KR100901437B1 (en) 2008-05-08 2008-05-08 Supporting apparatus having in between two belts and constructing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080042639A KR100901437B1 (en) 2008-05-08 2008-05-08 Supporting apparatus having in between two belts and constructing method thereof

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR1020090025086A Division KR100989023B1 (en) 2009-03-24 2009-03-24 Supporting apparatus having in between two belts and constructing method thereof

Publications (1)

Publication Number Publication Date
KR100901437B1 true KR100901437B1 (en) 2009-06-05

Family

ID=40982402

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080042639A KR100901437B1 (en) 2008-05-08 2008-05-08 Supporting apparatus having in between two belts and constructing method thereof

Country Status (1)

Country Link
KR (1) KR100901437B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11247191A (en) 1998-03-03 1999-09-14 Kumagai Gumi Co Ltd Fixing pedestal of ground anchor for earth retaining
JP3840331B2 (en) 1998-04-16 2006-11-01 近畿日本鉄道株式会社 Retaining wall using corrosion-resistant structural anchor
JP2007177517A (en) 2005-12-28 2007-07-12 Tanaka Juken:Kk Earth anchor method
JP2008002059A (en) 2006-06-20 2008-01-10 Tanaka Juken:Kk Earth anchor construction method and linear body tension holding pedestal with upper and lower wale receivers

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11247191A (en) 1998-03-03 1999-09-14 Kumagai Gumi Co Ltd Fixing pedestal of ground anchor for earth retaining
JP3840331B2 (en) 1998-04-16 2006-11-01 近畿日本鉄道株式会社 Retaining wall using corrosion-resistant structural anchor
JP2007177517A (en) 2005-12-28 2007-07-12 Tanaka Juken:Kk Earth anchor method
JP2008002059A (en) 2006-06-20 2008-01-10 Tanaka Juken:Kk Earth anchor construction method and linear body tension holding pedestal with upper and lower wale receivers

Similar Documents

Publication Publication Date Title
KR101785677B1 (en) Construction method of retaining wall using precast slope panel
KR100799358B1 (en) Combined retaining wall and method for constructing thereof
KR100917044B1 (en) Concrete retaining wall construction method with dual wall jointed by anchor
KR20190036591A (en) Thrust pile with prestress and self-supporting type pile construction using it
KR101206344B1 (en) Precast panel for retaining wall and construction method therewith
US9683347B2 (en) Systems and methods to reinforce excavation walls
JP4599423B2 (en) Embankment structure and construction method thereof
KR20200124949A (en) Anchor Tension way sheathing structure and sheathing method of construction
KR20110129657A (en) Retaining wall using frame structure and method of making retaining wall using thereof
KR20110098597A (en) Guide frame for h-steel
KR100715098B1 (en) Shoring structure
KR100778137B1 (en) Bracket and Support for Prestressed Scaffolding System
KR101679727B1 (en) Retaining wall with panel type frictional plate anchor and construction method thereof
KR20170017199A (en) Retaining Wal1 Construction Method Using PHC Pile
KR101993609B1 (en) Earth retaining structure using concrete block for the anchorage of anchor pc-strands and construction method thereof
KR100901437B1 (en) Supporting apparatus having in between two belts and constructing method thereof
KR100989023B1 (en) Supporting apparatus having in between two belts and constructing method thereof
KR20130121271A (en) Assemblies for supporting earth anchor of soil retaining wall and soil retaining wall constructing method using the same
KR20120067402A (en) Connecting structure for precast concrete column to cast-in-place footing
KR100827009B1 (en) Earth retaining for lay supply pipe and drain pipe
KR200468018Y1 (en) An apparatus of fixing the prebricated concrete block for breast wall
KR102307510B1 (en) Temporary earth retaining structure and Construction method using the same
KR20150010422A (en) Mid supporting beam for temporary soil sheathing work
KR101534058B1 (en) Soil retaining wall for load support and constructing method thereof
KR101166127B1 (en) A method of construction for a bridge abutment using poor ground and a bridge abutment structureconstructed by the method

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E902 Notification of reason for refusal
AMND Amendment
E90F Notification of reason for final refusal
AMND Amendment
E601 Decision to refuse application
E801 Decision on dismissal of amendment
A107 Divisional application of patent
AMND Amendment
J201 Request for trial against refusal decision
B701 Decision to grant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130506

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20140428

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20150601

Year of fee payment: 7