KR20090116292A KR1020080042149A KR20080042149A KR20090116292A KR 20090116292 A KR20090116292 A KR 20090116292A KR 1020080042149 A KR1020080042149 A KR 1020080042149A KR 20080042149 A KR20080042149 A KR 20080042149A KR 20090116292 A KR20090116292 A KR 20090116292A
Authority
KR
South Korea
Prior art keywords
cargo tank
block
tank block
dock
cargo
Prior art date
Application number
KR1020080042149A
Other languages
Korean (ko)
Inventor
김응래
신성광
원교응
윤탁
Original Assignee
에스티엑스조선주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 에스티엑스조선주식회사 filed Critical 에스티엑스조선주식회사
Priority to KR1020080042149A priority Critical patent/KR20090116292A/en
Publication of KR20090116292A publication Critical patent/KR20090116292A/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B11/00Interior subdivision of hulls
    • B63B11/04Constructional features of bunkers, e.g. structural fuel tanks, or ballast tanks, e.g. with elastic walls
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B25/00Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby
    • B63B25/02Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods
    • B63B25/08Load-accommodating arrangements, e.g. stowing, trimming; Vessels characterised thereby for bulk goods fluid
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C1/00Dry-docking of vessels or flying-boats

Abstract

PURPOSE: A procedure of a ship building method including a painting process of a cargo tank block is provided to effectually shorten a total building period of crude/product oil tanker ships. CONSTITUTION: A cargo tank block is completely formed in a preceding step(S100). The inspection of the cargo tank block, an air test, and a surface process is performed(S200). The inside painting of the cargo tank block is performed(S300). The cargo tank block is moved to a dock using a horizontal transporting device(S400). The cargo tank block is mounted and launched within the dock(S500).

Description

화물탱크 블록의 선행화 및 도장공정을 포함하는 선박건조공법{METHOD OF SHIPBUILDING FOR CARGO TANK AT BLOCK STAGE INCLUDE TANK COATING}Shipbuilding process including prioritization and painting process of cargo tank block {METHOD OF SHIPBUILDING FOR CARGO TANK AT BLOCK STAGE INCLUDE TANK COATING}

본 발명은 CRUDE/PRODUCT OIL TANKER 선박의 건조공법에 관한 것이다.The present invention relates to a construction method of a CRUDE / PRODUCT OIL TANKER vessel.

선체를 건조함에는 다수의 강판이나 형강 등의 소재를 가공하여 먼저 개개의 부품을 제작하고, 그 일부를 조립정반(組立定盤) 위에서 소조립, 중조립을 통하여 부품의 대형화를 행한다. 이어서 라인화된 조립정반에 이들 부품을 배열, 조합하여 블록(BLOCK)을 제작한다. 제작된 블록은 도장공사(塗裝工事)를 행하여 최종공정인 도크(DOCK) 주위에서 총조립, 즉 블록과 블록의 결합작업 후 대형블록을 탑재하여 결합하는 것에 의하여 선체가 완성된다.In drying the hull, a large number of steel sheets, section steels, and the like are processed, and individual parts are first manufactured, and a part of the hull is enlarged by small and medium assembly on the assembly plate. Subsequently, these parts are arranged and combined on a lined assembly plate to produce a block. The manufactured block is completed by painting work and total assembly around the final dock, that is, after the block and block joining work, the large block is mounted and combined to complete the hull.

한편, 블록건조 방식의 목적은 도크에서의 공사량을 극력 감소시키기 위하여 지상의 조립정반 위에서 선체를 분할하여 제작하려고 하는 것으로, ① 도크에서의 작업기간을 단축할 수 있으며, ② 공정과 공작기술의 관리 감독이 용이하며, ③ 적절한 작업원의 배치를 행하기 쉬우며, ④ 작업환경을 양호하게 하고 기계화, 자동화가 용이하므로 능률이 향상되며, ⑤ 고소작업(高所作業)의 위험을 감소시킬 수 있으며, ⑥ 현장용접이 적어지므로 용접변형과 잔류응력을 감소시킬 수 있으며, ⑦ 블록도장을 실시하므로 도크에서의 도장작업을 감소시킬 수 있는 등의 장점이 있다.On the other hand, the purpose of the block drying method is to divide the hull on the assembly plate on the ground to reduce the amount of work in the dock as much as possible, ① to shorten the working period in the dock, ② to manage the process and work technology It is easy to supervise, ③ It is easy to arrange the appropriate worker, ④ It improves the work environment by improving the working environment, and it is easy to mechanize and automate. ⑤ It can reduce the risk of high place work. ⑥ It reduces the welding deformation and residual stress because of less spot welding. ⑦ It can reduce the painting work on the dock because of block painting.

블록은 그 크기와 구조에 따라서 여러 가지로 분류되지만 대별하여 평블록과 곡블록으로 나누어진다. 일반적으로 블록이라고 하면 플레이트(plate), 거더(girder), 스티프너(stiffener) 등에 의하여 평면적으로 구성된다고 개괄적으로 생각하더라도 무방한 경우가 많다. 어셈블리(대조립) 공정은 정반(定盤) 위에 플레이트를 배열하여 그 위에 거더, 스티프너를 배열하여 부착용접을 행하여 1개의 블록을 완성하는 것으로서 보통 부재의 배열로부터 부착, 용접, 완료 후 각종 시험완료까지를 대조립 공정이라 하고 있다. 근년에는 의장품 부착이나 각종 시험의 공사도 선행화(先行化)하여 조립정반 위에서 행하여지고 있다.Blocks are classified into various types according to their size and structure, but are divided into flat blocks and music blocks. In general, a block may be generally considered to be planarly formed by a plate, a girder, a stiffener, or the like. The assembly (large assembly) process consists of arranging plates on a surface plate, arranging girders and stiffeners on it, and performing welding by completing one block. It is called as a contrast process. In recent years, construction of equipments and various tests have also been advanced and carried out on assembly tables.

블록의 중량은 설비의 증강 및 생산기술의 향상과 더불어 대형화하여 가고 있으며, 대형 탱크선에서는 200~300톤이 보통으로 되어 있다. 또 설비의 규모에 따라 400~500톤을 초과하는 것도 있고, 더욱이 도크 옆에서 총조립(P.E) 공정을 거쳐 초대형 블록(800톤)을 건조하는 방식도 보편화되어 있다.The weight of the block is increasing with the increase of facilities and the improvement of production technology. In large tankers, 200 ~ 300 tons is common. Depending on the size of the facility, some may exceed 400-500 tons, and the method of drying the super-large block (800 tons) by the total assembly (P.E) process next to the dock is also common.

건조대상 선박은 설계단계에서 보유하고 있는 시설 및 장비의 능력과 작업의 용이성 등을 고려하여 적절한 형태의 블록으로 분할되며, 이러한 블록들은 부재의 가공 및 조립공정을 통해 완성되어 도크로 이동된다. 탑재공정은 이와 같이 조립공정을 거쳐 완성된 블록들을 도크에서 하나하나 일정한 순서에 의해 쌓아가면서 선박의 형체를 만들어 나가는 과정을 말한다. 크레인 용량의 증가에 따라 분할된 블록이 대형화되어가고 탑재공사와 더불어 의장(艤裝)공사를 진행하거나 또는 그 일 부를 선각공사(船殼工事)의 일환으로서 시공하는 소위 선행의장(先行艤裝)이 점차 증가되어 가고 있다.The ship to be constructed is divided into appropriately shaped blocks in consideration of the facilities and equipments possessed in the design stage and ease of operation, and these blocks are completed and moved to the dock through the processing and assembly process of the members. The mounting process refers to the process of building the shape of the ship by stacking the blocks completed through the assembly process in the dock one by one in a certain order. As the capacity of the crane increases, the divided blocks become larger and carry out design work together with the mounting work, or a part of the so-called preliminary design work as part of the hull construction work. Is gradually increasing.

한편, 일반적인 CRUDE/PRODUCT OIL TANKER 선박도 다수의 CARGO TANK 블록, 선수 및 선미블록과 같이 선체를 구성하는 각각의 블록을 육상에서 제조한 후 도크로 이동시켜 탑재하는 공법에 따라 건조된다. 이때, 도크에서 블록들을 탑재하여 선체를 건조하고 나면 이를 진수한 후 안벽에서 CARGO TANK 구역에 대한 INSPECTION, AIR TEST, 표면처리 및 도장공정을 진행하게 되는데, 이와 같은 공정들이 안벽기간 동안 모두 이루어지게 되므로 안벽기간이 불가피하게 길어지며 이에 따른 작업의 위험성이나 비용도 증가하는 문제가 발생하고 있다(도 2 참조).Meanwhile, a general CRUDE / PRODUCT OIL TANKER vessel is also manufactured according to a construction method in which each block constituting the hull, such as a plurality of CARGO TANK blocks, a bow and a stern block, is manufactured on land and moved to a dock. In this case, after the ships are built with the blocks mounted in the dock, the ship is launched and then the INSPECTION, AIR TEST, surface treatment and painting processes for the CARGO TANK area are carried out on the inner wall. Inevitably lengthening the length of the quay, there is a problem that increases the risk or cost of work (see Figure 2).

본 발명은 종래 CRUDE/PRODUCT OIL TANKER 선박의 건조시 안벽공기가 과다하게 소요되는 문제를 해결하기 위해 안출된 것으로, 선박의 중앙부인 CARGO TANK 구역의 일부 혹은 전부가 완벽하게 독립된 CARGO TANK 블록을 형성하도록 건조하고, 이렇게 형성된 CARGO TANK 블록에 대하여 INSPECTION, AIR TEST, 표면처리를 조기에 실시할 뿐만 아니라 도장공정까지도 조기에 실시함으로써 CRUDE/PRODUCT OIL TANKER 선박의 총 건조공기를 좌우하는 안벽공기를 효과적으로 단축시킬 수 있도록 하는 건조방법을 제공하는 것을 목적으로 한다.The present invention was devised to solve the problem of excessive overhanging air when building a conventional CRUDE / PRODUCT OIL TANKER vessel, so that some or all of the CARGO TANK zone, which is the center of the vessel, forms a completely independent CARGO TANK block. The dry and thus formed CARGO TANK blocks are not only subjected to INSPECTION, AIR TEST and surface treatment at an early stage, but also to the painting process at an early stage to effectively reduce the quay wall air that influences the total dry air of the CRUDE / PRODUCT OIL TANKER vessel. It is an object to provide a drying method that allows.

본 발명의 기타 목적 및 장점들은 하기에 설명될 것이며, 이는 본 발명의 청구범위에 기재된 사항 및 그 실시예의 개시 내용뿐만 아니라, 이들로부터 용이하게 추고할 수 있는 범위 내의 수단 및 조합에 의해 보다 넓은 범위로 포섭될 것임을 첨언한다.Other objects and advantages of the present invention will be described below, which are not limited to the matters set forth in the claims and the disclosure of the embodiments thereof, but also to the broader ranges by means and combinations within the range readily recited therefrom. Add that it will be included.

상기한 목적을 달성하기 위하여 본 발명은, CARGO TANK 블록을 선행단계에서 완벽하게 형성하는 제 100 단계; CARGO TANK 블록의 AIR TEST를 실시하는 제 200 단계; CARGO TANK 블록의 내부 도장을 실시하는 제 300 단계; CARGO TANK 블록을 수평이송장비를 이용하여 도크로 이송하는 제 400 단계; 및 CARGO TANK 블록을 도크 내에서 탑재한 후 진수하는 제 500 단계를 거치는 과정을 통하여 안벽공기를 단축시키는 것을 특징으로 하는 화물탱크 블록의 선행화 및 도장공정을 포함하는 선 박건조공법을 제시한다.In order to achieve the above object, the present invention, the 100th step to form a complete CARGO TANK block in the preceding step; A 200 step of performing AIR TEST of the CARGO TANK block; Step 300 for performing internal painting of the CARGO TANK block; Step 400 of transferring the CARGO TANK block to the dock by using a horizontal transfer device; And it proposes a ship drying method comprising the prior art and painting process of the cargo tank block, characterized in that to reduce the quay air through the process of the 500 step of loading the CARGO TANK block in the dock and launching it.

본 발명에 따르면, CRUDE/PRODUCT OIL TANKER 선박의 총 건조공기를 좌우하는 안벽공기를 효과적으로 단축시킬 수 있게 된다.According to the present invention, it is possible to effectively shorten the quay air, which influences the total drying air of the CRUDE / PRODUCT OIL TANKER vessel.

본 발명의 다른 효과는, 이상에서 설명한 실시예 및 본 발명의 청구범위에 기재된 사항뿐만 아니라, 이들로부터 용이하게 추고할 수 있는 범위 내에서 발생할 수 있는 효과 및 산업 발전에 기여하는 잠정적 장점의 가능성들에 의해 보다 넓은 범위로 포섭될 것임을 첨언한다.Other effects of the present invention, as well as those described in the above-described embodiments and claims of the present invention, as well as potential effects that may occur within the range that can be easily estimated therefrom and potential advantages that contribute to industrial development It will be added that it will be covered by a wider scope.

이하, 본 발명의 바람직한 실시예를 첨부된 도면들을 참조하여 상세히 설명한다. 본 발명을 설명함에 있어, 관련된 공지 구성 또는 기능에 대한 구체적인 설명이 본 발명의 요지를 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명은 생략한다. 또한, 이하에서 본 발명의 바람직한 실시예를 설명할 것이나, 본 발명의 기술적 사상은 이에 한정하거나 제한되지 않고 당업자에 의해 변형되어 다양하게 실시될 수 있음은 물론이다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In describing the present invention, when it is determined that the detailed description of the related well-known configuration or function may obscure the gist of the present invention, the detailed description thereof will be omitted. In addition, the following will describe a preferred embodiment of the present invention, but the technical idea of the present invention is not limited thereto and may be variously modified and modified by those skilled in the art.

본 발명은 CRUDE/PRODUCT OIL TANKER 선박을 건조함에 있어서, 선행단계에서 일부 또는 전부의 CARGO TANK(화물탱크) 블록을 완벽하게 형성하여 이에 대한 INSPECTION, AIR TEST, 표면처리 및 도장공정을 실시하고, 이러한 작업이 완료된 CARGO TANK 블록과 선행단계에서 완벽하게 형성되지 않은 나머지 선박의 중앙부, 선수부 및 선미부의 블록을 도크에서 탑재, 진수하여 안벽기간 동안 나머지 CARGO TANK에 대한 도장공정을 완료함으로써 안벽공기를 효과적으로 단축시킬 수 있도록 한 것이다(도 3 참조).In the present invention, when constructing a CRUDE / PRODUCT OIL TANKER vessel, the CARGO TANK (cargo tank) block of some or all completely formed in the preceding step to perform the INSPECTION, AIR TEST, surface treatment and coating process, and Cargo tank block, which has been completed and the center, bow and stern block of the remaining vessels, which are not completely formed in the preceding stage, are mounted and launched in the dock to reduce the wall air effectively by completing the painting process for the remaining car tank during the quay period. It is to be made (see Fig. 3).

이러한 목적을 달성하기 위하여 안출된 본 발명은, CARGO TANK 블록을 선행단계에서 완벽하게 형성하는 제 100 단계; CARGO TANK 블록의 INSPECTION, AIR TEST, 표면처리를 실시하는 제 200 단계; CARGO TANK 블록의 내부 도장을 실시하는 제 300 단계; CARGO TANK 블록을 수평이송장비를 이용하여 도크로 이송하는 제 400 단계; 및 CARGO TANK 블록을 도크 내에서 탑재한 후 진수하는 제 500 단계를 포함하여 이루어진다.The present invention devised to achieve this object, the 100th step to form a complete CARGO TANK block in the preceding step; A 200th step of performing INSPECTION, AIR TEST and surface treatment of the CARGO TANK block; Step 300 for performing internal painting of the CARGO TANK block; Step 400 of transferring the CARGO TANK block to the dock by using a horizontal transfer device; And a 500th step of launching the CARGO TANK block in the dock and launching it.

제 100 단계는 CARGO TANK 블록을 선행단계에서 완벽하게 형성하는 과정에 관한 것이다(도 3의 S300). 여기서, ‘CARGO TANK 블록을 완벽하게 형성한다’는 것은 CARGO TANK 블록의 전후 및 좌우가 격벽 및 외판으로 차단되도록 함으로써 하나의 밀폐된 공간을 형성하도록 한다는 것을 의미한다.The 100th step relates to a process of completely forming the CARGO TANK block in the preceding step (S300 of FIG. 3). Here, 'to form a CARGO TANK block perfectly' means that the front, rear, left and right of the CARGO TANK block is blocked by the partition wall and outer plate to form a closed space.

이때, 본 단계에서 완벽하게 형성되는 CARGO TANK 블록은 CARGO TANK 구간의 일부일 수도 있고 전부일 수도 있다.At this time, the CARGO TANK block formed completely in this step may be part or all of the CARGO TANK interval.

도 1에서 다수의 대형 블록을 탑재하는 일 예 및 선행단계에서 완벽하게 형성되는 CARGO TANK 블록(GBA, GBD)을 확인할 수 있는데, 본 발명은 이처럼 완벽하게 형성된 CARGO TANK 블록(GBA, GBD)에 대하여 AIR TEST 및 도장공정을 실시한 후 도크에서 이들 블록(GBA, GBD)과 나머지 CARGO TANK 블록(GBB, GBC), 선미부 블 록(GBH) 및 선수부 블록(GBE)을 탑재, 진수하여 나머지 도장공정을 마무리함으로써 안벽공기를 효과적으로 단축시키게 된다.In Figure 1 it can be seen an example of mounting a large number of large blocks and CARGO TANK blocks (GBA, GBD) that are perfectly formed in the preceding step, the present invention with respect to such a perfectly formed CARGO TANK blocks (GBA, GBD) After performing AIR TEST and painting process, these blocks (GBA, GBD) and the remaining CARGO TANK blocks (GBB, GBC), stern block (GBH) and bow block (GBE) are loaded and launched to carry out the remaining painting process. Finishing effectively shortens the quay air.

제 200 단계는 제 100 단계에서 완벽하게 형성된 CARGO TANK 블록의 INSPECTION, AIR TEST, 표면처리를 실시하는 과정에 관한 것이다(도 3의 S400 및 S500).The 200th step relates to a process of performing INSPECTION, AIR TEST and surface treatment of the CARGO TANK block perfectly formed in the 100th step (S400 and S500 of FIG. 3).

이때, AIR TEST의 경우, 안벽기간 동안 AIR TEST를 실시하던 종래에는 WATER BALLAST TANK 부분에 압력을 걸고 CARGO TANK 내부에서 공기가 새어 나오는지 여부를 확인(비눗방울 테스트 등)하는 공정을 취했으나, 본 발명의 경우 본 단계에서는 CARGO TANK 블록의 WATER BALLAST TANK가 완벽하게 형성되어 있지 않아 WATER BALLAST TANK 부분에 압력을 가할 수 없는 관계로 CARGO TANK에서 압력을 가하고 반대로 WATER BALLAST TANK에서 수밀 여부를 확인하는 공정을 취하게 된다.In this case, in the case of AIR TEST, the conventional AIR TEST was performed during the quay wall period, but the pressure was applied to the WATER BALLAST TANK portion to check whether air leaked from inside the CARGO TANK (such as a soap bubble test), but the present invention was performed. In this case, since the WATER BALLAST TANK of the CARGO TANK block is not perfectly formed, it is impossible to apply pressure to the WATER BALLAST TANK part. Done.

제 300 단계는 제 100 단계에서 완벽하게 형성된 CARGO TANK 블록의 내부 도장을 실시하는 과정에 관한 것인데, 본 단계에서는 선체블록에 적용되는 통상의 도장공정을 그대로 따르게 된다(도 3의 S600 및 S700).Step 300 relates to a process of performing the internal coating of the CARGO TANK block perfectly formed in the 100th step, in this step is to follow the usual coating process applied to the hull block as it is (S600 and S700 of Figure 3).

제 400 단계는 제 200 단계의 INSPECTION, AIR TEST, 표면처리와 제 300 단계의 내부 도장을 거친 CARGO TANK 블록을 수평이송장비를 이용하여 도크로 이송하는 과정에 관한 것이다(도 3의 S800).The 400th step relates to a process of transferring the CARGO TANK block, which has undergone the INSPECTION, AIR TEST, surface treatment of the 200th step and the internal coating of the 300th step, to the dock using a horizontal transfer device (S800 of FIG. 3).

본 단계에서는 CARGO TANK 블록을 트랜스포터, 모듈 트랜스포터, 대차 및 그리퍼잭, 대차 및 윈치와 같은 수평이송장비를 이용하여 안정되게 도크로 이송시키게 되는데, CARGO TANK 블록의 무게에 따라 수평이송장비의 수량을 적절하게 조정함으로써 이송시 CARGO TANK 블록의 자중에 의한 변형이나 스트레스, 그리고 도장된 도막손상을 최소화 할 수 있도록 하는 것이 바람직하다.In this step, the CARGO TANK block is stably transferred to the dock using horizontal transport equipment such as transporter, module transporter, truck and gripper jack, truck and winch, and the number of horizontal transport equipment according to the weight of the CARGO TANK block. It is desirable to minimize the deformation or stress caused by the weight of the CARGO TANK block and the damage of the coated film by appropriately adjusting the.

제 500 단계는 CARGO TANK 블록을 도크 내에서 탑재한 후 진수하는 과정에 관한 것이다(도 3의 S800).The 500th step relates to a process of launching the CARGO TANK block in the dock and launching it (S800 of FIG. 3).

본 단계에서는 제 100 단계에서 완벽하게 형성된 CARGO TANK 블록뿐만 아니라 제 100 단계에서 완벽하게 형성되지 않은 나머지 CARGO TANK 블록, 선수부 블록, 선미부 블록이 모두 탑재된 후 진수되는데, 안벽기간 동안 나머지 CARGO TANK에 대한 도장공정을 완료함으로써 안벽공기를 효과적으로 단축시킬 수 있게 된다.In this step, not only the CARGO TANK block perfectly formed in the 100th step but also the remaining CARGO TANK block, the bow block, and the stern block, which are not completely formed in the 100th step, are loaded and launched. By completing the coating process, it is possible to effectively reduce the quay air.

이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위 내에서 다양한 수정, 변경 및 치환이 가능할 것이다. 따라서, 본 발명에 개시된 실시예 및 첨부된 도면들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시예 및 첨부된 도면에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다. 본 발명의 보호 범위는 아래의 청구범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리범위에 포함되는 것으로 해석되어야 할 것이다.The above description is merely illustrative of the technical idea of the present invention, and various modifications, changes, and substitutions may be made by those skilled in the art without departing from the essential characteristics of the present invention. will be. Accordingly, the embodiments disclosed in the present invention and the accompanying drawings are not intended to limit the technical spirit of the present invention but to describe the present invention, and the scope of the technical idea of the present invention is not limited by the embodiments and the accompanying drawings. . The protection scope of the present invention should be interpreted by the following claims, and all technical ideas within the equivalent scope should be interpreted as being included in the scope of the present invention.

도 1은 본 발명에 따른 건조공법 적용시 CARGO TANK 블록의 조기형성을 보여주는 도면이다.1 is a view showing the early formation of CARGO TANK block when applying the drying method according to the present invention.

도 2는 종래 CRUDE/PRODUCT OIL TANKER 선박의 건조공정 흐름을 나타낸 도면이다.Figure 2 is a view showing the drying process flow of the conventional CRUDE / PRODUCT OIL TANKER ship.

도 3은 본 발명에 따른 CRUDE/PRODUCT OIL TANKER 선박의 건조공정 흐름을 나타낸 도면이다.3 is a view showing the drying process flow of the CRUDE / PRODUCT OIL TANKER ship according to the present invention.

Claims (4)

CRUDE/PRODUCT OIL TANKER 선박을 건조함에 있어서,In building a CRUDE / PRODUCT OIL TANKER vessel, CARGO TANK 블록을 선행단계에서 완벽하게 형성하는 제 100 단계;A 100th step of forming the CARGO TANK block completely in the preceding step; CARGO TANK 블록의 INSPECTION, AIR TEST, 표면처리를 실시하는 제 200 단계;A 200th step of performing INSPECTION, AIR TEST and surface treatment of the CARGO TANK block; CARGO TANK 블록의 내부 도장을 실시하는 제 300 단계;Step 300 for performing internal painting of the CARGO TANK block; CARGO TANK 블록을 수평이송장비를 이용하여 도크로 이송하는 제 400 단계; 및Step 400 of transferring the CARGO TANK block to the dock by using a horizontal transfer device; And CARGO TANK 블록을 도크 내에서 탑재한 후 진수하는 제 500 단계를 거치는 과정을 통하여 안벽공기를 단축시키는 것을 특징으로 하는 화물탱크 블록의 선행화 및 도장공정을 포함하는 선박건조공법.A ship drying method including a cargo tank block prioritization and painting process, wherein the cargo tank block is shortened through a 500th step of launching the CARGO TANK block in a dock and launching it. 제 1 항에 있어서,The method of claim 1, 상기 100 단계는,The 100 step, CARGO TANK 구간의 일부 또는 전부에 해당하는 CARGO TANK 블록을 완벽하게 형성하는 것을 특징으로 하는 화물탱크 블록의 선행화 및 도장공정을 포함하는 선박건조공법.Ship construction method comprising the prior art and painting process of the cargo tank block, characterized in that to completely form a CARGO TANK block corresponding to part or all of the CARGO TANK section. 제 1 항에 있어서,The method of claim 1, 상기 200 단계는,The 200 step, CARGO TANK에서 압력을 가하고 반대로 WATER BALLAST TANK에서 수밀 여부를 확인하는 것을 특징으로 하는 화물탱크 블록의 선행화 및 도장공정을 포함하는 선박건조공법.The shipbuilding method including the preceding step and the painting process of the cargo tank block, characterized in that the pressure in the CARGO TANK and on the contrary check the watertightness in the WATER BALLAST TANK. 제 1 항에 있어서,The method of claim 1, 상기 300 단계는,The 300 step, CARGO TANK 내부 도장을 선행 단계에 적용하는 것을 특징으로 하는 화물탱크 블록의 선행화 및 도장공정을 포함하는 선박건조공법.Cargo tank construction method comprising the preceding step and the painting process of the cargo tank block, characterized in that the coating in the preceding step.
KR1020080042149A 2008-05-07 2008-05-07 Method of shipbuilding for cargo tank at block stage include tank coating KR20090116292A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080042149A KR20090116292A (en) 2008-05-07 2008-05-07 Method of shipbuilding for cargo tank at block stage include tank coating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080042149A KR20090116292A (en) 2008-05-07 2008-05-07 Method of shipbuilding for cargo tank at block stage include tank coating

Publications (1)

Publication Number Publication Date
KR20090116292A true KR20090116292A (en) 2009-11-11

Family

ID=41601081

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080042149A KR20090116292A (en) 2008-05-07 2008-05-07 Method of shipbuilding for cargo tank at block stage include tank coating

Country Status (1)

Country Link
KR (1) KR20090116292A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103754323A (en) * 2014-02-14 2014-04-30 南通中远川崎船舶工程有限公司 Mid-series building method of large ship
KR101489534B1 (en) * 2010-12-17 2015-02-03 현대중공업 주식회사 Co2 pipe line pretest in a t-block assembling process of ship

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101489534B1 (en) * 2010-12-17 2015-02-03 현대중공업 주식회사 Co2 pipe line pretest in a t-block assembling process of ship
CN103754323A (en) * 2014-02-14 2014-04-30 南通中远川崎船舶工程有限公司 Mid-series building method of large ship

Similar Documents

Publication Publication Date Title
CN110877705B (en) Method for repairing ballast tank structure of bilge part of large container ship
KR100796410B1 (en) Inundation method using tandem construction method
JP2020513364A (en) Self-propelled integrated vessel for transportation and installation of submerged tunnel submerged pipes
CN202180910U (en) Stern roller used for engineering ship
CN110562386A (en) Pre-assembling method for superstructure of large ship
KR100949567B1 (en) Anchor and anchor chain installation process enhancement
CN113581408A (en) Ship block division method
CN108190723B (en) Hoisting method for side sections with outer plate bulwarks and hatch coamings
KR100718928B1 (en) Giga-block method using many sea-cranes
KR100960397B1 (en) Continuous Assembly Line System of Hull
KR20090116292A (en) Method of shipbuilding for cargo tank at block stage include tank coating
KR20090020825A (en) Tank hydro test method a period of dock stage using buoyancy of half diving state
JP4759620B2 (en) Inundation method applied to tandem construction method
KR100752043B1 (en) Standard procedure for the construction of cargo containment of lng carriers using 9% ni-steel
CN102092458A (en) In-dock super-large ship floating secondary positioning process
KR20090007920A (en) Ship assembling and launching method using divided land and marine construction
CN102844147B (en) Ultrasonic peening method and floating building
CN111791983A (en) Hull broadside structure of semi-submersible multifunctional transport assembly and disassembly ship
JP2005104187A (en) Duct device of tanker
KR100835493B1 (en) A shipbuilding method using three-point contact skids
CN104358234A (en) Over-water floating gate type anti-collision device and manufacture and installation method thereof
CN212386643U (en) Hull broadside structure of semi-submersible multifunctional transport assembly and disassembly ship
KR101807600B1 (en) Construction method for fpu on floating facility
KR100736135B1 (en) Method for constructing a ship
KR100953487B1 (en) Inundation method using lashing in tandem construction method