KR20090041033A - Project management information system - Google Patents
Project management information system Download PDFInfo
- Publication number
- KR20090041033A KR20090041033A KR1020070106522A KR20070106522A KR20090041033A KR 20090041033 A KR20090041033 A KR 20090041033A KR 1020070106522 A KR1020070106522 A KR 1020070106522A KR 20070106522 A KR20070106522 A KR 20070106522A KR 20090041033 A KR20090041033 A KR 20090041033A
- Authority
- KR
- South Korea
- Prior art keywords
- management
- project
- unit
- protocol
- management unit
- Prior art date
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
Abstract
Description
The present invention intersects the entire process of a project from project creation to completion.
As managed by the net, PMS is not only intended to increase project efficiency, but also provide management transparency. In addition to eliminating work risks in advance, it is characterized by efficient operation and management of project-specific progress such as delivery and cost management, and relates to a project management system and method that can be customized to the process most suitable for each company. It is characterized by the efficient operation and management of SME projects.
ERP, which is currently widely available, can only be used for mass-produced products, so it cannot be used for non-mass-produced products. Since these ERP packages are expensive programs, they are difficult to introduce and maintain in SMEs and cannot be modified according to the special form of the company. SMEs have a work process with different work schedules for each ordered product. Therefore, a system suitable for each company's situation and project should be established.
Accordingly, the present invention has been proposed to solve the conventional problems as described above, and an object of the present invention is to integrate and adjust the project using the protocol information for each project, and to customize the process to the most suitable process for each company and the project. It is to provide an efficient project management system (PMS) and a method thereof.
The present invention is a project management system using the Internet journaling protocol management unit that can manage the individual journal and schedule for each project from the Web server; Project protocol management unit for project progress and fund statistics management from the journal protocol management unit; A supplier protocol manager for managing supplier information and order notification from the project protocol manager; A comprehensive search protocol management unit by inputting a project name and a unit price in the supplier protocol management unit; An ordering protocol manager that manages the ordering status of each company in the comprehensive search protocol manager; A receipt protocol manager for managing the receipt quantity and the receipt processing in the ordering protocol manager; A drawing protocol management unit capable of managing drawings, appearances, and payments for each project in the goods receipt protocol management unit; A quality protocol management unit capable of managing the quantity and defect of goods received according to the product in the drawing protocol manager, and the date of receipt; Member management protocol management unit that can link the mail sending service by selecting the output target by the data management and keyword search of employees and cooperative companies, members subscribed using the database in the quality protocol management unit; The membership management protocol management unit is characterized in that it comprises a pass management protocol management unit for managing the access check of members.
The journaling protocol management unit may include: a journaling unit outputting a data on a project log and schedule management for each individual project from a web server on a screen; It is preferably configured to include a journaling section that enables management, technology, control, production, quality, sales, and CS selection.
In addition, the project protocol management unit and a project output unit for providing a data data of the current date, the quotation submission, customer charge, company decision, completion date, the estimated amount according to the project name on the screen; It is preferably configured to include a project selection unit that allows selection of quotation, production, settlement, completion, reference, statistics, sales, purchase, and order information.
In addition, the supplier protocol management unit and the partner supplier output unit for providing the data data of the supplier, division, type, person in charge, department, mobile phone, telephone number, fax number, items, mail on the screen; It is desirable to include a supplier selection section to select customers, competitions and suppliers.
In addition, the comprehensive search protocol management unit is a comprehensive search output unit that provides data on the screen of the company's order amount, material costs, operating profits, labor costs by performing a comprehensive search for each company by entering the project name, unit price in the partner protocol management unit; This is preferred.
The ordering protocol management unit may include: an order management output unit providing data on a screen of a unit name, a product name, a standard, a quantity, a unit order, a unit price, a fixed amount, and a company name according to a project name; It is preferably configured to include an order management selection unit that can select the order, quotation, payment.
In addition, the receipt protocol management unit and the receipt management output unit for providing the quantity, receipt, unit price, amount data on the screen; It is preferable to include a receipt management selection section for selecting the receipt processing, completion items, and search.
In addition, the drawing protocol management unit and a drawing management output unit for providing data on the screen number, quantity, issue, unit price, amount, company name, payment of the project on the screen; It is preferably configured to include; drawing management selection unit that can select the registration, output, quotation, drawing publication, payment.
The quality protocol management unit may include: a quality management output unit for providing a screen for inputting a product name, a standard, a drawing number, a date of receipt of goods, a request date of a user, a quantity of goods received, and a defect; It is preferable to include a quality control selection unit capable of downloading, downloading, receiving items, completing items, detailed search, and comprehensive search of an Excel file.
In addition, the member management protocol management unit provides the member's name, ID, nickname, member group, department, position, gender / age, contact, the number of times, membership on the screen and put a check box for the selected member mail, notes, It is preferable that the member management output unit is configured so that the text service can be linked and managed.
In addition, the pass management protocol management unit is preferably configured as a pass management output unit that provides a screen for checking the department name, name, registration date, scheduled date, update date, status.
By building a PMS according to the present invention, a company can integrate and adjust a project from a company-wide perspective and check the project progress in detail and conveniently through the system. In addition, practitioners can minimize trial and error through advanced process-based project management and improve research productivity through integrated and automated processes. In addition, depending on the project, the business process speed between the head office and the project team can be improved and efficient. In addition, as a web-based system that can be used anywhere, as the number of overseas companies increases, the efficiency of work will be improved.
Preferred embodiments of the project management system according to the present invention configured as described above will be described in detail with reference to the accompanying drawings.
First, the present invention is to support the efficient operation and management of the progress of each SME project.
1 is an overall conceptual diagram of the components of a project management system according to an embodiment of the present invention.
Project management system according to the present invention schematically shown in Figure 1, the work log
The journaling
The project
The supplier
The comprehensive search
The ordering
The goods receipt
The drawing
The
The member management
The pass management
The users grant access rights according to the rights of the individual through the login of the Main screen, and the journaling
In the journal
The project
In addition, the
According to the project management system described above, all organizations and business (business processes) such as sales, production, purchasing, materials, accounting, etc. of companies or individuals are integrated into one management system so that all information can be integrated and processed in real time. .
In addition, even if the management system according to the present invention is developed for each unit of work to perform the work as a whole, it is possible to integrate and manage the whole work as a single task integrated in accordance with the user's request.
Therefore, according to the technique of managing the work using the project management system of the present invention as described above, by distributing individual projects more efficiently, batch processing for each orderer, for example, immediately whether inventory or the like on the system This can be very effective, such as being able to identify and automatically notify or warn of an immediate due date, and proceed with the procedure involved with the order.
The above description is merely illustrative of the technical idea of the present invention, and those skilled in the art to which the present invention pertains may make various modifications and changes without departing from the essential characteristics of the present invention. Therefore, the embodiments disclosed in the present invention are not intended to limit the technical idea of the present invention but to describe the present invention, and the scope of the technical idea of the present invention is not limited by these embodiments. The scope of protection of the present invention should be interpreted by the following claims, and all technical ideas within the scope equivalent thereto should be construed as being included in the scope of the present invention.
1 is a conceptual diagram of a project management system and its surrounding blocks according to an embodiment of the present invention.
2 is an initial login screen of the project management system.
3 is a diagram showing an example of journal management in the journal protocol management unit in FIG.
4 is a diagram showing an example of project management in the project protocol management unit in FIG.
FIG. 5 is a diagram illustrating an example of managing a supplier in the supplier protocol management unit of FIG. 1.
FIG. 6 is a diagram illustrating an example of comprehensive search management in the global search protocol manager in FIG. 1.
FIG. 7 is a diagram illustrating an example of order management in the order protocol management unit in FIG. 1.
FIG. 8 is a view illustrating an example of a receipt management in the receipt protocol manager of FIG. 1.
FIG. 9 is a diagram illustrating an example of drawing management in the drawing protocol manager in FIG. 1.
FIG. 10 is a diagram illustrating an example of quality control in the quality protocol manager in FIG. 1.
11 is a diagram illustrating an example of member management in the member management protocol manager in FIG.
FIG. 12 is a view showing an example of access control in the access control protocol management unit in FIG. 1.
* Description of the symbols for the main parts of the drawings *
100: project management system 110: journal protocol management unit
111: journal selection unit 120: project management unit
121: project selection unit 122: project output unit
130: supplier management unit 131: partner selection unit
132: output of the partner company 140: comprehensive search management unit
141: comprehensive search output unit 150: order management management unit
151: order management selection unit 152: order management output unit
160: receipt management management unit 161: receipt management selection unit
162: receipt management output unit 170: drawing management management unit
171: Drawing management selection unit 172: Drawing management output unit
180: quality control management unit 181: quality control selection unit
182: quality control output 190: member management management
192: member management output unit 200: pass management unit
Claims (11)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070106522A KR20090041033A (en) | 2007-10-23 | 2007-10-23 | Project management information system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070106522A KR20090041033A (en) | 2007-10-23 | 2007-10-23 | Project management information system |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20090041033A true KR20090041033A (en) | 2009-04-28 |
Family
ID=40764227
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070106522A KR20090041033A (en) | 2007-10-23 | 2007-10-23 | Project management information system |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20090041033A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104966170A (en) * | 2015-07-15 | 2015-10-07 | 北京市燃气集团有限责任公司 | Project management information system |
-
2007
- 2007-10-23 KR KR1020070106522A patent/KR20090041033A/en not_active Application Discontinuation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104966170A (en) * | 2015-07-15 | 2015-10-07 | 北京市燃气集团有限责任公司 | Project management information system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Jutla et al. | Enabling and measuring electronic customer relationship management readiness | |
US20120047079A1 (en) | Providing foundation application as enterprise services | |
US20080133303A1 (en) | Consistent set of interfaces derived from a business object model | |
US20040139001A1 (en) | Network based business to business portal for the retail convenience marketplace | |
KR100756001B1 (en) | direct distribution system for consumer goods and services | |
WO2007112958A2 (en) | Foundation layer for services based enterprise software architecture | |
Haulder et al. | An analysis of core functions offered by software packages aimed at the supply chain management software market | |
US20030220862A1 (en) | System and method for managing a web-based agricultural application | |
Mladenova | Open-source ERP systems: an overview | |
CN103473622A (en) | Scoping based on business scenario | |
KR100810743B1 (en) | Pos system within e-erp using for internet | |
KR102205214B1 (en) | Binary management user interface and product information management system | |
KR20120023356A (en) | System and method for customer-centric logistics or transportation | |
Choudhary et al. | Study about the types of information technology service for supply chain management | |
KR20090041033A (en) | Project management information system | |
Alt et al. | Logistics Web Services for Collaborative Order Management | |
Foo et al. | Strategic Planning of Reverse Logistics System Among Omnichannel Companies: A Qualitative Study | |
Fathoni et al. | Implementation of Entreprise Resource Planning Development In Cosmetic Company Cosme Centre Surabaya | |
Sharma et al. | Building systems around reverse value chain: a new system development approach | |
Clinton | Importance of technology investments in the logistics service providers: a case study of UPS and its use of online tools | |
US20050033602A1 (en) | Business-to-employee web services | |
Kozamernik | The Digital Transformation of the Process from Order Placement to Final Product Tracking | |
Nugraha et al. | Application of the Digital Company Concept in Retail Companies during the Covid-19 Pandemic. | |
Lindberg | Real-time Balance Management in Omnichannel Retail | |
Langer et al. | The Product Strategy |