KR20090030424A - Soil-nail for reinforcing a slope - Google Patents

Soil-nail for reinforcing a slope Download PDF

Info

Publication number
KR20090030424A
KR20090030424A KR1020070095718A KR20070095718A KR20090030424A KR 20090030424 A KR20090030424 A KR 20090030424A KR 1020070095718 A KR1020070095718 A KR 1020070095718A KR 20070095718 A KR20070095718 A KR 20070095718A KR 20090030424 A KR20090030424 A KR 20090030424A
Authority
KR
South Korea
Prior art keywords
nail
slope
packer
hole
head
Prior art date
Application number
KR1020070095718A
Other languages
Korean (ko)
Inventor
백정식
이승호
Original Assignee
백정식
이승호
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 백정식, 이승호 filed Critical 백정식
Priority to KR1020070095718A priority Critical patent/KR20090030424A/en
Publication of KR20090030424A publication Critical patent/KR20090030424A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0046Production methods using prestressing techniques
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/30Miscellaneous comprising anchoring details

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Piles And Underground Anchors (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A soil nail for the slope reinforcement is provided that the management to the shear stress generated in the forecast activity surface of four sides is possible since the shear resistance of nail, and the bend resistance power and drawing resistance are strengthened. A soil nail for the slope reinforcement comprises a rod-shaped nail(110) which is inserted so that the head be exposed to the perforation hole(103) punched in four sides(101), a sheath pipe(120) covering the outer circumference of nail from the head of nail with the regular length, a hook-shaped packer(130) which is installed at the nail, and which expands and adheres closely with the perforation hole if the urethane drug solution is injected in inside, a steel pipe(140) which is inserted in nail in order to be positioned in the forecast activity surface of four sides and is slid, an urethane injection hose(150) which is installed so that urethane be injected in packer, a grout injecting hose(160) for injecting the grout into the perforation hole, an air exhaust hose(170) taking good care of the air within the perforation hole with exhaustion, a pressing plate(180) inserted in the head of nail, a nut(190) which adheres the anchor plate closely to four sides of the perforation hole surrounding and fixed.

Description

사면보강용 소일네일{SOIL-NAIL FOR REINFORCING A SLOPE}Slope reinforcement nails {SOIL-NAIL FOR REINFORCING A SLOPE}

본 발명은 소일네일링(Soil-nailing)공법에 사용되는 소일네일(Soil-nail)에 관한 것으로, 보다 상세하게는 압력식 그라우팅 및 네일(Nail)에 긴장력(Pre-tension)의 도입을 통하여 사면의 활동(Sliding)에 대한 저항력이 우수하고, 사면의 예상활동면에서 발생되는 전단력에 대하여 대처할 수 있도록 전단저항력, 휨저항력 및 인발저항력을 강화시킨 사면보강용 소일네일에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a soil-nail used in a soil-nailing method, and more particularly, to a slope through pressure grouting and introduction of a pre-tension to a nail. The present invention relates to a slope reinforcement nail that has excellent resistance to sliding and strengthens shear resistance, bending resistance and pullout resistance to cope with the shear force generated in the expected activity of slope.

국토가 좁고 산지가 많은 우리나라의 경우 대규모 토지조성공사, 도로공사, 철도공사 등에 수반하여 사면(斜面)을 개발하는 것은 필수적으로 요구되고 있다. 그러나, 사면은 토사와 암반이 불균질하게 분포되어 있어 폭우, 지진 등의 자연재해로 사면이 붕괴 되거나, 활동(Sliding) 되어 귀중한 인명과 재산을 손실시키는 불안요소가 되기도 한다.In Korea, which has a narrow land and many mountainous areas, it is essential to develop slopes with large-scale land construction, road construction, and railway construction. However, due to the inhomogeneous distribution of soil and rock, slopes can be collapsed due to natural disasters such as heavy rains and earthquakes, or it can be anxious to lose valuable lives and property due to sliding.

따라서, 사면을 안정화시키기 위한 사면보강공법이 다양하게 개발되어 토목현장에서 적용되고 있다. 특히, 소일네일링공법은 네일의 전단저항을 이용하는 공 법으로서, 도 4a에 도시된 것과 같이 네일(110)을 비교적 촘촘한 간격으로 사면의 지반에 삽입하여 지반 자체의 전체적인 전단강도를 증대시키고, 또한 공사도중 및 완료 후에 예상되는 지반의 변위를 억제할 뿐만 아니라 사면의 예상활동면(a)에서의 지반의 활동을 억제하는 공법이다. Therefore, a variety of slope reinforcement methods for stabilizing slopes have been developed and applied in civil works. In particular, the soil nailing method is a method using the shear resistance of the nail, as shown in Figure 4a to insert the nail 110 into the ground of the slope at a relatively tight interval to increase the overall shear strength of the ground itself, It is a construction method that not only suppresses the displacement of the ground expected during and after construction, but also suppresses the ground activity in the expected activity surface (a) of the slope.

소일네일링공법의 통상적인 시공방법은 먼저 사면을 굴착하여 약 10°~ 20°의 하향경사로 천공홀을 형성시킨다. 다음으로 네일을 삽입한 후 시멘트그라우트를 충진고결시켜 네일구조체를 형성시키고, 지압판 및 너트를 이용하여 네일을 사면에 고정시키게 된다. 이때, 소일네일이 설치된 사면의 전면에 숏크리트를 타설하기도 한다.Conventional construction methods of the soil nailing method first excavate the slope to form a drill hole with a downward slope of about 10 ° ~ 20 °. Next, after the nail is inserted, cement grout is filled and solidified to form a nail structure, and the nail is fixed to the slope using a pressure plate and a nut. At this time, shotcrete may be placed on the front of the slope where the nail is installed.

소일네일링공법에 사용되는 소일네일의 종래기술로서 등록실용신안 제290351호의 "압력식 쏘일 네일링 패커기"가 개시되어 있다. 이에 의하면 네일의 두부 측에 패커를 설치하고, 패커에 발포성 우레탄약액을 주입 및 경화시켜 천공홀을 완전히 밀폐시킨 상태에서 네일에 설치된 그라우트 주입호스를 통해 고압으로 그라우팅을 할 수 있다. 이로써 그라우트고결체의 유효경이 증가되어 네일의 인발저항력 및 사면의 활동에 대한 저항력이 향상되는 장점이 있다. As a prior art of a soil nail used in the soil nailing method, a "pressure-type soil nailing packer" of the Utility Model No. 290351 is disclosed. According to this, the packer is installed on the head side of the nail, and the foaming urethane chemical is injected and cured into the packer to grout at a high pressure through the grout injection hose installed in the nail in a state of completely sealing the perforation hole. This increases the effective diameter of the grout solidified body has the advantage of improving the resistance to the pull out of the nail and the activity of the slope.

또한, 소일네일의 종래기술로서 등록실용신안 제359052호의 "프리텐션 쏘일네일구조"가 개시되어 있다. 이에 의하면 네일의 일부분이 시멘트그라우트에 의해 정착되지 않도록 네일에 쉬스관(Sheathe pipe)을 설치하고, 네일에 긴장력(Pretension)을 도입하는 것을 특징으로 하고 있다. 이로써 사면의 전면벽체 내부에 수동토압이 유발되어 주변지반의 전단강도가 증가하게 되고, 사면의 활동에 대한 저항력이 향상되는 장점이 있다.Further, as a prior art of small nails, a "pretensioned nail structure" of registered utility model No. 359052 is disclosed. According to this, a sheath pipe is installed on the nail so that a part of the nail is not settled by cement grout, and a tension is introduced to the nail. As a result, passive earth pressure is induced inside the front wall of the slope, so that the shear strength of the surrounding ground is increased, and the resistance to the activity of the slope is improved.

그러나, 상기 종래기술에 따른 소일네일들은 사면의 활동에 대한 저항력을 향상시키는데 유익하지만, 도 4b에 도시된 바와 같이 네일(110)로 보강된 사면의 예상활동면(a)에서는 과대한 전단력이 발생하는데 비해 네일(110) 자체의 전단저항력이 부족하여 사면의 예상활동면(a)에서 네일(110)이 파괴되거나, 휨저항력 및 인발저항력이 부족하여 사면이 흘러내리는 방향으로 쉽게 휘어지게 되거나 뽑히게 되어 사면의 활동에 대한 저항력을 상실하는 경우가 발생한다. 결국, 종래의 기술에 따른 소일네일은 사면의 예상활동면에서 발생하는 전단력에 대한 네일의 전단저항력, 휨저항력 및 인발저항력이 부족하여 사면을 안정화시키는데 문제점이 있었다. However, while the small nails according to the prior art are beneficial to improve the resistance to the activity of the slope, excessive shear force occurs in the expected active surface (a) of the slope reinforced with nail 110 as shown in Figure 4b Compared to the nail (110) lacks the shear resistance of the nail itself due to the lack of shear resistance (a), the nail 110 is broken, or the deflection resistance and pull-out resistance is insufficient to be bent or pulled in the direction that the slope flows down easily. Loss of resistance to slope activity occurs. As a result, the small nail according to the prior art has a problem in stabilizing the slope due to the lack of shear resistance, bending resistance and pull resistance of the nail to the shear force generated in the expected activity of the slope.

본 발명은 상기와 같은 문제점을 위하여 안출된 것으로, 사면의 예상활동면에서 발생하는 전단력에 대한 네일의 전단저항력, 휨저항력 및 인발저항력을 강화시킨 사면보강용 소일네일을 제공하는 것을 목적으로 한다.The present invention has been made for the above problems, and an object of the present invention is to provide a slope reinforcement nail that strengthens the shear resistance, bending resistance and pull resistance of the nail to the shear force generated in the expected activity surface of the slope.

본 발명의 그 밖의 목적, 특정한 장점들 및 신규한 특징들은 첨부된 도면들과 연관된 이하의 상세한 설명과 바람직한 실시예로부터 더욱 분명해질 것이다.Other objects, specific advantages and novel features of the present invention will become more apparent from the following detailed description and preferred embodiments in conjunction with the accompanying drawings.

상기한 목적을 달성하기 위하여 본 발명에 따른 사면보강용 소일네일은 사면에 천공된 천공홀에 두부가 노출되도록 삽입되는 봉 형상의 네일과, 상기 네일의 두부로부터 일정길이를 가지고 상기 네일의 외주면을 덮는 쉬스관과, 상기 천공홀의 진입선단에 위치하도록 상기 네일에 설치되고 내부에 우레탄 약액이 주입되면 팽창하여 상기 천공홀과 밀착되는 고리형상의 패커와, 상기 쉬스관의 외경보다 큰 내경을 가지고 상기 사면의 예상활동면에 위치하도록 상기 네일에 끼워져 슬라이딩 되는 강관과, 상기 패커에 상기 우레탄이 주입되도록 설치되는 우레탄주입호스와, 상기 패커를 관통하여 설치되고 상기 천공홀에 그라우트를 주입하기 위한 그라우트 주입호스와, 상기 패커를 관통하여 설치되고 상기 천공홀 내의 공기가 배출되는 공기 배출호스와, 상기 네일의 두부에 끼워지는 지압판과, 상기 네일에 긴장력을 도 입한 후에 상기 지압판을 상기 천공홀 주위의 사면에 밀착시켜 고정하는 너트를 포함하는 것을 특징으로 한다.In order to achieve the above object, the slope reinforcing small nail according to the present invention has a rod-shaped nail inserted so that the head is exposed to the perforated hole drilled on the slope, and the outer peripheral surface of the nail having a predetermined length from the head of the nail. It has a sheath tube covering, the annular packer is installed in the nail so as to be located at the entry end of the drilling hole and the urethane chemical is injected therein and in close contact with the drilling hole, and has an inner diameter larger than the outer diameter of the sheath tube. Steel pipe that is inserted into the nail and slides so as to be located on an expected active surface of a slope, a urethane injection hose installed to inject the urethane into the packer, and grout injection installed through the packer to inject grout into the drilling hole. An air discharge hose installed through the hose and the packer, and the air discharged from the drilling hole And the jiappan to be fitted to the head of the jiappan four days, and the tensile force in four days even after purchased, characterized in that it comprises a nut for fixing by adhesion the surfaces around the perforations.

본 발명에 따른 사면보강용 소일네일은 상기 사면의 예상활동면에 위치하는 강관을 상기 네일에 고정시키기 위한 강관고정부재를 더 포함하는 것이 바람직하다.Slope reinforcing small nail according to the invention preferably further comprises a steel pipe fixing member for fixing the steel pipe located on the expected active surface of the slope to the nail.

또한, 본 발명에 따른 사면보강용 소일네일에 있어서, 상기 패커는 서로 이격하여 상기 네일에 끼워지는 2개의 패커판과, 양단이 개방된 원통형상의 천부재와, 상기 천부재의 양단을 상기 2개의 패커판 각각에 고정시켜는 고정링으로 구성되는 것이 바람직하다. In addition, in the reinforcement small nail according to the present invention, the packer comprises two packer plates to be spaced apart from each other and fitted to the nail, a cylindrical cloth member with both ends open, and both ends of the cloth member It is preferable that it is comprised by the fixing ring fixed to each packer plate.

또한, 본 발명에 따른 사면보강용 소일네일은 상기 천공홀의 진입말단에 위치하도록 상기 네일에 끼워져 고정설치되는 판형상의 인발저항체를 더 포함하는 것이 바람직하다. 나아가, 상기 네일이 상기 천공홀과 일정한 간격을 유지하도록 상기 네일의 외주면에 설치되는 복수개의 간격재를 더 포함하는 것이 바람직하다.In addition, the slope reinforcing small nail according to the present invention preferably further comprises a plate-shaped pull-out resistor that is fitted and fixed to the nail so as to be located at the entry end of the drilling hole. Furthermore, it is preferable that the nail further includes a plurality of spacers installed on the outer circumferential surface of the nail so as to maintain a constant distance from the drilling hole.

본 발명에 따른 사면보강용 소일네일은 사면의 예상활동면을 충분히 포괄할 수 있는 강관을 구비함으로써 사면의 활동에 대한 전단저항력, 휨저항력 및 인발저항력이 강화되는 이점이 있다.Slope reinforcement nail according to the present invention has the advantage that the shear resistance, bending resistance and pullout resistance to the activity of the slope is enhanced by having a steel pipe that can fully cover the expected active surface of the slope.

또한, 본 발명에 따른 사면보강용 소일네일은 패커를 구비하여 압력식 그라우팅을 실시하고, 네일에 긴장력을 도입하여 사면의 활동에 대한 저항력이 향상되 는 이점이 있다.In addition, the slope reinforcement small nail according to the present invention is provided with a packer pressure grouting, there is an advantage that the resistance to the activity of the slope is improved by introducing a tension force to the nail.

상기 본 발명의 목적과 이를 달성하는 본 발명의 구성과 작용 및 효과는 첨부한 도면을 참조한 본 발명의 바람직한 실시예에 대한 이하의 상세한 설명에 의해서 좀 더 명확히 이해될 수 있을 것이다.The object of the present invention and the configuration, operation and effect of the present invention to achieve the same will be more clearly understood by the following detailed description of the preferred embodiment of the present invention with reference to the accompanying drawings.

도 1은 본 발명에 따른 사면보강용 소일네일의 구조 및 작용을 나타내는 단면도이고, 도 2는 도 1의 제1패커판을 나타내는 정면도이고, 도 3은 도 1의 강관의 작용을 설명하기 위한 설명도이다.1 is a cross-sectional view showing the structure and operation of the slope reinforcing small nail according to the present invention, Figure 2 is a front view showing the first packer plate of Figure 1, Figure 3 is a description for explaining the operation of the steel pipe of Figure 1 It is also.

본 발명에 따른 사면보강용 소일네일은 네일(110)과, 쉬스관(120)과, 패커(130)와, 강관(140)과, 우레탄약액 주입호스(150)와, 그라우트 주입호스(160)와, 공기 배출호스(170)와, 지압판(180)과, 너트(190)를 포함하여 이루어진다.Slope reinforcing small nail according to the present invention is nail 110, sheath tube 120, packer 130, steel pipe 140, urethane chemical injection hose 150, grout injection hose 160 And an air discharge hose 170, a pressure plate 180, and a nut 190.

네일(110)은 봉 형상을 가진다. 네일(110)은 사면의 활동을 방지하기 위해 사면의 예상활동면(a) 보다 연장되어 설치될 수 있도록 충분한 길이를 가지는 것이 바람직하다. 또한 네일(110)은 전단저항력이 우수하고, 외주면이 오돌토돌하여 사면의 지반으로부터 쉽게 뽑히지 않도록 인발저항력이 좋은 이형철근을 사용하는 것이 바람직하다. Nail 110 has a rod shape. The nail 110 preferably has a length sufficient to be installed to extend beyond the expected active surface (a) of the slope to prevent the activity of the slope. In addition, the nail 110 is excellent in shear resistance, it is preferable to use a deformed reinforcing bar with good pull resistance so that the outer circumference is not easily drawn from the ground of the slope.

네일의 두부(112)의 반대편에 해당하는 네일(110)의 말단부에 인발저항체(200)를 설치하여 사면의 지반으로부터 쉽게 뽑히지 않도록 하는 것이 바람직하다. 또한, 네일(110)의 외주면에 복수개의 간격재(210)를 설치하여 네일(110)을 천공홀(130)에 일정한 간격을 둔 상태에서 삽입될 수 있도록 하는 것이 바람직하다. It is preferable that the drawing resistor 200 is installed at the distal end of the nail 110 corresponding to the opposite side of the head 112 of the nail so that it is not easily pulled out from the ground of the slope. In addition, it is preferable to install the plurality of spacers 210 on the outer circumferential surface of the nail 110 so that the nail 110 can be inserted at a predetermined interval in the drilling hole 130.

네일(110)은 절개된 사면(101)에 하향시켜 천공된 복수개의 천공홀(103)에 각각 네일의 두부(112)가 노출되도록 삽입된다. 네일(110)은 이후에 주입되는 시멘트그라우트에 의해 정착됨으로써 네일구조체를 이루게 되어 사면의 활동을 방지하여 사면을 안정화시키게 된다.The nail 110 is inserted so that the head 112 of the nail is exposed to each of the plurality of perforation holes 103 drilled downward on the inclined slope 101. The nail 110 is stabilized by the cement grout is injected later to form a nail structure to prevent the activity of the slope to stabilize the slope.

쉬스관(120)은 네일(110)에 긴장력을 도입하기 위해 네일의 두부(112)로부터 일정길이까지 네일(110)의 외주면을 덮도록 설치되는 파이프부재이다. 쉬스관(120)이 설치됨으로써 네일(110)은 도 1에 도시된 바와 같이 쉬스관(120)이 덮히지 않아 이후에 주입되는 시멘트그라우트에 의해 정착되는 정착부(116)와, 쉬스관(120)이 덮혀 시멘트그라우트에 의해 정착되지 않는 자유부(114)로 구분할 수 있다. 쉬스관(120)은 일반적으로 사용되는 플라스틱제 파이프를 사용하고, 네일(110)에 충분한 긴장력을 도입하기 위해 약 2 ~ 3 M의 길이를 갖는 것이 바람직하다. The sheath tube 120 is a pipe member installed to cover the outer circumferential surface of the nail 110 to a predetermined length from the head 112 of the nail in order to introduce tension to the nail 110. As the sheath tube 120 is installed, the nail 110 is not covered with the sheath tube 120 as shown in FIG. 1, and the fixing unit 116 and the sheath tube 120 which are fixed by the cement grout injected thereafter. ) Can be divided into free parts 114 which are not covered by cement grout. The sheath tube 120 uses a plastic pipe generally used, and preferably has a length of about 2 to 3 M to introduce sufficient tension to the nail 110.

네일(110)에 긴장력을 도입하는 방법은 천공홀(103)에 시멘트그라우트를 주입하여 네일의 정착부(116)가 정착된 이후에 인장기를 사용하여 네일의 두부(112)를 잡아당겨 인장시키면 자유부(114)에 긴장력이 도입된다. 긴장력이 도입된 후 지압판(180) 및 너트(190)를 네일의 두부(112)에 체결함으로써 도입된 긴장력이 유지된다. 이때, 긴장력을 도입하기 전에 사면(101)의 전면에 용접철망의 설치 및 숏크리트를 타설하여 좀 더 안정적으로 긴장력을 도입하는 것도 가능하다. 네 일(110)에 긴장력이 도입됨으로써 사면의 지반 내부에 수동토압이 유발되어 주변지반의 전단강도가 증가되고, 사면의 활동에 대한 저항력을 향상시킬 수 있다.The method of introducing the tension force to the nail 110 is by injecting cement grout into the punching hole 103 and pulling and pulling the head 112 of the nail using a tensioner after the fixing unit 116 of the nail is fixed. Tension force is introduced to the part 114. After the tension force is introduced, the tension force introduced is maintained by fastening the acupressure plate 180 and the nut 190 to the head 112 of the nail. At this time, it is also possible to introduce a more stable tension by installing the welded wire mesh and shotcrete on the front of the slope 101 before introducing the tension force. By introducing the tension force in the day 110, the passive earth pressure is induced inside the ground of the slope to increase the shear strength of the surrounding ground, it is possible to improve the resistance to the activity of the slope.

패커(130)는 네일(110)이 삽입된 천공홀(103)에 시멘트그라우트를 고압으로 주입시키기 위해 설치된다. 패커(130)는 천공홀(103)의 진입선단에 위치하도록 네일(110)에 설치되고, 발포성 우레탄약액이 주입되어 팽창함으로써 천공홀(103)과 밀착하게 되어 천공홀(103)은 밀폐상태가 된다. 따라서, 시멘트그라우트를 천공홀(103)에 고압분사하여 압력식 그라우팅이 가능하게 된다. 압력식 그라우팅을 통해 그라우트고결체(220)의 유효경이 증가되어 네일의 인발저항력 및 사면의 활동에 대한 저항력이 향상되는 이점이 있다.The packer 130 is installed to inject cement grout at high pressure into the drill hole 103 into which the nail 110 is inserted. The packer 130 is installed at the nail 110 to be positioned at the entrance end of the drilling hole 103, and is injected into the foamed urethane chemical solution so that the packer 130 is in close contact with the drilling hole 103 so that the drilling hole 103 is sealed. do. Therefore, high pressure injection of the cement grout into the drilling hole 103 enables pressure grouting. The effective diameter of the grout consolidation body 220 is increased through the pressure grouting, and thus, the pull resistance of the nail and the resistance to slope activity are improved.

이때, 패커(130)는 서로 이격하여 네일(110)에 끼워지는 2개의 패커판(132, 132')과, 양단이 개방된 천부재(137)와, 상기 천부재(137)의 양단을 2개의 패커판(132, 132') 각각에 고정시키는 고정링(138)으로 이루어지는 것이 바람직하다. 도 2는 도 1의 제1패커판(132)을 나타내는 정면도로써, 이를 참고하면 제1패커판(132)은 네일(110)에 끼워질 수 있도록 중앙에 제1관통홀(133)이 형성되어 있다. 또한, 우레탄약액 주입호스(150)가 삽입되기 위한 제2관통홀(134), 그라우트 주입호스(160)가 삽입되기 위한 제3관통홀(135) 및 공기 배출호스(170)가 삽입되기 위한 제4관통홀(136)이 형성되어 있다. 그리고, 제2패커판(132')은 제1패커판(132)과 비교하여 우레탄약액 주입호스(150)가 삽입되기 위한 제2관통홀(134)가 형성되어 있지 않고, 나머지는 동일하게 형성되어 있다. 상기 패커판들의 제1, 제2, 제3, 및 제4관통홀은 패커(130)에 주입된 우레탄약액이 패커(130) 외부로 빠져 나가 는 것을 방지하기 위해 실링재로 마감처리하는 것이 바람직하다. 그리고, 패커의 천부재(137)는 부직포를 사용하고, 고정링(138)으로 천부재(137)의 양단을 2개의 패커판(132, 132')의 외주면에 형성된 홈에 고정시키게 된다. At this time, the packer 130 is spaced apart from each other two packer plate (132, 132 ') to be fitted to the nail 110, both ends of the cloth member 137, and both ends of the cloth member 137 It is preferable that the fixing ring 138 is fixed to each of the two packer plate (132, 132 '). FIG. 2 is a front view illustrating the first packer plate 132 of FIG. 1. Referring to this, the first packer plate 132 is formed with a first through hole 133 at the center thereof so as to be fitted into the nail 110. have. In addition, the second through-hole 134 for the urethane chemical injection hose 150 is inserted, the third through-hole 135 for inserting the grout injection hose 160 and the air discharge hose 170 for insertion Four through holes 136 are formed. In addition, the second packer plate 132 ′ is not formed with the second through hole 134 for the urethane chemical injection hose 150 to be inserted in comparison with the first packer plate 132. It is. The first, second, third, and fourth through holes of the packer plates are preferably finished with a sealing material to prevent the urethane chemical injected into the packer 130 from escaping out of the packer 130. . The cloth member 137 of the packer uses a nonwoven fabric, and both ends of the cloth member 137 are fixed to the grooves formed on the outer circumferential surfaces of the two packer plates 132 and 132 'by the fixing ring 138.

강관(140)은 도 1에 도시된 바와 같이 쉬스관(120)의 외관보다 큰 내경을 가지고, 사면의 예상활동면(a)에 위치하도록 네일에 끼워져 슬라이딩 된다. 강관(140)을 설치하기 위해서는 사면의 예상활동면(a)을 미리 계산하여 결정하여야 한다. 사면의 예상활동면(a)은 사면의 경사나 지반의 상태와 같은 조건에 따라 계산에 의하여 구할 수 있다. 도 3에 도시된 것과 같이 계산에 의하여 구해진 사면의 예상활동면(a)을 충분히 포괄할 수 있도록 네일(110)에 강관(140)을 위치시키고 천공홀(103)에 삽입설치하게 된다. 이때, 소일네일은 사면의 예상활동면(a)에 위치하는 강관(140)을 네일(110)에 고정시키기 위한 강관고정부재(142)를 더 포함하는 것이 바람직하다. 강관고정부재(142)는 네일(110)에 끼워서 강관(140)을 고정할 수 있고, 용접으로 고정하는 것도 가능하다. The steel pipe 140 has an inner diameter larger than that of the sheath pipe 120 as shown in FIG. 1, and is slid into the nail so as to be located at the expected active surface (a) of the slope. In order to install the steel pipe 140, the expected activity surface (a) of the slope should be calculated in advance. The expected active surface (a) of the slope can be obtained by calculation according to conditions such as the slope of the slope and the condition of the ground. As shown in FIG. 3, the steel pipe 140 is positioned in the nail 110 and inserted into the drilling hole 103 so as to sufficiently cover the expected active surface a of the slope obtained by the calculation. At this time, the small nail preferably further comprises a steel pipe fixing member 142 for fixing the steel pipe 140 located on the expected activity surface (a) of the slope to the nail (110). The steel pipe fixing member 142 may be inserted into the nail 110 to fix the steel pipe 140, or may be fixed by welding.

네일(110)에 설치된 강관(140)에 의해 사면의 예상활동면(a)에서 집중발생되는 전단력에 의하여 네일이 전단파괴되거나 휘어지거나 뽑혀져서 사면의 활동에 대한 저항력이 상실하는 것을 방지할 수 있다. The nail is sheared, bent or pulled by shear force concentrated at the expected activity surface (a) of the slope by the steel pipe 140 installed in the nail 110, thereby preventing the loss of resistance to the activity of the slope. .

우레탄약액 주입호스(150)는 네일(110)에 설치된 패커(130)에 우레탄약액이 주입되는 호스이다. 도 2에 도시된 바와 같이 제1패커판(132)에 형성된 제2관통홀(134)에 끼워져 패커(130)에 설치된다. 우레탄약액 주입호스(150)를 통하여 패커의 천부재(137)가 팽창하여 천공홀(103)과 밀착되도록 우레탄약액을 주입하게 된 다. 주입된 우레탄약액은 경화시간이 매우 짧고, 경화시 부피가 증가되는 특성이 있다. 따라서 주입된 우레탄약액이 경화되면 도 1의 우레탄약액고결체(230)가 형성되어 천공홀(103)을 밀폐시키게 되고, 압력식 그라우팅이 가능하게 된다. Urethane chemical injection hose 150 is a hose in which the urethane chemical is injected into the packer 130 installed in the nail (110). As shown in FIG. 2, it is fitted into the second through hole 134 formed in the first packer plate 132 and installed in the packer 130. The urethane chemical solution is injected through the urethane chemical injection hose 150 so that the cloth member 137 of the packer expands to be in close contact with the punching hole 103. The injected urethane chemical has a very short curing time and has a characteristic of increasing volume upon curing. Therefore, when the injected urethane chemical liquid is cured, the urethane chemical liquid solid body 230 of FIG. 1 is formed to seal the perforation hole 103, and pressure grouting is possible.

그라우트 주입호스(160)는 패커(130)를 관통하여 설치되고, 우레탄약액고결체(130)가 형성된 이후에 시멘트그라우트가 주입되는 호스이다. 그라우트 주입호스(160)는 제1패커판과 제2패커판의 제3관통홀(135)에 끼워져 네일의 정착부(116)까지 연장되도록 패커(130)에 설치된다. 그라우트 주입호스(160)를 통하여 시멘트그라우트를 고압분사하게 되고, 주입된 시멘트그라우트가 양생되면 그라우트고결체(220)가 형성된다. The grout injection hose 160 is installed through the packer 130 and is a hose into which cement grout is injected after the urethane chemical solid solution 130 is formed. The grout injection hose 160 is installed in the packer 130 to be inserted into the third through hole 135 of the first packer plate and the second packer plate to extend to the fixing unit 116 of the nail. High pressure spraying the cement grout through the grout injection hose 160, the grout solidified body 220 is formed when the injected cement grout is cured.

공기 배출호스(170)는 패커(130)를 관통하여 설치되고, 시멘트그라우트 주입시 천공홀(103) 내의 공기가 배출되는 호스이다. 공기 배출호스(170)는 제1패커판 및 제2패커판의 제4관통홀(136)에 끼워져 네일의 정착부(116)까지 연장되도록 패커(130)에 설치된다. 따라서, 그라우팅시 천공홀(103) 내의 공기를 배출시킴으로써 시멘트그라우트가 용이하게 주입될 수 있는 것이다.The air discharge hose 170 is installed through the packer 130 and is a hose through which the air in the drilling hole 103 is discharged when cement grout is injected. The air discharge hose 170 is installed in the packer 130 to be inserted into the fourth through hole 136 of the first packer plate and the second packer plate to extend to the fixing unit 116 of the nail. Therefore, the cement grout can be easily injected by discharging the air in the drilling hole 103 during grouting.

지압판(180)과 너트(190)는 천공홀(103)에 주입된 시멘트그라우트가 양생되어 그라우트고결체(220)가 형성되면 네일의 자유부(114)에 긴장력을 도입하기 위한 것이다. 즉, 지압판(180)을 네일의 두부(112)에 끼운 상태에서 인장기를 사용하여 네일의 두부(112)를 잡아당겨 인장시키면 네일의 자유부(114)에 긴장력이 도입되고, 지압판(180)이 사면(101)에 밀착고정되도록 너트(190)를 체결하면 네일(110)에 도입된 긴장력을 유지할 수 있는 것이다. The acupressure plate 180 and the nut 190 are for introducing a tension force to the free portion 114 of the nail when the cement grout injected into the drilling hole 103 is cured to form the grout consolidation body 220. That is, when the tension plate 180 is pulled by pulling the head 112 of the nail using a tensioner in the state of being inserted into the head 112 of the nail, tension is introduced into the free portion 114 of the nail, and the pressure plate 180 is When the nut 190 is fastened to be tightly fixed to the slope 101, the tension force introduced into the nail 110 may be maintained.

앞에서 설명되고, 도면에 도시된 본 발명의 일 실시예는, 본 발명의 기술적 사상을 한정하는 것으로 해석되어서는 안 된다. 본 발명이 보호범위는 청구범위에 기재된 사항에 의하여만 제한되고, 본 발명의 기술분야에서 통상의 지식을 가진 자는 본 발명의 기술적 사상을 다양한 형태로 개량 변경하는 것이 가능하다. 따라서 이러한 개량 및 변경은 통상의 지식을 가진자에게 자명한 것인 한 본 발명의 보호범위에 속하게 될 것이다.An embodiment of the present invention described above and illustrated in the drawings should not be construed as limiting the technical idea of the present invention. The scope of protection of the present invention is limited only by the matters set forth in the claims, and those skilled in the art can change and change the technical idea of the present invention in various forms. Therefore, such improvements and modifications will fall within the protection scope of the present invention as long as it will be apparent to those skilled in the art.

도 1은 본 발명에 따른 사면보강용 소일네일의 구조 및 작용을 나타내는 단면도이고,1 is a cross-sectional view showing the structure and operation of the slope reinforcing small nail according to the present invention,

도 2는 도 1의 제1패커판을 나타내는 정면도이고,FIG. 2 is a front view illustrating the first packer plate of FIG. 1,

도 3은 도 1의 강관의 작용을 설명하기 위한 설명도이고,3 is an explanatory diagram for explaining the operation of the steel pipe of FIG.

도 4는 종래기술에 따른 소일네일의 문제점을 설명하기 위한 설명도이다.4 is an explanatory diagram for explaining a problem of a small nail according to the prior art.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

101 : 사면 103 : 천공홀101: slope 103: drilling hole

110 : 네일 112 : 두부110: nail 112: tofu

114 : 자유부 116 : 정착부114: free part 116: fixing unit

120 : 쉬스관 130 : 패커120: Sheath Hall 130: Packer

132 : 제1패커판 132' : 제2패커판132: first packer plate 132 ': second packer plate

133 : 제1관통홀 134 : 제2관통홀133: first through hole 134: second through hole

135 : 제3관통홀 136 : 제4관통홀135: third through hole 136: fourth through hole

137 : 천부재 138 : 고정링137: cloth member 138: retaining ring

140 : 강관 142 : 강관고정부재140: steel pipe 142: steel pipe fixing member

150 : 우레탄약액 주입호스 160 : 그라우트 주입호스150: urethane chemical injection hose 160: grout injection hose

170 : 공기 배출호스 180 : 지압판170: air discharge hose 180: pressure plate

190 : 너트 200 : 인발저항체190: nut 200: drawing resistor

210 : 간격재 220 : 그라우트고결체210: spacer 220: grout solidified body

230 : 우레탄약액고결체230: Urethane chemical solidified body

Claims (5)

사면에 천공된 천공홀에 두부가 노출되도록 삽입되는 봉 형상의 네일과,A rod-shaped nail inserted to expose the head to a perforation hole drilled on a slope; 상기 네일의 두부로부터 일정길이를 가지고, 상기 네일의 외주면을 덮는 쉬스관과,Sheath tube having a certain length from the head of the nail, covering the outer peripheral surface of the nail, 상기 천공홀의 진입선단에 위치하도록 상기 네일에 설치되고, 내부에 우레탄 약액이 주입되면 팽창하여 상기 천공홀과 밀착되는 고리형상의 패커와,An annular packer installed on the nail to be positioned at the entrance end of the punching hole and expanding when urethane chemical is injected into the nail to closely contact the punching hole; 상기 쉬스관의 외경보다 큰 내경을 가지고, 상기 사면의 예상활동면에 위치하도록 상기 네일에 끼워져 슬라이딩 되는 강관과,A steel pipe having an inner diameter larger than an outer diameter of the sheath pipe and being slid into the nail so as to be located at an expected active surface of the slope; 상기 패커에 상기 우레탄이 주입되도록 설치되는 우레탄주입호스와,Urethane injection hose is installed so that the urethane is injected into the packer, 상기 패커를 관통하여 설치되고, 상기 천공홀에 그라우트를 주입하기 위한 그라우트 주입호스와,A grout injection hose installed through the packer to inject grout into the hole, 상기 패커를 관통하여 설치되고, 상기 천공홀 내의 공기가 배출되는 공기 배출호스와,An air discharge hose installed through the packer and through which air in the drilling hole is discharged; 상기 네일의 두부에 끼워지는 지압판과,Acupressure plate fitted to the head of the nail, 상기 네일에 긴장력을 도입한 후에 상기 지압판을 상기 천공홀 주위의 사면에 밀착시켜 고정하는 너트를 포함하는 사면보강용 소일네일.Slope reinforcement nails including a nut for fixing the pressure plate in close contact with the periphery around the perforation hole after introducing the tension force to the nail. 제1항에 있어서,The method of claim 1, 상기 사면의 예상활동면에 위치하는 강관을 상기 네일에 고정시키기 위한 강 관고정부재를 더 포함하는 것을 특징으로 하는 사면보강용 소일네일.Slope reinforcement nails characterized in that it further comprises a steel pipe fixing member for fixing the steel pipe located on the expected activity surface of the slope to the nail. 제1항에 있어서, 상기 패커는,The method of claim 1, wherein the packer, 서로 이격하여 상기 네일에 끼워지는 2개의 패커판과,Two packer plates spaced from each other and fitted to the nail, 양단이 개방된 원통형상의 천부재와,Cylindrical cloth member which is open at both ends, 상기 천부재의 양단을 상기 2개의 패커판 각각에 고정시켜는 고정링으로 구성되는 것을 특징으로 하는 사면보강용 소일네일.Slope reinforcement nails, characterized in that consisting of a fixing ring for fixing both ends of the cloth member to each of the two packer plate. 제1항에 있어서,The method of claim 1, 상기 천공홀의 진입말단에 위치하도록 상기 네일에 끼워져 고정설치되는 판형상의 인발저항체를 더 포함하는 것을 특징으로 하는 사면보강용 소일네일.Slope reinforcement nails characterized in that it further comprises a plate-shaped pull-out resistor is inserted into the nail so as to be located at the entrance end of the drilling hole. 제1항 내지 제4항에 있어서,The method according to claim 1, wherein 상기 네일이 상기 천공홀과 일정한 간격을 유지하도록 상기 네일의 외주면에 설치되는 복수개의 간격재를 더 포함하는 것을 특징으로 하는 사면보강용 소일네일.Slope reinforcement nails characterized in that it further comprises a plurality of spacers installed on the outer circumferential surface of the nail so that the nail maintains a constant distance with the drilling hole.
KR1020070095718A 2007-09-20 2007-09-20 Soil-nail for reinforcing a slope KR20090030424A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070095718A KR20090030424A (en) 2007-09-20 2007-09-20 Soil-nail for reinforcing a slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070095718A KR20090030424A (en) 2007-09-20 2007-09-20 Soil-nail for reinforcing a slope

Publications (1)

Publication Number Publication Date
KR20090030424A true KR20090030424A (en) 2009-03-25

Family

ID=40696720

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070095718A KR20090030424A (en) 2007-09-20 2007-09-20 Soil-nail for reinforcing a slope

Country Status (1)

Country Link
KR (1) KR20090030424A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101012756B1 (en) * 2010-04-16 2011-02-08 주식회사 지지케이 Grouting anchor bolt install device
KR101038757B1 (en) * 2010-10-14 2011-06-03 신성종합건축사사무소(주) Pretension soil nail structure with steel pipe, and construction method thereof
KR101047085B1 (en) * 2010-10-14 2011-07-06 신성종합건축사사무소(주) Pretension soil nail structure with deformed bar, and construction method thereof
KR101056417B1 (en) * 2010-11-22 2011-08-11 주식회사 이파그리드코리아 Packer of the soil-nailing
KR101056416B1 (en) * 2010-11-22 2011-08-11 주식회사 이파그리드코리아 Soil nailing method using the packer
KR101715254B1 (en) * 2016-01-28 2017-03-10 강명석 Retaining wall for planting having water tank and construction method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101012756B1 (en) * 2010-04-16 2011-02-08 주식회사 지지케이 Grouting anchor bolt install device
KR101038757B1 (en) * 2010-10-14 2011-06-03 신성종합건축사사무소(주) Pretension soil nail structure with steel pipe, and construction method thereof
KR101047085B1 (en) * 2010-10-14 2011-07-06 신성종합건축사사무소(주) Pretension soil nail structure with deformed bar, and construction method thereof
KR101056417B1 (en) * 2010-11-22 2011-08-11 주식회사 이파그리드코리아 Packer of the soil-nailing
KR101056416B1 (en) * 2010-11-22 2011-08-11 주식회사 이파그리드코리아 Soil nailing method using the packer
KR101715254B1 (en) * 2016-01-28 2017-03-10 강명석 Retaining wall for planting having water tank and construction method thereof

Similar Documents

Publication Publication Date Title
KR20090030424A (en) Soil-nail for reinforcing a slope
KR101539031B1 (en) Pack-mounted Reinforcing Structure
KR101353882B1 (en) Method of reinforcement and construction of pillar of neighboring tunnel
KR101413593B1 (en) Composite pile with end bearing capacity, friction capacity and construction method therefor
KR100859872B1 (en) An anchor equipped winding fixation-packer and constructing method thereof
KR101736292B1 (en) Anchor using corrugated pipe for enabling reinforcement of anchor&#39;s free-length field and constructing method thereof
KR20090101045A (en) Pre-tension soil nail and method of soil nail construction using the same
KR100966148B1 (en) Ground adhering soil nailing structure and ground reinforcement method using the same
KR100576053B1 (en) Soil nailing by extended packer grouting and construction method
KR100773920B1 (en) Pre-tention soil nailing system and method for reinforcing inclined earth using the same
KR100908085B1 (en) Ground adhering soil nailing structure and ground reinforcement method using the same
KR20040110204A (en) Earth anchor including a duplex grouting pipe and the earth anchor construction method using the same
KR101202845B1 (en) Hybrid ground reinforcing method by earth anchor and soil nail
KR102091016B1 (en) Metallath permanent anchor assembly
KR102522769B1 (en) Fixing construction method of high-strength GFRP hollow bar for tunnel and ground reinforcement and its construction device
KR100984040B1 (en) Method of reinforced earth retaining wall for cutting face through double reinforcing execution
KR100944199B1 (en) Prestressed concrete anchor body structure using together poly bar nail
US20180291582A1 (en) Anchor having fixing device at side of pressure plate to depress land slope and method of installing same
KR20190006232A (en) Retaining Wall Panel Structure using PC Strand and Ground Reinforcement Method
KR100556668B1 (en) Structure of a slop reinforced of carrying out by physical environment
KR100776620B1 (en) Bar Type Anchor
KR100869369B1 (en) The ground reinforcement apparatus and method grouting type using bundle steel pipe
KR101017412B1 (en) Permanent anchor of friction bearing pressure type and constructing method thereof
KR200329151Y1 (en) Soil nailing by pressure grouting
KR200203646Y1 (en) Rihforcement fixer for secondary pre-stress

Legal Events

Date Code Title Description
A201 Request for examination
N231 Notification of change of applicant
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
NORF Unpaid initial registration fee