KR20080027605A - Box for sleeve - Google Patents

Box for sleeve Download PDF

Info

Publication number
KR20080027605A
KR20080027605A KR1020060092914A KR20060092914A KR20080027605A KR 20080027605 A KR20080027605 A KR 20080027605A KR 1020060092914 A KR1020060092914 A KR 1020060092914A KR 20060092914 A KR20060092914 A KR 20060092914A KR 20080027605 A KR20080027605 A KR 20080027605A
Authority
KR
South Korea
Prior art keywords
pipe
slab
joint pipe
box
joint
Prior art date
Application number
KR1020060092914A
Other languages
Korean (ko)
Inventor
강철
Original Assignee
강철
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 강철 filed Critical 강철
Priority to KR1020060092914A priority Critical patent/KR20080027605A/en
Publication of KR20080027605A publication Critical patent/KR20080027605A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/02Plumbing installations for fresh water
    • E03C1/04Water-basin installations specially adapted to wash-basins or baths
    • E03C1/042Arrangements on taps for wash-basins or baths for connecting to the wall
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/02Plumbing installations for fresh water
    • E03C1/04Water-basin installations specially adapted to wash-basins or baths
    • E03C1/044Water-basin installations specially adapted to wash-basins or baths having a heating or cooling apparatus in the supply line
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/02Plumbing installations for fresh water
    • E03C2001/028Alignment aids for plumbing installations

Landscapes

  • Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A box embedded in a slab is provided to prevent reinforcing bars for a slab from cutting and removing and to couple a pipe and a joint pipe easily by minimizing horizontal and vertical standards of a box, and to increase constructability by arranging pipelines without overturning a case when embedding a box in a slab. A box embedded in a slab comprises a joint pipe housing body(1) provided with a pipe penetration body(5) having many holes(6) to put a pipe in or out from a body which is formed to have a wide opening(3) on the lower part, connected with a bottom body(2) having a rectangular frame structure and folded upward to be symmetric with each other at two ends, and the joint pipe housing body is installed by putting the body between reinforcing bars arranged upward and downward and making the bottom body in contact with a form for a slab, wherein an inspection cover(7) is coupled to the lower part of the bottom body and mounted on the form to repair and inspect through the opening at the lower part of the slab even if the joint pipe housing body is laid under the concrete, a joint pipe housed in the joint pipe housing body and a pipe built in a corrugated pipe introduced into the holes of the pipe penetration body are arranged freely by forming two side walls and the top of the joint pipe housing body opened, two side wall bodies(8) are inserted to insertion bodies(10) formed on two sides of the pipe penetration body and assembled with the pipe penetration body of each joint pipe housing body, and a cover body(9) is put on the opened top of the assembled joint pipe housing body to be supported to the pipe penetration body and the side wall body to cover the joint pipe housing body tightly and to place concrete.

Description

스래브 매설상자 {Box For Sleeve}Slab Laying Box {Box For Sleeve}

도 1 은 본 발명의 매설상자의 전개 사시도1 is an exploded perspective view of the buried box of the present invention

도 2 는 본 발명의 매설상자의 거푸집에 안치된 상태를 나타내는 사시도Figure 2 is a perspective view showing a state placed in the formwork of the buried box of the present invention

도 3 은 본 발명의 매설상자의 배관 상태를 나타내는 사시도Figure 3 is a perspective view showing a piping state of the buried box of the present invention

도 4 는 본 발명의 매설상자의 결합 상태를 나타내는 사시도Figure 4 is a perspective view showing a coupling state of the buried box of the present invention

도 5 는 본 발명의 매설상자가 바닥스래브에 매설된 상태를 나타내는 단면도Figure 5 is a cross-sectional view showing a buried box buried in the floor slab of the present invention

도 6 은 매설상자에 수용되는 이음관 사시도6 is a perspective view of the fitting pipe accommodated in the buried box

도 7 은 종래의 매설상자를 나타내는 사시도7 is a perspective view showing a conventional buried box

※ 도면의 주요부분에 대한 부호의 설명※ Explanation of code for main part of drawing

1:이음관내장체 2:바닥체1: joint pipe internal body 2: bottom body

3:개구부3: opening

5:관출입체 6:구멍5: tube body 6: hole

7:점검커버 8:측벽체7: Inspection cover 8: Side wall

9:뚜껑체 10:삽입체9: lid 10: insert

21:관 22:주름관21: Tube 22: Wrinkle tube

23:이음관 24:접속구23: Joint pipe 24: Connection port

25:철근 27:스래브25: Rebar 27: Slab

31:상자 32:케이스31: Box 32: case

33:커버33: cover

본 발명은 APT나 주택 등의 세대 내 위생배관(급수급탕배관)에 관한 것으로, 더욱 상세하게는 누수에 의한 하자시 보수 수리를 할 수 있고, 배관작업을 용이하게 시공하도록 제안하는 스래브 매설상자에 관한 것이다.The present invention relates to sanitary piping (water supply and supply piping) in households, such as APTs and houses, and more specifically, in the slab buried box, which can be repaired and repaired in case of a defect due to leakage, and to facilitate the piping work. It is about.

종래에서는 일본공개특허공보 특개평 9-228435, 일본공보특허 특공평 6-60704, 대한민국 실용신안등록 제225897호에 나타낸 도 7와 같이 벽체에 매설되는 상자(31) 들은 전면부와 개방한 개구부를 가진 육면체의 상자인 케이스(32)로 된 후 개구부를 덮는 커버(33)로 구성한 상자(31)를 구성하였다.Conventionally, as shown in FIG. 7 shown in Japanese Patent Application Laid-Open No. Hei 9-228435, Japanese Patent Application Laid-Open No. 6-60704, and Korean Utility Model Registration No. 225897, the boxes 31 embedded in the wall have a front part and an opening opening. The box 31 which consisted of the case 32 which is a box of the hexahedron and comprised the cover 33 which covers an opening part was comprised.

이와같은 상자(31)들을 주택 내 세로벽에 매설 시공할때는 개구부가 세로벽에 표출되어 케이스(32)의 개구부를 통해 내장되는 이음관들과 케이스(32)내로 유도된 관을 용이하게 배관이 되어, 이후 콘크리트가 타설되어 벽체에 매설될 수 있지만, 고안자가 출원한 바 있는(출원번호 10-2005-011116) 상자(31)를 스래브에 매설, 즉 스래브 콘크리트 타설용 거푸집에 개구부가 하향하도록 케이스(32)를 업어서 매설시킨 후, 이후 스래브 하측에서 커버(33)를 해체하여 케이스(32)내의 이음 관과 관을 보수 점검하는 상자(31) 매설공법에서는, 배관시공시 케이스(32)의 개구부가 하향되어 있어 케이스(32)를 뒤집어 개구부를 측방향 또는 상방향으로 향하게 한 후 관과 이음관은 일단 배관하고, 다시 케이스(32)를 뒤집어서 개구부를 스래브의 거푸집에 밀착하여야 하는데, 이때 케이스(32)를 뒤집고 다시 엎는 것은 케이스(32) 측벽 구멍(6)을 통해 유입된 관들이 스래브용, 즉 상하로 배근된 철근들과 서로 엉키고 구속되어 공사를 시행하기가 용이하지 않게 된다. 더욱이 케이스(32) 내에 유입되는 관의 수량이 많을수록 이와같은 시행은 더욱 어렵다.When the box 31 is installed on the vertical wall in the house, the opening is expressed on the vertical wall to easily pipe the pipes introduced through the opening of the case 32 and the pipe guided into the case 32. , After which concrete can be poured and embedded in the wall, but the box 31, which has been filed by the inventor (application number 10-2005-011116), is buried in the slab, ie the opening in the slab concrete casting form is directed downward. In the case where the case 32 is buried and buried, and then the cover 33 is dismantled from the lower side of the slab to repair and check the joint pipe and the tube in the case 32, the case 32 during piping construction ), The opening is downward, and the case 32 is inverted so that the opening is laterally or upwardly oriented, and the pipe and the fitting pipe are first piped, and the case 32 is inverted again to close the opening to the slab formwork. , This It eopneun Turn the case 32 again is not the case 32 is an inlet tube through the side wall 6 is made to scan, that is bound to each other with a reinforcement in the upper and lower eongkigo for Labrador easy to implement construction. Moreover, the larger the quantity of pipes flowing into the case 32, the more difficult such an implementation is.

상기와 같은 스래브에 매설하는 상자 공법은 휨이 가능한 플라스틱관을 관의 외경보다 큰 내경의 주름관(CD관)에 내장하여, 주름관내에서 관이 유동성을 가지고 인입,인출하여 상자(31)내로 유입하고, 하자시 상자(31)를 통해 관을 외부로 인출시켜 보수 점검하는 배관시스템으로 이 때 관의 접합은 손으로 관을 견고히 잡고 이음관 내주에 삽입, 압압(삽입길이:28mm)하는 메커니컬 결합인데 이로 인해 상자(31)내 공간부가 충분하지 않으면 케이스(32)의 내부에 손을 집어 넣어 케이스(32) 구멍(6)으로 유입된 관과 이음관이 접합할 때 케이스(32)의 측벽들과 상하로 배근된 철근이 방해가 되어 배관이 용이하지 않게 되며 이러한 현상을 없애려고 상자(31)의 규격을 크게하면 스래브용 철근의 배근 간격(가로 180mm×세로 180mm)에 상자(31) 몸체가 삽입되지 못해 철근을 절단하여 제거하게 되면서 건축 구조를 악화시키고 철근을 절단하는 작업도 번거로워 공사품을 증대시키게 된다.In the box method embedded in the slab as described above, a flexible plastic pipe is embedded in a corrugated pipe (CD pipe) having an inner diameter larger than the outer diameter of the pipe, and the pipe is drawn in and drawn out of the corrugated pipe into the box 31. It is a piping system that flows in and repairs the tube by taking out the tube through the box 31 and repairing it. At this time, the joint of the tube is firmly held by the hand and inserted into the inner circumference of the joint pipe and pressed (insert length: 28 mm). If this does not have enough space in the box 31, the hand 32 is placed inside the case 32 and the sidewalls of the case 32 when the pipe introduced into the hole 6 of the case 32 and the fitting tube are joined to each other. Reinforcing bars reinforced above and below become obstructed and piping is not easy, and if the size of the box 31 is increased to eliminate this phenomenon, the box 31 body is placed in the reinforcement spacing (180 mm x 180 mm) of the rebar rebar. Could not insert the rebar As it is removed by cutting, the construction structure is deteriorated and the work of cutting the rebar is cumbersome to increase the construction work.

본 발명은 상기한 문제점들, 즉 상자를 스래브에 매설할 때 케이스를 뒤집지 않고 배관을 하고, 상자의 가로·세로 규격이 최소화하였지만 배관 시공이 용이하도록 제안된 스래브 매설상자를 제안한 것이다.The present invention proposes the above-mentioned problems, namely, the slab buried box proposed to be easily piped, although piping is carried out without inverting the case when the box is buried in the slab, and the horizontal and vertical dimensions of the box are minimized.

이하 첨부된 도면을 참조하여 본 고안의 스래브 매설상자를 상세히 설명하면,Referring to the slab buried box of the present invention in detail with reference to the accompanying drawings,

도1과 같이 이음관이 내장하는 이음관내장체(1)는 몸체 하부가 비교적 넓은 개구부(3)로 형성한 후 사방에 4각틀의 프레임구조를 가진 바닥체(2)에 연결되어 양끝단에서 대칭하여 마주보고 상향으로 절곡한 몸체에 관이 출입하는 다수개 구멍(6)을 가진 관출입체(5)를 구비한 이음관내장체(1)로 구성하였다.As shown in FIG. 1, the inner tube 1 of the inner tube 1 is formed with a relatively wide opening 3 at the lower part of the body, and is connected to the bottom body 2 having a quadrangular frame structure on all sides, thereby being symmetrical at both ends. It consists of a joint tube internal body (1) having a tube access body (5) having a plurality of holes (6) through which the tube enters and exits the body bent upwards.

상기의 이음관내장체(1)의 시공은 도2와 같이 몸체를 상하로 배근된 철근(25) 간격사이로 넣어서 스래브(27) 형성용 거푸집면에 바닥체(2)가 맞닿도록 안치하는데, 이음관내장체(1)가 콘크리트에 매설되더라도 스래브(27) 하부에서 개구부(3)가 열려서 보수 점검하도록 점검커버(7)가 바닥체(2)의 하부에 결합되어 거푸집면에 안치된다.The construction of the joint pipe internal body (1) is placed so that the bottom body (2) abuts on the form surface for forming the slab (27) by inserting the body between the spacing of the reinforcing bar 25 up and down as shown in Figure 2, Even if the endotracheal body 1 is embedded in concrete, the inspection cover 7 is coupled to the lower part of the bottom body 2 and placed in the form surface so that the opening 3 is opened and repaired under the slab 27.

근래에는 세대 내에서 최소수량의 상자(31)를 사용하고 이와같은 상자(31)에서 여러곳의 수도꼭지로 관을 보내 시공성과 경제성을 높이도록 케이스(32)에 수용되는 이음관(23)이 다수개의 접속구(24)를 구비하도록 하는데, 상기의 케이스(32)에는 다수개의 접속구를 구비하되 케이스(32)의 규격을 최소화하여 이음관(23)의 가로, 세로부 면적을 줄이는 목적으로 도 와 같이 직렬되어 양단에서 다수개 접속구(24)를 구비하고, 일측이 상하의 복층구조로 된 접속구(24)를 구비한 이음관(23) 을 사용하게 된다.In recent years, there are many joint pipes 23 accommodated in the case 32 so as to improve construction and economic efficiency by using a minimum amount of boxes 31 within a household and sending pipes from such boxes 31 to various faucets. It is to be provided with two connection ports 24, the case 32 is provided with a plurality of connection ports to minimize the size of the case 32 to reduce the horizontal and vertical area of the joint pipe 23 as shown in FIG. A joint pipe 23 having a plurality of connection ports 24 in series at both ends and a connection port 24 having a multi-layered structure having one side up and down is used.

도3은 거푸집면에 안치된 이음관내장체(1)에 실시배관을 나타낸 것으로, 이음관내장체(1)에 수용되는 이음관(23)과 관출입체(5)의 구멍(6)으로 도입한 주름관(22)에 내장된 관(21)을 손으로 잡고 삽입·압압작업을 할 때 이음관내장체(1)의 측벽 2개와 상부가 열려있어 이음관내장체(1)의 배관 접합을 자유롭게 시행할 수 있다.Fig. 3 shows the implementation pipe in the joint pipe internal body 1 placed on the mold surface, which is introduced into the hole 6 of the joint pipe 23 and the tube entry body 5 accommodated in the joint pipe internal body 1. When inserting and pressing the tube 21 embedded in the corrugated pipe 22 by hand, two side walls and the upper part of the joint inner tube 1 are open, so that the joint of the joint inner tube 1 can be freely joined. have.

도4는 상기와 같은 관(21)과 이음관(23)의 배관이 끝나고, 이음관내장체(1)의 결합조립을 나타낸 것으로, 관출입체(5) 양단에 미리 구비된 삽입체(10)에 2개의 측벽체(8)를 각각 이음관내장체(1)의 관출입체(5)에 삽입하여 조립하고, 상기와 같이 조립된 이음관내장체(1)의 열린상부, 즉 관출입체(5) 상부와 측벽체(8) 상부내측에 열린부를 관출입체(5)와 측벽체(8)의 상부 살에 지지하도록 된 뚜껑체(9)가 덮여서 이음관내장체(1)를 밀폐하여 콘크리트를 타설한다. 이때 뚜껑체(9)가 결합되면 다시 해체할 필요가 없어 서로의 살을 맞닿게하여 통상의 방법인 나사나 못등으로 양측을 고정한다.Figure 4 shows the coupling assembly of the pipe 21 and the fitting pipe 23 as described above, and the coupling pipe internal body (1), the insert (10) previously provided at both ends of the pipe entrance (5) Two side wall bodies 8 are respectively inserted into the tube entry body 5 of the fitting tube internal body 1, and the open upper part of the joint tube internal body 1 assembled as described above, that is, the tube fitting body 5 is assembled. The upper and side wall bodies 8 are covered with a lid body 9 which supports an opening in the upper part of the entrance and exit body 5 and the upper flesh of the side wall body 8 to seal the inner tube body 1 with concrete. Pour it. At this time, when the lid body 9 is combined, there is no need to dismantle it again so that the flesh of each other abuts and fixes both sides with screws or nails, which are common methods.

도5는 콘크리트가 타설된 후 양생되어 거푸집이 제거된 상태를 나타내는 것으로 거푸집면에 바닥체(2)의 하부에 결합된 점검커버(7)가 밀착되어 콘크리트가 타설되었기 때문에 점검커버(7)가 스래브(27) 하부면에 표출하고 있어, 보수점검시 바닥체(2)에서 점검커버(7)를 탈착하여 개구부(3)를 통해 이음관내장체(1) 내의 관(21)과 이음관(23)을 보수 수선하는데, 상기 바닥체(2)에 점검커버(7)의 결합은 개폐 가능하도록 통상의 나사, 못 등의 고정부재를 이용 점검커버(7)가 바닥체(2) 에서 탈부착하게 된다.5 shows the state in which the form is removed after the concrete is poured and the inspection cover 7 coupled to the lower part of the bottom body 2 is adhered to the form surface so that the inspection cover 7 is poured. On the lower surface of the slab 27, the inspection cover 7 is detached from the bottom body 2 at the time of maintenance inspection, and the pipe 21 and the fitting pipe in the inner tube body 1 through the opening 3 are opened. 23) repairing, the coupling of the inspection cover (7) to the bottom (2) using a fixing member such as a screw, nail or the like so that the inspection cover (7) detachable from the bottom (2). do.

상기의 스래브 매설상자는 가로·세로 규격을 작게하여 스래브용 철근의 절단, 제거를 막고 상하로 배근된 철근의 제약에서 이음관내장체의 상부와 측벽 2곳이 열려있는 상태에서 손을 자유롭게 움직이면서 관과 이음관결합을 용이하게 하고, 배관 중 상자를 뒤집을 필요가 없어 시공성을 향상하는 효과가 있다.The slab buried box is small in width and length to prevent cutting and removal of slab rebars, and freely moving hands while the upper part and two sidewalls of the inner part of the joint tube are open under the constraints of the reinforcement bars. It is easy to join the pipe and the joint pipe, and there is no need to turn the box upside down in the pipe, thereby improving the workability.

Claims (2)

주름관에 내장한 관이 출입하여 이음관과 배관하도록 벽체(스래브)에 매설되는 상자에 있어서,In the box which is embedded in the wall (slab) so that the pipe built into the corrugated pipe enters and pipes with the joint pipe, 중앙에 개구부(3)를 구비한 바닥체(2)의 양끝에서 절곡하여 마주본 몸체에 관(21)이 출입하는 다수개 구멍(6)이 구비하고, 양단에 삽입체(10)를 가진 관출입체(5)가 일체되어 형성된 이음관내장체(1)로 구성된 후,A tube having a plurality of holes 6 which are bent at both ends of the bottom body 2 having an opening 3 at the center thereof and which the tube 21 enters and faces the body facing each other, and has an insert 10 at both ends. After the access body 5 is composed of a joint pipe internal body 1 formed integrally, 상기 바닥체(2) 하부에 점검커버(7)가 결합되어 스래브(27)용 철근(25) 간격사이로 안착되어 거푸집에 밀착고정하여 타측에서 도입·도출한 주름관(22)에 내장한 관(21)과 이음관(23)이 배관하고, 한쌍의 측벽체(8)가 각각 상기 관출입체(5)의 삽입체(10)에 끼워져 결합된 후 상부를 뚜껑체(9)에 덮어 밀폐시켜 콘크리트가 타설하도록 형성되어 구성된 것을 특징으로 하는 스래브 매설상자The inspection cover 7 is coupled to the bottom of the bottom body 2 and is seated between the rebars 25 for the slab 27 to be fixed in close contact with the formwork, and the tube embedded in the corrugated pipe 22 introduced and drawn from the other side ( 21 and the fitting pipe 23 are piped together, and a pair of side wall bodies 8 are fitted to the insert 10 of the tube access body 5 respectively, and then the upper part is covered with a lid 9 to be sealed. Slab buried box characterized in that the concrete is formed and formed 제1항에 있어서,The method of claim 1, 상기 이음관내장체(1)에는 직렬되어 양단에 다수개 접속구(24)를 구비한 후 접속구(24) 상방향에 복층의 접속구(24)를 더 구비한 이음관(23) 형상으로 형성하여 내장되는 것을 특징으로 하는 스래브 매설상자The joint pipe internal body 1 is provided in series with a plurality of connection ports 24 at both ends, and then formed in a shape of a joint pipe 23 having a plurality of connection ports 24 formed in the upper direction of the connection port 24. Slab burial box, characterized in that
KR1020060092914A 2006-09-25 2006-09-25 Box for sleeve KR20080027605A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060092914A KR20080027605A (en) 2006-09-25 2006-09-25 Box for sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060092914A KR20080027605A (en) 2006-09-25 2006-09-25 Box for sleeve

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020060028611U Division KR200435541Y1 (en) 2006-10-28 2006-10-28 Box For Sleeve

Publications (1)

Publication Number Publication Date
KR20080027605A true KR20080027605A (en) 2008-03-28

Family

ID=39414467

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060092914A KR20080027605A (en) 2006-09-25 2006-09-25 Box for sleeve

Country Status (1)

Country Link
KR (1) KR20080027605A (en)

Similar Documents

Publication Publication Date Title
KR101729899B1 (en) waterproof device for bathroom and manufacture method thereof and construction method
KR101157482B1 (en) Sleeve
KR200417638Y1 (en) piping inspect of a wall reclamation style that insulation attached
KR101204760B1 (en) Built-in Ceiling type Hot and Cold Distributor with Structure for Piping and Repairing easily
KR200417094Y1 (en) Circular-type Manhole
KR20080027605A (en) Box for sleeve
KR200435541Y1 (en) Box For Sleeve
KR101219145B1 (en) Piping System For Bathroom Having Double Pipe Structure
KR200434389Y1 (en) Box for Piping
KR20060021800A (en) Joint inner-box for wall-setting
KR100780797B1 (en) That inspect piping of wall reclamation styleand form of double pipe
KR101029791B1 (en) Cold and hot water distributor of ceiling buried type having a drain pipe
KR100665267B1 (en) Manhole structure and manufacturing method of the same
KR101037465B1 (en) Box for Piping
KR100751728B1 (en) A slab bottom constructing structure of dividened box and a slab bottom exposure pipe of the rectangular double pipe and the dry wall reclaim perpendicular facinf downward piping structure
KR20080076279A (en) Box buried in wall having temporary fix member and pipe jointing method using the same
SI1600573T1 (en) Prefabricated construction element
KR20150081381A (en) Household Slab Concrete Partial Built in Type Connecting Structure of Wastewater and drainwater Vertical Pipes including Pipe and parts with Noiseproof Layer and Slide Waterproof Connecting Part and Constructing Method thereby
KR100762918B1 (en) Fixing assembly about that inspect box and piping of wall reclamation style
KR100581088B1 (en) Drainpipe connect structure
KR100874134B1 (en) A dividened box and laying bricks wall reclaim piping structure for constructing bottom having a double pipe connecting sleeve of connecting structure of slab
CN106948432A (en) Outdoor 3 liters of water drainage systems of single layer draining stinking-proof leakage-proof energy-saving
CN207392333U (en) A kind of pre-buried bent-tube boiler leakproof deodorization ponding processor of alternate configuration plate
KR200428870Y1 (en) Hume pipe duct connecting device
KR20090131353A (en) Shutting tightly style manhole formation body

Legal Events

Date Code Title Description
WITN Withdrawal due to no request for examination