KR20070119285A - 풍속패턴 분류를 통한 풍력발전 예보방법 - Google Patents
풍속패턴 분류를 통한 풍력발전 예보방법 Download PDFInfo
- Publication number
- KR20070119285A KR20070119285A KR1020060053716A KR20060053716A KR20070119285A KR 20070119285 A KR20070119285 A KR 20070119285A KR 1020060053716 A KR1020060053716 A KR 1020060053716A KR 20060053716 A KR20060053716 A KR 20060053716A KR 20070119285 A KR20070119285 A KR 20070119285A
- Authority
- KR
- South Korea
- Prior art keywords
- wind speed
- wind
- forecast
- time
- pattern
- Prior art date
Links
- 238000010248 power generation Methods 0.000 title claims abstract description 44
- 238000013277 forecasting method Methods 0.000 title claims description 8
- 238000000034 method Methods 0.000 claims abstract description 35
- 238000010276 construction Methods 0.000 claims description 13
- 238000000611 regression analysis Methods 0.000 claims description 11
- 238000012795 verification Methods 0.000 claims description 10
- 230000007774 longterm Effects 0.000 claims description 9
- 230000001419 dependent effect Effects 0.000 claims description 7
- 238000004364 calculation method Methods 0.000 claims 1
- 238000007796 conventional method Methods 0.000 description 5
- 238000013179 statistical model Methods 0.000 description 5
- 238000013528 artificial neural network Methods 0.000 description 4
- 238000012937 correction Methods 0.000 description 3
- 238000012544 monitoring process Methods 0.000 description 3
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 230000007423 decrease Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 229930091051 Arenine Natural products 0.000 description 1
- 102100030714 Endogenous retrovirus group K member 18 Env polyprotein Human genes 0.000 description 1
- 101001064122 Homo sapiens Endogenous retrovirus group K member 18 Env polyprotein Proteins 0.000 description 1
- 101000956193 Homo sapiens Endogenous retrovirus group K member 18 Pro protein Proteins 0.000 description 1
- 101001066690 Homo sapiens Ribonuclease H Proteins 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 229910002092 carbon dioxide Inorganic materials 0.000 description 1
- 239000001569 carbon dioxide Substances 0.000 description 1
- 238000013145 classification model Methods 0.000 description 1
- 230000001186 cumulative effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 239000005431 greenhouse gas Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003062 neural network model Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 238000007619 statistical method Methods 0.000 description 1
- 238000010792 warming Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Wind Motors (AREA)
Abstract
Description
DATE | TIME | t | V(t-2) | V(t-1) | V(t) | Pattern | O=V(t+1) | P=V(t+1) |
2002-02-15 | 1:00 | 1 | 10.2 | 7.7 | 10.7 | D | 12.2 | 8.0 |
2002-02-16 | 2:00 | 2 | 7.7 | 10.7 | 12.2 | A | 9.0 | 10.1 |
2002-02-17 | 3:00 | 3 | 10.7 | 12.2 | 9.0 | C | 10.7 | 11.8 |
2002-02-18 | 4:00 | 4 | 12.2 | 9.0 | 10.7 | D | 10.8 | 9.7 |
2002-02-19 | 5:00 | 5 | 9.0 | 10.7 | 10.8 | A | 11.7 | 10.4 |
2002-02-20 | 6:00 | 6 | 10.7 | 10.8 | 11.7 | A | 9.0 | 10.6 |
2002-02-21 | 7:00 | 7 | 10.8 | 11.7 | 9.0 | C | 9.8 | 11.4 |
2002-02-22 | 8:00 | 8 | 11.7 | 9.0 | 9.8 | D | 9.7 | 9.6 |
2002-02-23 | 9:00 | 9 | 9.0 | 9.8 | 9.7 | C | 10.0 | 9.7 |
2002-02-24 | 10:00 | 10 | 9.8 | 9.7 | 10.0 | D | 9.2 | 9.5 |
: | : | : | : | : | : | : | : | : |
불확도 | 신경망회로 | 자기회귀 | 본 발명 패턴분류 |
CORR | 0.95 | 0.95 | 0.95 |
RMSE | 1.60 | 1.60 | 0.43 |
IOA | 0.97 | 0.97 | 0.99 |
Claims (9)
- 풍력발전 예보방법에 있어서.풍속 패턴분류에 의한 풍력발전단지의 실시간 대표풍속 예측단계와;상기 실시간 대표풍속 예측단계에 대응하여 측정-상관-예측(MCP: Measure-Correlate-Predict)에 의한 인근지역의 실시간 참조풍속 예측단계와;상기 대표풍속 예측단계와 참조풍속 예측단계에 따라 예보풍속을 보정하는 단계와;이후 풍력발전기 배치를 고려한 후류 손실율을 계산하는 단계와;이후 풍력발전기별 허브 높이에서의 풍속과 출력곡선에 따라 풍력발전기별 발전량을 예측하는 단계와;이후 풍력발전단지의 총발전량을 예보하는 단계;로 이루어져 가동경력이 짧고, 풍력발전 예보에 필요한 충분한 기간의 기상통계자료가 없는 풍력발전단지에서 풍력예보를 하는 것을 특징으로 하는 풍속패턴 분류를 통한 풍력발전 예보방법.
- 제 1항에 있어서,상기 풍력발전단지의 실시간 대표풍속 예측단계는,풍력발전단지의 기상요소를 실시간으로 관측하여 예보시스템에 전송하는 단계와;이후 현시점의 풍속패턴을 분류하는 단계와;이후 분류된 풍속패턴별로 다중회귀 모형계수를 적용하는 단계와;이후 대표풍속을 예측하는 단계로 이루어지는 것을 특징으로 하는 풍속패턴 분류를 통한 풍력발전 예보방법.
- 제 1항에 있어서,상기 실시간 인근지역의 실시간 참조풍속 예측단계는,인근지역의 기상청 실시간 예보풍속값을 전송받는 단계와;이후 측정-상관-예측 방법을 적용하여 인근지역의 기상청 예보풍속값을 풍력발전단지 위치에서의 예보풍속값으로 보정하는 단계와;이후 참조풍속을 예측하는 단계로 이루어지는 것을 특징으로 하는 풍속 패턴 분류를 통한 풍력발전 예보방법.
- 제 2항에 있어서,상기 풍속패턴별 다중회귀 모형계수를 적용하는 단계는,풍력발전단지의 대표위치에서 관측된 장기간 기상자료 데이터베이스를 구비하는 단계와;상기 기상관측자료 데이터베이스를 예보모형 구축용도 데이터베이스와 검증 용도 데이터베이스로 분할하는 단계와;상기 예보모형 구축용으로 분할된 예보모형 구축용도 데이터베이스의 시계열 기상자료로부터 각각의 시간단계에 따른 풍속패턴을 분류하는 단계와;상기 시간단계에 따라 풍속패턴별로 분류된 자료는 각각의 패턴별로 다중회귀분석에 의한 모형계수를 산출하는 단계와;결정된 풍속패턴별 모형계수를 적용한 예측모형을 모형검증용 기상자료를 이용하여 검증함으로써 현 단계에서의 불확도(uncertainty)를 구하는 단계와;현 단계의 불확도와 전 단계의 불확도를 비교하여 최적 차수를 결정하거나 상기 과정의 반복을 결정하는 단계;를 거쳐 이루어지는 것을 특징으로 하는 풍속패턴 분류를 통한 풍력발전 예보방법.
- 제 2항에 있어서,상기 대표풍속을 예측하는 단계는,패턴별로 다중회귀모형의 계수를 적용하여 현 시각 t를 기준으로 1시간 후, 2시간 후 그리고 n시간 후인 t+1, t+2, ..., t+n 시각에서의 대표풍속 예보값을 산출하는 것을 특징으로 하는 풍속패턴 분류를 통한 풍력발전 예보방법.
- 제 3항에 있어서,상기 참조풍속을 예측하는 단계는, 측정-상관-예측 방법을 적용하여 기상청에서 발표하는 예보위치를 풍력발전단지 현장위치로 보정하고 풍력발전단지 대표위치에서의 실측값에 의한 대표풍속 예보값과 기상청 예보값을 변환한 참조풍속 예보값을 가중평균함으로써 풍력발전단지 현장의 대표풍속 예보값을 결정하는 것을 특징으로 하는 풍속패턴 분류를 통한 풍력발전 예보방법.
- 제 4항에 있어서,상기 예보모형 구축용도로 분할된 예보모형 구축용도 데이터베이스의 시계열 기상자료로부터 각각의 시간단계에 따른 풍속패턴을 분류하는 단계는,풍속 시계열의 변화형태에 따라 풍속패턴을 구분한 것으로 패턴차수값 N=2이면 독립변수는 V(t-1), V(t)이고, 풍속패턴은 V(t-1) > V(t), V(t-1) = V(t), V(t-1) < V(t)의 패턴 형태 중 어느 하나 이상인 것을 특징으로 하는 풍속패턴 분류를 통한 풍력발전 예보방법.
- 제 4항에 있어서,상기 예보모형 구축용으로 분할된 예보모형 구축용도 데이터베이스의 시계열 기상자료로부터 각각의 시간단계에 따른 풍속패턴을 분류하는 단계는,풍속 시계열의 변화형태에 따라 풍속패턴을 구분한 것으로 패턴차수값 N=3이 면 독립변수는 V(t-2), V(t-1), V(t)이고, 풍속패턴은 V(t-2) < V(t-1) < V(t), V(t-2) > V(t-1) > V(t), V(t-2) < V(t-1) > V(t), V(t-2) > V(t-1) < V(t), V(t-2) = V(t-1) = V(t), V(t-2) < V(t-1) = V(t), V(t-2) < V(t-1) = V(t), V(t-2) = V(t-1) > V(t), V(t-2) = V(t-1) < V(t)의 패턴 형태 중 어느 하나 이상인 것을 특징으로 하는 풍속패턴 분류를 통한 풍력발전 예보방법.
- 제 4항에 있어서,상기 시간단계에 따라 풍속패턴별로 분류된 자료는 각각의 패턴별로 다중회귀분석에 의한 모형계수를 산출하는 단계는,N=2인 경우 3 가지 풍속패턴, V(t-1) > V(t), V(t-1) = V(t), V(t-1) < V(t)에 대한 종속변수로서의 예보풍속 V(t+1) (1시간 이후 풍속예보값), V(t+2) (2시간 이후 풍속예보값), V(t+3) (3시간 이후 풍속예보값)을 V(t+1) = a1 * V(t-1) + b1 * V(t) + c1, V(t+2) = a2 * V(t-1) + b2 * V(t) + c3, V(t+3) = a3 * V(t-1) + b3 * V(t) + c3에 의해 a1, b1, c1에 따라 다중회귀 모형계수를 산출하는 것을 특징으로 하는 풍속패턴 분류를 통한 풍력발전 예보방법.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060053716A KR100802402B1 (ko) | 2006-06-15 | 2006-06-15 | 풍속패턴 분류를 통한 풍력발전 예보방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020060053716A KR100802402B1 (ko) | 2006-06-15 | 2006-06-15 | 풍속패턴 분류를 통한 풍력발전 예보방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20070119285A true KR20070119285A (ko) | 2007-12-20 |
KR100802402B1 KR100802402B1 (ko) | 2008-02-14 |
Family
ID=39137638
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020060053716A KR100802402B1 (ko) | 2006-06-15 | 2006-06-15 | 풍속패턴 분류를 통한 풍력발전 예보방법 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100802402B1 (ko) |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101794996A (zh) * | 2010-02-10 | 2010-08-04 | 华东电网有限公司 | 风电场出力实时预测方法 |
KR100975202B1 (ko) * | 2008-08-21 | 2010-08-10 | 한국전력공사 | 풍속 분포 산정 방법 |
CN102435437A (zh) * | 2011-09-08 | 2012-05-02 | 天津理工大学 | 一种用于风电系统的混沌实时检测系统及其工作方法 |
CN102588210A (zh) * | 2011-12-21 | 2012-07-18 | 中能电力科技开发有限公司 | 一种用于功率曲线拟合数据预处理的滤波方法 |
WO2012115313A1 (ko) * | 2011-02-21 | 2012-08-30 | 삼성중공업 주식회사 | 풍력발전기의 나셀 풍속 보정 시스템 및 그 방법 |
CN104239979A (zh) * | 2014-10-09 | 2014-12-24 | 国电南瑞科技股份有限公司 | 一种风电场发电功率超短期预测方法 |
CN104268659A (zh) * | 2014-10-09 | 2015-01-07 | 国电南瑞科技股份有限公司 | 一种光伏电站发电功率超短期预测方法 |
CN104376388A (zh) * | 2014-12-08 | 2015-02-25 | 国家电网公司 | 一种基于风速因子控制模型的风电超短期功率预测方法 |
CN105117593A (zh) * | 2015-08-18 | 2015-12-02 | 河海大学 | 基于小波变换和粒子群改进灰色模型的短期风速预测方法 |
CN109217367A (zh) * | 2018-09-30 | 2019-01-15 | 国家电网有限公司 | 风力发电预测方法、装置及设备 |
KR20200013468A (ko) * | 2018-07-30 | 2020-02-07 | 강원대학교산학협력단 | 풍력 발전기의 후류모델 보정방법 |
CN111290052A (zh) * | 2019-09-30 | 2020-06-16 | 中国人民解放军国防科技大学 | 一种使用平流层重力波预测台风风速的方法 |
CN112801429A (zh) * | 2021-04-12 | 2021-05-14 | 湖南防灾科技有限公司 | 微地形风功率计算方法、装置及系统 |
CN113723683A (zh) * | 2021-08-30 | 2021-11-30 | 西安热工研究院有限公司 | 一种风电场利润预测方法及系统 |
KR102338519B1 (ko) * | 2021-04-28 | 2021-12-13 | 주식회사 인코어드 테크놀로지스 | 실시간 신재생에너지 발전량 추정 시스템 |
CN113850440A (zh) * | 2021-09-30 | 2021-12-28 | 浙江运达风电股份有限公司 | 一种利用基于平均风速订正的mcp的风速预测方法 |
KR102379984B1 (ko) * | 2021-12-06 | 2022-03-29 | 주식회사 인코어드 테크놀로지스 | 신재생에너지 발전 관리 시스템 |
CN114662800A (zh) * | 2022-05-18 | 2022-06-24 | 浙江浙能能源服务有限公司 | 一种基于人工神经网络的风电功率预测方法及系统 |
CN115291303A (zh) * | 2022-07-21 | 2022-11-04 | 山东省气象科学研究所(山东省海洋气象科学研究所、山东省气象局培训中心) | 一种基于数值天气预报mos滑动订正的大风客观预报方法 |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108364071A (zh) * | 2018-02-06 | 2018-08-03 | 南京国电南自电网自动化有限公司 | 一种基于遗传规划法的自适应建模风功率预测方法 |
CN111697621B (zh) * | 2020-06-23 | 2021-08-24 | 石家庄铁道大学 | 基于ewt-pdbn组合的短期风电功率预测方法 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08166465A (ja) * | 1994-12-12 | 1996-06-25 | East Japan Railway Co | 風速予測方法及びその風速予測方法に基づく交通手段運行方法 |
KR20030087182A (ko) * | 2001-10-19 | 2003-11-13 | 미츠비시 쥬고교 가부시키가이샤 | 기체 상황 예측 방법 |
JP4347030B2 (ja) * | 2003-12-02 | 2009-10-21 | 株式会社四国総合研究所 | 風力発電出力予測方法 |
KR20050063616A (ko) * | 2003-12-22 | 2005-06-28 | 재단법인 포항산업과학연구원 | 풍력 자원 지도화 방법 |
-
2006
- 2006-06-15 KR KR1020060053716A patent/KR100802402B1/ko active IP Right Grant
Cited By (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100975202B1 (ko) * | 2008-08-21 | 2010-08-10 | 한국전력공사 | 풍속 분포 산정 방법 |
CN101794996A (zh) * | 2010-02-10 | 2010-08-04 | 华东电网有限公司 | 风电场出力实时预测方法 |
US9103318B2 (en) | 2011-02-21 | 2015-08-11 | Samsung Heavy Ind. Co., Ltd. | System and method for correcting nacelle wind velocity of wind power generator |
WO2012115313A1 (ko) * | 2011-02-21 | 2012-08-30 | 삼성중공업 주식회사 | 풍력발전기의 나셀 풍속 보정 시스템 및 그 방법 |
CN102435437A (zh) * | 2011-09-08 | 2012-05-02 | 天津理工大学 | 一种用于风电系统的混沌实时检测系统及其工作方法 |
CN102588210A (zh) * | 2011-12-21 | 2012-07-18 | 中能电力科技开发有限公司 | 一种用于功率曲线拟合数据预处理的滤波方法 |
CN104268659A (zh) * | 2014-10-09 | 2015-01-07 | 国电南瑞科技股份有限公司 | 一种光伏电站发电功率超短期预测方法 |
CN104239979B (zh) * | 2014-10-09 | 2017-11-10 | 国电南瑞科技股份有限公司 | 一种风电场发电功率超短期预测方法 |
CN104268659B (zh) * | 2014-10-09 | 2017-12-29 | 国电南瑞科技股份有限公司 | 一种光伏电站发电功率超短期预测方法 |
CN104239979A (zh) * | 2014-10-09 | 2014-12-24 | 国电南瑞科技股份有限公司 | 一种风电场发电功率超短期预测方法 |
CN104376388A (zh) * | 2014-12-08 | 2015-02-25 | 国家电网公司 | 一种基于风速因子控制模型的风电超短期功率预测方法 |
CN105117593A (zh) * | 2015-08-18 | 2015-12-02 | 河海大学 | 基于小波变换和粒子群改进灰色模型的短期风速预测方法 |
KR20200013468A (ko) * | 2018-07-30 | 2020-02-07 | 강원대학교산학협력단 | 풍력 발전기의 후류모델 보정방법 |
CN109217367A (zh) * | 2018-09-30 | 2019-01-15 | 国家电网有限公司 | 风力发电预测方法、装置及设备 |
CN111290052A (zh) * | 2019-09-30 | 2020-06-16 | 中国人民解放军国防科技大学 | 一种使用平流层重力波预测台风风速的方法 |
CN111290052B (zh) * | 2019-09-30 | 2021-12-07 | 中国人民解放军国防科技大学 | 一种使用平流层重力波预测台风风速的方法 |
CN112801429A (zh) * | 2021-04-12 | 2021-05-14 | 湖南防灾科技有限公司 | 微地形风功率计算方法、装置及系统 |
CN112801429B (zh) * | 2021-04-12 | 2021-07-13 | 湖南防灾科技有限公司 | 微地形风功率计算方法、装置及系统 |
KR102338519B1 (ko) * | 2021-04-28 | 2021-12-13 | 주식회사 인코어드 테크놀로지스 | 실시간 신재생에너지 발전량 추정 시스템 |
CN113723683A (zh) * | 2021-08-30 | 2021-11-30 | 西安热工研究院有限公司 | 一种风电场利润预测方法及系统 |
CN113850440A (zh) * | 2021-09-30 | 2021-12-28 | 浙江运达风电股份有限公司 | 一种利用基于平均风速订正的mcp的风速预测方法 |
KR102379984B1 (ko) * | 2021-12-06 | 2022-03-29 | 주식회사 인코어드 테크놀로지스 | 신재생에너지 발전 관리 시스템 |
CN114662800A (zh) * | 2022-05-18 | 2022-06-24 | 浙江浙能能源服务有限公司 | 一种基于人工神经网络的风电功率预测方法及系统 |
CN115291303A (zh) * | 2022-07-21 | 2022-11-04 | 山东省气象科学研究所(山东省海洋气象科学研究所、山东省气象局培训中心) | 一种基于数值天气预报mos滑动订正的大风客观预报方法 |
CN115291303B (zh) * | 2022-07-21 | 2023-08-29 | 山东省气象科学研究所 | 一种基于数值天气预报mos滑动订正的大风客观预报方法 |
Also Published As
Publication number | Publication date |
---|---|
KR100802402B1 (ko) | 2008-02-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100802402B1 (ko) | 풍속패턴 분류를 통한 풍력발전 예보방법 | |
Haupt et al. | Building the Sun4Cast system: Improvements in solar power forecasting | |
Clifton et al. | Wind plant preconstruction energy estimates. current practice and opportunities | |
Murcia et al. | Validation of European-scale simulated wind speed and wind generation time series | |
Foley et al. | Wind power forecasting & prediction methods | |
Rajagopalan et al. | Wind power forecasting and error analysis using the autoregressive moving average modeling | |
Dowds et al. | A review of large-scale wind integration studies | |
Watts et al. | Assessment of wind energy potential in Chile: A project-based regional wind supply function approach | |
Giani et al. | Closing the gap between wind energy targets and implementation for emerging countries | |
Brockway et al. | Weathering adaptation: Grid infrastructure planning in a changing climate | |
CN109726867B (zh) | 一种基于多模式集合的高分辨率电力气象预报方法 | |
Cutler et al. | Using nacelle‐based wind speed observations to improve power curve modeling for wind power forecasting | |
Tang et al. | Value of medium-range precipitation forecasts in inflow prediction and hydropower optimization | |
Mandal et al. | A new recursive neural network algorithm to forecast electricity price for PJM day‐ahead market | |
US20180248370A1 (en) | Methods and systems for energy use normalization and forecasting | |
Cabezon et al. | Comparison of methods for power curve modelling | |
Deng et al. | A survey of the researches on grid-connected solar power generation systems and power forecasting methods based on ground-based cloud atlas | |
Eltohamy et al. | A novel approach for the power ramping metrics | |
Ayodele et al. | Comparison of different wind speed prediction models for wind power application | |
Schneider et al. | A wind atlas for Germany and the effect of remodeling | |
Bryce et al. | Solar pv, wind generation, and load forecasting dataset for ercot 2018: Performance-based energy resource feedback, optimization, and risk management (perform) | |
Milad et al. | Wind Turbine Modeling Using Wind Speed Measurement Data | |
Chen et al. | Short-term wind power forecasting based on spatial correlation and artificial neural network | |
Lang et al. | Verification of wind power forecasts provided in real-time to the Irish Transmission System Operator | |
Valsaraj et al. | Machine learning-based simplified methods using shorter wind measuring masts for the time ahead wind forecasting at higher altitude for wind energy applications |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
G170 | Publication of correction | ||
FPAY | Annual fee payment |
Payment date: 20130204 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20140129 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20150203 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20160201 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20170102 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20180209 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20181211 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20191210 Year of fee payment: 13 |