KR20070112594A - Temporary supporting machinery of electric wire - Google Patents

Temporary supporting machinery of electric wire Download PDF

Info

Publication number
KR20070112594A
KR20070112594A KR1020060045683A KR20060045683A KR20070112594A KR 20070112594 A KR20070112594 A KR 20070112594A KR 1020060045683 A KR1020060045683 A KR 1020060045683A KR 20060045683 A KR20060045683 A KR 20060045683A KR 20070112594 A KR20070112594 A KR 20070112594A
Authority
KR
South Korea
Prior art keywords
pole
fixed
wire
lifting
wall
Prior art date
Application number
KR1020060045683A
Other languages
Korean (ko)
Inventor
하성환
Original Assignee
합자회사 대광전기
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 합자회사 대광전기 filed Critical 합자회사 대광전기
Priority to KR1020060045683A priority Critical patent/KR20070112594A/en
Publication of KR20070112594A publication Critical patent/KR20070112594A/en

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • H02G1/04Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables for mounting or stretching
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G2200/00Indexing scheme relating to installation of electric cables or lines covered by H02G

Landscapes

  • Electric Cable Installation (AREA)

Abstract

A method of installing an auxiliary supporting apparatus for a hot line mending and exchanging work and an auxiliary supporting apparatus of a hot line are provided to simplify a repairing and exchanging process by moving downwardly and upwardly an elevating pole by pulling and releasing a wire. An upper roller(13) and a lower roller are rotatably inserted into an inner wall of a fixing pole(10) of a hexagonal pillar having a hollow and an outer wall of an elevating pole(20). A pulley includes a fixing pole roller(12) and an elevating pole roller which are installed at the inner wall of the fixing pole and the outer wall of the elevating pole, respectively. A wire(30) is wound around the pulley. An auxiliary supporting unit(1) is fixed to an upper part of an electric pole in order to move upwardly and downwardly the elevating pole by using the wire. A brake unit(40) is fixed to a lower part of the electric pole. The brake unit includes a supporting plate(41), a plurality of releasing control rollers(42), a rotation stopping roller(43), a pressing lever(44) extended by a spring, and a lower binding band(45). A hot line is fixed at each holder(26) of a horizontal bar(25) which is installed at an upper part of an outer wall of the elevation pole.

Description

활선 전선로의 보수 및 교체작업을 위한 보조 가지지장치의 설치공법 및 활선전선로의 보조가지지장치{TEMPORARY SUPPORTING MACHINERY OF ELECTRIC WIRE}Installation method of auxiliary supporting device for repairing and replacing live cable line and supporting device for live cable line {TEMPORARY SUPPORTING MACHINERY OF ELECTRIC WIRE}

도1은 본 발명에 따른 보조 가지지장치의 설치 상태의 사시도.1 is a perspective view of an installation state of the auxiliary supporting apparatus according to the present invention.

도2는 본 발명에 따른 보조 가지지장치의 실시상태를 보인 정면도.Figure 2 is a front view showing an embodiment of the auxiliary supporting apparatus according to the present invention.

도3은 본 발명의 설명을 위한 요부를 발췌하여 보인 확대사시도.Figure 3 is an enlarged perspective view showing the main portion for explaining the present invention.

도4는 본 발명을 구성하는 고정폴과 승강폴을 분리하여 보인 확대사시도.Figure 4 is an enlarged perspective view showing the separation of the fixed pole and the lifting pole constituting the present invention.

도5는 본 발명의 고정폴회전롤러 및 승강폴회전롤러에 와이어가 걸어 돌림된 상태를 설명하는 개략사시도.Figure 5 is a schematic perspective view illustrating a state in which a wire is turned on the fixed pole rotating roller and the lifting pole rotating roller of the present invention.

도6은 본 발명에 따른 브레이크장치의 후방을 보인 배면도.Figure 6 is a rear view showing the rear of the brake device according to the present invention.

도7은 종래의 오가크레인에 장착된 전선로 가지지장치를 이용하여 활선전선로 활선작업상태를 보인 사시도.Figure 7 is a perspective view showing a live wire line working state by using a wire support device mounted on the conventional Oga crane.

* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

1 보조 가지지장치 3 활선전선로 5 전주1 Auxiliary Supporting Device 3 Live Cable Line 5 Jeonju

10 고정폴 11 묶음고리 10 Fixed pole 11 Bundle

12,12a,12b 고정폴회전롤러 13,13a,13b 상부습동롤러12,12a, 12b Fixed pole rotating roller 13,13a, 13b Upper sliding roller

15,15a 지지간 16 보강편 16a 결착볼트15,15a Supporting section 16 Reinforcement piece 16a Tightening bolt

17,17a 물림밴드 18 볼트 19 너트17,17a bleed band 18 bolt 19 nut

20 승강폴 22,22a,22b 승강폴회전롤러20 Lifting pole 22,22a, 22b Lifting pole rotating roller

23,23a,23b 하부습동롤러 24 도르레장치 25 수평바23,23a, 23b Lower sliding roller 24 Pulley device 25 Horizontal bar

26 홀더 26a 클램프 27 상부결착밴드26 Holder 26a Clamp 27 Upper binding band

27a 결착대 30 와이어27a binding wire 30 wire

40 브레이크장치 41 지지판 42 풀림제어롤러40 Brake system 41 Support plate 42 Release control roller

43 회전정지롤러 44 압지레버 44a 스프링43 Rotary stop roller 44 Push lever 44a Spring

45 하부결착밴드45 Bottom Tie Band

본 발명은 활선 전선로의 보수 및 교체작업을 위한 보조 가지지장치의 설치공법 및 활선전선로의 보조가지지장치에 관한 것으로, 더욱 상세하게는 통이 크고 작은 속이 빈 육각기둥의 구조로 형성한 고정폴의 내부에서 승강폴이 도르레장치에 의하여 승강작동하도록 내삽설치한 보조가지지장치를 전주의 상부에 고정 설치한 단계와, 전주의 하부에 가이드회전롤러와 보조회전롤러 및 회전정지롤러를 결합시켜 구성한 브레이크장치를 고정 설치한 단계와, 상기 도르레장치에 걸어 돌려 현수된 와이어를 브레이크장치에 걸어 돌림시키는 단계와, 상기 보조가지지장치를 결합 구성한 승강폴의 상단부에 결착 고정된 수평바의 각 홀더에 각 활설전선로를 물림 고정시키는 단계에 의하여 본 발명의 보조가지지장치의 설치공법에 의한 제반작업을 완료하는 것으로, 활선전선로의 보수 및 교체작업을 하고자 하는 전주마다 고가의 장비인 전선로 가지지장치가 부설된 오가크레인을 준비 및 설치할 필요가 없이 본 발명의 보조 가지지장치만을 용이하게 설치하여 와이어의 당김과 풀림에 의해 활선전선로를 등어 올려 분리 이격시켜 작업을 용이하게 함으로써 현장여건에 구애됨이 없이 용이하게 설치하여 간단한 조작으로 활선전선로의 보수 및 교체작업을 안전하고 신속하게 시행하며, 작업시간을 단축하여 활선전선로의 보수작업이나 교체작업에 따른 경비를 현저하게 절감시켜 경제성을 향상시킬 수 있도록 제안된 것이다.The present invention relates to a method for installing an auxiliary support device for repairing and replacing a live cable line, and an auxiliary support device for a live wire line. More specifically, the inside of a fixed pole formed of a hollow hexagonal column structure having a large and small cylinder. A step of fixing the auxiliary support device, which is interpolated and installed so that the lifting pole moves up and down by the pulley device, in the upper part of the pole, and the brake device configured by combining the guide rotating roller, the auxiliary rotating roller, and the rotating stop roller in the lower part of the pole. A step of fixed installation, a step of turning the suspended wire by hanging on the pulley device to the brake device, and each active wire line to each holder of the horizontal bar which is fixedly fixed to the upper end of the lifting pole which comprises the auxiliary supporting device. Completion of the overall work by the installation method of the supporting device of the present invention by the step of fixing the bite It is not necessary to prepare and install the Ogacrane, which is equipped with a wire rail support device, which is expensive equipment, for every pole to repair and replace live cables, and easily install only the auxiliary support device of the present invention to pull and loosen the wire. By lifting up and moving the live tracks to make it easier to work, it can be easily installed without regard to the site conditions, and the repair and replacement of the live cable lines can be carried out safely and quickly by simple operation. It is proposed to improve the economics by remarkably reducing the cost of repairing or replacing the cable line.

일반적으로 전선로의 교체 또는 보수에 의한 활선 작업시에는 활선 작업 교체 전주 부근에 전주나 케이블을 임시로 가설하고 활선전선로를 이체하여 공급 전원을 완전히 차단시킨 상태로 교체 작업 공사를 완료한 후에 공급전원을 정상적으로 공급한 다음, 임시로 가설한 전주나 케이블을 철거시킨다.In general, during live work by replacing or repairing cable lines, temporarily install a pole or cable near the live work replacement pole and transfer the live wire to completely cut off the power supply. After supplying normally, remove temporary pole or cable.

이와 같은 종래의 활선작업은 임시 가설 및 철거 공사비가 많이 소요될 뿐만 아니라 공사 시간이 많이 소요되는 결점이 있다.This conventional live work has a drawback in that it takes not only a lot of temporary construction and demolition construction costs but also a lot of construction time.

따라서 근래에는 도6에 나타낸 바와 같이, 별도의 임시 전주를 가설하지 않고, 가지지장치(100)가 부설된 오가크레인(102)을 이용하여 전선로(104)의 활선 작업을 하고 있다.Therefore, in recent years, as shown in FIG. 6, the wire line 104 is live-worked using the organ crane 102 in which the supporting device 100 is installed, without providing temporary temporary poles.

그러나 상기와 같이 오가크레인(102)은 한 곳의 전주(106)마다 한 대의 오가크레인(102)을 설치하여 가지지 작업을 할 수 밖에 없었다.However, as described above, the oga crane 102 was forced to work by installing one oga crane 102 for each pole 106.

따라서, 여러 곳의 전주의 활선작업을 동시에 시행하려면, 고가인 오가크레인(102)이 소요되므로 비경제적이었으며, 또한, 다수 대의 오가크레인(102)을 이용하여 동시에 활선작업을 할 경우에는 보행자가 통행하는 인도나, 차량이 통행하는 도로를 점유하게 되어 통행에 방해가 되어 불편함을 줌은 물론 사고 발생이 우려되는 결점이 있었다.Therefore, it is inexpensive to carry out the live work of several places at the same time, because it takes expensive Oga Crane 102, and also, when doing the live work using multiple Oga Crane 102 at the same time, pedestrians pass. There was a drawback to take the sidewalks, or to occupy the road that the vehicle passes, hindered the traffic, inconvenience, as well as an accident.

또한, 활선전선로의 이선 작업시에도 상기와 같이 오가크레인(102)을 이용하기도 하지만, 상기 오가크레인(102)은 고가의 비싼 장비인 관계로 오가크레인(102)을 이용하지 않고 활선전선로가 홀더에 의해 지지되어 있는 완금에 별도의 지지구를 활선전선로에 닿지 않게 적정 간격으로 이격시켜 설치한 후에 활선전선로의 이 선작업을 하는 것으로, 예로써, 별도의 지지구인 핀장주를 구비한 완금연장 보조암을 완금(도시생략)의 일측단으로 설치한 후에 상기 핀장주의 끝단으로 형성된 전선이선롤러에 활선전선로를 걸고서 핀장주를 회전이동시켜 홀더로부터 활선전선로를 이격시킨 후 상기 홀더에 새로운 전선로를 설치함으로써, 전선로의 이선작업이 완료된다.In addition, although the Oga crane 102 is used as described above when the live line is moved, the Oga Crane 102 is an expensive and expensive equipment, and thus the Ota Crane 102 does not use the Oga Crane 102. A separate supporting tool is installed at a distance supported by the gap so that it does not touch the live cable line, and this line work is carried out. For example, a fully extended auxiliary arm with a pin holder, which is a separate support tool, is installed. After installing to the one end of the complete (not shown), the wire formed by the end of the pin holder hangs the live wire line on the line roller and rotates the pin long pole to separate the live wire line from the holder, and then establish a new wire line in the holder. By the installation, the wiring work to be completed is completed.

그러나 상기와 같은 핀장주를 구비한 완금연장 보조암은 작업자가 활선전선로가 설치된 완금에 근접한 상태에서 직접 설치하여야 함은 물론, 활선전선로의 이격작업시에도 작업자가 활선전선로에 근접된 상태로 작업을 해야하는 것으로, 작업자가 항상 위험요소에 노출된 상태가 되며, 상기 완금연장 보조암의 크기가 제한적이어서 활선전선로의 이격거리도 제한적이다 보니 이선작업공간이 협소하여 작업이 불편함은 물론 안전사고가 우려되는 결점이 있었다.However, as the above-mentioned pin extension pillar with pin length column, the worker should install it directly in the state close to the completion line where the live wire is installed. In addition, the work should be performed close to the live wire even when the live wire is separated. The worker is always exposed to risk factors, and because the size of the fully extended auxiliary arm is limited, the distance between livelines is limited, so the working space is narrow and the work is inconvenient and the safety accident is concerned. There was a flaw.

본 발명은 종래의 제반 결점을 해소하기 위하여 승강폴을 브레이크장치에 의하여 승강작동시키도록 결합 구성한 고정폴을 전주에 고정설치하는 단계와, 승강폴의 상단부에 결착 고정된 수평바의 각 홀더에 각 전선로를 물림 고정시키는 단계의 설치공법에 의하여 활선전선로의 작업을 위한 보조가지지장치의 설치작업을 간편하고 용이하게 완료할 수 았도록 함에 목적이 있으며, 따라서, 본 발명의 보조가지지장치에 결합 구성되는 와이어를 당겨주고 풀어주는 동작만으로 활선전선로를 간편하고 용이하게 들어 올려 이격시켜주는 작업을 완료함으로써, 현장 여건에 구애됨 이 없이 용이하게 설치하고, 간단한 조작으로 활선전선로의 보수 및 교체작업을 안전하고 신속하게 시행하여, 작업시간을 단축할 수 있으며, 전선로의 보수 및 교체비용을 현저하게 절감시켜 경제성을 향상시킬 수 있도록 함에 목적이 있다.The present invention is a step of fixing the fixed pole coupled to the pole to configure the elevating pole to operate the lifting pole by the brake device in order to solve all the conventional defects, and each of the holder of the horizontal bar is fixed to the upper end of the lifting pole The object of the present invention is to easily and easily complete the installation of the auxiliary support device for the work of the live wire line by the installation method of the step of fixing the electric wire, and thus, is configured to be coupled to the auxiliary support device of the present invention By simply pulling and releasing the wires, you can easily and easily lift and separate the live cables, and you can easily install them without having to worry about the site conditions. It can be implemented quickly to shorten the working time and remarkably reduce the cost of repairing and replacing the cables. The purpose as it reduces to improve the economy.

본 발명은 통이 크고 작은 속이 빈 육각면기둥구조의 고정폴(10)의 상부에 승강폴(20)을 내삽시켜 승강작동하도록 결합 구성하되, 고정폴(10)의 어느 일측 내벽면 상부에 와이어(30)의 묶음고리(11)를 고정설치하고, 고정폴회전롤러(12)(12a)(12b)와 상부습동롤러(13)(13a)(13b)를 서로 이웃하여 각각 120°각도의 위치에 서로 건너뛰는 구조로 설치하며, 어느 일측 외벽면의 상, 하부에는 지지간(15)(15a)을 고정 설치하여 외측선단부에 보강편(16)(16a)을 개재하여 볼트(18)와 너트(19)로 결착고정시키는 물림밴드(17)(17a)를 설치한 구조이며, 승강폴(20)의 외벽면 상부에는, 수개의 홀더(26)가 클램프(26a)에 의하여 착설된 수평바(25)를 고정편(16)과 결착볼트(16a)가 구비된 상부결착밴드(27)로 고정설치하고, 승강폴(20)의 외벽면 하부에는 승강폴회전롤러(22)(22a)(22b)와 하부습동롤러(23)(23a)(23b)를 서로 이웃하여 각각 120°각도에 위치하는 구조로 설치하여 상기 고정폴(10)에 고정 설치한 묶음고리(11)에 걸어 묶음시킨 와이어(30)를 각 고정폴회전롤러(12)(12a)(12b) 및 승강폴회전롤러(22)(22a)(22b)에 상, 하 지그재그의 구조로 걸어 돌림시켜 도르레장치(24)가 되도록 구성하였다.The present invention is configured to combine the lifting pole 20 by inserting the lifting pole 20 in the upper portion of the fixed pole 10 of the large hollow hollow cylindrical surface structure, the wire on any one inner wall surface of the fixed pole (10) The bundle 11 of 30 is fixedly installed, and the fixed pole rotating rollers 12, 12a, 12b and the upper sliding rollers 13, 13a, 13b are adjacent to each other at a position of 120 degrees. Installed in a structure that skips each other, and the support rods 15 and 15a are fixedly installed on the upper and lower portions of one of the outer wall surfaces, and the bolts 18 and the nuts are interposed at the outer ends of the reinforcing pieces 16 and 16a. A horizontal bar having a plurality of holders 26 mounted on the outer wall surface of the lifting pole 20 by a clamp 26a is provided. 25 is fixed to the upper fastening band 27 provided with the fixing piece 16 and the fastening bolt 16a, and the lifting pole rotating rollers 22, 22a and 22b are disposed below the outer wall surface of the lifting pole 20. ) And lower sliding roll 23 (23) (23a) (23b) adjacent to each other and installed in a structure located at an angle of 120 ° each to fix the wire 30, which is tied to the bundle ring (11) fixed to the fixed pole (10) The pole rotating rollers 12, 12a and 12b and the lifting pole rotating rollers 22, 22a and 22b were rolled up and down in a zigzag structure to form a pulley device 24.

본 발명은 속이 빈 육각면기둥주고의 고정폴(10)의 내벽면 상부에 승강 폴(20)의 외벽면 하부에 설치한 상부습동롤러(13)(13a)(13b)와 하부습동롤러(23)(23a)(23b)가 고정폴(10)의 내벽면과 승강폴(20)의 외벽면에 굴림식으로 내삽되어 고정폴(10)의 내벽면과 승강폴(20)의 외벽면에 각각 설치한 고정폴회전롤러(12)(12a)(12b)와 승강폴회전롤러(22)(22a)(22b)로 구성되는 도르레장치(40)에 걸어 돌림시킨 와이어(30)를 잡아 당기고 놓아 줌에 따라서 고정폴(10)의 상부로부터 내삽된 승강폴(20)이 승강작동하도록 결합 구성한 보조가지지장치(1)를 전주(5)의 상부에 고정 설치하는 단계와,According to the present invention, the upper sliding rollers (13) (13a) and (13b) and the lower sliding rollers (23) are installed on the lower inner wall surface of the elevating pole (20) on the inner wall surface of the fixed pole (10). 23a and 23b are inserted into the inner wall surface of the fixed pole 10 and the outer wall surface of the lifting pole 20 in a rolling manner, respectively to the inner wall surface of the fixed pole 10 and the outer wall surface of the lifting pole 20. Pulling and releasing the wire 30 which is hooked and turned on the pulley device 40 composed of the fixed pole rotating rollers 12, 12a and 12b and the lifting pole rotating rollers 22, 22a and 22b. According to the fixing pole 10, the auxiliary support device (1) fixedly installed on the upper portion of the pole 5, so that the lifting pole 20 inserted from the upper portion of the fixed pole 10 is configured to lift and operate;

하부결착밴드(45)를 고정 설치한 지지판(41)의 외면부에 수개의 풀림제어롤러(42)와 회전정지롤러(43) 및 스프링(44a)으로 인장되는 압지레버(44)를 설치하여 와이어(30)를 지그재그로 걸어 돌림시켜 구성한 브레이크장치(40)를 전주(5)의 하부에 고정 설치하는 단계와,On the outer surface of the support plate 41 on which the lower fastening band 45 is fixed, a plurality of release control rollers 42, rotation stop rollers 43, and a holding lever 44 are tensioned with springs 44a. Fixing the brake device 40 formed by zigzag-turning the rotation 30 at the lower part of the electric pole 5,

승강폴(20)의 외벽면 상부에 고정 설치한 수평바(25)의 각 홀더(26)에 각 활선전선로(3)를 물림 고정 설치하는 단계에 의하여 본 발명의 보조가지지장치(1)의 설치공법을 완료함을 특징으로 한다.The auxiliary support device 1 of the present invention is formed by biting and installing each live wire line 3 to each holder 26 of the horizontal bar 25 fixedly installed on the outer wall surface of the lifting pole 20. Characterized by completing the installation method.

이와 같이 결합 구성된 본 발명은 전주(5)의 상부에 고정 설치하여 활선전선로(3)의 보수 및 교체작업을 함으로써, 종래와 같이 고가의 장비인 활선전선로 가지지장치가 부설된 오가크레인을 전주(5)마다 설치할 필요가 없이, 본 발명의 보조 가지지장치(1)만을 용이하게 설치하여 도르레장치(24)의 구조로 걸어 돌림시켜 설치한 와이어(30)를 작업자가 직접 수동으로 잡아 당겨주고 풀어 주면서 활선전선로(3)를 적정 높이로 들어 올려 분리 이격시키는 작업을 할 수 있는 것으로써, 현 장 여건에 구애됨이 없이 간편하게 설치하여 간단한 조작으로 활선전선로(3)의 보수작업 및 교체작업을 안전하고 신속하게 시행할 수 있으며, 작업시간을 단축하여 전선로(3)의 보수작업이나 교체작업에 따른 경비를 현저하게 절감시켜 경제성을 향상시킬 수 있다.The present invention constituted as described above is fixed to the top of the pole (5) by performing repair and replacement of the live wire line (3), electric poles that are attached to the device having a live wire line that is expensive equipment as in the prior art There is no need to install each (5), the operator simply pulls and loosens the wire 30, which is easily installed only by the auxiliary supporting device 1 of the present invention, by walking in the structure of the pulley device 24 and installed. Lifting the live cable line (3) to a suitable height while separating it, and can be separated from the site conditions, easy installation without regard to the site conditions, maintenance and replacement of the live cable line (3) by simple operation It can be carried out safely and quickly, and the work time can be shortened to significantly reduce the cost due to the repair work or replacement work of the cable line (3) to improve the economics.

이와 같은 본 발명은 작업자가 수동으로 작업을 용이하게 할 수 있는 높이의 전주(5)에 고정설치되는 브레이크장치(40)의 각 풀림제어롤러(42)에 걸어 돌림되어 인출시킨 와이어(30)를 잡아당겨 주므로써, 각 120°의 위치에 서로 건너뛰는 구조로 설치한 고정폴(10) 상부 내벽면의 상부습동롤러(13)(13a)(13b)와 승강폴(20) 하부 외벽면의 하부습동롤러(23)(23a)(23b)의 도르레장치(24)에 의하여 선단부가 고정폴(10)의 어느 일측 내벽면에 고정 설치한 묶음고리(11)에 걸어 물림된 와이어(30)가 당겨짐과 동시에 승강폴(20)의 하부습동롤러(23)(23a)(23b)는 고정폴(10)의 내벽면에 슬라이딩되고, 고정폴(10)의 상부습동롤러(13)(13a)(13b)는 승강폴(20)의 외벽면에 슬라이딩되면서 고정폴(10)에 내삽된 승강폴(20)이 수직으로 상승하게 된다.The present invention as described above is a wire 30, which is rotated and pulled out of each of the unwinding control rollers 42 of the brake device 40 is fixed to the pole 5 of the height that can be easily operated by the operator manually By pulling out, the upper sliding rollers 13, 13a and 13b of the upper inner wall surface of the fixed pole 10 installed in the structure of skipping each other at the position of 120 ° and the lower outer wall surface of the lower lifting pole 20 The pulled wires 30 are pulled by the pulleys 24 of the sliding rollers 23, 23a and 23b, and the bit 30 is caught by the bundle ring 11 fixed to the inner wall surface of one of the fixed poles 10. At the same time, the lower sliding rollers 23, 23a and 23b of the lifting pole 20 slide on the inner wall surface of the fixed pole 10, and the upper sliding rollers 13, 13a and 13b of the fixed pole 10. ) Slides on the outer wall surface of the lifting poles 20 so that the lifting poles 20 inserted into the fixed poles 10 rise vertically.

이때, 브레이크장치(40)에 지그재그로 걸어 돌림되어 회전정지롤러(44)에 압지된 와이어(30)는 스프링(44a)으로 인장된 상태의 압지레버(44)를 글어 당김에 따라 회전정지롤러(43)에 압지상태의 와이어(30)가 해압되면서 도르레장치(24)의 구조에 의하여 용이하게 당겨진다.At this time, the wire 30, which is zigzag-turned to the brake device 40 and squeezed by the rotation stop roller 44, pulls the squeezing lever 44 in the tensioned state with the spring 44a to rotate the rotation stop roller ( 43 is easily pulled by the structure of the pulley device 24 while the wire 30 in the pressed state is depressurized.

이와 같이 상승되는 승강폴(20)은 승강폴(20)의 상부에 고정 설치된 각 홀더(26)가 전주(5)에 설치된 각 활선전선로(3)를 물림고정시킬 수 있는 위치까지 상 승하게 되면, 수동으로 잡아 당기고 있는 와이어(30)를 놓아 주므로써, 브레이크장치(40)의 각 풀림제어롤러(42)에 지그재그로 걸어 돌림되어 회전정지롤러(43)에 스프링(44a)이 압지레버(44)를 끌어 당기면서 압지레버(44)가 와이어(30)를 회전정지롤러(43)에 가압하여 회전정지롤러(43)를 정지시킴에 따라서 승강폴(20)은 고정폴(10)에서 수직으로 입설된 상태로 고정되어 설치된다.The lifting pole 20 which is lifted up as described above rises to a position where each holder 26 fixedly installed on the upper side of the lifting pole 20 can bite and fix each live wire line 3 installed on the pole 5. In this case, by releasing the wire 30 which is pulled manually, it is zigzag-turned to each release control roller 42 of the brake device 40, and the spring 44a is rotated by the holding lever 43. As the pushing lever 44 presses the wire 30 to the rotation stop roller 43 to stop the rotation stop roller 43 while pulling the 44, the lifting pole 20 is perpendicular to the fixed pole 10. It is fixed and installed in the installed state.

이와 같이 도르레장치(24)에 의하여 걸어 돌림되어 설치된 와이어(30)를 작은 힘으로 용이하게 잡아 당겨주면서 본 발명의 보조가지지장치(1)를 전주(5)에 설치된 활선전선로(3)의 높이에 이르도록 상승시키면서 본 발명의 설치공법에 의한 제반 작업을 완료하게 되는데, 이때, 본 발명의 보조가지지장치(1)의 고정폴(10)을 전주(5)의 적정 높이에 고정 설치함에 있어서는 별도의 오가크레인이나 작업자가 탑승할 수 있는 버켓이 구비된 작업차(도시생략)를 이용하여 활선전선로(3)가 설치된 전주(5)의 상단부 적정 위치에 지지간(15)(15a)을 접설하여 보강편(16)(16a)이 개재된 물림밴드(17)(17a)를 둘러씌운 다음, 볼트(18)와 너트(19)를 결착하여 고정 설치한다.Thus, the height of the live wire line (3) installed on the pole (5) the auxiliary supporting device (1) of the present invention while easily pulling the wire 30 installed by being turned by the pulley device (24) with a small force While raising to reach the complete work by the installation method of the present invention, in this case, in the fixed installation of the fixed pole 10 of the auxiliary supporting device 1 of the present invention to the appropriate height of the pole 5 is separate Using a working vehicle (not shown) equipped with an oak crane or a bucket on which the worker can ride, the support section 15 (15a) is attached to an appropriate position of the upper end of the electric pole (5) on which the live wire line (3) is installed. By covering the squeezing band (17) (17a) interposed between the reinforcing pieces (16) and (16a), the bolt (18) and the nut (19) are attached and fixed.

또, 상기 고정폴(10)의 하부로 인출된 와이어(30)가 걸어 물림된 브레이크장치(40)를 하부결착밴드(45)에 의해 전주(5)의 하부 적정 위치, 즉, 작업자가 지면에 서서 와이어(30)를 잡고 당김과 풀림의 작업을 실시할 수 있는 적정 높이에 설치 고정함으로써, 본 발명의 보조 가지지장치(1)의 설치 작업을 완료한다.In addition, the brake device 40 pulled by the wire 30 drawn out to the lower portion of the fixed pole 10 by the lower binding band 45, the lower proper position of the pole 5, that is, the operator The installation work of the auxiliary supporting device 1 of the present invention is completed by standing and fixing the wire 30 at an appropriate height capable of carrying out pulling and loosening operations.

이와 같이 활선전선로(3)의 보수 및 교체작업을 위하여 본 발명의 보조가지지장치(1)가 설치된 전주(5)의 하방에서 작업자가 상기 와이어(30)의 일측 끝단이 상기 고정폴(10)의 내벽면 상부의 어느 한 곳에 고정 설치된 묶음고리(11)에 걸어 물림되어 인출되어 있는 와이어(30)를 하부 방향으로 잡아 당김에 따라 승강폴(20)의 하부 둘레부로 설치된 하부습동롤러(23)(23a)(23b)가 고정폴(10)의 내벽면에 습동 회전되면서 승강폴(20)이 상승되어 수평바(25)에 착설된 홀더(26)에 활선전선로(3)가 인입되도록 한 후, 계속하여 와이어(30)를 당겨 주어 전주(5)에 설치된 활선전선로(3)가 전주(5)로부터 적정 간격의 간격으로 분리 이격되도록 하여 브레이크장치(40)에 의해 와이어(30)를 고정시킨 다음, 활선전선로(3)의 교체 및 보수작업을 시행한다.As described above, the worker has one end of the wire 30 at the lower side of the electric pole 5 in which the auxiliary support device 1 of the present invention is installed for repair and replacement of the live wire line 3. The lower sliding roller 23 installed at the lower circumference of the elevating pole 20 by pulling the wire 30 drawn out by being hooked by the bundled ring 11 fixedly installed at one of the upper inner wall surfaces of the lifting pole 20. (23a) (23b) is swung and rotated on the inner wall surface of the fixed pole 10, the lifting pole 20 is raised so that the live wire line (3) is introduced into the holder 26 mounted on the horizontal bar (25). After that, the wire 30 is continuously pulled so that the live cable line 3 installed on the pole 5 is separated and separated from the pole 5 at appropriate intervals by the brake device 40. After fixing, the live line (3) should be replaced and repaired.

이와 같은 본 발명은 활선전선로(3)의 교체 및 보수 작업을 하고자 하는 전주(5)마다 본 발명의 보조 가지지장치(1)를 설치함으로써, 고가의 장비인 전선로 가지지장치가 부설된 오가크레인을 보수 및 교체하고자 하는 전주(5)마다 준비 및 설치하여 작업할 필요가 없이 본 발명의 보조 가지지장치(1)만를 설치하여 작업을 함으로써, 현장 여건에 구애됨이 없이 용이하게 설치하여 간단한 조작으로 활선전선로(3)의 보수나 교체작업을 안전하고 신속하게 시행하여 작업시간을 단축할 수 있는 것으로, 활선전선로(3)의 보수 및 교체작업비용을 현저하게 절감하여 경제성 및 산업 발전을 향상시킬 수 있는 지대한 효과를 얻을 수 있다.The present invention by installing the auxiliary supporting device (1) of the present invention for each pole (5) to be replaced and repair the live cable line (3), the Oga crane which is attached to the wire supporting device is an expensive equipment There is no need to prepare and install and work for each pole (5) to repair and replace the work by installing only the auxiliary supporting device (1) of the present invention, and work easily, without regard to the site conditions to install easily It is possible to reduce the working time by safely and quickly performing repair or replacement work of live line (3), and significantly reduce the cost of repair and replacement of live line (3) to improve economic efficiency and industrial development. You can get great effects.

이와 같이 된 본 발명은 고정폴의 내측으로 내설된 승강폴을 와이어의 당김과 풀림에 의해 승,하강하도록 구성하여 활선전선로의 보수 및 교체를 하고자 하는 전주마다 본 발명의 보조 가지지장치를 설치함으로써, 고가의 장비인 전선로 가지지장치가 부설된 오가크레인을 보수 또는 교체하고자 하는 전주마다 준비 및 설치하여 작업할 필요가 없이 본 발명의 보조 가지지장치만를 설치하여 와이어의 당김과 풀림에 의해 활선전선로를 분리 이격시켜 작업을 함으로써, 현장 여건에 구애됨이 없이 간편하게 설치하여 간단한 조작으로 전선로의 보수나 교체작업을 안전하고 신속하게 시행하며, 작업시간을 단축하여 활선전선로의 보수나 교체작업비용을 현저하게 절감시켜 경제성을 향상시킬 수 있는 효과가 있는 것이다.The present invention as described above is configured to raise and lower the lifting poles in the inner side of the fixed pole by pulling and loosening the wire to install the auxiliary supporting device of the present invention for each pole to repair and replace the live wire, There is no need to prepare and install every work pole to repair or replace the Oga Crane, which is equipped with the wire line support device, which is expensive equipment, and installs only the auxiliary support device of the present invention to separate live wire lines by pulling and unwinding wires. By working apart, it is easy to install regardless of site conditions, and it is simple and safe to carry out repair and replacement of cable lines safely and quickly, and shorten working time, significantly reducing the cost of repairing or replacing live cables. It will have the effect of improving the economics.

Claims (3)

전선로(3)의 가지지장치의 시공 설치함에 있어서,In constructing and installing the supporting device of the electric wire path 3, 속이 빈 육각면기둥주고의 고정폴(10)의 내벽면 상부에 승강폴(20)의 외벽면 하부에 설치한 상부습동롤러(13)(13a)(13b)와 하부습동롤러(23)(23a)(23b)가 고정폴(10)의 내벽면과 승강폴(20)의 외벽면에 굴림식으로 내삽되어 고정폴(10)의 내벽면과 승강폴(20)의 외벽면에 각각 설치한 고정폴회전롤러(12)(12a)(12b)와 승강폴회전롤러(22)(22a)(22b)로 구성되는 도르레장치(40)에 걸어 돌림시킨 와이어(30)를 잡아 당기고 놓아 줌에 따라서 고정폴(10)의 상부로부터 내삽된 승강폴(20)이 승강작동하도록 결합 구성한 보조가지지장치(1)를 전주(5)의 상부에 고정 설치하는 단계와,The upper sliding rollers 13, 13a, 13b and the lower sliding rollers 23, 23a installed on the lower inner wall of the elevating pole 20 on the inner wall surface of the fixed pole 10 having a hollow hexagonal surface column. (23b) is inserted into the inner wall surface of the fixed pole 10 and the outer wall surface of the lifting pole 20 in a rolling manner, and fixed to the inner wall surface of the fixed pole 10 and the outer wall surface of the lifting pole 20, respectively. Fixed by pulling and releasing the wire 30 which is hooked on the pulley device 40 which is comprised of the pole rotating rollers 12, 12a and 12b and the lifting pole rotating rollers 22, 22a and 22b. Fixing and installing the auxiliary support device 1 coupled to the lifting pole 20 interpolated from the upper part of the pole 10 so that the lifting pole 20 can be lifted and operated on the upper part of the pole 5; 하부결착밴드(45)를 고정 설치한 지지판(41)의 외면부에 수개의 풀림제어롤러(42)와 회전정지롤러(43) 및 스프링(44a)으로 인장되는 압지레버(44)를 설치하여 와이어(30)를 지그재그로 걸어 돌림시켜 구성한 브레이크장치(40)를 전주(5)의 하부에 고정 설치하는 단계와,On the outer surface of the support plate 41 on which the lower fastening band 45 is fixed, a plurality of release control rollers 42, rotation stop rollers 43, and a holding lever 44 are tensioned with springs 44a. Fixing the brake device 40 formed by zigzag-turning the rotation 30 at the lower part of the electric pole 5, 승강폴(20)의 외벽면 상부에 고정 설치한 수평바(25)의 각 홀더(26)에 각 활선전선로(3)를 물림 고정 설치하는 단계에 의하여 본 발명의 보조가지지장치(1)의 설치작업을 완료함을 특징으로 한 활선 전선로의 보수 및 교체작업을 위한 보조 가지지장치의 설치공법. The auxiliary support device 1 of the present invention is formed by biting and installing each live wire line 3 to each holder 26 of the horizontal bar 25 fixedly installed on the outer wall surface of the lifting pole 20. Installation method of auxiliary supporting device for repair and replacement of live cable line, characterized by completion of installation work. 클램프(26a)에 의하여 수평바(25)에 착설 고정된 수개의 홀더(26)에 전주(5)에 설치된 활선전선로(3)를 인입시켜 전주(5)로부터 적정간격으로 분리 이격시키는 통상의 가지지장치에 있어서,Ordinary separation of the live cable line (3) installed in the pole (5) into the holder 26 fixed to the horizontal bar (25) by the clamp (26a) separated from the pole (5) at an appropriate interval. In the supporting device, 통이 크고 작은 속이 빈 육각면기둥구조의 고정폴(10)의 상부에 승강폴(20)을 내삽시켜 승강작동하도록 결합 구성하되, 고정폴(10)의 내벽면 상부에 와이어(30)를 걸어 묶음시키는 묶음고리(11)를 고정설치한 구성과,The large and small hollow hexagonal surface structure of the hollow structure of the pole 10 is inserted into the elevating pole 20 by inserting the elevating operation by interlocking, hang the wire 30 on the inner wall surface of the fixed pole 10 A configuration in which the bundle ring 11 to be bundled is fixedly installed, 고정폴회전롤러(12)(12a)(12b)와 상부습동롤러(13)(13a)(13b)를 서로 이웃하여 각각 120°각도의 위치에 위치하도록 설치하는 구조와,A structure in which the fixed pole rotating rollers 12, 12a, 12b and the upper sliding rollers 13, 13a, 13b are disposed adjacent to each other and positioned at 120 ° angles, 외벽면의 상, 하부에는 지지간(15)(15a)을 고정 설치하여 외측선단부에 보강편(16)(16a)을 개재하여 볼트(18)와 너트(19)로 결착고정시키는 물림밴드(17)(17a)를 설치한 구성과,Bending bands 17 for fastening and fixing the support bars 15 and 15a on the upper and lower sides of the outer wall, and binding and fixing the bolts 18 and the nuts 19 via the reinforcing pieces 16 and 16a at the outer ends thereof. (17a) installed, 승강폴(20)의 외벽면 하부에는 승강폴회전롤러(22)(22a)(22b)와 하부습동롤러(23)(23a)(23b)를 서로 이웃하여 각각 120°각도에 위치하도록 설치하는 구조와,A structure in which the lifting pole rotating rollers 22, 22a, 22b and the lower sliding rollers 23, 23a, 23b are installed adjacent to each other at a 120 ° angle in the lower portion of the outer wall of the lifting pole 20. Wow, 상기 고정폴(10)에 고정 설치한 묶음고리(11)에 걸어 묶음시킨 와이어(30)를 상, 하 지그재그의 구조로 걸어 돌림시켜 도르레장치(24)가 되도록 형성한 구성과,A configuration in which the wire 30, which is hooked to the bundle ring 11 fixedly fixed to the fixing pole 10, is formed to be a pulley device 24 by turning in a structure of up and down zigzag; 하부결착밴드(45)를 고정 설치한 지지판(41)의 외면부에 수개의 풀림제어롤러(42)와 회전정지롤러(43) 및 스프링(44a)으로 인장되는 압지레버(44)를 설치하여 상기 와이어(30)를 지그재그로 걸어 돌림시켜 압지레버(44)에 압지되어 인출되는 구성의 브레이크장치(40)로 결합구성된 것을 특징으로 한 전선로 보조가지지장치.In the outer surface of the support plate 41 on which the lower binding band 45 is fixed, a plurality of release control rollers 42, a rotation stop roller 43, and a pressure lever 44 are tensioned by the spring 44a. The auxiliary support device as a wire, characterized in that coupled to the brake device 40 of the configuration to be pulled by the wire 30 in a zigzag to be pushed out by the push lever (44). 제2항에 있어서,The method of claim 2, 통이 크고 작은 속이 빈 육각면기둥 구조의 고정폴(10) 및 승강폴(20)은 통이크고 작은 속이 빈 사각면기둥의 구조로 구성된 것을 특징으로 한 전선로 보조가지지장치.The fixed pole 10 and the lifting pole 20 of the large and small hollow hexagonal surface pillar structure of the tubular auxiliary supporting device with a wire, characterized in that the structure of the hollow hollow small square surface.
KR1020060045683A 2006-05-22 2006-05-22 Temporary supporting machinery of electric wire KR20070112594A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060045683A KR20070112594A (en) 2006-05-22 2006-05-22 Temporary supporting machinery of electric wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060045683A KR20070112594A (en) 2006-05-22 2006-05-22 Temporary supporting machinery of electric wire

Publications (1)

Publication Number Publication Date
KR20070112594A true KR20070112594A (en) 2007-11-27

Family

ID=39090859

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060045683A KR20070112594A (en) 2006-05-22 2006-05-22 Temporary supporting machinery of electric wire

Country Status (1)

Country Link
KR (1) KR20070112594A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100898030B1 (en) * 2008-08-26 2009-05-19 주식회사 삼립전기 Apparatus for testing illuminator
KR101218710B1 (en) * 2011-01-31 2013-01-09 서광전기통신공사(주) The cable fixing bar provisionally installation equipment for work power distribution line
KR101254577B1 (en) * 2012-11-21 2013-04-15 서광전기통신공사(주) The cable fixing bar provisionally installation equipment for work power distribution line
KR101275111B1 (en) * 2013-02-13 2013-06-17 임용호 Replacement method for power distribution equipment of direct live wire for double insulation
KR101352073B1 (en) * 2013-11-15 2014-01-15 양정모 Underground line connetcion pipe
KR101352075B1 (en) * 2013-11-14 2014-02-17 (주)세종그룹엔지니어링 Fixing frame of underground line for power distribution
CN106654985A (en) * 2016-11-16 2017-05-10 国网浙江桐乡市供电公司 Linear pole lifting pulley
CN109301764A (en) * 2018-10-12 2019-02-01 盐城恒久市政工程有限公司 A kind of construction hydropower installation threading auxiliary device
CN109616950A (en) * 2019-01-16 2019-04-12 四川同风源建设工程有限公司 A kind of subway station cable laying of bridge frame device
KR20190137512A (en) * 2018-06-01 2019-12-11 화정준 Power cable supporting apparatus for live line works
KR20200009445A (en) * 2018-07-19 2020-01-30 홍희성 Wire support apparatus and power failure construction method using the same
CN113602906A (en) * 2021-07-28 2021-11-05 国网山东省电力公司建设公司 A wire abrasionproof decreases device for transmission line non-tension unwrapping wire
CN113708295A (en) * 2021-09-25 2021-11-26 国网辽宁省电力有限公司丹东供电公司 Cable maintenance framework among electric power system
CN114803931A (en) * 2021-01-22 2022-07-29 国网智能科技股份有限公司 Distribution network live working robot wire lifting device and method and robot
CN117013443A (en) * 2023-08-08 2023-11-07 北京中港国信科技有限公司 Subway tunnel interval cable laying device

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100898030B1 (en) * 2008-08-26 2009-05-19 주식회사 삼립전기 Apparatus for testing illuminator
KR101218710B1 (en) * 2011-01-31 2013-01-09 서광전기통신공사(주) The cable fixing bar provisionally installation equipment for work power distribution line
KR101254577B1 (en) * 2012-11-21 2013-04-15 서광전기통신공사(주) The cable fixing bar provisionally installation equipment for work power distribution line
KR101275111B1 (en) * 2013-02-13 2013-06-17 임용호 Replacement method for power distribution equipment of direct live wire for double insulation
KR101352075B1 (en) * 2013-11-14 2014-02-17 (주)세종그룹엔지니어링 Fixing frame of underground line for power distribution
KR101352073B1 (en) * 2013-11-15 2014-01-15 양정모 Underground line connetcion pipe
CN106654985A (en) * 2016-11-16 2017-05-10 国网浙江桐乡市供电公司 Linear pole lifting pulley
KR20190137512A (en) * 2018-06-01 2019-12-11 화정준 Power cable supporting apparatus for live line works
KR20200009445A (en) * 2018-07-19 2020-01-30 홍희성 Wire support apparatus and power failure construction method using the same
CN109301764A (en) * 2018-10-12 2019-02-01 盐城恒久市政工程有限公司 A kind of construction hydropower installation threading auxiliary device
CN109616950A (en) * 2019-01-16 2019-04-12 四川同风源建设工程有限公司 A kind of subway station cable laying of bridge frame device
CN109616950B (en) * 2019-01-16 2020-04-10 四川同风源建设工程有限公司 Subway station crane span structure cable laying device
CN114803931A (en) * 2021-01-22 2022-07-29 国网智能科技股份有限公司 Distribution network live working robot wire lifting device and method and robot
CN114803931B (en) * 2021-01-22 2023-12-05 国网智能科技股份有限公司 Distribution network live working robot wire lifting device, method and robot
CN113602906A (en) * 2021-07-28 2021-11-05 国网山东省电力公司建设公司 A wire abrasionproof decreases device for transmission line non-tension unwrapping wire
CN113602906B (en) * 2021-07-28 2023-01-24 国网山东省电力公司建设公司 A wire abrasionproof decreases device for transmission line non-tension unwrapping wire
CN113708295A (en) * 2021-09-25 2021-11-26 国网辽宁省电力有限公司丹东供电公司 Cable maintenance framework among electric power system
CN117013443A (en) * 2023-08-08 2023-11-07 北京中港国信科技有限公司 Subway tunnel interval cable laying device
CN117013443B (en) * 2023-08-08 2024-01-30 北京中港国信科技有限公司 Subway tunnel interval cable laying device

Similar Documents

Publication Publication Date Title
KR20070112594A (en) Temporary supporting machinery of electric wire
KR101344289B1 (en) The pole fittings changing method use lifting apparatus
KR102232560B1 (en) Roller movable insulated lift arm for indirect live wire and non-power-failure power distribution method
KR20150087781A (en) Auxiliary apparatus for hot line work of power distribution equipment and method for hot line work of power distribution equipment using thereof
JP5065814B2 (en) Electric wire replacement method
JP5998076B2 (en) Automatic seat laying cart
CN213171204U (en) Construction equipment hoisting device
CN111069316A (en) Special-shaped steel drawing production line
KR101147597B1 (en) The complex power pulling apparatus of cable for underground
CN104261035B (en) Cable trench cover plate removing and placing tool
CN217984295U (en) Cable promotes laying device fast
CN116675055A (en) Pay-off for electric power construction
CN216129274U (en) Automobile overhaul device
CN205610179U (en) Cable - line device of quick detachable installation
CN203033702U (en) Lifting device for being matched with coal mine fully-mechanized mining hydraulic support
CN215249223U (en) Building construction hoist device
CN210286597U (en) Safe lifting device of reinforcing bar for building
JP6139241B2 (en) Gold wheel crossing method such as wire connection sleeves and jigs used in the method
CN105384112B (en) Winch maintenance equipment
KR101317384B1 (en) The hoisting and installing method and apparatus of wind turbines by using the self tower
KR102559106B1 (en) deconstruction cutting pulling apparatus of the underground power cable
CN116902884B (en) Opening device for cable trench cover plate
CN215804646U (en) Monorail crane transport type traction advance support device
JP7440871B2 (en) sleeper replacement aid
CN220596813U (en) Auxiliary operation device for plugging drain pipe

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application
AMND Amendment
J201 Request for trial against refusal decision
E801 Decision on dismissal of amendment
B601 Maintenance of original decision after re-examination before a trial
J301 Trial decision

Free format text: TRIAL DECISION FOR APPEAL AGAINST DECISION TO DECLINE REFUSAL REQUESTED 20080205

Effective date: 20080820