KR20060133516A - Head reforcement apparatus of concreat pipe piles for foundation work - Google Patents

Head reforcement apparatus of concreat pipe piles for foundation work Download PDF

Info

Publication number
KR20060133516A
KR20060133516A KR1020060122413A KR20060122413A KR20060133516A KR 20060133516 A KR20060133516 A KR 20060133516A KR 1020060122413 A KR1020060122413 A KR 1020060122413A KR 20060122413 A KR20060122413 A KR 20060122413A KR 20060133516 A KR20060133516 A KR 20060133516A
Authority
KR
South Korea
Prior art keywords
pipe pile
concrete pipe
head
hook
reinforcing
Prior art date
Application number
KR1020060122413A
Other languages
Korean (ko)
Other versions
KR100819521B1 (en
Inventor
홍원철
Original Assignee
홍원철
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 홍원철 filed Critical 홍원철
Priority to KR1020060122413A priority Critical patent/KR100819521B1/en
Publication of KR20060133516A publication Critical patent/KR20060133516A/en
Application granted granted Critical
Publication of KR100819521B1 publication Critical patent/KR100819521B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/60Piles with protecting cases
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

An apparatus for reinforcing a head of a concrete pipe pile for foundation construction is provided to improve the reinforcing installation efficiency of the pile and reduce the construction cost without parts by supporting the vertical connection reinforcing bars at the upper part of the pile and mounting the reinforced structure at the head of the pile. An apparatus(100) for reinforcing a head of a concrete pipe pile(200) for foundation construction is composed of a bolt combining unit formed at the upper end of the pile; a support plate(110) formed at a shape corresponded with the inner shape of the pile, installed at a predetermined depth of the pile, and bored with plural combining holes(112) at the outer periphery; a hanging rod(120) whose lower end is combined at the combining hole and upper end is integrally formed with a hanging hook(122); plural hanging bolt members(130) hanging the hanging hook of the hanging rod and supporting the support plate; a nut member(140) fixing the hanging bolt member at the bolt combining unit of the pile; a reinforcing bar supporting spacer(150) having plural holes(152) formed at regular intervals on the outer periphery; and a reinforcing bar supporting member(160) combined at the hole of the spacer to support a vertical connection reinforcing bar(200).

Description

기초공사용 콘크리트관말뚝의 두부 보강장치{Head reforcement apparatus of concreat pipe piles for foundation work}Head reforcement apparatus of concreat pipe piles for foundation work}

도 1 은 종래의 기술에 따른 기초공사용 강관말뚝의 두부 보강장치를 보인 분리 사시도.Figure 1 is an exploded perspective view showing the head reinforcement device of the foundation pipe for public works according to the prior art.

도 2 는 종래의 기술에 따른 기초공사용 강관말뚝의 두부 보강장치를 보인 결합 단면도.Figure 2 is a cross-sectional view showing a head reinforcing device of the steel pipe pile for basic construction according to the prior art.

도 3 은 종래의 기술에 따른 기초공사용 강관말뚝의 두부 보강장치를 보인 평면도.Figure 3 is a plan view showing the head reinforcement device of the steel pipe pile for basic construction according to the prior art.

도 4 는 본 발명에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치를 보인 분리 사시도.Figure 4 is an exploded perspective view showing the head reinforcement device of the concrete pipe pile for basic construction according to the present invention.

도 5 는 본 발명에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치를 보인 결합 사시도.Figure 5 is a perspective view showing the head reinforcement device of the concrete pipe pile for public works according to the present invention.

도 6 은 본 발명에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치를 보인 결합 단면도.Figure 6 is a combined cross-sectional view showing the head reinforcement device of the concrete pipe pile for foundation work according to the present invention.

도 7 은 본 발명에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치를 보인 결합 평면도.Figure 7 is a plan view showing the head reinforcement device of the concrete pipe pile foundation for public use in accordance with the present invention.

도 8 은 본 발명에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치의 다른 예를 보인 분리 사시도.Figure 8 is an exploded perspective view showing another example of the head reinforcement device of the concrete pipe pile for foundation work according to the present invention.

도 9 는 도 8 에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치를 보인 결합 단면도.9 is a cross-sectional view showing the head reinforcement device of the concrete pipe pile for the foundation works according to FIG.

도 10 은 본 발명에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치에서 수직연결철근의 다른 적용 예를 보인 사시도.Figure 10 is a perspective view showing another application example of the vertical connection reinforcement in the head reinforcement device of the concrete pipe pile for foundation work according to the present invention.

도 11 은 도 10 의 종단면도.FIG. 11 is a longitudinal cross-sectional view of FIG. 10;

[도면의 주요 부분에 대한 부호의 설명][Description of Symbols for Main Parts of Drawing]

100. 콘크리트관말뚝의 두부 보강장치 100. Head reinforcement device of concrete pipe pile

110. 받침판 120. 걸이봉110. Base plate 120. Hook

122. 걸고리 124. 너트122. Hook 124. Nut

130. 걸이용 볼트부재 140. 너트부재130. Hook bolt member 140. Nut member

150. 철근지지용 스페이서 152. 통공150. Reinforcement spacer 152. Through hole

160. 철근지지부재 162. 몸체160. Reinforcing bar support member 162. Body

164. 헤드 166. 철근관통공164.Head 166. Rebar Through

200. 콘크리트관말뚝 210. 거치홈200. Concrete pipe pile 210. Mounting groove

210a. 핀공 300. 수직연결철근210a. Pinhole 300. Vertical Rebar

본 발명은 기초공사용 콘크리트관말뚝의 두부 보강장치에 관한 것으로, 더욱 상세하게는 건물이나 교량 등의 건축물이나 구조물 축조시 지면에 매설된 기초공사용 콘크리트관말뚝의 상부에 설치되는 수직연결철근을 철근지지용 스페이서와 철근지지용 너트부재를 통해 보다 견고하게 지지할 수 있도록 함은 물론 콘크리트관말뚝의 두부에 두부 보강구조를 설치할 수 있는 구조를 제공한기 위한 기초공사용 콘크리트관말뚝의 두부 보강장치에 관한 것이다.The present invention relates to a head reinforcement device of a concrete pipe pile for basic construction, and more specifically, to support the vertical reinforcing bars installed on the upper part of the concrete pipe pile for basic construction embedded in the ground when building or structures such as buildings or bridges The present invention relates to a head reinforcement device for a concrete pipe pile for basic construction for providing a structure for installing a head reinforcement structure on the head of a concrete pipe pile as well as for supporting it more firmly through a spacer for spacer and a reinforcing nut member. .

일반적으로, 건물이나 교량을 축조할 때는 지면에 해머 등으로 강관말뚝을 수직으로 매설한 후 각 강관말뚝의 상부에 수직연결철근을 설치하여 확대 기초콘크리트를 타설하게 되는데, 이때 하단부가 지하에 매설 지지되는 강관말뚝의 상단부인 두부에는 강관말뚝의 상단부 및 외주면에 작용하는 수직 하중 및 측토압에 의해 강관말뚝의 상단부가 변형되는 것을 방지하기 위하여 강관말뚝 두부 보강구조를 설치하게 된다. 다음은 종래 기술에 따른 강관말뚝의 두부 보강구조를 보인 것이다.In general, when constructing a building or bridge, steel pipe piles are vertically buried in the ground with hammers, etc., and vertical connecting bars are installed at the top of each steel pipe pile to install an expanded foundation concrete. The head, which is the upper end of the steel pipe pile, is provided with a steel pipe pile head reinforcement structure to prevent the upper end of the steel pipe pile from being deformed by the vertical load and the side soil pressure acting on the upper end and the outer circumferential surface of the steel pipe pile. The following shows the head reinforcement structure of the steel pipe pile according to the prior art.

도 1 은 종래의 기술에 따른 기초공사용 강관말뚝의 두부 보강장치를 보인 분리 사시도, 도 2 는 종래의 기술에 따른 기초공사용 강관말뚝의 두부 보강장치를 보인 결합 단면도, 도 3 은 종래의 기술에 따른 기초공사용 강관말뚝의 두부 보강장치를 보인 평면도이다.1 is an exploded perspective view showing a head reinforcing device of the steel pipe pile for basic work according to the prior art, Figure 2 is a cross-sectional view showing a head reinforcing device of the steel pipe pile for the basic work according to the prior art, Figure 3 according to the prior art This is a plan view showing the head reinforcement device of steel pipe pile for basic construction.

도 1 내지 도 3 에 도시된 기술은 본 출원인이 2006년 2월 4일자 실용신안등 록출원 제2006-3162호로 출원되어 2006년 4월 19일자 등록되어 그 권리가 현재까지 적법하게 유지되고 있는 "기초공사용 강관말뚝의 두부 보강장치"에 관한 기술로, 종래의 기술에 따른 기초공사용 강관말뚝의 두부 보강장치(10)는 강관말뚝(30)의 내부 형상에 일정 깊이 설치되어지되 외주연에 상하로 다수의 결합공이 천공되는 받침판(12), 받침판(12)의 결합공(12a) 각각에 그 하단이 결합되어지되 상단에는 걸고리(14a)가 일체로 형성된 걸이봉(14), 강관말뚝(30)의 상부 외주면 상에 내외로 천공된 핀공(30a) 각각에 결합되어지되 걸이봉(14)의 걸고리(14a)를 걸어 받침판(12)을 지지하는 다수의 걸이용 볼트부재(16), 걸이용 볼트부재(16)의 단부에 나사 결합되어 걸고리의 빠짐을 방지하는 너트(18), 걸이용 볼트부재(16) 상에 안착되어지되 그 외주연에는 등간격으로 다수의 통공(20a)이 형성되는 철근지지용 스페이서(20) 및 철근지지용 스페이서(20)의 통공(20a)에 체결되어 그 중심을 관통하는 수직연결철근(32)을 지지하는 철근지지부재(22)의 구성으로 이루어진다.1 to 3, the applicant filed as a Utility Model Application No. 2006-3162 filed on February 4, 2006, and registered on April 19, 2006, the rights of which are legally maintained until now. Head reinforcement device of the steel pipe pile for basic construction ", the head reinforcement device 10 of the steel pipe pile for basic construction according to the prior art is installed to a certain depth in the inner shape of the steel pipe pile (30) up and down on the outer periphery The lower end is coupled to each of the support plate 12, the coupling hole 12a of the support plate 12, a plurality of coupling holes are drilled, the hook rod 14, the steel pipe pile 30 formed integrally with the hook 14a at the top A plurality of hanger bolt members 16 and hanger bolts that are coupled to each of the pin holes 30a drilled in and out on the upper outer circumferential surface of the hanger 14 to support the support plate 12 by hanging the hooks 14a of the hanger rods 14. Nut 18 screwed into the end of member 16 to prevent the hook from being pulled out ), The through-hole 20a of the reinforcing support spacer 20 and the reinforcing support spacer 20, which are seated on the hook bolt member 16, the outer periphery of which a plurality of through holes 20a are formed at equal intervals. It consists of a configuration of the reinforcing bar support member 22 is fastened to the vertical connecting reinforcing bar 32 passing through the center.

한편, 전술한 바와 같은 종래 기술에 따른 기초공사용 강관말뚝의 두부 보강장치(10)의 구성에서 철근지지부재(22)는 철근지지용 스페이서(20)의 외주연에 형성된 통공(20a)의 내경에 대응하는 외경의 몸체(22a), 몸체(22a) 상단에 일체로 형성되어지되 통공(20a)에 비해 큰 직경으로 형성되어 몸체(22a)를 통공(20a)에 삽입시 걸림이 이루어지는 걸림헤드(22b) 및 수직연결철근(32)의 직경에 비해 큰 내경으로 이루어져 삽입된 수직연결철근(32)을 쓰러지지 않도록 지지하는 철근관통공(22c)으로 이루어진다.On the other hand, in the configuration of the head reinforcement device 10 of the steel pipe pile for basic construction according to the prior art as described above, the reinforcing member 22 is formed on the inner diameter of the through hole (20a) formed on the outer periphery of the reinforcing support spacer 20 The locking head 22b is formed integrally with the upper end of the body 22a and the body 22a of the corresponding outer diameter, but is formed with a larger diameter than the through hole 20a so that the body 22a is inserted into the through hole 20a. And a reinforcing bar 22c supporting the inserted vertical connecting bar 32 so as not to fall down, having a larger inner diameter than the diameter of the vertical connecting bar 32).

전술한 바와 같이 받침판(12), 걸이봉(14), 걸이용 볼트부재(16), 너트(18), 철근지지용 스페이서(20) 및 철근지지부재(22)로 이루어진 보강구조를 강관말뚝(30)의 두부에 설치한 상태에서 강관말뚝(30) 상부로부터 받침판(12) 상부의 강관말뚝(30) 내부에 콘크리트를 타설하여 양생하게 되면 콘크리트 타설물의 양생과정에서 받침판(12), 걸이봉(14), 걸이용 볼트부재(16), 너트(18), 철근지지용 스페이서(20) 및 철근지지부재(22) 등이 접합된다. 다시 말해서, 콘크리트 타설물의 양생에 의해 받침판(12), 걸이봉(14), 걸이용 볼트부재(16), 너트(18), 철근지지용 스페이서(20) 및 철근지지부재(22) 등이 접합되어 콘크리트의 미끄러짐이 방지된다.As described above, the reinforcing structure consisting of the support plate 12, the hanger rod 14, the hanger bolt member 16, the nut 18, the reinforcing support spacer 20 and the reinforcing support member 22 is formed of a steel pipe pile ( When the concrete is placed and cured in the steel pipe pile 30 in the upper portion of the support plate 12 from the upper portion of the steel pipe pile 30 in the state of being installed in the head of the support plate 12, hanger rod ( 14), the hook bolt member 16, the nut 18, the rebar support spacer 20, the rebar support member 22, and the like are joined. In other words, the supporting plate 12, the hook rod 14, the hook bolt member 16, the nut 18, the reinforcing spacer spacer 20, the reinforcing rod supporting member 22, and the like are joined by curing the concrete pouring. This prevents the sliding of the concrete.

그러나, 건물이나 교량을 축조할 때 지면에 매설하는 관이 강관말뚝이 아닌 저가의 콘크리트관말뚝인 경우에는 콘크리트관말뚝의 단면이 매우 두껍기 때문에 전술한 바와 같은 종래 기술에 따른 기초공사용 강관말뚝의 두부 보강장치를 콘크리트관말뚝에 설치하기란 어려운 문제가 따르게 된다. 따라서, 종래 기술에 따른 기초공사용 강관말뚝의 두부 보강장치를 콘크리트관말뚝에 적용시 이에 따른 구조적인 문제가 발생한다.However, when constructing a building or bridge, if the pipe buried in the ground is a low-cost concrete pipe pile instead of a steel pipe pile, the cross section of the concrete pipe pile is very thick, so that the head reinforcement of the steel pipe pile for the basic construction according to the prior art as described above. The installation of equipment on concrete pipe piles is a difficult problem. Therefore, when applying the head reinforcing device of the steel pipe pile for the basic construction according to the prior art to the concrete pipe pile, there arises a structural problem.

본 발명은 전술한 종래 기술의 문제점을 해결하기 위한 창안된 것으로, 건물이나 교량 등의 건축물이나 구조물 축조시 지면에 매설된 기초공사용 콘크리트관말뚝의 상부에 수직연결철근을 지지하여 콘크리트관말뚝의 두부를 보강하기 위한 보강구조를 콘크리트관말뚝의 두부에 설치 가능하도록 한 기초공사용 콘크리트관말뚝의 두부 보강장치를 제공함에 그 목적이 있다.The present invention has been made to solve the above-mentioned problems of the prior art, the head of the concrete pipe pile by supporting the vertical connection reinforcement on the upper part of the concrete pipe pile for basic construction embedded in the ground when building buildings or structures such as buildings or bridges The purpose of the present invention is to provide a head reinforcement device for a concrete pipe pile for basic construction, which enables the reinforcement structure to be installed on the head of a concrete pipe pile.

본 발명에 따른 기술의 다른 목적은 건물이나 교량 등의 건축물이나 구조물 축조시 지면에 매설된 기초공사용 콘크리트관말뚝의 상부에 수직연결철근을 지지하여 콘크리트관말뚝의 두부를 보강하기 위한 보강구조를 콘크리트관말뚝의 두부에 설치 가능하도록 함으로써 콘크리트관말뚝 두부의 보강구조를 보다 용이하게 설치할 수 있도록 함에 있다.Another object of the technology according to the present invention is to support the vertical connection reinforcement in the upper part of the concrete pipe pile for basic construction embedded in the ground when building buildings or structures such as buildings or bridges to reinforce the head of the concrete pipe pile concrete It is to be able to install the reinforcing structure of the concrete pipe pile head by enabling to be installed on the head of the pipe pile.

아울러, 본 발명에 따른 기술은 건물이나 교량 등의 건축물이나 구조물 축조시 지면에 매설된 기초공사용 콘크리트관말뚝의 상부에 수직연결철근을 지지하여 콘크리트관말뚝의 두부를 보강하기 위한 보강구조를 콘크리트관말뚝의 두부에 설치 가능하도록 함으로써 사용부품의 감소에 따른 시공비용을 크게 절감시킬 수 있을 뿐만 아니라, 구조의 단순화에 따른 작업 능률을 향상시켜 시공 시간을 대폭 단축시킬 수 있도록 함에 그 목적이 있다.In addition, the technology according to the present invention is to support the vertical connection reinforcement on the upper part of the concrete pipe piles for foundation work embedded in the ground when building buildings or structures such as buildings or bridges to reinforce the head of the concrete pipe pile concrete pipe By installing it to the head of the pile, it is possible to greatly reduce the construction cost due to the reduction of the used parts, and to improve the work efficiency due to the simplification of the structure, thereby greatly reducing the construction time.

전술한 목적을 달성하기 위해 구성되는 본 발명은 다음과 같다. 즉, 본 발명에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치는 건물이나 교량의 건축물이나 구조물 축조시 지면에 매설된 기초공사용 콘크리트관말뚝의 두부를 보강하기 위한 기초공사용 콘크리트관말뚝 두부 보강장치에 있어서, 기초공사용 콘크리트관말뚝 두부 보강장치는 콘크리트관말뚝의 상단부에 형성되는 볼트 결합수단; 콘크리트관말뚝의 내부 형상에 대응하는 형태로 형성되어 콘크리트관말뚝의 일정 깊이에 설치되어지되 외주연에 상하로 다수의 결합공이 천공되는 받침판; 받침판의 결합공 각각에 그 하단이 결합되어지되 상단에는 걸고리가 일체로 형성된 걸이봉; 콘크리 트관말뚝의 볼트 결합수단 각각에 결합되어지되 걸이봉의 걸고리를 걸어 받침판을 지지하는 다수의 걸이용 볼트부재; 걸이용 볼트부재의 단부에 나사 결합되어 걸고리의 빠짐을 방지하는 한편 콘크리트관말뚝의 볼트 결합수단 각각에 걸이용 볼트부재를 고정시키는 너트부재; 걸이용 볼트부재 상에 안착되어지되 그 외주연에는 등간격으로 다수의 통공이 형성되는 철근지지용 스페이서; 및 철근지지용 스페이서의 통공에 체결되어 그 중심을 관통하는 수직연결철근을 지지하는 철근지지부재를 포함하여 이루어진다.The present invention configured to achieve the above object is as follows. That is, the head reinforcement device of the foundation pipe concrete pipe pile according to the present invention is to reinforce the concrete pipe pile head reinforcement device for foundation engineering concrete pipe to reinforce the head of the foundation pipe concrete pipe buried in the ground when building or building buildings or bridges Concrete foundation pile head reinforcement for basic construction, bolt coupling means formed on the upper end of the concrete pipe pile; A support plate formed in a shape corresponding to the inner shape of the concrete pipe pile to be installed at a predetermined depth of the concrete pipe pile and having a plurality of coupling holes drilled up and down on the outer circumference; The lower end is coupled to each of the coupling holes of the support plate, but the upper end of the hook rod formed integrally; A plurality of hook bolt members coupled to each of the bolt coupling means of the concrete pipe pile to support the backing plate by hooking the hook rod; A nut member which is screwed to an end of the hook bolt member to prevent the hook from being pulled out and fixes the hook bolt member to each bolt coupling means of the concrete pipe pile; Rebar support spacer which is seated on the hook bolt member but the outer periphery is formed with a plurality of through holes at equal intervals; And a reinforcing bar support member fastened to the through hole of the reinforcing bar support spacer to support the vertical connecting rebars passing through the center thereof.

전술한 바와 같은 본 발명의 구성에서 볼트 결합수단은 콘크리트관말뚝의 상단면 상에 등간격으로 다수 절개 형성되어지되 역삼각형 형태의 V자 홈으로 형성된 거치홈 또는 콘크리트관말뚝의 상단부 상에 내외로 천공되어지되 등간격으로 형성된 핀공의 형태로 구성될 수 있다.In the configuration of the present invention as described above, the bolt coupling means is formed in a plurality of incisions at equal intervals on the top surface of the concrete pipe pile in and out on the upper end of the mounting groove or concrete pipe pile formed of the V-shaped groove of the inverted triangle shape Perforations may be formed in the form of pin holes formed at equal intervals.

그리고, 전술한 본 발명의 구성에는 걸이용 볼트부재의 양측에 결합되어 콘크리트관말뚝의 볼트 결합수단 각각의 내외측 상에 위치되어지되 너트부재의 조임에 의해 걸이용 볼트부재의 볼트머리와 너트에 의해 가압되어 콘크리트관말뚝의 볼트 결합수단 각각에 걸이용 볼트부재의 고정이 이루어질 수 있도록 하는 와셔가 더 구비될 수 있다.And, in the above-described configuration of the present invention is coupled to both sides of the hook bolt member is located on the inside and outside of each of the bolt coupling means of the concrete pipe pile to the bolt head and nut of the hook bolt member by tightening the nut member The washer may be further provided with a washer for fixing the bolt member for the hook to each of the bolt coupling means of the concrete pipe pile.

한편, 전술한 구성에서 철근지지부재는 철근지지용 스페이서의 외주연에 형성된 통공의 내경에 대응하는 외경의 몸체; 몸체 상단에 일체로 형성되어지되 통공에 비해 큰 직경으로 형성되어 몸체를 통공에 삽입시 걸림이 이루어지는 걸림헤드; 및 수직연결철근의 직경에 비해 큰 내경으로 이루어져 삽입된 철근을 쓰러지지 않 도록 지지하는 철근관통공으로 이루어질 수 있다.On the other hand, the reinforcing bar support member in the above-described configuration body of the outer diameter corresponding to the inner diameter of the through hole formed on the outer periphery of the reinforcing spacer; It is formed integrally on the upper end of the body is formed of a larger diameter than the through-hanging head is caught when the body is inserted into the through-hole; And a reinforcing bar through which the inserted reinforcing bar is supported so as not to fall down.

전술한 콘크리트관말뚝의 볼트 결합수단과 받침판의 결합공은 동일 위치 상에 동일 개수로 형성된다.The above-mentioned bolt coupling means of the concrete pipe pile and the coupling holes of the support plate are formed in the same number on the same position.

아울러, 받침판과 철근지지용 스페이서에 의해 지지된 각각의 수직연결철근은 콘크리트관말뚝의 상단으로부터 일정높이에서 일정경사각의 외측으로 크랭크 형태로 절곡되어 콘크리트관말뚝의 상단에 지지되는 수직연결철근과 철근링을 통해 원상으로 연결될 수 있다. 이때, 받침판과 철근지지용 스페이서에 의해 지지된 각각의 수직연결철근의 절곡위치는 콘크리트관말뚝의 상부로 설치되는 기초철근과의 간섭이 발생하지 않는 높이에서 절곡됨이 보다 양호하다.In addition, each vertical connecting reinforcement supported by the support plate and the reinforcing support spacer is bent in a crank form at a predetermined height from the top of the concrete pipe pile to the outside of the inclined angle to support the vertical connecting reinforcing bars and reinforcing bars at the top of the concrete pipe pile. It can be connected circularly through the ring. At this time, the bending position of each vertical connecting reinforcing bar supported by the support plate and the reinforcing bar support spacer is more preferably bent at a height that does not cause interference with the basic reinforcing bar installed above the concrete pipe pile.

이하에서는 본 발명의 바람직한 실시 예에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치에 대하여 상세하게 설명하기로 한다.Hereinafter will be described in detail with respect to the head reinforcement device of the concrete pipe pile for basic construction according to a preferred embodiment of the present invention.

도 4 는 본 발명에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치를 보인 분리 사시도, 도 5 는 본 발명에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치를 보인 결합 사시도, 도 6 은 본 발명에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치를 보인 결합 단면도, 도 7 은 본 발명에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치를 보인 결합 평면도이다.Figure 4 is an exploded perspective view showing the head reinforcement device of the concrete pipe pile for the public works according to the present invention, Figure 5 is a perspective view showing a head reinforcement device of the concrete pipe pile for the foundation work according to the present invention, Figure 6 is a foundation hole according to the present invention Coupling cross-sectional view showing the head reinforcement device of the concrete pipe pile used, Figure 7 is a plan view showing the head reinforcement device of the concrete pipe pile for basic construction according to the present invention.

도 4 내지 도 7 에 도시된 바와 같이 본 발명에 따른 기초공사용 콘크리트관말뚝 두부 보강장치(100)는 콘크리트관말뚝(200)의 상단면 상에 등간격으로 다수 형성되는 볼트 결합수단, 콘크리트관말뚝(200)의 일정 깊이에 설치되어지되 외주연에 상하로 다수의 결합공(112)이 천공되는 받침판(110), 받침판(110)의 결합 공(112) 각각에 그 하단이 결합되어지되 상단에는 걸고리(122)가 일체로 형성된 걸이봉(120), 콘크리트관말뚝(200)의 볼트 결합수단 각각에 거치되어지되 걸이봉(120)의 걸고리(122)를 걸어 받침판(110)을 지지하는 다수의 걸이용 볼트부재(130), 걸이용 볼트부재(130)의 단부에 나사 결합되어 걸고리(122)의 빠짐을 방지하는 한편 콘크리트관말뚝(200)의 거치홈 각각에 걸이용 볼트부재(130)를 고정시키는 너트부재(140), 걸이용 볼트부재(130) 상에 안착되어지되 그 외주연에는 등간격으로 다수의 통공(152)이 형성되는 철근지지용 스페이서(150) 및 철근지지용 스페이서(150)의 통공(152)에 체결되어 그 중심을 관통하는 수직연결철근(300)을 지지하는 철근지지부재(160)로 구성된다.4 to 7 concrete pipe pile head reinforcement device 100 for foundation work according to the present invention as shown in Figure 4 is a bolt coupling means, concrete pipe piles are formed a plurality at equal intervals on the top surface of the concrete pipe pile (200) Is installed at a predetermined depth of 200, but the lower end is coupled to each of the support plate 110, the coupling hole 112 of the support plate 110, the plurality of coupling holes 112 are drilled up and down on the outer periphery Hook hook 122 is integrally formed on the hook rod 120, the concrete pipe pile 200 is mounted on each of the bolt coupling means, but the hook 122 of the hook rod 120 to support the support plate 110 The hook bolt member 130 is screwed to an end of the hook bolt member 130 and the hook bolt member 130 to prevent the hook ring 122 from being pulled out while the hook bolt member 130 is provided in each of the mounting grooves of the concrete pipe pile 200. Nut member 140 to be fixed, is mounted on the hook bolt member 130 At the outer periphery, the vertical connection rebar 300 is fastened to the through hole 152 of the reinforcing support spacer 150 and the reinforcing support spacer 150 formed at a plurality of through holes 152 at equal intervals. It consists of a reinforcing bar support member 160.

전술한 본 발명에 따른 기초공사용 콘크리트관말뚝 두부 보강장치(100)의 구성에서 걸이용 볼트부재(130)를 결합시키기 위한 볼트 결합수단은 콘크리트관말뚝(200) 상단면에 동일간격으로 형성되어지되 역삼각형 형태의 V자 홈으로 형성되는 거치홈(210)으로 이루어진다. 이처럼 볼트 결합수단으로써의 거치홈(210)을 역삼각형 형태의 V자 홈으로 형성하는 이유는 거치홈(210) 상에 걸이용 볼트부재(130)를 거치시 거치홈(210)의 하부 꼭지점 상에 걸이용 볼트부재(130)가 끼어 너트부재(140)의 체결 조임시 걸이용 볼트부재(130)의 볼트머리와 너트부재(140)가 꼭지점 부분의 거치홈(210) 내외측면 상에 걸림이 이루어져 거치홈(210)의 꼭지점 상에 걸이용 볼트부재(130)의 고정이 이루어질 수 있도록 하기 위함이다.The bolt coupling means for coupling the hook bolt member 130 in the configuration of the concrete pipe pile head reinforcement device 100 according to the present invention described above is formed at the same interval on the top surface of the concrete pipe pile (200) It consists of a mounting groove 210 formed of an inverted triangular V-shaped groove. The reason for forming the mounting groove 210 as the bolt coupling means in the form of an inverted triangular V-shaped groove on the lower groove of the mounting groove 210 when the mounting bolt member 130 is mounted on the mounting groove 210. The bolt head 130 and the nut member 140 of the hook bolt member 130 are caught on the inner and outer sides of the mounting groove 210 of the vertex when the fastening and fastening of the nut member 140 is caught by the hook bolt member 130. It is to ensure that the fixing bolt member 130 is made on the vertex of the mounting groove (210).

그리고, 전술한 바와 같은 본 발명의 구성에서 콘크리트관말뚝(200)의 거치홈(210)과 받침판(110)의 결합공(112)은 동일 위치상에 동일 개수로 형성된다. 따 라서, 거치홈(210) 상에 거치 고정되는 걸이용 볼트부재(130)에 걸이봉(120)을 거는 경우 걸이봉(120)은 틀어짐없이 걸이용 볼트부재(130)로부터 상하로 늘어지게 된다.Then, in the configuration of the present invention as described above, the mounting grooves 210 and the coupling holes 112 of the support plate 110 of the concrete pipe pile 200 is formed in the same number in the same position. Therefore, when the hook rod 120 is fastened to the hook bolt member 130 mounted on the mounting groove 210, the hook rod 120 is stretched up and down from the hook bolt member 130 without being twisted. .

본 발명에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치(100)를 보다 상세하게 설명하면 다음과 같다. 먼저, 콘크리트관말뚝(200) 상단면 상에 등간격으로 다수 형성된 거치홈(210)은 걸이용 볼트부재(130)를 거치시키기 위한 것으로, 이 거치홈(210)은 앞서 기술한 바와 같이 콘크리트관말뚝(200) 상단면에 역삼각형 형태의 V자 홈으로 형성되어 걸이용 볼트부재(130)를 거치시 거치홈(210)의 하부 꼭지점 상에 걸이용 볼트부재(130)가 끼어 너트부재(140)의 체결 조임시 거치홈(210)의 하단 꼭지점 상에 걸이용 볼트부재(130)의 고정이 이루어질 수 있도록 한다.Referring to the head reinforcement device 100 of the concrete pipe pile for basic construction according to the invention as follows. First, a plurality of mounting grooves 210 formed at equal intervals on the top surface of the concrete pipe pile 200 are for mounting the hook bolt member 130, the mounting groove 210 is a concrete pipe as described above The pile 200 is formed with a V-shaped groove having an inverted triangle shape on the top surface thereof so that the hook bolt member 130 is caught on the lower vertex of the mounting groove 210 when the hook bolt member 130 is mounted. When fastening and tightening) of the mounting groove 210 so that the fixing of the hook bolt member 130 can be made on the bottom vertex.

한편, 전술한 바와 같이 구성된 기초공사용 콘크리트관말뚝 두부 보강장치(100)에서 철근지지부재(160)는 철근지지용 스페이서(150)의 통공(152)에 삽입 유지되어 그 중심을 통해 수직연결철근(200)을 삽입함으로써 수직연결철근(200)이 쓰러지지 않도록 지지하기 위한 것으로, 이 철근지지부재(160)는 철근지지용 스페이서(150)의 외주연에 형성된 통공(152)의 내경에 대응하는 외경으로 형성되어 통공(152) 상에 삽입되는 몸체(162), 몸체(162) 상단에 일체로 형성되어지되 통공(152)에 비해 큰 직경으로 형성된 일정길이의 몸체(162)를 통공(152)에 삽입시 걸림이 이루어지는 헤드(164) 및 수직연결철근(300)의 직경에 비해 큰 내경으로 이루어져 삽입된 수직연결철근(300)을 쓰러지지 않도록 지지하는 철근관통공(166)으 로 이루어진다.Meanwhile, in the concrete pipe pile head reinforcement device 100 constructed as described above, the reinforcing support member 160 is inserted into and maintained in the through hole 152 of the reinforcing support spacer 150, and through the center thereof, a vertical connecting reinforcing bar ( By inserting the 200 to support the vertical connection reinforcement 200 does not fall, the reinforcing support member 160 is an outer diameter corresponding to the inner diameter of the through hole 152 formed on the outer periphery of the reinforcing support spacer 150 The body 162 is formed and inserted into the through hole 152, the body 162 is formed integrally with the upper end of the body 162 of a predetermined length formed in a larger diameter than the through hole 152 into the through hole 152 It consists of a reinforcing through hole 166 supporting the inserted vertical connecting reinforcement (300) so as not to fall made of a large inner diameter compared to the diameter of the head 164 and the vertical connecting reinforcement (300) is made when jammed.

전술한 바와 같은 철근지지부재(160)의 구성에서 몸체(162)는 그 중심을 관통하여 수직하게 설치되는 수직연결철근(300)을 옆으로 쓰러지지 않도록 지지하기 위한 것으로, 이 철근지지부재(160)의 몸체(162) 부분은 일정길이로 형성되어지되 철근지지용 스페이서(150)의 통공(152) 내경에 비해 작은 외경으로 형성된다.In the configuration of the reinforcing bar support member 160 as described above, the body 162 is to support the vertical connecting reinforcing bar 300 vertically penetrating through its center so as not to fall sideways, the reinforcing bar support member 160 The body 162 portion of the body 162 is formed to a predetermined length but is formed with a smaller outer diameter than the inner diameter of the through hole 152 of the reinforcing spacer 150.

철근지지부재(160)의 헤드(164)는 몸체(162)를 철근지지용 스페이서(150)의 통공(152)에 삽입 체결시 걸림 유지되도록 하기 위한 것으로, 이 철근지지부재(160)의 헤드(164)는 몸체(162)의 상단부에 일체로 형성되어지되 철근지지용 스페이서(150)의 통공(152)에 비해 큰 직경으로 형성되어 몸체(162)를 철근지지용 스페이서(150)의 통공(152)에 삽입 체결시 헤드(164) 부분이 통공(152) 상단부에 걸려 철근지지부재(160)가 철근지지용 스페이서(150)의 통공(152) 상에 걸림 유지되도록 한다.The head 164 of the reinforcing support member 160 is to hold the body 162 when the body 162 is inserted into and fastened to the through hole 152 of the reinforcing support spacer 150. 164 is formed integrally with the upper end of the body 162 but is formed with a larger diameter than the through-hole 152 of the reinforcing support spacer 150 through the body 162 of the reinforcing support spacer 150 through 152 At the insertion and fastening), the head 164 is caught by the upper end of the through hole 152 so that the reinforcing support member 160 is held on the through hole 152 of the reinforcing spacer 150.

그리고, 철근지지부재(160)의 철근관통공(166)은 그 내부를 통해 수직연결철근(200)을 삽입하여 철근지지부재(160)에 의해 쓰러지지 않도록 하기 위한 것으로, 이 철근지지부재(160)의 철근관통공(166)은 몸체(162)와 헤드(164)가 일체로 이루어진 부재의 중심에 상하로 관통 형성된다.And, the reinforcing bar through hole 166 of the reinforcing support member 160 is to prevent falling by the reinforcing support member 160 by inserting the vertical connection reinforcement 200 through the inside, the reinforcing support member 160 The rebar through hole 166 is formed to penetrate up and down in the center of the member body 162 and the head 164 integrally.

전술한 바와 같이 구성된 철근지지부재(160)는 도 4 및 도 5 에 도시된 바와 같이 띠 형상으로 형성되어 방사상의 걸이용 볼트부재(130) 상부에 위치된 철근지지용 스페이서(150)의 외주연 상에 등간격으로 형성된 통공(152) 각각에 삽입 유지된다. 이처럼 철근지지용 스페이서(150)의 통공(152)에 삽입 유지된 철근지지부 재(160)의 철근관통공(166)을 통해 수직연결철근(200)을 삽입하여 그 하단이 받침판(110)의 상부면 상에 지지되도록 하면 수직연결철근(200)은 철근지지용 스페이서(150)와 철근지지부재(160)에 의해 수직으로 세워지게 된다.The reinforcing bar support member 160 configured as described above is formed in a band shape as shown in FIGS. 4 and 5 and has an outer circumference of the reinforcing bar support spacer 150 located above the radially fastening bolt member 130. It is inserted into and maintained in each of the through holes 152 formed at equal intervals on the top. As such, the vertical connecting rebar 200 is inserted through the reinforcing bar hole 166 of the reinforcing bar support member 160 inserted into and maintained in the through hole 152 of the reinforcing support spacer 150, and a lower end thereof is provided at the upper part of the support plate 110. The vertically connected reinforcing bar 200 is vertically erected by the reinforcing support spacer 150 and the reinforcing bar support member 160 when supported on the surface.

본 발명에 따른 기초공사용 콘크리트관말뚝 두부 보강장치(100)는 먼저, 받침판(110) 상의 결합공(112) 각각에 걸이봉(120)의 하단을 삽입하여 받침판(110)의 하부측에서 너트(124)를 통해 받침판(110)과 걸이봉(120)을 결합한 후, 이를 콘크리트관말뚝(200)의 내부에 삽입하여 걸이봉(120)의 걸고리(122)를 콘크리트관말뚝(200)의 상단부에 걸어 받침판(110)이 걸림 유지되도록 한다.Concrete pipe pile head reinforcement device 100 for basic construction according to the present invention, first, by inserting the lower end of the hook rod 120 in each of the coupling holes 112 on the support plate 110, the nut (the lower side of the support plate 110) 124 and after coupling the support plate 110 and the hanger rod 120, and inserted it into the inside of the concrete pipe pile 200 to hook the hook 122 of the hanger rod 120 to the upper end of the concrete pipe pile 200 Hanging support plate 110 to keep the jam.

한편, 전술한 바와 같은 상태에서 콘크리트관말뚝(200)의 거치홈(210) 각각에 걸이용 볼트부재(130)를 콘크리트관말뚝(200)의 내외측으로 거치시켜 걸이용 볼트부재(130)에 너트부재(140)를 체결함으로써 콘크리트관말뚝(200)의 거치홈(210) 각각에 걸이용 볼트부재(130)를 고정시킨 후, 각각의 걸이용 볼트부재(130) 상에 걸이봉(120)의 걸고리(122)를 걸어 걸이용 볼트부재(130)와 걸이봉(120)에 의해 받침판(110)이 콘크리트관말뚝(200)의 상부로부터 일정 깊이의 내측에 유지되도록 한 상태에서 콘크리트관말뚝(200)의 내부로 돌출된 각각의 걸이용 볼트부재(130) 선단의 너트부재(140)를 체결 조임하여 걸이용 볼트부재(130) 상에 걸림 유지된 걸고리(122)의 고정이 이루어질 수 있도록 한다.On the other hand, in the above-described state by mounting the bolt bolts 130 for each of the mounting grooves 210 of the concrete pipe pile 200 to the inside and outside of the concrete pipe pile 200 nut to the hook bolt member 130 After fastening the fastening bolt members 130 to the mounting grooves 210 of the concrete pipe pile 200 by fastening the members 140, the hook rods 120 are mounted on the respective fastening bolt members 130. Hanging the hook 122, the support plate 110 by the hook bolt member 130 and the hook rod 120 to maintain the concrete pipe pile 200 in a state that is maintained in a predetermined depth from the top of the concrete pipe pile 200 By fastening and tightening the nut member 140 at the tip of each hook bolt member 130 protruding into the inside of the hook so that the hook 122 held on the hook bolt member 130 can be fixed.

전술한 바와 같이 각각의 걸이용 볼트부재(130) 상에 걸이봉(120)의 걸고리(122)를 거는 경우 걸고리(122)는 너트부재(140)와 콘크리트관말뚝(200)의 내측면 사이의 걸이용 볼트부재(130) 상에 걸려 너트부재(140)의 조임에 의해 너트부 재(140)와 콘크리트관말뚝(200)의 내측면에 의해 고정되어진다.As described above, when hanging the hook 122 of the hook rod 120 on each hook bolt member 130, the hook 122 is formed between the nut member 140 and the inner surface of the concrete pipe pile 200. The fastening of the nut member 140 is caught on the hook bolt member 130 and is fixed by the inner surface of the nut member 140 and the concrete pipe pile 200.

그리고, 전술한 바와 같은 구성에서 걸이용 볼트부재(130)를 콘크리트관말뚝(200)의 거치홈(210) 상에 거치시키는 경우 걸이용 볼트부재(130)의 양측에는 와셔(142)가 더 결합될 수 있다. 이러한 와셔(142)는 걸이용 볼트부재(130)의 양측에 결합되어 너트부재(140)의 조임시 너트부재(140)와 걸이용 볼트부재(130)의 볼트머리에 의해 콘크리트관말뚝(200)의 거치홈(210) 내외측면에 가압 면접촉되어 걸이용 볼트부재(130)가 콘크리트관말뚝(200)의 거치홈(210) 상에 보다 견고하게 고정될 수 있도록 한다.In addition, when the hook bolt member 130 is mounted on the mounting groove 210 of the concrete pipe pile 200 in the configuration as described above, the washers 142 are further coupled to both sides of the hook bolt member 130. Can be. The washer 142 is coupled to both sides of the hook bolt member 130, the concrete pipe pile 200 by the bolt head of the nut member 140 and the hook bolt member 130 when tightening the nut member 140 The contact surface of the mounting groove 210 of the pressing surface in contact with the pressurized surface so that the bolt member 130 can be more firmly fixed on the mounting groove 210 of the concrete pipe pile (200).

전술한 바와 같이 걸이용 볼트부재(130)와 너트부재(140) 및 걸이봉(120)을 통해 받침판(110)을 지지시킨 상태에서 철근지지용 스페이서(150)를 걸이용 볼트부재(130)의 상부에 안착시켜 받침판(110)으로부터 일정높이에 설치한 후, 철근지지용 스페이서(150) 각각의 통공(152)에 철근지지부재(160)를 삽입 체결하여 걸림이 유지되도록 한 상태에서 철근지지부재(160)의 철근관통공(166) 상에 수직연결철근(300)을 삽입하여 받침판(12)의 상부에 수직연결철근(300)이 일정 간격으로 세워지도록 한다.As described above, in the state in which the support plate 110 is supported through the hook bolt member 130, the nut member 140, and the hook rod 120, the spacer support 150 for the hook bolt member 130 is fixed. Reinforcement support member in a state that is seated on the upper and installed at a certain height from the support plate 110, the reinforcing support member 160 is inserted into the through hole 152 of each of the reinforcing support spacer 150 to maintain the latch The vertical connecting reinforcement 300 is inserted into the rebar through hole 166 of the 160 so that the vertical connecting reinforcement 300 is erected at regular intervals on the upper portion of the support plate 12.

한편, 전술한 바와 같이 받침판(110), 걸이봉(120), 걸이용 볼트부재(130), 너트부재(140), 철근지지용 스페이서(150) 및 철근지지부재(160)로 이루어진 보강구조를 콘크리트관말뚝(200)의 두부에 설치한 상태에서 콘크리트관말뚝(200) 상부로부터 받침판(110) 상부의 콘크리트관말뚝(200) 내부와 콘크리트관말뚝(200)의 두부 전체에 콘크리트를 타설하여 양생하게 되면 콘크리트 타설물의 양생과정에서 받 침판(110), 걸이봉(120), 걸이용 볼트부재(130), 너트부재(140), 철근지지용 스페이서(150) 및 철근지지부재(160) 등이 접합된다. 다시 말해서, 콘크리트 타설물의 양생에 의해 받침판(110), 걸이봉(120), 걸이용 볼트부재(130), 너트부재(140), 철근지지용 스페이서(150) 및 철근지지부재(160) 등이 접합되어 콘크리트의 미끄러짐이 방지된다.On the other hand, as described above, the reinforcing structure consisting of the support plate 110, the hanger rod 120, the hook bolt member 130, the nut member 140, the reinforcing support spacer 150 and the reinforcing support member 160 In the state of being installed on the head of the concrete pipe pile (200) from the top of the concrete pipe pile (200) by pouring concrete in the concrete pipe pile 200 and the entire head of the concrete pipe pile (200) upper portion of the support plate 110 When the support plate 110, the hanger rod 120, the hook bolt member 130, the nut member 140, the reinforcing spacer 150 and the reinforcing member 160, etc. Are bonded. In other words, the support plate 110, the hook rod 120, the hook bolt member 130, the nut member 140, the reinforcing spacer 150 and the reinforcing member 160 by the curing of the concrete pouring Bonded to prevent slipping of concrete.

또한, 전술한 바와 같이 콘크리트관말뚝(200) 상부로부터 받침판(110) 상부의 콘크리트관말뚝(200) 내부와 콘크리트관말뚝(200)의 두부 전체에 콘크리트를 타설하여 양생하게 되면 양생되는 콘크리트 타설물이 콘크리트관말뚝(200)의 상단면 상에 형성된 거치홈(210)에서도 양생되어 결국 콘크리트관말뚝(200)의 거치홈(210)이 걸림턱의 기능을 하게 됨으로써 콘크리트의 미끄러짐이 방지된다.In addition, as described above, when the concrete is poured into the entire head of the concrete pipe pile 200 and the concrete pipe pile 200 from the upper support plate 110 from the top of the concrete pipe pile 200 is cured concrete cured It is also cured in the mounting groove 210 formed on the top surface of the concrete pipe pile 200 and eventually the mounting groove 210 of the concrete pipe pile 200 to function as a locking jaw to prevent the sliding of the concrete.

전술한 바와 같이 본 발명에 따른 기술은 받침판(110), 걸이봉(120), 걸이용 볼트부재(130), 너트부재(140), 철근지지용 스페이서(150)로 이루어지는 콘크리트관말뚝 두부 보강구조에 더하여 철근지지용 스페이서(150)의 통공(152) 상에 삽입 체결을 통해 걸림 유지되는 철근지지부재(160)의 구성을 통해 수직연결철근(300)을 보다 더 견고하게 지지할 수 있도록 할 수 있다.As described above, the technology according to the present invention is a concrete pipe pile head reinforcement structure consisting of a support plate 110, a hanger rod 120, a hook bolt member 130, a nut member 140, and a spacer 150 for reinforcing bars. In addition, through the configuration of the reinforcing bar support member 160 that is held through the insertion fastening on the through hole 152 of the reinforcing support spacer 150 may be able to more firmly support the vertical connection reinforcement 300 have.

도 8 은 본 발명에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치의 다른 예를 보인 분리 사시도, 도 9 는 도 8 에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치를 보인 결합 단면도이다.8 is an exploded perspective view showing another example of the head reinforcement device of the concrete pipe pile for basic construction according to the present invention, Figure 9 is a cross-sectional view showing the head reinforcement device of the concrete pipe pile for basic construction according to FIG.

도 8 및 도 9 는 본 발명에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치(100)의 다른 예를 보인 것으로, 전체적인 구성에 있어서는 도 4 내지 도 7 에 도시된 바와 같은 기초공사용 콘크리트관말뚝의 두부 보강장치(100)의 구성과 마찬가지로 콘크리트관말뚝(200)의 상단면 상에 등간격으로 다수 형성되는 볼트 결합수단, 콘크리트관말뚝(200)의 일정 깊이에 설치되어지되 외주연에 상하로 다수의 결합공(112)이 천공되는 받침판(110), 받침판(110)의 결합공(112) 각각에 그 하단이 결합되어지되 상단에는 걸고리(122)가 일체로 형성된 걸이봉(120), 콘크리트관말뚝(200)의 볼트 결합수단 각각에 거치되어지되 걸이봉(120)의 걸고리(122)를 걸어 받침판(110)을 지지하는 다수의 걸이용 볼트부재(130), 걸이용 볼트부재(130)의 단부에 나사 결합되어 걸고리(122)의 빠짐을 방지하는 한편 콘크리트관말뚝(200)의 거치홈 각각에 걸이용 볼트부재(130)를 고정시키는 너트부재(140), 걸이용 볼트부재(130) 상에 안착되어지되 그 외주연에는 등간격으로 다수의 통공(152)이 형성되는 철근지지용 스페이서(150) 및 철근지지용 스페이서(150)의 통공(152)에 체결되어 그 중심을 관통하는 수직연결철근(300)을 지지하는 철근지지부재(160)로 구성된다.8 and 9 show another example of the head reinforcement apparatus 100 of the foundation pipe concrete pipe pile according to the present invention, in the overall configuration, the head of the foundation pipe concrete pipe pile as shown in Figures 4 to 7 Similar to the configuration of the reinforcement device 100, a plurality of bolt coupling means formed at equal intervals on the top surface of the concrete pipe pile 200, is installed at a predetermined depth of the concrete pipe pile 200, a plurality of up and down on the outer periphery The lower end is coupled to each of the coupling plate 112, the coupling hole 112 of the support plate 110, the coupling hole 112 is drilled on the top hook hook 120 formed integrally with the hook 122, concrete pipe pile A plurality of hook bolt members 130, which are mounted on each of the bolt coupling means of the 200 to support the support plate 110 by hanging the hook 122 of the hook rod 120, the ends of the hook bolt member 130 Screwed in to prevent slippage of hook (122) Meanwhile, the nut member 140 for fixing the hook bolt member 130 to each of the mounting grooves of the concrete pipe pile 200 is seated on the hook bolt member 130, but a plurality of at equal intervals are formed on the outer circumference thereof. Reinforcing bar support member 160 is fastened to the reinforcing support spacer 150 and the through-hole 152 of the reinforcing support spacer 150 is formed through the hole 152 to support the vertical connection reinforcement 300 through the center thereof It consists of.

다만, 도 8 및 도 9 에 도시된 바와 같은 다른 예에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치(100)와 도 4 내지 도 7 에 도시된 기초공사용 콘크리트관말뚝의 두부 보강장치(100)의 다른 점은 콘크리트관말뚝(200)의 상단면 상에 등간격으로 다수 형성되는 볼트 결합수단에 있어 다른 예에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치(100)는 콘크리트관말뚝의 상단부 상에 내외로 천공되어지되 등간격으로 형성된 핀공(210a)으로 이루어지는 반면, 도 4 내지 도 7 에 도시된 기초공사용 콘크리트관말뚝의 두부 보강장치(100)는 콘크리트관말뚝(200) 상단 면에 동일간격으로 형성되어지되 역삼각형 형태의 V자 홈으로 형성되는 거치홈(210)으로 이루어진다는 점이 다르다.However, the head reinforcement apparatus 100 of the foundation pipe concrete pipe pile according to another example as shown in Figures 8 and 9 and the head reinforcement device 100 of the concrete pipe pile for foundation work shown in Figures 4 to 7 Another point is that the head reinforcement device 100 of the concrete pipe pile for basic construction according to another example in the bolt coupling means are formed in a plurality of equal intervals on the top surface of the concrete pipe pile 200 inside and outside the top of the concrete pipe pile Wherein it is made of a pin hole (210a) to be bored at equal intervals, while the head reinforcement device 100 of the concrete pipe pile for basic construction shown in Figures 4 to 7 are formed at the same interval on the top surface of the concrete pipe pile (200) The difference is that it consists of a mounting groove 210 is formed of a V-shaped groove of the inverted triangle shape.

한편, 전술한 바와 같이 도 8 및 도 9 에 도시된 다른 예에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치(100)는 콘크리트관말뚝(200)의 핀공(210a) 각각에 걸이용 볼트부재(130)를 체결하는 것이 도 4 내지 도 7 에 도시된 기초공사용 콘크리트관말뚝의 두부 보강장치(100)의 거치홈(210) 각각에 볼트부재(130)를 거치시키는 구성이 다를 뿐 그 이외의 기술은 도 4 내지 도 7 에 도시된 기초공사용 콘크리트관말뚝의 두부 보강장치(100)와 동일하다.On the other hand, as described above, the head reinforcement device 100 of the concrete pipe pile for basic construction according to another example shown in Figures 8 and 9 is a bolt member 130 for each hook in the pin hole (210a) of the concrete pipe pile 200 ) Fastening the bolt member 130 to each of the mounting grooves 210 of the head reinforcing device 100 of the concrete pipe pile for the basic construction shown in Figures 4 to 7 is different from the other technologies 4 and 7 is the same as the head reinforcement device 100 of the concrete pipe pile for the foundation works.

도 10 은 본 발명에 따른 기초공사용 콘크리트관말뚝의 두부 보강장치에서 수직연결철근의 다른 적용 예를 보인 사시도, 도 11 은 도 10 의 종단면도이다.Figure 10 is a perspective view showing another application example of the vertical connection reinforcement in the head reinforcement device of the concrete pipe pile for foundation work according to the present invention, Figure 11 is a longitudinal cross-sectional view of FIG.

도 10 및 도 11 은 기초공사용 콘크리트관말뚝의 두부 보강장치(100)에서 수직연결철근의 다른 적용 예로, 받침판(110)과 철근지지용 스페이서(150)에 의해 지지된 각각의 수직연결철근(300a)은 콘크리트관말뚝(200)의 상단으로부터 일정높이에서 일정경사각의 외측으로 크랭크 형태로 절곡 구성된다. 이처럼 크랭크 형태로 절곡 구성된 수직연결철근(300a)은 콘크리트관말뚝(200)의 상단에 지지되는 수직연결철근(310a)과 철근링(320a)을 통해 원상으로 연결된다.10 and 11 are other application examples of vertical connecting bars in the head reinforcement device 100 of the concrete pipe pile for the basic construction, each of the vertical connecting bars (300a) supported by the support plate 110 and the reinforcement spacer 150 ) Is bent in a crank form to the outside of a certain inclination angle at a certain height from the top of the concrete pipe pile (200). The vertical connection reinforcement (300a) bent in a crank form as described above is connected in a circular manner through the vertical connection reinforcement (310a) and the reinforcing ring (320a) supported on the top of the concrete pipe pile (200).

전술한 바와 같이 받침판(110)과 철근지지용 스페이서(150)에 의해 지지된 각각의 수직연결철근(300a)의 절곡위치는 콘크리트관말뚝(200)의 상부로 설치되는 기초철근(330a)과의 간섭이 발생하지 않는 높이에서 절곡된다.As described above, the bending positions of the vertical connecting bars 300a supported by the support plate 110 and the reinforcing bar support spacer 150 are different from those of the base reinforcing bars 330a installed above the concrete pipe pile 200. It is bent at a height where no interference occurs.

한편, 도 10 및 도 11 은 수직연결철근(300a)의 구성만이 다를 뿐 도 4 내지 도 7 에 도시된 구성, 도 8 및 도 9 에 도시된 구성과 동일한 구성으로 이루어진다.On the other hand, Figures 10 and 11 has only the configuration of the vertical connection reinforcement (300a) is made of the same configuration as the configuration shown in Figures 4 to 7, and the configuration shown in Figures 8 and 9 only.

이상에서와 같이 본 발명에 따른 기술은 콘크리트관말뚝(200)의 상단부 상에 역삼각형 형태의 V자 홈으로 거치홈(210) 또는 핀공(210a)을 다수 형성하여 거치홈(210) 또는 핀공(210a) 상에 걸이용 볼트부재(130)를 결합 고정시킬 수 있도록 함으로써 콘크리트관말뚝(200)에도 받침판(110), 걸이봉(120), 걸이용 볼트부재(130), 너트부재(140), 철근지지용 스페이서(150)로 이루어지는 콘크리트관말뚝 두부 보강구조를 설치할 수 있도록 하였다.As described above, the technology according to the present invention forms a plurality of mounting grooves 210 or pin holes 210a as V-shaped grooves having an inverted triangle shape on the upper end of the concrete pipe pile 200, or mounting holes 210 or pin holes ( The support plate 110, the hanger rod 120, the hanger bolt member 130, the nut member 140, and the like by allowing the fastening bolt member 130 to be fixed to the 210a on the concrete pipe pile 200, Concrete pipe pile head reinforcement structure consisting of a spacer 150 for supporting the reinforcement was to be installed.

본 발명은 전술한 실시 예에 국한되지 않고 본 발명의 기술사상이 허용하는 범위 내에서 다양하게 변형하여 실시할 수가 있다.The present invention is not limited to the above embodiments, and various modifications can be made within the scope of the technical idea of the present invention.

이상에서와 같이 본 발명에 따르면 건물이나 교량 등의 건축물이나 구조물 축조시 지면에 매설된 기초공사용 콘크리트관말뚝의 상부에 수직연결철근을 지지하여 콘크리트관말뚝의 두부를 보강하기 위한 보강구조를 콘크리트관말뚝의 두부에 설치 가능하도록 할 수가 있다.As described above, according to the present invention, when constructing a building or a structure such as a bridge or a bridge, a reinforcing structure for reinforcing the head of the concrete pipe pile is supported by supporting vertical connecting bars on the upper part of the concrete pipe pile for foundation work. It can be installed on the head of the pile.

또한, 본 발명에 따른 기술은 건물이나 교량 등의 건축물이나 구조물 축조시 지면에 매설된 기초공사용 콘크리트관말뚝의 상부에 수직연결철근을 지지하여 콘크리트관말뚝의 두부를 보강하기 위한 보강구조를 콘크리트관말뚝의 두부에 설치 가능하도록 함으로써 콘크리트관말뚝 두부의 보강구조를 보다 용이하게 설치할 수 있는 효과가 발현된다.In addition, the technology according to the present invention is to support the vertical reinforcing bar on the upper part of the concrete pipe pile for basic construction embedded in the ground when building buildings or structures such as buildings or bridges to reinforce the head of the concrete pipe pile concrete pipe By making it possible to install in the head of the pile, the effect that can be installed more easily the reinforcement structure of the concrete pipe pile head.

아울러, 본 발명에 따른 기술은 건물이나 교량 등의 건축물이나 구조물 축조시 지면에 매설된 기초공사용 콘크리트관말뚝의 상부에 수직연결철근을 지지하여 콘크리트관말뚝의 두부를 보강하기 위한 보강구조를 콘크리트관말뚝의 두부에 설치 가능하도록 함으로써 사용부품의 감소에 따른 시공비용을 크게 절감시킬 수 있을 뿐만 아니라, 구조의 단순화에 따른 작업 능률을 향상시켜 시공 시간을 대폭 단축시킬 수 있다.In addition, the technology according to the present invention is to support the vertical connection reinforcement on the upper part of the concrete pipe piles for foundation work embedded in the ground when building buildings or structures such as buildings or bridges to reinforce the head of the concrete pipe pile concrete pipe By installing it in the head of the pile, not only the construction cost can be greatly reduced due to the reduction of used parts, but also the construction time can be greatly reduced by improving the work efficiency due to the simplification of the structure.

Claims (7)

건물이나 교량의 건축물이나 구조물 축조시 지면에 매설된 기초공사용 콘크리트관말뚝의 두부를 보강하기 위한 기초공사용 콘크리트관말뚝 두부 보강장치에 있어서,In the reinforcement device for the concrete pipe pile head reinforcement for the basic public use for reinforcing the head of the concrete pipe pile for the foundation work embedded in the ground when building buildings or structures of buildings or bridges, 상기 기초공사용 콘크리트관말뚝 두부 보강장치는 상기 콘크리트관말뚝의 상단부에 형성되는 볼트 결합수단;The concrete pipe pile head reinforcement device for the basic construction is bolt coupling means formed on the upper end of the concrete pipe pile; 상기 콘크리트관말뚝의 내부 형상에 대응하는 형태로 형성되어 콘크리트관말뚝의 일정 깊이에 설치되어지되 외주연에 상하로 다수의 결합공이 천공되는 받침판;A support plate formed in a shape corresponding to the inner shape of the concrete pipe pile to be installed at a predetermined depth of the concrete pipe pile, and having a plurality of coupling holes drilled up and down on an outer circumference; 상기 받침판의 결합공 각각에 그 하단이 결합되어지되 상단에는 걸고리가 일체로 형성된 걸이봉;A lower end of which is coupled to each of the coupling holes of the support plate, and a hook rod having an upper end integrally formed with a hook; 상기 콘크리트관말뚝의 볼트 결합수단 각각에 결합되어지되 상기 걸이봉의 걸고리를 걸어 받침판을 지지하는 다수의 걸이용 볼트부재;A plurality of hook bolt members coupled to each of the bolt coupling means of the concrete pipe pile to support the backing plate by hanging the hook of the hook rod; 상기 걸이용 볼트부재의 단부에 나사 결합되어 걸고리의 빠짐을 방지하는 한편 상기 콘크리트관말뚝의 볼트 결합수단 각각에 걸이용 볼트부재를 고정시키는 너트부재;A nut member which is screwed to an end of the bolt member for the hook to prevent the hook from being pulled out while fixing the bolt member for the hook to each bolt coupling means of the concrete pipe pile; 상기 걸이용 볼트부재 상에 안착되어지되 그 외주연에는 등간격으로 다수의 통공이 형성되는 철근지지용 스페이서; 및Rebar support spacer is mounted on the bolt member for the hook, the outer periphery is formed with a plurality of through holes at equal intervals; And 상기 철근지지용 스페이서의 통공에 체결되어 그 중심을 관통하는 수직연결 철근을 지지하는 철근지지부재를 포함하여 이루어진 것을 특징으로 하는 기초공사용 콘크리트관말뚝의 두부 보강장치.Head reinforcement device of the concrete pipe pile for the basic construction, characterized in that it comprises a reinforcing support member which is fastened to the through hole of the reinforcing spacer for supporting the vertically connected reinforcing bars passing through the center. 제 1 항에 있어서, 상기 볼트 결합수단은 상기 콘크리트관말뚝의 상단면 상에 등간격으로 다수 절개 형성되어지되 역삼각형 형태의 V자 홈으로 형성된 거치홈 또는 상기 콘크리트관말뚝의 상단부 상에 내외로 천공되어지되 등간격으로 형성된 핀공인 것을 특징으로 하는 기초공사용 콘크리트관말뚝의 두부 보강장치.The method of claim 1, wherein the bolt coupling means is formed in a plurality of incisions at equal intervals on the top surface of the concrete pipe pile in or out on the top of the mounting groove formed in the V-shaped groove of the inverted triangle shape or the concrete pipe pile The head reinforcement device of the concrete pipe pile for the basic construction, characterized in that the drilled but formed pin holes at equal intervals. 제 2 항에 있어서, 상기 걸이용 볼트부재의 양측에 결합되어 상기 콘크리트관말뚝의 볼트 결합수단 각각의 내외측 상에 위치되어지되 상기 너트부재의 조임에 의해 상기 걸이용 볼트부재의 볼트머리와 너트에 의해 가압되어 상기 콘크리트관말뚝의 볼트 결합수단 각각에 상기 걸이용 볼트부재의 고정이 이루어질 수 있도록 하는 와셔가 더 구비된 것을 특징으로 하는 기초공사용 콘크리트관말뚝의 두부 보강장치.3. The bolt head and the nut of the bolt member of the hook according to claim 2, wherein the bolt head and the nut are coupled to both sides of the hook bolt member and positioned on the inner and outer sides of the bolt coupling means of the concrete pipe pile. The head reinforcement device of the concrete pipe pile foundation for public works, characterized in that it is further provided with a washer to be fixed to each of the bolt coupling means of the concrete pipe pile to be fixed by the bolt member for the hook. 제 1 항 내지 제 3 항 중 어느 한 항에 있어서, 상기 철근지지부재는 상기 철근지지용 스페이서의 외주연에 형성된 통공의 내경에 대응하는 외경의 몸체;According to any one of claims 1 to 3, wherein the reinforcing bar support member body of the outer diameter corresponding to the inner diameter of the through hole formed on the outer periphery of the reinforcing bar support spacer; 상기 몸체 상단에 일체로 형성되어지되 상기 통공에 비해 큰 직경으로 형성되어 상기 몸체를 상기 통공에 삽입시 걸림이 이루어지는 걸림헤드; 및A catching head which is formed integrally with the upper end of the body but is formed with a larger diameter than the through hole and is caught when the body is inserted into the through hole; And 상기 수직연결철근의 직경에 비해 큰 내경으로 이루어져 삽입된 수직연결철근을 쓰러지지 않도록 지지하는 철근관통공으로 이루어진 것을 특징으로 하는 기초공사용 콘크리트관말뚝의 두부 보강장치.Head reinforcement device of the concrete pipe pile for the basic construction, characterized in that made of a reinforcing through hole for supporting the vertical connecting reinforcement bar not to fall made of a larger inner diameter than the diameter of the vertical connecting reinforcement. 제 4 항 에 있어서, 상기 콘크리트관말뚝의 볼트 결합수단과 받침판의 결합공은 동일 위치 상에 동일 개수로 형성되는 것을 특징으로 하는 기초공사용 콘크리트관말뚝의 두부 보강장치.The head reinforcement apparatus of claim 4, wherein the coupling holes of the bolt coupling means and the support plate of the concrete pipe pile are formed in the same number on the same position. 제 4 항에 있어서, 상기 받침판과 철근지지용 스페이서에 의해 지지된 각각의 수직연결철근은 상기 콘크리트관말뚝의 상단으로부터 일정높이에서 일정경사각의 외측으로 크랭크 형태로 절곡되어 상기 콘크리트관말뚝의 상단에 지지되는 수직연결철근과 철근링을 통해 원상으로 연결되는 것을 특징으로 하는 기초공사용 콘크리트관말뚝의 두부 보강장치.The method of claim 4, wherein each of the vertical connection reinforcement supported by the support plate and the reinforcing bar support spacer is bent in a crank form out of a predetermined inclination angle at a predetermined height from the top of the concrete pipe pile to the top of the concrete pipe pile The head reinforcement device of the concrete pipe pile for the basic construction, characterized in that connected to the circular through the reinforcing bar and the reinforcing bars supported vertically. 제 6 항에 있어서, 상기 받침판과 철근지지용 스페이서에 의해 지지된 각각의 수직연결철근의 절곡위치는 상기 콘크리트관말뚝의 상부로 설치되는 기초철근과의 간섭이 발생하지 않는 높이에서 절곡되는 것을 특징으로 하는 기초공사용 콘크리트관말뚝의 두부 보강장치.The bending position of each vertical connecting reinforcement supported by the support plate and the reinforcing bar support spacer is bent at a height such that interference with the base reinforcing bar installed above the concrete pipe pile does not occur. Head reinforcement system of concrete pipe pile for foundation works.
KR1020060122413A 2006-12-05 2006-12-05 Head reforcement apparatus of concreat pipe piles for foundation work KR100819521B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060122413A KR100819521B1 (en) 2006-12-05 2006-12-05 Head reforcement apparatus of concreat pipe piles for foundation work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060122413A KR100819521B1 (en) 2006-12-05 2006-12-05 Head reforcement apparatus of concreat pipe piles for foundation work

Publications (2)

Publication Number Publication Date
KR20060133516A true KR20060133516A (en) 2006-12-26
KR100819521B1 KR100819521B1 (en) 2008-04-07

Family

ID=37812351

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060122413A KR100819521B1 (en) 2006-12-05 2006-12-05 Head reforcement apparatus of concreat pipe piles for foundation work

Country Status (1)

Country Link
KR (1) KR100819521B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116695688A (en) * 2023-06-21 2023-09-05 江苏泰禾建设工程有限公司 Anti-sedimentation tubular pile
CN117754721A (en) * 2023-12-29 2024-03-26 浙江泰华工程科技有限公司 Engineering tubular pile production and preparation device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101013028B1 (en) * 2010-04-01 2011-02-14 (주)파일테크 Product for reinforcing pile head for concrete pile

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200273580Y1 (en) 2002-02-01 2002-04-25 비비엠코리아(주) Head reinforced apparatus for steel pipe piles
KR200282684Y1 (en) 2002-04-16 2002-07-22 비비엠코리아(주) Head reinforced apparatus for steel pipe piles reinforced with assembled cover plates
KR100480018B1 (en) 2002-12-11 2005-03-31 (주) 대호바콘텍 Head cover for concrete pile and construction method of pile foundation structure using that
KR200370669Y1 (en) * 2004-09-22 2004-12-23 홍석희 Multifunctional and multipurpose apparatus for reinforcing the head of pile composed of little members
KR100815602B1 (en) * 2006-09-30 2008-03-24 홍원철 Head reforcement apparatus of steel pipe piles for foundation work

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116695688A (en) * 2023-06-21 2023-09-05 江苏泰禾建设工程有限公司 Anti-sedimentation tubular pile
CN116695688B (en) * 2023-06-21 2023-11-10 江苏泰禾建设工程有限公司 Anti-sedimentation tubular pile
CN117754721A (en) * 2023-12-29 2024-03-26 浙江泰华工程科技有限公司 Engineering tubular pile production and preparation device

Also Published As

Publication number Publication date
KR100819521B1 (en) 2008-04-07

Similar Documents

Publication Publication Date Title
KR100879621B1 (en) Basement reinforcing and structure restoration method using piling appratus
KR101632030B1 (en) Installation structure and method of steel tube columns and brackets
CA2841477C (en) Anchoring system
US8616807B2 (en) Two-stage mechanically-stabilized retaining earth wall and method
KR100685862B1 (en) Reinforced structure of pile
CN105507573A (en) Method for mounting external cantilever scaffolds made of shape steel
KR100819521B1 (en) Head reforcement apparatus of concreat pipe piles for foundation work
KR100728286B1 (en) A conclude apparatus of wire using matrix
KR101893658B1 (en) Apparatus for a mold for joint part between case in place uper end of pile and rear bridge for monopile construnction
KR101281067B1 (en) Head reforcement apparatus of pipe piles for foundation work
KR200282684Y1 (en) Head reinforced apparatus for steel pipe piles reinforced with assembled cover plates
KR200414866Y1 (en) Head reforcement apparatus of steel pipe piles for foundation work
KR100815602B1 (en) Head reforcement apparatus of steel pipe piles for foundation work
KR20110119472A (en) Precast concrete blocks and remodeling reinforcing construction methods for low and middle-rise beam-column buildings by using that blocks
KR20100007721A (en) Reinforcement
JP4456041B2 (en) Anchor facility for civil engineering facilities
CN108756012B (en) Tensioning rope connection assembly for connecting concrete wall panels and method of use thereof
KR101304501B1 (en) Steel Pipe Pile head reinforcement device
KR100779582B1 (en) Reinforcing structure for steel pipe head and the reinforcing method
KR20110116905A (en) Structure for reinforcing head of a steel pipe pile for a construction
KR200326562Y1 (en) Molding fixture for underground revetment construction
KR101803767B1 (en) Assembly for reinforcing head part of steel tube pile and steel tubepile assembly including the same
KR200285572Y1 (en) Apparatus for connecting head of steel pipe and concrete footing
CN220266964U (en) Non-metallic bottom plate integrated floor carrier plate with steel bars and corresponding floor structure
KR101013028B1 (en) Product for reinforcing pile head for concrete pile

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal