KR20060127322A - Gabion retaining wall block, construction structure of gabion retaining wall and method - Google Patents

Gabion retaining wall block, construction structure of gabion retaining wall and method Download PDF

Info

Publication number
KR20060127322A
KR20060127322A KR1020050048310A KR20050048310A KR20060127322A KR 20060127322 A KR20060127322 A KR 20060127322A KR 1020050048310 A KR1020050048310 A KR 1020050048310A KR 20050048310 A KR20050048310 A KR 20050048310A KR 20060127322 A KR20060127322 A KR 20060127322A
Authority
KR
South Korea
Prior art keywords
retaining wall
stage
gebion retaining
gebion
wall block
Prior art date
Application number
KR1020050048310A
Other languages
Korean (ko)
Inventor
이용희
Original Assignee
이용희
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이용희 filed Critical 이용희
Priority to KR1020050048310A priority Critical patent/KR20060127322A/en
Publication of KR20060127322A publication Critical patent/KR20060127322A/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • E02B11/005Drainage conduits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0208Gabions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/13Geometrical or physical properties having at least a mesh portion

Abstract

A gabion retaining wall block is provided to shorten a period of construction and to make construction easy by constructing a retaining wall by manufacturing a retaining wall block used for a gabion retaining wall for preventing the breaking of a slope by earth pressure and piling up the retaining wall blocks. A gabion retaining wall block(10) comprises: both lateral walls(11) inclined toward the rear and provided with a filling space(14), hanging projections(12) not to be pushed forward when piling up retaining wall blocks and to resist earth pressure and retreated grooves(19) to locate rings(40) formed by projecting reinforcing bars buried under lateral walls and connected with a think wire or bar to be carried easily; a front wall(13) connecting the front ends of both lateral walls horizontally and having natural patterns; and a rear wall(17) connecting the rear ends of both lateral walls horizontally. Drain holes(15) are formed on the lateral walls, the front wall and the rear wall and the drain hole of the rear wall is attached with a net to prevent the inflow of soil, and bolt holes(16) are formed on the lateral walls and the rear walls to connect with adjacent gabion retaining wall blocks using connecting bolts.

Description

게비온 옹벽블록 및 그 시공구조와 방법 {Gabion retaining wall block, construction structure of gabion retaining wall and method}Gabion retaining wall block, construction structure of gabion retaining wall and method}

도 1은 본 발명의 일실시예에 따른 게비온 옹벽블록의 사시도,1 is a perspective view of a gebion retaining wall block according to an embodiment of the present invention,

도 2a와 도 2b는 도 1에 나타낸 옹벽블록의 측단면도 및 배면도,2a and 2b is a side cross-sectional view and a rear view of the retaining wall block shown in FIG.

도 3은 본 발명의 다른 실시예에 따른 게비온 옹벽블록의 사시도,3 is a perspective view of a gebion retaining wall block according to another embodiment of the present invention;

도 4a와 도 4b는 도 3에 나타낸 옹벽블록의 측단면도 및 배면도,4a and 4b is a side cross-sectional view and a rear view of the retaining wall block shown in FIG.

도 5는 본 발명의 또 다른 실시예에 따른 게비온 옹벽블록의 사시도,5 is a perspective view of a gebion retaining wall block according to another embodiment of the present invention;

도 6은 도 5에 옹벽블록의 배면도,6 is a rear view of the retaining wall block in FIG. 5;

도 7은 본 발명의 일 실시예에 따른 옹벽블록의 시공예를 나타내는 측면도,7 is a side view showing a construction example of the retaining wall block according to an embodiment of the present invention;

도 8은 도 7에서 인접된 옹벽블록 간의 연결예를 나타내는 도면,8 is a view showing an example of connection between adjacent retaining wall blocks in FIG.

도 9는 본 발명의 다른 실시예에 따른 옹벽블록의 시공예를 나타내는 측면도이다.9 is a side view showing a construction example of the retaining wall block according to another embodiment of the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

10,20,30: 게비온 옹벽블록 11,21: 측벽10,20,30: Gebion retaining wall block 11,21: side wall

12,22,32: 걸림턱 13,23,33: 전방벽12,22,32: hanging jaw 13,23,33: front wall

14,24,34: 채움공 15,25,35: 배수공,14,24,34: fill hole 15,25,35: drain hole,

16,26,36: 볼트구멍 17,27: 후방벽16, 26, 36: bolt hole 17, 27: rear wall

18,28,38: 그물망 19,29,39: 요홈18,28,38: Net 19,29,39: Home

31: 측후벽 40: 고리31: Lateral wall 40: Loop

50: 연결볼트 100,200: 게비온 옹벽50: connecting bolt 100,200: Gebion retaining wall

본 발명은 게비온 옹벽블록 및 그 시공구조와 방법에 관한 것으로서, 더욱 상세하게는 토압으로 인한 비탈면 붕괴를 막기 위한 게비온 옹벽의 축조에 이용되는 옹벽블록과, 상기 옹벽블록 사이를 연결볼트로 체결하여 시공이 용이하고 견고한 시공구조와 방법에 관한 것이다.The present invention relates to a gebion retaining wall block, and its construction structure and method, and more particularly, to retain the construction wall and the retaining wall block used in the construction of the gebion retaining wall for preventing the slope of the slope due to earth pressure, the construction of the retaining wall block This is an easy and robust construction structure and method.

하천이나 저수지의 제방, 수로 또는 도로변에 홍수나 태풍과 같은 천재지변에 의하여 산사태 및 도로유실 등의 발생을 방지하기 위하여 게비온(gabion)을 이용한 옹벽을 시공한다.Retaining walls using gabions are installed to prevent the occurrence of landslides and road loss due to natural disasters such as floods or typhoons on the banks, reservoirs, banks, or roadsides.

통상적으로 이런 게비온은 아연 도금선 또는 여기에 PVC 피복한 것을 이중으로 꼬아서 만든 육각 또는 사각 형상 등의 금속망을 의미한다.Typically, such a gebion refers to a metal mesh such as a hexagonal or square shape made by twisting a galvanized wire or a PVC coating thereto.

이 금속망 속에는 잡석, 조약돌이나 깬 돌 등의 석재나 골재가 채움재로 채워지고, 절개지나 비탈면 등에 수평 또는 수직으로 적층되어 게비온 옹벽을 이루게 된다.In this metal mesh, stones and aggregates such as rubble, pebbles, and crushed stones are filled with fillers, and they are stacked horizontally or vertically on incisions or slopes to form gebion retaining walls.

상기 게비온을 하천 제방이나 수로 또는 법면 등에 시공하기 위해서는 먼저 금속망을 현장에서 조립, 설치한 후에 인력으로 그 내부에 일정규격의 돌이나 골재 를 일정량만큼 채워나가면서 차례대로 시공해야 한다.In order to install the Gebion on a river bank, a waterway, or a surface, first, a metal mesh must be assembled and installed in the field, and then, in order to fill a predetermined amount of stones or aggregates therein by manpower, the construction must be performed in order.

이를 상세히 설명하면, 게비온 옹벽을 시공하기 전에 기초지반을 부동침하 등이 일어나지 않도록 다지고, 이때 지반이 연약할 경우에는 모래, 자갈 등으로 치환하거나 버팀 콘크리트 등을 타설하여 하중을 고르게 분포시킨 상태에서, 다수의 금속망을 시공 장소에 정확하게 위치시키고, 철선을 이용하여 금속망을 연결한다.To explain this in detail, before the construction of the gabion retaining wall, the foundation ground is grounded so as not to settle down, and when the ground is soft, it is replaced with sand, gravel, or cast concrete, and the load is evenly distributed. Place a large number of metal meshes at the construction site and connect the metal meshes with wires.

상기 금속망을 하측에서부터 설치 및 연결함과 더불어 채움재를 금속망 내에 채우게 되고, 채워진 금속망의 뚜껑을 닫고서 그 상부에 다시 금속망을 설치 및 연결하며, 상부에 연결된 금속망에 다시 채움재를 채우는 것을 반복하여 소정의 높이와 폭을 갖는 게비온 옹벽을 설치하게 된다.In addition to installing and connecting the metal mesh from below, the filling material is filled in the metal mesh, and the metal mesh is installed and connected again on the upper part by closing the lid of the filled metal mesh, and filling the filling material into the metal mesh connected to the upper part. By repeating this, the gebion retaining wall having a predetermined height and width is installed.

따라서 종래의 게비온 옹벽은 시공기간이 길어지고 돌 등의 채움재를 현지에서 옮겨야 하는 불편함이 있으며 시공할 때 게비온의 정확한 위치를 설정하여 고정 설치하여야 하기 때문에 작업효율이 떨어지는 문제점이 있었다.Therefore, the conventional gebion retaining wall has a long construction period and has the inconvenience of moving the filling material such as stones in the field, and there is a problem in that the work efficiency is lowered because it is necessary to set and fix the exact position of the gebion during construction.

상술한 문제점을 해결하기 위하여 안출된 본 발명은, 토압으로 인한 비탈면 붕괴를 막기 위한 게비온 옹벽의 축조에 이용되는 옹벽블록을 제조하고 옹벽블록을 적층하여 게비온 옹벽을 시공함으로써 시공기간이 단축되고 시공이 용이하며 작업효율이 우수한 게비온 옹벽블록 및 그 시공구조와 방법을 제공하는데 그 목적이 있다.The present invention has been made to solve the above problems, manufacturing a retaining wall block used for the construction of the gebion retaining wall to prevent slope collapse due to earth pressure, and by stacking the retaining wall block to construct a gebion retaining wall, the construction period is shortened and construction is reduced An object of the present invention is to provide an easy and excellent work efficiency of the Gabion retaining wall block and its construction structure and method.

상술한 목적을 달성하기 위한 본 발명의 실시예에 따른 게비온 옹벽블록은, 상하로 내부가 빈 채움공이 형성되고, 좌우 양측에 소정의 경사각을 가지고 대향되는 측벽과, 상기 양 측벽의 전단부를 횡으로 연결하는 전방벽과, 상기 양 측벽의 후단부를 횡으로 연결하는 후방벽으로 이루어지며, 상기 양 측벽의 상면에 걸림턱이 형성됨을 특징으로 한다.According to an embodiment of the present invention for achieving the above-mentioned object, a gebion retaining wall block has a hollow filling hole formed up and down, and has sidewalls facing each other with a predetermined inclination angle on both left and right sides, and the front end portions of both sidewalls laterally. It consists of a front wall for connecting, and a rear wall for connecting laterally the rear end portions of both side walls, characterized in that the locking step is formed on the upper surface of the both side walls.

또한, 본 발명의 실시예에 따른 게비온 옹벽블록은, 상하로 내부가 빈 채움공이 형성되고, 좌우 양측에 소정의 경사각을 가지고 후단부가 연결되는 양 측후벽과, 상기 양 측후벽의 전단부를 횡으로 연결하는 전방벽으로 이루어지며, 상기 양 측후벽의 상면에 걸림턱이 형성됨을 특징으로 한다.In addition, the gabion retaining wall block according to an embodiment of the present invention, both the rear wall is formed with a hollow filling hole up and down, the rear end portion is connected to the rear end with a predetermined inclination angle on the left and right sides, and the front end portions of both side rear wall in the horizontal direction It is made of a front wall connecting, characterized in that the locking step is formed on the upper surface of the both side rear wall.

본 발명의 실시예에 따른 게비온 옹벽 시공구조는, 상하로 관통되는 채움공이 형성된 제1게비온 옹벽블록(A)의 후방벽이 전후로 인접된 상태에서 시공구간을 따라 양측으로 인접되게 설치되는 제1단 게비온 옹벽과, 상기 제1게비온 옹벽블록(A)보다 전후의 길이가 짧은 2단 제2게비온 옹벽블록(B)이, 상기 전방에 위치된 제1게비온 옹벽블록(A) 상부에 걸리도록 후방벽이 맞닿게 전후로 인접된 상태에서, 시공구간을 따라 양측으로 인접되게 설치되는 제2단 게비온 옹벽과, 제3단 제2게비온 옹벽블록(B)이, 상기 제2단 전방에 위치된 제2게비온 옹벽블록(B)의 상부에 걸리도록 양측으로 인접되게 설치되는 제3단 게비온 옹벽 및 제4단 제2게비온 옹벽블록(B)이, 상기 제3단 제2게비온 옹벽블록(B)의 상부에 걸리도록 양측으로 인접되게 설치되는 제4단 게비온 옹벽을 포함한다.According to an exemplary embodiment of the present invention, a construction structure of a gebion retaining wall includes: a first end disposed to be adjacent to both sides along a construction section in a state in which a rear wall of the first gebion retaining wall block A having a filling hole penetrating up and down is adjacent to the front and rear; A rear wall such that the second gebion retaining wall block (B), which is shorter in front and rear than the first gebion retaining wall block (A), is caught by the upper part of the first gebion retaining wall block (A) located in the front. In the state in which the abutment is adjacent to the front and rear, the second stage gebion retaining wall and the third stage second gebion retaining wall block (B), which are installed adjacent to both sides along the construction section, are located in front of the second stage. The third-stage gebion retaining wall and the fourth-stage second gebion retaining wall block (B), which are installed adjacent to both sides to be caught by the upper portion of the retaining wall block (B), are disposed on the upper portion of the third-stage second gebion retaining wall block (B). The fourth-stage gebion retaining wall installed adjacent to both sides to be hooked It includes.

또한, 본 발명의 실시예에 따른 게비온 옹벽 시공구조는, 상하로 관통되는 채움공이 형성된 제4게비온 옹벽블록(D)의 후면이 전후로 인접된 상태에서 시공구 간을 따라 양측으로 인접되게 설치되는 제1단 게비온 옹벽과, 제2단 제4게비온 옹벽블록(D)이, 상기 제1단 전방에 위치된 제4게비온 옹벽블록(D)의 상부에 걸리도록 양측으로 인접되게 설치되는 제2단 게비온 옹벽 및 제3단 제4게비온 옹벽블록(D)이, 상기 제2단 제4게비온 옹벽블록(D)의 상부에 걸리도록 양측으로 인접되게 설치되는 제3단 게비온 옹벽을 포함한다.In addition, the gebion retaining wall construction structure according to an embodiment of the present invention, the rear surface of the fourth gebion retaining wall block (D) is formed to be adjacent to both sides along the construction section in the state adjacent to the front and rear adjacent to the filling hole penetrating up and down The second stage gebion is installed to be adjacent to both sides so that the first stage gebion retaining wall and the second stage fourth gebion retaining wall block D are caught by an upper portion of the fourth gebion retaining wall block D located in front of the first stage. The retaining wall and the third-stage fourth gebion retaining wall block (D) include a third-stage gebion retaining wall installed adjacent to both sides so as to be caught by an upper portion of the second-stage fourth gebion retaining wall block (D).

본 발명의 실시예에 따른 게비온 옹벽 시공방법은, 상하로 관통되는 채움공이 형성된 제1게비온 옹벽블록(A)의 후방벽을 전후로 인접한 상태에서 시공구간을 따라 양측으로 인접되게 하여 인접된 제1게비온 옹벽블록(A)을 연결볼트 등으로 서로 연결하는 제1단 시공공정과; 상기 게비온 옹벽블록(A)보다 전후의 길이가 짧은 2단 제2게비온 옹벽블록(B)을, 상기 전방에 위치된 게비온 옹벽블록(A) 상부에 걸리도록 후방벽이 맞닿게 전후로 인접한 상태에서, 시공구간을 따라 양측으로 인접되게 하여 인접된 제2단 제2게비온 옹벽블록(B)을 연결볼트 등으로 서로 연결하는 제2단 시공공정과; 제3단 제2게비온 옹벽블록(B)을, 상기 제2단 전방에 위치된 제2게비온 옹벽블록(B)의 상부에 걸리도록 양측으로 인접되게 하여 인접된 제3단 제2게비온 옹벽블록(B)을 연결볼트 등으로 서로 연결하는 제3단 시공공정 및 제4단 제2게비온 옹벽블록(B)을, 상기 제3단 제2게비온 옹벽블록(B)의 상부에 걸리도록 양측으로 인접되게 하여 인접된 제4단 제2게비온 옹벽블록(B)을 연결볼트 등으로 서로 연결하는 제4단 시공공정을 포함한다.In the method of constructing a gebion retaining wall according to an embodiment of the present invention, the first wall of the first gebion retaining wall block A having a filling hole penetrating up and down is adjacent to both sides along the construction section in a state in which the rear wall is adjacent to the front and rear adjacent to each other. A first stage construction step of connecting the retaining wall block A to each other with a connection bolt; In a state in which the rear wall is abutted back and forth adjacent to the upper part of the second gebion retaining wall block (B), which is shorter in front and rear than the gebion retaining wall block (A), to be caught on the upper part of the gebion retaining wall block (A). A second step construction step of connecting adjacent second step second gebion retaining wall blocks (B) to each other along a construction section by connecting bolts and the like; The third stage second gebion retaining wall block (B) is adjacent to both sides so as to be caught on the upper side of the second gebion retaining wall block (B) located in front of the second stage, and the third third second gebion retaining wall block ( The third stage construction process and the fourth stage second gebion retaining wall block (B) connecting B) to each other with a connecting bolt or the like are adjacent to both sides so as to be caught on the upper portion of the third stage second gebion retaining wall block (B). And a fourth stage construction process of connecting the second fourth gebion retaining wall block B adjacent to each other with a connection bolt or the like.

또한, 본 발명의 실시예에 따른 게비온 옹벽 시공방법은, 상하로 관통되는 채움공이 형성된 제4게비온 옹벽블록(D)의 후방벽을 전후로 인접한 상태에서 시공 구간을 따라 양측으로 인접되게 하여 인접된 제4게비온 옹벽블록(D)을 연결볼트 등으로 서로 연결하는 제1단 시공공정과, 제2단 제4게비온 옹벽블록(D)을, 상기 제1단 전방에 위치된 제4게비온 옹벽블록(D)의 상부에 걸리도록 양측으로 인접되게 하여 인접된 제2단 제4게비온 옹벽블록(B)을 연결볼트 등으로 서로 연결하는 제2단 시공공정 및 제3단 제4게비온 옹벽블록(D)을, 상기 제2단 제4게비온 옹벽블록(D)의 상부에 걸리도록 양측으로 인접되게 하여 인접된 제3단 제4게비온 옹벽블록(D)을 연결볼트 등으로 서로 연결하는 제3단 시공공정을 포함한다.In addition, the method of constructing the gebion retaining wall according to the embodiment of the present invention, adjacent to the rear wall of the fourth gebion retaining wall block (D) having a filling hole penetrating up and down adjacent to both sides along the construction section in the state adjacent to the front and rear The first stage construction process for connecting the four gebion retaining wall blocks (D) with a connecting bolt, etc., and the fourth gebion retaining wall blocks (D) in the second stage, are located in front of the first stage. The second stage construction process and the third stage fourth gebion retaining wall block (D), which are adjacent to both sides so as to be caught on the upper side thereof, are connected to each other with the second stage fourth gebion retaining wall block (B) by a connecting bolt or the like. The third stage construction process of connecting the adjacent third stage fourth gebion retaining wall block (D) to each other by connecting bolts and the like so as to be adjacent to both sides so as to be caught on the upper portion of the second stage fourth gebion retaining wall block (D) Include.

이하 본 발명의 실시예에 대하여 첨부된 도면을 참고로 그 구성 및 작용을 설명하기로 한다.Hereinafter, the configuration and operation of the present invention will be described with reference to the accompanying drawings.

도 1은 본 발명의 일실시예에 따른 게비온 옹벽블록의 사시도이고, 도 2a와 도 2b는 도 1에 나타낸 옹벽블록의 측단면도 및 배면도이다.1 is a perspective view of a gebion retaining wall block according to an embodiment of the present invention, Figures 2a and 2b is a side cross-sectional view and a rear view of the retaining wall block shown in FIG.

도시된 바와 같이, 본 발명의 일실시예에 따른 게비온 옹벽블록(10)은 상하로 내부가 빈 채움공(14)이 형성되고, 좌우 양측에 소정의 경사각을 가지고 대향되는 측벽(11)과, 상기 양 측벽(11)의 전단부를 횡으로 연결하고 앞면에 자연석에 가까운 모습으로 시각적인 효과가 있는 무늬가 형성된 전방벽(13)과, 상기 양 측벽(11)의 후단부를 횡으로 연결하는 후방벽(17)으로 이루어진다.As shown, the gebion retaining wall block 10 according to an embodiment of the present invention has a hollow hole 14 is formed up and down, the side wall 11 facing the left and right sides with a predetermined inclination angle, The front wall 13 which has the front end of the both side walls 11 transversely and has a visual effect on the front surface close to the natural stone, and the rear wall which laterally connects the rear ends of the both side walls 11. It consists of 17.

이때 게비온 옹벽블록(10)은 상기 측벽(11)의 길이가 전방벽(13)의 좌우 길이 및 게비온 옹벽블록(10)의 높이와 거의 같은 대략 정육면체의 형상을 이룬다.At this time, the gebion retaining wall block 10 has a shape of a cube substantially equal to the length of the left and right lengths of the front wall 13 and the height of the gebion retaining wall block 10.

상기 양 측벽(11)은 후방으로 갈수록 좁아지는 경사각을 가지는바, 이는 게비온 옹벽을 둥근 형상으로 시공하는 경우를 대비하기 위해서이다.Both sidewalls 11 have an inclination angle that narrows toward the rear side, in order to prepare for the case of constructing the gebion retaining wall in a round shape.

그리고 양 측벽(11), 전방벽(13), 후방벽(17)에는 배수공(15)이 형성되고 후방벽(17)의 배수공(15)에는 토사가 유입되지 않도록 치밀하게 얽혀진 그물망(18)이 설치된다.A drainage hole 15 is formed in both sidewalls 11, the front wall 13, and the rear wall 17, and the mesh 18 is closely intertwined so that soil is not introduced into the drainage hole 15 of the rear wall 17. This is installed.

상기 양 측벽(11) 상부에는 걸림턱(12)이 형성되어 상부에 다른 게비온 옹벽블록이 적층된 경우에 앞으로 밀려나지 않게 되고 토압에 강하다.The engaging jaw 12 is formed on both sidewalls 11 so that it is not pushed forward when other gebion retaining wall blocks are stacked on the upper side, and is resistant to earth pressure.

상기 양 측벽(11) 하부에는 요홈(19)이 형성되고 요홈(19)에는 측벽(11)에 매립된 철근이 돌출되어 형성된 고리(40)가 위치되어, 상기 고리(40)에 굵은 철사나 바 등을 연결하여 크레인 등을 이용하여 쉽게 운반할 수 있다.Grooves 19 are formed below both sidewalls 11, and the grooves 19 are formed with a ring 40 formed by protruding reinforcing bars embedded in the sidewalls 11. It can be easily transported using a crane by connecting the lamp.

또한, 양 측벽(11)과 후방벽(17)에는 인접된 다른 게비온 옹벽블록과 연결볼트로 연결할 수 있도록 볼트구멍(16)이 형성된다.In addition, both side walls 11 and the rear wall 17 is formed with a bolt hole 16 so as to be connected to the other adjacent gebion retaining wall block with a connection bolt.

도 1에 나타낸 게비온 옹벽블록(10)의 규격은 1000 X 1000 X 1000(mm)이나 본 발명이 이 규격에 한정되지는 않는다.The standard of the gebion retaining wall block 10 shown in Fig. 1 is 1000 X 1000 X 1000 (mm), but the present invention is not limited to this standard.

상기 게비온 옹벽블록(10)은 적층되는 층수가 비교적 적은 경우의 바닥과, 층수에 관계없이 게비온 옹벽의 양측단부를 제외한 바닥 상부에 적층되게 사용된다.The gebion retaining wall block 10 is used to be stacked on the bottom when the number of laminated layers is relatively small and on the bottom except for both side ends of the gebion retaining wall.

도 3은 본 발명의 다른 실시예에 따른 게비온 옹벽블록의 사시도이고, 도 4a와 도 4b는 도 3에 나타낸 옹벽블록의 측단면도 및 배면도이다.3 is a perspective view of a gebion retaining wall block according to another embodiment of the present invention, Figures 4a and 4b is a side cross-sectional view and a rear view of the retaining wall block shown in FIG.

도시된 바와 같이, 본 발명의 일실시예에 따른 게비온 옹벽블록(20)은 상하로 내부가 빈 채움공(24)이 형성되고, 좌우 양측에 소정의 경사각을 가지고 대향되는 측벽(21)과, 상기 양 측벽(21)의 전단부를 횡으로 연결하고 앞면에 자연석에 가 까운 모습으로 시각적인 효과가 있는 무늬가 형성된 전방벽(23)과, 상기 양 측벽(21)의 후단부를 횡으로 연결하는 후방벽(27)으로 이루어진다.As shown, the gebion retaining wall block 20 according to an embodiment of the present invention has a hollow hole 24 is formed up and down, the side wall 21 facing the left and right sides with a predetermined inclination angle, After connecting the front end portions of both sidewalls 21 laterally and the front wall 23 having a pattern having a visual effect on the front surface close to the natural stone, and laterally connecting the rear ends of both sidewalls 21 laterally. It consists of a barrier 27.

이때 게비온 옹벽블록(20)도 1과 다르게 상기 측벽(21)의 길이가 전방벽(23)의 좌우 길이 및 게비온 옹벽블록(20)의 높이보다 큰 대략 직육면체 형상을 이룬다.At this time, unlike the Gebion retaining wall block 20, the length of the side wall 21 is formed in a substantially rectangular parallelepiped shape larger than the left and right lengths of the front wall 23 and the height of the Gebion retaining wall block 20.

상기 양 측벽(21)은 후방으로 갈수록 좁아지는 경사각을 가지는바, 이는 게비온 옹벽을 둥근 형상으로 시공하는 경우를 대비하기 위해서이다.Both sidewalls 21 have an inclination angle that narrows toward the rear side, in order to prepare for the case of constructing the gebion retaining wall in a round shape.

그리고 양 측벽(21), 전방벽(23), 후방벽(27)에는 배수공(25)이 형성되고 후방벽(27)의 배수공(25)에는 토사가 유입되지 않도록 치밀하게 얽혀진 그물망이 설치된다.In addition, drain holes 25 are formed in both side walls 21, front wall 23, and rear wall 27, and a network of finely entangled nets is installed in drain holes 25 of the rear wall 27 to prevent soil from entering. .

상기 양 측벽(21) 상부에는 걸림턱(22)이 형성되어 상부에 다른 게비온 옹벽블록이 적층된 경우에 앞으로 밀려나지 않게 되고 토압에 강하다.Hanging jaws 22 are formed on the upper sidewalls 21 so that they are not pushed forward when other gebion retaining wall blocks are stacked thereon, and are resistant to earth pressure.

상기 양 측벽(21) 하부에는 요홈(29)이 형성되고 요홈(29)에는 측벽(21)에 매립된 철근이 돌출되어 형성된 고리(40)가 위치되어, 상기 고리(40)에 굵은 철사나 바 등을 연결하여 크레인 등을 이용하여 쉽게 운반할 수 있다.Grooves 29 are formed below both sidewalls 21, and the grooves 29 are formed with a ring 40 formed by protruding reinforcing bars embedded in the sidewalls 21. It can be easily transported using a crane by connecting the lamp.

또한, 양 측벽(21)과 후방벽(27)에는 인접된 다른 게비온 옹벽블록과 연결볼트(50)로 연결할 수 있도록 볼트구멍(26)이 형성된다.In addition, both side walls 21 and the rear wall 27 is formed with a bolt hole 26 so as to be connected to another adjacent gebion retaining wall block and the connection bolt 50.

도 3에 나타낸 게비온 옹벽블록(20)의 규격은 1500 X 1000 X 1000(mm)이나 본 발명이 이 규격에 한정되지는 않는다.The standard of the gebion retaining wall block 20 shown in Fig. 3 is 1500 X 1000 X 1000 (mm), but the present invention is not limited to this standard.

상기 게비온 옹벽블록(20)은 적층되는 층수가 비교적 많은 경우에 게비온 옹 벽의 기초가 되는 바닥으로 사용된다.The gebion retaining wall block 20 is used as a floor that is the basis of the gebion retaining wall when the number of laminated layers is relatively large.

도 5는 본 발명의 또 다른 실시예에 따른 게비온 옹벽블록의 사시도이고, 도 6은 도 5에 나타낸 옹벽블록의 배면도이다.5 is a perspective view of a gebion retaining wall block according to another embodiment of the present invention, and FIG. 6 is a rear view of the retaining wall block shown in FIG. 5.

도시된 바와 같이, 본 발명의 일실시예에 따른 게비온 옹벽블록(30)은 상하로 내부가 빈 채움공(34)이 형성되고, 좌우 양측에 소정의 경사각을 가지고 후단부가 연결되는 양 측후벽(31)과, 상기 양 측후벽(31)의 전단부를 횡으로 연결하고 앞면에 자연석에 가까운 모습으로 시각적인 효과가 있는 무늬가 형성된 전방벽(33)으로 이루어진다.As shown, the gebion retaining wall block 30 according to an embodiment of the present invention is formed in the hollow filling hole 34 up and down, both sides of the rear wall is connected to the rear end with a predetermined inclination angle on both left and right sides ( 31) and a front wall 33 having a visual effect having a visual effect by connecting the front ends of both side rear walls 31 laterally and being close to natural stone on the front surface.

그리고 양 측후벽(31), 전방벽(33)에는 배수공(35)이 형성되고 측후벽(31)의 배수공(35)에는 토사가 유입되지 않도록 치밀하게 얽혀진 그물망(38)이 설치된다.In addition, drain holes 35 are formed in both side rear walls 31 and front walls 33, and the mesh 38 is tightly entangled so that soil is not introduced into the drain holes 35 of the side rear walls 31.

상기 측후벽(31) 상부에는 걸림턱(32)이 형성되어 상부에 다른 게비온 옹벽블록이 적층된 경우에 앞으로 밀려나지 않게 되고 토압에 강하다.A hooking jaw 32 is formed on the upper side of the rear wall 31 so as not to be pushed forward when other gebion retaining wall blocks are stacked on the top, and are resistant to earth pressure.

상기 양 측후벽(31) 하부에는 요홈(39)이 형성되고 요홈(39)에는 측후벽(31)에 매립된 철근이 돌출되어 형성된 고리(40)가 위치되어, 상기 고리(40)에 굵은 철사나 바 등을 연결하여 크레인 등을 이용하여 쉽게 운반할 수 있다.Grooves 39 are formed at both lower sides of the rear wall 31, and the grooves 39 are formed with a ring 40 formed by protruding reinforcing bars embedded in the rear wall 31. It can be easily transported using cranes by connecting bars or the like.

또한, 양 측후벽(31)에는 인접된 다른 게비온 옹벽블록(10)과 연결볼트(50)로 연결할 수 있도록 볼트구멍(36)이 형성된다.In addition, both side rear walls 31 are formed with a bolt hole 36 so as to be connected to another adjacent gebion retaining wall block 10 and the connection bolt 50.

상기 게비온 옹벽블록(30)은 게비온 옹벽 바깥쪽에 시공하는 삼각형 블록으로 사면 끝의 흙의 쓸어내림을 방지한다.The gebion retaining wall block 30 is a triangular block constructed outside the gebion retaining wall to prevent the sweep of the soil at the end of the slope.

도 7은 본 발명의 일실시예에 따른 옹벽블록의 시공예를 나타내는 측면도이 고, 도 8은 도 7에서 인접된 옹벽블록 간의 연결예를 나타내는 도면이다.7 is a side view showing a construction example of the retaining wall block according to an embodiment of the present invention, Figure 8 is a view showing an example of connection between adjacent retaining wall blocks in FIG.

도 7에 도시한 본 발명의 일실시예에 따른 옹벽블록은 적층되는 층수가 많은 경우에 게비온 옹벽(100)의 예로서, 도 3에 나타낸 게비온 옹벽블록(20)의 후방벽(27)을 전후로 맞닿게 하여 비탈면을 따라 양 측방으로 설치한다.The retaining wall block according to the embodiment of the present invention shown in FIG. 7 is an example of the gebion retaining wall 100 when the number of stacked layers is large, and the rear wall 27 of the gebion retaining wall block 20 shown in FIG. Abut on both sides along the slope.

상기 후방벽(27)에 형성된 볼트구멍(26)으로 연결볼트(50)를 관통시킨 후에 너트 등을 체결시켜 전후로 인접된 게비온 옹벽블록(20)을 서로 연결하고, 측벽(21)에 형성된 볼트구멍(26)으로 연결볼트(50)를 관통시킨 후에 너트 등을 체결시켜 측방으로 인접된 게비온 옹벽블록(20)을 서로 연결한다.After passing through the connecting bolt 50 through the bolt hole 26 formed in the rear wall 27, the nut or the like is fastened to connect the neighboring Gebion retaining wall block 20 back and forth to each other, the bolt hole formed in the side wall 21 After passing through the connecting bolt (50) to (26) by fastening the nut or the like to connect the gabion retaining wall block 20 adjacent to the side.

이와 같이 하여 제1단의 게비온 옹벽이 시공되면, 그 상부에 도 1에 나타낸 게비온 옹벽블록(10)의 후방벽(17)을 전후로 맞닿게 하여, 게비온 옹벽블록(20)의 상부를 따라 측방으로 설치한다.In this way, when the first step of the gebion retaining wall is constructed, the rear wall 17 of the gebion retaining wall block 10 shown in FIG. 1 is brought into contact with the front and rear, and laterally along the upper part of the gebion retaining wall block 20. Install.

이때 게비온 옹벽블록(10)은 1단 전방 게비온 옹벽블록(20)의 걸림턱(22)에 걸리도록 위치시켜 후퇴축조가 되도록 하고, 상하의 측벽(21,11)을 일치하도록 하여 채움공(24,14)을 연통시켜 토사 등으로 채움공(24,14)을 채울 수 있도록 한다.At this time, the Gebion retaining wall block 10 is positioned so as to be caught by the engaging jaw 22 of the first-stage front Gabion retaining wall block 20 so as to be retracted, and the upper and lower sidewalls 21 and 11 correspond to the filling hole 24, 14) so that the filling holes (24, 14) can be filled with earth and sand.

상기 후방벽(17)에 형성된 볼트구멍(16)으로 연결볼트(50)를 관통시킨 후에 너트 등을 체결시켜 전후로 인접된 게비온 옹벽블록(10)을 서로 연결하고, 측벽(11)에 형성된 볼트구멍(16)으로 연결볼트(50)를 관통시킨 후에 너트 등을 체결시켜 측방으로 인접된 게비온 옹벽블록(10)을 서로 연결한다.After passing through the connecting bolt 50 through the bolt hole 16 formed in the rear wall 17, the nut or the like is fastened to connect the neighboring Gebion retaining wall block 10 back and forth to each other, the bolt hole formed in the side wall 11 After passing through the connecting bolt 50 to the (16) by fastening the nut and the like to connect the gabion retaining wall block 10 adjacent to the side.

이와 같이 하여 제2단의 게비온 옹벽이 시공되면, 그 상부에 도 1에 나타낸 게비온 옹벽블록(10)을 2단 전방 게비온 옹벽블록(10)의 걸림턱(12)에 걸리도록 위 치시켜 후퇴축조가 되도록 하고 상하의 측벽(11)을 일치하도록 하여 채움공(12)을 연통시켜 토사 등으로 채움공(14)을 채울 수 있도록 한다.In this way, when the second stage gebion retaining wall is constructed, the reinforcement structure is placed on the upper part thereof so as to be caught by the engaging jaw 12 of the two-stage front gebion retaining wall block 10. And the side walls 11 of the upper and lower sides to be aligned so that the filling hole 12 is communicated so as to fill the filling hole 14 with earth and sand.

이때 3단 게비온 옹벽의 양 측단부는 도 5에 나타낸 게비온 옹벽블록(30)을 2단 전방 게비온 옹벽블록(10)의 걸림턱(12)에 걸리도록 위치시켜 후퇴축조가 되도록 한다.At this time, both side ends of the three-stage gebion retaining wall are positioned so as to be caught by the locking step 12 of the two-stage front gabion retaining wall block 10 shown in FIG.

상기 측벽(11)과 측후벽(31)에 형성된 볼트구멍(16,36)으로 연결볼트(50)를 관통시킨 후에 너트 등을 체결시켜 측방으로 인접된 게비온 옹벽블록((10,10),(10,30))을 서로 연결한다.After passing through the connecting bolts 50 through the bolt holes 16 and 36 formed in the side wall 11 and the side rear wall 31, and tightening the nut or the like, the gabion retaining wall blocks ((10, 10), ( 10,30)).

이와 같이 하여 제3단의 게비온 옹벽이 시공되면, 그 상부에 다시 도 1에 나타낸 게비온 옹벽블록(10)을 3단 게비온 옹벽블록(10)의 걸림턱(12)에 걸리도록 위치시켜 후퇴축조가 되도록 하고 상하의 측벽(11)을 일치하도록 하여 채움공(14)을 연통시켜 토사 등으로 채움공(14)을 채울 수 있도록 한다.In this way, when the third stage gebion retaining wall is constructed, the reinforcement structure is placed on the upper part thereof so as to be caught by the engaging jaw 12 of the three-stage gebion retaining wall block 10 again. And the side walls 11 of the upper and lower sides are aligned so that the filling holes 14 communicate with each other to fill the filling holes 14 with earth and sand.

이때 4단 게비온 옹벽의 측단부는 도 5에 나타낸 게비온 옹벽블록(30)을 3단 게비온 옹벽블록(30)의 걸림턱(32)에 걸리도록 위치시켜 후퇴축조가 되도록 한다.At this time, the side end portion of the four-stage gebion retaining wall is positioned so as to be caught by the locking step 32 of the three-stage gebion retaining wall block 30 shown in FIG.

상기 측벽(11)과 측후벽(31)에 형성된 볼트구멍(16,36)으로 연결볼트(50)를 관통시킨 후에 너트 등을 체결시켜 측방으로 인접된 게비온 옹벽블록((10,10),(10,30))을 서로 연결하는 공정을 반복하여 게비온 옹벽(100)이 시공된다.After passing through the connecting bolts 50 through the bolt holes 16 and 36 formed in the side wall 11 and the side rear wall 31, and tightening the nut or the like, the gabion retaining wall blocks ((10, 10), ( 10, 30)) by repeating the process of connecting each other the gebion retaining wall 100 is constructed.

도 9는 본 발명의 다른 실시예에 따른 옹벽블록의 시공예를 나타내는 측면도이다.9 is a side view showing a construction example of the retaining wall block according to another embodiment of the present invention.

도 9에 도시한 본 발명의 다른 실시예에 따른 옹벽블록은 적층되는 층수가 작은 경우에 게비온 옹벽(200)의 예로서, 도 1에 나타낸 게비온 옹벽블록(10)의 후방벽(17)을 전후로 맞닿게 하여 비탈면을 따라 측방으로 위치시킨다.The retaining wall block according to another embodiment of the present invention shown in FIG. 9 is an example of the gebion retaining wall 200 when the number of stacked layers is small, and the rear wall 17 of the gebion retaining wall block 10 shown in FIG. Abut and laterally along the slope.

상기 후방벽(17)에 형성된 볼트구멍(16)으로 연결볼트(50)를 관통시킨 후에 너트 등을 체결시켜 전후로 인접된 게비온 옹벽블록(10)을 서로 연결하고, 측벽(11)에 형성된 볼트구멍(16)으로 연결볼트(50)를 관통시킨 후에 너트 등을 체결시켜 측방으로 인접된 게비온 옹벽블록(10)을 서로 연결한다.After passing through the connecting bolt 50 through the bolt hole 16 formed in the rear wall 17, the nut or the like is fastened to connect the neighboring Gebion retaining wall block 10 back and forth to each other, the bolt hole formed in the side wall 11 After passing through the connecting bolt 50 to the (16) by fastening the nut and the like to connect the gabion retaining wall block 10 adjacent to the side.

이와 같이 하여 제1단의 게비온 옹벽이 시공되면, 그 상부에 도 1에 나타낸 게비온 옹벽블록(10)을 1단 전방 게비온 옹벽블록(10)의 걸림턱(12)에 걸리도록 위치시켜 후퇴축조가 되도록 하고, 상하의 측벽(11)을 일치하도록 하여 채움공(14)을 연통시켜 토사 등으로 채움공(14)을 채울 수 있도록 한다.In this way, when the first step of the gebion retaining wall is constructed, the reinforcement structure is placed on the upper part thereof so as to be caught by the catching jaw 12 of the first-stage front gabion retaining wall block 10. In order to make the upper and lower sidewalls 11 coincide with each other, the filling hole 14 is communicated with each other so that the filling hole 14 may be filled with earth and sand.

이때 게비온 옹벽의 측단부는 도 5에 나타낸 게비온 옹벽블록(30)을 1단 전방 게비온 옹벽블록(10)의 걸림턱(12)에 걸리도록 위치시켜 후퇴축조가 되도록 한다.At this time, the side end portion of the gebion retaining wall is positioned so as to be caught by the locking jaw 12 of the first step front gebion retaining wall block 10 shown in FIG.

상기 측벽(11)과 측후벽(31)에 형성된 볼트구멍(16,36)으로 연결볼트(50)를 관통시킨 후에 너트 등을 체결시켜 측방으로 인접된 게비온 옹벽블록((10,10),(10,30))을 서로 연결한다.After passing through the connecting bolts 50 through the bolt holes 16 and 36 formed in the side wall 11 and the side rear wall 31, and tightening the nut or the like, the gabion retaining wall blocks ((10, 10), ( 10,30)).

이와 같이 하여 제2단의 게비온 옹벽이 시공되면 그 상부에 다시 도 1에 나타낸 게비온 옹벽블록(10)을 2단 게비온 옹벽블록(10)의 걸림턱(12)에 걸리도록 위치시켜 후퇴축조가 되도록 하고, 상하의 측벽(11)을 일치하도록 하여 채움공(14)을 연통시켜 토사 등으로 채움공(14)을 채울 수 있도록 한다.In this manner, when the second stage gebion retaining wall is constructed, the Gebion retaining wall block 10 shown in FIG. 1 is placed on the upper part so as to be caught by the latching jaw 12 of the two-stage gebion retaining wall block 10 so as to be retracted. Then, the top and bottom sidewalls 11 are aligned so that the filling holes 14 communicate with each other to fill the filling holes 14 with earth and sand.

이때 게비온 옹벽의 측단부는 도 5에 나타낸 게비온 옹벽블록(30)을 2단 게비온 옹벽블록(30)의 걸림턱(32)에 걸리도록 위치시켜 후퇴축조가 되도록 한다.At this time, the side end portion of the gebion retaining wall is positioned so as to be caught by the locking jaw 32 of the two-stage gebion retaining wall block 30 shown in FIG.

상기 측벽(11)과 측후벽(31)에 형성된 볼트구멍(16,36)으로 연결볼트(50)를 관통시킨 후에 너트 등을 체결시켜 측방으로 인접된 게비온 옹벽블록((10,10,(10,30))을 서로 연결하는 공정을 반복하여 게비온 옹벽(200)이 시공된다.After passing through the connecting bolt 50 through the bolt holes 16 and 36 formed in the side wall 11 and the side rear wall 31, the nut and the like are fastened to laterally adjacent gebion retaining wall blocks ((10, 10, (10)). (30)) by repeating the process of connecting each other the gebion retaining wall 200 is constructed.

이상 도면과 상세한 설명에서 최적 실시예들이 개시되고, 이상에서 사용된 특정한 용어는 단지 본 발명을 설명하기 위한 목적에서 사용된 것일 뿐 의미 한정이나 특허청구범위에 기재된 본 발명의 범위를 제한하기 위하여 사용된 것이 아니다.Embodiments of the present invention are disclosed in the drawings and the detailed description, and the specific terms used above are used only for the purpose of describing the present invention, and are used to limit the scope of the present invention as defined in the meaning or claims. It is not.

그러므로 본 기술분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하고, 본 발명의 진정한 기술적 보호 범위는 특허청구범위의 기술적 사상에 의해 정해져야 할 것이다.Therefore, those skilled in the art can be various modifications and other equivalent embodiments from this, and the true technical protection scope of the present invention should be determined by the technical spirit of the claims.

이상에서 살펴본 바와 같이 본 발명에 의하면, 토압으로 인한 비탈면 붕괴를 막기 위한 게비온 옹벽의 축조에 이용되는 옹벽블록을 제조하고 옹벽블록을 적층하여 게비온 옹벽을 시공함으로써 시공기간이 단축되고 시공이 매우 용이하다.As described above, according to the present invention, the construction period is shortened and the construction is very easy by manufacturing the retaining wall block used for the construction of the gebion retaining wall to prevent the slope of the slope due to earth pressure and stacking the retaining wall block. .

Claims (22)

상하로 내부가 빈 채움공이 형성되고,Fill holes are formed up and down inside, 좌우 양측에 소정의 경사각을 가지고 대향되는 측벽과, 상기 양 측벽의 전단부를 횡으로 연결하는 전방벽과, 상기 양 측벽의 후단부를 횡으로 연결하는 후방벽으로 이루어지며,It consists of a side wall facing each other with a predetermined inclination angle on the left and right sides, a front wall connecting the front ends of the two side walls transversely, and a rear wall connecting the rear ends of the both side walls laterally, 상기 양 측벽의 상면에 걸림턱이 형성됨을 특징으로 하는 게비온 옹벽블록.Gabion retaining wall block, characterized in that the locking step is formed on the upper surface of the both side walls. 제1항에 있어서,The method of claim 1, 상기 양 측벽, 전방벽, 후방벽에는 적어도 하나의 배수공이 형성됨을 특징으로 하는 게비온 옹벽블록.At least one drain hole is formed on both side walls, the front wall, and the rear wall. 제2항에 있어서,The method of claim 2, 상기 후방벽의 배수공에는 토사가 유입되지 않도록 치밀하게 얽혀진 그물망이 설치됨을 특징으로 하는 게비온 옹벽블록.Gebion retaining wall block, characterized in that the drainage hole of the rear wall is provided with a mesh entangled tightly so that the soil is not introduced. 제1항 또는 제2항에 있어서,The method according to claim 1 or 2, 상기 양 측벽에는 요홈이 형성되고 요홈에는 측벽에 매립된 철근이 돌출되어 형성된 고리가 위치됨을 특징으로 하는 게비온 옹벽블록.Grooved retaining wall block, characterized in that the groove is formed on both side walls and the groove is formed in the groove is formed by the protruded reinforcing bars embedded in the side wall. 상하로 내부가 빈 채움공이 형성되고,Fill holes are formed up and down inside, 좌우 양측에 소정의 경사각을 가지고 후단부가 연결되는 양 측후벽과, 상기 양 측후벽의 전단부를 횡으로 연결하는 전방벽으로 이루어지며,It consists of both rear and rear walls having a predetermined inclination angle on the left and right sides, and the front wall connecting the front ends of the both rear and rear walls laterally, 상기 양 측후벽의 상면에 걸림턱이 형성됨을 특징으로 하는 게비온 옹벽블록.Gabion retaining wall block, characterized in that the locking step is formed on the upper surface of the both side rear wall. 제5항에 있어서,The method of claim 5, 상기 양 측후벽, 전방벽에는 적어도 하나의 배수공이 형성됨을 특징으로 하는 게비온 옹벽블록.The gabion retaining wall block, characterized in that at least one drain hole is formed in the both side rear wall, the front wall. 제6항에 있어서,The method of claim 6, 상기 양 측후벽의 배수공에는 토사가 유입되지 않도록 치밀하게 얽혀진 그물망이 설치됨을 특징으로 하는 게비온 옹벽블록.Gebion retaining wall block is characterized in that the drainage holes of the both rear wall is installed in a tightly entangled net so that the soil is not introduced. 제5항 내지 제7항 중 어느 한 항에 있어서,The method according to any one of claims 5 to 7, 상기 양 측후벽에는 요홈이 형성되고 요홈에는 측후벽에 매립된 철근이 돌출되어 형성된 고리가 위치됨을 특징으로 하는 게비온 옹벽블록.Both side rear walls are formed with grooves, and the grooves retaining wall blocks, characterized in that the ring is formed by protruding reinforcing bars embedded in the side rear wall. 상하로 관통되는 채움공이 형성된 제1게비온 옹벽블록(A)의 후방벽이 전후로 인접된 상태에서 시공구간을 따라 양측으로 인접되게 설치되는 제1단 게비온 옹벽 과;A first stage gebion retaining wall installed adjacent to both sides along a construction section in a state in which a rear wall of the first gebion retaining wall block A having a filling hole penetrated vertically is adjacent to the front and rear; 상기 제1게비온 옹벽블록(A)보다 전후의 길이가 짧은 제2단 2게비온 옹벽블록(B)이, 상기 전방에 위치된 제1게비온 옹벽블록(A) 상부에 걸리도록 후방벽이 맞닿게 전후로 인접된 상태에서, 시공구간을 따라 양측으로 인접되게 설치되는 제2단 게비온 옹벽과;The rear wall is brought into contact with the rear wall so that the second stage two-gebion retaining wall block B, which has a shorter length before and after than the first gebion retaining wall block A, is caught by an upper portion of the first gebion retaining wall block A positioned at the front. In the adjoining state, the second stage gebion retaining wall is installed adjacent to both sides along the construction section; 제3단 제2게비온 옹벽블록(B)이, 상기 제2단 전방에 위치된 제2게비온 옹벽블록(B)의 상부에 걸리도록 양측으로 인접되게 설치되는 제3단 게비온 옹벽; 및A third stage second gebion retaining wall (B), the third stage of the second gebion retaining wall block (B) is disposed adjacent to both sides so as to be caught in the upper portion of the second gebion retaining wall block (B); And 제4단 제2게비온 옹벽블록(B)이, 상기 제3단 제2게비온 옹벽블록(B)의 상부에 걸리도록 양측으로 인접되게 설치되는 제4단 게비온 옹벽을 포함하는 게비온 옹벽 시공구조.The second stage gebion retaining wall block (B) is a gebion retaining wall construction structure comprising a fourth stage gebion retaining wall is installed adjacent to both sides so as to be caught on the upper portion of the third stage second gebion retaining wall block (B). 제9항에 있어서,The method of claim 9, 상기 제3단 게비온 옹벽에서, 상하로 관통되는 채움공이 형성된 제3단 제3게비온 옹벽블록(C)이, 상기 제2단 전방에 위치된 제2게비온 옹벽블록(B)의 상부에 걸리도록 제3단 제2게비온 옹벽블록(B)의 양 외측 끝단부에 인접되게 더 설치되고,In the third stage gebion retaining wall, the third stage third gebion retaining wall block (C) having a filling hole penetrating up and down is caught by an upper portion of the second gebion retaining wall block (B) located in front of the second stage. It is further installed adjacent to both outer ends of the third stage second gebion retaining wall block (B), 상기 제4단 게비온 옹벽에서, 제4단 제3게비온 옹벽블록(C)이 상기 제3단 제2게비온 옹벽블록(B)의 상부에 걸리도록 제4단 제2게비온 옹벽블록(B)의 양 외측 끝단부에 인접되게 더 설치됨을 특징으로 하는 게비온 옹벽 시공구조.In the fourth stage gebion retaining wall, the amount of the fourth stage second gebion retaining wall block (B) so that the fourth stage third gebion retaining wall block (C) is caught on the upper portion of the third stage second gebion retaining wall block (B) Gebion retaining wall construction structure, characterized in that further installed adjacent to the outer end. 제9항 또는 제10항에 있어서,The method of claim 9 or 10, 상기 전후나 양측으로 인접된 게비온 옹벽블록(A,B,C)은 연결볼트에 의해 연결됨을 특징으로 하는 게비온 옹벽 시공구조.Gebion retaining wall construction structure characterized in that the front and rear or adjacent to both sides of the Gebion retaining wall block (A, B, C) is connected by a connecting bolt. 제9항 또는 제10항에 있어서,The method of claim 9 or 10, 상기 제4단 게비온 옹벽의 시공구조를 갖는 게비온 옹벽이 제4단 게비온 옹벽의 상부에 다층으로 적층됨을 특징으로 하는 게비온 옹벽 시공구조.A gebion retaining wall construction structure, characterized in that the gebion retaining wall having a construction structure of the fourth stage gebion retaining wall is laminated in a multi-layer on top of the fourth stage gebion retaining wall. 상하로 관통되는 채움공이 형성된 제4게비온 옹벽블록(D)의 후면이 전후로 인접된 상태에서 시공구간을 따라 양측으로 인접되게 설치되는 제1단 게비온 옹벽과;A first stage gebion retaining wall installed adjacent to both sides along a construction section in a state in which a rear surface of the fourth gebion retaining wall block D having a filling hole penetrated up and down is adjacent to the front and rear; 제2단 제4게비온 옹벽블록(D)이, 상기 제1단 전방에 위치된 제4게비온 옹벽블록(D)의 상부에 걸리도록 양측으로 인접되게 설치되는 제2단 게비온 옹벽; 및A second stage gebion retaining wall disposed to be adjacent to both sides such that a second stage fourth gebion retaining wall block D is caught by an upper portion of the fourth gebion retaining wall block positioned in front of the first stage; And 제3단 제4게비온 옹벽블록(D)이, 상기 제2단 제4게비온 옹벽블록(D)의 상부에 걸리도록 양측으로 인접되게 설치되는 제3단 게비온 옹벽을 포함하는 게비온 옹벽 시공구조.The third stage fourth gebion retaining wall block (D) is a gebion retaining wall construction structure comprising a third stage gebion retaining wall is installed adjacent to both sides so as to be caught on the upper portion of the second stage fourth gebion retaining wall block (D). 제13항에 있어서,The method of claim 13, 상기 제2단 게비온 옹벽에서, 상하로 관통되는 채움공이 형성된 제2단 제5게비온 옹벽블록(E)이, 상기 제1단 전방에 위치된 제4게비온 옹벽블록(D)의 상부에 걸리도록 제2단 제4게비온 옹벽블록(D)의 양 외측 끝단부에 인접되게 더 설치되고,In the second stage gebion retaining wall, the second stage fifth gebion retaining wall block (E) having a filling hole penetrating up and down is caught by an upper portion of the fourth gebion retaining wall block (D) located in front of the first stage. It is further installed adjacent to both outer ends of the second stage fourth gebion retaining wall block (D), 상기 제3단 게비온 옹벽에서, 제3단 제5게비온 옹벽블록(E)이, 상기 제2단 제4게비온 옹벽블록(D)의 상부에 걸리도록 제3단 제4게비온 옹벽블록(D)의 양 외측 끝단부에 인접되게 설치됨을 특징으로 하는 게비온 옹벽 시공구조.In the third-stage gebion retaining wall, the third-stage fifth gebion retaining wall block (E) is caught by an upper portion of the second-stage fourth gebion retaining wall block (D). Gebion retaining wall construction structure, characterized in that installed adjacent to both outer ends. 제13항 또는 제14항에 있어서,The method according to claim 13 or 14, 상기 전후나 양측으로 인접된 게비온 옹벽블록(D,E)은 연결볼트에 의해 연결됨을 특징으로 하는 게비온 옹벽 시공구조.Gebion retaining wall construction structure characterized in that the front and rear or both sides adjacent to the Gebion retaining wall block (D, E) is connected by a connecting bolt. 제13항 또는 제14항에 있어서,The method according to claim 13 or 14, 상기 제3단 게비온 옹벽의 시공구조를 갖는 게비온 옹벽이 제3단 게비온 옹벽의 상부에 다층으로 적층됨을 특징으로 하는 게비온 옹벽 시공구조.The gebion retaining wall construction structure, characterized in that the gebion retaining wall having a construction structure of the third-stage gebion retaining wall is laminated in multiple layers on top of the third-stage gebion retaining wall. 상하로 관통되는 채움공이 형성된 제1게비온 옹벽블록(A)의 후방벽을 전후로 인접한 상태에서 시공구간을 따라 양측으로 인접되게 하여 인접된 제1게비온 옹벽블록(A)을 연결볼트 등으로 서로 연결하는 제1단 시공공정과;In the state in which the rear wall of the first gebion retaining wall block (A) having a filling hole penetrated up and down is adjacent to both sides along the construction section, connecting the adjacent first gebion retaining wall block (A) to each other by connecting bolts, etc. 1st stage construction process; 상기 게비온 옹벽블록(A)보다 전후의 길이가 짧은 2단 제2게비온 옹벽블록(B)을, 상기 전방에 위치된 게비온 옹벽블록(A) 상부에 걸리도록 후방벽이 맞닿게 전후로 인접한 상태에서, 시공구간을 따라 양측으로 인접되게 하여 인접된 제2단 제2게비온 옹벽블록(B)을 연결볼트 등으로 서로 연결하는 제2단 시공공정과;In a state in which the rear wall is abutted back and forth adjacent to the upper part of the second gebion retaining wall block (B), which is shorter in front and rear than the gebion retaining wall block (A), to be caught on the upper part of the gebion retaining wall block (A). A second step construction step of connecting adjacent second step second gebion retaining wall blocks (B) to each other along a construction section by connecting bolts and the like; 제3단 제2게비온 옹벽블록(B)을, 상기 제2단 전방에 위치된 제2게비온 옹벽 블록(B)의 상부에 걸리도록 양측으로 인접되게 하여 인접된 제3단 제2게비온 옹벽블록(B)을 연결볼트 등으로 서로 연결하는 제3단 시공공정; 및The third stage second gebion retaining wall block (B) is adjacent to both sides so as to be caught on the upper side of the second gebion retaining wall block (B) located in front of the second stage. A third step construction step of connecting B) to each other with a connecting bolt or the like; And 제4단 제2게비온 옹벽블록(B)을, 상기 제3단 제2게비온 옹벽블록(B)의 상부에 걸리도록 양측으로 인접되게 하여 인접된 제4단 제2게비온 옹벽블록(B)을 연결볼트 등으로 서로 연결하는 제4단 시공공정을 포함하는 게비온 옹벽 시공방법.The fourth stage second gebion retaining wall block (B) is adjacent to both sides so as to be caught on the upper portion of the third stage second gebion retaining wall block (B) to connect the second fourth gebion retaining wall block (B) adjacent to each other. A gebion retaining wall construction method comprising a fourth step construction process connected to each other by a bolt or the like. 제17항에 있어서,The method of claim 17, 상기 제3단 시공공정에, 상하로 관통되는 채움공이 형성된 제3단 제3게비온 옹벽블록(C)을, 상기 제2단 전방에 위치된 제2게비온 옹벽블록(B)의 상부에 걸리도록 제3단 제2게비온 옹벽블록(B)의 양 외측 끝단부에 인접되게 하여 인접된 제3단 제2,제3게비온 옹벽블록(B,C)을 연결볼트 등으로 서로 연결하는 공정이 더 포함되고,In the third stage construction process, the third stage third gebion retaining wall block (C) having a filling hole penetrating up and down is caught to the upper portion of the second gebion retaining wall block (B) located in front of the second stage. Further comprising a step of connecting adjacent third ends of the second and third gebion retaining wall blocks (B, C) to each other by connecting bolts by adjoining both outer ends of the third stage second gebion retaining wall block (B); , 상기 제4단 시공공정에, 제4단 제3게비온 옹벽블록(C)을, 상기 제3단 제2게비온 옹벽블록(B)의 상부에 걸리도록 제4단 제2게비온 옹벽블록(B)의 양 외측 끝단부에 인접되게 하여 인접된 제4단 제2,제3게비온 옹벽블록(B,C)을 연결볼트 등으로 서로 연결하는 공정이 더 포함됨을 특징으로 하는 게비온 옹벽 시공방법.In the fourth stage construction process, the fourth stage second gebion retaining wall block C is fastened to the upper portion of the third stage second gebion retaining wall block B. A method of constructing a gebion retaining wall further comprising a step of connecting adjacent second end second and third gebion retaining wall blocks (B, C) to each other by a connecting bolt or the like by adjoining both outer end portions. 제17항 또는 제18항에 있어서,The method of claim 17 or 18, 상기 제4단 시공공정을 반복하여 게비온 옹벽을 다층으로 적층하는 공정이 더 포함됨을 특징으로 하는 게비온 옹벽 시공방법.A method of constructing a gebion retaining wall, characterized in that it further comprises the step of repeating the fourth step construction process to laminate the gebion retaining wall in multiple layers. 상하로 관통되는 채움공이 형성된 제4게비온 옹벽블록(D)의 후방벽을 전후로 인접한 상태에서 시공구간을 따라 양측으로 인접되게 하여 인접된 제4게비온 옹벽블록(D)을 연결볼트 등으로 서로 연결하는 제1단 시공공정과;In the state in which the rear wall of the fourth gebion retaining wall block (D) having a filling hole penetrating up and down is adjacent to both sides along the construction section, connecting the adjacent fourth gebion retaining wall block (D) to each other by connecting bolts, etc. 1st stage construction process; 제2단 제4게비온 옹벽블록(D)을, 상기 제1단 전방에 위치된 제4게비온 옹벽블록(D)의 상부에 걸리도록 양측으로 인접되게 하여 인접된 제2단 제4게비온 옹벽블록(B)을 연결볼트 등으로 서로 연결하는 제2단 시공공정; 및The second stage fourth gebion retaining wall block (D) is adjacent to both sides so as to be caught on the upper side of the fourth gebion retaining wall block (D) located in front of the first end adjacent second stage fourth gebion retaining wall block ( A second stage construction step of connecting B) to each other with a connecting bolt or the like; And 제3단 제4게비온 옹벽블록(D)을, 상기 제2단 제4게비온 옹벽블록(D)의 상부에 걸리도록 양측으로 인접되게 하여 인접된 제3단 제4게비온 옹벽블록(D)을 연결볼트 등으로 서로 연결하는 제3단 시공공정을 포함하는 게비온 옹벽 시공방법.The third stage fourth gebion retaining wall block (D) is adjacent to both sides so as to be caught on the upper portion of the second stage fourth gebion retaining wall block (D) to connect the adjacent third stage fourth gebion retaining wall block (D). A gebion retaining wall construction method comprising a third stage construction process connected to each other by a bolt or the like. 제20항에 있어서,The method of claim 20, 상기 제2단 시공공정에, 상하로 관통되는 채움공이 형성된 제2단 제5게비온 옹벽블록(E)을, 상기 제1단 전방에 위치된 제4게비온 옹벽블록(D)의 상부에 걸리도록 제2단 제4게비온 옹벽블록(D)의 양 외측 끝단부에 인접되게 하여 인접된 제2단 제4,제5게비온 옹벽블록(D,E)을 연결볼트 등으로 서로 연결하는 공정이 더 포함되고,In the second stage construction process, the second stage fifth gebion retaining wall block (E) having a filling hole penetrating up and down is caught to the upper portion of the fourth gebion retaining wall block (D) located in front of the first stage. It further includes a step of connecting adjacent second stage fourth and fifth gebion retaining wall blocks (D, E) to each other by connecting bolts such that adjacent second ends of the second stage fourth gebion retaining wall block (D) , 상기 제3단 시공공정에, 제3단 제5게비온 옹벽블록(E)을, 상기 제2단 제4게비온 옹벽블록(D)의 상부에 걸리도록 제3단 제4게비온 옹벽블록(D)의 양 외측 끝단부에 인접되게 하여 인접된 제3단 제4,제5게비온 옹벽블록(D,E)을 연결볼트 등으로 서로 연결하는 공정이 더 포함됨을 특징으로 하는 게비온 옹벽 시공방법.In the third stage construction process, the third stage fourth gebion retaining wall block (E) is fastened to the upper portion of the second stage fourth gebion retaining wall block (D). A method of constructing a gebion retaining wall further comprising a step of connecting adjacent third ends of the fourth and fifth gebion retaining wall blocks (D, E) to each other by a connecting bolt or the like by adjoining both outer end portions. 제20항 또는 제21항에 있어서,The method of claim 20 or 21, 상기 제3단 시공공정을 반복하여 게비온 옹벽을 다층으로 적층하는 공정이 더 포함됨을 특징으로 하는 게비온 옹벽 시공방법.A method of constructing a gebion retaining wall, characterized in that it further comprises the step of repeating the third step construction process to laminate the gebion retaining wall in multiple layers.
KR1020050048310A 2005-06-07 2005-06-07 Gabion retaining wall block, construction structure of gabion retaining wall and method KR20060127322A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050048310A KR20060127322A (en) 2005-06-07 2005-06-07 Gabion retaining wall block, construction structure of gabion retaining wall and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050048310A KR20060127322A (en) 2005-06-07 2005-06-07 Gabion retaining wall block, construction structure of gabion retaining wall and method

Publications (1)

Publication Number Publication Date
KR20060127322A true KR20060127322A (en) 2006-12-12

Family

ID=37730432

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050048310A KR20060127322A (en) 2005-06-07 2005-06-07 Gabion retaining wall block, construction structure of gabion retaining wall and method

Country Status (1)

Country Link
KR (1) KR20060127322A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110656636A (en) * 2019-09-19 2020-01-07 泉州市泉港区科尚赢德工业科技有限公司 Hydraulic engineering drainage equipment is used in gardens with waste material stirs garrulous protection
KR20210014535A (en) * 2019-07-30 2021-02-09 청호산업 유한회사 Multipurpose block

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210014535A (en) * 2019-07-30 2021-02-09 청호산업 유한회사 Multipurpose block
CN110656636A (en) * 2019-09-19 2020-01-07 泉州市泉港区科尚赢德工业科技有限公司 Hydraulic engineering drainage equipment is used in gardens with waste material stirs garrulous protection
CN110656636B (en) * 2019-09-19 2021-10-08 刘培珠 Hydraulic engineering drainage equipment is used in gardens with waste material stirs garrulous protection

Similar Documents

Publication Publication Date Title
US20180274191A1 (en) Breakwater construction blocks having improved stability against over-turning and pulling-out when struck by natural forces
KR101126658B1 (en) Assembly type of structure for drainage and construction method using the same
CN109024481B (en) River course bank slope protection structure and river course bank slope protection method
KR20060127322A (en) Gabion retaining wall block, construction structure of gabion retaining wall and method
KR102490872B1 (en) Reinforced earth retaining wall and construction method using tensile force of steel rod piles
KR101000915B1 (en) Revetment for directly connecting front and reinforcement
KR20050097291A (en) Method for constructing retaining wall
CN110306588B (en) Panel module unit for reinforced earth retaining wall and reinforced earth retaining wall
JP3665896B2 (en) Reinforced embankment body and its construction method
JP2970748B2 (en) Embankment structure
KR100450733B1 (en) a gabion pannel and a method for constructing the pannel structure
KR101132697B1 (en) Reinfored earth retaining wall and construction method on the badness ground forcasted settlement
KR101074267B1 (en) A revetment
US11530518B1 (en) Shoreline erosion protection using anchored concrete boulders
KR102478778B1 (en) Integrated structure and its manufacturing method by block assemble type caisson construction method using round bar anchor
JPH09328761A (en) Retaining wall structure
KR100458721B1 (en) Vegetation bank protection structures well-matched in nature environment and constructing method thereof
KR102493308B1 (en) Block assembly type caisson construction method
KR100457834B1 (en) Soft ground stabilization method make use of squeezing out-formed light weight concrete panel
KR102483537B1 (en) Seawater penetrating block caisson and its installation method
KR100674265B1 (en) Mounting structure for vegetation belt
JP7266086B2 (en) honeycomb reinforced slope
KR200357964Y1 (en) Block for retaining wall
KR102153322B1 (en) Compound block and construction method thereof
KR200327422Y1 (en) A block for protecting the causeway