KR20060127322A - Gabion retaining wall block, construction structure of gabion retaining wall and method - Google Patents
Gabion retaining wall block, construction structure of gabion retaining wall and method Download PDFInfo
- Publication number
- KR20060127322A KR20060127322A KR1020050048310A KR20050048310A KR20060127322A KR 20060127322 A KR20060127322 A KR 20060127322A KR 1020050048310 A KR1020050048310 A KR 1020050048310A KR 20050048310 A KR20050048310 A KR 20050048310A KR 20060127322 A KR20060127322 A KR 20060127322A
- Authority
- KR
- South Korea
- Prior art keywords
- retaining wall
- stage
- gebion retaining
- gebion
- wall block
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B11/00—Drainage of soil, e.g. for agricultural purposes
- E02B11/005—Drainage conduits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0208—Gabions
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2200/00—Geometrical or physical properties
- E02D2200/13—Geometrical or physical properties having at least a mesh portion
Abstract
Description
도 1은 본 발명의 일실시예에 따른 게비온 옹벽블록의 사시도,1 is a perspective view of a gebion retaining wall block according to an embodiment of the present invention,
도 2a와 도 2b는 도 1에 나타낸 옹벽블록의 측단면도 및 배면도,2a and 2b is a side cross-sectional view and a rear view of the retaining wall block shown in FIG.
도 3은 본 발명의 다른 실시예에 따른 게비온 옹벽블록의 사시도,3 is a perspective view of a gebion retaining wall block according to another embodiment of the present invention;
도 4a와 도 4b는 도 3에 나타낸 옹벽블록의 측단면도 및 배면도,4a and 4b is a side cross-sectional view and a rear view of the retaining wall block shown in FIG.
도 5는 본 발명의 또 다른 실시예에 따른 게비온 옹벽블록의 사시도,5 is a perspective view of a gebion retaining wall block according to another embodiment of the present invention;
도 6은 도 5에 옹벽블록의 배면도,6 is a rear view of the retaining wall block in FIG. 5;
도 7은 본 발명의 일 실시예에 따른 옹벽블록의 시공예를 나타내는 측면도,7 is a side view showing a construction example of the retaining wall block according to an embodiment of the present invention;
도 8은 도 7에서 인접된 옹벽블록 간의 연결예를 나타내는 도면,8 is a view showing an example of connection between adjacent retaining wall blocks in FIG.
도 9는 본 발명의 다른 실시예에 따른 옹벽블록의 시공예를 나타내는 측면도이다.9 is a side view showing a construction example of the retaining wall block according to another embodiment of the present invention.
<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>
10,20,30: 게비온 옹벽블록 11,21: 측벽10,20,30: Gebion
12,22,32: 걸림턱 13,23,33: 전방벽12,22,32: hanging
14,24,34: 채움공 15,25,35: 배수공,14,24,34: fill
16,26,36: 볼트구멍 17,27: 후방벽16, 26, 36:
18,28,38: 그물망 19,29,39: 요홈18,28,38: Net 19,29,39: Home
31: 측후벽 40: 고리31: Lateral wall 40: Loop
50: 연결볼트 100,200: 게비온 옹벽50: connecting bolt 100,200: Gebion retaining wall
본 발명은 게비온 옹벽블록 및 그 시공구조와 방법에 관한 것으로서, 더욱 상세하게는 토압으로 인한 비탈면 붕괴를 막기 위한 게비온 옹벽의 축조에 이용되는 옹벽블록과, 상기 옹벽블록 사이를 연결볼트로 체결하여 시공이 용이하고 견고한 시공구조와 방법에 관한 것이다.The present invention relates to a gebion retaining wall block, and its construction structure and method, and more particularly, to retain the construction wall and the retaining wall block used in the construction of the gebion retaining wall for preventing the slope of the slope due to earth pressure, the construction of the retaining wall block This is an easy and robust construction structure and method.
하천이나 저수지의 제방, 수로 또는 도로변에 홍수나 태풍과 같은 천재지변에 의하여 산사태 및 도로유실 등의 발생을 방지하기 위하여 게비온(gabion)을 이용한 옹벽을 시공한다.Retaining walls using gabions are installed to prevent the occurrence of landslides and road loss due to natural disasters such as floods or typhoons on the banks, reservoirs, banks, or roadsides.
통상적으로 이런 게비온은 아연 도금선 또는 여기에 PVC 피복한 것을 이중으로 꼬아서 만든 육각 또는 사각 형상 등의 금속망을 의미한다.Typically, such a gebion refers to a metal mesh such as a hexagonal or square shape made by twisting a galvanized wire or a PVC coating thereto.
이 금속망 속에는 잡석, 조약돌이나 깬 돌 등의 석재나 골재가 채움재로 채워지고, 절개지나 비탈면 등에 수평 또는 수직으로 적층되어 게비온 옹벽을 이루게 된다.In this metal mesh, stones and aggregates such as rubble, pebbles, and crushed stones are filled with fillers, and they are stacked horizontally or vertically on incisions or slopes to form gebion retaining walls.
상기 게비온을 하천 제방이나 수로 또는 법면 등에 시공하기 위해서는 먼저 금속망을 현장에서 조립, 설치한 후에 인력으로 그 내부에 일정규격의 돌이나 골재 를 일정량만큼 채워나가면서 차례대로 시공해야 한다.In order to install the Gebion on a river bank, a waterway, or a surface, first, a metal mesh must be assembled and installed in the field, and then, in order to fill a predetermined amount of stones or aggregates therein by manpower, the construction must be performed in order.
이를 상세히 설명하면, 게비온 옹벽을 시공하기 전에 기초지반을 부동침하 등이 일어나지 않도록 다지고, 이때 지반이 연약할 경우에는 모래, 자갈 등으로 치환하거나 버팀 콘크리트 등을 타설하여 하중을 고르게 분포시킨 상태에서, 다수의 금속망을 시공 장소에 정확하게 위치시키고, 철선을 이용하여 금속망을 연결한다.To explain this in detail, before the construction of the gabion retaining wall, the foundation ground is grounded so as not to settle down, and when the ground is soft, it is replaced with sand, gravel, or cast concrete, and the load is evenly distributed. Place a large number of metal meshes at the construction site and connect the metal meshes with wires.
상기 금속망을 하측에서부터 설치 및 연결함과 더불어 채움재를 금속망 내에 채우게 되고, 채워진 금속망의 뚜껑을 닫고서 그 상부에 다시 금속망을 설치 및 연결하며, 상부에 연결된 금속망에 다시 채움재를 채우는 것을 반복하여 소정의 높이와 폭을 갖는 게비온 옹벽을 설치하게 된다.In addition to installing and connecting the metal mesh from below, the filling material is filled in the metal mesh, and the metal mesh is installed and connected again on the upper part by closing the lid of the filled metal mesh, and filling the filling material into the metal mesh connected to the upper part. By repeating this, the gebion retaining wall having a predetermined height and width is installed.
따라서 종래의 게비온 옹벽은 시공기간이 길어지고 돌 등의 채움재를 현지에서 옮겨야 하는 불편함이 있으며 시공할 때 게비온의 정확한 위치를 설정하여 고정 설치하여야 하기 때문에 작업효율이 떨어지는 문제점이 있었다.Therefore, the conventional gebion retaining wall has a long construction period and has the inconvenience of moving the filling material such as stones in the field, and there is a problem in that the work efficiency is lowered because it is necessary to set and fix the exact position of the gebion during construction.
상술한 문제점을 해결하기 위하여 안출된 본 발명은, 토압으로 인한 비탈면 붕괴를 막기 위한 게비온 옹벽의 축조에 이용되는 옹벽블록을 제조하고 옹벽블록을 적층하여 게비온 옹벽을 시공함으로써 시공기간이 단축되고 시공이 용이하며 작업효율이 우수한 게비온 옹벽블록 및 그 시공구조와 방법을 제공하는데 그 목적이 있다.The present invention has been made to solve the above problems, manufacturing a retaining wall block used for the construction of the gebion retaining wall to prevent slope collapse due to earth pressure, and by stacking the retaining wall block to construct a gebion retaining wall, the construction period is shortened and construction is reduced An object of the present invention is to provide an easy and excellent work efficiency of the Gabion retaining wall block and its construction structure and method.
상술한 목적을 달성하기 위한 본 발명의 실시예에 따른 게비온 옹벽블록은, 상하로 내부가 빈 채움공이 형성되고, 좌우 양측에 소정의 경사각을 가지고 대향되는 측벽과, 상기 양 측벽의 전단부를 횡으로 연결하는 전방벽과, 상기 양 측벽의 후단부를 횡으로 연결하는 후방벽으로 이루어지며, 상기 양 측벽의 상면에 걸림턱이 형성됨을 특징으로 한다.According to an embodiment of the present invention for achieving the above-mentioned object, a gebion retaining wall block has a hollow filling hole formed up and down, and has sidewalls facing each other with a predetermined inclination angle on both left and right sides, and the front end portions of both sidewalls laterally. It consists of a front wall for connecting, and a rear wall for connecting laterally the rear end portions of both side walls, characterized in that the locking step is formed on the upper surface of the both side walls.
또한, 본 발명의 실시예에 따른 게비온 옹벽블록은, 상하로 내부가 빈 채움공이 형성되고, 좌우 양측에 소정의 경사각을 가지고 후단부가 연결되는 양 측후벽과, 상기 양 측후벽의 전단부를 횡으로 연결하는 전방벽으로 이루어지며, 상기 양 측후벽의 상면에 걸림턱이 형성됨을 특징으로 한다.In addition, the gabion retaining wall block according to an embodiment of the present invention, both the rear wall is formed with a hollow filling hole up and down, the rear end portion is connected to the rear end with a predetermined inclination angle on the left and right sides, and the front end portions of both side rear wall in the horizontal direction It is made of a front wall connecting, characterized in that the locking step is formed on the upper surface of the both side rear wall.
본 발명의 실시예에 따른 게비온 옹벽 시공구조는, 상하로 관통되는 채움공이 형성된 제1게비온 옹벽블록(A)의 후방벽이 전후로 인접된 상태에서 시공구간을 따라 양측으로 인접되게 설치되는 제1단 게비온 옹벽과, 상기 제1게비온 옹벽블록(A)보다 전후의 길이가 짧은 2단 제2게비온 옹벽블록(B)이, 상기 전방에 위치된 제1게비온 옹벽블록(A) 상부에 걸리도록 후방벽이 맞닿게 전후로 인접된 상태에서, 시공구간을 따라 양측으로 인접되게 설치되는 제2단 게비온 옹벽과, 제3단 제2게비온 옹벽블록(B)이, 상기 제2단 전방에 위치된 제2게비온 옹벽블록(B)의 상부에 걸리도록 양측으로 인접되게 설치되는 제3단 게비온 옹벽 및 제4단 제2게비온 옹벽블록(B)이, 상기 제3단 제2게비온 옹벽블록(B)의 상부에 걸리도록 양측으로 인접되게 설치되는 제4단 게비온 옹벽을 포함한다.According to an exemplary embodiment of the present invention, a construction structure of a gebion retaining wall includes: a first end disposed to be adjacent to both sides along a construction section in a state in which a rear wall of the first gebion retaining wall block A having a filling hole penetrating up and down is adjacent to the front and rear; A rear wall such that the second gebion retaining wall block (B), which is shorter in front and rear than the first gebion retaining wall block (A), is caught by the upper part of the first gebion retaining wall block (A) located in the front. In the state in which the abutment is adjacent to the front and rear, the second stage gebion retaining wall and the third stage second gebion retaining wall block (B), which are installed adjacent to both sides along the construction section, are located in front of the second stage. The third-stage gebion retaining wall and the fourth-stage second gebion retaining wall block (B), which are installed adjacent to both sides to be caught by the upper portion of the retaining wall block (B), are disposed on the upper portion of the third-stage second gebion retaining wall block (B). The fourth-stage gebion retaining wall installed adjacent to both sides to be hooked It includes.
또한, 본 발명의 실시예에 따른 게비온 옹벽 시공구조는, 상하로 관통되는 채움공이 형성된 제4게비온 옹벽블록(D)의 후면이 전후로 인접된 상태에서 시공구 간을 따라 양측으로 인접되게 설치되는 제1단 게비온 옹벽과, 제2단 제4게비온 옹벽블록(D)이, 상기 제1단 전방에 위치된 제4게비온 옹벽블록(D)의 상부에 걸리도록 양측으로 인접되게 설치되는 제2단 게비온 옹벽 및 제3단 제4게비온 옹벽블록(D)이, 상기 제2단 제4게비온 옹벽블록(D)의 상부에 걸리도록 양측으로 인접되게 설치되는 제3단 게비온 옹벽을 포함한다.In addition, the gebion retaining wall construction structure according to an embodiment of the present invention, the rear surface of the fourth gebion retaining wall block (D) is formed to be adjacent to both sides along the construction section in the state adjacent to the front and rear adjacent to the filling hole penetrating up and down The second stage gebion is installed to be adjacent to both sides so that the first stage gebion retaining wall and the second stage fourth gebion retaining wall block D are caught by an upper portion of the fourth gebion retaining wall block D located in front of the first stage. The retaining wall and the third-stage fourth gebion retaining wall block (D) include a third-stage gebion retaining wall installed adjacent to both sides so as to be caught by an upper portion of the second-stage fourth gebion retaining wall block (D).
본 발명의 실시예에 따른 게비온 옹벽 시공방법은, 상하로 관통되는 채움공이 형성된 제1게비온 옹벽블록(A)의 후방벽을 전후로 인접한 상태에서 시공구간을 따라 양측으로 인접되게 하여 인접된 제1게비온 옹벽블록(A)을 연결볼트 등으로 서로 연결하는 제1단 시공공정과; 상기 게비온 옹벽블록(A)보다 전후의 길이가 짧은 2단 제2게비온 옹벽블록(B)을, 상기 전방에 위치된 게비온 옹벽블록(A) 상부에 걸리도록 후방벽이 맞닿게 전후로 인접한 상태에서, 시공구간을 따라 양측으로 인접되게 하여 인접된 제2단 제2게비온 옹벽블록(B)을 연결볼트 등으로 서로 연결하는 제2단 시공공정과; 제3단 제2게비온 옹벽블록(B)을, 상기 제2단 전방에 위치된 제2게비온 옹벽블록(B)의 상부에 걸리도록 양측으로 인접되게 하여 인접된 제3단 제2게비온 옹벽블록(B)을 연결볼트 등으로 서로 연결하는 제3단 시공공정 및 제4단 제2게비온 옹벽블록(B)을, 상기 제3단 제2게비온 옹벽블록(B)의 상부에 걸리도록 양측으로 인접되게 하여 인접된 제4단 제2게비온 옹벽블록(B)을 연결볼트 등으로 서로 연결하는 제4단 시공공정을 포함한다.In the method of constructing a gebion retaining wall according to an embodiment of the present invention, the first wall of the first gebion retaining wall block A having a filling hole penetrating up and down is adjacent to both sides along the construction section in a state in which the rear wall is adjacent to the front and rear adjacent to each other. A first stage construction step of connecting the retaining wall block A to each other with a connection bolt; In a state in which the rear wall is abutted back and forth adjacent to the upper part of the second gebion retaining wall block (B), which is shorter in front and rear than the gebion retaining wall block (A), to be caught on the upper part of the gebion retaining wall block (A). A second step construction step of connecting adjacent second step second gebion retaining wall blocks (B) to each other along a construction section by connecting bolts and the like; The third stage second gebion retaining wall block (B) is adjacent to both sides so as to be caught on the upper side of the second gebion retaining wall block (B) located in front of the second stage, and the third third second gebion retaining wall block ( The third stage construction process and the fourth stage second gebion retaining wall block (B) connecting B) to each other with a connecting bolt or the like are adjacent to both sides so as to be caught on the upper portion of the third stage second gebion retaining wall block (B). And a fourth stage construction process of connecting the second fourth gebion retaining wall block B adjacent to each other with a connection bolt or the like.
또한, 본 발명의 실시예에 따른 게비온 옹벽 시공방법은, 상하로 관통되는 채움공이 형성된 제4게비온 옹벽블록(D)의 후방벽을 전후로 인접한 상태에서 시공 구간을 따라 양측으로 인접되게 하여 인접된 제4게비온 옹벽블록(D)을 연결볼트 등으로 서로 연결하는 제1단 시공공정과, 제2단 제4게비온 옹벽블록(D)을, 상기 제1단 전방에 위치된 제4게비온 옹벽블록(D)의 상부에 걸리도록 양측으로 인접되게 하여 인접된 제2단 제4게비온 옹벽블록(B)을 연결볼트 등으로 서로 연결하는 제2단 시공공정 및 제3단 제4게비온 옹벽블록(D)을, 상기 제2단 제4게비온 옹벽블록(D)의 상부에 걸리도록 양측으로 인접되게 하여 인접된 제3단 제4게비온 옹벽블록(D)을 연결볼트 등으로 서로 연결하는 제3단 시공공정을 포함한다.In addition, the method of constructing the gebion retaining wall according to the embodiment of the present invention, adjacent to the rear wall of the fourth gebion retaining wall block (D) having a filling hole penetrating up and down adjacent to both sides along the construction section in the state adjacent to the front and rear The first stage construction process for connecting the four gebion retaining wall blocks (D) with a connecting bolt, etc., and the fourth gebion retaining wall blocks (D) in the second stage, are located in front of the first stage. The second stage construction process and the third stage fourth gebion retaining wall block (D), which are adjacent to both sides so as to be caught on the upper side thereof, are connected to each other with the second stage fourth gebion retaining wall block (B) by a connecting bolt or the like. The third stage construction process of connecting the adjacent third stage fourth gebion retaining wall block (D) to each other by connecting bolts and the like so as to be adjacent to both sides so as to be caught on the upper portion of the second stage fourth gebion retaining wall block (D) Include.
이하 본 발명의 실시예에 대하여 첨부된 도면을 참고로 그 구성 및 작용을 설명하기로 한다.Hereinafter, the configuration and operation of the present invention will be described with reference to the accompanying drawings.
도 1은 본 발명의 일실시예에 따른 게비온 옹벽블록의 사시도이고, 도 2a와 도 2b는 도 1에 나타낸 옹벽블록의 측단면도 및 배면도이다.1 is a perspective view of a gebion retaining wall block according to an embodiment of the present invention, Figures 2a and 2b is a side cross-sectional view and a rear view of the retaining wall block shown in FIG.
도시된 바와 같이, 본 발명의 일실시예에 따른 게비온 옹벽블록(10)은 상하로 내부가 빈 채움공(14)이 형성되고, 좌우 양측에 소정의 경사각을 가지고 대향되는 측벽(11)과, 상기 양 측벽(11)의 전단부를 횡으로 연결하고 앞면에 자연석에 가까운 모습으로 시각적인 효과가 있는 무늬가 형성된 전방벽(13)과, 상기 양 측벽(11)의 후단부를 횡으로 연결하는 후방벽(17)으로 이루어진다.As shown, the gebion retaining
이때 게비온 옹벽블록(10)은 상기 측벽(11)의 길이가 전방벽(13)의 좌우 길이 및 게비온 옹벽블록(10)의 높이와 거의 같은 대략 정육면체의 형상을 이룬다.At this time, the gebion
상기 양 측벽(11)은 후방으로 갈수록 좁아지는 경사각을 가지는바, 이는 게비온 옹벽을 둥근 형상으로 시공하는 경우를 대비하기 위해서이다.Both
그리고 양 측벽(11), 전방벽(13), 후방벽(17)에는 배수공(15)이 형성되고 후방벽(17)의 배수공(15)에는 토사가 유입되지 않도록 치밀하게 얽혀진 그물망(18)이 설치된다.A
상기 양 측벽(11) 상부에는 걸림턱(12)이 형성되어 상부에 다른 게비온 옹벽블록이 적층된 경우에 앞으로 밀려나지 않게 되고 토압에 강하다.The
상기 양 측벽(11) 하부에는 요홈(19)이 형성되고 요홈(19)에는 측벽(11)에 매립된 철근이 돌출되어 형성된 고리(40)가 위치되어, 상기 고리(40)에 굵은 철사나 바 등을 연결하여 크레인 등을 이용하여 쉽게 운반할 수 있다.
또한, 양 측벽(11)과 후방벽(17)에는 인접된 다른 게비온 옹벽블록과 연결볼트로 연결할 수 있도록 볼트구멍(16)이 형성된다.In addition, both
도 1에 나타낸 게비온 옹벽블록(10)의 규격은 1000 X 1000 X 1000(mm)이나 본 발명이 이 규격에 한정되지는 않는다.The standard of the gebion
상기 게비온 옹벽블록(10)은 적층되는 층수가 비교적 적은 경우의 바닥과, 층수에 관계없이 게비온 옹벽의 양측단부를 제외한 바닥 상부에 적층되게 사용된다.The gebion
도 3은 본 발명의 다른 실시예에 따른 게비온 옹벽블록의 사시도이고, 도 4a와 도 4b는 도 3에 나타낸 옹벽블록의 측단면도 및 배면도이다.3 is a perspective view of a gebion retaining wall block according to another embodiment of the present invention, Figures 4a and 4b is a side cross-sectional view and a rear view of the retaining wall block shown in FIG.
도시된 바와 같이, 본 발명의 일실시예에 따른 게비온 옹벽블록(20)은 상하로 내부가 빈 채움공(24)이 형성되고, 좌우 양측에 소정의 경사각을 가지고 대향되는 측벽(21)과, 상기 양 측벽(21)의 전단부를 횡으로 연결하고 앞면에 자연석에 가 까운 모습으로 시각적인 효과가 있는 무늬가 형성된 전방벽(23)과, 상기 양 측벽(21)의 후단부를 횡으로 연결하는 후방벽(27)으로 이루어진다.As shown, the gebion retaining
이때 게비온 옹벽블록(20)도 1과 다르게 상기 측벽(21)의 길이가 전방벽(23)의 좌우 길이 및 게비온 옹벽블록(20)의 높이보다 큰 대략 직육면체 형상을 이룬다.At this time, unlike the Gebion retaining
상기 양 측벽(21)은 후방으로 갈수록 좁아지는 경사각을 가지는바, 이는 게비온 옹벽을 둥근 형상으로 시공하는 경우를 대비하기 위해서이다.Both
그리고 양 측벽(21), 전방벽(23), 후방벽(27)에는 배수공(25)이 형성되고 후방벽(27)의 배수공(25)에는 토사가 유입되지 않도록 치밀하게 얽혀진 그물망이 설치된다.In addition, drain holes 25 are formed in both
상기 양 측벽(21) 상부에는 걸림턱(22)이 형성되어 상부에 다른 게비온 옹벽블록이 적층된 경우에 앞으로 밀려나지 않게 되고 토압에 강하다.Hanging
상기 양 측벽(21) 하부에는 요홈(29)이 형성되고 요홈(29)에는 측벽(21)에 매립된 철근이 돌출되어 형성된 고리(40)가 위치되어, 상기 고리(40)에 굵은 철사나 바 등을 연결하여 크레인 등을 이용하여 쉽게 운반할 수 있다.
또한, 양 측벽(21)과 후방벽(27)에는 인접된 다른 게비온 옹벽블록과 연결볼트(50)로 연결할 수 있도록 볼트구멍(26)이 형성된다.In addition, both
도 3에 나타낸 게비온 옹벽블록(20)의 규격은 1500 X 1000 X 1000(mm)이나 본 발명이 이 규격에 한정되지는 않는다.The standard of the gebion retaining
상기 게비온 옹벽블록(20)은 적층되는 층수가 비교적 많은 경우에 게비온 옹 벽의 기초가 되는 바닥으로 사용된다.The gebion retaining
도 5는 본 발명의 또 다른 실시예에 따른 게비온 옹벽블록의 사시도이고, 도 6은 도 5에 나타낸 옹벽블록의 배면도이다.5 is a perspective view of a gebion retaining wall block according to another embodiment of the present invention, and FIG. 6 is a rear view of the retaining wall block shown in FIG. 5.
도시된 바와 같이, 본 발명의 일실시예에 따른 게비온 옹벽블록(30)은 상하로 내부가 빈 채움공(34)이 형성되고, 좌우 양측에 소정의 경사각을 가지고 후단부가 연결되는 양 측후벽(31)과, 상기 양 측후벽(31)의 전단부를 횡으로 연결하고 앞면에 자연석에 가까운 모습으로 시각적인 효과가 있는 무늬가 형성된 전방벽(33)으로 이루어진다.As shown, the gebion retaining
그리고 양 측후벽(31), 전방벽(33)에는 배수공(35)이 형성되고 측후벽(31)의 배수공(35)에는 토사가 유입되지 않도록 치밀하게 얽혀진 그물망(38)이 설치된다.In addition, drain holes 35 are formed in both side
상기 측후벽(31) 상부에는 걸림턱(32)이 형성되어 상부에 다른 게비온 옹벽블록이 적층된 경우에 앞으로 밀려나지 않게 되고 토압에 강하다.A hooking
상기 양 측후벽(31) 하부에는 요홈(39)이 형성되고 요홈(39)에는 측후벽(31)에 매립된 철근이 돌출되어 형성된 고리(40)가 위치되어, 상기 고리(40)에 굵은 철사나 바 등을 연결하여 크레인 등을 이용하여 쉽게 운반할 수 있다.
또한, 양 측후벽(31)에는 인접된 다른 게비온 옹벽블록(10)과 연결볼트(50)로 연결할 수 있도록 볼트구멍(36)이 형성된다.In addition, both side
상기 게비온 옹벽블록(30)은 게비온 옹벽 바깥쪽에 시공하는 삼각형 블록으로 사면 끝의 흙의 쓸어내림을 방지한다.The gebion retaining
도 7은 본 발명의 일실시예에 따른 옹벽블록의 시공예를 나타내는 측면도이 고, 도 8은 도 7에서 인접된 옹벽블록 간의 연결예를 나타내는 도면이다.7 is a side view showing a construction example of the retaining wall block according to an embodiment of the present invention, Figure 8 is a view showing an example of connection between adjacent retaining wall blocks in FIG.
도 7에 도시한 본 발명의 일실시예에 따른 옹벽블록은 적층되는 층수가 많은 경우에 게비온 옹벽(100)의 예로서, 도 3에 나타낸 게비온 옹벽블록(20)의 후방벽(27)을 전후로 맞닿게 하여 비탈면을 따라 양 측방으로 설치한다.The retaining wall block according to the embodiment of the present invention shown in FIG. 7 is an example of the
상기 후방벽(27)에 형성된 볼트구멍(26)으로 연결볼트(50)를 관통시킨 후에 너트 등을 체결시켜 전후로 인접된 게비온 옹벽블록(20)을 서로 연결하고, 측벽(21)에 형성된 볼트구멍(26)으로 연결볼트(50)를 관통시킨 후에 너트 등을 체결시켜 측방으로 인접된 게비온 옹벽블록(20)을 서로 연결한다.After passing through the connecting
이와 같이 하여 제1단의 게비온 옹벽이 시공되면, 그 상부에 도 1에 나타낸 게비온 옹벽블록(10)의 후방벽(17)을 전후로 맞닿게 하여, 게비온 옹벽블록(20)의 상부를 따라 측방으로 설치한다.In this way, when the first step of the gebion retaining wall is constructed, the
이때 게비온 옹벽블록(10)은 1단 전방 게비온 옹벽블록(20)의 걸림턱(22)에 걸리도록 위치시켜 후퇴축조가 되도록 하고, 상하의 측벽(21,11)을 일치하도록 하여 채움공(24,14)을 연통시켜 토사 등으로 채움공(24,14)을 채울 수 있도록 한다.At this time, the Gebion
상기 후방벽(17)에 형성된 볼트구멍(16)으로 연결볼트(50)를 관통시킨 후에 너트 등을 체결시켜 전후로 인접된 게비온 옹벽블록(10)을 서로 연결하고, 측벽(11)에 형성된 볼트구멍(16)으로 연결볼트(50)를 관통시킨 후에 너트 등을 체결시켜 측방으로 인접된 게비온 옹벽블록(10)을 서로 연결한다.After passing through the connecting
이와 같이 하여 제2단의 게비온 옹벽이 시공되면, 그 상부에 도 1에 나타낸 게비온 옹벽블록(10)을 2단 전방 게비온 옹벽블록(10)의 걸림턱(12)에 걸리도록 위 치시켜 후퇴축조가 되도록 하고 상하의 측벽(11)을 일치하도록 하여 채움공(12)을 연통시켜 토사 등으로 채움공(14)을 채울 수 있도록 한다.In this way, when the second stage gebion retaining wall is constructed, the reinforcement structure is placed on the upper part thereof so as to be caught by the engaging
이때 3단 게비온 옹벽의 양 측단부는 도 5에 나타낸 게비온 옹벽블록(30)을 2단 전방 게비온 옹벽블록(10)의 걸림턱(12)에 걸리도록 위치시켜 후퇴축조가 되도록 한다.At this time, both side ends of the three-stage gebion retaining wall are positioned so as to be caught by the locking
상기 측벽(11)과 측후벽(31)에 형성된 볼트구멍(16,36)으로 연결볼트(50)를 관통시킨 후에 너트 등을 체결시켜 측방으로 인접된 게비온 옹벽블록((10,10),(10,30))을 서로 연결한다.After passing through the connecting
이와 같이 하여 제3단의 게비온 옹벽이 시공되면, 그 상부에 다시 도 1에 나타낸 게비온 옹벽블록(10)을 3단 게비온 옹벽블록(10)의 걸림턱(12)에 걸리도록 위치시켜 후퇴축조가 되도록 하고 상하의 측벽(11)을 일치하도록 하여 채움공(14)을 연통시켜 토사 등으로 채움공(14)을 채울 수 있도록 한다.In this way, when the third stage gebion retaining wall is constructed, the reinforcement structure is placed on the upper part thereof so as to be caught by the engaging
이때 4단 게비온 옹벽의 측단부는 도 5에 나타낸 게비온 옹벽블록(30)을 3단 게비온 옹벽블록(30)의 걸림턱(32)에 걸리도록 위치시켜 후퇴축조가 되도록 한다.At this time, the side end portion of the four-stage gebion retaining wall is positioned so as to be caught by the locking
상기 측벽(11)과 측후벽(31)에 형성된 볼트구멍(16,36)으로 연결볼트(50)를 관통시킨 후에 너트 등을 체결시켜 측방으로 인접된 게비온 옹벽블록((10,10),(10,30))을 서로 연결하는 공정을 반복하여 게비온 옹벽(100)이 시공된다.After passing through the connecting
도 9는 본 발명의 다른 실시예에 따른 옹벽블록의 시공예를 나타내는 측면도이다.9 is a side view showing a construction example of the retaining wall block according to another embodiment of the present invention.
도 9에 도시한 본 발명의 다른 실시예에 따른 옹벽블록은 적층되는 층수가 작은 경우에 게비온 옹벽(200)의 예로서, 도 1에 나타낸 게비온 옹벽블록(10)의 후방벽(17)을 전후로 맞닿게 하여 비탈면을 따라 측방으로 위치시킨다.The retaining wall block according to another embodiment of the present invention shown in FIG. 9 is an example of the
상기 후방벽(17)에 형성된 볼트구멍(16)으로 연결볼트(50)를 관통시킨 후에 너트 등을 체결시켜 전후로 인접된 게비온 옹벽블록(10)을 서로 연결하고, 측벽(11)에 형성된 볼트구멍(16)으로 연결볼트(50)를 관통시킨 후에 너트 등을 체결시켜 측방으로 인접된 게비온 옹벽블록(10)을 서로 연결한다.After passing through the connecting
이와 같이 하여 제1단의 게비온 옹벽이 시공되면, 그 상부에 도 1에 나타낸 게비온 옹벽블록(10)을 1단 전방 게비온 옹벽블록(10)의 걸림턱(12)에 걸리도록 위치시켜 후퇴축조가 되도록 하고, 상하의 측벽(11)을 일치하도록 하여 채움공(14)을 연통시켜 토사 등으로 채움공(14)을 채울 수 있도록 한다.In this way, when the first step of the gebion retaining wall is constructed, the reinforcement structure is placed on the upper part thereof so as to be caught by the catching
이때 게비온 옹벽의 측단부는 도 5에 나타낸 게비온 옹벽블록(30)을 1단 전방 게비온 옹벽블록(10)의 걸림턱(12)에 걸리도록 위치시켜 후퇴축조가 되도록 한다.At this time, the side end portion of the gebion retaining wall is positioned so as to be caught by the locking
상기 측벽(11)과 측후벽(31)에 형성된 볼트구멍(16,36)으로 연결볼트(50)를 관통시킨 후에 너트 등을 체결시켜 측방으로 인접된 게비온 옹벽블록((10,10),(10,30))을 서로 연결한다.After passing through the connecting
이와 같이 하여 제2단의 게비온 옹벽이 시공되면 그 상부에 다시 도 1에 나타낸 게비온 옹벽블록(10)을 2단 게비온 옹벽블록(10)의 걸림턱(12)에 걸리도록 위치시켜 후퇴축조가 되도록 하고, 상하의 측벽(11)을 일치하도록 하여 채움공(14)을 연통시켜 토사 등으로 채움공(14)을 채울 수 있도록 한다.In this manner, when the second stage gebion retaining wall is constructed, the Gebion
이때 게비온 옹벽의 측단부는 도 5에 나타낸 게비온 옹벽블록(30)을 2단 게비온 옹벽블록(30)의 걸림턱(32)에 걸리도록 위치시켜 후퇴축조가 되도록 한다.At this time, the side end portion of the gebion retaining wall is positioned so as to be caught by the locking
상기 측벽(11)과 측후벽(31)에 형성된 볼트구멍(16,36)으로 연결볼트(50)를 관통시킨 후에 너트 등을 체결시켜 측방으로 인접된 게비온 옹벽블록((10,10,(10,30))을 서로 연결하는 공정을 반복하여 게비온 옹벽(200)이 시공된다.After passing through the connecting
이상 도면과 상세한 설명에서 최적 실시예들이 개시되고, 이상에서 사용된 특정한 용어는 단지 본 발명을 설명하기 위한 목적에서 사용된 것일 뿐 의미 한정이나 특허청구범위에 기재된 본 발명의 범위를 제한하기 위하여 사용된 것이 아니다.Embodiments of the present invention are disclosed in the drawings and the detailed description, and the specific terms used above are used only for the purpose of describing the present invention, and are used to limit the scope of the present invention as defined in the meaning or claims. It is not.
그러므로 본 기술분야의 통상의 지식을 가진 자라면 이로부터 다양한 변형 및 균등한 타 실시예가 가능하고, 본 발명의 진정한 기술적 보호 범위는 특허청구범위의 기술적 사상에 의해 정해져야 할 것이다.Therefore, those skilled in the art can be various modifications and other equivalent embodiments from this, and the true technical protection scope of the present invention should be determined by the technical spirit of the claims.
이상에서 살펴본 바와 같이 본 발명에 의하면, 토압으로 인한 비탈면 붕괴를 막기 위한 게비온 옹벽의 축조에 이용되는 옹벽블록을 제조하고 옹벽블록을 적층하여 게비온 옹벽을 시공함으로써 시공기간이 단축되고 시공이 매우 용이하다.As described above, according to the present invention, the construction period is shortened and the construction is very easy by manufacturing the retaining wall block used for the construction of the gebion retaining wall to prevent the slope of the slope due to earth pressure and stacking the retaining wall block. .
Claims (22)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050048310A KR20060127322A (en) | 2005-06-07 | 2005-06-07 | Gabion retaining wall block, construction structure of gabion retaining wall and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050048310A KR20060127322A (en) | 2005-06-07 | 2005-06-07 | Gabion retaining wall block, construction structure of gabion retaining wall and method |
Publications (1)
Publication Number | Publication Date |
---|---|
KR20060127322A true KR20060127322A (en) | 2006-12-12 |
Family
ID=37730432
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020050048310A KR20060127322A (en) | 2005-06-07 | 2005-06-07 | Gabion retaining wall block, construction structure of gabion retaining wall and method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR20060127322A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110656636A (en) * | 2019-09-19 | 2020-01-07 | 泉州市泉港区科尚赢德工业科技有限公司 | Hydraulic engineering drainage equipment is used in gardens with waste material stirs garrulous protection |
KR20210014535A (en) * | 2019-07-30 | 2021-02-09 | 청호산업 유한회사 | Multipurpose block |
-
2005
- 2005-06-07 KR KR1020050048310A patent/KR20060127322A/en not_active Application Discontinuation
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20210014535A (en) * | 2019-07-30 | 2021-02-09 | 청호산업 유한회사 | Multipurpose block |
CN110656636A (en) * | 2019-09-19 | 2020-01-07 | 泉州市泉港区科尚赢德工业科技有限公司 | Hydraulic engineering drainage equipment is used in gardens with waste material stirs garrulous protection |
CN110656636B (en) * | 2019-09-19 | 2021-10-08 | 刘培珠 | Hydraulic engineering drainage equipment is used in gardens with waste material stirs garrulous protection |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20180274191A1 (en) | Breakwater construction blocks having improved stability against over-turning and pulling-out when struck by natural forces | |
KR101126658B1 (en) | Assembly type of structure for drainage and construction method using the same | |
CN109024481B (en) | River course bank slope protection structure and river course bank slope protection method | |
KR20060127322A (en) | Gabion retaining wall block, construction structure of gabion retaining wall and method | |
KR102490872B1 (en) | Reinforced earth retaining wall and construction method using tensile force of steel rod piles | |
KR101000915B1 (en) | Revetment for directly connecting front and reinforcement | |
KR20050097291A (en) | Method for constructing retaining wall | |
CN110306588B (en) | Panel module unit for reinforced earth retaining wall and reinforced earth retaining wall | |
JP3665896B2 (en) | Reinforced embankment body and its construction method | |
JP2970748B2 (en) | Embankment structure | |
KR100450733B1 (en) | a gabion pannel and a method for constructing the pannel structure | |
KR101132697B1 (en) | Reinfored earth retaining wall and construction method on the badness ground forcasted settlement | |
KR101074267B1 (en) | A revetment | |
US11530518B1 (en) | Shoreline erosion protection using anchored concrete boulders | |
KR102478778B1 (en) | Integrated structure and its manufacturing method by block assemble type caisson construction method using round bar anchor | |
JPH09328761A (en) | Retaining wall structure | |
KR100458721B1 (en) | Vegetation bank protection structures well-matched in nature environment and constructing method thereof | |
KR102493308B1 (en) | Block assembly type caisson construction method | |
KR100457834B1 (en) | Soft ground stabilization method make use of squeezing out-formed light weight concrete panel | |
KR102483537B1 (en) | Seawater penetrating block caisson and its installation method | |
KR100674265B1 (en) | Mounting structure for vegetation belt | |
JP7266086B2 (en) | honeycomb reinforced slope | |
KR200357964Y1 (en) | Block for retaining wall | |
KR102153322B1 (en) | Compound block and construction method thereof | |
KR200327422Y1 (en) | A block for protecting the causeway |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E601 | Decision to refuse application |