KR20050093214A - Steel cord heating apparatus of tire calending process - Google Patents

Steel cord heating apparatus of tire calending process Download PDF

Info

Publication number
KR20050093214A
KR20050093214A KR1020040018476A KR20040018476A KR20050093214A KR 20050093214 A KR20050093214 A KR 20050093214A KR 1020040018476 A KR1020040018476 A KR 1020040018476A KR 20040018476 A KR20040018476 A KR 20040018476A KR 20050093214 A KR20050093214 A KR 20050093214A
Authority
KR
South Korea
Prior art keywords
steel cord
tire
semi
heating
rubber
Prior art date
Application number
KR1020040018476A
Other languages
Korean (ko)
Other versions
KR100558693B1 (en
Inventor
김무영
Original Assignee
한국타이어 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국타이어 주식회사 filed Critical 한국타이어 주식회사
Priority to KR1020040018476A priority Critical patent/KR100558693B1/en
Publication of KR20050093214A publication Critical patent/KR20050093214A/en
Application granted granted Critical
Publication of KR100558693B1 publication Critical patent/KR100558693B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F2005/0416Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps with an odour seal
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/042Arrangements of means against overflow of water, backing-up from the drain

Abstract

본 발명은 타이어 제조공정 중 배합고무를 압출하는 압출공정 다음인 비드 와이어 또는 코드 등에 고무를 입히는 토핑(Topping)이 이루어지는 압연공정에서 스틸과 고무 사이의 계면 변화를 최소화하여 그린타이어의 형상변화를 감소시킴으로써 치수 안정화에 따른 품도를 향상시키는 타이어 압연공정의 스틸코드 가열장치에 관한 것으로, 벨트(1) 내지는 카카스(2)의 반제품 시트를 제조하기 위해 가이드 롤러(3)를 거쳐 스프라이서(4)에 의해 스틸 코드(5) 간격을 일정하게 유지하고 고무를 입히는 토핑 작업을 거쳐 어큐뮬레이터(6)를 통과하여 완성된 반제품 시트를 최종 와인딩 유니트(7)에 감는 타이어 압연공정의 반제품 시트 제조장치에 있어서, 상기 스프라이서(4)의 다음 단계에서 자성체인 스틸코드(5)를 섭씨 80°~250°까지 순간적으로 가열시키면서 고무가 입혀지는 순간 예비 가황이 이루어지도록 고주파 전원에 의해 가열되는 가열 코일부(8)가 설치되되, 이 가열 코일부(8)는 스틸코드(5)와 수평으로 상, 하측 코일부(8a,8b)로 이루어지고, 상기 스틸코드(5)의 온도를 측정하는 온도센서(9)가 설치되어 있다.The present invention reduces the shape change of the green tire by minimizing the interface change between steel and rubber in a rolling process in which a topping is applied to a bead wire or a cord, which is followed by an extrusion process for extruding compound rubber in a tire manufacturing process. The steel cord heating device of the tire rolling process to improve the quality according to the dimensional stabilization, by passing through a guide roller (3) to produce a semi-finished sheet of the belt (1) or carcass (2) 4) Semi-finished sheet manufacturing apparatus of the tire rolling process of winding the finished semi-finished sheet through the accumulator 6 through the rubber topping operation and the rubberized topping operation by the 4) to the final winding unit 7. In the next step of the splicer (4), while heating the magnetic cord (5), which is a magnetic material, to 80 degrees to 250 degrees Celsius instantaneously The heating coil part 8 which is heated by a high frequency power source is installed so that the preliminary vulcanization is performed when nothing is applied, and this heating coil part 8 is horizontally upper and lower coil parts 8a and 8b horizontally with the steel cord 5. ), And a temperature sensor 9 for measuring the temperature of the steel cord 5 is provided.

Description

타이어 압연공정의 스틸코드 가열장치{Steel cord heating apparatus of tire calending process}Steel cord heating apparatus of tire calending process

본 발명은 타이어 제조공정 중 배합고무를 압출하는 압출공정 다음인 비드 와이어 또는 코드 등에 고무를 입히는 토핑(Topping)이 이루어지는 압연공정에서 스틸과 고무 사이의 계면 변화를 최소화하여 그린타이어의 형상변화를 감소시킴으로써 치수 안정화에 따른 품도를 향상시키는 타이어 압연공정의 스틸코드 가열장치에 관한 것이다.The present invention reduces the shape change of the green tire by minimizing the interface change between steel and rubber in a rolling process in which a topping is applied to a bead wire or a cord, which is followed by an extrusion process for extruding compound rubber in a tire manufacturing process. The present invention relates to a steel cord heating device for a tire rolling process that improves product quality according to dimensional stabilization.

공지된 바와 같이 타이어 제조 공정에서 압연공정은 생 코드지 양면에 일정한 두께의 고무를 입히는 작업을 말하여 이를 칼렌딩(Calending) 작업 또는 토핑 작업이라 칭한다.As is known, a rolling process in a tire manufacturing process refers to an operation of coating a rubber of a certain thickness on both sides of raw code paper, which is called a calending operation or a topping operation.

일반적으로 타이어 제조시 압연공정과 재단공정, 비드공정 및 밴드공정 등을 마치게 되면 성형공정에서 도 3과 같이 비드부(12)와 카카스(2) 및 벨트(1) 등이 내장된 그린타이어(100)가 완성된다.In general, when the tire is finished in the rolling process, cutting process, bead process, and band process, the green tire having the bead part 12, the carcass 2, the belt 1, and the like as shown in FIG. 100) is completed.

통상 상기 그린타이어는 원료고무, 카본 블랙, 황 및 기타 배합제를 혼합한 배합고무를 압출하고, 비드 와이어, 코드 등에 토핑하는 압연공정과 여러 반제품을 조합하는 성형공정을 거치게 되면 그린타이어(100)가 도 3과 같이 완성 되어진다.In general, the green tire is extruded the compounding rubber mixed with the raw material rubber, carbon black, sulfur, and other compounding agent, the rolling process topping the bead wire, cord, etc. and the molding process of combining a number of semi-finished green tire (100) Is completed as shown in FIG.

그러면 이 그린타이어(100)를 가류기의 몰드에 넣고 열과 압력을 가함으로써 일정시간 경과시키게 되면 독특한 트레드를 가진 타이어 완제품이 제조된다.Then, the green tire 100 is put into the mold of the vulcanizer and subjected to heat and pressure for a predetermined time to produce a finished tire having a unique tread.

이러한 타이어 공정 중 상기와 같은 그린타이어(100)를 제조함에 있어서 압연공정은 도 2의 (b)와 같이 그린타이어(100)를 구성하는 보강재인 스틸(5)에 고무(10)를 입히게 되는 칼렌딩 작업을 수행하게 되는바, 종래 이러한 칼렌딩 작업을 도 4에 도시된 바와 같이 그린타이어(100)를 구성하는 벨트(1)와 카카스(2)의 반제품을 제조하기 위해 가이드 롤러(103)를 거쳐 스프라이서(104)에 의하여 스틸코드(5) 간격을 일정하게 유지하고 고무를 입히는 토핑 과정을 거쳐 어큐뮬레이터(106)를 통과하여 최종 와인딩 유니트(107)에 의해 반제품을 생산하게 된다.In manufacturing the green tire 100 as described above in the tire process, the rolling process is a calen to apply the rubber 10 to the steel 5, which is a reinforcing material constituting the green tire 100 as shown in (b) of FIG. As a result of the ding work, the guide roller 103 is used to manufacture semi-finished products of the belt 1 and the carcass 2 constituting the green tire 100 as shown in FIG. 4. Through the splicer 104 to maintain a constant interval between the steel cord (5) and through the rubber topping process through the accumulator 106 to produce a semi-finished product by the final winding unit 107.

그러나 상기와 같은 종래 칼렌딩 장치는 대기 중에 노출되어 있어, 온도 및 습도를 유지하기가 용이하지 못하여, 스틸코드(5) 표면에는 습기가 많이 있게 된다. 이러한 스틸 코드(5)에 뜨거운 고무(10)를 입히게 되면, 습기가 증발하여 아주 작은 기포(에어)로 존재한다.However, such a conventional calendering device is exposed to the air, and thus it is not easy to maintain the temperature and humidity, so that there is a lot of moisture on the surface of the steel cord 5. When hot rubber 10 is applied to this steel cord 5, moisture evaporates and exists as a very small bubble (air).

상기와 같이 제조된 반제품이 사용되어 도 2의 (b)에서와 같이 성형공정에서 그린타이어를 팽창시키면 스틸 코드(5)와 고무(6) 계면에 에어(11)가 발생하여 최종 완제품의 불량으로 나타난다.When the semi-finished product manufactured as described above is used and the green tire is expanded in the molding process as shown in FIG. 2 (b), air 11 is generated at the interface between the steel cord 5 and the rubber 6, resulting in a failure of the final finished product. appear.

또한 팽창압력에 따라 코드 간격이 불균일하여 그린타이어의 치수에도 변화를 가져오게 된다.In addition, the cord spacing is uneven according to the inflation pressure, resulting in a change in the dimensions of the green tire.

이에 본 발명은 상기와 같은 종래 문제점을 해결하기 위해 발명된 것으로, 유도가열 방법을 이용하여 그린타어어를 구성하는 스틸 보강재인 벨트, 카카스의 반제품 생산시 스틸 표면에 있는 습기를 증발시키고, 스틸과 고무를 예비 가황함으로써 스틸과 고무 계면 사이에 발생하는 에어의 양을 제거시켜 불량을 최소화하며, 그린타이어의 형상 변화를 감소시킴으로써 치수 안정화를 도모하는 타이어 압연공정의 스틸코드 가열장치를 제공함에 그 목적이 있다.Therefore, the present invention was invented to solve the conventional problems as described above, the steel reinforcing material constituting the green tire using the induction heating method, the vapor evaporating moisture on the steel surface during the production of semi-finished products of the carcass, steel The preliminary vulcanization of rubber and rubber eliminates the amount of air generated between the steel and rubber interfaces, thereby minimizing defects and reducing the shape change of the green tire, thereby providing a steel cord heating device for the tire rolling process. There is a purpose.

상기와 같은 목적을 달성하기 위한 본 발명은 벨트와 카카스의 반제품 시트를 제조하기 위해 가이드 롤러를 거쳐 스프라이서에 의해 스틸코드 간격을 일정하게 유지하고 고무를 입히는 토핑 과정을 거쳐 어큐뮬레이터를 통과하여 완성된 반제품 시트를 최종 와인딩 유니트에 감는 타이어 압연공정의 반제품 시트 제조장치에 있어서, 상기 스프라이서의 다음 단계에서 자성체인 스틸코드를 섭씨 80°~250°까지 순간적으로 가열시키면서 고무가 입혀지는 순간 예비 가황이 이루어지도록 고주파 전원에 의해 가열되는 가열 코일부가 설치되되, 이 가열 코일부는 스틸코드와 수평으로 상하 코일부로 이루어지고, 상기 스틸코드의 온도를 측정하는 온도센서가 설치되어 이루어진 구조로 되어 있다.The present invention for achieving the above object is to pass through the accumulator through the topping process to maintain a constant steel cord spacing by the splicer and rubber coating through the guide roller to manufacture the semi-finished sheet of the belt and carcass In the semi-finished sheet manufacturing apparatus of the tire rolling process in which the finished semi-finished sheet is wound on the final winding unit, in the next step of the splicer, when the rubber is applied while instantaneously heating the magnetic cord, which is a magnetic material, from 80 ° to 250 ° C The heating coil is heated by a high frequency power source so that preliminary vulcanization is performed. The heating coil is made up of a coil cord horizontally with the steel cord, and a temperature sensor for measuring the temperature of the steel cord is installed. .

이하 본 발명을 첨부된 예시도면에 의거 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 타이어 압연공정의 전체 구성을 나타낸 도면이다.1 is a view showing the overall configuration of a tire rolling process according to the present invention.

본 발명은 벨트(1) 내지는 카카스(2)의 반제품 시트를 제조하기 위해 가이드 롤러(3)를 거쳐 스프라이서(4)에 의해 스틸 코드(5) 간격을 일정하게 유지하고 고무를 입히는 토핑 작업을 거쳐 어큐뮬레이터(6)를 통과하여 완성된 반제품 시트를 최종 와인딩 유니트(7)에 감는 타이어 압연공정의 반제품 시트 제조장치에 있어서, 상기 스프라이서(4)의 다음 단계에서 자성체인 스틸코드(5)를 섭씨 80°~250°까지 순간적으로 가열시키면서 고무가 입혀지는 순간 예비 가황이 이루어지도록 고주파 전원에 의해 가열되는 가열 코일부(8)가 설치되되, 이 가열 코일부(8)는 스틸코드(5)와 수평으로 상, 하측 코일부(8a,8b)로 이루어지고, 상기 스틸코드(5)의 온도를 측정하는 온도센서(9)가 설치되어 있다.The present invention maintains a constant steel cord (5) spacing and rubberized toppings by a splicer (4) via a guide roller (3) to produce a semi-finished sheet of belt (1) or carcass (2). In the semi-finished sheet manufacturing apparatus of the tire rolling process of winding the finished semi-finished sheet through the accumulator (6) through the work to the final winding unit (7), in the next step of the splicer (4) 5) heating coil portion 8 is heated by a high frequency power source so that preliminary vulcanization is made while instantaneously heating the rubber to 80 ° to 250 ° C, and the heating coil portion 8 is a steel cord. The temperature sensor 9 which consists of upper and lower coil parts 8a and 8b horizontally with (5) and measures the temperature of the said steel cord 5 is provided.

여기서 상기 가열 코일부(8)는 일예로 유도가열 원리를 이용하는데, 이 유도가열은 금속과 같은 도전물질에 고주파 자장을 가할 때 도체 내에서 생기는 맴돌이 전류(일명, 와전류:eddy current)에 의하여 물질을 가열하는 방법으로, 전자유도 작용에 의하여 교류전류가 흐르는 코일자장 속에 위치하는 금속 등의 도전체는 와전류 손실에 의하여 열이 발생하여 피 가열체가 가열되는 방식이다.In this case, the heating coil unit 8 uses an induction heating principle as an example, and the induction heating material is formed by a eddy current (aka, eddy current) generated in a conductor when a high frequency magnetic field is applied to a conductive material such as metal. In the heating method, a conductor such as a metal located in a coil magnetic field in which an alternating current flows due to an electromagnetic induction action generates heat due to eddy current loss, thereby heating the heated object.

그러나 본 발명은 상기와 같이 가열 코일부(8)의 가열방식이 꼭 유도가열 방식이 아니더라도 상관은 없으며, 단지 스틸코드(5)를 순간적으로 가열할 수 있는 방법이면 된다.However, the present invention does not matter even if the heating method of the heating coil unit 8 is not necessarily an induction heating method as described above, but only a method capable of heating the steel cord 5 instantaneously.

이어 본 발명의 가열 방식을 설명한다.Next, the heating method of the present invention will be described.

가열 코일부 지지대(도면 미도시)와 함께 구성된 가열 코일부(8)는 상측 코일부(8a)와 하측 코일부(8b)로 이루어지며, 고주파 전원(도면 미도시)에 의해 교류 전류가 흘러 가열 코일 전류방향의 직각방향으로 자속이 방생하여 자장내의 스틸코드(5)를 직접 가열하는 수단이다.The heating coil part 8 formed together with the heating coil part supporter (not shown) is composed of an upper coil part 8a and a lower coil part 8b, and an AC current flows by a high frequency power supply (not shown). Magnetic flux is generated in a direction perpendicular to the coil current direction, and means for directly heating the steel cord 5 in the magnetic field.

이 가열 코일부(8)는 스틸코드(5)와 수평방향으로 상, 하측 코일부(8a,8b)가 스틸 코드(5) 규격 교체시 탈, 부착이 용이하도록 되어 있다.The heating coil portion 8 is easy to be removed and attached when the upper and lower coil portions 8a and 8b are replaced with the steel cord 5 in the horizontal direction with the steel cord 5.

통상 스틸코드(5)는 빠른 속도록 생산됨으로 생산속도에 따라 온도조절이 용이하도록 적외선 온도센서(9)가 구성되어 목표온도를 순간 측정하여 고주파 세기를 조절하게 된다.In general, the steel cord 5 is produced at a rapid rate, so that the infrared temperature sensor 9 is configured to facilitate temperature control according to the production speed, thereby adjusting the high frequency intensity by measuring the target temperature instantaneously.

본 발명에 의하여 스틸코드(5)는 80°~250℃ 까지 순간적으로 가열되어 스틸 코드(5) 표면의 습기가 증발되고, 토핑 고무(10)와 예비 가황이 가능하게 된다.According to the present invention, the steel cord 5 is instantaneously heated to 80 ° to 250 ° C. so that moisture on the surface of the steel cord 5 is evaporated, and the prepping vulcanization with the topping rubber 10 is possible.

상기와 같이 유도가열을 이용하여 스틸 코드(5)를 가열하였을 때, 증발된 습기가 작은 기포로 고무(10) 속으로 확산되며, 스틸과 고무의 계면이 예비 가황이 되어 불량율 감소 및 그린타이어 치수 안정화가 가능하게 된다.When the steel cord 5 is heated using the induction heating as described above, the evaporated moisture diffuses into the rubber 10 with a small bubble, and the interface between the steel and the rubber becomes preliminary vulcanization to reduce the defective rate and the size of the green tire. Stabilization is possible.

또한, 본 발명은 성형공정에서 그린타이어를 팽창하였을 때 스틸코드(5)와 고무(10) 사이의 계면이 향상되고, 연속 생산시 불량율 감소를 최소화할 수 있다.In addition, the present invention can improve the interface between the steel cord 5 and the rubber 10 when the green tire is expanded in the molding process, it is possible to minimize the reduction in defective rate during continuous production.

도 1은 본 발명에 따른 스틸코드 가열장치가 설치된 타이어 압연공정의 전체 구성도,1 is an overall configuration diagram of a tire rolling process in which a steel cord heating device according to the present invention is installed;

도 2의(a)와 (b)는 본 발명에 따른 스틸코드 가열장치를 통해 압연된 스틸코드와 종래 장치에 의해 압연된 스틸코드의 비교 단면도,Figure 2 (a) and (b) is a cross-sectional view of a steel cord rolled by a steel cord heating apparatus according to the present invention and a steel cord rolled by a conventional apparatus,

도 3은 일반적인 완성된 그린타이어의 단면도,3 is a cross-sectional view of a general completed green tire,

도 4는 종래 타이어 압연공정을 나타낸 구성도로서, 도 1에 대응되는 도면이다.4 is a diagram illustrating a conventional tire rolling process, which corresponds to FIG. 1.

-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing

1 : 벨트, 2 : 카카스,1: belt, 2: carcass,

3 : 가이드 롤러, 4 : 스프라이서,3: guide roller, 4: splicer,

5 : 스틸코드, 6 : 어큐뮬레이터,5: steel cord, 6: accumulator,

7 : 와인딩 유니트, 8 : 가열 코일부,7: winding unit, 8: heating coil part,

9 : 온도센서, 10 : 고무.9: temperature sensor, 10: rubber.

Claims (1)

벨트(1) 내지는 카카스(2)의 반제품 시트를 제조하기 위해 가이드 롤러(3)를 거쳐 스프라이서(4)에 의해 스틸코드(5) 간격을 일정하게 유지하고 고무를 입히는 토핑 작업을 거쳐 어큐뮬레이터(6)를 통과하여 완성된 반제품 시트를 최종 와인딩 유니트(7)에 감는 타이어 압연공정의 반제품 시트 제조장치에 있어서, In order to manufacture the semi-finished sheet of the belt 1 or carcass 2, the guide roller 3 is passed through the splicer 4 to maintain a constant steel cord 5 spacing, and a rubberized topping operation is performed. In the semi-finished sheet manufacturing apparatus of the tire rolling process of winding the finished semi-finished sheet passed through the accumulator (6) to the final winding unit (7), 상기 스프라이서(4)의 다음 단계에서 자성체인 스틸 코드(5)를 섭씨 80°~250°까지 순간적으로 가열시키면서 고무가 입혀지는 순간 예비 가황이 이루어지도록 고주파 전원에 의해 가열되는 가열 코일부(8)가 설치되되, 이 가열 코일부(8)는 스틸 코드(5)와 수평으로 상, 하측 코일부(8a,8b)로 이루어지고, 상기 스틸코드(5)의 온도를 측정하는 온도센서(9)가 설치되어 이루어진 것을 특징으로 하는 타이어 압연공정의 스틸코드 가열장치.In the next step of the splicer 4, while heating the magnetic steel cord (5) to 80 ° to 250 ° instantaneously heating the coil portion heated by a high frequency power supply so that preliminary vulcanization occurs when the rubber is coated ( 8) is installed, the heating coil portion 8 is composed of the upper and lower coil portions (8a, 8b) horizontally with the steel cord (5), the temperature sensor for measuring the temperature of the steel cord ( 9) Steel cord heating device of the tire rolling process, characterized in that the installation.
KR1020040018476A 2004-03-18 2004-03-18 Steel cord heating apparatus of tire calending process KR100558693B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040018476A KR100558693B1 (en) 2004-03-18 2004-03-18 Steel cord heating apparatus of tire calending process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040018476A KR100558693B1 (en) 2004-03-18 2004-03-18 Steel cord heating apparatus of tire calending process

Publications (2)

Publication Number Publication Date
KR20050093214A true KR20050093214A (en) 2005-09-23
KR100558693B1 KR100558693B1 (en) 2006-03-10

Family

ID=37274331

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040018476A KR100558693B1 (en) 2004-03-18 2004-03-18 Steel cord heating apparatus of tire calending process

Country Status (1)

Country Link
KR (1) KR100558693B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101410725B1 (en) * 2012-12-17 2014-06-23 한국타이어 주식회사 Reinforcement belt building apparatus of truck and bus radial tire

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101335220B1 (en) 2011-11-28 2013-11-29 금호타이어 주식회사 Rubber extruder apparatus with two roll loop

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101410725B1 (en) * 2012-12-17 2014-06-23 한국타이어 주식회사 Reinforcement belt building apparatus of truck and bus radial tire

Also Published As

Publication number Publication date
KR100558693B1 (en) 2006-03-10

Similar Documents

Publication Publication Date Title
JP3954195B2 (en) Tire molding apparatus and tire molding method using the same
JP2010264627A (en) Method and apparatus for detecting inner liner joint, and method for manufacturing green tire
KR100558693B1 (en) Steel cord heating apparatus of tire calending process
JP2001191423A (en) Method for producing pneumatic tire
JP6560031B2 (en) Rubber sheet manufacturing apparatus and manufacturing method
US10328639B2 (en) Method and system for variable heat sources for composite fiber placement
JP6784088B2 (en) Pneumatic tire manufacturing method
US11752715B2 (en) Method and plant for building tyres
US5468442A (en) Apparatus and process for gauging and controlling extruded profiled elements
JP2015199286A (en) Mold for tire vulcanization, tire vulcanization device, and tire vulcanization method
KR101502231B1 (en) Control Method and Same Apparatus for Temperature of Creel Room
JP2002225043A (en) Method for correcting uniformity of pneumatic tire
KR101562745B1 (en) Device for guiding tyre rubber item inclusive of steel wire at green tyre process
JP3260581B2 (en) Sheet thickness control system
US1977018A (en) Method of constructing pneumatic tires
KR101202142B1 (en) A Stitching and Pricking Device of Half-finished Product Strip for Producing Tire
JPH03193312A (en) Elastmeric article and manufacture thereof
KR101200953B1 (en) Apparatus for manufacturing and molding tire tread by calendaring
JP2010125693A (en) Dimension adjusting tool for extrusion molded article, and method of manufacturing extrusion molded article using the same
JP2019111674A (en) Manufacturing method of pneumatic tire
KR101645637B1 (en) Detecting device for centering
JP2020104314A (en) Molding apparatus and molding method for tire rubber member, and tire production method
JP3267818B2 (en) Surface treatment method for unvulcanized tire
KR101055397B1 (en) Conveyor automatic speed change method and device
KR101642588B1 (en) Manufacturing method of truck bus radial tire and tire thereof

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20090302

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20120229

Year of fee payment: 9

LAPS Lapse due to unpaid annual fee