KR20050082895A - Establishment method of producting plan when vessel is constructed - Google Patents
Establishment method of producting plan when vessel is constructed Download PDFInfo
- Publication number
- KR20050082895A KR20050082895A KR1020040011503A KR20040011503A KR20050082895A KR 20050082895 A KR20050082895 A KR 20050082895A KR 1020040011503 A KR1020040011503 A KR 1020040011503A KR 20040011503 A KR20040011503 A KR 20040011503A KR 20050082895 A KR20050082895 A KR 20050082895A
- Authority
- KR
- South Korea
- Prior art keywords
- plan
- schedule
- production
- production plan
- design
- Prior art date
Links
Classifications
-
- A—HUMAN NECESSITIES
- A61—MEDICAL OR VETERINARY SCIENCE; HYGIENE
- A61G—TRANSPORT, PERSONAL CONVEYANCES, OR ACCOMMODATION SPECIALLY ADAPTED FOR PATIENTS OR DISABLED PERSONS; OPERATING TABLES OR CHAIRS; CHAIRS FOR DENTISTRY; FUNERAL DEVICES
- A61G17/00—Coffins; Funeral wrappings; Funeral urns
- A61G17/007—Coffins; Funeral wrappings; Funeral urns characterised by the construction material used, e.g. biodegradable material; Use of several materials
-
- A—HUMAN NECESSITIES
- A61—MEDICAL OR VETERINARY SCIENCE; HYGIENE
- A61G—TRANSPORT, PERSONAL CONVEYANCES, OR ACCOMMODATION SPECIALLY ADAPTED FOR PATIENTS OR DISABLED PERSONS; OPERATING TABLES OR CHAIRS; CHAIRS FOR DENTISTRY; FUNERAL DEVICES
- A61G17/00—Coffins; Funeral wrappings; Funeral urns
- A61G17/08—Urns
Landscapes
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Animal Behavior & Ethology (AREA)
- General Health & Medical Sciences (AREA)
- Public Health (AREA)
- Veterinary Medicine (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Factory Administration (AREA)
Abstract
본 발명은 선박 건조 시 생산 계획 수립 방법에 관한 것으로서, 보다 상세하게는 선박의 생산 계획을 수립할 때 조립, 탑재등의 공정 단계와 이를 지원하는 공정인 가공, 의장등의 단계를 분리하여 주생산 계획과 이를 지원하는 지원 생산 계획으로 분리하여 생산 계획의 단계 축소 및 계획의 정확성을 향상시킬 수 있는 선박 건조 시 생산 계획 수립 방법에 관한 것이다.The present invention relates to a method of establishing a production plan when a ship is built, and more particularly, when manufacturing a ship's production plan, a main production is performed by separating process steps such as assembly and mounting, and processing, design, etc. It relates to a production plan for shipbuilding that can be separated into plans and supporting production plans that support it, reducing the steps of the production plan and improving the accuracy of the plan.
본 발명의 목적은, 선박 건조 시 중일정 계획에 따라 생산 계획인 소일정 계획을 수립할 때 상호 연관성이 있는 가공 및 조립 단계와, 선행 의장, 후행 의장 및 의장 제작 단계를 각각 주생산 및 지원 생산으로 분리하여 계획을 수립함으로써, 조립 단계 및 의장 단계가 가공 단계 및 의장 제작에 의해 제약을 받지 않도록 하는 선박 건조 시 생산 계획 수립 방법을 제공함에 있다.The object of the present invention is to produce the main production and support of the processing and assembly stages, and the preceding design, the subsequent design and the design production stages, which are correlated with each other when establishing a small schedule, which is a production plan, according to the medium schedule plan. By separately establishing a plan, it provides a production planning method for building a ship so that the assembly step and the design step are not restricted by the processing step and the design of the design.
상기한 목적을 실현하기 위하여 본 발명은, 선박 수주 시 영업 설계와 상세 설계에 따라 각각 대일정 계획과 중일정 계획을 수립한 후, 상기한 중일정 계획에 따라 각 부서별, 공정별로 생산 계획인 소일정 계획을 각각 수립하는 선박 건조 시 생산 계획 수립 방법에 있어서,In order to realize the above object, the present invention, after establishing a large schedule plan and a middle schedule plan according to the sales design and detailed design at the time of ship order, respectively, according to the above-mentioned medium schedule plan, the production plan for each department and process In the method of establishing a production plan when the ship is built each schedule,
상기한 소일정 계획을 수립할 때 하나의 공정이 끝나야 그 다음 공정을 수행할 수 있는 연관 관계를 갖는 공정에서 후공정들을 주생산계획으로 분류하는 단계와,Classifying the post-processes into the main production plan in a process that has one relationship to complete the next process when the small schedule plan is developed;
상기한 후공정에 선행되어야할 선공정들을 지원생산계획으로 분류하는 단계와,Classifying the pre-processes to be preceded by the post-process as a supporting production plan;
상기한 주생산계획을 각 부서별, 공종별로 일정 계획을 수립하여 서버 컴퓨터에 입력하고 일정을 조정하는 단계와,The schedule of the main production plan for each department and the type of work, the step of entering into the server computer and adjusting the schedule,
상기한 주생산계획에 연관되는 지원생산계획의 일정을 주생산계획에 연관하여 서버 컴퓨터에 입력하고 일정을 조정하는 단계를 포함함을 특징으로 한다.And inputting a schedule of a supported production plan associated with the main production plan into a server computer in association with the main production plan and adjusting the schedule.
Description
본 발명은 선박 건조 시 생산 계획 수립 방법에 관한 것으로서, 보다 상세하게는 선박의 생산 계획을 수립할 때 조립, 탑재등의 공정 단계와 이를 지원하는 공정인 가공, 의장등의 단계를 분리하여 주생산 계획과 이를 지원하는 지원 생산 계획으로 분리하여 생산 계획의 단계 축소 및 계획의 정확성을 향상시킬 수 있는 선박 건조 시 생산 계획 수립 방법에 관한 것이다.The present invention relates to a method of establishing a production plan when a ship is built, and more particularly, when manufacturing a ship's production plan, a main production is performed by separating process steps such as assembly and mounting, and processing, design, etc. It relates to a production plan for shipbuilding that can be separated into plans and supporting production plans that support it, reducing the steps of the production plan and improving the accuracy of the plan.
일반적으로, 선박을 건조하기 위해서는 도2에 도시된 바와 같이 수주된 선박의 종류별(상선, 특수선등), 크기별(배수량)등에 따라 영업 설계를 시작함과 아울러 생산 계획에서 대일정 계획을 수립하게 된다.In general, in order to build a ship, as shown in FIG. 2, the sales plan is started according to the type of vessel (commercial vessel, special vessel, etc.), size (drainage), etc., and a large schedule is planned in the production plan. .
영업 설계가 수립되면 상세 설계를 함과 아울러 이에 따른 구매 일정을 수립하고, 다시 상기한 구매 일정과 연동하도록 중일정 계획을 수립하게 된다.Once the sales design is established, the detailed design, the purchase schedule according to the above, and the mid-schedule plan are established to link with the purchase schedule.
상기한 상세 설계 및 중일정 계획이 수립되면 다시 생산에 필요한 생산 설계를 함과 아울러 생산에 필요한 소일정 계획을 부서별, 공종별로 수립함과 아울러 구매 자재가 입고되고, 생산을 실행하게 되는 것이다.When the detailed design and the middle schedule plan are established, the production design necessary for production is established again, the small schedule plan required for the production is established by department and by type, purchase materials are received, and production is executed.
물론, 생산 일정 및 생산 계획을 수립하여 선박 건조 일정에 소요되는 인력 배치, 도크(DOCK) 배치, 작업장 배치, 건조 설비 일정 조절, 외주 업체 일정 조절등을 하게 된다.Of course, by establishing a production schedule and production plan, personnel arrangement, dock arrangement, workshop arrangement, drying facility schedule adjustment, and outsourcing company schedule adjustment are required for ship construction schedule.
상기한 생산의 일정계획은 대략 1년 정도의 중일정 계획을 세우고, 이를 다시 부서별, 공종별로 시수에 따른 상세한 소일정 계획을 수립하게 된다.The production schedule of the above-described production schedule is about one year, and then the detailed small schedule according to the time of each department and work is established.
즉, 중일정 계획을 수립할 때 조립, 도장, 의장, 탑재등의 부서별 및 선행, 후행, 선실, 특도, 기장, 선장, 전장등과 같은 공종별로 각자가 시수에 따른 일정을 수립하게 되는 것이다.In other words, when establishing a mid-sized schedule, each department, such as assembly, painting, design, loading, etc., and the preceding, trailing, cabin, specialty, captain, captain, battlefield, etc., will establish a schedule according to the time. .
이는 도3에 도시된 바와 같이 중일정 계획에 따라 이를 생산 계획에 맞춰서 세분화하여 가공, 조립, 의장, 도장, 탑재에 대한 소일정 계획 및 주간 실행 계획을 수립한 후, 이를 계획에 맞춰서 실행하게 되는 것이다.As shown in FIG. 3, this is subdivided according to the production schedule according to the production plan, and then a small schedule plan and a weekly execution plan for processing, assembly, designing, painting, and mounting are established, and then executed according to the plan. will be.
예를 들면, 의장 소일정 계획이 수립되면 여기에 따른 배관, 목의장, 기계의장의 세부 의장 단계가 분리되고 이에 따른 주간 계획을 수립하면서 소일정 계획을 진행하게 되는 것이다.For example, when the chairman schedule is established, the detailed chairman stages of the plumbing, neck chairman, and machine chairmen will be separated, and the small schedule plan will be progressed while establishing a weekly plan accordingly.
물론, 상기한 나머지 소일정 계획인 가공, 조립, 도장, 탑재도 동일하게 세부 계획으로 분할 수립한 후 진행하게 되는 것이다.Of course, the remaining small schedule, such as processing, assembly, painting, mounting will also proceed after establishing the same as the detailed plan.
그러나, 상기한 바와 같이 상세 설계에 따라 중일정 계획 수립 후 이에 따라 생산 계획인 소일정 계획을 각각 수립하고 진행할 때, 조립, 의장, 가공, 도장, 탑재의 일정 계획을 각각 진행하게 됨으로써, 소일정 계획의 수립 및 진행이 매우 복잡하게 됨과 아울러 이로 인해 소일정 계획이 주간 실행계획에 따라 순조롭게 진행되지 않는 문제점이 있다.However, as described above, when the medium schedule plan is established according to the detailed design and the small schedule plan, which is a production plan, is established and proceeded accordingly, the schedule schedule of assembling, designing, processing, painting, and mounting is performed, respectively. The development and progress of the plan is very complicated, and this causes the small schedule to not proceed smoothly according to the weekly execution plan.
즉, 소일정 계획 및 주간실행계획을 진행하는 부서가 매우 많기 때문에 각각의 진행 상황 체크가 어렵고, 또한 상호 연관성이 있는 공정의 경우 예를 들면 가공 단계가 완료되어야 조립 단계가 이루어지지만, 이를 각각 계획 수립 및 진행하기 때문에 상호 계획의 부조화에 따른 선박 건조 기간의 지연, 건조 비용의 증대등의 문제점이 있는 것이다.In other words, because there are so many departments that carry out small schedule planning and weekly execution planning, it is difficult to check the progress of each, and in the case of correlated processes, for example, the assembly step is completed only after the machining step is completed. Because of the establishment and progress, there are problems such as delay of ship construction period and increase of construction cost due to mismatch of mutual planning.
따라서, 본 발명의 목적은 상기한 문제점을 해결하기 위한 것으로서, 선박 건조 시 중일정 계획에 따라 생산 계획인 소일정 계획을 수립할 때 상호 연관성이 있는 가공 및 조립 단계와, 선행 의장, 후행 의장 및 의장 제작 단계를 각각 주생산 및 지원 생산으로 분리하여 계획을 수립함으로써, 조립 단계 및 의장 단계가 가공 단계 및 의장 제작에 의해 제약을 받지 않도록 하는 선박 건조 시 생산 계획 수립 방법을 제공함에 있다.Accordingly, an object of the present invention is to solve the above problems, and the processing and assembly steps that are correlated when establishing a small schedule, which is a production plan according to the medium schedule plan during ship construction, and the preceding chairman, the following chairman and By establishing a plan by dividing the design stage into main production and supporting production respectively, it provides a production planning method for ship construction so that the assembly stage and the design stage are not restricted by the processing stage and the design of the design.
상기한 목적을 실현하기 위하여 본 발명은, 선박 수주 시 영업 설계와 상세 설계에 따라 각각 대일정 계획과 중일정 계획을 수립한 후, 상기한 중일정 계획에 따라 각 부서별, 공정별로 생산 계획인 소일정 계획을 각각 수립하는 선박 건조 시 생산 계획 수립 방법에 있어서,In order to realize the above object, the present invention, after establishing a large schedule plan and a middle schedule plan according to the sales design and detailed design at the time of ship order, respectively, according to the above-mentioned medium schedule plan, the production plan for each department and process In the method of establishing a production plan when the ship is built each schedule,
상기한 소일정 계획을 수립할 때 하나의 공정이 끝나야 그 다음 공정을 수행할 수 있는 연관 관계를 갖는 공정에서 후공정들을 주생산계획으로 분류하는 단계와,Classifying the post-processes into the main production plan in a process that has one relationship to complete the next process when the small schedule plan is developed;
상기한 후공정에 선행되어야할 선공정들을 지원생산계획으로 분류하는 단계와,Classifying the pre-processes to be preceded by the post-process as a supporting production plan;
상기한 주생산계획을 각 부서별, 공종별로 일정 계획을 수립하여 서버 컴퓨터에 입력하고 일정을 조정하는 단계와,The schedule of the main production plan for each department and the type of work, the step of entering into the server computer and adjusting the schedule,
상기한 주생산계획에 연관되는 지원생산계획의 일정을 주생산계획에 연관하여 서버 컴퓨터에 입력하고 일정을 조정하는 단계를 포함함을 특징으로 한다.And inputting a schedule of a supported production plan associated with the main production plan into a server computer in association with the main production plan and adjusting the schedule.
도1은 본 발명에 따른 선박 건조 시 생산 계획 수립 방법을 도시한 블록도로서, 선박이 수주되면 선박 건조의 특성상 설계와 생산 계획이 동시에 진행되는 바, 생산 계획의 경우 먼저 상세 설계에 따라 대략 1년정도의 계획인 중일정 계획(기준계획)을 수립함과 아울러 이를 기준으로 소일정 계획(생산계획)을 수립하게 된다.1 is a block diagram illustrating a method for establishing a production plan when a ship is constructed according to the present invention. A mid-year plan (baseline plan), which is a yearly plan, will be established, and a small schedule (production plan) will be established based on this.
즉, 상세 설계에 따라 각 부서별, 공종별 중일정 계획이 수립되면, 상기한 중일정 계획에 맞춰서 각 부서별, 공종별로 생산 일정인 소일정 계획을 수립하게 되는 것이다.In other words, if a mid-schedule plan for each department and a model is established according to the detailed design, a small schedule plan, which is a production schedule for each department and a model, will be established in accordance with the above-mentioned medium schedule plan.
상기한 소일정 계획은 예를 들면, 가공, 조립, 의장, 도장, 탑재로 분류하여 각 부서별로 계획을 수립한다고 할 때, 가공이 끝나야 조립(소조, 중조, 대조)을 할 수 있고, 의장 제작(목의장, 기계의장...)이 끝나야 선행 또는 후행 의장 작업을 진행할 수 있기 때문에, 조립, 도장, 탑재는 주생산계획으로 분류하고, 가공 및 의장 제작은 지원 생산으로 분류하게 된다.For example, the small schedule may be classified into machining, assembly, design, painting, and mounting to establish a plan for each department. Because the chairman, the machineman ... must be finished before or after the design work, assembly, painting, and mounting are classified as the main production plan, and processing and designing are classified as supporting production.
물론, 상기한 주생산계획 및 지원 생산 계획으로 분류되는 기준은 가공과 조립의 관계처럼 하나가 끝나야 다음 공정을 진행할 수 있는 것을 분류하여 주생산 및 지원 생산으로 하게 되는 것이다.Of course, the criteria categorized into the main production plan and the support production plan are classified into the main production and the support production by classifying the one that can be carried out until the next process, such as the relationship between processing and assembly.
즉, 본 실시예에서는 조립, 선행의장, 후행의장, 선행도장, 선행탑재, 탑재가 주생산 계획에 속하게 되고, 가공 및 의장제작이 지원 생산 계획으로 분류된다.That is, in this embodiment, assembly, preceding design, subsequent design, preceding painting, preceding mounting, and mounting belong to the main production plan, and processing and designing are classified as supporting production plans.
상기한 바와 같이 주생산 및 지원생산으로 분류된 단계로 생산 일정 계획을 수립하게 되면, 가공 및 의장제작이 지원 생산으로 분류됨으로써 주생산 일정 계획이 단순해지게 되어 주생산 일정 계획의 수립 및 진행이 용이하게 된다.As described above, if the production schedule is established at the stage classified into main production and subsidiary production, processing and designing are classified as subsidiary production, which simplifies the main production schedule and the establishment and progress of main production schedule planning It becomes easy.
또한, 주생산 일정 계획에 적용된 조립, 선행 의장, 후행의장, 탑재, 선행 탑재, 도장등의 공정은 서로간의 제약이 거의 없거나 매우 적기 때문에 각각의 생산 진행에 영향을 주지 않게 되고, 이로 인해 각 생산단계의 일정에 있어서 변수(조립 전단계의 가공이 끝나지 않아 조립이 이루어지지 않게 되는 것과 같은)가 없어지게 되고, 따라서 일정 계획의 정확성이 매우 향상되는 것이다.In addition, the processes such as assembly, preliminary design, trailing design, mounting, preloading, painting, etc. applied to the main production schedule have little or no restrictions on each other and thus do not affect each production process. There is no variable in the schedule of the stages (such as no pre-assembly processing to complete the assembly), thus improving the accuracy of the scheduling.
물론, 지원 계획으로 분류된 단계들은 별도로 생산 계획을 수립함과 아울러 가공은 조립의 생산 일정과 연계하여 세우게 되고, 의장 제작은 선행 및 후행 의장의 일정과 연계하여 수립하게 된다.Of course, the steps categorized into the support plan separately establish the production plan and the machining is established in connection with the production schedule of the assembly, and the design of the chairman is established in connection with the schedule of the preceding and succeeding chairmen.
상기한 주생산 계획과 지원 생산계획은 각각 부서별 클라이언트 컴퓨터를 통해 서버 컴퓨터에 입력되어 ERP등과 같은 소정의 프로그램에 의해 통합 관리되는 바, 상기한 주생산계획의 입력 후 이와 연동하도록 지원 생산계획을 서버 컴퓨터에 입력하여 연계성을 갖도록 한다.The main production plan and the supporting production plan are respectively input to the server computer through the departmental client computer and integratedly managed by a predetermined program such as ERP. Enter it on your computer to have connectivity.
상기한 바와 같이 서버 컴퓨터에 입력되어 있는 주생산 계획 및 지원생산계획의 수립 후, 계획 변경을 하려고 하면, 실제 생산 계획인 조립, 도장, 탑재 계획에 관해서만 변경을 하면된다.As described above, if the plan is to be changed after the production of the main production plan and the supported production plan input to the server computer, the plan only needs to be changed for the assembly, painting, and mounting plan which are actual production plans.
즉, 상기한 조립 공정 및 의장 공정을 변경하려고 하면, 종래에는 조립, 가공, 의장, 의장제작, 탑재, 도장 공정을 순차적으로 모두 변경하여야 했지만, 본원 발명에서는 주생산계획인 조립, 탑재, 도장 공정만을 변경하고, 상기한 지원 계획인 가공 및 의장 제작 공정은 주생산계획에 따라 연동하면서 변경되도록 하면 됨으로써, 생산 일정 계획의 변경도 매우 용이하게 되는 것이다.In other words, when attempting to change the above-described assembly process and design process, conventionally, the assembly, processing, designing, designing, mounting, and painting processes had to be changed in sequence. By changing the bay and making the above-described support and machining process such as the fabrication process and the design process change in conjunction with the main production plan, it is also very easy to change the production schedule plan.
이상과 같이 본 발명은 선박 생산 계획을 수립할 때 주생산 계획과 지원 생산 계획으로 분류(예를 들면, 조립 공정전에 가공 공정이 완료되어야 하는 것처럼 서로 연관된 공정에서 먼저 끝나야 하는 공정을 지원 계획으로 분류 수립)하여 선박 생산 계획의 단계를 축소함과 아울러 지원 생산 계획을 별도 수립함으로써 계획 수립 및 일정 진행이 원활하고 정확하게 이루어지도록 하는 잇점이 있는 것이다.As described above, the present invention classifies the main production plan and the support production plan when establishing the ship production plan (for example, classifying the process that should be finished first in the related processes as the processing plan should be completed before the assembly process as the support plan). By reducing the stage of ship production planning and establishing a supporting production plan, it is advantageous to make the planning and schedule progress smoothly and accurately.
도1은 본 발명에 따른 선박 건조 시 생산계획 수립 방법을 도시한 블록도,1 is a block diagram showing a method for establishing a production plan during ship construction according to the present invention;
도2는 일반적인 선박 건조시의 흐름을 도시한 블록도,Figure 2 is a block diagram showing the flow in general ship construction,
도3은 도2에서 중일정 계획에 따른 소일정의 연계 상태를 도시한 블록도.Figure 3 is a block diagram showing a linking state of a small schedule according to the middle schedule in Figure 2;
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040011503A KR101051998B1 (en) | 2004-02-20 | 2004-02-20 | How to plan production when building a ship |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020040011503A KR101051998B1 (en) | 2004-02-20 | 2004-02-20 | How to plan production when building a ship |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20050082895A true KR20050082895A (en) | 2005-08-24 |
KR101051998B1 KR101051998B1 (en) | 2011-07-26 |
Family
ID=37269232
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040011503A KR101051998B1 (en) | 2004-02-20 | 2004-02-20 | How to plan production when building a ship |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101051998B1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101050907B1 (en) * | 2007-12-14 | 2011-07-20 | 현대중공업 주식회사 | Unit production work system management system for ship building |
KR101052109B1 (en) * | 2010-01-07 | 2011-07-26 | 에스티엑스조선해양 주식회사 | A computer readable medium recording a method, apparatus, and program for generating a trailing chair routing for ships |
KR20150047845A (en) | 2013-10-25 | 2015-05-06 | 대우조선해양 주식회사 | Project master schedule system and method thereof |
KR20210008988A (en) * | 2019-07-15 | 2021-01-26 | 대우조선해양 주식회사 | Design process for modeling base structure based on module |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100688441B1 (en) * | 2004-09-22 | 2007-03-02 | 인하대학교 산학협력단 | Feed additive using citrus peel and method for manufacturing thereof |
KR20240107036A (en) | 2022-12-29 | 2024-07-08 | 한화오션 주식회사 | Ship construction execution planning system |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11328276A (en) | 1998-03-16 | 1999-11-30 | Mitsubishi Heavy Ind Ltd | Scheduling system |
-
2004
- 2004-02-20 KR KR1020040011503A patent/KR101051998B1/en active IP Right Grant
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101050907B1 (en) * | 2007-12-14 | 2011-07-20 | 현대중공업 주식회사 | Unit production work system management system for ship building |
KR101052109B1 (en) * | 2010-01-07 | 2011-07-26 | 에스티엑스조선해양 주식회사 | A computer readable medium recording a method, apparatus, and program for generating a trailing chair routing for ships |
KR20150047845A (en) | 2013-10-25 | 2015-05-06 | 대우조선해양 주식회사 | Project master schedule system and method thereof |
KR20210008988A (en) * | 2019-07-15 | 2021-01-26 | 대우조선해양 주식회사 | Design process for modeling base structure based on module |
Also Published As
Publication number | Publication date |
---|---|
KR101051998B1 (en) | 2011-07-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Browning et al. | Reconceptualizing the effects of lean on production costs with evidence from the F-22 program | |
US7840295B2 (en) | Computer implemented method for defining an input product | |
CN110096270A (en) | A kind of design drawing method for splitting and system based on .NET plug-in unit | |
KR101051998B1 (en) | How to plan production when building a ship | |
CN105867308A (en) | Sheet metal part rapid development system based on precision control | |
US20090024424A1 (en) | System and method for dynamic linking of business processes | |
Serfati et al. | Global supply chains and intangible assets in the automotive and aeronautical industries | |
Cooper | What leading companies are doing to re-invent their NPD processes | |
DeFilippo | World-class manufacturing in Chengdu: a case study on China's first aviation joint venture | |
Smirnov et al. | Knowledge Management for Complex Product Development: Framework and Implementation | |
US7319937B2 (en) | System and method for programming measuring equipment offline | |
Etienne et al. | An improved approach for automatic process plan generation of complex borings | |
JP2003508841A (en) | Assembling based on features | |
Ellegård et al. | People-production-international division of labour | |
Kinard | F-35 Production–advanced manufacturing and the digital thread | |
Santos et al. | Interaction between Lean philosophy and Industry 4.0: exploratory study | |
Frenkel | Flying high: A case study of Japanese industrial policy | |
Shehab et al. | Model-based enterprise framework for aerospace manufacturing engineering | |
Thomas et al. | Making industry fit: the conceptualization of a generic'fit'manufacturing strategy for industry | |
Bandyopadhyay | Product design to facilitate JIT production | |
Pointner et al. | Reinforcing Lean Production through Agility Aspects | |
Maltsevich | PROSPECTS AND BASIC TECHNOLOGIES IN THE CONDITIONS OF DIGITAL TRANSFORMATION | |
CN115756429A (en) | Programmable continuous integration and continuous publishing system | |
Vavra | On the cutting edge: Mazak embraces technology and innovation to deliver productivity | |
Sadegh Amalnik | Design of Computer Integrated Manufacturing System for Irankhodro Auto Industry |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
AMND | Amendment | ||
E601 | Decision to refuse application | ||
J201 | Request for trial against refusal decision | ||
AMND | Amendment | ||
B701 | Decision to grant | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20140701 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20150625 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20160630 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20170703 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20180716 Year of fee payment: 8 |