KR101051998B1 - How to plan production when building a ship - Google Patents

How to plan production when building a ship Download PDF

Info

Publication number
KR101051998B1
KR101051998B1 KR1020040011503A KR20040011503A KR101051998B1 KR 101051998 B1 KR101051998 B1 KR 101051998B1 KR 1020040011503 A KR1020040011503 A KR 1020040011503A KR 20040011503 A KR20040011503 A KR 20040011503A KR 101051998 B1 KR101051998 B1 KR 101051998B1
Authority
KR
South Korea
Prior art keywords
plan
schedule
production
production plan
design
Prior art date
Application number
KR1020040011503A
Other languages
Korean (ko)
Other versions
KR20050082895A (en
Inventor
권영구
이병모
임영섭
이석태
Original Assignee
대우조선해양 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대우조선해양 주식회사 filed Critical 대우조선해양 주식회사
Priority to KR1020040011503A priority Critical patent/KR101051998B1/en
Publication of KR20050082895A publication Critical patent/KR20050082895A/en
Application granted granted Critical
Publication of KR101051998B1 publication Critical patent/KR101051998B1/en

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61GTRANSPORT, PERSONAL CONVEYANCES, OR ACCOMMODATION SPECIALLY ADAPTED FOR PATIENTS OR DISABLED PERSONS; OPERATING TABLES OR CHAIRS; CHAIRS FOR DENTISTRY; FUNERAL DEVICES
    • A61G17/00Coffins; Funeral wrappings; Funeral urns
    • A61G17/007Coffins; Funeral wrappings; Funeral urns characterised by the construction material used, e.g. biodegradable material; Use of several materials
    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61GTRANSPORT, PERSONAL CONVEYANCES, OR ACCOMMODATION SPECIALLY ADAPTED FOR PATIENTS OR DISABLED PERSONS; OPERATING TABLES OR CHAIRS; CHAIRS FOR DENTISTRY; FUNERAL DEVICES
    • A61G17/00Coffins; Funeral wrappings; Funeral urns
    • A61G17/08Urns

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Animal Behavior & Ethology (AREA)
  • General Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Veterinary Medicine (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

본 발명은 선박 건조 시 생산 계획 수립 방법에 관한 것으로서, 보다 상세하게는 선박의 생산 계획을 수립할 때 조립, 탑재등의 공정 단계와 이를 지원하는 공정인 가공, 의장등의 단계를 분리하여 주생산 계획과 이를 지원하는 지원 생산 계획으로 분리하여 생산 계획의 단계 축소 및 계획의 정확성을 향상시킬 수 있는 선박 건조 시 생산 계획 수립 방법에 관한 것이다.The present invention relates to a method of establishing a production plan when a ship is built, and more particularly, when manufacturing a ship's production plan, a main production is performed by separating process steps such as assembly and mounting, and processing, design, etc. It relates to a production plan for shipbuilding that can be separated into plans and supporting production plans that support it, reducing the steps of the production plan and improving the accuracy of the plan.

본 발명의 목적은, 선박 건조 시 중일정 계획에 따라 생산 계획인 소일정 계획을 수립할 때 상호 연관성이 있는 가공 및 조립 단계와, 선행 의장, 후행 의장 및 의장 제작 단계를 각각 주생산 및 지원 생산으로 분리하여 계획을 수립함으로써, 조립 단계 및 의장 단계가 가공 단계 및 의장 제작에 의해 제약을 받지 않도록 하는 선박 건조 시 생산 계획 수립 방법을 제공함에 있다.The object of the present invention is to produce the main production and support of the processing and assembly stages, and the preceding design, the subsequent design and the design production stages, which are correlated with each other when establishing a small schedule, which is a production plan, according to the medium schedule plan. By separately establishing a plan, it provides a production planning method for building a ship so that the assembly step and the design step are not restricted by the processing step and the design of the design.

상기한 목적을 실현하기 위하여 본 발명은, 선박 수주 시 서버 컴퓨터에 의해 영업 설계 및 상세 설계에 따라 각각 대일정 계획과 중일정 계획이 수립된 후, 상기 중일정 계획에 따라 각 부서별, 공정별로 소일정 계획이 각각 수립되는 선박 건조 시 생산 계획 수립 방법에 있어서,In order to achieve the above object, the present invention, after a large schedule plan and a mid-schedule plan is established according to the sales design and detailed design by the server computer at the time of ordering ship, respectively, according to each department, process according to the medium schedule plan In the method of establishing a production plan when the ship is built each schedule,

상기 소일정 계획이 수립될 때 하나의 공정이 끝나야 다음 공정을 수행할 수 있는 연관 관계를 갖는 공정에서 후공정들이 주생산계획으로 분류되는 단계와,When the small schedule plan is established, the post-processes are classified as the main production plan in a process having an association relationship in which one process must be completed to perform the next process,

상기 후공정들에 선행되어야할 선공정들이 지원생산계획으로 분류되는 단계와,Pre-processes to be preceded by the post-processes are classified into a supporting production plan;

상기 주생산계획의 일정 계획이 수립되어 서버 컴퓨터에 입력되고 일정이 조정되면 상기 주생산계획에 수반하여 지원생산계획의 일정이 서버컴퓨터에 입력되고 일정조정이 되도록 하는 단계를 포함하는 것을 특징으로 한다.And a schedule of the main production plan is input to the server computer and the schedule is adjusted, so that the schedule of the support production plan is input to the server computer and adjusted according to the main production plan. .

선박건조 생산계획 수립Establishment of ship construction production plan

Description

선박 건조 시 생산 계획 수립 방법{Establishment method of producting plan when vessel is constructed}Establishment method of producting plan when vessel is constructed

도1은 본 발명에 따른 선박 건조 시 생산계획 수립 방법을 도시한 블록도,1 is a block diagram showing a method for establishing a production plan during ship construction according to the present invention;

도2는 일반적인 선박 건조시의 흐름을 도시한 블록도,Figure 2 is a block diagram showing the flow in general ship construction,

도3은 도2에서 중일정 계획에 따른 소일정의 연계 상태를 도시한 블록도.Figure 3 is a block diagram showing the linking state of a small schedule according to the middle schedule in Figure 2;

본 발명은 선박 건조 시 생산 계획 수립 방법에 관한 것으로서, 보다 상세하게는 선박의 생산 계획을 수립할 때 조립, 탑재 등의 공정 단계와 이를 지원하는 공정인 가공, 의장 등의 단계를 분리하여 주생산 계획과 이를 지원하는 지원 생산 계획으로 분리하여 생산 계획의 단계 축소 및 계획의 정확성을 향상시킬 수 있는 선박 건조 시 생산 계획 수립 방법에 관한 것이다.The present invention relates to a method of establishing a production plan when a ship is constructed, and more particularly, when manufacturing a ship's production plan, a main production is performed by separating process steps such as assembly and mounting, and processing, designing, etc. It relates to a production plan for shipbuilding that can be separated into plans and supporting production plans that support it, reducing the steps of the production plan and improving the accuracy of the plan.

일반적으로, 선박을 건조하기 위해서는 도2에 도시된 바와 같이 수주된 선박의 종류별(상선, 특수선등), 크기별(배수량)등에 따라 영업 설계를 시작함과 아울러 생산 계획에서 대일정 계획을 수립하게 된다.In general, in order to build a ship, as shown in FIG. 2, the sales plan is started according to the type of vessel (commercial vessel, special vessel, etc.), size (drainage), etc., and a large schedule is planned in the production plan. .

영업 설계가 수립되면 상세 설계를 함과 아울러 이에 따른 구매 일정을 수립 하고, 다시 상기한 구매 일정과 연동하도록 중일정 계획을 수립하게 된다.Once the sales design is established, the detailed design and the purchase schedule are established accordingly, and the mid-schedule plan is established to link with the purchase schedule.

상기한 상세 설계 및 중일정 계획이 수립되면 다시 생산에 필요한 생산 설계를 함과 아울러 생산에 필요한 소일정 계획을 부서별, 공정별로 수립함과 아울러 구매 자재가 입고되고, 생산을 실행하게 되는 것이다.When the detailed design and the mid-schedule plan are established, the production design necessary for production is established again, the small schedule necessary for the production is established by department and process, the purchase materials are received, and the production is executed.

물론, 생산 일정 및 생산 계획을 수립하여 선박 건조 일정에 소요되는 인력 배치, 도크(DOCK) 배치, 작업장 배치, 건조 설비 일정 조절, 외주 업체 일정 조절등을 하게 된다.Of course, by establishing a production schedule and production plan, personnel arrangement, dock arrangement, workshop arrangement, drying facility schedule adjustment, and outsourcing company schedule adjustment are required for ship construction schedule.

상기한 생산의 일정계획은 대략 1년 정도의 중일정 계획을 세우고, 이를 다시 부서별, 공정별로 시수에 따른 상세한 소일정 계획을 수립하게 된다.The production schedule of the above-described production schedule is about one year, and then a detailed small schedule according to the time of each department and process.

즉, 중일정 계획을 수립할 때 조립, 도장, 의장, 탑재등의 부서별 및 선행, 후행, 선실, 특도, 기장, 선장, 전장 등과 같은 공정별로 각자가 시수에 따른 일정을 수립하게 되는 것이다.In other words, when establishing a mid-sized schedule, each department, such as assembly, painting, design, and mounting, and each process such as preceding, trailing, cabin, specialty, captain, captain, and battlefield, establishes a schedule according to the time.

이는 도3에 도시된 바와 같이 중일정 계획에 따라 이를 생산 계획에 맞춰서 세분화하여 가공, 조립, 의장, 도장, 탑재에 대한 소일정 계획 및 주간 실행 계획을 수립한 후, 이를 계획에 맞춰서 실행하게 되는 것이다.As shown in FIG. 3, this is subdivided according to the production schedule according to the production plan, and then a small schedule plan and a weekly execution plan for processing, assembly, design, painting, and mounting are established, and then executed according to the plan. will be.

예를 들면, 의장 소일정 계획이 수립되면 여기에 따른 배관, 목의장, 기계의장의 세부 의장 단계가 분리되고 이에 따른 주간 계획을 수립하면서 소일정 계획을 진행하게 되는 것이다.For example, when the chairman schedule is established, the detailed chairman stages of the plumbing, neck chairman, and machine chairmen will be separated, and the small schedule plan will be progressed while establishing a weekly plan accordingly.

물론, 상기한 나머지 소일정 계획인 가공, 조립, 도장, 탑재도 동일하게 세부 계획으로 분할 수립한 후 진행하게 되는 것이다.Of course, the remaining small schedule, such as processing, assembly, painting, mounting will also proceed after establishing the same as the detailed plan.

그러나, 상기한 바와 같이 상세 설계에 따라 중일정 계획 수립 후 이에 따라 생산 계획인 소일정 계획을 각각 수립하고 진행할 때, 조립, 의장, 가공, 도장, 탑재의 일정 계획을 각각 진행하게 됨으로써, 소일정 계획의 수립 및 진행이 매우 복잡하게 됨과 아울러 이로 인해 소일정 계획이 주간 실행계획에 따라 순조롭게 진행되지 않는 문제점이 있다.However, as described above, when the medium schedule plan is established according to the detailed design and the small schedule plan, which is a production plan, is established and proceeded accordingly, the schedule schedule of assembling, designing, processing, painting, and mounting is performed, respectively. The development and progress of the plan is very complicated, and this causes the small schedule to not proceed smoothly according to the weekly execution plan.

즉, 소일정 계획 및 주간실행계획을 진행하는 부서가 매우 많기 때문에 각각의 진행 상황 체크가 어렵고, 또한 상호 연관성이 있는 공정의 경우 예를 들면 가공 단계가 완료되어야 조립 단계가 이루어지지만, 이를 각각 계획 수립 및 진행하기 때문에 상호 계획의 부조화에 따른 선박 건조기간의 지연, 건조 비용의 증대 등의 문제점이 있는 것이다.In other words, because there are so many departments that carry out small schedule planning and weekly execution planning, it is difficult to check the progress of each, and in the case of correlated processes, for example, the assembly step is completed only after the machining step is completed. Because of the establishment and progress, there is a problem such as delay between ship dryers due to the mismatch of mutual plans and increase of construction cost.

따라서, 본 발명의 목적은 상기한 문제점을 해결하기 위한 것으로서, 선박 건조 시 중일정 계획에 따라 생산 계획인 소일정 계획을 수립할 때 상호 연관성이 있는 가공 및 조립 단계와, 선행 의장, 후행 의장 및 의장 제작 단계를 각각 주생산 및 지원 생산으로 분리하여 계획을 수립함으로써, 조립 단계 및 의장 단계가 가공 단계 및 의장 제작에 의해 제약을 받지 않도록 하는 선박 건조 시 생산 계획 수립 방법을 제공함에 있다.Accordingly, an object of the present invention is to solve the above problems, and the processing and assembly steps that are correlated when establishing a small schedule, which is a production plan according to the medium schedule plan during ship construction, and the preceding chairman, the following chairman and By establishing a plan by dividing the design stage into main production and supporting production respectively, it provides a production planning method for ship construction so that the assembly stage and the design stage are not restricted by the processing stage and the design of the design.

상기한 목적을 실현하기 위하여 본 발명은, 선박 수주 시 서버 컴퓨터에 의해 영업 설계 및 상세 설계에 따라 각각 대일정 계획과 중일정 계획이 수립된 후, 상기 중일정 계획에 따라 각 부서별, 공정별로 소일정 계획이 각각 수립되는 선박 건조 시 생산 계획 수립 방법에 있어서,
상기 소일정 계획이 수립될 때 하나의 공정이 끝나야 다음 공정을 수행할 수 있는 연관 관계를 갖는 공정에서 후공정들이 주생산계획으로 분류되는 단계와,
상기 후공정들에 선행되어야할 선공정들이 지원생산계획으로 분류되는 단계와,
상기 주생산계획의 일정 계획이 수립되어 서버 컴퓨터에 입력되고 일정이 조정되면 상기 주생산계획에 수반하여 지원생산계획의 일정이 서버컴퓨터에 입력되고 일정조정이 되도록 하는 단계를 포함하는 것을 특징으로 한다.
In order to achieve the above object, the present invention, after a large schedule plan and a mid-schedule plan is established according to the sales design and detailed design by the server computer at the time of ordering ship, respectively, according to each department, process according to the medium schedule plan In the method of establishing a production plan when the ship is built each schedule,
When the small schedule plan is established, the post-processes are classified as the main production plan in a process having an association relationship in which one process must be completed to perform the next process,
Pre-processes to be preceded by the post-processes are classified into a supporting production plan;
And a schedule of the main production plan is input to the server computer and the schedule is adjusted, so that the schedule of the support production plan is input to the server computer and adjusted according to the main production plan. .

삭제delete

삭제delete

삭제delete

삭제delete

도1은 본 발명에 따른 선박 건조 시 생산 계획 수립 방법을 도시한 블록도로서, 선박이 수주되면 선박 건조의 특성상 설계와 생산 계획이 동시에 진행되는 바, 생산 계획의 경우 먼저 상세 설계에 따라 대략 1년정도의 계획인 중일정 계획(기준계획)을 수립함과 아울러 이를 기준으로 소일정 계획(생산계획)을 수립하게 된다.1 is a block diagram illustrating a method for establishing a production plan when a ship is constructed according to the present invention. A mid-year plan (baseline plan), which is a yearly plan, will be established, and a small schedule (production plan) will be established based on this.

즉, 상세 설계에 따라 각 부서별, 공정별 중일정 계획이 수립되면, 상기한 중일정 계획에 맞춰서 각 부서별, 공정별로 생산 일정인 소일정 계획을 수립하게 되는 것이다.In other words, if a mid-schedule plan for each department and process is established according to the detailed design, a small schedule plan, which is a production schedule for each department and a process, is established in accordance with the above-described medium schedule plan.

상기한 소일정 계획은 예를 들면, 가공, 조립, 의장, 도장, 탑재로 분류하여 각 부서별로 계획을 수립한다고 할 때, 가공이 끝나야 조립(소조, 중조, 대조)을 할 수 있고, 의장 제작(목의장, 기계의장...)이 끝나야 선행 또는 후행 의장 작업을 진행할 수 있기 때문에, 조립, 도장, 탑재는 주생산계획으로 분류하고, 가공 및 의장 제작은 지원 생산으로 분류하게 된다.For example, the small schedule may be classified into machining, assembly, design, painting, and mounting to establish a plan for each department. Because the chairman, the machineman ... must be finished before or after the design work, assembly, painting, and mounting are classified as the main production plan, and processing and designing are classified as supporting production.

물론, 상기한 주생산계획 및 지원 생산 계획으로 분류되는 기준은 가공과 조립의 관계처럼 하나가 끝나야 다음 공정을 진행할 수 있는 것을 분류하여 주생산 및 지원 생산으로 하게 되는 것이다.Of course, the criteria categorized into the main production plan and the support production plan are classified into the main production and the support production by classifying the one that can be carried out until the next process, such as the relationship between processing and assembly.

즉, 본 실시예에서는 조립, 선행의장, 후행의장, 선행도장, 선행탑재, 탑재가 주생산 계획에 속하게 되고, 가공 및 의장제작이 지원 생산 계획으로 분류된다.That is, in this embodiment, assembly, preceding design, subsequent design, preceding painting, preceding mounting, and mounting belong to the main production plan, and processing and designing are classified as supporting production plans.

상기한 바와 같이 주생산 및 지원생산으로 분류된 단계로 생산 일정 계획을 수립하게 되면, 가공 및 의장제작이 지원 생산으로 분류됨으로써 주생산 일정 계획이 단순해지게 되어 주생산 일정 계획의 수립 및 진행이 용이하게 된다.As described above, if the production schedule is established at the stage classified into main production and subsidiary production, processing and designing are classified as subsidiary production, which simplifies the main production schedule and the establishment and progress of main production schedule planning It becomes easy.

또한, 주생산 일정 계획에 적용된 조립, 선행 의장, 후행의장, 탑재, 선행 탑재, 도장 등의 공정은 서로간의 제약이 거의 없거나 매우 적기 때문에 각각의 생산 진행에 영향을 주지 않게 되고, 이로 인해 각 생산단계의 일정에 있어서 변수(조립 전단계의 가공이 끝나지 않아 조립이 이루어지지 않게 되는 것과 같은)가 없어지게 되고, 따라서 일정 계획의 정확성이 매우 향상되는 것이다.In addition, the processes such as assembly, preliminary design, post-design, post, preload, and painting applied to the main production schedule have little or no restrictions on each other and thus do not affect each production process. There is no variable in the schedule of the stages (such as no pre-assembly processing to complete the assembly), thus improving the accuracy of the scheduling.

물론, 지원 계획으로 분류된 단계들은 별도로 생산 계획을 수립함과 아울러 가공은 조립의 생산 일정과 연계하여 세우게 되고, 의장 제작은 선행 및 후행 의장의 일정과 연계하여 수립하게 된다.Of course, the steps categorized into the support plan separately establish the production plan and the machining is established in connection with the production schedule of the assembly, and the design of the chairman is established in connection with the schedule of the preceding and succeeding chairmen.

상기한 주생산 계획과 지원 생산계획은 각각 부서별 클라이언트 컴퓨터를 통 해 서버 컴퓨터에 입력되어 ERP등과 같은 소정의 프로그램에 의해 통합 관리되는 바, 상기한 주생산계획의 입력 후 이와 연동하도록 지원 생산계획을 서버 컴퓨터에 입력하여 연계성을 갖도록 한다.The main production plan and the supporting production plan are respectively input to the server computer through the departmental client computer and integratedly managed by a predetermined program such as ERP. Enter it on the server computer to have connectivity.

상기한 바와 같이 서버 컴퓨터에 입력되어 있는 주생산 계획 및 지원생산계획의 수립 후, 계획 변경을 하려고 하면, 실제 생산 계획인 조립, 도장, 탑재 계획에 관해서만 변경을 하면된다.As described above, if the plan is to be changed after the production of the main production plan and the supported production plan input to the server computer, the plan only needs to be changed for the assembly, painting, and mounting plan which are actual production plans.

즉, 상기한 조립 공정 및 의장 공정을 변경하려고 하면, 종래에는 조립, 가공, 의장, 의장제작, 탑재, 도장 공정을 순차적으로 모두 변경하여야 했지만, 본원 발명에서는 주생산계획인 조립, 탑재, 도장 공정만을 변경하고, 상기한 지원 계획인 가공 및 의장 제작 공정은 주생산계획에 따라 연동하면서 변경되도록 하면 됨으로써, 생산 일정 계획의 변경도 매우 용이하게 되는 것이다.In other words, when attempting to change the above-described assembly process and design process, conventionally, the assembly, processing, designing, designing, mounting, and painting processes had to be changed in sequence. By changing the bay and making the above-described support and machining process such as the fabrication process and the design process change in conjunction with the main production plan, it is also very easy to change the production schedule plan.

이상과 같이 본 발명은 선박 생산 계획을 수립할 때 주생산 계획과 지원 생산 계획으로 분류(예를 들면, 조립 공정전에 가공 공정이 완료되어야 하는 것처럼 서로 연관된 공정에서 먼저 끝나야 하는 공정을 지원 계획으로 분류 수립)하여 선박 생산 계획의 단계를 축소함과 아울러 지원 생산 계획을 별도 수립함으로써 계획 수립 및 일정 진행이 원활하고 정확하게 이루어지도록 하는 잇점이 있는 것이다.As described above, the present invention classifies the main production plan and the support production plan when establishing the ship production plan (for example, classifying the process that should be finished first in the related processes as the processing plan should be completed before the assembly process as the support plan). By reducing the stage of ship production planning and establishing a supporting production plan, it is advantageous to make the planning and schedule progress smoothly and accurately.

Claims (3)

선박 수주 시 서버 컴퓨터의 주기억장치에 저장된 ERP(Enterprise Ressource Planning) 프로그램에 의해 영업 설계 및 상세 설계에 따라 각각 대일정 계획과 중일정 계획이 동시에 수립된 후, 상기 중일정 계획(기준계획)에 따라 클라이언트 컴퓨터의 주기억장치에 저장된 관리 프로그램에 의해 각 부서별, 공정별로 소일정 계획(생산계획)이 각각 수립되는 선박 건조 시 생산 계획 수립 방법으로서,At the time of ordering, the large and mid-scheduled plans are established at the same time according to the sales and detailed design by the enterprise resource planning (ERP) program stored in the main memory of the server computer. As a method of establishing a production plan when a ship is built, a small schedule (production plan) is established for each department and process by a management program stored in a main memory device of a client computer. 상기 소일정 계획이 수립될 때 하나의 공정이 끝나야 다음 공정을 수행할 수 있는 주종관계의 연관 관계를 갖는 공정에서 상기 클라이언트 컴퓨터의 관리 프로그램에 의해 후공정들이 상기 클라이언트 컴퓨터의 주기억장치에 저장된 관리 프로그램에 의해 주생산계획으로 분류되고, 상기 후공정들에 선행되어야할 선공정들이 지원생산계획으로 분류되는 단계; 및A management program stored in a main memory of the client computer by a management program of the client computer in a process having a master-slave relationship in which one process must be completed when the small schedule plan is established. Classifying the main production plan by the first step and classifying the pre-processes to be preceded by the post-processes into the supporting production plan; And 상기 주생산계획의 일정 계획이 상기 서버 컴퓨터의 주기억장치에 저장된 관리 프로그램에 의해 수립되어 입력장치에 의해 서버 컴퓨터에 입력되어 주기억장치에 저장되고 바뀐 일정이 상기 입력장치를 통해 입력되면 상기 주생산계획에 따라 지원생산계획의 일정이 상기 서버 컴퓨터의 주기억장치에 저장된 관리 프로그램에 의해 바뀌는 단계를 포함하는 것을 특징으로 하는 선박 건조 시 생산 계획 수립 방법.When the schedule of the main production plan is established by a management program stored in the main memory device of the server computer, inputted to the server computer by an input device, stored in the main memory device, and the changed schedule is inputted through the input device. And changing the schedule of the support production plan by a management program stored in the main memory of the server computer. 제1항에 있어서,The method of claim 1, 상기 주생산계획은 조립 공정, 탑재 공정, 도장 공정으로 분류함을 특징으로 하는 선박 건조 시 생산 계획 수립 방법.The main production plan is a production plan establishment method when the ship, characterized in that divided into assembly process, mounting process, painting process. 제1항에 있어서,The method of claim 1, 상기 지원생산계획은 조립 공정전에 수행되는 가공 공정, 의장 공정 전에 수행되는 의장 제작공정으로 분류함을 특징으로 하는 선박 건조 시 생산 계획 수립 방법.Said supporting production plan is classified into a machining process performed before the assembly process, a design manufacturing process performed before the design process, characterized in that the production plan during ship building production method.
KR1020040011503A 2004-02-20 2004-02-20 How to plan production when building a ship KR101051998B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040011503A KR101051998B1 (en) 2004-02-20 2004-02-20 How to plan production when building a ship

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040011503A KR101051998B1 (en) 2004-02-20 2004-02-20 How to plan production when building a ship

Publications (2)

Publication Number Publication Date
KR20050082895A KR20050082895A (en) 2005-08-24
KR101051998B1 true KR101051998B1 (en) 2011-07-26

Family

ID=37269232

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040011503A KR101051998B1 (en) 2004-02-20 2004-02-20 How to plan production when building a ship

Country Status (1)

Country Link
KR (1) KR101051998B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100688441B1 (en) * 2004-09-22 2007-03-02 인하대학교 산학협력단 Feed additive using citrus peel and method for manufacturing thereof

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101050907B1 (en) * 2007-12-14 2011-07-20 현대중공업 주식회사 Unit production work system management system for ship building
KR101052109B1 (en) * 2010-01-07 2011-07-26 에스티엑스조선해양 주식회사 A computer readable medium recording a method, apparatus, and program for generating a trailing chair routing for ships
KR101587467B1 (en) 2013-10-25 2016-01-22 대우조선해양 주식회사 Project master schedule system and method thereof
KR102647348B1 (en) * 2019-07-15 2024-03-14 한화오션 주식회사 Design process for modeling base structure based on module

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11328276A (en) 1998-03-16 1999-11-30 Mitsubishi Heavy Ind Ltd Scheduling system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11328276A (en) 1998-03-16 1999-11-30 Mitsubishi Heavy Ind Ltd Scheduling system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100688441B1 (en) * 2004-09-22 2007-03-02 인하대학교 산학협력단 Feed additive using citrus peel and method for manufacturing thereof

Also Published As

Publication number Publication date
KR20050082895A (en) 2005-08-24

Similar Documents

Publication Publication Date Title
US7739695B2 (en) Computer implemented method and system for running a plurality of business processes
US7840295B2 (en) Computer implemented method for defining an input product
CN110096270A (en) A kind of design drawing method for splitting and system based on .NET plug-in unit
Lee et al. Study on a process-centric modeling methodology for virtual manufacturing of ships and offshore structures in shipyards
KR101051998B1 (en) How to plan production when building a ship
Barlatt et al. Ford motor company implements integrated planning and scheduling in a complex automotive manufacturing environment
CN105867308A (en) Sheet metal part rapid development system based on precision control
US20090024424A1 (en) System and method for dynamic linking of business processes
Kremer Design for Mass Customised Manufacturing and Assembly (DfMCMA): A framework for capturing off-site and on-site efficiencies in mass timber construction
CN103186384A (en) Business-component-oriented software designing and analyzing system and using method thereof
US11995589B2 (en) System and method for processing requirements in ERP and HRIS
Smirnov et al. Knowledge Management for Complex Product Development: Framework and Implementation
US7319937B2 (en) System and method for programming measuring equipment offline
Etienne et al. An improved approach for automatic process plan generation of complex borings
CN115168337A (en) Manufacturing information processing method and system based on parameterized process data structure
CN111340383A (en) Method and system for dynamically adjusting schedule plan of assembled component under random disturbance
Rambabu et al. Gap analysis and optimization of process involved in product design and development by integrating enterprise resource planning & product lifecycle management
CN110866675B (en) Product design platform design flow management and control method and device
Smith Reengineering space projects
US20240185152A1 (en) System and method for processing requirements in erp and hris
US20060173669A1 (en) Process model consolidation
Shehab et al. Model-based enterprise framework for aerospace manufacturing engineering
CN106354487A (en) Quick construction method of software product
Pointner et al. Reinforcing Lean Production Through Agility Aspects
Kim Understanding ISP Methodologies and Identifying Requirements of ISP-Supporting Software Tools

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
J201 Request for trial against refusal decision
AMND Amendment
B701 Decision to grant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20140701

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20150625

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20160630

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20170703

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20180716

Year of fee payment: 8