KR200495069Y1 - Drain block for a reinforcing drain wall of slope - Google Patents

Drain block for a reinforcing drain wall of slope Download PDF

Info

Publication number
KR200495069Y1
KR200495069Y1 KR2020190005194U KR20190005194U KR200495069Y1 KR 200495069 Y1 KR200495069 Y1 KR 200495069Y1 KR 2020190005194 U KR2020190005194 U KR 2020190005194U KR 20190005194 U KR20190005194 U KR 20190005194U KR 200495069 Y1 KR200495069 Y1 KR 200495069Y1
Authority
KR
South Korea
Prior art keywords
drainage
block
slope
drain
wall
Prior art date
Application number
KR2020190005194U
Other languages
Korean (ko)
Other versions
KR20210001477U (en
Inventor
윤성호
Original Assignee
(주)씨티이엔씨
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)씨티이엔씨 filed Critical (주)씨티이엔씨
Priority to KR2020190005194U priority Critical patent/KR200495069Y1/en
Publication of KR20210001477U publication Critical patent/KR20210001477U/en
Application granted granted Critical
Publication of KR200495069Y1 publication Critical patent/KR200495069Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/205Securing of slopes or inclines with modular blocks, e.g. pre-fabricated
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Agronomy & Crop Science (AREA)
  • Mechanical Engineering (AREA)
  • Retaining Walls (AREA)

Abstract

본 고안은 경사면을 일정량만큼 깍아내어 개설면을 평지화시킨 절취사면의 후방측에서 옹벽 형태로 설치되는 한편, 해당 절취사면으로부터 경사면측으로 유출되는 지중수나 침투수를 집수토록 하는 보강배수벽체의 구축을 위하여 육면체 블록 형상으로 제작되는 배수블록에 관한 것으로서, 더욱 상세하게는 상기 배수블록을 육면체 형상의 블록바디와, 상기 블록바디의 전방면에 배치되는 집수커버로 구성하되, 상기 블록바디의 몸통 전면(全面)에 걸쳐 전,후 방향의 배수구멍을 촘촘한 간격으로 관통 형성시키고, 상기 집수커버는 블록바디의 전방면 전체를 덮는 " ]"자형 단면의 커버가 되도록 하며, 상기 블록바디의 후방면에 토사의 유입을 차단하면서 지중수나 침투수만이 통과되게 하는 필터시트를 부착시키고, 상기 보강배수벽체 중 최하측에 위치하는 배수블록의 집수커버 하단에 배수라인과 연결되는 배수구를 제공함으로서, 절취사면의 내부로 유입된 지중수나 침투수가 필터시트와 블록바디 및 집수커버를 거쳐 보강배수벽체의 하단측으로 전량 집수된 다음, 해당 위치의 집수커버에 제공된 배수구와 배수라인을 거쳐 경사면의 외부로 집중 배출될 수 있도록 하는 한편, 배수블록을 이용한 보강배수벽체의 구축작업 역시 별도의 중장비를 사용하지 않는 인력에 의한 작업만으로도 손쉽고 신속하며 견고하게 수행할 수 있도록 한 경사면 보강배수벽체용 배수블록에 관한 것이다.The present invention is designed to be installed in the form of a retaining wall from the rear side of the cut-off slope, which has been cut off by a certain amount of the slope to make the opening surface flat, while constructing a reinforced drainage wall that collects the underground water or seepage water flowing out from the cut slope to the slope side. It relates to a drainage block manufactured in a hexahedral block shape for Drain holes in the front and rear directions are formed through the entire surface at close intervals, and the water collection cover is made to be a cover with a " ]" shape cross-section that covers the entire front surface of the block body, and soil and sand on the rear surface of the block body By attaching a filter sheet that blocks the inflow of water and allowing only underground water or permeated water to pass through, and by providing a drain hole connected to the drain line at the bottom of the water collecting cover of the drain block located at the bottom of the reinforcement drain wall, the inside of the cut-off slope The groundwater or permeated water introduced into the tunnel is collected in the lower part of the reinforced drainage wall through the filter sheet, the block body, and the water collecting cover, and then discharged through the drain hole and the drain line provided in the water collecting cover at the location to be discharged intensively to the outside of the slope. On the other hand, the construction work of the reinforced drainage wall using the drainage block also relates to the drainage block for the inclined surface reinforcement drainage wall, which can be easily, quickly, and firmly performed only by the work of a man who does not use a separate heavy equipment.

Description

경사면 보강배수벽체용 배수블록{Drain block for a reinforcing drain wall of slope}Drain block for a reinforcing drain wall of slope

본 고안은 경사면을 일정량만큼 깍아내어 개설면을 평지화시킨 절취사면의 후방측에서 절취사면을 따라 옹벽 형태로 설치되는 한편, 해당 절취사면으로부터 경사면측으로 유출되는 지중수나 침투수를 집수토록 하는 보강배수벽체의 구축을 위하여 육면체 블록 형상으로 제작되는 배수블록에 관한 것이다.The present invention is installed in the form of a retaining wall along the cut slope from the rear side of the cut slope that has been cut off by a certain amount of the slope to make the open surface flat, while the reinforcement drainage to collect the underground water or seepage water flowing out from the cut slope to the slope side It relates to a drainage block manufactured in a hexahedral block shape for the construction of a wall.

일반적으로 폭우나 홍수와 같은 천재지변에 의하여 산비탈이나 언덕의 경사면이 일부 훼손된 경우에는 훼손된 경사면을 일정량만큼 깍아내고 그 부분에 토사를 메워서 새로운 경사면을 조성하게 되고, 산비탈이나 언덕 부분에 도로나 철도 등을 새로이 개설할 경우에도 산비탈이나 언덕 부분을 일정량만큼 깍아내어 개설면을 평지화시킨 다음 나머지 부분을 새로운 경사면으로 조성하게 되며, 하천의 범람방지와 수자원의 이용을 위하여 하천이나 호수의 부근에 조성된 둑이나 제방 또한 토사의 성토로 인한 경사면이 조성되어 있다.In general, when the slope of a mountain slope or hill is partially damaged due to natural disasters such as heavy rain or flood, the damaged slope is cut off by a certain amount and soil is filled in the area to create a new slope, and roads or railways on the slope or hill In case of new construction, etc., the slope or hill is cut by a certain amount to make the surface flat, and then the remaining part is created as a new slope. The embankment or embankment is also created with a slope due to the filling of the soil.

상기와 같이 토사를 깍아내거나 메워서 새로운 지형으로 조성한 성토지역이나 절토지역의 불안정한 경사면을 나대지로 방치할 경우에는, 폭우나 홍수 등과 같은 여러 가지의 자연적인 원인으로 인하여 경사면의 토사가 쉽게 유실됨으로서 경사면의 복구작업을 빈번히 수행하여야 될 뿐만 아니라, 심한 경우에는 나대지 상태의 경사면이 붕괴되어 막대한 인명과 재산피해를 유발시킬 위험성이 크기 때문에, 경사면상에 별도의 보호 및 보강구조물을 설치함으로서 경사면의 붕괴 및 낙석 등의 위험요소를 사전에 차단시켜야 한다.As described above, when an unstable slope of a filled or cut area created as a new topography by cutting or filling in the soil is left as bare ground, the slope is easily lost due to various natural causes such as heavy rain or flood. Not only must the restoration work of the slope be performed frequently, but in severe cases there is a high risk that the slope of bare ground will collapse and cause enormous damage to life and property. Risk factors such as falling rocks should be blocked in advance.

상기와 같이 경사면을 안정화시키기 위한 종래의 사면보호 및 보강공법으로서는, 앵커볼트를 사용하여 식생매트와 철망을 경사면상에 고정시킨 다음 철망을 통하여 점성력이 우수한 녹생토 조성물을 취부시키는 공법과, 경사면의 경사각도에 맞추어 "∠" 형태로 절곡시킨 절곡프레임을 따라 일정 간격으로 수평프레임을 연결시킴으로서 전방보강격자와 바닥보강격자를 형성시킨 격자구조틀을 경사면의 표면상에 시공하는 공법이 알려져 있다.As a conventional slope protection and reinforcement method for stabilizing the slope as described above, a method of fixing a vegetation mat and a wire mesh on the slope using an anchor bolt and then attaching a green soil composition with excellent viscosity through the wire mesh, and the slope angle of the slope A method is known for constructing a lattice structure frame with a front reinforcement grid and a floor reinforcement grid formed on the surface of an inclined surface by connecting horizontal frames at regular intervals along the bent frame bent in the shape of "∠" according to the drawing.

이와 더불어, 경사면의 표면상에 플라스틱이나 콘크리트 또는 철강 재질로 이루어지는 각종 블록을 사각이나 육각 등의 형태로 연결시키는 공법과, 천공기를 사용하여 경사면에 일정 깊이의 구멍을 천공시킨 다음, 해당 구멍에 소일네일(Soil nail)과 모르타르(Mortar)를 삽입하여 그라우팅(Grouting)시키는 공법과, 경사면의 전방측에 대형 콘크리트 구조물을 옹벽의 형식으로 축조하는 공법 등이 추가로 알려져 있다.In addition, a method of connecting various blocks made of plastic, concrete, or steel in the shape of a square or hexagon on the surface of the inclined surface, and using a perforator to drill a hole of a certain depth in the inclined surface, and then sand the hole A method of grouting by inserting a nail and mortar and a method of constructing a large concrete structure in the form of a retaining wall on the front side of a slope are additionally known.

상기와 같은 종래의 사면보호 및 보강공법 중에서 식생매트와 철망을 이용한 공법은 초,목본식물의 생장을 도모하여 경사면의 녹화를 이루어낼 수 있는 장점을 가지지만, 경사면의 완전한 녹화가 이루어지기 전까지는 다른 공법에 비하여 경사면의 보호강도가 떨어지는 단점이 있었고, 각종 재질의 블록을 경사면의 표면상에 연결시키도록 한 공법의 경우는 식생매트와 철망을 이용한 공법에 비하여 경사면의 보호강도를 다소 향상시킬 수는 있었으나, 우천시 토사유실이 심하여 경사면의 조기녹화가 어려운 단점이 있었다.Among the conventional slope protection and reinforcement methods as described above, the method using a vegetation mat and wire mesh has the advantage of achieving greening of the slope by promoting the growth of grass and woody plants. Compared to other methods, the protection strength of the slope was inferior, and in the case of the method in which blocks of various materials were connected on the surface of the slope, the protection strength of the slope could be slightly improved compared to the method using a vegetation mat and wire mesh. However, there was a disadvantage in that early greening of slopes was difficult due to severe soil loss in rainy weather.

또한, 상기 그라우팅 공법이나 콘크리트 옹벽 공법의 경우는 앞서 설명되어진 다른 공법에 비하여 경사면의 보호 및 보강강도를 매우 높은 수준으로 향상시킬 수 있는 장점을 가지지만, 콘크리트 마감표면을 가지는 공법의 특성상 경사면상에 초,목본식물의 생장이 불가능하여 환경친화적이지 못할 뿐만 아니라, 시공에 따른 초기 비용이 과도하게 소요되고 해당 구조물의 시공후에도 꾸준한 유지보수가 병행되어야 한다는 단점이 있었다.In addition, the grouting method or the concrete retaining wall method has the advantage of improving the protection and reinforcing strength of the slope to a very high level compared to the other methods described above. Not only is it not environmentally friendly because it is impossible to grow grass and woody plants, but there are also disadvantages in that the initial cost for construction is excessive, and continuous maintenance must be performed in parallel after the construction of the structure.

이에 반하여, 격자구조틀을 이용한 경사면 보호공법의 경우는 경사면의 전방측에 배치되는 전방보강격자 및 바닥보강격자에 의하여 경사면의 표면강도를 충분히 확보할 수 있음은 물론이고, 전방보강격자가 제공하는 벽체구조물상에 녹화시트를 부착하여 식생토를 취부시킴으로서 경사면의 녹화 역시 가능하다는 장점을 가지고 있는 바, 상기 격자구조틀을 이용한 경사면 보강구조가 일본 공개특허공보 특개평4-213625호(1992. 8. 4. 공개)에 기재되어 알려져 있다.On the other hand, in the case of the slope protection method using the grid structure frame, the surface strength of the slope can be sufficiently secured by the front reinforcement grid and the floor reinforcement grid disposed on the front side of the slope, as well as the wall provided by the front reinforcement grid. It has the advantage that greening of the slope is also possible by attaching the vegetation soil by attaching the greening sheet on the structure. . Published) and known.

상기와 같은 격자구조틀은 도 1에서와 같이 절취사면의 후방측과 바닥측에 걸쳐 배치되는 배수구조물로서의 보강배수벽체(11) 및 배수관(14)과 함께 경사면 보강구조물(20)을 이루게 되며, 상기 보강배수벽체(11)는 육면체 블록 형상으로 제작된 배수블록(12)을 절취사면의 폭과 높이 방향을 따라 순차적으로 맞대어 연결시키는 방식으로 시공되는 것이며, 상기 격자구조틀(10)은 배수관(14)의 선단측 부위에서 경사면의 높이 방향을 따라 적층식으로 연결 설치되는 것이다.The lattice structure frame as described above forms the inclined surface reinforcement structure 20 together with the reinforcement drainage wall 11 and the drainage pipe 14 as drainage structures disposed over the rear side and the bottom side of the cut-off slope as in FIG. 1, and the The reinforced drainage wall 11 is constructed in such a way that the drainage blocks 12 manufactured in the shape of a hexahedral block are sequentially buttted along the width and height directions of the cut-off slopes, and the grid structure frame 10 is a drainage pipe 14. It is to be connected and installed in a stacked manner along the height direction of the inclined surface at the tip side of the

상기와 같은 보강배수벽체(11)의 구축을 위하여 사용되었던 종래의 배수블록(12)은 도 2 및 도 3에서와 같이, 육면체 형상을 이루는 외곽프레임(15)의 내부공간에 골재(骨材)(17)를 충진시키되, 해당 외곽프레임(15)이 제공하는 육면에 걸쳐 골재(17)의 유출을 방지하는 금속제 커버망(16)을 설치한 골재형 배수블록(12)이 되는 바, 이러한 종래의 골재형 배수블록(12)은 경사면의 보강시공 후 얼마의 기간이 지나지 않아 커버망(16)으로 유입된 토사 성분이 골재(17) 사이의 공극을 채움에 따라 절취사면의 내부로 유입되는 지중수나 침투수를 경사면의 외부로 원활히 배출시키지 못하는 문제점이 있었다.The conventional drainage block 12 used for construction of the reinforcement drainage wall 11 as described above is, as shown in FIGS. 2 and 3, aggregate in the inner space of the outer frame 15 having a hexahedral shape. Filling (17), it becomes an aggregate-type drainage block (12) provided with a metal cover network (16) to prevent the outflow of aggregate (17) over the six surfaces provided by the corresponding outer frame (15). The aggregate-type drainage block 12 of There was a problem in that water or seepage water could not be smoothly discharged to the outside of the slope.

이로 인하여, 지중수나 침투수에 의한 세골(洗骨)이나 균열 등이 절취사면의 내부에서 점차 진행 및 증대(확대)될 경우, 지반약화에 따른 경사면의 붕괴를 유발시킬 위험성이 매우 높은 문제점이 있었으며, 외곽프레임(15)을 따라 커버망(16)을 연결시킨 구조적인 특성상 절취사면의 후방측에 다수 개의 배수블록(12)을 옹벽 형태로 적층 설치하여 보강배수벽체(11)를 일차적으로 구축한 다음, 해당 보강배수벽체(11)의 최하측 배수블록(12)을 배수관(14) 등의 배수라인과 연결시키더라도 지중수나 침투수의 확실한 배수작업을 보장하기 어려운 문제점이 있었다.For this reason, if fine bones or cracks caused by underground water or seepage water gradually progress and increase (expand) inside the cut slope, there is a very high risk of causing the collapse of the slope due to the weakening of the ground. , the reinforcement drainage wall 11 was first built by stacking a plurality of drainage blocks 12 in the form of a retaining wall on the rear side of the cut-off slope due to the structural characteristics of connecting the cover network 16 along the outer frame 15. Next, even if the lowermost drainage block 12 of the reinforcing drainage wall 11 is connected to a drainage line such as a drainage pipe 14, there is a problem in that it is difficult to ensure reliable drainage of underground water or infiltration water.

다시 말해서, 종래의 골재형 배수블록(12)을 이용하여 옹벽 형태로 구축된 보강배수벽체(11)의 경우, 그 하단측에 연결된 배수라인을 통하여 지중수나 침투수가 한데 모여 집중적으로 배출되지 못하고 보강배수벽체(11)를 이루는 각각의 골재형 배수블록(12)을 거쳐 지중수나 침투수의 상당 부분이 토사다짐층으로 직접 유입된다는 것이며, 이와 같이 유입된 지중수나 침투수가 토사다짐층의 내부에 새로운 세골이나 균열 등을 유발시킴으로서, 격자구조틀(10)이 포함된 토사다짐층의 시공후 안전성에도 심각한 악영향을 미치게 된다는 것이다.In other words, in the case of the reinforcing drainage wall 11 constructed in the form of a retaining wall using the conventional aggregate-type drainage block 12, the underground water or infiltrated water gathers together through the drainage line connected to the lower end, and cannot be discharged intensively. A significant portion of groundwater or infiltration water flows directly into the soil compaction layer through each aggregate-type drainage block 12 constituting the drainage wall 11 . By inducing fine bones or cracks, it will seriously adversely affect the safety after construction of the soil compaction layer including the lattice structure 10 .

이러한 문제점을 어느 정도 보완할 수 있도록, 골재형 배수블록(12)의 전,후방측 커버망(16)에 필터시트(13)를 부착시킴으로서, 절취사면으로부터 토사 성분이 지중수나 침투수와 함께 커버망(16)을 거쳐 골재(17)의 공극 사이로 유입되는 것을 차단시킴에 따라, 배수작업에 필요한 골재(17) 사이의 공극을 최대한으로 유지시킬 수 있도록 하고, 각각의 배수블록(12)과 함께 보강배수벽체(11)의 전면과 후면이 필터시트(13)로 덮혀지도록 함에 따라, 절취사면으로부터 배출되는 지중수나 침투수를 흡수하여 이를 배수관(14)이 연결된 보강배수벽체(11)의 하단부로 유도할 수 있도록 하였다.In order to compensate for this problem to some extent, by attaching the filter sheet 13 to the front and rear cover nets 16 of the aggregate-type drainage block 12, the soil component from the cut-off surface is covered together with groundwater or infiltration water. By blocking the inflow between the voids of the aggregate 17 through the mesh 16, it is possible to maintain the voids between the aggregates 17 necessary for drainage work to the maximum, and together with each drainage block 12 As the front and rear surfaces of the reinforcing drainage wall 11 are covered with the filter sheet 13, it absorbs the underground water or infiltration water discharged from the cut-off slope and uses it to the lower end of the reinforced drainage wall 11 to which the drainage pipe 14 is connected. was made to be induced.

그러나, 기존의 골재형 배수블록(12) 전,후방면에 필터시트(13)를 부착시키는 개선사항만으로는 절취사면의 내부로 유입된 지중수나 침투수가 보강배수벽체(11) 전방측의 토사다짐층으로 유출될 가능성이 항상 내포되어 있기 때문에, 지중수나 침투수가 토사다짐층으로 유출되지 않고 보강배수벽체(11)를 따라 그 하단 내측으로 전량 집수된 다음, 해당 위치에 연결된 배수관(14)을 거쳐 경사면의 외부로 집중 배출시킬 수 있도록 한다는 궁극적인 목적을 효과적으로 달성할 수가 없는 문제점이 있었다.However, only the improvement of attaching the filter sheet 13 to the front and rear surfaces of the existing aggregate-type drainage block 12 is the soil compaction layer on the front side of the reinforcement drainage wall 11 with the groundwater or seepage water flowing into the cut slope. Since there is always a possibility that it will leak into There was a problem that could not effectively achieve the ultimate purpose of allowing concentrated discharge to the outside of

특히, 종래의 골재형 배수블록(12)은 그 무게가 매우 무겁기 때문에, 절취사면의 후방측에 배수블록(12)을 이용하여 보강배수벽체(11)를 설치하는 작업시 대형 크레인 등의 중장비가 추가로 사용되어야 함으로서 시공비용을 불필요하게 상승시키는 요인이 되었고, 인력에 의한 보강배수벽체(11)의 구축작업이 가능한 수준으로 골재형 배수블록(12)을 최대한 작게 제작할 경우에는, 절취사면의 폭과 높이 방향을 따라 작은 크기의 배수블록(12)을 전,후와 좌,우 및 상,하 방향으로 정확하게 맞대어 보강배수벽체(11)를 안정적으로 구축하는 작업 역시 매우 까다롭고 난해한 문제점이 있었다.In particular, since the conventional aggregate-type drainage block 12 has a very heavy weight, heavy equipment such as a large crane is As it had to be additionally used, it became a factor that unnecessarily increased the construction cost, and when the aggregate-type drainage block 12 is made as small as possible to a level where the construction work of the reinforced drainage wall 11 by manpower is possible, the width of the cut-off slope The task of stably constructing the reinforced drainage wall 11 by accurately abutting the small-sized drainage blocks 12 in the front, rear, left, right, and top and bottom directions along the height and height direction was also very difficult and difficult.

본 고안은 상기와 같은 종래의 문제점을 해결하기 위하여 안출된 것으로서, 상기 배수블록을 육면체 형상의 블록바디와, 상기 블록바디의 전방면에 배치되는 집수커버로 구성하되, 상기 블록바디의 몸통 전면(全面)에 걸쳐 전,후 방향의 배수구멍을 촘촘한 간격으로 관통 형성시키고, 상기 집수커버는 블록바디의 전방면 전체를 덮는 " ]"자형 단면의 커버가 되도록 하며, 상기 블록바디의 후방면에 토사의 유입을 차단하면서 지중수나 침투수만이 통과되게 하는 필터시트를 부착시키고, 상기 보강배수벽체 중 최하측에 위치하는 배수블록의 집수커버 하단에 배수라인과 연결되는 배수구를 제공함으로서, 절취사면의 내부로 유입된 지중수나 침투수가 필터시트와 블록바디 및 집수커버를 거쳐 보강배수벽체의 하단측으로 전량 집수된 다음, 해당 위치의 집수커버에 제공된 배수구와 배수라인을 거쳐 경사면의 외부로 집중 배출될 수 있도록 하는 한편, 배수블록을 이용한 보강배수벽체의 구축작업 역시 별도의 중장비를 사용하지 않는 인력에 의한 작업만으로도 손쉽고 신속하며 견고하게 수행할 수 있도록 하는 것을 그 주된 기술적 과제로 한다.The present invention has been devised to solve the conventional problems as described above, and the drainage block is composed of a hexahedral block body and a water collecting cover disposed on the front surface of the block body, but the front of the body of the block body ( Drain holes in the front and rear directions are formed through the entire surface at close intervals, and the water collection cover is made to be a cover with a " ]" shape cross-section that covers the entire front surface of the block body, and soil and sand on the rear surface of the block body By attaching a filter sheet that blocks the inflow of water and allowing only underground water or permeated water to pass through, and by providing a drain hole connected to the drain line at the bottom of the water collecting cover of the drain block located at the bottom of the reinforcement drain wall, the inside of the cut-off slope The groundwater or permeated water introduced into the tunnel is collected in the lower part of the reinforced drainage wall through the filter sheet, the block body, and the water collecting cover, and then discharged through the drain hole and the drain line provided in the water collecting cover at the location to be discharged intensively to the outside of the slope. On the other hand, the main technical task of the construction work of the reinforcement drainage wall using the drainage block is to make it easy, fast and robust only by the work of a man who does not use a separate heavy equipment.

상기의 기술적 과제를 해결하기 위한 수단으로서의 본 고안은, 경사면을 일정량만큼 깍아내어 개설면을 평지화시킨 절취사면의 전방측에 토사의 성토와 다짐 시공에 의한 토사다짐층으로 새로운 경사면을 조성할 시, 상기 절취사면으로부터 토사다짐층으로 유출되는 지중수나 침투수의 집수를 위하여 절취사면과 토사다짐층의 사이에 옹벽 형태의 보강배수벽체를 설치하는 데 사용되는 배수블록에 있어서, 상기 배수블록은 절취사면의 높이와 폭 방향을 따라 상,하 및 좌,우 방향으로 맞대어 보강배수벽체의 구축이 가능토록 하는 육면체 형상의 블록바디와, 상기 블록바디의 전방측에 배치되는 집수커버와, 상기 블록바디의 후방면에 부착 설치되는 필터시트를 포함하여서 이루어지고, 상기 블록바디에는 해당 몸통을 전,후 방향으로 관통하는 배수구멍이 몸통의 전면에 걸쳐 촘촘한 간격으로 형성되는 한편, 상기 집수커버는 블록바디의 전방면과 동일 면적을 가지는 사각판의 좌,우측단에 사이드판이 후방으로 돌출 형성된 " ]"자형 단면의 커버가 되며, 상기 보강배수벽체의 최하측에 위치하는 배수블록의 집수커버 하단측에는 배수관 또는 배수채널과 연결되는 배수구가 제공되는 것을 특징으로 한다.The present invention as a means to solve the above technical problems is when a new slope is created with a soil compaction layer by filling and compacting of the soil on the front side of the cut slope, where the open surface is flattened by cutting the slope by a certain amount. , In the drainage block used to install a reinforced drainage wall in the form of a retaining wall between the cut slope and the soil compaction layer for collection of underground water or seepage water flowing out from the cut slope to the soil compaction layer, the drainage block is cut A block body in the shape of a hexahedron that enables the construction of a reinforced drainage wall by facing up, down, left, and right directions along the height and width direction of the slope, and a water collecting cover disposed on the front side of the block body, and the block body It is made including a filter sheet attached to and installed on the rear surface of the block body, and drain holes penetrating the body in the front and rear directions are formed at tight intervals over the front of the body, while the water collecting cover is the block body At the left and right ends of the square plate having the same area as the front surface of Alternatively, it is characterized in that a drain port connected to the drain channel is provided.

이와 더불어, 상기 블록바디의 상부면과 하부면에는 블록바디의 적층식 조립작업을 위한 조립홈부와 조립돌출부가 각각 대응 형성되고, 상기 블록바디의 배수구멍은 전방측을 향하여 소정의 각도만큼 하향 경사지게 형성되는 것을 특징으로 하며, 상기 집수커버의 후방면 중앙에는 사이드판과 동일한 형태를 가지는 최소 1개 이상의 칸막이판이 형성되고, 상기 배수구는 칸막이판에 의하여 구획되는 공간마다 최소 1개 이상의 개수로 설치되는 것을 특징으로 하며, 상기 보강배수벽체의 최하측에 위치하는 배수블록의 집수커버 하단측에는 좌,우측 사이드판을 연결하는 바닥판이 설치되고, 상기 보강배수벽체의 최상측에 위치하는 배수블록의 집수커버 상단측에는 좌,우측 사이드판을 연결하는 덮개판이 설치되는 것을 특징으로 한다.In addition, an assembly groove and an assembly protrusion for stacked assembly of the block body are respectively formed on the upper and lower surfaces of the block body, and the drain hole of the block body is inclined downward by a predetermined angle toward the front side. At least one partition plate having the same shape as the side plate is formed in the center of the rear surface of the water collecting cover, and the drain hole is installed in at least one number for each space partitioned by the partition plate Characterized in that, the bottom plate connecting the left and right side plates is installed at the lower end of the water collection cover of the drainage block located at the lowermost side of the reinforcing drainage wall, and the water collection cover of the drainage block located at the uppermost side of the reinforced drainage wall. It is characterized in that a cover plate connecting the left and right side plates is installed on the upper side.

상기와 같은 본 고안에 따르면, 보강배수벽체의 구축을 위한 배수블록을 육면체 형상의 블록바디와, 상기 블록바디의 전방면에 배치되는 집수커버로 구성하되, 상기 블록바디의 몸통 전면에 걸쳐 전,후 방향의 배수구멍을 촘촘한 간격으로 관통 형성시키고, 상기 집수커버는 블록바디의 전방면 전체를 덮는 " ]"자형 단면의 커버가 되도록 하며, 상기 블록바디의 후방면에 토사의 유입을 차단하면서 지중수나 침투수만이 통과되게 하는 필터시트를 부착시키고, 상기 보강배수벽체의 최하측에 위치하는 집수커버의 하단에 배수라인과 연결되는 배수구를 제공함으로서, 절취사면의 내부로 유입된 지중수나 침투수가 필터시트와 블록바디 및 집수커버를 거쳐 보강배수벽체의 하단측으로 전량 집수된 다음, 해당 위치의 집수커버에 제공된 배수구와 배수라인을 거쳐 경사면의 외부로 집중 배출시킬 수 있는 효과를 제공한다.According to the present invention as described above, the drainage block for the construction of the reinforcing drainage wall is composed of a hexahedral block body and a water collecting cover disposed on the front surface of the block body, but over the entire body of the block body, The drainage holes in the rear direction are penetrated at close intervals, and the water collection cover is made to have a “ ]”-shaped cross-section that covers the entire front surface of the block body. By attaching a filter sheet that allows only water or permeated water to pass through, and providing a drain connected to the drain line at the lower end of the water collection cover located at the lowermost side of the reinforcing drainage wall, the underground water or permeated water introduced into the cut-off slope is filtered It provides the effect that the entire amount of water is collected to the lower side of the reinforced drainage wall through the seat, block body and water collecting cover, and then concentrated to the outside of the slope through the drain hole and drain line provided in the water collecting cover at the corresponding location.

이를 통하여, 절취사면이나 토사다짐층의 내부에 지중수나 침투수에 의한 세골이나 균열 등이 진행 및 증대(확대)되는 것을 사전에 차단시킴으로서, 지반약화에 따른 경사면의 붕괴 위험성을 보다 더 확실하게 방지할 수 있는 효과를 제공하며, 상기 블록바디와 집수커버의 경우 플라스틱 소재를 이용한 사출성형 방식으로도 제작이 가능하고, 배수블록 자체를 비교적 큰 치수로 대형화시키더라도 배수블록의 전체적인 무게는 골재형 배수블록에 비하여 훨씬 더 경량화시킬 수 있음에 따라, 배수블록을 이용하여 보강배수벽체를 구축하는 작업 역시 별도의 중장비를 사용하지 않고 인력에 의한 작업만으로도 신속하고 용이하게 수행할 수 있는 동시에, 블록바디의 상부면과 하부면에 제공된 조립홈부와 조립돌출부를 이용하여 보강배수벽체의 구축작업을 조립식으로 한층 더 정확하고 견고하게 수행할 수 있는 등의 매우 유용한 효과를 제공하는 것이다.Through this, by blocking in advance the progress and increase (expansion) of fine bones or cracks caused by underground water or seepage water in the cut slope or the inside of the soil compaction layer, the risk of collapse of the slope due to ground weakness is more reliably prevented In the case of the block body and the water collection cover, it is possible to manufacture by injection molding using plastic materials, and even if the drainage block itself is enlarged to a relatively large size, the overall weight of the drainage block is aggregate-type drainage As it can be made much lighter than the block, the construction of the reinforced drainage wall using the drainage block can also be quickly and easily performed without the use of separate heavy equipment and only by manpower. It is to provide very useful effects, such as being able to perform the construction work of the reinforcing drainage wall in a prefabricated manner more accurately and firmly by using the assembly grooves and assembly projections provided on the upper and lower surfaces.

도 1은 격자구조틀이 포함된 경사면 보강구조물을 나타내는 외관사시도.
도 2는 도 1의 보강배수벽체에 사용되는 종래의 배수블록을 나타내는 일부 분해사시도.
도 3은 도 2의 결합된 상태의 외관사시도.
도 4는 본 고안에 따른 배수블록을 이용한 보강배수벽체의 설치상태를 나타내는 외관사시도.
도 5는 본 고안에 따른 배수블록의 구조도.
도 6은 도 5에 도시된 블록바디의 저면사시도.
도 7의 (가) 및 (나)는 본 고안에 따른 배수블록의 측단면도.
도 8은 보강배수벽체와 함께 사용되는 배수라인의 다른 실시예를 나타내는 외관사시도.
도 9는 보강배수벽체와 함께 사용되는 배수라인의 또 다른 실시예를 나타내는 외관사시도.
도 10 내지 도 19는 본 고안에 따른 배수블록을 이용한 경사면 보강구조물의 시공과정을 순차적으로 나타내는 시공설명도.
도 20은 도 19의 측단면도.
1 is an external perspective view showing an inclined surface reinforcement structure including a grid frame;
Figure 2 is a partial exploded perspective view showing a conventional drainage block used for the reinforcement drainage wall of Figure 1;
Figure 3 is an external perspective view of the coupled state of Figure 2;
Figure 4 is an exterior perspective view showing the installation state of the reinforcement drainage wall using the drainage block according to the present invention.
5 is a structural diagram of a drainage block according to the present invention.
Figure 6 is a bottom perspective view of the block body shown in Figure 5;
7 (A) and (B) are side cross-sectional views of the drain block according to the present invention.
8 is an external perspective view showing another embodiment of a drainage line used together with a reinforced drainage wall.
9 is an external perspective view showing another embodiment of a drainage line used together with a reinforced drainage wall.
10 to 19 are construction explanatory views sequentially showing the construction process of the inclined surface reinforcement structure using the drainage block according to the present invention.
Fig. 20 is a side cross-sectional view of Fig. 19;

이하, 상기의 목적을 달성하기 위한 본 고안을 첨부된 도면을 참조하여 상세하게 설명하면 다음과 같다.Hereinafter, the present invention for achieving the above object will be described in detail with reference to the accompanying drawings.

본 고안에 따른 경사면 보강배수벽체(11)용 배수블록(12)은 도 4 내지 도 6에 걸쳐 도시된 바와 같이, 육면체 형상의 블록바디(18)와, 상기 블록바디(18)의 전방측에 배치되는 집수커버(19)로 구성되고, 상기 블록바디(18)에는 해당 몸통을 전,후 방향으로 관통하는 배수구멍(18a)이 몸통의 전면(全面)에 걸쳐 촘촘한 간격으로 형성되는 한편, 상기 집수커버(19)는 블록바디(18)의 전방면과 동일 면적을 가지는 사각판의 좌,우측단에 사이드판(19b)이 후방으로 돌출 형성된 " ]"자형 단면의 커버가 된다.As shown in Figs. 4 to 6, the drainage block 12 for the inclined surface reinforcement drainage wall 11 according to the present invention has a block body 18 of a hexahedron shape, and the front side of the block body 18. Consists of a water collecting cover 19 disposed, and in the block body 18, drainage holes 18a penetrating the body in the front and rear directions are formed at tight intervals over the entire surface of the body, while the The water collecting cover 19 is a cover having a " ]" shape cross-section in which the side plates 19b protrude rearwardly at the left and right ends of a square plate having the same area as the front surface of the block body 18 .

따라서, 상기 집수커버(19)를 블록바디(18)의 전방면과 맞대어 설치할 경우, 블록바디(18)의 전방면과 집수커버(19)의 후방면이 사이드판(19b)에 의하여 소정의 여유간격을 두고 이격됨으로서 해당 여유간격이 수직 방향의 배수통로를 제공하게 되는 것이며, 상기 필터시트(13)는 배수블록(12)을 이루는 블록바디(18)의 후방면에 부착 설치되고, 상기 배수블록(12)에 의하여 구축되는 보강배수벽체(11)의 최하측에 위치하는 배수블록(12)의 집수커버(19) 하단측에 배수관(14)과 연결되는 배수구(19a)가 제공되는 것이다.Therefore, when the water collecting cover 19 is installed facing the front surface of the block body 18, the front surface of the block body 18 and the rear surface of the water collecting cover 19 are provided with a predetermined margin by the side plate 19b. By being spaced apart at a distance, the corresponding clearance provides a vertical drain passage, and the filter sheet 13 is attached to the rear surface of the block body 18 constituting the drain block 12 and installed, and the drain block A drain hole (19a) connected to the drain pipe (14) is provided on the lower side of the water collecting cover (19) of the drain block (12) located on the lowermost side of the reinforced drain wall (11) constructed by (12).

상기 블록바디(18)에 형성되는 배수구멍(18a)은 앞서 설명되어진 수직 방향의 배수통로와 연계된 수평(전,후) 방향의 배수통로를 제공하는 것으로서, 블록바디(18)의 몸통 전방면과 후방면 전체 면적의 약 70~80% 정도가 배수구멍(18a)을 이루도록 하고, 그 나머지 부분이 블록바디(18)의 테두리 부분 및 배수구멍(18a)의 지지살(18b)을 이루도록 하는 것이 바람직하다.The drain hole 18a formed in the block body 18 provides a horizontal (front, rear) direction drainage passage linked to the vertical drain passage described above, and the front surface of the body of the block body 18 and about 70 to 80% of the total area of the rear surface form the drain hole 18a, and the remaining portion forms the edge portion of the block body 18 and the support rib 18b of the drain hole 18a desirable.

도면상 각각의 배수구멍(18a)이 사각형 구멍으로 형성되어 있으나, 이외에도 원형 구멍 또는 다각형 구멍과 같은 다양한 형태의 구멍으로 형성될 수 있으며, 상기 배수블록(12)을 이용하여 보강배수벽체(11)를 구축하는 작업의 신속성과 편의성 및 정확성을 모두 확보할 수 있도록, 블록바디(18)의 상부면과 하부면에 조립홈부(12a)와 조립돌출부(12b)를 각각 대응 형성시키는 것이 바람직하다.Although each drain hole 18a is formed as a square hole in the drawing, it may be formed in various shapes such as a circular hole or a polygonal hole in addition to, and the reinforcement drain wall 11 using the drain block 12 In order to secure all of the speed, convenience, and accuracy of the construction work, it is preferable to form the assembly groove portion 12a and the assembly projection portion 12b respectively on the upper surface and the lower surface of the block body 18 to correspond to each other.

필요에 따라서는 상기 블록바디(18)의 좌측면과 우측면에도 조립홈부(12a) 및 조립돌출부(12b)와 같은 블록바디(18)간의 측면 조립구조를 제공할 수 있음은 물론이고, 상기 블록바디(18)의 전방면 좌,우측 가장자리 부분에 집수커버(19)의 사이드판(19b)이 끼움식으로 조립되는 조립홈이나 조립단턱을 형성시킬 수도 있으며, 상기 필터시트(13)는 접착제를 이용하여 블록바디(18)의 후방면에 접착시켜 놓을 수도 있고, 블록바디(18)의 후방면 가장자리를 따라 제공된 테두리부상에 일정 간격을 두고 체결공(미도시)을 형성시킨 다음, 상기 필터시트(13)를 나사체결식으로 블록바디(18)상에 부착시킬 수도 있음을 밝혀두는 바이다.If necessary, a side assembly structure between the block body 18 such as the assembly groove 12a and the assembly protrusion 12b may be provided on the left side and the right side of the block body 18 as well, and the block body An assembly groove or an assembly step in which the side plate 19b of the water collection cover 19 is fitted in the left and right edges of the front surface of (18) may be formed, and the filter sheet 13 is formed using an adhesive. Then, the filter sheet ( 13) can be attached to the block body 18 by screwing.

이와 더불어, 상기 집수커버(19)의 후방면 중앙에 사이드판(19b)과 동일한 형태를 가지는 최소 1개 이상의 칸막이판(19c)을 추가로 형성시킬 수도 있는 바, 상기 칸막이판(19c)은 집수커버(19)에 의하여 제공되는 수직 방향의 배수통로를 보다 더 세분화시키는 기능을 제공함과 아울러, 상기 배수블록(12)을 이용하여 구축된 보강배수벽체(11)의 전방측으로 토사를 성토 및 다짐하는 과정에서 토사의 다짐력에 의하여 집수커버(19)가 블록바디(18)측으로 불룩하게 돌출되는 것을 방지하는 보강살의 기능을 병행하는 것이며, 이를 고려하여 상기 칸막이판(19c)의 설치갯수는 최소 1개에서 최대 3개를 넘지 않도록 하는 것이 바람직하다.In addition, at least one partition plate 19c having the same shape as the side plate 19b may be additionally formed in the center of the rear surface of the water collection cover 19, and the partition plate 19c is In addition to providing a function of further subdividing the drainage passage in the vertical direction provided by the cover 19, the soil is filled and compacted toward the front side of the reinforced drainage wall 11 constructed using the drainage block 12. In the process, the function of reinforcing meat to prevent the water collecting cover 19 from protruding from the block body 18 side by the compaction force of the soil and sand in the process is performed in parallel, and in consideration of this, the number of installations of the partition plate 19c is at least 1 It is desirable not to exceed a maximum of three in dogs.

상기와 같이 집수커버(19)의 중앙에 칸막이판(19c)이 설치될 경우, 보강배수벽체(11)의 최하측에 배치되는 배수구(19a)는 해당 집수커버(19)의 칸막이판(19c)에 의하여 구획되는 수직 방향의 배수통로마다 최소 1개 이상의 개수로 하여 설치될 것이지만, 배수관(14)의 전체적인 설치갯수를 감안할 경우 칸막이판(19c)에 의하여 제공되는 수직 방향의 배수통로마다 1개의 배수구(19a)를 설치하는 것이 가장 경제적이며, 경우에 따라서는 상기 보강배수벽체(11)의 첫 번째 층(최하층)을 이루는 배수블록(12)의 상단부나 두 번째 층을 이루는 배수블록(12)의 하단부에 배수관(14)을 추가로 연결시킴으로서, 해당 배수관(14)이 최하부측 배수관(14)의 기능을 보완토록 할 수도 있다.When the partition plate 19c is installed in the center of the water collection cover 19 as described above, the drain hole 19a disposed on the lowermost side of the reinforcing drainage wall 11 is the partition plate 19c of the water collection cover 19. At least one drain hole will be installed for each vertical drain passage partitioned by It is most economical to install (19a), and in some cases, the upper end of the drainage block 12 constituting the first layer (lowest layer) of the reinforcement drainage wall 11 or the drainage block 12 constituting the second layer. By additionally connecting the drain pipe 14 to the lower end, the drain pipe 14 may supplement the function of the lowermost drain pipe 14 .

도 7의 (가) 및 (나)에 도시된 것은 보강배수벽체(11)의 최하측과 최상측에 각각 배치되는 배수블록(12)의 또 다른 적용례를 나타낸 것으로서, 보강배수벽체(11)의 최하측에 위치하는 배수블록(12)의 집수커버(19) 하단측에는 좌,우측 사이드판(19b)을 연결하는 바닥판(19d)을 설치하고, 보강배수벽체(11)의 최상측에 위치하는 배수블록(12)의 집수커버(19) 상단측에는 좌,우측 사이드판(19b)을 연결하는 덮개판(19e)을 설치함으로서, 집수커버(19)가 제공하는 수직 방향의 배수통로 바닥측으로 지중수나 침투수가 누설되지 않도록 함과 동시에, 해당 배수통로의 상단측으로 토사가 유입되지 않도록 하는 것이 바람직하다.7 (A) and (B) show another application example of the drainage block 12 disposed on the lowermost and uppermost sides of the reinforced drainage wall 11, respectively. The bottom plate 19d connecting the left and right side plates 19b is installed on the lower side of the water collection cover 19 of the drainage block 12 located at the lowermost side, and located on the uppermost side of the reinforcing drainage wall 11 By installing a cover plate 19e that connects the left and right side plates 19b on the upper side of the water collecting cover 19 of the drain block 12, the water collecting cover 19 provides the vertical direction of the drain passage to the bottom side. It is desirable to prevent the infiltration of water from leaking and at the same time prevent the inflow of soil into the upper end of the drain passage.

또한, 상기 각각의 배수구멍(18a)은 블록바디(18)의 후방측으로부터 그 전방측을 향하여 소정의 각도, 예를 들어 10도 내외의 각도만큼 하향 경사지게 형성시킴으로서, 지중수나 침투수의 배출작업이 보다 더 확실하게 수행되도록 하는 것이 바람직하고, 도 7의 (가)에서와 같이 보강배수벽체(11)의 최하단측에 배치되는 배수블록(12)의 블록바디(18) 하부면에는 조립돌출부(12b)를 형성시키지 않더라도 무방하지만, 해당 조립돌출부(12b)가 절취사면의 바닥면을 통하여 매입되도록 하면 보강배수벽체(11)의 시공에 전혀 지장을 초래하지 아니하므로, 블록바디(18)의 적용에 혼선을 초래하지 않도록 조립홈부(12a)와 조립돌출부(12b)가 모두 형성된 1가지 종류의 블록바디(18)만을 제작 및 사용하는 것이 바람직하다.In addition, each drain hole (18a) is formed to be inclined downward by a predetermined angle, for example, an angle of about 10 degrees from the rear side of the block body 18 toward the front side, thereby discharging underground water or infiltration water. It is preferable to perform more reliably than this, and as shown in (A) of FIG. 12b) may not be formed, but if the assembly protrusion 12b is embedded through the bottom surface of the cut-off slope, it does not interfere with the construction of the reinforced drainage wall 11 at all, so the application of the block body 18 It is preferable to manufacture and use only one type of block body 18 in which both the assembly groove 12a and the assembly protrusion 12b are formed so as not to cause confusion.

도 8 및 도 9에 도시된 것은 본 고안의 배수블록(12)을 이용한 보강배수벽체(11)와 함께 경사면 보강구조물(20)에 적용 가능한 배수라인의 다른 실시예를 나타낸 것으로서, 도 8에 도시된 것은 파이프형 배수관(14)을 대신하여 "U"자형 단면의 배수채널(14a)이 설치된 것이고, 도 9에 도시된 것은 상기 배수채널(14a)을 경사면의 폭 방향에 걸쳐 추가로 연결시킨 것인 바, 이를 위하여 도 9에 도시된 배수라인은 일자형 채널(21a)과 십자형 채널(21b) 및 티자형 채널(21c)간의 조립식 채널(21)이 되며, 앞서 설명되어진 파이프형 배수관(14)의 경우에도 일자형 파이프와 십자형 연결관 및 티자형 연결관을 이용하여 도 9에 도시된 구조의 배수라인으로 설치될 수 있음은 물론이다.8 and 9 show another embodiment of a drainage line applicable to the inclined surface reinforcement structure 20 together with the reinforcement drainage wall 11 using the drainage block 12 of the present invention, shown in FIG. What has been done is that a drain channel 14a having a “U” cross section is installed instead of the pipe-type drain pipe 14, and the one shown in FIG. 9 is that the drain channel 14a is additionally connected across the width direction of the inclined surface. For this purpose, the drain line shown in FIG. 9 becomes the prefabricated channel 21 between the straight channel 21a, the cross channel 21b and the tee-shaped channel 21c, and the pipe-type drain pipe 14 described above. It goes without saying that even in this case, it can be installed as a drainage line of the structure shown in FIG.

상기와 같은 구성으로 이루어지는 본 고안의 배수블록(12)을 이용하여 격자구조틀(10)이 포함된 경사면 보강구조물(20)을 시공하는 과정을 도 10 내지 도 20을 참조하여 간략하게 설명하면 다음과 같다.The process of constructing the inclined surface reinforcement structure 20 including the grid structure frame 10 using the drainage block 12 of the present invention having the configuration as described above is briefly described with reference to FIGS. 10 to 20 as follows. same.

먼저, 훼손된 경사면의 복구작업 또는 도로나 철도의 개설작업 등을 위하여 경사면을 일정량만큼 깍아냄으로서 개설면이 평지화 된 절취사면을 일차적으로 조성시킨 다음, 도 10에서와 같이 절취사면(22)의 후방측에서 절취사면(22)의 폭과 높이 방향을 따라 본 고안의 배수블록(12)을 상,하 및 좌,우 방향으로 맞대어 보강배수벽체(11)를 구축하되, 각각의 배수블록(12)을 이루는 블록바디(18)의 후방면에 필터시트(13)를 부착시킨 상태에서, 블록바디(18) 상,하부면의 조립홈부(12a)와 조립돌출부(12b)를 이용하여 각각의 블록바디(18)를 전방측 집수커버(19)와 함께 적층식으로 맞대어 설치하게 된다.First, a cut-off slope with a flattened open surface is first created by cutting the inclined surface by a certain amount for restoration work of a damaged slope or construction of a road or railroad, and then, as shown in FIG. From the rear side, the drainage block 12 of the present invention is faced in the up, down, left, and right directions along the width and height directions of the cut-out slope 22 to construct the reinforcement drainage wall 11, but each drainage block 12 ) with the filter sheet 13 attached to the rear surface of the block body 18 constituting The body 18 and the front water collecting cover 19 are installed in a stacked manner.

도면상 각각의 배수블록(12)을 이용하여 2개의 층을 가지는 보강배수벽체(11)를 한번에 구축하는 것으로 도시되어 있으나, 1회에 1개층씩 보강배수벽체(11)를 순차적으로 구축하는 것도 가능하며, 이와 같이 보강배수벽체(11)가 구축된 절취사면(22)의 전방측 개설면을 따라 도 11에서와 같이 지오그리드 등의 보강시트(23)를 깔아 놓은 다음, 도 12에서와 같이 보강배수벽체(11)의 최하측에 위치하는 배수블록(12)의 배수구(19a)마다 배수관(14)을 연결시켜 해당 배수관(14)이 보강시트(23)의 상부면에 놓이도록 하는 한편, 각 배수관(14)의 선단 출구측이 경사면의 전방측에 선시공된 메인배수로(24)의 내측에 위치토록 하게 된다.Although it is shown in the drawing that the reinforcement drainage wall 11 having two layers is built at a time by using each drainage block 12, sequentially building the reinforcement drainage wall 11 one layer at a time is also It is possible, and as shown in FIG. 11, along the front side open surface of the cut-out slope 22 on which the reinforcement drainage wall 11 is constructed in this way, a reinforcement sheet 23 such as a geogrid is laid, and then reinforced as in FIG. The drain pipe 14 is connected to each drain hole 19a of the drain block 12 located at the lowermost side of the drain wall 11 so that the drain pipe 14 is placed on the upper surface of the reinforcing sheet 23, while each The distal end outlet side of the drain pipe 14 is positioned inside the main drain channel 24 pre-constructed on the front side of the inclined surface.

상기와 같은 상태에서 도 13에 도시된 바와 같이, 각각의 배수관(14)이 매입(埋入)되도록 보강시트(23)의 상부면에 기초콘크리트(25)를 타설 및 경화시켜 토사의 다짐시공에 필요한 토대를 제공토록 하고, 상기 배수관(14)을 대신하여 배수채널(14a)이 설치된 경우에는 기초콘크리트(25)의 타설 이전에 각 배수채널(14a)의 상부면을 커버 등으로 덮어 배수채널(14a)의 내부로 콘크리트가 유입되지 않도록 하며, 기초콘크리트(25)가 최종 경화된 이후 도 14 및 도 15에서와 같이, 기초콘크리트(25)의 상부면에 보강시트(23)를 추가로 덮은 다음, 해당 보강시트(23)의 선단측에 격자구조틀(10)이 놓이도록 하며, 필요시 앵커볼트 등을 이용하여 상기 격자구조틀(10)을 보강시트(23)와 함께 기초콘크리트(25)상에 견고히 고정되도록 할 수도 있다.As shown in FIG. 13 in the above state, by pouring and hardening the foundation concrete 25 on the upper surface of the reinforcement sheet 23 so that each drain pipe 14 is embedded, To provide a necessary foundation, and when a drainage channel 14a is installed in place of the drainage pipe 14, before pouring the foundation concrete 25, cover the upper surface of each drainage channel 14a with a cover, etc. 14a) so that the concrete does not flow into the interior, and after the foundation concrete 25 is finally hardened, as in FIGS. 14 and 15 , the reinforcement sheet 23 is additionally covered on the upper surface of the foundation concrete 25 and then , so that the grid structure frame 10 is placed on the tip side of the reinforcing sheet 23, and if necessary, the grid structure frame 10 together with the reinforcing sheet 23 is placed on the foundation concrete 25 using an anchor bolt or the like. It can also be made to be firmly fixed.

상기와 같은 방식으로 기초콘크리트(25)의 상부면과 그 선단측에 보강시트(23)와 격자구조틀(10)을 배치하여 놓은 상태에서, 도 16 및 도 17에서와 같이 격자구조틀(10)의 후방면과 보강배수벽체(11)의 전방면 사이에 걸쳐 토사를 성토 및 다짐함으로서, 보강배수벽체(11)의 1층 높이에 해당하는 토사다짐층(26)을 시공한 다음, 해당 토사다짐층(26)의 상부면에 보강시트(23)를 추가로 덮어두게 되며, 상기 격자구조틀(10)의 전방측 상단 부분은 토사다짐층(26)의 상부면을 통하여 일정 길이만큼 외부로 노출시킴으로서, 그 상부에 위치하게 될 또 다른 격자구조틀(10)과의 연결작업에 사용토록 한다.In the state in which the reinforcement sheet 23 and the grid structure 10 are arranged on the upper surface and the tip side of the foundation concrete 25 in the same manner as described above, as in FIGS. 16 and 17 of the grid structure frame 10 By filling and compacting the soil between the rear surface and the front surface of the reinforcement drainage wall 11, the soil compaction layer 26 corresponding to the first floor height of the reinforcement drainage wall 11 is constructed, and then the soil compaction layer The reinforcing sheet 23 is additionally covered on the upper surface of the 26, and the front upper portion of the grid structure 10 is exposed to the outside by a certain length through the upper surface of the soil compaction layer 26, It is to be used for connection work with another grid structure frame 10 to be located on the upper part.

상기와 같은 상태에서 도 18에 도시된 바와 같이, 토사다짐층(26)의 선단측 상부면에 또 다른 격자구조틀(10)을 배치하여 각각의 격자구조틀(10)을 적층식으로 연결 설치하게 되며, 본 단계에 투입되는 격자구조틀(10)은 보강시트(23)를 거쳐 토사다짐층(26)으로 박히는 앵커나 말뚝 등을 이용하여 토사다짐층(26)상에 견고히 고정시켜 놓는 것이 바람직하다.In the above state, as shown in FIG. 18, another lattice frame 10 is arranged on the upper surface of the tip side of the soil compaction layer 26, and each lattice structure frame 10 is connected and installed in a stacked manner. , it is preferable to firmly fix the grid structure frame 10 input in this step on the soil compaction layer 26 using anchors or piles that are driven into the soil compaction layer 26 through the reinforcement sheet 23 .

상기와 같은 상태에서 도 19 및 도 20에서와 같이, 격자구조틀(10)의 후방면과 보강배수벽체(11)의 전방면 사이에 걸쳐 토사를 성토 및 다짐함으로서, 보강배수벽체(11)의 2층 높이에 해당하는 토사다짐층(26)을 추가로 시공하게 되며, 이러한 일련의 과정을 순차적으로 거침에 따라 격자구조틀(10) 및 보강배수벽체(11)가 포함된 경사면 보강구조물(20)을 경사면의 높이에 맞추어 시공할 수 있는 것이며, 경사면의 보강시공이 완료된 이후에는 격자구조틀(10)의 전방측 벽체구조물상에 녹화시트를 부착하여 식생토를 취부시킴으로서 경사면의 녹화를 최종 유도하게 되는 것이다.19 and 20 in the above state, by filling and compacting the soil between the rear surface of the grid structure frame 10 and the front surface of the reinforcement drainage wall 11, 2 of the reinforcement drainage wall 11 The soil compaction layer 26 corresponding to the layer height is additionally constructed, and by sequentially passing through this series of processes, the inclined surface reinforcement structure 20 including the grid structure 10 and the reinforcing drainage wall 11 is installed. It can be constructed according to the height of the slope, and after the reinforcement construction of the slope is completed, the greening sheet is attached on the front wall structure of the lattice frame 10 to attach the vegetation soil to finally induce the greening of the slope. .

상기와 같은 일련의 시공과정을 거쳐 본 고안의 배수블록(12)을 이용한 보강배수벽체(11)를 경사면상에 구축할 경우, 절취사면(22)의 내부로 유입된 지중수나 침투수가 필터시트(13)와 블록바디(18) 및 집수커버(19)를 거쳐 보강배수벽체(11)의 하단측으로 전량 집수된 다음, 해당 위치의 집수커버(19)에 제공된 배수구(19a)와 배수라인을 거쳐 경사면의 외부로 집중 배출되도록 할 수 있으며, 이를 통하여 절취사면(22)이나 토사다짐층(26)의 내부에 지중수나 침투수에 의한 세골이나 균열 등이 진행 및 증대(확대)되는 것을 사전에 차단시킴으로서, 지반약화에 따른 경사면의 붕괴 위험성을 보다 더 확실하게 방지할 수 있다.When the reinforced drainage wall 11 using the drainage block 12 of the present invention is built on an inclined surface through a series of construction processes as described above, the groundwater or infiltration water flowing into the cut-off slope 22 is filtered through the filter sheet ( 13) and the block body 18 and the water collecting cover 19, the entire amount of water is collected toward the lower end of the reinforced drainage wall 11, and then the inclined surface is passed through the drain 19a provided in the water collecting cover 19 at the corresponding position and the drainage line. By blocking in advance the progress and increase (expansion) of fine bones or cracks caused by underground water or infiltration water in the cut slope 22 or the soil compaction layer 26 through this, , it is possible to more reliably prevent the risk of collapse of the slope due to the weakening of the ground.

특히, 상기 블록바디(18)와 집수커버(19)의 경우 플라스틱 소재를 이용한 사출성형 방식으로도 제작이 가능하고, 배수블록(12) 자체를 비교적 큰 치수로 대형화시키더라도 배수블록(12)의 전체적인 무게는 골재형 배수블록에 비하여 훨씬 더 경량화시킬 수 있음에 따라, 배수블록(12)을 이용하여 보강배수벽체(11)를 구축하는 작업 역시 별도의 중장비를 사용하지 않고 인력에 의한 작업만으로도 신속하고 용이하게 수행할 수 있는 동시에, 블록바디(18)의 상부면과 하부면에 제공된 조립홈부(12a)와 조립돌출부(12b)를 이용하여 보강배수벽체(11)의 구축작업을 조립식으로 한층 더 정확하고 견고하게 수행할 수 있는 것이다.In particular, in the case of the block body 18 and the water collection cover 19, it is possible to manufacture by injection molding using a plastic material, and even if the drainage block 12 itself is enlarged to a relatively large size, the drainage block 12 is As the overall weight can be significantly reduced compared to the aggregate-type drainage block, the construction of the reinforced drainage wall 11 using the drainage block 12 is also rapid without using additional heavy equipment and only by manpower. and at the same time can be easily performed, the construction of the reinforcement drainage wall 11 by using the assembly grooves 12a and the assembly protrusions 12b provided on the upper and lower surfaces of the block body 18 in a prefabricated manner. It can be done accurately and robustly.

도 10 내지 도 20을 기초로 하여 위에서 설명되어진 내용은 본 고안에 따른 배수블록(12)을 이용하여 경사면 보강구조물(20)을 시공하는 하나의 대표적인 일례에 불과한 것으로서, 기초콘크리트(25)와 메인배수로(24)의 적용여부 및 보강시트(23)의 적용위치 등은 시공여건에 따라 임의대로 조정 및 변경이 가능하고, 상기 배수블록(12) 및 이를 이용한 보강배수벽체(11) 자체가 격자구조틀(10)과는 상관없이 그 단독으로 경사면의 보강시공에 사용될 수 있음은 물론이다.
이와 더불어, 상기 필터시트(13)의 경우에도 각각의 배수블록(12)마다 개별적으로 분할 설치하는 대신에, 보강시트(23)와 같이 절취사면(22)의 폭과 높이 방향을 아우르는 하나의 대형시트로 설치될 수 있고, 필터시트(13)의 재질 또한 토사의 유입은 차단시키면서 지중수나 침투수만의 선택적 배출이 가능한 것이라면, 각종 천이나 부직포 또는 합성수지 재질의 다공성 시트 등을 포함하여 어떠한 종류의 시트 소재라도 적용이 가능하며, 상기 블록바디(18)와 집수커버(19)의 경우 역시 플라스틱 이외에도 콘크리트를 포함한 다른 여러 가지 소재로 제작될 수 있음을 밝혀두는 바이다.
The contents described above based on FIGS. 10 to 20 are only one representative example of constructing the inclined surface reinforcement structure 20 using the drainage block 12 according to the present invention, and the foundation concrete 25 and the main The application of the drainage channel 24 and the application position of the reinforcement sheet 23 can be arbitrarily adjusted and changed according to the construction conditions, and the drainage block 12 and the reinforcement drainage wall 11 using the same are the grid structure frame. Of course, regardless of (10), it can be used alone for the reinforcement construction of the inclined surface.
In addition, even in the case of the filter sheet 13, instead of separately installing for each drainage block 12, a single large size covering the width and height directions of the cut-out slope 22 like the reinforcement sheet 23 It can be installed as a sheet, and if the material of the filter sheet 13 also blocks the inflow of soil and allows selective discharge of only underground water or permeated water, any kind of sheet, including various types of cloth, non-woven fabric, or porous sheet made of synthetic resin material It should be noted that any material can be applied, and the block body 18 and the water collecting cover 19 can also be made of various other materials, including concrete, in addition to plastic.

10 : 격자구조틀 11 : 보강배수벽체 12 : 배수블록
12a : 조립홈부 12b : 조립돌출부 13 : 필터시트
14 : 배수관 14a : 배수채널 15 : 외곽프레임
16 : 커버망 17 : 골재 18 : 블록바디
18a : 배수구멍 18b : 지지살 19 : 집수커버
19a : 배수구 19b : 사이드판 19c : 칸막이판
19d : 바닥판 19e : 덮개판 20 : 보강구조물
21 : 조립식 채널 21a : 일자형 채널 21b : 십자형 채널
21c : 티자형 채널 22 : 절취사면 23 : 보강시트
24 : 메인배수로 25 : 기초콘크리트 26 : 토사다짐층
10: lattice structure frame 11: reinforcement drainage wall 12: drainage block
12a: assembly groove 12b: assembly protrusion 13: filter sheet
14: drain pipe 14a: drain channel 15: outer frame
16: cover network 17: aggregate 18: block body
18a: drain hole 18b: support meat 19: water collecting cover
19a: drain hole 19b: side plate 19c: partition plate
19d: bottom plate 19e: cover plate 20: reinforcing structure
21: prefabricated channel 21a: straight channel 21b: cross channel
21c: Tee-shaped channel 22: Cut-off side 23: Reinforcement sheet
24: main drainage channel 25: concrete foundation 26: soil compaction layer

Claims (4)

경사면을 일정량만큼 깍아내어 개설면을 평지화시킨 절취사면(22)의 전방측에 토사의 성토와 다짐 시공에 의한 토사다짐층(26)으로 새로운 경사면을 조성할 시, 상기 절취사면(22)으로부터 토사다짐층(26)으로 유출되는 지중수나 침투수의 집수를 위하여 절취사면(22)과 토사다짐층(26)의 사이에 옹벽 형태의 보강배수벽체(11)를 설치하는 데 사용되는 배수블록(12)에 있어서,
상기 배수블록(12)은 절취사면(22)의 높이와 폭 방향을 따라 상,하 및 좌,우 방향으로 맞대어 보강배수벽체(11)의 구축이 가능토록 하는 육면체 형상의 블록바디(18)와, 상기 블록바디(18)의 전방측에 배치되는 집수커버(19)와, 상기 블록바디(18)의 후방면에 부착 설치되는 필터시트(13)를 포함하여서 이루어지고,
상기 블록바디(18)에는 해당 몸통을 전,후 방향으로 관통하는 배수구멍(18a)이 몸통의 전면(全面)에 걸쳐 촘촘한 간격으로 형성되는 한편, 상기 집수커버(19)는 블록바디(18)의 전방면과 동일 면적을 가지는 사각판의 좌,우측단에 사이드판(19b)이 후방으로 돌출 형성된 " ]"자형 단면의 커버가 되며,
상기 보강배수벽체(11)의 최하측에 위치하는 배수블록(12)의 집수커버(19) 하단측에는 배수관(14) 또는 배수채널(14a)과 연결되는 배수구(19a)가 제공되는 것을 특징으로 하는 경사면 보강배수벽체용 배수블록.
When a new slope is created with the soil compaction layer 26 by the soil filling and compaction construction on the front side of the cut-off slope 22, where the open surface is flattened by cutting the slope by a certain amount, from the cut-off slope 22 A drainage block ( In 12),
The drainage block 12 is a block body 18 in the shape of a hexahedron that enables the construction of the reinforcement drainage wall 11 by facing up, down, left, and right directions along the height and width direction of the cut-off slope 22 and , a water collecting cover 19 disposed on the front side of the block body 18, and a filter sheet 13 attached to and installed on the rear surface of the block body 18,
In the block body 18, drain holes 18a penetrating the body in the front and rear directions are formed at tight intervals over the entire surface of the body, while the water collecting cover 19 is formed in the block body 18 The side plates 19b protrude rearwardly at the left and right ends of the square plate having the same area as the front surface of
A drain hole (19a) connected to a drain pipe (14) or a drain channel (14a) is provided at the lower end of the water collecting cover (19) of the drain block (12) located at the lowermost side of the reinforcing drain wall (11) Drainage block for slope reinforcement drainage wall.
제 1항에 있어서, 상기 블록바디(18)의 상부면과 하부면에는 블록바디(18)의 적층식 조립작업을 위한 조립홈부(12a)와 조립돌출부(12b)가 각각 대응 형성되고, 상기 블록바디(18)의 배수구멍(18a)은 전방측을 향하여 소정의 각도만큼 하향 경사지게 형성되는 것을 특징으로 하는 경사면 보강배수벽체용 배수블록.The block body (18) according to claim 1, wherein an assembly groove (12a) and an assembly protrusion (12b) for stacking the block body (18) are respectively formed on the upper and lower surfaces of the block body (18). The drainage block for the inclined surface reinforcement drainage wall, characterized in that the drainage hole (18a) of the body (18) is inclined downward by a predetermined angle toward the front side. 제 1항 또는 제 2항에 있어서, 상기 집수커버(19)의 후방면 중앙에는 사이드판(19b)과 동일한 형태를 가지는 최소 1개 이상의 칸막이판(19c)이 형성되고, 상기 배수구(19a)는 칸막이판(19c)에 의하여 구획되는 공간마다 최소 1개 이상의 개수로 설치되는 것을 특징으로 하는 경사면 보강배수벽체용 배수블록.According to claim 1 or 2, wherein at least one partition plate (19c) having the same shape as the side plate (19b) is formed in the center of the rear surface of the water collecting cover (19), the drain hole (19a) A drainage block for an inclined surface reinforced drainage wall, characterized in that at least one or more is installed in each space partitioned by the partition plate (19c). 제 1항 또는 제 2항에 있어서, 상기 보강배수벽체(11)의 최하측에 위치하는 배수블록(12)의 집수커버(19) 하단측에는 좌,우측 사이드판(19b)을 연결하는 바닥판(19d)이 설치되고, 상기 보강배수벽체(11)의 최상측에 위치하는 배수블록(12)의 집수커버(19) 상단측에는 좌,우측 사이드판(19b)을 연결하는 덮개판(19e)이 설치되는 것을 특징으로 하는 경사면 보강배수벽체용 배수블록.According to claim 1 or 2, wherein the bottom plate for connecting the left and right side plates (19b) on the lower side of the collecting cover (19) of the drainage block (12) located at the lowermost side of the reinforcing drainage wall (11) ( 19d) is installed, and a cover plate 19e connecting the left and right side plates 19b is installed on the upper side of the water collecting cover 19 of the drain block 12 located on the uppermost side of the reinforcing drainage wall 11. Drainage block for slope reinforcement drainage wall, characterized in that it becomes.
KR2020190005194U 2019-12-20 2019-12-20 Drain block for a reinforcing drain wall of slope KR200495069Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020190005194U KR200495069Y1 (en) 2019-12-20 2019-12-20 Drain block for a reinforcing drain wall of slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020190005194U KR200495069Y1 (en) 2019-12-20 2019-12-20 Drain block for a reinforcing drain wall of slope

Publications (2)

Publication Number Publication Date
KR20210001477U KR20210001477U (en) 2021-06-30
KR200495069Y1 true KR200495069Y1 (en) 2022-02-25

Family

ID=76603487

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020190005194U KR200495069Y1 (en) 2019-12-20 2019-12-20 Drain block for a reinforcing drain wall of slope

Country Status (1)

Country Link
KR (1) KR200495069Y1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200354010Y1 (en) * 2004-02-17 2004-06-23 (주)다산컨설턴트 Breast mounting structure of road
KR100490959B1 (en) * 2005-01-14 2005-05-24 주식회사 건축연합종합건축사사무소 A breast facilities of double for construction
KR101550457B1 (en) * 2009-09-22 2015-09-09 민승기 Anti-collapse block on slope

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200354010Y1 (en) * 2004-02-17 2004-06-23 (주)다산컨설턴트 Breast mounting structure of road
KR100490959B1 (en) * 2005-01-14 2005-05-24 주식회사 건축연합종합건축사사무소 A breast facilities of double for construction
KR101550457B1 (en) * 2009-09-22 2015-09-09 민승기 Anti-collapse block on slope

Also Published As

Publication number Publication date
KR20210001477U (en) 2021-06-30

Similar Documents

Publication Publication Date Title
KR101126658B1 (en) Assembly type of structure for drainage and construction method using the same
KR101023660B1 (en) Retaining Wall using Anchor and Concrete Panel and its Construction Method
US10480150B2 (en) Retaining wall method of precast block to prevent landslide
CN210216254U (en) Concrete guardrail structure
CN110258622B (en) Pile plate type retaining wall and construction method thereof
KR20220012525A (en) Slurry wall, construction method for the same and wire mesh assembly
CN114775352A (en) Widening structure for embankment wall section of existing roadbed in riverside and construction method
CN109750571A (en) A kind of road landslide emergency and permanent supporting and retaining system integral structure and construction method
KR102150343B1 (en) Framework with lattice structure for reinforcing slope and slope reinforcing construct using thereof
CN210262555U (en) Light soil road structure
KR20090039448A (en) Nature-friendly diversion drain at top of slope
KR100744043B1 (en) Reinforced Soil Retaining Wall Prestressed To The Horizontal Direction And The Construction Method Using The Same
KR200495069Y1 (en) Drain block for a reinforcing drain wall of slope
KR100414779B1 (en) Reinforcing structure for a slope of ground cutted area
KR101201544B1 (en) Underground Penetration Type Side Gutter Assembly
CN216920384U (en) Highway tunnel entrance to a cave section landslide body side slope protection additional strengthening that collapses
JP6676462B2 (en) Embankment reinforcement method
CN213173779U (en) Cutting slope protection structure
JP6931876B2 (en) How to build a permeable wall for slope reinforcement
CN113718802A (en) Ecological concrete rock-soil slope protection structure and construction method
KR100968518B1 (en) Construction method of reinforced green retaining wall
KR100884391B1 (en) Abreast wall having enhanced supply function on the top of retaining wall and construction method thereof
CN114086505A (en) River course slope protection structure for hydraulic engineering and laying construction method
KR20090035951A (en) Retaining wall for easy drainage and it's construction work method thereof
KR200258951Y1 (en) Reinforcing structure for a slope of ground cutted area

Legal Events

Date Code Title Description
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
REGI Registration of establishment