KR200473805Y1 - A test unit for turbine thrust trip relay of steam turbine apply to power plant and operating test working method therefore - Google Patents

A test unit for turbine thrust trip relay of steam turbine apply to power plant and operating test working method therefore Download PDF

Info

Publication number
KR200473805Y1
KR200473805Y1 KR2020120012220U KR20120012220U KR200473805Y1 KR 200473805 Y1 KR200473805 Y1 KR 200473805Y1 KR 2020120012220 U KR2020120012220 U KR 2020120012220U KR 20120012220 U KR20120012220 U KR 20120012220U KR 200473805 Y1 KR200473805 Y1 KR 200473805Y1
Authority
KR
South Korea
Prior art keywords
turbine
trust
trip relay
plunger
bolt holes
Prior art date
Application number
KR2020120012220U
Other languages
Korean (ko)
Other versions
KR20140004095U (en
Inventor
오동우
Original Assignee
한전케이피에스 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한전케이피에스 주식회사 filed Critical 한전케이피에스 주식회사
Priority to KR2020120012220U priority Critical patent/KR200473805Y1/en
Publication of KR20140004095U publication Critical patent/KR20140004095U/en
Application granted granted Critical
Publication of KR200473805Y1 publication Critical patent/KR200473805Y1/en

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M99/00Subject matter not provided for in other groups of this subclass
    • G01M99/008Subject matter not provided for in other groups of this subclass by doing functionality tests
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D21/00Shutting-down of machines or engines, e.g. in emergency; Regulating, controlling, or safety means not otherwise provided for
    • F01D21/003Arrangements for testing or measuring
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M13/00Testing of machine parts

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Control Of Turbines (AREA)

Abstract

본 고안은 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 신뢰도시험장치 및 그 시험실시방법에 관한 것으로, 그 목적은 발전시설의 관련계통에 대한 가동 없이, 발전시설의 관련계통상에 설치된 터빈 트러스트 트립 릴레이를 현장에서 바로 분리시켜 정상작동 여부를 신속하게 시험하여 확인할 수 있고, 불시에 사용될 수 있는 스페어 터빈 트러스트 트립 릴레이를 확보하는 동시에 스페어 터빈 트러스트 트립 릴레이에 대한 동작시험을 수시로 실시하여 항상 최상의 상태로 유지함으로써 유사시 신뢰성 있는 부품으로 교체하여 전력계통의 안정적인 운영을 가능한 것이며, 그 구성은 다수개의 볼트공과, 다수개의 결합공과, 상기 볼트공에 결합되어 볼트공을 유밀하게 차단하는 다수개의 차단용 볼트를 구비하고, 터빈 트러스트 트립 릴레이의 후면에 착탈가능하게 결합되는 테스트 유닛과; 상기 다수개의 볼트공 중 어느 하나에 장착되어 시험 대상 터빈 트러스트 트립 릴레이의 하우징 내에 내장된 트립 릴레이 플런저가 작동할 수 있도록 조립된 볼트공을 통해 하우징 내로 압유를 공급하는 유압펌프와; 상기 트립 릴레이 플런저의 이동위치별 압력을 측정하는 압력계와; 상기 테스트 유닛의 다수개의 볼트공 중 어느 하나에 장착되어 가압에 따른 플런저의 이동을 확실히 하기 위해 플런저 하우징 내부의 공기구멍 기능을 하는 벤트밸브로 구성되는 것을 특징으로 한다.The present invention relates to a reliability test apparatus for a turbine trust trip relay of a steam turbine for a power generation facility and a test execution method thereof and aims at providing a turbine trust trip relay installed in a related system of a power generation facility without operation of the related system of the power generation facility, Can be quickly tested and verified for normal operation, ensuring spur turbine trust trip relays that can be used unintentionally, while at the same time performing operational tests on spare turbine trust trip relays to keep them in top condition at all times. Thereby enabling stable operation of the power system by replacing the parts with reliable parts in case of emergency. The construction includes a plurality of bolt holes, a plurality of coupling holes, and a plurality of blocking bolts coupled to the bolt holes to block the bolt holes , And the turbine The test unit is detachably coupled to the surface; A hydraulic pump installed in any one of the plurality of bolt holes to supply pressure oil into the housing through a bolt hole assembled to operate a trip relay plunger built in a housing of a turbine trust relay to be tested; A pressure gauge for measuring a pressure of the trip relay plunger according to a moving position; And a vent valve mounted in one of the plurality of bolt holes of the test unit and functioning as an air hole in the plunger housing to ensure movement of the plunger in response to pressurization.

Description

발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 신뢰도시험장치 및 그 시험실시방법{A test unit for turbine thrust trip relay of steam turbine apply to power plant and operating test working method therefore }Technical Field [0001] The present invention relates to a turbine thrust trip relay of a steam turbine for a power plant,

본 고안은 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 신뢰도시험장치 및 그 시험실시방법에 관한 것으로, 더욱 상세하게는 증기터빈의 정상운전중 위험발생 시 증기터빈을 안전하게 정지시키는 터빈보호장치에 있어서 추력 베어링이 비정상적으로 마모되어 변위가 기준 이상으로 발생 되었을 때 동작하여 증기터빈을 정지시키는 터빈 트러스트 트립 릴레이(Turbine Thrust Trip Relay)를 증기터빈의 계통정상화 전에 사전 시험 및 정비를 시행할 수 있는 구조를 갖도록 한 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 신뢰도시험장치 및 그 시험실시방법에 관한 것이다.The present invention relates to a reliability testing apparatus for a turbine trust trip relay of a steam turbine for a power plant, and more particularly, to a turbine protection apparatus for safely stopping a steam turbine in the event of a danger during normal operation of the steam turbine, The turbine thrust trip relay, which operates when the bearing wears abnormally and occurs when the displacement is above the reference, stops the steam turbine so that it can be pre-tested and maintained before normalization of the steam turbine system. The present invention relates to a reliability test apparatus for a turbine trust trip relay of a steam turbine for a power generation facility and a test execution method thereof.

일반적으로, 발전시설의 증기터빈에는 운전 중 비정상적인 작동이 감지되면 이를 바로 감지하여 자동으로 증기터빈의 운전을 정지시키는 여러 가지 터빈보호장치가 구비되어 있다.Generally, a steam turbine of a power generation facility is provided with various turbine protection devices that immediately detect abnormal operation during operation and automatically stop the operation of the steam turbine.

본 고안은 상기 여러 가지 터빈보호장치 중 터빈의 추력 베어링이 비정상적으로 마모되어 변위가 기준 이상으로 발생 되었을 때 동작하여 증기터빈을 정지시키는 터빈 트러스트 트립 릴레이(Turbine Thrust Trip Relay)에 대한 사전 시험 및 정비를 위한 장치 및 시험실시방법에 관한 것임으로, 본 명세서에서는 증기터빈의 터빈 트러스트 트립 릴레이 및 이를 사전 작동시험/정비하는 장치 및 그 시험실시방법에 대하여만 기술된다는 것을 양지하기 바란다.The present invention relates to a turbine thrust trip relay (turbine thrust trip relay) which operates when turbine thrust bearing is abnormally worn out of the various turbine protecting apparatuses, It is noted that only turbine trust trip relays of the steam turbine and the apparatus for preliminary operation test / maintenance thereof and the test execution method thereof are described in this specification.

일반적으로, 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이는 터빈의 추력 베어링의 비정상적 마모로 인한 기준치 이상의 변위(Turbine Thrust Bearing Wear) 발생 시 자동으로 동작하여 증기터빈을 정지시키는데 이러한 터빈 트러스트 트립 릴레이는 작동오일이 적절히 공급 및 배유될 수 있는 통로가 형성되어야만 동작 안전성을 확보할 수 있으나, 구조상 플런저(Plunger)와 하우징(Housing) 등이 복잡하고 정밀하게 조립되어 있고, 스프링 장력의 변화, 유로형성 불량, 플런저 동작불량 등이 있을 때 제대로 동작되지 않기 때문에 증기터빈의 정상운전 전에 사전 점검을 실시하여 최적으로 상태를 유지해야만 발전소를 안전하게 운전할 수 있는 것이다.Generally, the turbine-trust-trip relay of the steam turbine for the power generation plant operates automatically when turbine thrust bearing wear occurs due to abnormal wear of the turbine thrust bearing to stop the steam turbine. Such a turbine- The plunger and the housing are complicatedly and precisely assembled in terms of structure, and a change in the spring tension, a defective flow path, a plunger, It is not possible to operate the power plant safely until the steam turbine is properly operated by performing the preliminary inspection before the normal operation of the steam turbine.

이러한 터빈 트러스트 트립 릴레이의 동작상태를 시험하기 위한 종래의 시험방법은 메인터빈 및 유압오일펌프의 관련계통을 정상화시킨 상태에서 터빈 트러스트 트립 릴레이의 동작시험을 실시하고, 동작시험 실시의 결과 문제점이 있을 때 해당 부품을 확보하여 교체한 후 재차 동작시험을 실시하여 문제점이 해소되고 정상적인 동작이 이루어졌을 때 증기터빈을 정상운전하여 전력을 생산하도록 하고 있다.The conventional test method for testing the operation state of the turbine-trust-trip relay is to perform an operation test of the turbine-trust-trip relay under normalization of the main system of the main turbine and the hydraulic oil pump, , The parts are secured and replaced, and then the operation test is performed again to solve the problem, and when the normal operation is performed, the steam turbine operates normally to produce electric power.

그러나, 종래의 터빈 트러스트 트립 릴레이에 대한 시험방법은 먼저 메인터빈 및 유압오일펌프의 관련계통을 정상화시킨 상태에서 동작시험이 가능하기 때문에 계통정상화를 위한 많은 추가작업이 필요하고, 동작시험을 한 결과 동작에 문제가 발생하였을 때 문제의 원인을 파악하고, 해당부품을 부품을 확보/교체하는데 많은 시간이 소요됨으로 막대한 전력생산의 차질을 초래할 뿐만 아니라 주변공간이 협소함으로 인해 올바른 시험을 실시하기가 어렵다는 문제점이 있었다.However, since the test method for the conventional turbine trust trip relay can perform the operation test in the state where the related system of the main turbine and the hydraulic oil pump is normalized, a lot of additional work is required for normalization of the system. It is difficult to identify the cause of the problem and to secure / replace the part because it takes a lot of trouble to produce electric power and it is difficult to conduct a proper test due to the narrow space There was a problem.

본 고안은 상기와 같은 종래의 문제점을 고려하여 안출한 것으로서, 그 목적은 발전시설의 관련계통에 대한 가동 없이, 발전시설의 관련계통상에 설치된 터빈 트러스트 트립 릴레이를 현장에서 바로 분리시켜 정상작동 여부를 신속하게 시험하여 확인할 수 있고, 불시에 사용될 수 있는 스페어 터빈 트러스트 트립 릴레이를 확보하는 동시에 스페어 터빈 트러스트 트립 릴레이에 대한 동작시험을 수시로 실시하여 항상 최상의 상태로 유지함으로써 유사시 신뢰성 있는 부품으로 교체하여 전력계통의 안정적인 운영을 가능하게 할 수 있는 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 신뢰도시험장치를 제공하는 것이다.The present invention has been made in view of the above-described conventional problems, and it is an object of the present invention to provide a turbine control system that separates a turbine trust trip relay installed in a related system of a power generation facility directly from a site without operating the related system of the power generation facility, And ensure the spur turbine trust trip relay that can be used unexpectedly while at the same time performing the operation tests on the spare turbine trust trip relay from time to time to keep it in the best state at all times, And to provide a reliability test apparatus for a turbine trust trip relay of a steam turbine for a power generation facility capable of stable operation of the system.

본 고안의 다른 목적은 본 고안에 따른 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이에 대한 신뢰도 시험장치를 사용하여 터빈 트러스트 트립 릴레이에 대한 작동신뢰도를 시험하기 위한 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 신뢰도시험장치의 시험실시방법을 제공하는 것이다.Another object of the present invention is to provide a reliability test of a turbine trust trip relay of a steam turbine for a power generation plant according to the present invention and a reliability test of a turbine trust trip relay of a steam turbine for a power generation facility for testing operation reliability of the turbine trust trip relay And to provide a test execution method of the test apparatus.

상기 본 고안의 목적은 평판으로써, 관통된 다수개의 볼트공과, 연부를 따라 관통형성된 다수개의 결합공과, 상기 볼트공에 결합되어 볼트공을 유밀하게 차단하는 다수개의 차단용 볼트를 구비하고, 터빈 트러스트 트립 릴레이의 후면에 결합볼트에 의해 착탈가능하게 결합되는 테스트 유닛과; 상기 테스트 유닛의 다수개의 볼트공 중 어느 하나에 장착되어 시험 대상 터빈 트러스트 트립 릴레이의 하우징 내에 내장된 트립 릴레이 플런저가 작동할 수 있도록 조립된 볼트공을 통해 하우징 내로 압유를 공급하는 유압펌프와; 상기 테스트 유닛의 다수개의 볼트공 중 어느 하나에 장착되어 상기 트립 릴레이 플런저의 이동위치별 압력을 측정하는 압력계와; 상기 테스트 유닛의 다수개의 볼트공 중 어느 하나에 장착되어 가압에 따른 플런저의 이동을 확실히 하기 위해 플런저 하우징 내부의 공기구멍 기능을 하는 벤트밸브로 구성되는 것을 특징으로 하는 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 신뢰도시험장치에 의해 달성될 수 있는 것이다.The object of the present invention is to provide a flat plate which has a plurality of through holes, a plurality of through holes formed along the edge, and a plurality of blocking bolts coupled to the bolt holes to block the bolt holes, A test unit detachably coupled to the rear surface of the trip relay by a coupling bolt; A hydraulic pump installed in any one of a plurality of bolts of the test unit and supplying pressurized oil into the housing through a bolt hole assembled so that a trip relay plunger built in a housing of a turbine to be tested relay relay can operate; A pressure gauge mounted on any one of a plurality of bolts of the test unit and measuring a pressure of each of the trip relay plungers at a moving position; And a vent valve mounted in one of a plurality of bolt holes of the test unit and functioning as an air hole in the plunger housing to ensure movement of the plunger in response to the pressurization. Which can be achieved by a reliability testing apparatus of a relay.

또한, 상기 본 고안의 다른 목적은 상기 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 신뢰도시험장치를 사용하여 터빈 트러스트 트립 릴레이에 대한 작동시험실시방법에 있어서, 상기 방법은 테스트 유닛의 볼트공 중 시험 대상 터빈 트러스트 트립 릴레이의 후면에 장착되었을 때 오일유로를 원활하게 형성할 수 있는 위치에 위치된 각각의 볼트공에 유압펌프, 압력계 및 벤트밸브를 각기 장착시키는 부품조립단계와; 상기 부품조립단계가 완료되었을 때 상기 유압펌프, 압력계 및 벤트밸브가 장착되지 않은 나머지 볼트공에 차단용 볼트를 체결하여 유밀하게 차단하는 볼트공 차단단계와; 상기 볼트공 차단단계가 완료되었을 때 테스트 유닛(20)을 시험대상 터빈 트러스트 트립 릴레이의 후면에 장착하는 테스트 유닛 장착단계와; 상기 벤트밸브를 개방한 후 상기 유압펌프를 가동하여 오일을 압류하는 유압펌프가동단계와; 상기 유압펌프가동으로 시험대상 터빈 트러스트 트립 릴레이의 하우징내에 오일이 공급되고, 오일공급에 따라 하우징 내의 공기가 상기 개방된 벤트밸브를 통해 외부로 배기되었을 때 상기 벤트밸브를 닫는 벤트밸브폐쇄단계와; 유압펌프가 가동 중인 상태에서 시험대상 터빈 트러스트 트립 릴레이의 하우징내에 플런저가 원활하게 작동되는지를 확인하는 플런저작동 확인단계와; 플런저가 최대 스트크로크로 작동되는지를 확인하는 플런저최대스트로크확인단계와; 플런저가 작동될 때 플런저의 위치에 따른 압력을 확인하는 플런저 위치별 압력확인단계로 구성되는 것을 특징으로 하는 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 신뢰도시험장치의 시험실시방법에 의해 달성될 수 있는 것이다.It is another object of the present invention to provide a method for performing an operational test on a turbine trust trip relay using a reliability testing apparatus of a turbine trust trip relay of a steam turbine for a power generation facility, A component assembling step of mounting a hydraulic pump, a pressure gauge and a vent valve on each bolt hole positioned at a position where the oil passage can be smoothly formed when the turbine thrust relay is mounted on the rear surface of the turbine trust trip relay; A bolt hole blocking step of tightening a blocking bolt to the remaining bolt holes to which the hydraulic pump, the pressure gauge and the vent valve are not attached when the component assembling step is completed, A test unit mounting step of mounting the test unit (20) to the rear surface of the test subject turbine trust trip relay when the bolt blank cutting step is completed; A hydraulic pump operating step of opening the vent valve and then operating the hydraulic pump to seize the oil; Closing the vent valve when oil is supplied into the housing of the turbine trust relay to be tested by operating the hydraulic pump and air in the housing is exhausted to the outside through the open vent valve according to the oil supply; A plunger operation confirming step of confirming whether the plunger is smoothly operated in the housing of the test subject turbine trust trip relay in a state where the hydraulic pump is in operation; A plunger maximum stroke checking step of confirming whether the plunger is operated with the maximum stroke; And a pressure confirming step of plunger position for confirming the pressure according to the position of the plunger when the plunger is actuated. The method for testing the reliability of a turbine trust trip relay of a steam turbine for a power generation facility, will be.

본 고안에 따른 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 신뢰도시험장치는 계통의 정상화전에 미리 터빈 트러스트 트립 릴레이만을 관련계통으로 부터 분리하여 동작시험 및 정비를 실시할 수 있고, 스페어 터빈 트러스트 트립 릴레이를 확보하고, 수시로 스페어 터빈 트러스트 트립 릴레이에 대한 동작시험을 실시하여 최상의 상태가 유지되도록 하여 유사시에 즉시 터빈 트러스트 트립 릴레이를 스페어로 교체하여 발전시설을 신속하게 정상화시킬 수 있어 발전 차질을 최소하시킬 수 있는 효과를 갖는다.According to the present invention, the reliability test apparatus of the turbine trust trip relay of the steam turbine for the power generation facility can perform operation test and maintenance by separating only the turbine trust trip relay from the related system before normalization of the system, and the spare turbine trust trip relay The operation of the spare turbine trust trip relay is performed at any time to maintain the best condition. In case of emergency, the turbine trust trip relay can be replaced with a spare, so that the power generation facility can be quickly normalized, .

도 1은 본 고안에 따른 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 신뢰도시험장치의 테스트 유닛을 도시한 정면도이고,
도 2는 도 1의 A-A선을 따라 단면하고, 테스트 유닛의 해당 볼트공에 각각 체결되는 구성요소들을 조립상태를 개략적으로 도시한 조립상태 단면도이고,
도 3은 본 고안에 따른 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 신뢰도시험장치를 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 배면에 장착시킨 상태를 단면하여 도시한 조립상태 단면도이며,
도 4는 본 고안에 따른 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 신뢰도시험장치의 시험실시방법을 예시하는 블럭도이다.
1 is a front view showing a test unit of a reliability testing apparatus of a turbine trust trip relay of a steam turbine for a power generation plant according to the present invention,
FIG. 2 is a cross-sectional view taken along the line AA in FIG. 1, and is an assembled state sectional view schematically showing components assembled to the corresponding bolt holes of the test unit,
3 is a cross-sectional view of a state in which a reliability test apparatus for a turbine trust trip relay of a steam turbine for a power generation plant according to the present invention is mounted on the back surface of a turbine trust trip relay of a steam turbine for a power generation facility,
4 is a block diagram illustrating a test method of a reliability testing apparatus for a turbine trust trip relay of a steam turbine for a power generation plant according to the present invention.

이하, 첨부된 도면을 참조하여 본 고안에 따른 발전시설용 축류팬의 제어작동기에 대한 신뢰도 시험장치의 바림직한 실시 예를 구체적으로 설명한다.Hereinafter, a preferred embodiment of a reliability testing apparatus for a control actuator of an axial flow fan for a power generation facility according to the present invention will be described in detail with reference to the accompanying drawings.

이에 앞서, 본 명세서 및 청구범위에 사용된 용어나 단어는 통상적이거나 사전적인 의미로 한정해서 해석되어서는 아니 되며, 고안자는 그 자신의 고안을 가장 최선의 방법으로 설명하기 위해 용어의 개념을 적절하게 정의할 수 있다는 원칙에 입각하여 본 고안의 기술적 사상에 부합하는 의미와 개념으로 해석되어야만 한다.Prior to this, terms and words used in the present specification and claims should not be construed as limited to ordinary or dictionary meanings, and the inventor may appropriately design the concept of the term appropriately to describe its own design in the best way possible. It should be interpreted as a meaning and a concept consistent with the technical idea of the present invention based on the principle that it can be defined.

따라서, 본 명세서에 기재된 실시 예와 도면에 도시된 구성은 본 고안의 가장 바람직한 일 실시 예에 불과할 뿐이고, 본 고안의 기술적 사상을 모두 대변하는 것은 아니므로, 본 출원시점에 있어서 이들은 대체할 수 있는 다양한 균등물과 변형 예들이 있을 수 있음을 이해하여야 한다.Therefore, the embodiments described in this specification and the configurations shown in the drawings are merely the most preferred embodiments of the present invention and do not represent all the technical ideas of the present invention, so that they can be replaced at the time of the present application It should be understood that various equivalents and modifications may be present.

도 1 내지 도 3을 참조하면, 본 고안에 따른 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 신뢰도시험장치(10)는 테스트 유닛(20)과, 유압펌프(30)와, 압력계(40)와, 벤트밸브(50)로 구성된다.1 to 3, a reliability testing apparatus 10 for a turbine trust trip relay of a steam turbine for a power generation facility according to the present invention includes a test unit 20, a hydraulic pump 30, a pressure gauge 40, Vent valve (50).

상기 테스트 유닛(20)은 평판으로써, 관통된 다수개의 볼트공(21-1 ~ 21-12)과, 연부를 따라 관통형성된 다수개의 결합공(22)과, 상기 볼트공(21-1 ~ 21-12)에 각각 결합되어 볼트공(21-1 ~ 21-12)을 유밀하게 차단하는 다수개의 차단용 볼트(23)를 구비하고, 터빈 트러스트 트립 릴레이(100)의 후면에 결합볼트(103)에 의해 착탈가능하게 결합된다.The test unit 20 includes a plurality of bolt holes 21-1 to 21-12 penetrating through the test unit 20, a plurality of engagement holes 22 formed through the edge portion, and a plurality of bolt holes 21-1 to 21 And a plurality of shielding bolts 23 that are respectively coupled to the turbine thrust relays 100 and 21 to block the bolt holes 21-1 to 21-12. As shown in Fig.

상기 차단용 볼트(23)는 상기 볼트공(21-1 ~ 21-12) 중 상기 유압펌프(30), 압력계(40) 및 벤트밸브(50)가 장착되지 않은 볼트공에 체결되어 볼트공을 유밀하게 차단한다.The blocking bolt 23 is fastened to the bolt holes of the bolt holes 21-1 to 21-12 which are not provided with the hydraulic pump 30, the pressure gauge 40 and the vent valve 50, Shut off.

상기 유압펌프(30)는 상기 테스트 유닛(20)의 다수개의 볼트공(21-1 ~ 21-12) 중 어느 하나에 장착되어 시험 대상 터빈 트러스트 트립 릴레이(100)의 하우징(101) 내에 내장된 트립 릴레이 플런저(102)가 작동할 수 있도록 조립된 볼트공(21-4)을 통해 하우징(101) 내로 압유를 공급한다.The hydraulic pump 30 is installed in any one of a plurality of bolt holes 21-1 to 21-12 of the test unit 20 and is installed in the housing 101 of the test target turbine trust trip relay 100. [ The pressurized oil is supplied into the housing 101 through the bolt hole 21-4 assembled so that the trip relay plunger 102 can operate.

상기 유압계(40)는 상기 테스트 유닛(20)의 다수개의 볼트공(21-1 ~ 21-12) 중 어느 하나에 장착되어 상기 트립 릴레이 플런저(102)의 이동위치별 압력을 측정한다.The hydraulic system 40 is mounted on one of a plurality of bolt holes 21-1 to 21-12 of the test unit 20 to measure a pressure of the trip relay plunger 102 at each moving position.

상기 벤트밸브(50)는 개폐를 통해 내부의 공기를 배출하거나 차단하는 통상의 배기밸브로써, 상기 테스트 유닛(20)의 다수개의 볼트공(21-1 ~ 21-12) 중 어느 하나에 장착되어 가압에 따른 플런저(102)의 이동을 확실히 하기 위해 플런저 하우징(101) 내부의 공기구멍 기능을 한다.The vent valve 50 is a conventional exhaust valve for discharging or shutting off the inside air through opening and closing and is mounted on any one of a plurality of bolt holes 21-1 to 21-12 of the test unit 20 And functions as an air hole in the plunger housing 101 to ensure movement of the plunger 102 in accordance with the pressure.

도 3 내지 도 4를 참조하면, 상기와 같은 구성을 갖는 본 고안에 따른 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 신뢰도시험장치(10)의 시험실시방법은 부품조립단계(S100)와, 볼트공차단단계(S110)와, 테스트 유닛 장착단계(S120)와, 유압펌프가동단계(S130)와, 벤트밸브폐쇄단계(S140)와, 플런저작동확인단계(S150)와, 플런저최대스트로크확인단계(S160)와, 플런저 위치별 압력확인단계(S170)로 구성된다.3 to 4, a method of performing the test of the reliability test apparatus 10 for a turbine trust trip relay of a steam turbine for a power generation plant according to the present invention having the above-described configuration includes a component assembling step S100, (Step S110), a test unit mounting step S120, a hydraulic pump operation step S130, a vent valve closing step S140, a plunger operation checking step S150, a plunger maximum stroke checking step S160 And a pressure confirmation step S170 for each plunger position.

상기 부품조립단계(S100)는 테스트 유닛(20)의 볼트공(21-1 ~ 21-12) 중 시험 대상 터빈 트러스트 트립 릴레이(100)의 후면에 장착되었을 때 오일유로를 원활하게 형성할 수 있는 위치에 위치된 각각의 볼트공에 유압펌프(30), 압력계(40) 및 벤트밸브(50)를 각기 장착시킨다.The component assembling step S100 is a step in which the oil passage can be formed smoothly when the test subject 20 is mounted on the rear surface of the test subject turbine trust trip relay 100 among the bolt holes 21-1 to 21-12 of the test unit 20 The hydraulic pump 30, the pressure gauge 40, and the vent valve 50 are respectively mounted on the respective bolt holes located at the positions of the bolt holes.

상기 볼트공 차단단계(S110)는 상기 부품조립단계(S100)가 완료되었을 때 상기 유압펌프(30), 압력계(40) 및 벤트밸브(50)가 장착되지 않은 나머지 볼트공에 차단용 볼트(23)를 체결하여 유밀하게 차단한다.The bolt hole interception step S110 is a step of inserting blocking bolts 23 into the remaining bolt holes to which the hydraulic pump 30, the pressure gauge 40 and the vent valve 50 are not mounted when the component assembling step S100 is completed ) To tightly block the oil.

상기 테스트 유닛 장착단계(S120)는 상기 볼트공 차단단계(S110)가 완료되었을 때 테스트 유닛(20)을 시험대상 터빈 트러스트 트립 릴레이(100)의 후면에 장착한다.The test unit mounting step S120 mounts the test unit 20 on the rear surface of the turbine trust relay 100 to be tested when the bolt hole interception step S110 is completed.

상기 유압펌프가동단계(S130)는 상기 벤트밸브(50)를 개방한 후 상기 유압펌프(30)를 가동하여 오일을 압유한다.In the hydraulic pump operation step S130, the vent valve 50 is opened and the hydraulic pump 30 is operated to pressurize the oil.

상기 벤트밸브폐쇄단계(S140)는 상기 유압펌프(30)의 가동으로 시험대상 터빈 트러스트 트립 릴레이(100)의 하우징(101) 내에 오일이 공급되고, 오일공급에 따라 하우징(101) 내의 공기가 상기 개방된 벤트밸브(50)를 통해 외부로 배기되었을 때 상기 벤트밸브(50)를 닫는다.In the vent valve closing step S140, oil is supplied into the housing 101 of the test subject turbine trust trip relay 100 by the operation of the hydraulic pump 30, and air in the housing 101 is supplied And closes the vent valve 50 when exhausted to the outside through the open vent valve 50.

상기 플런저 작동 확인단계(S150)는 상기 유압펌프(30)가 가동 중인 상태에서 시험대상 터빈 트러스트 트립 릴레이(100)의 하우징(101) 내에 플런저(102)가 원활하게 작동되는지를 확인한다.The plunger operation confirmation step S150 checks whether the plunger 102 is smoothly operated in the housing 101 of the turbine trust trip relay 100 to be tested in a state where the hydraulic pump 30 is in operation.

상기 플런저 최대 스트로크 확인단계(S160)는 플런저(102)가 최대 스트로크로 작동되는지를 확인한다.The plunger maximum stroke checking step S160 confirms that the plunger 102 is operated at the maximum stroke.

상기 플런저 위치별 압력확인단계(S170)는 플런저(102)가 작동될 때 플런저(102)의 위치에 따른 압력을 확인한다.The plunger position-dependent pressure confirmation step S170 confirms the pressure according to the position of the plunger 102 when the plunger 102 is actuated.

이렇게 상기 각각의 단계를 통해 시험대상 터빈 트러스트 트립 릴레이(100)에 대한 작동상태를 점검하고, 이러한 과정을 통해 시험대상 터빈 트러스트 트립 릴레이(100)의 불량 여부는 물론 불량의 원인이 되는 부품을 즉시 교체하여 재차 작동상태를 점검함으로써, 터빈 트러스트 트립 릴레이(100)를 항상 최상의 상태로 유지시킬 수 있는 것이다.Through each of the above steps, the operation state of the turbine trust relay 100 to be tested is checked. Through this process, not only the failure of the turbine trust relay 100 to be tested but also the parts The turbine-trust-trip relay 100 can be maintained in the best condition at all times by replacing the turbine-throttle-

이상과 같이, 본 고안은 비록 한정된 실시 예와 도면에 의해 설명되었으나 이에 한정되지 않으며, 고안이 속하는 기술분야에서 통상의 지식을 가진 자에 의해 본 고안의 기술 사상과 아래에 기재될 특허청구범위의 균등범위 내에서 다양한 수정 및 변형이 가능함은 물론이다.As described above, although the present invention has been described with reference to specific embodiments and drawings, it will be understood by those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention as defined in the appended claims. It is to be understood that various changes and modifications may be made without departing from the scope of the present invention.

10: 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 신뢰도시험장치
20: 테스트 유닛 21-1 ~ 21-12: 볼트공
22: 결합공 23: 차단용 볼트
30: 유압펌프 40: 압력계
50: 벤트밸브 100: 터빈 트러스트 트립 릴레이
101: 하우징 102: 플런저
103: 결합볼트
10: Reliability test equipment of turbine-trust-trip relay of steam turbine for power plant
20: Test unit 21-1 to 21-12: Bolt hole
22: coupling hole 23: blocking bolt
30: Hydraulic pump 40: Manometer
50: vent valve 100: turbine trust trip relay
101: housing 102: plunger
103: Coupling bolt

Claims (3)

평판으로써, 관통된 다수개의 볼트공(21-1 ~ 21-12)과, 연부를 따라 관통형성된 다수개의 결합공(22)과, 상기 볼트공(21-1 ~ 21-12)에 각각 결합되어 볼트공(21-1 ~ 21-12)을 유밀하게 차단하는 다수개의 차단용 볼트(23)를 구비하고, 터빈 트러스트 트립 릴레이(100)의 후면에 결합볼트에 의해 착탈가능하게 결합되는 테스트 유닛(20)과;
상기 테스트 유닛(20)의 다수개의 볼트공(21-1 ~ 21-12) 중 어느 하나에 장착되어 시험 대상 터빈 트러스트 트립 릴레이(100)의 하우징(101) 내에 내장된 트립 릴레이 플런저(102)가 작동할 수 있도록 조립된 볼트공을 통해 하우징(101) 내로 압유를 공급하는 유압펌프(30)와;
상기 테스트 유닛(20)의 다수개의 볼트공(21-1 ~ 21-12) 중 어느 하나에 장착되어 상기 트립 릴레이 플런저(102)의 이동위치별 압력을 측정하는 압력계(40)와;
상기 테스트 유닛(20)의 다수개의 볼트공(21-1 ~ 21-12) 중 어느 하나에 장착되어 가압에 따른 플런저(102)의 이동을 위해 하우징(101) 내부의 공기구멍 기능을 하는 벤트밸브(50)로 구성되는 것을 특징으로 하는 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 신뢰도시험장치.
A plurality of bolt holes 21-1 to 21-12 penetrating the bolt holes 21-1 to 21-12 and a plurality of bolt holes 22 penetrating the bolt holes 21-1 to 21-12, A test unit (not shown) having a plurality of shielding bolts 23 that block the bolt holes 21-1 to 21-12 in an airtight manner and detachably coupled to the rear surface of the turbine trust trip relay 100 by engagement bolts 20);
The trip relay plunger 102 installed in any one of the plurality of bolt holes 21-1 to 21-12 of the test unit 20 and built in the housing 101 of the test subject turbine trust trip relay 100 A hydraulic pump 30 for supplying pressurized oil into the housing 101 through a bolt hole assembled to be operable;
A pressure gauge 40 mounted on any one of the plurality of bolt holes 21-1 to 21-12 of the test unit 20 to measure the pressure of the trip relay plunger 102 at each moving position;
A vent valve (not shown) which is attached to any one of a plurality of bolt holes 21-1 to 21-12 of the test unit 20 and functions as an air hole in the housing 101 to move the plunger 102 in response to the pressure, (50). The apparatus for testing the reliability of a turbine trust trip relay of a steam turbine for a power generation facility.
제1항에 있어서,
상기 테스트 유닛(20)은,
상기 볼트공(21-1 ~ 21-12) 중 상기 유압펌프(30), 압력계(40) 및 벤트밸브(50)가 장착되지 않은 볼트공에 차단용 볼트(23)가 체결되는 것을 특징으로 하는 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 신뢰도시험장치.
The method according to claim 1,
The test unit (20)
The blocking bolt 23 is fastened to the bolt holes of the bolt holes 21-1 to 21-12 to which the hydraulic pump 30, the pressure gauge 40 and the vent valve 50 are not mounted. Reliability Test System for Turbine Trust Trip Relay of Steam Turbine for Power Generation Facilities.
제1항의 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 신뢰도시험장치를 사용하여 터빈 트러스트 트립 릴레이에 대한 시험실시방법에 있어서,
상기 방법은,
테스트 유닛(20)의 볼트공(21-1 ~ 21-12) 중 시험 대상 터빈 트러스트 트립 릴레이(100)의 후면에 장착되었을 때 오일 유로를 원활하게 형성할 수 있는 위치에 위치된 각각의 볼트공에 유압펌프(30), 압력계(40) 및 벤트밸브(50)를 각기 장착시키는 부품조립단계(S100)와;
상기 부품조립단계(S100)가 완료되었을 때 상기 유압펌프(30), 압력계(40) 및 벤트밸브(50)가 장착되지 않은 나머지 볼트공에 차단용 볼트(23)를 체결하여 유밀하게 차단하는 볼트공 차단단계(S110)와;
상기 볼트공 차단단계(S110)가 완료되었을 때 테스트 유닛(20)을 시험대상 터빈 트러스트 트립 릴레이(100)의 후면에 장착하는 테스트 유닛 장착단계(S120)와;
상기 벤트밸브(50)를 개방한 후 상기 유압펌프(30)를 가동하여 오일을 압유하는 유압펌프가동단계(S130)와;
상기 유압펌프(30)의 가동으로 시험대상 터빈 트러스트 트립 릴레이(100)의 하우징(101) 내에 오일이 공급되고, 오일공급에 따라 하우징(101) 내의 공기가 상기 개방된 벤트밸브(50)를 통해 외부로 배기 되었을 때 상기 벤트밸브(50)를 닫는 벤트밸브폐쇄단계(S140)와;
유압펌프(30)가 가동 중인 상태에서 시험대상 터빈 트러스트 트립 릴레이(100)의 하우징(101) 내에 플런저(102)가 원활하게 작동되는지를 확인하는 플런저작동확인단계(S150)와;
플런저(102)가 최대 스트크로크로 작동되는지를 확인하는 플런저 최대스트로크확인단계(S160)와;
플런저(102)가 작동될 때 플런저(102)의 위치에 따른 압력을 확인하는 플런저 위치별 압력확인단계(S170)로 구성되는 것을 특징으로 하는 발전시설용 증기터빈의 터빈 트러스트 트립 릴레이의 신뢰도시험장치의 시험실시방법.
A method for conducting a test on a turbine trust trip relay using the reliability test apparatus of a turbine trust trip relay of a steam turbine for a power generation facility according to claim 1,
The method comprises:
When each of the bolt holes 21-1 to 21-12 of the test unit 20 is mounted on the rear surface of the subject turbine trust trip relay 100, A component assembling step S100 for mounting the hydraulic pump 30, the pressure gauge 40 and the vent valve 50 to each other;
When the component assembling step S100 is completed, the bolt 23 is fastened to the remaining bolt holes to which the hydraulic pump 30, the pressure gauge 40 and the vent valve 50 are not mounted, (S110);
A test unit mounting step (S120) of mounting the test unit (20) to the rear surface of the test subject turbine trust trip relay (100) when the bolt hole interception step (S110) is completed;
A hydraulic pump operating step (S130) of operating the hydraulic pump (30) after the vent valve (50) is opened to pressurize the oil;
Oil is supplied into the housing 101 of the test subject turbine trust trip relay 100 by the operation of the hydraulic pump 30 and the air in the housing 101 is supplied through the open vent valve 50 A vent valve closing step (S140) of closing the vent valve (50) when exhausted to the outside;
A plunger operation confirmation step (S150) of confirming whether the plunger (102) is smoothly operated in the housing (101) of the test subject turbine trust trip relay (100) while the hydraulic pump (30) is in operation;
A plunger maximum stroke check step (S160) to confirm that the plunger (102) is operated with the maximum stroke;
And a pressure confirmation step (S170) of the plunger position for confirming the pressure corresponding to the position of the plunger (102) when the plunger (102) is operated. The apparatus for testing reliability of a turbine trust trip relay of a steam turbine for a power generation facility Method of conducting the test.
KR2020120012220U 2012-12-26 2012-12-26 A test unit for turbine thrust trip relay of steam turbine apply to power plant and operating test working method therefore KR200473805Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020120012220U KR200473805Y1 (en) 2012-12-26 2012-12-26 A test unit for turbine thrust trip relay of steam turbine apply to power plant and operating test working method therefore

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020120012220U KR200473805Y1 (en) 2012-12-26 2012-12-26 A test unit for turbine thrust trip relay of steam turbine apply to power plant and operating test working method therefore

Publications (2)

Publication Number Publication Date
KR20140004095U KR20140004095U (en) 2014-07-04
KR200473805Y1 true KR200473805Y1 (en) 2014-07-31

Family

ID=51989641

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020120012220U KR200473805Y1 (en) 2012-12-26 2012-12-26 A test unit for turbine thrust trip relay of steam turbine apply to power plant and operating test working method therefore

Country Status (1)

Country Link
KR (1) KR200473805Y1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101662131B1 (en) * 2016-02-05 2016-10-05 주식회사 에네스지 Apparatus for testing emergency trip apparatus and method for testing thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200210089Y1 (en) 2000-08-02 2001-01-15 이유성 Pressure testing device for dial gauge
JP2007225435A (en) 2006-02-23 2007-09-06 Nok Corp Pressure resistance testing method of pressure container and pressure resistance testing machine
KR100919122B1 (en) 2007-11-28 2009-09-25 한국표준과학연구원 A sealed component pressure measuring apparatus and the method of the same
KR101153318B1 (en) 2010-01-27 2012-06-07 국방과학연구소 Batch-type reactor prevented leakage and experimental method having the same

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200210089Y1 (en) 2000-08-02 2001-01-15 이유성 Pressure testing device for dial gauge
JP2007225435A (en) 2006-02-23 2007-09-06 Nok Corp Pressure resistance testing method of pressure container and pressure resistance testing machine
KR100919122B1 (en) 2007-11-28 2009-09-25 한국표준과학연구원 A sealed component pressure measuring apparatus and the method of the same
KR101153318B1 (en) 2010-01-27 2012-06-07 국방과학연구소 Batch-type reactor prevented leakage and experimental method having the same

Also Published As

Publication number Publication date
KR20140004095U (en) 2014-07-04

Similar Documents

Publication Publication Date Title
US7874241B2 (en) Electronically controllable and testable turbine trip system
FI116587B (en) Method and apparatus for verifying the proper functioning of the restraint
US9903221B2 (en) Electronically controllable and testable turbine trip system and method with redundant bleed manifolds
US10989064B2 (en) Dual trip manifold assembly for turbine systems
US20090222233A1 (en) Partial stroke testing system coupled with fuel control valve
CN110509042B (en) Tool and method for disassembling and assembling main bolt of pneumatic shielding main pump
CN103982249A (en) Emergency trip device capable of isolating testing signal
KR200473805Y1 (en) A test unit for turbine thrust trip relay of steam turbine apply to power plant and operating test working method therefore
KR101968265B1 (en) Turbine Trip Device that can be tested without generating stop
KR101221631B1 (en) Apparatus of performance testing console for the Pilot Operated Check Valve
KR101495197B1 (en) An apparatus to test a mechanical trip valve of emergency trip system for the turbine of an generator and method to test it
CN103953613B (en) The field diagnostic method that the safe oil pressure of a kind of emergency trip is low
CN105628393A (en) Aircraft engine over temperature false alarm troubleshooting method
KR20160072464A (en) Performance test apparatus for safety valve
CN106298431B (en) A kind of power-off protection apparatus and method of on-line mass spectroscopy detection
US10563540B2 (en) Casing for a rotating machine and rotating machine including such casing
CN104204470B (en) Method and apparatus for the safe operation of gas turbine equipment
KR102058887B1 (en) Apparatus for testing valve pressure
KR101708374B1 (en) Apparatus for testing of rupture disc
KR102579660B1 (en) Replacement device during operation of BFPT MTSV valve
CN209195492U (en) A kind of online isolating device of crisis warning system for Turbo-generator Set
US20230121412A1 (en) Pneumatically-operated emergency isolation valve switchover kit
JPH09287409A (en) Oil trip test device of emergency governor for turbine
KR101467743B1 (en) A Test Block Apparatus For Disc-Dump Valve And A Test Method Using Of It
KR100970225B1 (en) Protecting equipment for Inlet Isolation valve of Boron Injection Tank

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20170623

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20180627

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20190625

Year of fee payment: 6