KR200426149Y1 - A line-beam of form - Google Patents

A line-beam of form Download PDF

Info

Publication number
KR200426149Y1
KR200426149Y1 KR2020060016627U KR20060016627U KR200426149Y1 KR 200426149 Y1 KR200426149 Y1 KR 200426149Y1 KR 2020060016627 U KR2020060016627 U KR 2020060016627U KR 20060016627 U KR20060016627 U KR 20060016627U KR 200426149 Y1 KR200426149 Y1 KR 200426149Y1
Authority
KR
South Korea
Prior art keywords
formwork
line beam
panel
slide
coupled
Prior art date
Application number
KR2020060016627U
Other languages
Korean (ko)
Inventor
장태석
Original Assignee
장태석
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 장태석 filed Critical 장태석
Priority to KR2020060016627U priority Critical patent/KR200426149Y1/en
Application granted granted Critical
Publication of KR200426149Y1 publication Critical patent/KR200426149Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/04Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements
    • E04G17/042Connecting or fastening means for metallic forming or stiffening elements, e.g. for connecting metallic elements to non-metallic elements being tensioned by threaded elements

Abstract

본 고안은 건물을 시공함에 있어, 철근 콘크리트를 양생시켜 옹벽이나 벽체 등을 시공하기 위해 사용되는 거푸집의 상단부에 설치되는 라인 빔에 관한 것으로, 특히, 라인 빔을 거푸집으로부터 별도로 구성하여 규격화된 거푸집 패널을 별도로 제작하지 않고서도 용이하게 사용할 수 있으며, 라인 빔을 고정하기 위한 보울트가 슬라이드 방식에 의해 간편, 용이하게 결합되도록 한 거푸집용 라인 빔에 관한 것이다.The present invention relates to a line beam installed in the upper end of the formwork used to cure the reinforced concrete to construct retaining walls, walls, etc. in the construction of the building, in particular, the formwork panel standardized by configuring the line beam separately from the formwork It can be easily used without making a separate, and relates to a line beam for formwork so that the bolt for fixing the line beam is simply, easily coupled by a slide method.

본 고안은 거푸집을 구성하기 위해 규격화된 거푸집 패널에 라인 빔을 설치함에 있어, 거푸집 패널과 라인 빔의 결합시 슬라이드 방식에 의해 위치 고정체가 끼워져 결합되므로, 거푸집 구성을 위한 라인 빔의 정확한 위치확보와 진동이나 흔들림에 의한 유동을 방지하여 내구성과 견고함을 향상시킬 수 있도록 한 것이다.The present invention is to install the line beam in the formwork panel standardized to form the formwork, the position fixing body is fitted by the slide method when the formwork panel and the line beam is combined, so as to ensure the exact position of the line beam for formwork To prevent the flow caused by vibration or shaking and to improve the durability and robustness.

거푸집, 몸체, 라인 빔, 슬라이드부, 결합홈 Formwork, body, line beam, slide part, coupling groove

Description

거푸집용 라인 빔{A line-beam of form}Formwork line beams {A line-beam of form}

도 1은 종래의 거푸집을 나타내는 종단면도,1 is a longitudinal sectional view showing a conventional formwork;

도 2는 본 고안에 따른 거푸집용 라인 빔을 나타내는 사시도,Figure 2 is a perspective view showing a line beam for formwork according to the present invention,

도 3은 본 고안에 따른 거푸집용 라인 빔을 나타내는 종단면도,Figure 3 is a longitudinal sectional view showing a formwork line beam according to the present invention,

도 4는 본 고안에 따른 거푸집용 라인 빔의 사용상태를 나타내는 종단면도,Figure 4 is a longitudinal cross-sectional view showing a state of use of the formwork line beam according to the present invention,

도 5(a), 5(b)는 본 고안에 따른 거푸집용 라인 빔의 다른 실시예를 나타내는 종단면도,5 (a), 5 (b) is a longitudinal sectional view showing another embodiment of the formwork line beam according to the present invention,

도 6(a), 6(b)는 본 고안에 따른 거푸집용 라인 빔의 또 다른 실시예를 나타내는 사시도 및 종단면도이다.6 (a), 6 (b) is a perspective view and a longitudinal cross-sectional view showing another embodiment of the formwork line beam according to the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

1:거푸집 2:패널1: Formwork 2: Panel

10:라인 빔 12:몸체10: line beam 12: body

14:결합홈 16:슬라이드부14: engaging groove 16: slide section

18:받침편 20:고정체18: support 20: fixed body

본 고안은 거푸집용 라인 빔에 관한 것으로서, 보다 상세하게는 건물을 축조함에 있어, 철근 콘크리트를 양생시켜 옹벽이나 벽체 등을 시공하기 위해 사용되는 거푸집의 상단부에 설치되는 라인 빔에 관한 것으로, 특히, 라인 빔을 거푸집으로부터 별도로 구성하여 규격화된 거푸집 패널을 별도로 제작하지 않고서도 용이하게 사용할 수 있으며, 라인 빔을 고정하기 위한 보울트가 슬라이드 방식에 의해 간편, 용이하게 결합되도록 한 거푸집용 라인 빔에 관한 것이다.The present invention relates to a line beam for formwork, and more particularly, to a line beam installed in the upper end of the formwork used for curing the reinforced concrete to construct retaining walls, walls, etc. The line beam is formed separately from the formwork and can be easily used without producing a standard formwork panel, and relates to a line beam for formwork in which a bolt for fixing the line beam is simply and easily combined by a slide method. .

또한, 본 고안은 거푸집을 구성하기 위해 규격화된 거푸집 패널에 라인 빔을 설치함에 있어, 거푸집 패널과 라인 빔의 결합시 슬라이드 방식에 의해 위치 고정체가 끼워져 결합되므로, 거푸집 구성을 위한 라인 빔의 정확한 위치확보와 진동이나 흔들림에 의한 유동을 방지하여 내구성과 견고함을 향상시킬 수 있도록 한 것이다.In addition, the present invention in the installation of the line beam to the standard formwork panel to form a formwork, since the position fixing body is fitted by a sliding method when the formwork panel and the line beam is coupled, the line beam for the formwork It is designed to improve the durability and robustness by securing the position and preventing the flow by vibration or shaking.

일반적으로, 거푸집(form)이라 함은 각종 건축물을 시공함에 있어, 기둥, 바닥, 벽 등 콘크리트를 부어 만들 모양의 틀을 짠 후 콘크리트를 부어 넣고 굳은 뒤 이 틀을 떼어내는 것을 말한다.In general, the form (form) refers to the construction of a variety of buildings, such as pillars, floors, walls, etc. to squeeze the shape of the shape made by pouring concrete, pour concrete, and then harden the mold.

이러한, 거푸집은 별도의 고정수단을 이용하여 건물의 벽체나 옹벽 등을 시공하고자 하는 위치에 다수개의 패널을 연결하여 설치하게 되며, 상기 패널은 일정한 크기로 규격화되어 사용되고 있다.Such a formwork is installed by connecting a plurality of panels to a position where a wall or retaining wall of a building is to be constructed using a separate fixing means, and the panels are standardized to a certain size and used.

상기와 같은 종래의 거푸집은 첨부 도면 도 1에 도시된 바와 같이, 일정한 크기 L로 규격화 되며, 시공하고자 하는 벽체나 옹벽 등의 크기에 따라, 그에 알맞는 크기의 거푸집(100)을 구성하여 사용하게 되는 것이다.The conventional formwork as described above is standardized to a predetermined size L, as shown in Figure 1, according to the size of the wall or retaining wall to be constructed, to form and use the formwork 100 of the size suitable for Will be.

이때, 거푸집을 구성하기 위해 연결되어 설치되는 다수개의 패널(102) 중에서, 상부에 위치되는 거푸집의 패널은 마감처리를 위해 상단부에 라인 빔(110)이 일체로 구성되어 사용된다.At this time, among the plurality of panels 102 that are connected and installed to form the formwork, the panel of the formwork located on the upper portion is used as the line beam 110 is integrally configured at the upper end for the finishing process.

상기 거푸집 패널 상단부에 형성된 라인 빔에는 목재로 이루어지는 보강부재가 결합된다.The reinforcing member made of wood is coupled to the line beam formed at the upper end of the formwork panel.

따라서, 건물을 시공함에 있어, 다수개의 패널을 연결하여 시공하고자 하는 크기의 벽체나 옹벽 틀을 구성한 후, 콘크리트를 타설하여 시공하게 되는 것이다.Therefore, in constructing a building, after constructing a wall or retaining wall frame having a size to be constructed by connecting a plurality of panels, the concrete is to be poured.

그러나, 상기와 같이, 종래의 거푸집은 다수개의 패널을 연결하여 벽체나 옹벽틀을 구성함에 있어, 상부에 위치되는 패널은 상단부에 라인 빔을 형성해야 되므로, 규격화된 패널을 이용하지 못하고, 상단부에 라인 빔이 형성된 다른 규격의 패널을 제작하여 사용해야 하므로, 패널 제작에 따른 번거로움과 규격화된 패널을 이용하지 못하고 별도로 제작해야 하는 불편함이 발생하였으며, 특히, 거푸집을 형성함에 있어, 패널 제작 및 설치에 대한 작업성과 효율성이 떨어지는 등의 많은 문제점이 발생하였다.However, as described above, in the conventional formwork to form a wall or retaining wall frame by connecting a plurality of panels, the panel located on the top should form a line beam at the upper end, and therefore cannot use a standardized panel, Since it is necessary to manufacture and use panels of different sizes with line beams, the inconvenience of panel production and inconvenience of having to use standardized panels are generated. In particular, in forming a formwork, panels are manufactured and installed. Many problems occurred such as poor workability and efficiency.

본 고안은 상기와 같은 종래의 문제점을 해결하기 위한 것으로서, 그 목적은 건물을 시공함에 있어, 콘크리트를 타설하여 옹벽이나 벽체를 시공하기 위해 거푸집을 형성하는 과정에서, 규격화된 다수개의 패널을 이용하여 소정 크기의 거푸집을 형성함에 있어, 패널의 상단부에 마감처리를 위해 형성되는 라인 빔을 별도로 제작하여 구성함으로서, 거푸집을 형성하는 과정에서, 동일한 크기로 규격화된 패 널을 이용하여 간편, 용이하게 시공하고자 하는 크기의 옹벽이나 벽체를 구성하고, 라인 빔이 형성된 패널을 별도로 제작하여 사용하지 않고서도 규격화된 패널을 이용하여 효율적이고 경제적인 라인 빔 설치가 용이하도록 된 새로운 형태의 거푸집용 라인 빔을 제공하고자 하는 것이다.The present invention is to solve the conventional problems as described above, the purpose is to construct a building, in the process of forming the formwork for constructing the retaining wall or wall by pouring concrete, using a plurality of standardized panels In forming the formwork of a predetermined size, by separately manufacturing a line beam formed for the finishing process on the upper end of the panel, in the process of forming the formwork, using the panel standardized in the same size, easy and easy construction Provides a new formwork line beam for forming a retaining wall or wall of a desired size and making it easier and more economical to install a line beam using a standardized panel without separately manufacturing a panel in which a line beam is formed. I would like to.

본 고안의 다른 목적은 거푸집을 시공함에 있어, 적층되어 설치되는 패널을 규격화하여 제작 및 설치에 따른 편리함과 효율성을 향상시킴과 동시에, 패널 상단부에 라인 빔을 구성함에 있어, 슬라이드 방식에 의해 결합되는 체결보울트를 이용하여 간편, 용이하게 결합할 수 있도록 함과 동시에, 패널과 라인 빔을 결합함에 있어, 가이드 레일 형태의 고정체가 슬라이드 방식으로 끼워져 결합되도록 하여 패널과 라인 빔 결합부위에 대한 견고함과 고정과 진동 및 충격에 의한 흔들림을 방지하여 전체적인 거품집의 제작 및 설치에 따른 편리함과 작업성을 향상시키고 내구성을 향상시킬 수 있도록 한 것이다.Another object of the present invention is to improve the convenience and efficiency of manufacturing and installation by standardizing the panels to be installed in the formwork, and at the same time to configure the line beam on the top of the panel, coupled by the slide method In order to combine the panel and the line beam simply and easily by using the fastening bolt, the guide rail-shaped fixture is fitted in a slide manner so that the panel and the line beam joints are firmly connected. To prevent shaking due to the fixing and vibration and shock, and to improve the convenience and workability according to the manufacturing and installation of the overall foam house and to improve the durability.

이와 같은 목적을 달성하기 위하여, 본 고안은 건물의 옹벽이나 벽체를 시공하기 위해 거푸집을 형성함에 있어서, 규격화된 다수개의 패널을 연결하여 소정 크기의 거푸집을 형성하되, 상기 패널의 상단부에는 별도로 제작되어진 소정의 라인 빔이 마감처리를 위해 결합되며, 상기 라인 빔은 몸체가 상면이 개방된 'ㄷ' 자 모양으로 절곡되어 이루어지고, 바닥면에는 'T'자 모양의 결합홈이 형성되도록 슬라이드부가 형성되며, 양쪽 내면 하단부에는 받침편이 내향 돌출되도록 구성되어 상기 패널 상단부에 결합되어 거푸집을 구성하도록 이루어진 특징을 갖는다.In order to achieve the above object, the present invention in forming the formwork for the construction of the retaining wall or wall of the building, by connecting a plurality of standardized panels to form a formwork of a predetermined size, which is manufactured separately on the upper end of the panel A predetermined line beam is combined for finishing, and the line beam is formed by bending the body into a 'c' shape with an open upper surface, and a slide portion formed to form a 't' shaped coupling groove on the bottom surface. At the lower end of both inner surfaces, the supporting pieces are configured to protrude inwardly, and are coupled to the upper end of the panel to form a formwork.

이와 같은 본 고안에서, 상기 라인 빔의 몸체에 형성된 슬라이드부에는 상면 에 'ㄱ'자 모양으로 절곡된 결합편이 돌출되어 형성된 가이드 레일 형태의 고정체가 끼워져 결합된 특징을 갖는다.In the present invention as described above, the slide portion formed in the body of the line beam has a feature that is coupled to the guide rail-shaped fixture formed by protruding the coupling piece bent in the 'b' shape on the upper surface.

이하, 본 고안을 첨부된 도면에 의해 보다 상세하게 설명하면 다음과 같다.Hereinafter, the present invention in more detail by the accompanying drawings as follows.

도 2 내지 도 4에 도시된 바와 같이, 본 고안에 따른 거푸집용 라인 빔(10)의 몸체(12)는 상면이 개방된 'ㄷ' 자 모양으로 절곡되어 이루어지고, 바닥면에는 'T'자 모양의 결합홈(14)이 형성되어 슬라이드부(16)가 형성되며, 양쪽 내면 하단부에는 받침편(18)이 내향 돌출되도록 구성된 것이다.As shown in Figures 2 to 4, the body 12 of the form line line beam 10 according to the present invention is made of a bent in the 'c' shape of the upper surface is opened, the bottom surface 'T' Shaped engaging groove 14 is formed to form a slide 16, the lower end of both inner surface is configured to protrude inwards (18).

본 고안의 라인 빔(10)은 거푸집(1)을 구성하기 위해 연결되는 패널(2)의 상단부에 결합되는 것으로서, 몸체(12)에 형성된 슬라이드부(16)의 결합홈(14)에 체결 보울트(4)를 끼워 결합하고, 상기 라인 빔(10)이 결합되는 패널(2)의 상면에는 결합공(6)이 형성되어 체결 보울트(4)가 결합공(6)에 끼워진 후, 너트(8)에 의해 고정되어 결합되는 것이다.The line beam 10 of the present invention is coupled to the upper end of the panel 2 connected to form the formwork 1, the fastening bolt to the coupling groove 14 of the slide 16 formed in the body 12 The coupling holes 6 are formed on the upper surface of the panel 2 to which the line beam 10 is coupled, and the fastening bolt 4 is fitted into the coupling holes 6, and then the nut 8 Is fixed by).

이때, 상기 패널(2) 상단부에 결합되는 라인 빔(10)은 슬라이드부(16)에 끼워져 결합된 체결 보울트(4)가 'T'자 모양의 결합홈(14)을 따라 슬라이드 이동되면서 결합을 위한 위치가 조절된다.At this time, the line beam 10 is coupled to the upper end of the panel 2 is fitted to the slide portion 16 is coupled to the coupling bolt (4) slides along the 'T' shaped coupling groove 14 to engage the coupling Position is adjusted.

본 고안에서, 거푸집(1)을 구성하기 위해 사용되는 다수개의 패널(2)은 일정한 크기의 규격회된 것으로서, 통상적인 결합방식에 의해 연결되어 설치되는 것으로, 이에 대한 자세한 설명 및 도면 표기는 생략한다.In the present invention, the plurality of panels (2) used to form the formwork (1) is a standard size of a certain size, is connected and installed by a conventional coupling method, the detailed description and drawing notation thereof will be omitted. do.

도 2는 본 고안에 따른 거푸집용 라인 빔을 나타내는 사시도이고, 도 3은 본 고안에 따른 거푸집용 라인 빔을 나타내는 종단면도이며, 도 4는 본 고안에 따른 거푸집용 라인 빔의 사용상태를 나타내는 종단면도로서, 몸체(12)가 'ㄷ'자 모양으로 절곡되어 구성되고, 바닥면에는 'T'자 모양의 결합홈(14)이 형성되며, 내면 하단부에는 받침편(18)이 형성된 라인 빔(10)을 패널(2) 상단부에 결합하여 거푸집(1)을 설치하게 되는 것이다.Figure 2 is a perspective view showing a formwork line beam according to the present invention, Figure 3 is a longitudinal sectional view showing a formwork line beam according to the present invention, Figure 4 is a longitudinal section showing the state of use of the formwork line beam according to the present invention. As shown in the figure, the body 12 is bent in a 'c' shape, the bottom surface is formed with a coupling groove 14 of the 'T' shape, the lower end of the inner surface line beam formed with a support piece 18 ( 10) is coupled to the upper end of the panel (2) to install the formwork (1).

상기 패널(2)의 상단부에 결합되는 라인 빔(10)은 슬라이드부(16)의 결합홈(14)에 체결 보울트(4)를 끼워 결합한 후, 체결 보울트(4)를 패널(2)에 형성된 결합공(6)에 끼워 관통되도록 한 상태에서, 너트(8)를 체결하여 패널(2)에 라인 빔(10)을 고정하여 결합하게 되는 것이다.The line beam 10 coupled to the upper end of the panel 2 fits the fastening bolt 4 into the coupling groove 14 of the slide 16, and then the fastening bolt 4 is formed on the panel 2. The nut 8 is fastened to the coupling hole 6 to fix the line beam 10 to the panel 2 to be coupled thereto.

따라서, 라인 빔(10)은 슬라이드부(16)에 결합된 체결 보울트(4)에 의해 패널(2) 상단부에 설치되어 거푸집(1)을 구성하게 되는 것으로서, 본 고안에서는 규격화된 패널(2)을 이용하고, 마감처리를 위한 별도의 라인 빔(10)을 이용하여 거푸집(1)을 구성하게 되므로, 규격화되어 사용되고 있는 패널(2)을 이용하여 간편, 용이하게 거푸집(1)을 시공할 수 있는 것이다.Accordingly, the line beam 10 is installed at the upper end of the panel 2 by the fastening bolt 4 coupled to the slide 16 to form the formwork 1, and in the present invention, the standardized panel 2 Since the formwork 1 is configured using a separate line beam 10 for finishing, the formwork 1 can be easily and easily constructed using the panel 2 that is standardized and used. It is.

도 5(a), 5(b)는 본 고안에 따른 거푸집용 라인 빔의 다른 실시예를 나타내는 종단면도로서, 거푸집(1)을 시공함에 있어, 라인 빔(10)의 몸체(12)에 형성된 슬라이드부(16)에 가이드 레일 형태의 고정체(20)를 끼워 결합함에 따라, 패널(2)에 라인 빔(10)이 결합되는 과정에서, 견고함과 내구성을 향상시키게 되는 것이다.5 (a), 5 (b) is a longitudinal sectional view showing another embodiment of the formwork line beam according to the present invention, in the formwork 1, formed on the body 12 of the line beam 10 By fitting the guide rail-shaped fixture 20 into the slide unit 16, the line beam 10 is coupled to the panel 2, thereby improving the rigidity and durability.

이때, 상기 고정체(20)는 상면에 'ㄱ'자 모양으로 절곡된 결합편(22)이 돌출되고, 돌출된 결합편(22)은 라인 빔(10)의 몸체(12)에 형성된 결합홈(14)에 위치되 어 결합되도록 슬라이드 방식에 의해 결합되는 것이다.At this time, the fixing body 20 is a coupling piece 22 is bent in a 'b' shape on the upper surface, the protruding coupling piece 22 is a coupling groove formed in the body 12 of the line beam 10 Positioned at (14) is to be coupled by a slide method to be coupled.

상기 고정체(20)에 의해 라인 빔(10)과 패널(2)은 결합된 상태에서, 진동이나 외부 충격에 의해 흔들리거나 위치 이동없이 견고하게 고정된 상태를 유지하게 되는 것이다.The line beam 10 and the panel 2 are coupled to each other by the fixing body 20 so that the line beam 10 and the panel 2 are firmly fixed without shaking or moving due to vibration or external shock.

도 6(a), 6(b)는 본 고안에 따른 거푸집용 라인 빔의 또 다른 실시예를 나타내는 사시도 및 종단면도로서, 라인 빔(10) 몸체(12)의 바닥면에 소정 간격 이격되도록 슬라이드편(16a)이 일정 높이로 돌출되고, 슬라이드편(16a) 사이에는 결합공(16b)이 관통되어 구성된 것이다.6 (a), 6 (b) is a perspective view and a longitudinal cross-sectional view showing another embodiment of the formwork line beam according to the present invention, a slide so as to be spaced apart from the bottom surface of the body 12 of the line beam 10 by a predetermined interval The piece 16a protrudes to a predetermined height, and the coupling hole 16b penetrates between the slide pieces 16a.

이와 같이, 본 고안에 따른 거푸집용 라인 빔의 실시예에 대한 사용상태를 설명하면 다음과 같다.As described above, the use state of the embodiment of the formwork line beam according to the present invention is as follows.

도 2 내지 도 4에 도시된 바와 같이, 건물을 시공함에 있어, 옹벽이나 벽체 등을 시공하기 위해 거푸집을 구성하려면, 먼저, 규격화된 다수개의 패널(2)을 연결하여 콘크리트 타설을 위한 패널(2)을 구성한 상태에서, 상부에 위치된 패널의 상단부에 마감처리를 위한 라인 빔(10)을 설치하게 되는 것이다.2 to 4, in constructing a building, in order to construct a formwork for constructing a retaining wall or a wall, first, a plurality of standardized panels 2 are connected to each other for placing concrete panels 2 In the configured state, the line beam 10 for finishing is to be installed at the upper end of the panel located at the top.

상기 패널(2) 상단부에 결합되는 라인 빔(10)은 슬라이드부(16)에 형성된 결합홈(14)에 체결 보울트(4)의 두부가 끼워져 슬라이드 되면서 위치 이동이 가능하도록 결합한 다음, 몸체(12)를 패널(2) 상단부에 얹어 결합하게 되는 것이다.The line beam 10 coupled to the upper end of the panel 2 is coupled to the coupling groove 14 formed in the slide unit 16 so that the head of the fastening bolt 4 is fitted and slides so as to be movable in position, and then the body 12. ) Will be combined to put on the top of the panel (2).

이때, 상기 패널(2)에는 라인 빔(10)의 슬라이드부(16)에 결합된 체결 보울트(4)가 끼워져 결합되는 결합공(6)이 관통되어 있으므로, 체결 보울트(4)가 결합공(6)을 관통하여 결합된 후, 너트(8)에 의해 조여져 고정되는 것이다.At this time, since the fastening bolt 4 coupled to the slide portion 16 of the line beam 10 is fitted into the panel 2, the fastening bolt 4 is coupled to the fastening bolt 4. 6) After being coupled through, it is tightened and fixed by the nut (8).

이와 같이, 본 고안에 따른 라인 빔(10)을 이용하게 되면, 일정한 크기로 규격화된 패널(2)을 이용하여 간편, 용이하게 거푸집(1)을 구성할 수 있으므로, 라인 빔(10)을 구성하기 위한 별도의 패널(종래의 패널)을 제작하여 사용하지 않아도 되며, 이로 인해 전체적인 거푸집 시공에 따른 패널 제작 및 설치에 대한 작업성과 효율성을 향상시킬 수 있으며, 특히, 건물 시공에 따른 거푸집 설치 및 철거에 따른 공기를 단축할 수 있는 것이다.As such, when the line beam 10 according to the present invention is used, since the formwork 1 can be easily and easily configured using the panel 2 standardized to a predetermined size, the line beam 10 is configured. It is not necessary to manufacture and use a separate panel (traditional panel) for this purpose, which can improve the workability and efficiency of panel production and installation according to the overall formwork, and in particular, the installation and removal of the formwork according to the building construction It is possible to shorten the air.

예컨데, 종래에는 거푸집을 시공하기 위해서는 일정한 길이 L를 갖도록 규격화된 패널(2)과 라인 빔이 형성되어 일정한 길이 L, L1을 갖는 패널을 별도로 제작하여 사용해야 되었으나, 본 고안에서와 같이, 규격화된 길이 L을 갖는 다수개의 패널을 이용하고, 규격화된 길이 L2를 갖는 라인 빔(10)을 이용함에 따라, 거푸집 시공을 위한 2가지 크기의 패널을 이용하지 않고 동일한 규격의 패널을 이용하여 간편, 용이하게 거푸집(1)을 시공할 수 있는 것이다.For example, conventionally, in order to construct a formwork, a panel 2 and a line beam standardized to have a constant length L are formed and used to separately manufacture a panel having a constant length L and L1, but as in the present invention, the standardized length By using a plurality of panels having L and using a line beam 10 having a standardized length L2, it is simple and easy to use panels of the same size without using two sizes of panels for formwork. Formwork (1) can be constructed.

한편, 본 고안에 따른 라인 빔(10)은 도 5(a), 5(b) 및 도 6(a), 6(b)에 도시된 바와 같이, 다른 실시예로 사용할 수 있는 것으로서, 도 5(a), 5(b)에 따른 실시예에서는 패널(2) 상단부에 라인 빔(10) 몸체(12)를 얹어 결합함에 있어, 상면에 'ㄱ'자 모양으로 절곡된 결합편(22)이 돌출된 가이드 레일 형태의 고정체(20)를 결합홈(14)에 슬라이드 방식으로 끼워 결합하게 되면, 라인 빔(10)과 패널(2)이 결합된 상태에서, 진동이나 외부 충격에 의해 흔들리거나 위치 이동 없이 견고하게 고정된 상태를 유지하게 되는 것이다.On the other hand, the line beam 10 according to the present invention, as shown in Figure 5 (a), 5 (b) and 6 (a), 6 (b), can be used in another embodiment, Figure 5 In the embodiment according to (a) and 5 (b), the coupling piece 22 bent in a 'b' shape on the top surface is coupled to the line beam 10 and the body 12 on the upper end of the panel 2. When the fixed guide 20 in the form of a protruding guide rail is inserted into the coupling groove 14 in a sliding manner, the line beam 10 and the panel 2 are coupled to each other, and are shaken by vibration or external impact. It is to remain firmly fixed without moving the position.

도 6(a), 6(b)에 따른 실시예는 패널(2) 상단부에 라인 빔(10)을 결합함에 있어, 라인 빔(10) 몸체(12)의 바닥면에 일정 높이를 갖도록 돌출된 슬라이드편(16a)과 슬라이드편(16a) 사이에 관통되어 형성된 결합공(16b)을 이용하여 체결 보울트(4)를 끼워 결합하게 되는 것이다.6 (a) and 6 (b), in coupling the line beam 10 to the upper end of the panel 2, the line beam 10 protrudes to have a certain height on the bottom surface of the body 12 The fastening bolts 4 are fitted to each other by using the coupling holes 16b formed to penetrate between the slide pieces 16a and the slide pieces 16a.

이와 같이, 본 고안에 따른 거푸집용 라인 빔을 이용함에 따라, 콘크리트를 타설하여 옹벽이나 벽체를 시공하기 위해 거푸집을 형성하는 과정에서, 규격화된 패널을 이용하여 소정 크기의 거푸집을 형성함에 있어, 라인 빔을 별도로 제작하여 구성함으로서, 거푸집을 동일한 크기로 규격화된 패널을 이용하여 간편, 용이하게 시공할 수 있고, 패널을 별도로 제작하여 사용하지 않고서도 규격화된 패널을 이용하게 되므로, 거푸집 시공에 따른 작업성과 효율성을 향상시키고 거푸집 시공에 대한 경제적인 효과를 얻을 수 있는 것이다.Thus, according to the use of the formwork line beam according to the present invention, in the process of forming the formwork for constructing the retaining wall or wall by placing concrete, in forming the formwork of a predetermined size using a standardized panel, the line By constructing and constructing the beam separately, the formwork can be easily and easily constructed using the standardized panel with the same size, and the standardized panel can be used without producing and using the panel separately. It can improve performance efficiency and achieve economic effects on formwork.

Claims (3)

건물의 옹벽이나 벽체를 시공하기 위해 거푸집을 형성함에 있어서, 규격화된 다수개의 패널을 연결하여 소정 크기의 거푸집을 형성하되,In forming the formwork for the construction of the retaining wall or wall of the building, form a formwork of a predetermined size by connecting a plurality of standardized panels, 상기 패널의 상단부에는 별도로 제작된 라인 빔이 마감처리를 위해 결합되며,상기 라인 빔은 몸체가 상면이 개방된 'ㄷ' 자 모양으로 절곡되어 이루어지고, 바닥면에는 'T'자 모양의 결합홈이 형성되도록 슬라이드부가 형성되며, 양쪽 내면 하단부에는 받침편이 내향 돌출되도록 구성되고, 상기 패널 상단부에 결합되어 거푸집을 구성하도록 이루어진 것을 특징으로 하는 거푸집용 라인 빔.A separately manufactured line beam is coupled to the upper end of the panel for finishing treatment, and the line beam is bent in a 'c' shape with an open top surface, and a 't' shaped coupling groove on a bottom surface. The slide portion is formed to be formed, and both inner lower end portions are configured to protrude inwardly the supporting piece, and is coupled to the upper end of the panel to form a formwork line beam for the formwork. 제 1항에 있어서,The method of claim 1, 상기 라인 빔의 몸체에 형성된 슬라이드부에는 상면에 'ㄱ'자 모양으로 절곡된 결합편이 돌출되어 형성된 가이드 레일 형태의 고정체가 끼워져 결합되어 구성된 것을 특징으로 하는 거푸집용 라인 빔.The line beam for formwork, characterized in that the slide portion formed in the body of the line beam is formed by fitting the guide rail-shaped fixing body formed by protruding the engaging piece bent in a '-' shape on the upper surface. 제 1항에 있어서,The method of claim 1, 상기 라인 빔의 몸체 바닥면에 소정 간격 이격 되도록 슬라이드편이 일정 높이로 돌출되고, 슬라이드편 사이에는 결합공이 관통되어 구성된 것을 특징으로 하는 거푸집용 라인 빔.The line beam for the formwork, characterized in that the slide piece is projected to a predetermined height so as to be spaced apart from the body bottom surface of the line beam by a predetermined height, the coupling hole is passed between the slide pieces.
KR2020060016627U 2006-06-20 2006-06-20 A line-beam of form KR200426149Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020060016627U KR200426149Y1 (en) 2006-06-20 2006-06-20 A line-beam of form

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020060016627U KR200426149Y1 (en) 2006-06-20 2006-06-20 A line-beam of form

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR1020060056890A Division KR20060085607A (en) 2006-06-23 2006-06-23 A line-beam of form

Publications (1)

Publication Number Publication Date
KR200426149Y1 true KR200426149Y1 (en) 2006-09-08

Family

ID=41774726

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020060016627U KR200426149Y1 (en) 2006-06-20 2006-06-20 A line-beam of form

Country Status (1)

Country Link
KR (1) KR200426149Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200490549Y1 (en) * 2019-01-28 2019-11-28 미래테크(주) Corner type frame for concrete wall construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200490549Y1 (en) * 2019-01-28 2019-11-28 미래테크(주) Corner type frame for concrete wall construction

Similar Documents

Publication Publication Date Title
KR200481707Y1 (en) The outer wall for easy construction
KR100977804B1 (en) Gang form
KR200384386Y1 (en) Euro-form for outer appearance of concrete body
KR200426149Y1 (en) A line-beam of form
KR200414945Y1 (en) A slab panel for euro form of deck panel construct
KR20060085607A (en) A line-beam of form
KR200443097Y1 (en) steel rest including insert
JP2006283433A (en) Form member of foaming thermal insulation body and construction method of reinforced concrete structure using improved separator
CN210342689U (en) Slotted wood formwork for pool wall
JP4546979B2 (en) Formwork member having attachment means and concrete wall forming method
KR20170090536A (en) C type fixture used for wall mold and eco mold incorporating the same
KR101231779B1 (en) Extended precast concrete panel and construction method of it
KR100663378B1 (en) Euro-form for outer appearance of concrete body
KR20080087196A (en) The slab and beam form construction table form
KR200412098Y1 (en) Insert for ceiling
KR100934633B1 (en) Ocher foam for construction
KR200415591Y1 (en) The euroform for slab
KR20140130808A (en) The outer wall for easy construction
KR100445254B1 (en) Folded concrete permanent form
KR100501270B1 (en) Prefabricated form for stair hall
KR100471178B1 (en) Form for constructing concrete structure
KR100763027B1 (en) Water proof with precast concrete structure
KR101386415B1 (en) Floor structure and modular unit of modular building and method for manufacturing the same
KR100540643B1 (en) Wall of building
JP4546980B2 (en) Formwork member having attachment means and concrete wall forming method

Legal Events

Date Code Title Description
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20071008

Year of fee payment: 3

LAPS Lapse due to unpaid annual fee