KR200424430Y1 - A Grouting Unit of a High Powerness Steel Pipe - Google Patents

A Grouting Unit of a High Powerness Steel Pipe Download PDF

Info

Publication number
KR200424430Y1
KR200424430Y1 KR2020060014132U KR20060014132U KR200424430Y1 KR 200424430 Y1 KR200424430 Y1 KR 200424430Y1 KR 2020060014132 U KR2020060014132 U KR 2020060014132U KR 20060014132 U KR20060014132 U KR 20060014132U KR 200424430 Y1 KR200424430 Y1 KR 200424430Y1
Authority
KR
South Korea
Prior art keywords
steel pipe
cement sludge
ground
hole
cement
Prior art date
Application number
KR2020060014132U
Other languages
Korean (ko)
Inventor
김규철
Original Assignee
(주) 신풍컨설턴트
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주) 신풍컨설턴트 filed Critical (주) 신풍컨설턴트
Priority to KR2020060014132U priority Critical patent/KR200424430Y1/en
Application granted granted Critical
Publication of KR200424430Y1 publication Critical patent/KR200424430Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/028Devices or accesories for injecting a grouting liquid in a bore-hole
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

본 고안은 가압식 고강도 강관 그라우팅 장치에 있어서, 특히, 강관을 이용하여 선택적으로 가압할 수 있으며, 이로 인해 일정한 가압이 유지되어 가압 충진효과를 증대시키도록하여 지반변위를 억제시키고 또한 지반의 강성을 증대시켜 보강공의 공수를 줄이도록 한 것을 특징으로 하는 가압식 고강도 강관 그라우팅 장치에 관한 것으로,The present invention, in the high-pressure high-strength steel pipe grouting device, in particular, can be selectively pressed using a steel pipe, thereby maintaining a constant pressure to increase the pressure filling effect to suppress ground displacement and also increase the rigidity of the ground It relates to a pressurized high-strength steel pipe grouting device characterized in that to reduce the number of reinforcement work,

지반 구멍에 장착되며, 그라우트재인 시멘트 슬러지를 분산시키기 위해 다수개의 주입구를 형성한 파이프 형태의 강관과; 상기 강관의 외주연에 일정간격을 두고 배치하되 주입구 형성지점 중 어느 하나에 설치되고, 상기 주입구로부터 시멘트 슬러지가 출력될 시 부풀어오르면서 지반의 구멍을 폐쇄하도록 양측에 고무패킹으로 고정된 부직포로 이루어지는 차폐수단과; 상기 강관의 내부에 설치되는 시멘트 슬러지 주입장치와; 상기 시멘트 슬러지 주입장치의 외주연에 설치되되 2개 일개조로 형성하여 에어에 의해 차폐됨으로서 지반구멍에 공급되는 시멘트 슬러지 공급압력과 차폐수단에 공급되는 시멘트 슬러지 공급압력이 일정하도록 하는 패커를 포함하여 구성함이 특징이다.A steel pipe in the form of a pipe mounted in the ground hole and having a plurality of inlets formed therein for dispersing the cement sludge as a grout material; Arranged at a certain interval on the outer periphery of the steel pipe is installed at any one of the injection hole forming point, it is made of a non-woven fabric fixed by rubber packing on both sides to swell when the cement sludge is output from the injection hole to close the hole of the ground Shielding means; A cement sludge injection device installed inside the steel pipe; It is installed on the outer periphery of the cement sludge injection device is formed in two pieces to be shielded by air to include the cement sludge supply pressure supplied to the ground hole and the cement sludge supply pressure supplied to the shielding means including a packer It is characterized by configuration.

가압식, 강관, 그라우팅장치 Pressurized, Steel Pipe, Grouting Equipment

Description

가압식 고강도 강관 그라우팅 장치{A Grouting Unit of a High Powerness Steel Pipe}A Grouting Unit of a High Powerness Steel Pipe

도 1은 종래의 그라우팅 장치의 구성도.1 is a block diagram of a conventional grouting device.

도 2는 종래의 강관 동시주입 그라우팅 시공과정을 나타낸 도면.2 is a view showing a conventional steel pipe simultaneous injection grouting construction process.

도 3은 본 고안의 제 1 실시예에 따른 강관 그라우팅 장치 구성도.3 is a block diagram of a steel pipe grouting device according to a first embodiment of the present invention.

도 4는 도 3의 요부 확대도로서 본 고안의 시멘트 슬러시 주입용 패커의 상세도.Figure 4 is an enlarged view of the main portion of Figure 3 is a detailed view of the packer for cement slush injection of the present invention.

도 5은 본 고안의 제 2 실시예에 따른 강관 그라우팅 장치 구성도.5 is a block diagram of a steel pipe grouting apparatus according to a second embodiment of the present invention.

도 6는 도 5의 요부 확대도.6 is an enlarged view illustrating main parts of FIG. 5;

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

100: 강관100: steel pipe

200: 차폐장치200: shield

210: 고무패킹210: rubber packing

220: 부직포220: nonwoven fabric

300: 시멘트 슬러지 투입장치300: cement sludge dosing device

400, 400a: 패커400, 400a: packer

500: 시멘트 슬러지 투입호스500: cement sludge injection hose

500a: 지반구멍용 시멘트 슬러지 충진호스500a: cement sludge filling hose for ground holes

500b: 차폐용 시멘트 슬러지 충진호스500b: shielding cement sludge filling hose

600: 에어공급용 호스600: air supply hose

700: 스페이서700: spacer

1000, 1000a: 지반구멍1000, 1000a: Ground hole

본 고안은 가압식 고강도 강관 그라우팅 장치에 관한 것으로, 특히, 강관을 이용하여 선택적으로 가압할 수 있으며, 이로 인해 일정한 가압이 유지되어 가압 충진효과를 증대시키도록하여 지반변위를 억제시키고 또한 지반의 강성을 증대시켜 보강공의 공수를 줄이도록 한 것을 특징으로 하는 가압식 고강도 강관 그라우팅 장치에 관한 것이다.The present invention relates to a pressurized high-strength steel pipe grouting device, in particular, can be selectively pressurized using a steel pipe, thereby maintaining a constant pressurization to increase the pressure filling effect to suppress the ground displacement and also to increase the rigidity of the ground The present invention relates to a pressurized high-strength steel pipe grouting device characterized by increasing the number of reinforcing holes.

일반적으로 연약지반을 보강하거나 연약지반에 구축된 구조물의 침하를 방지하기 위해 사용된 차수 그라우팅을 이용한 지반 개량공법들은 유동성 유입재인 시멘트 슬러지나 약액을 침하된 지반등에 구멍을 뚫어 강제로 충진 응고시키켜 강고한 구축물을 시공하는 공법이다.In general, ground improvement methods using order grouting used to reinforce soft ground or to prevent settlement of structures built on soft ground are forcibly filled and solidified by drilling holes in cement sludge, which is a liquid influent, or chemical liquid. It is the construction method that constructs strong construct.

이러한 공법으로는 여러가지가 있으며, 그 중 일례로 도 1에 도시한 바와 같이 SGR 공법(Space Grouting Rocket System)을 tndog하기 위한 그라우팅 장치(2)는 주입 선단부(14)를 선단에 구비하는 천공로드(4)를 지반에 굴삭한 후, 그 천공로드(4)의 내측으로 주입튜브(16)를 삽입하고, 그 주입튜브(16)를 매개하여 주입펌프(도시하지 않음)를 통해 고압의 시멘트 슬러지를 공급하여 천공로드(4) 선단에 연결 설치된 주입 선단부(14)측으로 시멘트 슬러지가 이동된다.There are various such methods, and as an example, as shown in FIG. 1, the grouting apparatus 2 for tndog the SGR method (Space Grouting Rocket System) has a perforated rod having an injection tip 14 at the tip ( 4) is excavated to the ground, and then the injection tube 16 is inserted into the perforated rod 4, and the high pressure cement sludge is pumped through an injection pump (not shown) via the injection tube 16. The cement sludge is moved to the injection tip portion 14 which is supplied and connected to the tip of the punching rod 4.

이때, 상기 천공로드(4)는 미리 천공된 지반공간과 천공로드(4)의 사이에 시멘트 슬러지가 메워지도록 그 외주면에 시멘트 슬러지를 압출시키는 다수의 압출공(10)이 일정길이 간격으로 형성되며, 상기 천공로드(4)의 내주연중 그 압출공(10)이 형성된 전단에 각각 밀봉부재(12)가 링 형태로 부착되고, 상기 천공로드(4)의 전단부에는 상기 주입튜브(16)를 삽입하기 위한 개구부(8)가 형성된다.At this time, the perforated rod (4) is formed with a plurality of extrusion holes 10 for extruding cement sludge on the outer circumferential surface so that the cement sludge is filled between the pre-punched ground space and the perforated rod (4) In the inner circumference of the perforated rod 4, the sealing member 12 is attached to the front end of the perforated rod 4 in the form of a ring, and the injection tube 16 is attached to the front end of the perforated rod 4. The opening 8 for inserting the is formed.

그리고, 그 개구부(8)의 외주연에는 미리 천공된 지반의 천공부와 천공로드(4)의 사이를 밀봉시키기 위한 밀봉부재(6)가 부착된다.Then, a sealing member 6 is attached to the outer periphery of the opening 8 for sealing between the perforated portion of the ground previously drilled and the perforated rod 4.

따라서, 도 2에 도시한 바와 같이 미리 연약지반(20)의 소정부에 일정직경의 구멍(22)을 천공한 후, 그 천공구멍(22)에 상기 천공로드(4)를 삽입하고, 그 천공로드(4)의 개구부를 통해 상기 주입튜브(16)를 삽입한다.Therefore, as shown in Fig. 2, after drilling the hole 22 having a predetermined diameter in the predetermined portion of the soft ground 20, the drilling rod 4 is inserted into the drilling hole 22, and the drilling is performed. The injection tube 16 is inserted through the opening of the rod 4.

그리고, 주입튜브(16)를 통해 유입되어 주입구(18)를 통해 상기 천공로드(4)의 내부를 가득 채우게 된다.Then, it is introduced through the injection tube 16 to fill the inside of the perforated rod 4 through the injection hole 18.

천공로드(4)의 내부를 채운 시멘트 슬러지는 천공로드(4) 내부에 부착된 다단의 밀봉부재(12)에 의해 그 상단부로 유입되지 못하므로 천공로드(4)에 형성된 압출공(10)을 통해 시멘트 슬러지를 배출시키도록 한다.Cement sludge filling the inside of the drilling rod (4) is not introduced into the upper end by the multi-stage sealing member (12) attached to the inside of the drilling rod (4), so that the extrusion hole (10) formed in the drilling rod (4) To discharge cement sludge.

그러나, 이러한 구조는 그라우팅을 주입하는 주입호스가 천공내에 노출되어 있는 상태에서 가압을 하기 때문에 천공내 주변 흙들이 흐트러지는 효과가 발생할 수 있는 문제점이 있다.However, this structure has a problem in that the injection hose for injecting grouting is pressurized in a state where it is exposed in the perforation, so that the surrounding soil in the perforation may be disturbed.

또한, 지반의 균열내에 그라우팅재가 충진되기 전에 이미 가압에 의해 지반이 흐트러지는 효과가 발생하여 지반내의 균열이 미세하게 붕괴되어 충진의 범위가 축소되는 단점이 있다.In addition, before the grouting material is filled in the cracks of the ground, the ground is disturbed by pressurization, so that the cracks in the ground are finely collapsed and the range of filling is reduced.

또한, 지반의 재질에 따라 다양한 압력을 제어할 수 없기 때문에 지반이 약한부분에 강한 압력을 제공하게 되면 지반이 무너질 염려가 있다.In addition, since various pressures cannot be controlled according to the material of the ground, if the ground provides a strong pressure to the weak part, the ground may be collapsed.

본 고안은 상기와 같은 문제점을 해결코자 하는 것으로, 가압용 주입호스가 천공내의 중심에 잘 고정되고, 아울러 가압강도를 선택적으로 조절할 수 있도록 하는데 그 목적이 있다.The present invention is to solve the above problems, the purpose of the injection hose for press is well fixed to the center of the perforation, and also to selectively control the pressure strength.

상기 목적을 달성하기 위한 수단으로,As a means for achieving the above object,

본 고안은 지반 구멍에 장착되며, 그라우트재인 시멘트 슬러지를 분산시키기 위해 다수개의 주입구를 형성한 파이프 형태의 강관과; 상기 강관의 외주연에 일정간격을 두고 배치하되 주입구 형성지점 중 어느 하나에 설치되고, 상기 주입구로부터 시멘트 슬러지가 출력될 시 부풀어오르면서 지반의 구멍을 폐쇄하도록 양측에 고무패킹으로 고정된 부직포로 이루어지는 차폐수단과; 상기 강관의 내부에 설치되는 원통형 파이프 형상으로 시멘트 슬러지를 분사하여 강관의 주입구를 통해 외부로 배출됨으로써 차폐수단과 지반 구멍을 동시에 채우는 시멘트 슬러지 주입장치 와; 상기 시멘트 슬러지 주입장치의 외주연에 설치되되 2개 일개조로 형성하여 에어에 의해 차폐됨으로서 지반구멍에 공급되는 시멘트 슬러지 공급압력과 차폐수단에 공급되는 시멘트 슬러지 공급압력이 일정하도록 하는 패커와; 상기 시멘트 슬러지 주입장치에 접속되어 패커에 에어를 제공하는 에어공급용 호스와; 상기 시메트 슬러지 주입장치에 접속되어 시멘트 슬러지를 공급하는 시멘트 슬러지 투입호스를 포함하여 구성함이 특징이다.The present invention is a pipe-shaped steel pipe is mounted in the ground hole, and formed a plurality of inlets for dispersing the cement sludge as a grout material; Arranged at a certain interval on the outer periphery of the steel pipe is installed at any one of the injection hole forming point, it is made of a non-woven fabric fixed by rubber packing on both sides to swell when the cement sludge is output from the injection hole to close the hole of the ground Shielding means; A cement sludge injecting apparatus for filling cement sludge into a cylindrical pipe shape installed inside the steel pipe and discharged to the outside through an inlet of the steel pipe to simultaneously fill shielding means and ground holes; A packer installed at an outer circumference of the cement sludge injecting device, formed in two pieces and shielded by air so that the cement sludge supply pressure supplied to the ground hole and the cement sludge supply pressure supplied to the shielding means are constant; An air supply hose connected to the cement sludge injection device and providing air to the packer; It is characterized in that it comprises a cement sludge inlet hose which is connected to the Siemens sludge injection device for supplying cement sludge.

또한, 상기 시멘트 슬러지 주입장치의 외주연에는 강관과의 일정한 거리를 이격시키기 위한 스페이서를 다수개 더 부가설치하여 이루어진 것이 특징이다.In addition, the outer periphery of the cement sludge injection device is characterized in that a plurality of additional spacers for spaced apart from a certain distance from the steel pipe is installed.

또한, 지반 구멍에 장착되며, 그라우트재인 시멘트를 분산시키기 위해 다수개의 주입구를 형성한 파이프 형태의 강관과; 상기 강관의 외주연에 일정간격을 두고 배치하되 주입구 형성지점중 어느 하나에 설치되고, 상기 주입구로부터 시멘트 슬러지가 출력될 시 부풀어오르면서 지반의 구멍을 폐쇄하도록 양측에 고무패킹으로 고정된 부직포로 이루어지는 차폐수단과; 상기 고무패킹을 관통하여 설치되며 상기 차폐수단까지 연결되어 시멘트 슬러지를 채우는 차폐용 시멘트 슬러지 충진 호스와; 상기 고무패킹을 관통하여 설치되며 상기 지반 구멍의 공간부에까지 연결되어 시멘트 슬러지를 지반 구멍에 체우는 지반구멍용 시멘트 슬러지 충진 호스를 포함하여 구성함이 특징이다.In addition, the steel pipe in the form of a pipe which is mounted in the ground hole and formed a plurality of inlets for dispersing the cement grout material; Arranged at a certain interval on the outer periphery of the steel pipe is installed in any one of the injection hole forming point, it is made of a non-woven fabric fixed by rubber packing on both sides to swell when the cement sludge is output from the injection hole to close the hole of the ground Shielding means; A shielding cement sludge filling hose installed through the rubber packing and connected to the shielding means to fill cement sludge; It is installed through the rubber packing and connected to the space portion of the ground hole is characterized in that it comprises a cement sludge filling hose for ground holes to fill the cement sludge in the ground hole.

본 고안의 그 밖의 목적, 특정한 장점들 및 신규한 특징들은 첨부된 도면들과 연관되어지는 이하의 상세한 설명과 바람직한 실시예들로부터 더욱 분명해질 것이다.Other objects, specific advantages and novel features of the present invention will become more apparent from the following detailed description and the preferred embodiments associated with the accompanying drawings.

이하, 본 고안의 바람직한 실시예를 첨부된 도면들을 참조하여 상세히 설명한다. 우선 각 도면의 구성요소들에 참조부호를 부가함에 있어서, 동일한 구성요소들에 대해서는 비록 다른 도면상에 표시되더라도 가능한 한 동일한 부호를 가지도록 하고 있음에 유의하여야 한다. 또한, 하기에서 본 고안을 설명함에 있어, 관련된 공지기능 또는 구성에 대한 구체적인 설명이 본 고안의 요지를 불필요하게 흐릴 수 있다고 판단되는 경우에는 그 상세한 설명을 생략한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings. First, in adding reference numerals to the components of each drawing, it should be noted that the same reference numerals are used as much as possible even if displayed on different drawings. In addition, in the following description of the present invention, if it is determined that the detailed description of the related known function or configuration may unnecessarily obscure the subject matter of the present invention, the detailed description thereof will be omitted.

도 3은 본 고안의 제 1 실시예에 따른 강관 그라우팅 장치 구성도.3 is a block diagram of a steel pipe grouting device according to a first embodiment of the present invention.

도 4는 도 3의 요부 확대도로서 본 고안의 시멘트 슬러시 주입용 패커의 상세도로서, 도시한 바와 같이 본 고안은 크게 지반 구멍에 장착되는 강관(100)과, 강관(100)과 지반구멍(1000)사이를 폐쇄하는 차폐수단(200)과, 시멘트 슬러지(310)를 주입하기 위한 시멘트 슬러지 주입장치(300)와, 시멘트 슬러지(310)의 분사압력을 유지하기 위한 1개조의 패커(400, 400a)와, 패커(400, 400a)에 에어를 충진하기 위한 에어공급용 호스(600)와, 시멘트 슬러지(310)를 투입하기 위한 시멘트 슬러지 투입호스(500)로 이루어진다.Figure 4 is an enlarged view of the main portion of Figure 3 is a detailed view of the cement slush injection packer of the present invention, as shown in the present invention is a steel pipe 100, steel pipe 100 and ground hole ( Shielding means 200 for closing between the 1000, the cement sludge injection device 300 for injecting the cement sludge 310, and one packer 400 for maintaining the injection pressure of the cement sludge 310, 400a, an air supply hose 600 for filling air into the packers 400 and 400a, and a cement sludge inlet hose 500 for injecting the cement sludge 310.

상기 지반구멍(1000)은 시멘트 슬러지(310)를 투입할 장소에 특수기계를 이용하여 형성하는 것으로 구멍의 너비와 깊이를 적절히 예측하여 형성토록 한다.The ground hole 1000 is formed by using a special machine at the place where the cement sludge 310 is to be put, so as to properly predict the width and depth of the hole.

또한, 상기 지반구멍(1000)을 형성하는 과정에서 지반의 연약도등을 체크할 수 있으며, 그 깊이에 따라서 상이한 지반강도를 사전에 파악토록 한다.In addition, it is possible to check the softness of the ground, etc. in the process of forming the ground hole 1000, so as to grasp the different ground strength according to the depth in advance.

상기에서 지반강도를 사전에 파악하는 이유는 시멘트 슬러지를 투입하는 압력을 지반의 강도에 따라서 조절하여 투입하여야 하기 때문이다. 즉, 본 고안의 도면에서 첫번째 지반구멍(1000)과 두번째 지반구멍(1000a)에 존재하는 지반의 강도가 다를 때에는 다른 강도의 분사압력으로 시멘트 슬러지를 투입함이 바람직하다.The reason for grasping the ground strength in advance is that the pressure to inject cement sludge should be adjusted according to the strength of the ground. That is, in the drawings of the present invention, when the strength of the ground existing in the first ground hole 1000 and the second ground hole 1000a is different, it is preferable to inject the cement sludge at different injection pressures.

상기 강관(100)은 원통형 파이프 형태로서 외주면에 다수개의 주입구(110)가 형성되며, 상기 주입구(110)를 통해 시멘트 슬러지(310)를 공급하여 지반구멍(1000)을 채우도록 하고, 아울러 주입구(100a)를 통해 시멘트 슬러지를 공급하여 차폐수단(200)을 채우도록 한다.The steel pipe 100 has a cylindrical pipe shape, a plurality of injection holes 110 are formed on the outer circumferential surface, and supply the cement sludge 310 through the injection hole 110 to fill the ground hole 1000, and also the injection hole ( The cement sludge is supplied through 100a to fill the shielding means 200.

상기 차폐수단(200)은 양측에 고무패킹(210)이 형성되고 그 중간에 부직포(220)가 감싸여진 형태로서 강관(100)의 외주연에 설치된다. 상기 고무패킹(210)은 스틸밴드(211)를 이용하여 강관에 강하게 밀착시키도록 한다.The shielding means 200 is formed on the outer periphery of the steel pipe 100 as a rubber packing 210 is formed on both sides and the nonwoven fabric 220 is wrapped in the middle thereof. The rubber packing 210 is to be in close contact with the steel pipe using a steel band 211.

그리고, 상기 강관(100)의 주입구(100a)가 차폐수단 사이에 위치하도록 하여 상기 주입구(100a)로부터 시멘트 슬러지가 공급되면 부직포(220)가 부풀어 오르면서 강관(100)과 지반구멍(1000) 사이를 완전히 폐쇄하도록 하여 미리 지정한 압력으로 시멘트 슬러지(310)를 분사할 수 있도록 한다.In addition, when the injection port 100a of the steel pipe 100 is positioned between the shielding means, and the cement sludge is supplied from the injection hole 100a, the nonwoven fabric 220 swells between the steel pipe 100 and the ground hole 1000. It is to be completely closed so that the cement sludge 310 can be injected at a predetermined pressure.

상기 시멘트 슬러지 주입장치(300)는 패커(400, 400a)를 2개구비하여 이루어지며, 주입구(110a)위치에 상응하게 출력장치를 갖도록 하여 전단패커(400)를 이용하여 강관(100)을 밀폐시킨 후 지반구멍(1000)에 시멘트 슬러지를 분사하고 후단패커(400a)를 이용하여 강관(100)을 밀폐시킨 후 차폐수단(200)에 시멘트 슬러지를 분사한다.The cement sludge injection device 300 has two packers 400 and 400a and has an output device corresponding to the injection hole 110a to seal the steel pipe 100 using the shear packer 400. After the cement ground sludge is injected into the ground hole 1000, the steel pipe 100 is sealed using the rear end packer 400a, and then cement sludge is injected into the shielding means 200.

상기 패커(400, 400a)는 시멘트 슬러지 주입장치(300)의 외주연에 형성되며 외부로부터 에어를 공급받아 부풀어 오르면서 강관(100)과 시멘트 슬러지 주입장치 (300)사이를 차단하여 외부로 시멘트 슬러지가 빠져나가는 것을 차단하고 동시에 슬러지 공급압력이 일정하도록 하는 역할을 한다.The packer (400, 400a) is formed on the outer periphery of the cement sludge injection device 300 and is inflated by receiving air from the outside while blocking between the steel pipe 100 and the cement sludge injection device 300 to the outside cement sludge Prevents the escape of the gas and keeps the sludge supply pressure constant.

즉, 본 고안에서 상기 패커는 시멘트 슬러지 장치의 일단에 2개 일개조로 배치되는 것으로 전단에 위치한 패커(400)는 지반구멍(1000)에 공급되는 시멘트 슬러지의 공급압력을 유지시키고, 후단에 위치한 패커(400a)는 차폐수단(200)에 공급되는 시멘트 슬러지의 공급압력을 유지시킨다.That is, in the present invention, the packer is disposed in two pieces at one end of the cement sludge device, the packer 400 located at the front end maintains the supply pressure of the cement sludge supplied to the ground hole 1000, and is located at the rear end. The packer 400a maintains the supply pressure of the cement sludge supplied to the shielding means 200.

상기 시멘트 슬러지 투입호스(500)는 지반구멍(1000)과 차폐수단(200)에 시멘트 슬러지(310)를 공급하기 위한 것으로 시멘트 슬러지 주입장치(300)에 접속된다.The cement sludge inlet hose 500 is for supplying the cement sludge 310 to the ground hole 1000 and the shielding means 200 and is connected to the cement sludge injection device 300.

그리고, 에어공급용 호스(600)는 패커(400, 400a)에 각각 연결되어 에어를 공급하거나 빼내도록 함으로써 강관(100) 내부를 밀봉하거나 밀봉을 해제한다.In addition, the air supply hose 600 is connected to the packers 400 and 400a, respectively, to seal or release the inside of the steel pipe 100 by supplying or extracting air.

상기와 같이 구성하는 본 고안의 동작에 대해서 설명하면 다음과 같다.Referring to the operation of the present invention configured as described above are as follows.

먼저, 본 고안은 일정한 지름의 원통형 파이프 형성으로 형성된 강관(100)을 구비하고, 상기 강관(100)에 일정간격으로 다수개의 주입구(110, 110a)를 형성한다.First, the present invention is provided with a steel pipe 100 formed by forming a cylindrical pipe of a constant diameter, and forms a plurality of injection holes (110, 110a) at a predetermined interval on the steel pipe (100).

또한, 상기 강관(100)의 외주연에는 일정간격을 두고 차폐수단(200)을 결합시키는바, 고무패킹(210)과 부직포(220)로 이루어진 차폐수단(200)을 강관(100)에 결합시킴으로서 슬러지를 공급시 강관(100)과 지반구멍(1000)사이를 차폐토록 한 다.In addition, the outer periphery of the steel pipe 100 is coupled to the shielding means 200 at a predetermined interval, by coupling the shielding means 200 made of a rubber packing 210 and the nonwoven fabric 220 to the steel pipe 100. When supplying the sludge to shield between the steel pipe 100 and the ground hole (1000).

또한, 상기 강관(100)의 내부에 시멘트 슬러지(310)를 투입하기 위한 시멘트 슬러지 주입장치(300)를 설치하고, 상기 시멘트 슬러지 주입장치(300)의 외주연에 2개의 패커(400, 400a)를 설치한다.In addition, a cement sludge injector 300 for injecting the cement sludge 310 is installed inside the steel pipe 100, and two packers 400 and 400a are disposed on the outer circumference of the cement sludge injector 300. Install it.

그리고, 시멘트 슬러지 주입장치(300)의 일단에는 에어공급용 호스(600)와 슬러지 투입호스(500)를 연결하여 이루어진다.And, one end of the cement sludge injection device 300 is made by connecting the air supply hose 600 and the sludge inlet hose 500.

상기와 같이 조립이 완료되면 지반구멍(1000)에 강관(100)을 집어넣고 강관(100)의 내부를 통과하는 에어공급용 호스(600)를 통해 에어를 공급하여 패커(400, 400a)를 부풀어 오르게 하여 강관(100)내부를 페쇄한다.When the assembly is completed as described above, the steel pipe 100 is inserted into the ground hole 1000 and the air is supplied through the air supply hose 600 passing through the inside of the steel pipe 100 to inflate the packers 400 and 400a. The steel pipe 100 is closed and closed.

그리고, 상기 슬러지 투입호스(500)를 통해 시멘트 슬러지를 투입하여 강관의 주입구를 통해 배출되면서 시멘트 슬러지(310)가 지반구멍(1000)과 차폐수단(200)을 채우도록 한다.Then, the cement sludge is injected through the sludge inlet hose 500 to be discharged through the inlet of the steel pipe so that the cement sludge 310 fills the ground hole 1000 and the shielding means 200.

이때, 상대적으로 부피가 적은 차폐수단(200)이 먼저 차오르게 되는데, 부직포(220)가 부풀어오르면서 강관(100)과 지반구멍(1000)사이를 메우게 되어 패커(400, 400a)와 더불어 일정한 압력을 유지하게 된다.At this time, the relatively small shielding means 200 is filled up first, the nonwoven fabric 220 swells to fill the gap between the steel pipe 100 and the ground hole 1000, and the packer (400, 400a) and constant Maintain pressure.

따라서, 이때 지반구멍(1000)으로 출력되는 시멘트 슬러지가 가압되면서 필요로 하는 압력으로 지반구멍(1000)을 메우게 된다.Therefore, at this time, the cement sludge outputted to the ground hole 1000 is pressurized to fill the ground hole 1000 with the required pressure.

상기와 같이 첫번째 지반구멍(1000)의 작업이 마무리되면 패커(400, 400a)의 에어를 뺀 다음에 슬러지 투입장치(300)를 다음 두번째 지반구멍(1000a)으로 이동하여 마찬가지로 다음단에 차폐수단에 시멘트 슬러지를 공급하여 강관(100)과 지반 구멍(1000a) 사이를 밀봉하고, 동시에 지반구멍(1000a)을 가압하면서 시멘트 슬러지를 공급한다.As described above, when the work of the first ground hole 1000 is finished, the air of the packers 400 and 400a is removed, and then the sludge dosing device 300 is moved to the next second ground hole 1000a. The cement sludge is supplied to seal between the steel pipe 100 and the ground hole 1000a, and at the same time, the cement sludge is supplied while pressing the ground hole 1000a.

이때 공급압력은 첫번째 지반구멍(1000)의 가압과 달리할 수 있으며, 따라서 두번째 지반구멍(1000a)에 존재하는 지반이 연약하다면 첫번째 지반구멍보다 약한 압력으로 시멘트 슬러지(310)를 분사토록 한다.At this time, the supply pressure may be different from the pressurization of the first ground hole 1000. Therefore, if the ground existing in the second ground hole 1000a is weak, the cement sludge 310 is sprayed at a pressure lower than that of the first ground hole.

물론, 시멘트 슬러지(310)를 분사하기전에 두개의 패커(400, 400a)에 공기압을 제공하여 강관(100)내부를 밀봉해야 한다.Of course, before spraying the cement sludge 310, the air pressure should be provided to the two packers 400 and 400a to seal the inside of the steel pipe 100.

상기 작업이 완료되면 두개의 패커(400, 400a)에 에어를 뺀 다음에 시멘트 슬러지 공급장치(300)를 이동시켜 다음 지반구멍에 시멘트 슬러지를 채워넣는 작업을 계속하여 마무리한다.When the above operation is completed, the air is removed from the two packers 400 and 400a, and then the cement sludge supply device 300 is moved to finish the operation of filling the cement sludge into the next ground hole.

한편, 상기 시멘트 슬러지 주입장치의 외주연에는 스페이서(700)를 일정간격을 두고 배치하여 강관(100)의 정중앙을 시멘트 슬러지 주입장치(300)가 통과하도록 하는바, 이는 시멘트 슬러지 주입장치(300)가 강관(100)의 정중앙에 위치하면서 원할한 슬러지 주입작업이 이루어질 수 있도록 하기 위함이다.On the other hand, the outer periphery of the cement sludge injection device is arranged spacers 700 at regular intervals to allow the cement sludge injection device 300 to pass through the center of the steel pipe 100, which is the cement sludge injection device 300 In order to be able to make a smooth sludge injection operation is located in the center of the steel pipe (100).

결국, 차폐수단(200)을 이용하여 강관(100)이 지반구멍(1000)의 정중앙에 위치하도록하고, 스페이서(700)를 이용하여 시멘트 슬러지 주입장치(300)가 강관(100)의 정중앙에 위치하도록 하여 슬러지 투입이 원활이 이루어지도록 한다.As a result, the steel pipe 100 is positioned at the center of the ground hole 1000 using the shielding means 200, and the cement sludge injection device 300 is positioned at the center of the steel pipe 100 using the spacer 700. Sludge is injected smoothly.

도 5 및 도 6은 본 고안의 제 2 실시예 도면으로서, 강관(100)의 외주연에 차폐수단(200)을 설치하고, 상기 차폐수단(200)을 구성하는 고무패킹(210)을 통해 차폐용 시멘트 슬러지 충진호스(500b)와, 지반구멍용 시멘트 슬러지 충진호 스(500a)를 설치하였다.5 and 6 is a second embodiment of the present invention, the shielding means 200 is installed on the outer periphery of the steel pipe 100, the shielding through the rubber packing 210 constituting the shielding means 200 Cement sludge filling hose (500b) for the ground and cement sludge filling hose (500a) for the ground hole.

상기 차폐용 시멘트 슬러지 충진호스(500b)와 지반구멍용 시멘트 슬러지 충진호스(500a)는 고무패킹(210)을 관통하여 설치고정되며, 그 끝단이 각각 차폐수단 (200)내부와 지반구멍(1000) 일단에 배치되도록 하여 각각의 호스(500a, 500b)를 통해 시멘트 슬러지를 공급하면 차폐수단(200)을 구성하는 부직포(220)가 부풀어오르면서 강관(100)과 지반구멍(1000)사이를 메우도록 하고, 지반구멍(1000)을 통해 공급되는 슬러지를 이용하여 지반구멍(1000)을 차례로 메우도록 한다.The shielding cement sludge filling hose 500b and the ground hole cement sludge filling hose 500a are installed and fixed through the rubber packing 210, and ends thereof are respectively shielded means 200 and the ground hole 1000. When the cement sludge is supplied through each of the hoses 500a and 500b, the nonwoven fabric 220 forming the shielding means swells to fill the gap between the steel pipe 100 and the ground hole 1000. Then, the ground hole 1000 is sequentially filled by using the sludge supplied through the ground hole 1000.

또한, 상기 강관(100)에는 공기배출을 위한 공기배출홀(120)을 형성하여 지반구멍을 메우면서 발생하는 압력을 해소시키도록 한다.In addition, the steel pipe 100 to form an air discharge hole 120 for air discharge to relieve the pressure generated while filling the ground hole.

즉, 본 고안의 제 1 실시예에서는 강한 가압을 이용하여 시멘트 슬러지를 분사시키는 것을 예시하고 있고, 제 2 실시예에서는 공기배출홀(210)을 부가설치하여 필요에 따라 지반구멍(1000)이 가압되면서 발생하는 에어를 배출할 수 있도록 하였다.That is, the first embodiment of the present invention illustrates the injection of cement sludge using strong pressurization, and the second embodiment additionally installs an air discharge hole 210 to press the ground hole 1000 as necessary. It is possible to discharge the air generated while.

또한, 본 고안의 제 1 실시예는 시멘트 슬러지 주입장치(300)를 후퇴시키면서 작업이 이루어지며 작업이 마무리되면 시멘트 슬러지 주입장치(300)를 지반구멍(1000)으로부터 빼내도록 하나, 제 2 실시예는 시멘트 슬러지 주입장치를 이용하지 않고 호스(500a, 500b)를 통해 시멘트 슬러지를 공급하기 때문에 강관외부로 장치를 빼내지 않고 지반구멍에 매몰시키도록 한다.In addition, the first embodiment of the present invention is to retreat the cement sludge injection device 300, the operation is made, and when the work is finished to remove the cement sludge injection device 300 from the ground hole 1000, the second embodiment Since the cement sludge is supplied through the hoses 500a and 500b without using the cement sludge injection device, the device is buried in the ground hole without removing the device outside the steel pipe.

한편, 제 2 실시예 역시 강관(100)의 외주연에 고무패킹(210)과 부직포(220)로 이루어지는 차폐수단(200)을 설치하고, 고무패킹(210)을 관통하여 시멘트 슬러 지 공급을 위한 호스(500a, 500b)를 각각 설치하며, 아울러 강관(100)에 공기배출홀(120)을 형성한 상태에서 지반구멍(1000)에 집어넣는다.On the other hand, the second embodiment also installed a shielding means 200 made of a rubber packing 210 and a nonwoven fabric 220 on the outer periphery of the steel pipe 100, and penetrates the rubber packing 210 to supply cement sludge The hoses 500a and 500b are respectively installed and inserted into the ground holes 1000 in the state where the air discharge holes 120 are formed in the steel pipe 100.

이후, 상기 차폐용 시멘트 슬러지 충진호스(500b)와, 지반구멍용 시멘트 슬러지 충진호스(500a)를 통해 시멘트 슬러지를 투입하면 부피가 상대적으로 작은 차폐수단(200)의 부직포(220)가 부풀어오르면서 강관(100)과 지반구멍(1000) 사이를 차단하고 이후 지반구멍(1000)에 시멘트 슬러지가 차오르면서 밀봉된다.Thereafter, when the cement sludge is injected through the shielding cement sludge filling hose 500b and the ground hole cement sludge filling hose 500a, the nonwoven fabric 220 of the shielding means 200 having a relatively small volume swells. Blocking between the steel pipe 100 and the ground hole 1000 and then sealed in the ground hole 1000 as the cement sludge fills up.

그리고, 상기 차폐용 시멘트 슬러지 충진호스(500b)와, 지반구멍용 시멘트 슬러지 충진호스(500a)는 각 차폐수단(200)과 지반구멍(1000) 일단마다 설치되어 있어 첫번째 지반구멍(1000)의 슬러지 투입이 완료되면 두번째 지반구멍(1000a)에 슬러지를 투입하는 방식으로 순차 작업을 진행하여 슬러지의 지반구멍 투입작업을 마무리 할 수 있다.In addition, the shielding cement sludge filling hose 500b and the ground hole cement sludge filling hose 500a are installed at each shielding means 200 and one end of the ground hole 1000, so that the sludge of the first ground hole 1000 is disposed. When the loading is completed, the sludge is injected into the second ground hole 1000a to sequentially process the sludge ground hole insertion work.

또한, 상기 차폐수단(200)이 부풀어 오르면서 강관(100)이 지반구멍(1000)의 정중앙에 위치하게 되어 배치구조가 안정적으로 되고, 이에 따라 시멘트 슬러지 공급이 원활하게 진행될 수 있다.In addition, as the shielding means 200 is inflated, the steel pipe 100 is positioned at the center of the ground hole 1000, so that the arrangement structure is stable, and thus, cement sludge supply can be smoothly performed.

상술한 바와 같이 본 고안은 강관내의 2개 일개조의 패커를 통해 단계적으로 가압 충진함으로서 다양한 가변압력으로 충진이 가능하며, 이에 따라 보다 안정적이고 지반보강이 우수한 작업이 실시될 수 있도록 하는 효과를 제공한다.As described above, the present invention can be filled at various variable pressures by step-by-step filling through two sets of packers in a steel pipe, thereby providing an effect of performing more stable and excellent ground reinforcement. do.

비록 본 고안이 상기에서 언급한 바람직한 실시예와 관련하여 설명되어졌지 만, 본 고안의 요지와 범위로부터 벗어남이 없이 다른 다양한 수정 및 변형이 가능할 것이다. 따라서, 첨부된 청구의 범위는 본 고안의 진정한 범위내에 속하는 그러한 수정 및 변형을 포함할 것이라고 여겨진다.Although the present invention has been described in connection with the above-mentioned preferred embodiments, various other modifications and variations may be made without departing from the spirit and scope of the present invention. Accordingly, it is intended that the appended claims cover such modifications and variations as fall within the true scope of the present invention.

Claims (3)

지반 구멍에 장착되며, 그라우트재인 시멘트 슬러지를 분산시키기 위해 다수개의 주입구를 형성한 파이프 형태의 강관과;A steel pipe in the form of a pipe mounted in the ground hole and having a plurality of inlets formed therein for dispersing the cement sludge as a grout material; 상기 강관의 외주연에 일정간격을 두고 배치하되 주입구 형성지점중 어느하나에 설치되고, 상기 주입구로부터 시멘트 슬러지가 출력될 시 부풀어오르면서 지반의 구멍을 폐쇄하도록 양측에 고무패킹으로 고정된 부직포로 이루어지는 차폐수단과;Arranged at a certain interval on the outer periphery of the steel pipe is installed in any one of the injection hole forming point, it is made of a non-woven fabric fixed by rubber packing on both sides to swell when the cement sludge is output from the injection hole to close the hole of the ground Shielding means; 상기 강관의 내부에 설치되는 원통형 파이프 형상으로 시멘트 슬러지를 분사하여 강관의 주입구를 통해 외부로 배출됨으로써 차폐수단과 지반 구멍을 동시에 체우는 시멘트 슬러지 주입장치와;A cement sludge injector which sprays cement sludge into a cylindrical pipe shape installed inside the steel pipe and is discharged to the outside through an inlet of the steel pipe to simultaneously fill shielding means and ground holes; 상기 시멘트 슬러지 주입장치의 외주연에 설치되되 2개 일개조로 형성하여 에어에 의해 차폐됨으로서 지반구멍에 공급되는 시멘트 슬러지 공급압력과 차폐수단에 공급되는 시멘트 슬러지 공급압력이 일정하도록 하는 패커와;A packer installed at an outer circumference of the cement sludge injecting device, formed in two pieces and shielded by air so that the cement sludge supply pressure supplied to the ground hole and the cement sludge supply pressure supplied to the shielding means are constant; 상기 시멘트 슬러지 주입장치에 접속되어 패커에 에어를 제공하는 에어공급용 호스와;An air supply hose connected to the cement sludge injection device and providing air to the packer; 상기 시메트 슬러지 주입장치에 접속되어 시멘트 슬러지를 공급하는 시멘트 슬러지 투입호스를 포함하여 구성함을 특징으로 하는 가압식 고강도 강관 그라우팅 장치.Pressurized high-strength steel pipe grouting device comprising a cement sludge inlet hose connected to the simet sludge injecting device to supply cement sludge. 제 1 항에 있어서,The method of claim 1, 상기 시멘트 슬러지 주입장치의 외주연에는 강관과의 일정한 거리를 이격시키기 위한 스페이서를 다수개 더 부가설치하여 이루어진 것을 특징으로 하는 가압식 고강도 강관 그라우팅 장치.Pressurized high-strength steel pipe grouting device, characterized in that the outer periphery of the cement sludge injection device is further provided with a plurality of spacers for separating a certain distance from the steel pipe. 지반 구멍에 장착되며, 그라우트재인 시멘트를 분산시키기 위해 다수개의 주입구를 형성한 파이프 형태의 강관과;A steel pipe in the form of a pipe mounted in the ground hole and having a plurality of inlets formed therein to disperse the cement as the grout material; 상기 강관의 외주연에 일정간격을 두고 배치하되 주입구 형성지점중 어느하나에 설치되고, 상기 주입구로부터 시멘트 슬러지가 출력될 시 부풀어오르면서 지반의 구멍을 폐쇄하도록 양측에 고무패킹으로 고정된 부직포로 이루어지는 차폐수단과;Arranged at a certain interval on the outer periphery of the steel pipe is installed in any one of the injection hole forming point, it is made of a non-woven fabric fixed by rubber packing on both sides to swell when the cement sludge is output from the injection hole to close the hole of the ground Shielding means; 상기 고무패킹을 관통하여 설치되며 상기 차폐수단까지 연결되어 시멘트 슬러지를 채우는 차폐용 시멘트 슬러지 충진 호스와;A shielding cement sludge filling hose installed through the rubber packing and connected to the shielding means to fill cement sludge; 상기 고무패킹을 관통하여 설치되며 상기 지반 구멍의 공간부에까지 연결되어 시멘트 슬러지를 지반 구멍에 체우는 지반구멍용 시멘트 슬러지 충진 호스를 포함하여 구성함을 특징으로 하는 가압식 고강도 강관 그라우팅 장치.Pressurized high-strength steel pipe grouting device is installed through the rubber packing and comprises a cement sludge filling hose for ground holes connected to the space portion of the ground hole to fill the cement sludge in the ground hole.
KR2020060014132U 2006-05-26 2006-05-26 A Grouting Unit of a High Powerness Steel Pipe KR200424430Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020060014132U KR200424430Y1 (en) 2006-05-26 2006-05-26 A Grouting Unit of a High Powerness Steel Pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020060014132U KR200424430Y1 (en) 2006-05-26 2006-05-26 A Grouting Unit of a High Powerness Steel Pipe

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020060047301A Division KR100645071B1 (en) 2006-05-26 2006-05-26 A grouting unit of a high powerness steel pipe

Publications (1)

Publication Number Publication Date
KR200424430Y1 true KR200424430Y1 (en) 2006-08-22

Family

ID=41773023

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020060014132U KR200424430Y1 (en) 2006-05-26 2006-05-26 A Grouting Unit of a High Powerness Steel Pipe

Country Status (1)

Country Link
KR (1) KR200424430Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100756536B1 (en) 2006-12-11 2007-09-10 계림하이텍(주) Grout same time injection apparatus and a method of construction type reinforcement steel pipe
KR20200007540A (en) * 2018-07-13 2020-01-22 한아름 One-way tunnel excavation method using pipe roof and tunnel structure using pipe roof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100756536B1 (en) 2006-12-11 2007-09-10 계림하이텍(주) Grout same time injection apparatus and a method of construction type reinforcement steel pipe
KR20200007540A (en) * 2018-07-13 2020-01-22 한아름 One-way tunnel excavation method using pipe roof and tunnel structure using pipe roof
KR102223086B1 (en) * 2018-07-13 2021-03-04 한아름 One-way tunnel excavation method using pipe roof and tunnel structure using pipe roof

Similar Documents

Publication Publication Date Title
KR100645071B1 (en) A grouting unit of a high powerness steel pipe
KR101919084B1 (en) Simultaneous Injection System of Steel Pipe Grouting with Double Packers
KR102061167B1 (en) Grouting apparatus with improved caulking and sealing function and tunnel reinforcement method using the same
KR101125082B1 (en) Tublar member, chemical injection apparatus and chemical injection method using the same
KR101642916B1 (en) Waterproof method and system of earth retaining wall using jacket barrier wall packer preventing ground subsidence
KR101032745B1 (en) Caulking module and grouting apparatus with the same and tunnel reinforcement method using the same
CN113047294B (en) Duplex-pipe type multifunctional grouting device and construction method thereof
KR20200047881A (en) Simultaneous injection method of permeation grouting for reinforcing tunnel using outer packer
KR100856846B1 (en) A Grouting Unit of Pressurize Multi Injection
KR101276572B1 (en) Pressurizing grouting type soil nailing and method for reinforcing slope using thereof
KR100842925B1 (en) Grouting apparatus and grouting method
KR20090116022A (en) A reusable packer for a pressurized grouting process
KR200424430Y1 (en) A Grouting Unit of a High Powerness Steel Pipe
JP4294691B2 (en) Injection tube and grout injection method
KR100806938B1 (en) A grouting apparatus and method for groundwater wells which can be injected by injecting grouting liquid downwardly.
KR100914962B1 (en) Multi-stage type appratus for injecting reinforcement and method for injecting reinforcement
KR101442822B1 (en) Apparatus for inserting steel pipe and simultaneous horizontal high pressure jet-grouting in a tunnel supporting, and Method for inserting steel pipe and high pressure jet grouting with it
KR20180022219A (en) Grouting equipment for ground reinforcement using swellable packer and it's construction method
KR101029547B1 (en) Feeding device of agent for multi-stepped reinforcing foundation
KR102368275B1 (en) grouting device for pressing multi-level areas by one-step, and packer device of removal type for this
JPH0387412A (en) Natural ground consolidation process and combined pipes to be used for same process
KR100373927B1 (en) Device for and method surface water inflow interception of excavation hole
JP2002266341A (en) Injecting device
KR100402472B1 (en) Grouting Apparatus
KR100926345B1 (en) Appratus and method for continuous injecting reinforcement

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
EXTG Extinguishment