KR200420018Y1 - Structure land-side protection wall using h-beam - Google Patents

Structure land-side protection wall using h-beam Download PDF

Info

Publication number
KR200420018Y1
KR200420018Y1 KR2020060008663U KR20060008663U KR200420018Y1 KR 200420018 Y1 KR200420018 Y1 KR 200420018Y1 KR 2020060008663 U KR2020060008663 U KR 2020060008663U KR 20060008663 U KR20060008663 U KR 20060008663U KR 200420018 Y1 KR200420018 Y1 KR 200420018Y1
Authority
KR
South Korea
Prior art keywords
beams
large diameter
flanges
small diameter
diameter
Prior art date
Application number
KR2020060008663U
Other languages
Korean (ko)
Inventor
은성운
민경필
손인군
이두화
이태세
정하익
Original Assignee
현대제철 주식회사
주식회사 삼보기술단
한국건설기술연구원
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 현대제철 주식회사, 주식회사 삼보기술단, 한국건설기술연구원 filed Critical 현대제철 주식회사
Priority to KR2020060008663U priority Critical patent/KR200420018Y1/en
Application granted granted Critical
Publication of KR200420018Y1 publication Critical patent/KR200420018Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • E02D5/08Locking forms; Edge joints; Pile crossings; Branch pieces
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2220/00Temporary installations or constructions
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Abstract

본 고안은 서로 다른 부피를 갖는 에이치빔을 연속적으로 결합하여 틈새가 발생되지 않도록 한 흙막이용 에이치빔 구조체에 관한 것이다.The present invention relates to an H-beam structure for a mud wall, by continuously combining H-beams having different volumes so that no gap is generated.

그 공법은 서로 마주보는 플랜지들 사이에 웨브가 수직으로 연결되는 구조를 갖는 대경 에이치빔을 수직으로 매설하여 서로 이격되게 설치하고, 그 설치된 에이치빔의 플랜지들 사이 내측면에 대경 에이치빔의 플랜지들 사이의 간격보다 폭이 좁은 소경 에이치빔의 일단부가 끼워지도록 결합하며, 소경 에이치빔의 타단부 외측면에 다른 대경 에이치빔을 결합한 후에 그 상호간에 접촉되는 부위들을 일체화시키고, 대경 에이치빔들의 플랜지들 사이에 소경 에이치빔의 양단부가 결합되는 것이 다수개 연속으로 이루어져 하나의 벽체로 연결하는 단계들로 이루어진다.The construction method is to vertically install a large diameter H-beam having a structure in which the web is vertically connected between the flanges facing each other, and to be spaced apart from each other, and the flanges of the large diameter H-beam on the inner surface between the flanges of the installed H-beam. One end of the small diameter H-beam narrower than the gap between the two ends is fitted, the other large diameter H-beam is joined to the outer surface of the other end of the small-size H-beam, and then the parts contacting each other are integrated, and the flanges of the large-size H-beams Combining both ends of the small diameter H-beam in between consists of a plurality of consecutive steps consisting of connecting to a wall.

그 구조는 서로 마주보는 플랜지들 사이에 웨브가 일체로 연결되는 구조를 가지며 각각 동일한 간격으로 이격되게 지면에 수직으로 매설되는 다수개의 대경 에이치빔들과, 그 대경 에이치빔들 사이의 플랜지 양측에 개재되도록 양단부가 대경 에이치빔의 플랜지 내부에 각각 수용되어 양측 플랜지의 외측면이 각각 면접촉되고 결합수단에 의해 일체로 결합되는 다수의 소경 에이치빔으로 구성된다.The structure has a structure in which the webs are integrally connected between the flanges facing each other, each of which has a plurality of large diameter H beams vertically embedded in the ground spaced at equal intervals, and interposed on both sides of the flange between the large diameter H beams. The two ends are each accommodated in the flange of the large diameter H beam, and the outer surfaces of the two flanges are each in surface contact and are composed of a plurality of small diameter H beams which are integrally coupled by the coupling means.

이에 따르면 본 고안은 부피가 서로 다른 에이치빔들을 연속적으로 연결시켜 벽체를 형성함으로써, 에이치빔의 제조 및 매설과정에서 다소간의 오차가 발생되더라도 서로간의 틈새가 발생되지 않게 되므로 별도의 틈새 처리공정이 생략되어 작업성이 향상될 뿐만 아니라, 외부 토압에 대해 견고하게 지지할 수 있는 등의 유용 한 효과를 갖는다.According to the present invention, since the H-beams having different volumes are continuously connected to form a wall, even if some errors occur during the manufacturing and embedding of H-beams, gaps are not generated from each other, so a separate gap treatment process is omitted. Not only improves workability, but also has a useful effect such as being able to firmly support external earth pressure.

Description

흙막이용 에이치빔 구조체{STRUCTURE LAND-SIDE PROTECTION WALL USING H-BEAM}H-beam structure for earthen board {STRUCTURE LAND-SIDE PROTECTION WALL USING H-BEAM}

도 1은 본 고안에 따른 흙막이용 에이치빔 구조체를 나타낸 사시도.1 is a perspective view showing a hyung beam structure for the mudstone according to the present invention.

도 2는 본 고안 흙막이용 에이치빔 구조체의 개략적인 구성을 나타낸 평면도.Figure 2 is a plan view showing a schematic configuration of the H-beam structure for the present invention muddle.

도 3은 본 고안의 결합상태 사시도.3 is a perspective view of a coupled state of the present invention.

도 4는 도 3의 평면도.4 is a plan view of FIG.

도 5는 본 고안 에이치빔 구조체에 보강재가 추가된 구성을 나타낸 평면도.Figure 5 is a plan view showing a configuration in which the reinforcing material is added to the H-beam structure of the present invention.

도 6은 본 고안 에이치빔 구조체에 채움재가 더 구비된 것을 나타낸 평면도.Figure 6 is a plan view showing that the filling material is further provided in the H-beam structure of the present invention.

도 7은 본 고안 흙막이용 에이치빔 구조체의 다른 예를 보인 사시도.7 is a perspective view showing another example of the H-beam structure for the present invention.

도 8은 도 7의 결합상태 사시도.8 is a perspective view of the coupled state of FIG.

도 9는 본 고안 흙막이용 에이치빔 구조체의 또 다른 예를 보인 사시도.9 is a perspective view showing another example of the H-beam structure for the present invention.

도 10은 본 고안 흙막이용 에이치빔 구조체의 다른 실시예를 보인 사시도.10 is a perspective view showing another embodiment of the H-beam structure for the present invention.

도 11은 본 고안에 따른 에이치빔을 이용한 흙막이공법을 순차적으로 표현한 플로우 챠트이다. 11 is a flow chart sequentially illustrating the earth clogging method using a H-beam according to the present invention.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

100A : 대경 에이치빔 100B : 소경 에이치빔100A: Large diameter H beam 100B: Small diameter H beam

105 : 결합공 110,120 : 플랜지105: coupling hole 110,120: flange

130 : 웨브 160 : 통공130: web 160: through hole

210 : 볼트부재 300 : 보강재210: bolt member 300: reinforcing material

400 : 채움재 700 : 캡 플레이트400: filler 700: cap plate

본 고안은 흙막이용 에이치빔 구조체에 관한 것으로, 특히 서로 단부가 밀착되게 결합가능하도록 그 구조가 개량된 에이치빔들을 연결하여 흙막이용 옹벽을 형성시킬 수 있도록 한 에이치빔을 이용한 흙막이용 에이치빔 구조체에 관한 것이다.The present invention relates to an H-beam structure for mud walls, and particularly to an H-beam structure using mud-beams by connecting H-beams whose structures have been improved to be closely coupled to each other to form a retaining wall for mud wall. It is about.

일반적으로, 하수관용 콘크리트박스나 전기 통신선로 및 지하철등의 지하구조물들을 구축하기 위하여 그 지면의 하측으로 깊이를 갖는 터파기작업을 행하고 있으며, 그 터파기작업시 토사가 흘러 내리거나 지반이 무너지는 것을 방지하기 위하여 방호벽을 설치함과 아울러, 지반에서 용출되는 지하수가 공사구역으로 유입되는 것을 차단하는 차수작업을 병행하여야 한다.In general, in order to build underground structures such as concrete boxes for sewage pipes, electric communication lines, and subways, digging work is carried out with a depth to the lower side of the ground, and during the digging work, the soils flow down or the ground collapses. In order to prevent this from happening, it is necessary to install a barrier and to carry out the work of blocking the inflow of groundwater from the ground into the construction area.

그 차수작업 및 흙막이를 위한 방호벽 설치작업시 기존에 많은 공법이 시행되고 있으나, 최근에는 차수기능 및 흙막이 기능을 같이 갖도록 시트 파일 또는 에이치빔을 이용한 방호벽을 설치하는 공법이 일반화되어 있다.Although many methods have been conventionally used in the protection work and the installation of the barrier for the barrier, the method of installing the barrier using the sheet pile or the H-beam is common in order to have the barrier and the barrier.

이는, 다수개의 시트 파일 또는 에이치빔들을 상호 연결하여 벽체 형상으로 형성하여 그 벽체의 외측으로 위치하는 토사 및 지반에 대해 토류벽 기능을 갖도록 된 것이다.This is to form a wall shape by interconnecting a plurality of sheet piles or H-beams to have the earth wall function for the soil and ground that is located outside the wall.

그중 흙막이용 토류벽을 형성시키기 위해서 에이치빔을 사용하는 일 예로는, 서로 일정 간격으로 단면이 H형인 에이치빔의 일부를 수직으로 땅속에 타설하고, 서로 인접하는 에이치빔들 사이에 시트파일을 간격없이 걸쳐서 일체로 구성한 것으로, 하나의 벽체로 연결하도록 된 것이 있다.Among them, an H beam is used to form a soil wall for earthenment. For example, H-beams having H-shaped cross sections are vertically placed in the ground at regular intervals, and sheet piles are not spaced between adjacent H-beams. It is constructed integrally over, and there is what was connected by one wall.

또한, 큰 강도를 요하는 부위의 흙막이 토류벽을 구성하기 위해서는, 에이치빔을 간격없이 타설하여 하나의 벽체로 연결하는 방식이 이용되지만, 다수의 에이치빔을 간격없이 타설하는 것은 실제로 곤란할 뿐만 아니라, 서로 인접하는 에이치빔 사이의 오차가 발생할 수 밖에 없는 문제점이 있었다.In addition, in order to form the earthenware earth wall of the part requiring high strength, a method of placing H-beams without gaps and connecting them into one wall is used. However, it is not only difficult to place many H-beams without gaps, but also with each other. There was a problem that an error between adjacent H-beams must occur.

이를 극복하기 위해서 서로 인접하는 에이치빔들 사이의 틈새를 메우기 위해 별도의 패널 형태의 보강판(시트파일 또는 평판 형태의 플레이트)이 용접으로 일체화될 경우에는 별도의 작업이 요구되어 이로 인한 작업시간이 증가됨과 아울러, 작업성이 저하되는 문제점이 있었다.In order to overcome this problem, if a separate panel type reinforcement plate (sheet pile or plate type plate) is integrated by welding in order to fill gaps between adjacent H-beams, a separate work is required. In addition to the increase, there was a problem that workability is reduced.

또한, 보강판을 틈새사이에 덧붙이는 작업을 하더라도, 외부로부터 평상시보다 큰 압력의 토압이 전달될 경우에 그 결합부위가 파손될 우려가 있었다.In addition, even when the reinforcing plate is added between the gaps, there was a fear that the coupling site would be damaged when the earth pressure of a pressure larger than usual is transmitted from the outside.

본 고안은 상기한 제반 문제점을 감안하여 이를 해결하고자 제안된 것으로, 그 목적은 서로 인접하는 에이치빔간의 틈새 간격이 발생되지 않도록 함과 아울러, 외부로부터 전달되는 토압에 대한 내구성이 향상된 에이치빔을 이용한 흙막이용 에이치빔 구조체를 제공하는 데 있다.The present invention has been proposed to solve the above problems in consideration of the above problems, and its purpose is to prevent the gap gap between H beams adjacent to each other, and to improve the durability of earth pressure transmitted from the outside using H beams. It is to provide an H-beam structure for the soil barrier.

상기한 목적을 달성하기 위한 본 고안은 서로 마주보는 플랜지들 사이에 웨브가 수직으로 연결되는 구조로 된 대경 에이치빔을 수직으로 매설하는 단계와,The present invention for achieving the above object is a step of vertically embedding a large diameter H-beam having a structure in which the web is connected vertically between the flanges facing each other,

상기 매설된 에이치빔의 플랜지들 사이 내주면에 상기 대경 에이치빔의 플랜지들보다 폭이 좁은 소경 에이치빔의 일단부가 끼워지도록 결합하는 단계와,Coupling one end portion of a narrow diameter H beam narrower than the flanges of the large diameter H beam to an inner circumferential surface between the flanges of the embedded H beam;

상기 소경 에이치빔의 타단부 외측면에 다른 대경 에이치빔을 결합한 후에 그 상호간에 접촉되는 부위를 일체화시키는 단계와,Combining other large diameter H beams with other large diameter H beams on the outer surface of the other end of the small diameter H beams, and then integrating the mutually contacting portions;

상기 대경 에이치빔들의 플랜지들 사이에 상기 소경 에이치빔의 양단부가 결합되는 것이 다수개 연속으로 이루어져 하나의 벽체로 연결하는 것을 특징으로 한다.Both ends of the small diameter H beam may be coupled to each other by flanges of the large diameter H beams, and may be connected to one wall.

상기 대경 에이치빔과 소경 에이치빔의 결합후 생성되는 양측이 밀폐된 공간 내에 채움재를 채우는 단계를 더 구비하는 것이다.Both sides of the large diameter H-beam and the small diameter H-beam generated after the coupling is further provided with a step of filling the filler in a sealed space.

본 고안의 다른 특징은, 서로 마주보는 플랜지들 사이에 웨브가 일체로 연결되는 구조를 가지며 각각 동일한 간격으로 이격되게 지면에 수직으로 매설되는 다수개의 대경 에이치빔과,Another feature of the present invention is a plurality of large diameter H-beams having a structure in which the web is integrally connected between the flanges facing each other and buried perpendicularly to the ground to be spaced at equal intervals, respectively;

상기 대경 에이치빔들 사이의 플랜지 양측 내주면에 양단부가 각각 수용되어 양측 플랜지의 외측면이 각각 면접촉되고 결합수단에 의해 일체로 결합되는 다수의 소경 에이치빔을 구비하여서,Both ends of the flanges between the large diameter H-beams are respectively accommodated at both ends, and the outer surface of both flanges are each provided with a plurality of small diameter H-beams are integrally coupled by the coupling means,

상기 대경 에이치빔들 사이에 소경 에이치빔이 끼워져 연속적으로 결합된 흙막이용 벽체를 형성하는 것을 특징으로 한다.A small diameter H beam is sandwiched between the large diameter H beams to form a wall for continuously forming a retaining wall.

상기 대경 에이치빔의 플랜지들간의 내측면 폭이 상기 소경 에이치빔의 플랜지 외측면들간의 폭보다 더 크거나 동일한 것이다.The inner surface width between the flanges of the large diameter H-beam is greater than or equal to the width between the flange outer surfaces of the small diameter H-beam.

상기 결합수단은 상기 대경 에이치빔과 소경 에이치빔의 플랜지에 각각 대응되는 위치에 마련되고 내주면에 나사산을 갖는 다수의 결합공이 형성되고,The coupling means is provided at a position corresponding to each of the flange of the large diameter H-beam and the small diameter H-beam and a plurality of coupling holes having a thread on the inner peripheral surface is formed,

상기 결합공들에 관통되도록 체결 결합되는 볼트부재를 구비하는 것이다.It is to have a bolt member fastened and coupled to penetrate the coupling holes.

상기 결합수단은 상기 대경 에이치빔과 소경 에이치빔의 면 접촉부위에 용접으로 일체화되는 것이다.The coupling means is integrally welded to the surface contact portion of the large diameter H beam and the small diameter H beam.

상기 대경 에이치빔과 소경 에이치빔들의 플랜지 내측면에 일체로 결합되는 보강재를 더 구비하는 것이다.Further comprising a reinforcing material integrally coupled to the inner surface of the flange of the large diameter H-beam and the small diameter H-beams.

이하, 본 고안의 바람직한 실시예를 첨부된 도면에 참조하여 상세히 설명하기로 한다.Hereinafter, with reference to the accompanying drawings, preferred embodiments of the present invention will be described in detail.

본 고안에 따른 에이치빔을 이용한 흙막이공법은, 도 11을 참조하여 설명하면, 그 방법은 서로 마주보는 플랜지들 사이에 웨브가 수직으로 연결되는 구조를 갖는 대경 에이치빔을 수직으로 매설하여 서로 이격되게 설치하고(S1), 그 설치된 에이치빔의 플랜지들 사이 내측면에 대경 에이치빔의 플랜지들 사이의 간격보다 폭이 좁은 소경 에이치빔의 일단부가 끼워지도록 결합하며(S2), 소경 에이치빔의 타단부 외측면에 다른 대경 에이치빔을 결합한 후에 그 상호간에 접촉되는 부위들을 일체화시키고(S3), 대경 에이치빔들의 플랜지들 사이에 소경 에이치빔의 양단부가 결합되는 과정이 연속으로 이루어져 하나의 벽체로 연결하는(S5) 단계들로 이루어진다.Referring to FIG. 11, the soil clogging method using the H-beam according to the present invention includes a large diameter H-beam having a structure in which a web is vertically connected between flanges facing each other so as to be spaced apart from each other. It is installed (S1), and coupled to the inner surface between the flanges of the installed H-beam so that one end of the narrow-beam H-beam narrower than the gap between the flanges of the large-size H-beam is fitted (S2), the other end of the small-beam H-beam After combining the other large diameter H-beams on the outer surface, the parts in contact with each other are integrated (S3), and both ends of the small diameter H-beams are continuously connected between the flanges of the large diameter H-beams to connect to one wall. (S5) steps.

또한, 그 대경 에이치빔과 소경 에이치빔의 연속적인 결합에 의해 상부가 개구된 벽체가 형성되고, 그 벽체를 구성하는 대경 에이치빔과 소경 에이치빔의 내부에 빈 공간부가 형성된다.In addition, the continuous opening of the large diameter H beam and the small diameter H beam forms a wall having an upper opening, and an empty space portion is formed inside the large diameter H beam and the small diameter H beam constituting the wall.

따라서, 대경 에이치빔과 소경 에이치빔이 연결됨에 따라 내부에 형성되는 공간부를 흙, 골재 또는 콘크리트등의 채움재를 채워 빈 공간을 메워서 보강하는 단계(S4)가 더 구비될 수 있다.Therefore, as the large diameter H-beam and the small diameter H-beam are connected, the space formed in the interior may be further provided by filling a filling material such as soil, aggregate, or concrete to fill and fill the empty space (S4).

더 상세히 설명하면, 그 대경 에이치빔의 플랜지들 사이의 폭은 소경 에이치빔이 수용되도록 그 소경 에이치빔의 외측면 폭보다 넓거나, 거의 동일한 폭을 갖도록 형성되어 있다.In more detail, the width between the flanges of the large-size H-beams is formed to be wider than the width of the outer surface of the small-size H-beams or to have almost the same width.

즉, 그 대경 에이치빔과 소경 에이치빔은 그 사이즈에서 차이가 있으며, 다른 구성에서는 동일한 구조로 된 것이다.That is, the large diameter H beam and the small diameter H beam are different in size, and have the same structure in different configurations.

한편, 본 고안 흙막이용 에이치빔 구조체는, 도 1내지 도 6을 참조하여 설명하면, 그 구조는 서로 마주보는 플랜지(110)(120)들 사이에 웨브(130)가 일체로 연결되는 구조를 가지며 각각 동일한 간격으로 이격되게 지면에 수직으로 매설되는 다수개의 대경 에이치빔(100A)들과, 그 대경 에이치빔(100A)들 사이의 플랜지(110)(120) 양측에 개재되도록 양단부가 대경 에이치빔(100A)의 플랜지(110)(120) 내부에 각각 수용되어 양측 플랜지(110)(120)의 외측면이 각각 면접촉되고 결합수단에 의해 일체로 결합되는 다수의 소경 에이치빔(100B)으로 구성된다.On the other hand, the present invention Hyungbim structure for earthquake, when described with reference to Figures 1 to 6, the structure has a structure in which the web 130 is integrally connected between the flanges 110, 120 facing each other The large diameter H beams 100A are vertically buried in the ground spaced at equal intervals, and both ends thereof are interposed on both sides of the flanges 110 and 120 between the large diameter H beams 100A. It is composed of a plurality of small diameter H-beams (100B) are respectively accommodated in the flange 110, 120 of the 100A, the outer surface of both flanges 110, 120 are in surface contact and are integrally coupled by the coupling means. .

더 상세히 설명하면, 그 대경 에이치빔(100A)과 소경 에이치빔(100B)은 동일 한 구조로 되어 있으나, 그 사이즈가 서로 다른 치수로 형성된 것이다.In more detail, the large diameter H-beam 100A and the small diameter H-beam 100B have the same structure, but their sizes are formed in different dimensions.

즉, 도면에서 표현된 바와 같이, 대경 에이치빔(100A)의 플랜지(110)(120)간의 폭(ℓ1)은 소경 에이치빔(100B) 외측면들간의 폭(ℓ2)보다 크거나 동일한 치수를 갖는 것이다.That is, as represented in the figure, the width l1 between the flanges 110 and 120 of the large diameter H beam 100A has a dimension greater than or equal to the width l2 between the outer surfaces of the small diameter H beam 100B. will be.

그 결합수단은 대경 에이치빔(100A)과 소경 에이치빔(100B)의 플랜지(110)(120)가 서로 면접촉되는 부위에 서로 대응되며 내주면에 나사산이 형성된 결합공(105)이 다수개 형성되고, 그 결합공(105)에 체결되는 볼트부재(210)를 구비하여 된 것이다.The coupling means corresponds to a portion where the flanges 110 and 120 of the large diameter H beam 100A and the small diameter H beam 100B are in surface contact with each other, and a plurality of coupling holes 105 having a thread formed on the inner circumferential surface thereof are formed. , The bolt member 210 is fastened to the coupling hole 105.

그 볼트부재(210)의 단부에는 필요에 따라 너트부재(220)가 체결될 수 있으며, 이 경우에는 결합공(105)의 내주면에 형성된 나사산이 생략될 수 있다.The nut member 220 may be fastened to the end of the bolt member 210 as necessary. In this case, the thread formed on the inner circumferential surface of the coupling hole 105 may be omitted.

또한, 그 결합수단의 다른 예로는, 대경 에이치빔(100A)의 플랜지(110)(120) 내측면과 소경 에이치빔(100B)의 플랜지(110)(120) 외측면이 각각 면접촉된 상태로 용접에 의해 서로 일체화되는 것이다.As another example of the coupling means, the inner surface of the flanges 110 and 120 of the large diameter H beam 100A and the outer surfaces of the flanges 110 and 120 of the small diameter H beam 100B are in surface contact with each other. It is integrated with each other by welding.

그리고, 그 소경 에이치빔(100B)의 플랜지(110)(120) 단부가 위치하는 부위에 철근, 플레이트 판재 형상의 보강재(300)가 대경 에이치빔(100A)과 연결되도록 일체화되는 것이 바람직하며, 그 보강재(300)가 결합되는 것은 앞서 결합수단의 방식(용접 또는 볼팅결합,리벳팅등)과 동일하게 결합될 수 있다.In addition, the reinforcing rod 300 and plate-shaped reinforcement 300 are preferably integrated with the large diameter H beam 100A at a portion where the ends of the flanges 110 and 120 of the small diameter H beam 100B are located. The reinforcing material 300 may be coupled in the same manner as the method of the coupling means (welding or bolting coupling, riveting, etc.).

미설명 부호 "160"은 지하수의 유출입을 위해 대경 에이치빔(100A)과 소경 에이치빔(100B)에 형성된 통공을 나타낸 것으로, 설치되는 장소 환경에 따라 생략하거나 형성된 갯수를 조정할 수 있다.Reference numeral 160 denotes a through hole formed in the large diameter H beam 100A and the small diameter H beam 100B for the inflow and outflow of the groundwater, and may be omitted or adjusted according to the installation environment.

이러한 구성을 갖는 본 고안의 작용은 다음과 같다.The operation of the present invention having such a configuration is as follows.

본 고안은 지하 구조물 터파기 공사시 계획된 평면을 따라 설계 깊이까지 구멍을 뚫고, 수직으로 대경 에이치빔(100A)과 소경 에이치빔(100B)을 순차적으로 연결시켜 토류벽이라 칭하는 흙막이용 벽체를 형성하게 된다.The present invention drills a hole to the design depth along the planned plane during the construction of the underground structure, and vertically connects the large diameter H beam (100A) and the small diameter H beam (100B) in order to form a wall for earthwall called earth wall. .

이때, 대경 에이치빔(100A)들을 서로 이격되게 매설한 후에 소경 에이치빔(100B)을 들어서 그 사이에 매설시키거나, 혹은 대경 에이치빔(100A)의 매설후 그 측면에 소경 에이치빔(100B)의 일단부가 수용되도록 매설한 후에 그 소경 에이치빔(100B)의 타단부 외측에 대경 에이치빔(100A)이 감싸도록 매설할 수도 있다.At this time, the large diameter H-beams 100A are spaced apart from each other, and then the small diameter H-beams 100B are lifted up and embedded therein, or after the large diameter H-beams 100A are embedded, After embedding so that one end is accommodated, the large diameter H beam 100A may be embedded outside the other end of the small diameter H beam 100B.

이후에, 대경 에이치빔(100A)과 소경 에이치빔(100B)을 용접이나, 볼팅 결합 또는 리벳팅등의 방식으로 일체화시켜 흙막이용 벽체를 형성하게 된다.Subsequently, the large diameter H beam 100A and the small diameter H beam 100B are integrally formed by welding, bolting, or riveting to form a wall for an earth wall.

한편, 그 대경 에이치빔(100A)과 소경 에이치빔(100B)의 결합후 그 결합부위의 보강을 위해 플레이트 형상의 보강재(300)를 용접등의 방식으로 일체로 결합시켜 보강작업한 후에, 경우에 따라 그 대경 에이치빔(100A)과 소경 에이치빔(100B)의 밀폐된 빈 공간내에 흙,골재,시멘트,콘크리트등의 채움재(400)를 채워 견고하게 벽체를 형성할 수 있다.On the other hand, after the large diameter H-beam 100A and the small diameter H-beam 100B are combined, the plate-shaped reinforcement 300 is integrally joined by a method such as welding to reinforce the coupling portion, and then, in the case of Accordingly, a wall can be firmly formed by filling the filling material 400 such as soil, aggregate, cement, and concrete in the closed empty space of the large diameter H beam 100A and the small diameter H beam 100B.

그후에는 흙막이용 벽체의 시공이 완료되면, 부분적으로 굴착을 하고, 주형보와 복공판을 설치한다. 이어서, 복공판의 설치가 끝나면 이후의 공사는 굴착작업과 굴착에 따른 버팀보의 설치가 반복되면서 지하 구조물의 구축을 위한 공사가 진행되는 것이 통상적이다.After that, when the construction of the retaining wall is completed, the excavation is partially carried out, and the mold beam and the perforated plate are installed. Subsequently, after the installation of the perforated plate is completed, the construction for the construction of the underground structure is usually performed while the installation of the brace according to the excavation work and the excavation is repeated.

도 7과 도 8은 본 고안 결합수단의 다른 예를 보인 도면으로서, 그 구조는 대경 에이이치빔(100A)의 플랜지들 사이의 간격과 소경 에이치빔(100B)들의 폭이 거의 동일하게 형성되어 억지 끼움 결합구조로 된 것이다.7 and 8 are views showing another example of the coupling means of the present invention, the structure of the spacing between the flanges of the large diameter H-beam (100A) and the width of the small diameter H-beam (100B) is formed almost equal to the interference The fitting structure is fitted.

즉, 앞서 설명한 실시예에서는 대경 에이치빔(100A)의 플랜지 내측면 사이의 폭이 소경 에이치빔(100B)의 외측 폭보다 조금 더 크게 형성되어 소경 에이치빔(100B)을 외측에서 감싸도록 수용하는 구조로 되어 있으나, 억지 끼움 결합방식의 경우에는 대경 에이치빔(100A)의 플랜지 내측면 사이의 간격이 소경 에이치빔(100B)의 외측면과 거의 동일한 폭으로 형성되는 것이다.That is, in the above-described embodiment, the width between the flange inner surface of the large diameter H beam 100A is formed to be slightly larger than the outer width of the small diameter H beam 100B to accommodate the small diameter H beam 100B from the outside. In the case of the interference fitting method, the gap between the inner surface of the flange of the large diameter H beam 100A is formed to have a width substantially the same as that of the outer surface of the small diameter H beam 100B.

이에 따라, 대경 에이치빔(100A)과 소경 에이치빔(100B)은 별도의 결합수단없이도 상호 결합되어 대경 에이치빔(100A)이 외압에 의해 변형될 경우 소경 에이치빔(100B)도 같이 변형되도록 간섭되는 구조를 갖게 된다.Accordingly, the large diameter H-beam 100A and the small diameter H-beam 100B are mutually coupled without a separate coupling means, and when the large diameter H-beam 100A is deformed by external pressure, the small diameter H-beam 100B is also interfered with. You have a structure.

이 경우에는, 앞서 설명한 볼팅 결합을 위한 결합공이 생략되며, 도 9에서와 같이 대경 에이치빔(100A)과 소경 에이치빔(100B)의 상부에만 형성될 수도 있다.In this case, the coupling hole for the bolting coupling described above is omitted, and may be formed only on the large diameter H beam 100A and the small diameter H beam 100B as shown in FIG. 9.

이는, 에이치빔의 하부가 지반내에 매설될 경우에는 결합공(105)이 상부에만 위치하게 되기 때문이다.This is because, when the lower portion of the H-beam is embedded in the ground, the coupling hole 105 is located only in the upper portion.

도 10은 본 고안의 다른 실시예를 보인 도면으로서, 그 구조는 앞서 설명한 실시예와는 달리, 대경 에이치빔(100A)과 소경 에이치빔(100B)들이 연속적으로 결합된 후에 그 상부 테두리들을 일체화하기 위한 콘크리트 또는 시멘트 소재의 캡 플레이트(700)가 안착되는 구조로 된 것이다.10 is a view showing another embodiment of the present invention, the structure is different from the embodiment described above, after the large diameter H-beam 100A and the small diameter H-beam 100B are continuously combined to integrate the upper edges Cap plate 700 of the concrete or cement material is to be seated structure.

즉, 대경 에이치빔(100A)과 소경 에이치빔(100B)의 상부 테두리에 거푸집을 형성한 후에 콘크리트 또는 시멘트 혹은 콘크리트-시멘트 혼합물등의 일체로 경화가능한 소재를 타설하면, 시간이 경과함에 따라 경화된 캡 플레이트(700)가 대경 에이치빔(100A)과 소경 에이치빔(100B)들의 상부를 일체화시켜 외부로부터 전달되는 토압에 대한 강성을 보강할 수 있게 된다.That is, when the formwork is formed on the upper edges of the large diameter H beam 100A and the small diameter H beam 100B, and then an integrally hardenable material such as concrete or cement or concrete-cement mixture is poured, the cured material is hardened over time. The cap plate 700 may integrate the upper portion of the large diameter H beam 100A and the small diameter H beam 100B to reinforce rigidity against earth pressure transmitted from the outside.

상기한 본 고안은 지하 구조물 터파기 공사에만 한정되는 것이 아니라, 도면에 미도시되어 있지만 교량의 교각 기초 공사에도 적용 가능하며, 다른 건설 공사에도 적용 가능할 것이다.The present invention described above is not limited to the underground structure excavation work, it is not shown in the drawings, but also applicable to the bridge foundation work of the bridge, it will be applicable to other construction work.

이상과 같이 설명한 본 고안은 서로 다른 부피를 갖는 에이치빔을 연속적으로 결합하여 틈새가 발생되지 않도록 한 에이치빔을 이용한 흙막이공법 및 그 에이치빔구조체에 관한 것인 바, 이에 따르면 본 고안은 부피가 서로 다른 에이치빔들을 연속적으로 연결시켜 벽체를 형성함으로써, 에이치빔의 제조 및 매설과정에서 다소간의 오차가 발생되더라도 서로간의 틈새가 발생되지 않게 되므로 별도의 틈새 처리공정이 생략되어 작업성이 향상될 뿐만 아니라, 서로 다른 부피의 에이치빔이 맞물리는 구조로 되어 있으므로 외부 토압에 대해 견고하게 지지할 수 있는 등의 유용한 효과를 갖는다.The present invention described as described above relates to a soil blocking method using the H-beams and its H-beam structure to prevent the generation of gaps by continuously combining H-beams having different volumes, according to the present invention has a volume By connecting different H-beams continuously to form a wall, even if some errors occur in the manufacturing and embedding process of H-beams, gaps are not generated from each other. In addition, since H-beams having different volumes are engaged with each other, they have a useful effect of being able to be firmly supported against external earth pressure.

Claims (6)

서로 마주보는 플랜지들 사이에 웨브가 일체로 연결되는 구조를 가지며 각각 동일한 간격으로 이격되게 지면에 수직으로 매설되는 다수개의 대경 에이치빔과,A plurality of large diameter H-beams having a structure in which the webs are integrally connected between the flanges facing each other and buried perpendicular to the ground to be spaced at equal intervals, respectively; 상기 대경 에이치빔들 사이의 플랜지 양측 내주면에 양단부가 각각 수용되어 양측 플랜지의 외측면이 각각 면접촉되고 결합수단에 의해 일체로 결합되는 다수의 소경 에이치빔을 구비하여서,Both ends of the flanges between the large diameter H-beams are respectively accommodated at both ends, and the outer surface of both flanges are each provided with a plurality of small diameter H-beams are integrally coupled by the coupling means, 상기 대경 에이치빔들 사이에 소경 에이치빔이 끼워져 연속적으로 결합된 흙막이용 벽체를 형성하는 것을 특징으로 하는 흙막이용 에이치빔 구조체.A small-beam H-beams are sandwiched between the large-diameter H-beams to form a wall for the mud wall continuously coupled. 청구항 1에 있어서,The method according to claim 1, 상기 대경 에이치빔의 플랜지들간의 내측면 폭이 상기 소경 에이치빔의 플랜지 외측면들간의 폭보다 더 크게 형성되는 것을 특징으로 하는 흙막이용 에이치빔 구조체.And the inner surface width between the flanges of the large diameter H beam is greater than the width between the flange outer surfaces of the small diameter H beam. 청구항 1에 있어서,The method according to claim 1, 상기 결합수단은 상기 대경 에이치빔과 소경 에이치빔의 플랜지에 각각 대응되는 위치에 마련되고 내주면에 나사산을 갖는 다수의 결합공이 형성되고,The coupling means is provided at a position corresponding to each of the flange of the large diameter H-beam and the small diameter H-beam and a plurality of coupling holes having a thread on the inner peripheral surface is formed, 상기 결합공들에 관통되도록 체결 결합되는 볼트부재를 구비하는 것을 특징으로 하는 흙막이용 에이치빔 구조체.H-beam structure for a mud screen, characterized in that it comprises a bolt member coupled to penetrate through the coupling holes. 청구항 1에 있어서,The method according to claim 1, 상기 결합수단은 상기 대경 에이치빔과 소경 에이치빔의 면 접촉부위에 용접으로 일체화되는 것을 특징으로 하는 흙막이용 에이치빔 구조체.And the coupling means is integrated into the surface contact portion of the large diameter H beam and the small diameter H beam by welding. 청구항 1에 있어서,The method according to claim 1, 상기 결합수단은 상기 대경 에이치빔과 소경 에이치빔의 상부 테두리를 일체화시키기 위해 경화 가능한 소재로 된 캡 플레이트가 안착 설치되는 것을 특징으로 하는 흙막이용 에이치빔 구조체.The coupling means is a h-beam structure for a mud wall, characterized in that the cap plate made of a hardenable material is installed to integrate the upper edge of the large diameter H-beam and the small diameter H-beam. 청구항 1 내지 청구항 5중 어느 한 항에 있어서,The method according to any one of claims 1 to 5, 상기 대경 에이치빔과 소경 에이치빔들의 플랜지 내측면에 일체로 결합되는 보강재를 더 구비하는 것을 특징으로 하는 흙막이용 에이치빔 구조체.And a reinforcing material integrally coupled to the inner surface of the flange of the large diameter H beam and the small diameter H beam.
KR2020060008663U 2006-03-31 2006-03-31 Structure land-side protection wall using h-beam KR200420018Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020060008663U KR200420018Y1 (en) 2006-03-31 2006-03-31 Structure land-side protection wall using h-beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020060008663U KR200420018Y1 (en) 2006-03-31 2006-03-31 Structure land-side protection wall using h-beam

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020060029745A Division KR100659997B1 (en) 2006-03-31 2006-03-31 Method and structure land-side protection wall using h-beam

Publications (1)

Publication Number Publication Date
KR200420018Y1 true KR200420018Y1 (en) 2006-06-30

Family

ID=41768882

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020060008663U KR200420018Y1 (en) 2006-03-31 2006-03-31 Structure land-side protection wall using h-beam

Country Status (1)

Country Link
KR (1) KR200420018Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210082743A (en) 2019-12-26 2021-07-06 한국기술교육대학교 산학협력단 Pile of box type and diaghragm wall construction method using of the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20210082743A (en) 2019-12-26 2021-07-06 한국기술교육대학교 산학협력단 Pile of box type and diaghragm wall construction method using of the same

Similar Documents

Publication Publication Date Title
KR100910576B1 (en) Embed anchor and construction method of composite basement wall using the same
KR101595702B1 (en) Soil retaining structure using plate pile with reinforcing bridge and construction method thereof
KR102071225B1 (en) Construction method of sheathing temporary facility using steel sheet pile
KR100722665B1 (en) Steel guide wall for construction of underground diaphragm wall and construction method of underground diaphragm wall using the same
KR101687495B1 (en) Partial top-down construction method for building underground structures
KR100886445B1 (en) Soil tank type land-side protection wall
KR100698878B1 (en) Y Type Connecting Structure of Steel Pipe Struts
KR100862977B1 (en) Precast concrete file and method for constructing thereof
KR20010064667A (en) Method of building underground structure
KR101843023B1 (en) Shear connector for temporary retaining wall file and building outer wall, and method for constructing an underground structure using thereof
KR101296857B1 (en) Underground structure having slab beam with enhanced bearing power against earth pressure and construction methods of the same
KR101902791B1 (en) Under ground structure construction method using composite steel pile and under ground structure therewith
KR20060097891A (en) Pipe roof structures and construction method of pipe roof structures
JP4486136B2 (en) Caisson connection method
KR20130040521A (en) Method for constructing reinforced-earth abutment having connecting member for connecting reinforcement members
KR100659997B1 (en) Method and structure land-side protection wall using h-beam
KR102490872B1 (en) Reinforced earth retaining wall and construction method using tensile force of steel rod piles
KR200420018Y1 (en) Structure land-side protection wall using h-beam
KR100808977B1 (en) Connecting structure of corner supporting beam for temporary soil sheathing work
KR100742335B1 (en) Landscape architecture for cutting ground using natural stone and construction method thereof
KR100662524B1 (en) Double pipe girder struts as permanent system
KR20190142547A (en) Improved earth soil pre-stress method
JP4798203B2 (en) Reinforcement structure and reinforcement method for existing foundation
KR100858712B1 (en) Corner connecting apparatus of temporary soil sheathing work
KR100327547B1 (en) Composite retaining wall construction method

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
EXTG Extinguishment