KR200417216Y1 - A cap for filling resin foam for rock bolt - Google Patents

A cap for filling resin foam for rock bolt Download PDF

Info

Publication number
KR200417216Y1
KR200417216Y1 KR2020060006125U KR20060006125U KR200417216Y1 KR 200417216 Y1 KR200417216 Y1 KR 200417216Y1 KR 2020060006125 U KR2020060006125 U KR 2020060006125U KR 20060006125 U KR20060006125 U KR 20060006125U KR 200417216 Y1 KR200417216 Y1 KR 200417216Y1
Authority
KR
South Korea
Prior art keywords
rock
bolt
hole
resin
pipe
Prior art date
Application number
KR2020060006125U
Other languages
Korean (ko)
Inventor
김원유
Original Assignee
해동소재산업(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 해동소재산업(주) filed Critical 해동소재산업(주)
Priority to KR2020060006125U priority Critical patent/KR200417216Y1/en
Application granted granted Critical
Publication of KR200417216Y1 publication Critical patent/KR200417216Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0093Accessories
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/028Devices or accesories for injecting a grouting liquid in a bore-hole
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/80Ground anchors

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

본 고안은 록볼트용 발포레진 낙하 방지캡에 관한 것으로서, 더욱 상세하게는 터널 내부의 암벽에 록볼트(rock bolt)를 설치할 때 볼트공이 터널 천정에 형성된 경우에도 록볼트의 시공과정에서 발포 레진이 볼트공 밖으로 흘러내릴 가능성이 없고, 특히 록볼트에 대한 오거(auger)작업이 가능하여 록볼트를 견고히 정착시킬 수 있는 록볼트용 발포레진 낙하 방지캡에 관한 것이다. The present invention relates to a foam resin fall prevention cap for rock bolts, and more specifically, even when the bolt hole is formed in the ceiling of the tunnel when the rock bolt is installed on the rock wall inside the tunnel, The present invention relates to a foam resin drop prevention cap for rock bolts, which is not likely to flow out of a bolt hole, and in particular, augers for rock bolts can be secured to fix the rock bolts firmly.

록볼트, 안전캡, 시공 Rock bolt, safety cap, construction

Description

록볼트용 발포레진 낙하 방지캡{A cap for filling resin foam for rock bolt}Foam Resistant Cap for Rock Bolts {A cap for filling resin foam for rock bolt}

도 1은 종래의 방법으로 시공된 록볼트의 단면도,1 is a cross-sectional view of a rock bolt constructed by a conventional method,

도 2는 종래의 록볼트 고정구의 구조를 도시한 단면도,2 is a cross-sectional view showing the structure of a conventional rock bolt fixture;

도 3은 본 고안에 따른 록볼트용 발포레진 낙하 방지캡의 구성을 나타낸 단면도,Figure 3 is a cross-sectional view showing the configuration of the rock-proof foam resin drop prevention cap according to the present invention,

도 4는 도 3에서 고정마개를 도시한 사시도이다.4 is a perspective view showing the fixing stopper in FIG.

< 도면의 주요부분에 대한 부호의 설명 ><Description of Symbols for Major Parts of Drawings>

12; 암반 14; 록볼트(rock bolt)12; Rock mass 14; Rock bolt

17; 볼트공 20; 보강층17; Bolt hole 20; Reinforcement layer

50; 고정마개 52; 관통공50; Stopper 52; Through hole

54; 경사공 56; 슬릿(slit)54; Oblique hole 56; Slit

58; 걸림턱 60; 보강 파이프58; Hanging jaw 60; Reinforcement pipe

70; 파이프 마개70; Pipe stopper

본 고안은 록볼트용 발포레진 낙하 방지캡에 관한 것으로서, 더욱 상세하게는 터널 내부의 암벽에 록볼트(rock bolt)를 설치할 때 볼트공이 터널 천정에 형성된 경우에도 록볼트의 시공과정에서 발포 레진이 볼트공 밖으로 흘러내릴 가능성이 없고, 특히 록볼트에 대한 오거(auger)작업이 가능하여 록볼트를 견고히 정착시킬 수 있는 록볼트용 발포레진 낙하 방지캡에 관한 것이다. The present invention relates to a foam resin fall prevention cap for rock bolts, and more specifically, even when the bolt hole is formed in the ceiling of the tunnel when the rock bolt is installed on the rock wall inside the tunnel, The present invention relates to a foam resin drop prevention cap for rock bolts, which is not likely to flow out of a bolt hole, and in particular, augers for rock bolts can be secured to fix the rock bolts firmly.

통상적으로 도로 공사나 지하철 공사 또는 채광 작업 등을 위해 땅속으로 터널을 굴착할 때는 터널 내부의 구조를 보강하기 위하여 터널 내벽에 콘크리트 보강층을 형성한다. 이때, 상기 보강층을 지지하기 위하여 첨부한 도 1에 나타낸 바와 같이, 터널 내부의 암반(12) 깊숙히 일정한 간격으로 다수개의 볼트공(17)을 굴착하고, 그 볼트공(17)에 록볼트(14)와 발포 레진을 삽입한 다음, 상기 발포 레진을 경화시켜 록볼트(14)가 단단히 정착되도록 하고, 록볼트(14)의 노출 단부에 보강판(18)과 너트(19)를 체결한 후, 그 위에다 콘크리트를 타설하여 보강층(20)을 형성한다.In general, when excavating a tunnel into the ground for road construction, subway construction or mining work, a concrete reinforcement layer is formed on the inner wall of the tunnel to reinforce the structure inside the tunnel. At this time, as shown in the accompanying FIG. 1 to support the reinforcing layer, a plurality of bolt holes 17 are excavated at regular intervals deep in the rock 12 inside the tunnel, and the lock bolt 14 in the bolt holes 17. ) And the foamed resin, and then the foamed resin is cured so that the lock bolt 14 is firmly fixed, and the reinforcing plate 18 and the nut 19 are fastened to the exposed end of the rock bolt 14. Concrete is poured on it to form a reinforcement layer 20.

또한, 상기 볼트공에 록볼트를 고정하기 위해서 사용하는 발포 레진은 통상 유리관 속에 폴리우레탄 발포수지와 발포 촉진제가 분리 충진된 레진 캡슐(resin capsule)을 사용한다. 즉, 볼트공 속에 상기 레진 캡슐을 투입하고, 그 위에 록볼 트를 삽입하여 상기 레진 캡슐을 파쇄하면, 상기 발포수지와 촉진제가 반응하여 팽창 및 경화하면서 볼트공 내에 록볼트를 단단히 정착시킨다. 이때, 상기 레진 캡슐을 완전히 파쇄하고, 동시에 발포 레진이 볼트공 속에 구석구석 채워지도록 하기 위하여 상기 록볼트를 상하 및 좌우로 흔들어 주는 소위 오거(auger)작업을 실시한다.In addition, the foamed resin used to fix the rock bolt to the bolt hole generally uses a resin capsule in which a polyurethane foamed resin and a foaming accelerator are separately filled in a glass tube. That is, when the resin capsule is put into the bolt hole, and the rock bolt is inserted into the bolt hole to crush the resin capsule, the foamed resin and the accelerator react with each other to expand and harden to fix the lock bolt in the bolt hole. At this time, the resin capsule is completely crushed, and at the same time, a so-called auger operation is performed to shake the rock bolt vertically and horizontally so that the foamed resin is filled in every corner of the bolt hole.

그런데 종래에 특히 터널 천정 부분에다 록볼트를 설치할 경우에는 볼트공이 거꾸로 천공되어 있기 때문에 볼트공 속에서 레진 캡슐을 파쇄하고 오거(auger)작업을 실시하면, 발포 레진이 밑으로 흘러 내려서 작업 과정이 매우 번거럽고 불편하며, 때로는 캡슐이 파쇄되어 발생하는 유리 파편이 밑으로 떨어져서 작업자가 다치는 경우도 종종 발생하였다.However, in the past, especially in the case of installing the rock bolt in the ceiling part of the tunnel, since the bolt hole is drilled upside down, if the resin capsule is broken and augered in the bolt hole, the foamed resin flows down and the work process is very It is cumbersome and inconvenient, and sometimes the glass fragments caused by broken capsules fall down and hurt workers.

이러한 문제를 해결하기 위하여 대한민국 등록실용신안 제368519호(공고일자; 2004.11.26)에서는 다수개의 외측돌기(23)와 내측돌기(24)가 형성되어 있는 원통형 본체(21)와, 상기 본체(21) 하단의 플렌지부(25)에 결합되는 플랩(31)과, 상기 본체(21) 하부와 플랩(31) 사이에 삽입되는 원통형 가이드(41)로 이루어지는 록볼트 고정구가 제안된 바 있다. 이러한 구조를 갖는 록볼트 고정구는 원통형 본체(21)의 외측돌기(23)가 볼트공의 내벽에 지지되고, 내측돌기(24)는 록볼트(14)를 지지한다. 그런데 상기 외측돌기(23)와 내측돌기(24)는 얇은 철편에 불과하기 때문에 고정구를 견고하게 지지할 수가 없고, 록볼트(14)를 삽입하는 과정에서 고정구의 중심이 좌우로 흔들거릴 가능성이 매우 높다. 또한, 상기 고정구의 경우에는 고정구 속으로 록볼트(14)가 일단 삽입되고 나면, 록볼트(14)가 내측돌기(24)에 걸려 서 잘 움직이지 않기 때문에 록볼트(14)에 대한 오거(auger)작업을 효과적으로 실시할 수가 없는 문제가 있다. In order to solve this problem, the Republic of Korea Utility Model Model No. 368519 (Date of Announcement; 2004.11.26) in the cylindrical body 21 and a plurality of outer protrusions 23 and the inner protrusions 24 and the body 21 Rock bolt fixture has been proposed consisting of a flap 31 coupled to the flange portion 25 at the bottom, and a cylindrical guide 41 inserted between the lower portion of the main body 21 and the flap 31. In the rock bolt fixture having such a structure, the outer protrusion 23 of the cylindrical body 21 is supported on the inner wall of the bolt hole, and the inner protrusion 24 supports the rock bolt 14. However, since the outer protrusions 23 and the inner protrusions 24 are only thin iron pieces, the fasteners cannot be firmly supported, and the center of the fasteners may swing from side to side in the process of inserting the rock bolt 14. high. In addition, in the case of the fastener, once the lock bolt 14 is inserted into the fastener, the auger for the lock bolt 14 because the lock bolt 14 is caught on the inner protrusion 24 and does not move well. There is a problem that the work cannot be performed effectively.

이에 본 고안은 터널 암반에 형성된 볼트공에 록볼트를 설치함에 있어서, 상기 볼트공이 터널 천정에 형성된 경우에도 록볼트를 정착시켜 주는 발포 레진 및 유리 파편이 볼트공 밖으로 흘러내릴 가능성이 전혀 없고, 특히 록볼트를 볼트공의 중심축 상에 견고히 지지하면서도 록볼트에 대한 오거(auger)작업이 가능하여 록볼트를 단단히 정착시킬 수 있는 록볼트용 발포레진 낙하 방지캡에 관한 것이다. Therefore, in the present invention, in the installation of the rock bolt in the bolt hole formed in the tunnel rock, even if the bolt hole is formed in the ceiling of the tunnel, there is no possibility that the foamed resin and glass fragments to fix the rock bolt flow out of the bolt hole. The present invention relates to a foam resin drop prevention cap for rock bolts capable of fixing the rock bolts securely by augering the rock bolts while supporting the rock bolts firmly on the central axis of the bolt hole.

상기 목적을 달성하기 위하여 본 고안의 록볼트용 발포레진 낙하 방지캡은 신축성 합성수지로 이루어진 원뿔대(circular truncated cone) 형상으로서, 세로 중심선을 따라 상하로 원통형 관통공이 형성되어 있고, 상기 관통공의 상단부에는 위로 갈수록 차츰 내경이 좁아지는 경사공이 형성되어 있으며, 상기 경사공 주변에는 슬릿이 형성되어 있는 고정마개와, 상기 고정마개의 관통공 및 경사공에 삽입되는 보강 파이프로 구성되는 것을 특징으로 한다.In order to achieve the above object, the rockproof foam resin drop prevention cap of the present invention has a truncated cone shape made of a stretchable synthetic resin, and a cylindrical through hole is formed up and down along a vertical center line. The inclined hole is gradually formed to gradually narrow the inner diameter, characterized in that consisting of a fixed stopper with a slit is formed around the inclined hole, and a reinforcing pipe inserted into the through hole and the inclined hole of the fixed stopper.

본 고안에서 상기 경사공은 고정마개의 상단부에서 1/2 내지 1/3의 높이에 걸쳐서 형성되어 있고, 상기 고정마개의 외면에는 환형 걸림턱이 층층이 형성되어 있는 것을 특징으로 한다. In the present invention, the inclined hole is formed over a height of 1/2 to 1/3 at the upper end of the fixing stopper, the outer surface of the fixing stopper is characterized in that the annular locking step is formed layered.

또한, 본 고안에 따른 록볼트용 발포레진 낙하 방지캡은 추가적으로 보강 파이프의 내경을 임시로 막아 주는 파이프 마개를 포함하는 것을 특징으로 한다. In addition, the foam resin fall prevention cap for rock bolt according to the present invention is characterized in that it further comprises a pipe stopper to temporarily block the inner diameter of the reinforcement pipe.

이하, 첨부한 도면을 이용하여 본 고안을 더욱 상세하게 설명하면 다음과 같다. 도 3은 본 고안에 따른 록볼트용 발포레진 낙하 방지캡의 구성을 나타낸 단면도이고, 도 4는 도 3에서 고정마개를 도시한 사시도이다.Hereinafter, the present invention will be described in more detail with reference to the accompanying drawings. Figure 3 is a cross-sectional view showing the configuration of the rock-proof foam resin drop prevention cap according to the present invention, Figure 4 is a perspective view showing a fixing stopper in FIG.

본 고안에 따른 록볼트용 발포레진 낙하 방지캡은 연성의 고정마개(50)와 경성의 보강 파이프(60)로 이루어진다. 상기 고정마개(50)는 신축성 합성수지 재질로 이루어지고, 외면의 경사가 완만한 원뿔대(circular truncated cone) 형상이다. 여기서 원뿔대는 원뿔을 밑면에 평행인 평면으로 잘라서 원뿔 부분을 제거한 입체 도형을 말한다. 상기 고정마개(50)에는 세로 중심선을 따라서 상하로 원통형 관통공(52)이 형성되어 있다. 관통공(52)은 하단부에서 일정 높이까지는 내경이 일정하게 진행되다가 상반부, 바람직하기로는 고정마개(50) 전체 높이의 1/2 ~ 1/3 높이부터 위로 갈수록 차츰 내경이 좁아지는 경사공(54)이 형성되어 있다. 상기 경사공(54) 주변에는 다수개의 슬릿(56)이 형성되어 있다. 상기 고정마개(50)의 외면에는 원주상을 따라 층층이 환형 걸림턱(58)이 형성되어 있다.Rock resin foam resin fall prevention cap according to the present invention is composed of a flexible fixing stopper 50 and a rigid reinforcement pipe (60). The stopper 50 is made of a stretchable synthetic resin material, the outer surface is of a gentle truncated cone (circular truncated cone) shape. Here, the truncated cone is a three-dimensional figure in which the cone is removed by cutting the cone into a plane parallel to the base. The fixed stopper 50 has a cylindrical through hole 52 formed up and down along a vertical center line. The through hole 52 has a constant inner diameter from a lower end portion to a predetermined height, and the upper half, preferably an inclined hole that gradually narrows the inner diameter as it goes upward from a height of 1/2 to 1/3 of the entire height of the fixed stopper 50. ) Is formed. A plurality of slits 56 are formed around the inclined hole 54. The outer surface of the fixed stopper 50 is formed with an annular locking step 58 is a layered layer along the circumference.

상기 보강 파이프(60)는 외경과 내경이 일정한 경성 관체로서, 금속제 또는 강도가 강한 플라스틱 소재를 사용할 수 있다. 상기 파이프(60)의 외경은 상기 고정마개(50)의 관통공(52)의 내경과 동일하거나 약간 작고, 내경은 파이프(60) 속으로 록볼트가 자유롭게 진입할 수 있도록 록볼트의 최대 외경보다 약간 크게 형성한 다. 참고로 현재 산업 현장에서 사용하고 있는 록볼트는 대부분 직경이 25 mm 인 것을 사용하고 있다.The reinforcement pipe 60 is a rigid tube having a constant outer diameter and an inner diameter, and may be made of metal or a plastic material having high strength. The outer diameter of the pipe 60 is the same as or slightly smaller than the inner diameter of the through hole 52 of the fixing stopper 50, the inner diameter is larger than the maximum outer diameter of the rock bolt so that the rock bolt can freely enter the pipe 60 Slightly larger. For reference, most of the rock bolts currently used in industrial sites use a diameter of 25 mm.

또한, 본 고안은 상기 고정마개(50)와 보강 파이프(60)에 더하여 추가적으로 파이프(60)의 내경을 임시로 막아 주는 파이프 마개(70)를 포함할 수도 있다. 파이프 마개(70)는 볼트공 속으로 이물질이 유입되는 것을 방지하고, 특히 레진 캡슐의 외경이 보강 파이프(60)의 내경 보다 작은 경우에는 레진 캡슐이 파이프를 통해서 밑으로 떨어지지 않도록 방지해 주는 역할을 한다. In addition, the present invention may include a pipe stopper 70 to temporarily block the inner diameter of the pipe 60 in addition to the fixed stopper 50 and the reinforcement pipe 60. Pipe stopper 70 prevents foreign matter from entering into the bolt hole, and in particular, when the outer diameter of the resin capsule is smaller than the inner diameter of the reinforcing pipe 60 serves to prevent the resin capsule from falling down through the pipe. do.

이하, 본 고안에 따른 록볼트의 시공방법을 설명하면 다음과 같다.Hereinafter, the construction method of the rock bolt according to the present invention.

먼저 통상적인 방법으로 터널 내부의 암반에 다수개의 볼트공을 굴착한다. 이때, 볼트공의 직경과 길이는 터널 공사의 내용이나 암반의 상태에 따라 달라질 수 있는데, 예컨대 직경이 30 ~ 40 mm 이고, 길이는 2 ~ 4 m 의 크기로 되도록 굴착한다. First, a plurality of bolt holes are excavated to the rock inside the tunnel in a conventional manner. At this time, the diameter and length of the bolt hole may vary depending on the contents of the tunnel construction or the rock condition, for example, the diameter is 30 to 40 mm, the length is excavated to a size of 2 to 4 m.

이어, 상기 볼트공의 내부에 발포성 수지와 촉진제가 내장된 레진 캡슐을 투입한다. 현재 산업현장에서 사용되고 있는 레진의 종류는 발포 및 경화시간에 따라서 급결용, 선단용 및 충진용으로 구분할 수 있다. 이중 급결용은 발포시간이 약 30초이고, 경화시간은 약 1시간 소요된다. 그리고, 선단용은 발포시간이 약 60초이고, 경화시간은 약 1시간이며, 충진용은 발포시간이 약 360초, 경화시간은 약 6시간 정도 소요된다. 상기와 같은 레진 캡슐은 볼트공의 길이에 따라 사용하는 종류가 달라지게 되는데, 예컨대, 볼트공의 길이가 2 m 인 경우에는 급결형 + 선단형의 조합으로 사용하고, 볼트공의 길이가 3 m 인 경우에는 급결형 + 선단형 + 충진형을 조합하여 사용하며, 길이가 4 m 인 경우에는 급결형 + 선단형 + 충진형 + 충진형을 조합하여 사용한다.Subsequently, a resin capsule containing a foamable resin and an accelerator is introduced into the bolt hole. Types of resins currently used in industrial sites can be divided into quickening, tipping and filling according to foaming and curing time. For double quenching, the foaming time is about 30 seconds and the curing time is about 1 hour. In addition, for the tip, the foaming time is about 60 seconds, the curing time is about 1 hour, the filling time is about 360 seconds, the curing time takes about 6 hours. Resin capsules as described above will vary depending on the length of the bolt hole, for example, when the length of the bolt hole is 2 m used in combination of fastening type + tip type, the length of the bolt hole is 3 m In the case of, the combination of the fastening type + tip type + filling type is used, and when the length is 4 m, the combination of the fastening type + tip type + filling type + filling type is used.

다음 공정은 레진 캡슐이 투입된 볼트공 입구에 신축성 합성수지 재질로 이루어진 원뿔대 형상의 고정마개(50)를 삽입한다. 상기 고정마개(50)에는 세로 중심선을 따라 상하로 관통공(52)이 형성되어 있고, 관통공(52)의 상반부에는 위로 갈수록 차츰 내경이 좁아지는 경사공(54)이 형성되어 있으며, 상기 경사공(54) 주변부에는 다수개의 슬릿(56)이 형성되어 있다.The next step is to insert the fixing cap 50 of the truncated conical shape made of a stretchable synthetic resin material at the entrance to the bolt hole in which the resin capsule is inserted. The fixing stopper 50 has a through hole 52 formed up and down along a vertical center line, and an inclined hole 54 is formed in the upper half of the through hole 52 to gradually narrow the inner diameter thereof. A plurality of slits 56 are formed at the periphery of the ball 54.

다음 공정은 상기 고정마개(50)의 관통공(52)에 보강 파이프(60)를 강제 삽입한다. 이때 보강 파이프(60)의 외경은 상기 관통공(52)의 내경과 거의 동일하거나 약간 작기 때문에 관통공(52)에는 파이프(60)가 비교적 쉽게 삽입된다. 그러나 내경이 좁아지는 경사공(54) 부위에서는 보강 파이프(60)가 잘 삽입되지 않기 때문에, 예컨대 고무 망치를 이용하여 파이프(60)를 강제 삽입한다. 이렇게 하면, 경사공(54) 주변에 형성된 슬릿(56)에 의해 고정마개(60)의 상단이 밖으로 벌어지면서 고정마개(50)와 파이프(60)가 볼트공 내부에 견고히 밀착된다.The next step is forcibly inserting the reinforcement pipe 60 into the through hole 52 of the fixing stopper 50. At this time, since the outer diameter of the reinforcing pipe 60 is substantially the same as or slightly smaller than the inner diameter of the through hole 52, the pipe 60 is relatively easily inserted into the through hole 52. However, since the reinforcing pipe 60 is hardly inserted in the inclined hole 54 where the inner diameter is narrowed, the pipe 60 is forcibly inserted using, for example, a rubber mallet. In this way, the upper end of the fixing stopper 60 is opened by the slit 56 formed around the inclined hole 54 while the fixing stopper 50 and the pipe 60 are tightly adhered to the inside of the bolt hole.

다음 공정은 상기 보강 파이프(60) 속으로 록볼트를 삽입한다. 그러면, 록볼트에 의해 볼트공 속에 미리 투입된 레진 캡슐이 파손되면서 캡슐 속에 저장된 발포성 수지와 발포 개시제가 반응하여 발포 및 경화과정이 진행된다. 이때, 본 고안에서는 상기 보강 파이프(60) 속에서 록볼트가 자유롭게 진퇴할수 있기 때문에 볼트공 속에서 록볼트를 상하좌우로 흔들어 주는 오거(auger)작업을 용이하게 실시할 수 있다. 또한, 발포과정에서 발생하는 볼트공 내부의 압력은 보강 파이프(60)와 록볼트 사이의 간격을 통해서 외부로 방출된다.The next process inserts a rock bolt into the reinforcement pipe 60. Then, the resin capsules pre-injected into the bolt holes by the rock bolt are broken, and the foaming resin and the foaming initiator stored in the capsules react to perform the foaming and curing process. At this time, the rock bolt in the reinforcement pipe 60 can be freely moved back and forth in the present invention can be easily performed auger (auger) to rock the rock bolt in the bolt hole up, down, left and right. In addition, the pressure inside the bolt hole generated in the foaming process is released to the outside through the gap between the reinforcing pipe 60 and the rock bolt.

마지막 공정은 상기 록볼트가 완전히 경화된 후 통상적인 방법으로 록볼트의 노출 단부에 보강판과 너트를 체결한다.The final process is to fasten the reinforcement plate and nut to the exposed end of the rock bolt in the usual way after the rock bolt has fully cured.

본 고안에서는 상기 6가지 공정을 순서대로 진행하되, 일단 볼트공에 고정마개(50)와 보강 파이프(60)를 삽입하고 나면, 볼트공이 터널 천정에 거꾸로 설치된 경우에도 볼트공 속에 투입된 레진 캡슐이 밑으로 떨어질 염려가 없기 때문에 작업자가 일일이 볼트공 입구를 막은 상태로 작업을 진행할 필요가 없다. 따라서, 일단 모든 볼트공에 대하여 파이프 삽입공정까지 실시한 후에 필요한 만큼 시차를 두고 다음 공정인 록볼트 삽입공정을 진행할 수 있기 때문에 종래에 비하여 록볼트 설치작업을 매우 효율적으로 진행할 수가 있다. In the present invention, the above six processes are carried out in order, but once the fixed stopper 50 and the reinforcement pipe 60 are inserted into the bolt hole, the resin capsule injected into the bolt hole is lowered even when the bolt hole is installed upside down on the tunnel ceiling. Since there is no fear of falling, there is no need for the worker to work with the bolt hole entrance blocked. Therefore, since the bolt insertion step can be performed for all bolt holes once, and then the lock bolt insertion step, which is the next step, can be carried out with a time difference as necessary, so that the installation of the lock bolt can be performed more efficiently than in the related art.

또한, 파이프 삽입공정이 끝난 후 다음 공정인 록볼트 삽입공정이 진행될 때까지 상당한 시차가 예상되는 경우, 또는 레진 캡슐의 외경이 보강 파이프(60)의 내경 보다 작은 경우 등 필요한 경우에는 보강 파이프(60)의 내경에 파이프 마개(70)가 삽입된 상태에서 파이프 삽입공정을 진행할 수도 있다. 이때, 상기 파이프 마개(70)는 록볼트를 삽입할 때 볼트공 속으로 밀어넣으면 된다. 종래에는 특히 볼트공이 터널 천정에 설치된 경우, 볼트공 속에 레진 캡슐을 투입한 다음에는 작업자가 레진 캡슐이 떨어지지 않도록 볼트공 입구를 막고 있는 상태에서 곧 바로 록볼트 삽입공정을 진행해야 하는 불편함이 있었다. In addition, when a significant time difference is expected from the end of the pipe insertion process to the next process of the rock bolt insertion process, or when the outer diameter of the resin capsule is smaller than the inner diameter of the reinforcement pipe 60, the reinforcement pipe 60 The pipe insertion process may be performed in a state in which the pipe stopper 70 is inserted into the inner diameter of. At this time, the pipe stopper 70 may be pushed into the bolt hole when the lock bolt is inserted. Conventionally, in the case where the bolt hole is installed in the ceiling of the tunnel, after the resin capsule is put into the bolt hole, there is an inconvenience that the worker must immediately proceed to insert the rock bolt while blocking the entrance of the bolt hole so that the resin capsule does not fall. .

한편, 본 고안에서는 상기 발포 레진을 사용하는 대신에 시멘트를 포함하는 고착제나 모르타르를 사용할 수도 있다.On the other hand, in the present invention, instead of using the foamed resin, it is also possible to use a cement-containing binder or mortar.

본 고안에 따른 록볼트용 발포레진 낙하 방지캡을 사용하면, 특히 터널의 천정 부위에 볼트공을 설치할 때에도 발포 레진이나 유리 파편이 밑으로 흘러내릴 염려가 없어서 작업과정이 매우 편리하고 안전한 효과가 있다. When the foamed resin drop prevention cap for rock bolts according to the present invention is used, there is no fear that the foamed resin or glass fragments will flow down even when installing bolt holes in the ceiling part of the tunnel, so the work process is very convenient and safe. .

또한, 볼트공 내부에 레진 캡슐을 투입한 후에 바로 록볼트를 삽입할 필요가 없이 다수개의 볼트공에 연속적으로 레진 캡슐을 투입하고, 볼트공 입구를 본 고안의 안전캡으로 막은 이후에는 일단 작업을 중단하고 필요한 시간이 경과한 이후에 다시 록볼트를 삽입하면 되기 때문에 작업성이 매우 양호한 효과가 있다.In addition, it is not necessary to insert the rock bolt immediately after the resin capsule is inserted into the bolt hole, and the resin capsule is continuously added to a plurality of bolt holes, and the operation is performed once the bolt hole inlet is blocked with the safety cap of the present invention. The workability is very good because the lock bolt is inserted again after the required time has elapsed.

또한, 본 고안은 발포레진 낙하 방지캡이 록볼트를 볼트공의 중심축 상에 견고히 지지해 주며, 특히 상기 방지캡이 삽입된 상태에서도 록볼트에 대한 오거(auger)작업이 가능하기 때문에 록볼트를 단단히 정착시킬 수 있는 효과가 있다. In addition, the present invention is a foam resin fall prevention cap to securely support the rock bolt on the central axis of the bolt hole, especially the rock bolt is possible because the auger (auger) operation for the rock bolt even when the prevention cap is inserted There is an effect that can be firmly fixed.

Claims (3)

신축성 합성수지로 이루어진 원뿔대(circular truncated cone) 형상으로서, 세로 중심선을 따라 상하로 원통형 관통공이 형성되어 있고, 상기 관통공의 상단부에는 위로 갈수록 차츰 내경이 좁아지는 경사공이 형성되어 있으며, 상기 경사공 주변에는 슬릿이 형성되어 있는 고정마개와, 상기 고정마개의 관통공 및 경사공에 삽입되는 보강 파이프로 구성되는 것을 특징으로 하는 록볼트용 발포레진 낙하 방지캡.A cylindrical truncated cone shape made of stretchable synthetic resin has a cylindrical through hole formed vertically along a vertical center line. An upper end portion of the through hole is formed with an inclined hole that gradually narrows its inner diameter. Locking foam foam prevention cap for rock bolts, characterized in that consisting of a fixed stopper with a slit, and a reinforcing pipe inserted into the through hole and the inclined hole of the fixed stopper. 제1항에 있어서, 상기 경사공은 고정마개의 상단부에서 1/2 내지 1/3의 높이에 걸쳐서 형성되어 있는 것을 특징으로 하는 록볼트용 발포레진 낙하 방지캡.The method of claim 1, wherein the inclined hole is a rock-proof foam resin fall prevention cap, characterized in that formed over a height of 1/2 to 1/3 at the upper end of the fixed stopper. 제1항 또는 제2항에 있어서, 추가적으로 보강 파이프의 내경을 임시로 막아 주는 파이프 마개를 포함하는 것을 특징으로 하는 록볼트용 발포레진 낙하 방지캡.The foamed resin drop preventing cap according to claim 1 or 2, further comprising a pipe stopper that temporarily blocks the inner diameter of the reinforcing pipe.
KR2020060006125U 2006-03-07 2006-03-07 A cap for filling resin foam for rock bolt KR200417216Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020060006125U KR200417216Y1 (en) 2006-03-07 2006-03-07 A cap for filling resin foam for rock bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020060006125U KR200417216Y1 (en) 2006-03-07 2006-03-07 A cap for filling resin foam for rock bolt

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020060021094 Division 2006-03-06 2006-03-06

Publications (1)

Publication Number Publication Date
KR200417216Y1 true KR200417216Y1 (en) 2006-05-25

Family

ID=41766670

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020060006125U KR200417216Y1 (en) 2006-03-07 2006-03-07 A cap for filling resin foam for rock bolt

Country Status (1)

Country Link
KR (1) KR200417216Y1 (en)

Similar Documents

Publication Publication Date Title
CN101603431B (en) Method for reinforcing outburst-prone coal seam cross-cut coal uncovering
US6796745B2 (en) Soil nailing system
CZ20001823A3 (en) System and method for fastening object
KR101284289B1 (en) The foundation for retaining wall blocks combined structure and the foundation used a block retaining reinforcement
JP2001040980A (en) Multistage grouting device and method therefor
KR100979492B1 (en) Combined triple-spiral type underground anchor and rock bolt and method of reinfocing bearing power of ground using the same
KR20170034456A (en) Pressure control member is a grouting unit
KR200417216Y1 (en) A cap for filling resin foam for rock bolt
KR102091016B1 (en) Metallath permanent anchor assembly
JP5392555B2 (en) Anchor structure, bearing support restraint, anchor construction method
ES2715996T3 (en) Arrangement for high strength anchoring of a tensioning element that has a tensioning bar in a construction piece as well as a procedure for the production of such an anchor
KR100896963B1 (en) Rock bolt
KR100666678B1 (en) Micro-pile having a end supporting round-plate
KR20070091520A (en) A cap for filling resin foam for rock bolt and construction method using it
US10774644B2 (en) System and method for forming a cavity in a backfilled stope
KR101395868B1 (en) Rock bolt
JP2007170038A (en) Natural ground reinforcing body and construction method of natural ground reinforcing body
KR101864857B1 (en) Construction method of foundation pile with reinforced casing structure
JPH10184297A (en) Execution method of lock bolt
KR100783139B1 (en) Lock bolt apparatus
KR101330965B1 (en) Method and apparatus for fixing rock bolt in tunnel
JP4092647B2 (en) Tunnel support structure
KR200337877Y1 (en) Pressure-type grouting apparatus for reinforcing the ground
KR100771850B1 (en) Slope stabilizing rock bolt construction method using reinforcing rod having injection hole for grouting
JP4043968B2 (en) Repair method for existing tunnel

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
T201 Request for technology evaluation of utility model
EXTG Extinguishment
T601 Decision on revocation of utility model registration