KR200406129Y1 - An adhesion layer and resin layer the device which covers a Covering layer clothing steel pipe - Google Patents

An adhesion layer and resin layer the device which covers a Covering layer clothing steel pipe Download PDF

Info

Publication number
KR200406129Y1
KR200406129Y1 KR2020050031357U KR20050031357U KR200406129Y1 KR 200406129 Y1 KR200406129 Y1 KR 200406129Y1 KR 2020050031357 U KR2020050031357 U KR 2020050031357U KR 20050031357 U KR20050031357 U KR 20050031357U KR 200406129 Y1 KR200406129 Y1 KR 200406129Y1
Authority
KR
South Korea
Prior art keywords
resin
adhesive
layer
coating
steel pipe
Prior art date
Application number
KR2020050031357U
Other languages
Korean (ko)
Inventor
이동준
Original Assignee
주식회사 이니텍기계
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 이니텍기계 filed Critical 주식회사 이니텍기계
Priority to KR2020050031357U priority Critical patent/KR200406129Y1/en
Application granted granted Critical
Publication of KR200406129Y1 publication Critical patent/KR200406129Y1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05CAPPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05C5/00Apparatus in which liquid or other fluent material is projected, poured or allowed to flow on to the surface of the work
    • B05C5/02Apparatus in which liquid or other fluent material is projected, poured or allowed to flow on to the surface of the work the liquid or other fluent material being discharged through an outlet orifice by pressure, e.g. from an outlet device in contact or almost in contact, with the work
    • B05C5/0241Apparatus in which liquid or other fluent material is projected, poured or allowed to flow on to the surface of the work the liquid or other fluent material being discharged through an outlet orifice by pressure, e.g. from an outlet device in contact or almost in contact, with the work for applying liquid or other fluent material to elongated work, e.g. wires, cables, tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05CAPPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05C9/00Apparatus or plant for applying liquid or other fluent material to surfaces by means not covered by any preceding group, or in which the means of applying the liquid or other fluent material is not important
    • B05C9/06Apparatus or plant for applying liquid or other fluent material to surfaces by means not covered by any preceding group, or in which the means of applying the liquid or other fluent material is not important for applying two different liquids or other fluent materials, or the same liquid or other fluent material twice, to the same side of the work

Landscapes

  • Extrusion Moulding Of Plastics Or The Like (AREA)

Abstract

이 고안은 강관 외주면에 접착층과 수지층이 동시에 코팅되게 함으로써 제조공정을 단축시키고 유지 관리의 효율성이 도모되도록 개선된 접착층과 수지층을 가진 피복층이 코팅되게 하는 강관 피복장치에 관한 것으로서, 접착제압출기(1)와 수지제압출기(2)에서 각각 가압력을 가지고 공급되는 젤 상태의 접착제(21)와 수지제(22)가 강관(10) 외주면에 코팅되도록 하는 강관피복장치(100)로서; 상기 강관(10)이 통과되는 관통공(121)을 가진 길다란 제1관가이드부재(120)가 바디부재(110) 내부에 고정되게 설치되고, 상기 바디부재(110) 내부에는 원형태로 형성되는 접착제공급공(130)과 수지제공급공(140)을 각각 형성하여 접착제투입로(131) 및 수지제투입로(141)와 연결되게 하고, 상기 접착제공급공(130)과 수지제공급공(140)과 연장된 접착제이동로(132) 및 수지제이동로(142)가 상호 만나도록 하여 접착제(21)와 수지제(22)가 각각 접착층(21a)과 수지층(22a)으로 되는 피복층(20)이 되어 수평방향으로 이동하게 되는 피복층이동로(150)와 토출구(151)를 갖도록 하되; 상기 피복층이동로(150)가 제1관가이드부재(120) 끝단부에 체결되고 관통공(161)을 가진 제2관가이드부재(160)의 외주면(162)과, 가압와셔(173)가 끼워진 다수의 체결구(174)가 조절공(171)을 관통하여 바디부재(110)에 고정되는 토출조절부재(170)의 내주면(172) 사이에 형성되게 구성되고 상기 토출조절부재(170)는 바디부재(110)에 원주방향으로 다수 체결되는 조절나사(180)의 끝단부가 토출조절부재(170)의 외주면을 가압하여 이동 가능하도 록 이루어지게 함으로써 접착층과수지층이 동시에 강관 표면에 코팅되고 코팅 두께를 정확하게 조절하여 피복되게 할 수 있을 뿐만 아니라 제2관가이드부재 및 토출조절부재를 교체시켜 크기가 다른 강관을 코팅시킬 수 있게 되는 장점이 있다.The present invention relates to a steel pipe coating apparatus for coating a coating layer having an improved adhesive layer and a resin layer to shorten the manufacturing process and to improve the efficiency of maintenance by coating the adhesive layer and the resin layer on the outer circumferential surface of the steel pipe simultaneously. 1) and a steel pipe coating device 100 for coating the outer circumferential surface of the steel tube 10 with the adhesive 21 and the resin 22 in a gel state supplied with pressing pressure from the resin extruder 2, respectively; The elongated first pipe guide member 120 having a through hole 121 through which the steel pipe 10 passes is fixedly installed in the body member 110, and is formed in a circular shape in the body member 110. The adhesive supply hole 130 and the resin supply hole 140 are formed to be connected to the adhesive injection path 131 and the resin injection path 141, respectively, and the adhesive supply hole 130 and the resin supply hole ( The coating layer in which the adhesive 21 and the resin 22 are the adhesive layer 21a and the resin layer 22a, respectively, so that the adhesive movement path 132 and the resin movement path 142 that are extended to each other meet each other (140). 20) to have a coating layer moving path 150 and a discharge port 151 to be moved in the horizontal direction; The outer cover 162 and the pressure washer 173 of the second pipe guide member 160 having the through hole 161 and the cover layer moving path 150 are fastened to the end of the first pipe guide member 120. A plurality of fasteners 174 is formed to be formed between the inner circumferential surface 172 of the discharge control member 170 is fixed to the body member 110 through the adjustment hole 171 and the discharge control member 170 is a body The adhesive layer and the resin layer are simultaneously coated on the surface of the steel pipe by coating the end of the control screw 180, which is fastened in the circumferential direction to the member 110, to be movable by pressing the outer circumferential surface of the discharge control member 170. Not only can be precisely controlled to be coated, there is an advantage that the second pipe guide member and the discharge control member can be replaced to coat steel pipes of different sizes.

강관피복장치, 강관코팅장치, 강관피복시스템 Steel Pipe Coating Equipment, Steel Pipe Coating Equipment, Steel Pipe Coating System

Description

접착층과 수지층을 가진 피복층이 코팅되게 하는 강관 피복장치{An adhesion layer and resin layer the device which covers a Covering layer clothing steel pipe}An adhesion layer and resin layer the device which covers a Covering layer clothing steel pipe}

도 1은 본 고안이 실시되는 강관 피복 시스템의 개략도,1 is a schematic view of a steel pipe coating system in which the present invention is implemented;

도 2는 본 고안의 강관 피복장치의 전체 단면도,2 is an overall cross-sectional view of the steel pipe coating apparatus of the present invention,

도 3은 본 고안 장치의 일실시예의 요부 분리 단면도,3 is an essential part separation cross-sectional view of one embodiment of the present device;

도 4는 본 고안 장치의 작용을 설명하는 개략도,4 is a schematic view illustrating the operation of the device of the present invention,

도 5는 도 4의 "A" 부분 확대 작용도,5 is an enlarged view of a portion “A” of FIG. 4;

도 6은 도 4의 "B" 부분 확대 단면도,FIG. 6 is an enlarged cross-sectional view of portion “B” of FIG. 4;

도 7은 도 2의 C-C'선 확대 단면도,7 is an enlarged cross-sectional view taken along line CC ′ of FIG. 2;

도 8은 본 고안의 피복 두께 조절상태를 설명하는 일부 단면도,8 is a partial cross-sectional view illustrating a coating thickness control state of the present invention;

도 9는 본 고안 장치의 다른 실시예의 일부 분리 사시도,9 is a partially separated perspective view of another embodiment of the present invention device,

도 10은 도 9의 조립된 종단면도,10 is an assembled longitudinal cross-sectional view of FIG. 9;

도 11은 도 10의 다른 실시예의 일부 확대 단면도이다.11 is a partially enlarged cross-sectional view of another embodiment of FIG. 10.

* 도면의 주요 부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

100 : 강관피복장치 110 : 바디부재100: steel pipe coating device 110: body member

120 : 제1관가이드부재 130 : 접착제공급공120: first pipe guide member 130: adhesive supply hole

132 : 접착제이동로 140 : 수지제공급공132: adhesive transfer path 140: resin supply hole

142 : 수지제이동로 150 : 피복층이동로142: resin moving path 150: coating layer moving path

151 : 토출구 160,160' : 제2관가이드부재151: discharge port 160,160 ': second pipe guide member

162 : 외주면 170,170' : 토출조절부재162: outer peripheral surface 170,170 ': discharge control member

174 : 체결구 180 : 조절나사174: fastener 180: adjusting screw

본 고안은 강관의 외주면에 수지가 피복되게 하는 강관 피복장치에 관한 것으로서, 더욱 상세하게는 강관의 외주면에 접착제가 도포되게 하여 수지가 피복되게 하는데 있어 접착층과 수지층을 가진 피복층이 코팅되게 함으로써 피복 시간과 공정을 단축시키고 설비 비용의 절감과 원료 교체 시간의 단축이 도모되도록 개선된 접착층과 수지층을 가진 피복층이 코팅되게 하는 강관 피복장치에 관한 것이다.The present invention relates to a steel pipe coating device for coating a resin on the outer circumferential surface of the steel pipe, and more specifically, to the coating by coating the coating layer having an adhesive layer and a resin layer in order to coat the resin by applying an adhesive to the outer circumferential surface of the steel pipe The present invention relates to a steel pipe coating apparatus for coating a coating layer having an improved adhesive layer and a resin layer to shorten time and process, and to reduce equipment cost and shorten raw material replacement time.

일반적으로 강관은 부식 방지를 위하여 외주면에 폴리에틸렌(polyethylene)수지가 피복되게 하고 있고 이러한 강관을 피복강관이라고 한다.In general, steel pipes are coated with polyethylene resin on the outer circumference to prevent corrosion. Such steel pipes are called coated steel pipes.

피복강관을 제조하는데 있어서는 강관에 우선 열을 부여하여 이물질이 제거되게 하는 이물질제거공정과, 강관 외주면을 매끄럽게 하는 에폭시수지 코팅공정, 그리고 그 외주면에 접착제가 도포되게 하는 접착제도포공정과, 폴리에틸렌수지가 피복되게 하는 수지피복공정에 의해서 피복강관이 얻어지게 된다.In manufacturing coated steel pipe, the foreign material removal process to give heat to the steel pipe to remove foreign substances, the epoxy resin coating process to smooth the outer circumferential surface of the steel pipe, the adhesive coating process to apply the adhesive to the outer circumferential surface, and polyethylene resin A coated steel pipe is obtained by the resin coating process for coating.

상기한 각각의 제조공정은 별개의 장치에 의해서 각각 진행되므로 하나의 강 관 피복 시스템을 갖추기 위해서는 방대한 설비 면적과 비용이 소모되므로 제조공정을 단축시키려는 연구가 끊임없이 진행되고 있다.Since each of the above manufacturing process is carried out by a separate device, a large amount of facility area and cost are consumed in order to equip a single steel pipe coating system, and therefore, studies are continuously conducted to shorten the manufacturing process.

본 고안은 강관 외주면에 접착층과 수지층이 동시에 코팅되게 함으로써 제조공정을 단축시키고 유지 관리의 효율성이 도모되도록 개선된 접착층과 수지층을 가진 피복층이 코팅되게 하는 강관 피복장치를 제공하려는데 그 목적이 있다.The object of the present invention is to provide a steel pipe coating apparatus for coating a coating layer having an improved adhesive layer and a resin layer to shorten the manufacturing process and improve the efficiency of maintenance by coating the adhesive layer and the resin layer on the outer circumferential surface of the steel pipe at the same time. .

상기한 목적을 달성하기 위하여 본 고안은, 접착제압출기와 수지제압출기에서 각각 가압력을 가지고 공급되는 젤 상태의 접착제와 수지제가 강관 외주면에 코팅되도록 하는 강관피복장치로서; 상기 강관이 통과되는 관통공을 가진 길다란 제1관가이드부재가 바디부재 내부에 고정되게 설치되고, 상기 바디부재 내부에는 원형태로 형성되는 접착제공급공과 수지제공급공을 각각 형성하여 접착제투입로 및 수지제투입로와 연결되게 하고, 상기 접착제공급공과 수지제공급공과 연장된 접착제이동로 및 수지제이동로가 상호 만나도록 하여 접착제와 수지제가 각각 접착층과 수지층으로 되는 피복층이 되어 수평방향으로 이동하게 되는 피복층이동로와 토출구를 갖도록 하되; 상기 피복층이동로가 제1관가이드부재 끝단부에 체결되고 관통공을 가진 제2관가이드부재의 외주면과, 가압와셔가 끼워진 다수의 체결구가 조절공을 관통하여 바디부재에 고정되는 토출조절부재의 내주면 사이에 형성되게 구성됨을 그 특징으로 한다.In order to achieve the above object, the present invention is a steel pipe coating device to be coated on the outer peripheral surface of the steel adhesive and the resin of the gel state supplied with a pressing force from the adhesive extruder and the resin extruder, respectively; An elongated first tube guide member having a through hole through which the steel pipe passes is fixedly installed in the body member, and an adhesive supply hole and a resin supply hole formed in a circular shape are respectively formed in the body member. It is connected to the resin injection passage, and the adhesive supply hole, the resin supply hole and the extended adhesive movement path and the resin movement path to meet each other, so that the adhesive layer and the resin is a coating layer consisting of an adhesive layer and a resin layer, respectively, and move horizontally. To have a coating layer moving path and a discharge port to be made; The discharge control member is fastened to the end of the first pipe guide member and the outer layer of the second pipe guide member having a through hole, and a plurality of fasteners fitted with pressure washers are fixed to the body member through the adjustment hole. Characterized in that formed between the inner circumferential surface of the.

상기 토출조절부재는 바디부재에 원주방향으로 다수 체결되는 조절나사의 끝단부가 토출조절부재의 외주면을 가압하여 이동 가능하도록 구성됨을 다른 특징으 로 한다.The discharge control member is characterized in that the end of the control screw fastened in the circumferential direction to the body member is configured to move by pressing the outer peripheral surface of the discharge control member.

본 고안을 첨부된 바람직한 실시 도면에 의거하여 보다 상세히 설명하면 다음과 같다.When the present invention is described in more detail based on the accompanying preferred embodiments as follows.

도 1은 본 고안이 실시되는 강관 피복 시스템을 나타낸 것으로서, 본 고안의 강관피복장치(100)는 접착제압출기(1)와 수지제압출기(2)로부터 젤 상태의 접착제(21)와 수지제(22)가 가압력을 가지는 상태로서 각각 공급받게 되고, 강관피복장치(100) 내부에서 젤 상태의 접착제(21)와 수지제(22)가 합쳐져서 피복층(20)이 되어서 강관(10) 외주면에 코팅되는 상태로 피복되는 것이다. 부호 3은 강관(10)을 이동시키는 로울러를 나타 낸다.1 is a view showing a steel pipe coating system to which the present invention is carried out, the steel pipe coating device 100 of the present invention is made of an adhesive 21 and a resin 22 in a gel state from an adhesive extruder 1 and a resin extruder 2. ) Is supplied as a state having a pressing force, and the adhesive 21 in the gel state and the resin 22 in the steel pipe coating apparatus 100 are combined to form a coating layer 20 and coated on the outer circumferential surface of the steel pipe 10. It is covered with. Reference numeral 3 represents a roller for moving the steel pipe 10.

도 2 및 도 3을 참조하면, 강관피복장치(100)는 강관(10)이 통과되는 관통공(121)을 가진 길다란 제1관가이드부재(120)가 바디부재(110) 내부에 고정되게 설치된다.2 and 3, the steel pipe coating apparatus 100 is installed so that the long first pipe guide member 120 having a through hole 121 through which the steel pipe 10 passes through the body member 110. do.

또한, 바디부재(110) 내부에는 원형태로 형성되는 접착제공급공(130)과 수지제공급공(140)을 각각 형성하여 접착제투입로(131) 및 수지제투입로(141)와 연결되게 구성된다. 도면에서 바디부재(110)가 여러조각의 부품으로 제작되어 나사 및 볼트(111) 들로 고정되게 한 것은 설계 및 제작상으로 필요에 의해서 여러부품으로 나누어 제작하고 조립한 것이기 때문에 이들을 일일이 설명하지 않고 전체를 바디부재(110)로 설명하기로 한다.In addition, the body member 110 is formed to be connected to the adhesive injection passage 131 and the resin injection passage 141 by forming an adhesive supply hole 130 and a resin supply hole 140 formed in a circular shape, respectively. do. In the drawing, the body member 110 is made of several pieces and is fixed with screws and bolts 111 because they are manufactured and assembled into various parts as necessary for design and manufacture, and thus, these are not explained individually. The whole will be described as the body member 110.

따라서, 접착제투입로(131) 및 수지제투입로(141)는 바디부재(110) 내부에 형성되는 것이며, 이들에게는 접착제압출기(1) 및 수지제압출기(2)의 공급관(1a,2a)과 각각 연결되어 접착제(21) 및 수지제(22)가 각각 공급되어 투입됨으로써 원형상으로 형성하게 되는 접착제공급공(130) 및 수지제공급공(140)으로 공급되게 된다. 물론, 접착제(21) 및 수지제(22)는 점성이 있고 젤 상태로서 공급되므로 흐를 수 있는 상태이기 때문에 이동되어 공급될 수 있는 것이다.Therefore, the adhesive injection passage 131 and the resin injection passage 141 are formed inside the body member 110, and the supply pipes 1a and 2a of the adhesive extruder 1 and the resin extruder 2 are formed therein. Each of the adhesives 21 and the resin 22 are connected to each other so that the adhesive supply hole 130 and the resin supply hole 140 are circularly formed. Of course, since the adhesive 21 and the resin 22 are viscous and supplied in a gel state, they can be moved and supplied because they are in a flowable state.

상기 접착제공급공(130) 및 수지제공급공(140)에는 역시 원형태의 접착제이동로(132) 및 수지제이동로(142)가 각각 연장되게 형성되어 있고, 상기 접착제이동로(132) 및 수지제이동로(142)가 상호 만나는 지점부터는 피복층이동로(150)가 원 형태로 형성되게 되어 있다.The adhesive supply hole 130 and the resin supply hole 140 are also formed to extend the adhesive movement path 132 and the resin movement path 142 of the circular shape, respectively, the adhesive movement path 132 and From the point where the resin moving paths 142 meet each other, the coating layer moving path 150 is formed in a circular shape.

따라서, 도 4 및 도 5와 같이 접착제이동로(132) 및 수지제이동로(142)로 이동되는 접착제(21)와 수지제(22)는 피복층이동로(150)에서 접착층(21a) 외측에 수지층(22a)이 적층되는 상태로 합해져서 피복층(20)이 되는 상태로서 수평방향으로 이동하게 되어 토출구(151)를 통해서 토출되게 됨에 따라 관통공(121,161)을 통해서 이동되는 강관(10)의 외주면에 피복층(20)이 달라 붙는 상태로 코팅되게 된다.Therefore, the adhesive 21 and the resin 22 which are moved to the adhesive moving path 132 and the resin moving path 142 as shown in FIGS. 4 and 5 are outside the adhesive layer 21a in the coating layer moving path 150. The resin layer 22a is laminated in a state in which the coating layer 20 is combined to move in the horizontal direction and is discharged through the discharge holes 151 of the steel pipe 10 which is moved through the through holes 121 and 161. The coating layer 20 is coated on the outer circumferential surface.

이때, 강관(10)의 이동속도와 피복층(20)의 토출 속도는 사전에 설정된 상태로 이동 및 토출되게 속도가 조절되어 가동되는 것이며, 접착층(21a)은 도 6과 같이 강관(10) 외주면에 수지층(22a)이 접착되게 하는 역할을 수행한다.At this time, the moving speed of the steel pipe 10 and the discharging speed of the coating layer 20 is controlled by the speed to be moved and discharged in a preset state, the adhesive layer 21a is on the outer peripheral surface of the steel pipe 10 as shown in FIG. It serves to bond the resin layer 22a.

그리고 본 고안은 제1관가이드부재(120) 끝단부에 관통공(161)을 가진 제2관가이드부재(160)가 체결되고 그 외측으로는 가압와셔(173)가 끼워진 다수의 체결구(174)가 조절공(171)을 관통하여 바디부재(110)에 고정되는 토출조절부재(170)가 설치됨으로써 제2관가이드부재(160)의 외주면(162)과 토출조절부재(170)의 내주면(172) 사이에 피복층이동로(150)가 형성되게 구성되어 있다.And the present invention is a plurality of fasteners 174 is fastened to the second pipe guide member 160 having a through hole 161 at the end of the first pipe guide member 120 and the pressure washer 173 is fitted to the outside. The outer circumferential surface 162 of the second pipe guide member 160 and the inner circumferential surface of the discharge control member 170 are installed by installing the discharge control member 170 fixed to the body member 110 by passing through the adjustment hole 171. The coating layer moving path 150 is formed between the 172.

또한, 토출조절부재(170)는 도 7과 도 8과 같이 바디부재(110)에 원주방향으로 다수 체결되는 조절나사(180)의 끝단부가 토출조절부재(170)의 외주면을 가압하여 이동 가능하도록 구성되어 있다.In addition, the discharge control member 170 as shown in Figure 7 and 8 so that the end of the adjustment screw 180 is fastened in the circumferential direction to the body member 110 to press the outer circumferential surface of the discharge control member 170 to be movable. Consists of.

강관(10) 외주면에 피복되는 피복층(20)은 균일한 두께로 코팅되어야 하고, 그러기 위해서는 피복층이동로(150)의 폭이 일정한 폭을 유지하여야 한다.The coating layer 20 coated on the outer circumferential surface of the steel pipe 10 should be coated with a uniform thickness, and in order to do this, the width of the coating layer moving path 150 should be maintained at a constant width.

피복층이동로(150)의 폭을 일정하게 세팅시키기 위해서 먼저 체결구(174)를 약간 풀은 상태를 갖도록 하고, 이 상태는 체결구(174)의 조임력이 완전히 해제된 상태가 아니고 일부 조임력이 토출조절부재(170)에 작용되고 있는 상태이기 때문에 토출조절부재(170)가 자유롭게 움직이지 않게 되지만 조절나사(180)를 회전시켜서 그 끝단부가 토출조절부재(170)를 가압하게 되면 토출조절부재(170)가 이동되게 됨으로써 피복층이동로(150)의 간격(폭)을 균일하게 조절하게 된다.In order to uniformly set the width of the coating layer movement path 150, the fastener 174 is first slightly loosened, and this state is not a state in which the fastening force of the fastener 174 is not completely released and some of the fastening force is discharged. Since the discharge control member 170 does not move freely because it is in a state of being acted on the control member 170, the discharge control member 170 is rotated by rotating the adjustment screw 180 to press the discharge control member 170. ) Is moved to uniformly adjust the interval (width) of the coating layer movement path 150.

이와 같이 조절나사(180)를 회전시켜 토출조절부재(170)가 이동되게 조절하는 것은 매우 작은량(간격)을 이동시키는 미세 조절하는 것이며, 조절 완료 후에는 체결구(174) 들을 완전히 체결하여 토출조절부재(170)를 고정시키게 된다.As described above, the adjustment screw 170 is rotated so that the discharge control member 170 is moved to finely adjust a very small amount (interval). After the adjustment is completed, the fasteners 174 are completely fastened and discharged. The adjusting member 170 is fixed.

그리고 본 고안은 도 9 내지 도 11과 같이 강관(10)의 직경 크기에 따라 양호한 코팅이 되도록 하기 위하여 또 다른 제2관가이드부재(160') 및 토출조절부재(170')를 구비하여 교체 가능하도록 되어 있다.And the present invention can be replaced with another second pipe guide member 160 'and discharge control member 170' in order to ensure a good coating according to the diameter of the steel pipe 10 as shown in Figure 9 to 11 It is supposed to be.

상기한 또 다른 제2관가이드부재(160') 및 토출조절부재(170')는 강관(10,10') 직경 크기에 적합하게 제작되는 것이므로 도면에 도시된 것 말고도 관통공(161)과 외주면(162) 및 내주면(172)의 크기가 다른 다수의 또 다른 제2관가이드부재(160') 및 토출조절부재(170')가 제작되어 교체하여 사용될 수 있다.Since the second pipe guide member 160 'and the discharge control member 170' are manufactured to suit the diameter of the steel pipes 10 and 10 ', the through-hole 161 and the outer circumferential surface in addition to those shown in the drawings. A plurality of second pipe guide members 160 ′ and a discharge control member 170 ′ having different sizes of 162 and the inner circumferential surface 172 may be manufactured and used.

도 2와 같은 상태에서 교체시에는 제1관가이드부재(120)로부터 제2관가이드부재(160)를 풀은 다음 체결구(174)를 풀어서 토출조절부재(170)를 해체한 후에 도 10과 같이 다른 제2관가이드부재(160')를 제1관가이드부재(120)에 체결하고 또다른 토출조절부재(170')로 장착되게 교체하는 것으로서 신속하고 간편한 교체가 가능하고 다른 직경의 강관(10')을 피복층(20)으로 코팅시킬 수 있는 것이다.When replacing in the state as shown in FIG. 2, after unwinding the second pipe guide member 160 from the first pipe guide member 120, and then releasing the fastener 174 to disassemble the discharge control member 170, FIGS. As described above, the second pipe guide member 160 'is fastened to the first pipe guide member 120 and replaced with another discharge control member 170', thereby allowing quick and easy replacement and having different diameter steel pipes ( 10 ') can be coated with the coating layer 20.

따라서, 하나의 강관피복장치(100) 의해서도 제2관가이드부재(160,160')와 토출조절부재(170,170')를 교체하여 다양한 직경의 강관(10,10')를 피복층(20)으로 코팅시킬 수 있어 효율적일 뿐만 아니라 교체가 수월하다.Therefore, the second pipe guide members 160 and 160 'and the discharge control members 170 and 170' may be replaced by one steel pipe coating device 100 to coat the steel pipes 10 and 10 'of various diameters with the coating layer 20. It is not only efficient, but also easy to replace.

그러므로 강관피복시스템에서 다른 직경의 강관이 코팅되게 전환시키는 교체작업이 예전에 1일 이상 소요되어 비효율적이었으나 본 고안에 의해서는 1-2시간 정도에 다른 크기의 강관으로 코팅되게 전환시킬 수 있게 되는 것이다.Therefore, in the steel pipe coating system, the replacement work for converting steel pipes of different diameters was previously ineffective for more than one day, but according to the present invention, the steel pipe coating system can be converted to steel pipes of different sizes in about 1-2 hours. .

이상의 설명에 따르면, 본 고안은 강관 외주면에 접착층과 수지층이 동시에 코팅되게 함으로써 제조공정을 단축시키고 크기가 다른 강관의 수얼한 교체와 유지관리의 효율성이 도모되는 효과를 제공하는 유용한 고안이다.According to the above description, the present invention is useful to provide the effect that the adhesive layer and the resin layer is coated on the outer circumferential surface of the steel pipe at the same time to shorten the manufacturing process and the efficiency of manual replacement and maintenance of steel pipes of different sizes.

Claims (2)

접착제압출기(1)와 수지제압출기(2)에서 각각 가압력을 가지고 공급되는 젤 상태의 접착제(21)와 수지제(22)가 강관(10) 외주면에 코팅되도록 하는 강관피복장치(100)로서; As the steel pipe coating device 100 to be coated on the outer peripheral surface of the steel tube 10, the adhesive 21 and the resin 22 of the gel state supplied with the pressing force from the adhesive extruder 1 and the resin extruder 2, respectively; 상기 강관(10)이 통과되는 관통공(121)을 가진 길다란 제1관가이드부재(120)가 바디부재(110) 내부에 고정되게 설치되고,The long first pipe guide member 120 having a through hole 121 through which the steel pipe 10 passes is fixedly installed in the body member 110. 상기 바디부재(110) 내부에는 원형태로 형성되는 접착제공급공(130)과 수지제공급공(140)을 각각 형성하여 접착제투입로(131) 및 수지제투입로(141)와 연결되게 하고,Inside the body member 110 to form an adhesive supply hole 130 and a resin supply hole 140 formed in a circular shape, respectively, so as to be connected to the adhesive input passage 131 and the resin input passage 141, 상기 접착제공급공(130)과 수지제공급공(140)과 연장된 접착제이동로(132) 및 수지제이동로(142)가 상호 만나도록 하여 접착제(21)와 수지제(22)가 각각 접착층(21a)과 수지층(22a)으로 되는 피복층(20)이 되어 수평방향으로 이동하게 되는 피복층이동로(150)와 토출구(151)를 갖도록 하되;The adhesive supply hole 130, the resin supply hole 140, the extended adhesive movement path 132, and the resin movement path 142 meet each other so that the adhesive 21 and the resin 22 are each bonded to each other. A cover layer moving path 150 and a discharge port 151, which become a cover layer 20 formed of a 21a and a resin layer 22a and move in a horizontal direction; 상기 피복층이동로(150)가 제1관가이드부재(120) 끝단부에 체결되고 관통공(161)을 가진 제2관가이드부재(160)의 외주면(162)과, 가압와셔(173)가 끼워진 다수의 체결구(174)가 조절공(171)을 관통하여 바디부재(110)에 고정되는 토출조절부재(170)의 내주면(172) 사이에 형성되게 구성됨을 특징으로 하는 접착층과 수지층을 가진 피복층이 코팅되게 하는 강관 피복장치.The outer cover 162 and the pressure washer 173 of the second pipe guide member 160 having the through hole 161 and the cover layer moving path 150 are fastened to the end of the first pipe guide member 120. A plurality of fasteners 174 is formed between the inner circumferential surface 172 of the discharge control member 170 is fixed to the body member 110 by passing through the adjustment hole 171 having an adhesive layer and a resin layer Steel pipe sheathing device for coating the coating layer. 청구항 1에 있어서, 상기 토출조절부재(170)는 바디부재(110)에 원주방향으로 다수 체결되는 조절나사(180)의 끝단부가 토출조절부재(170)의 외주면을 가압하여 이동 가능하도록 구성됨을 특징으로 하는 접착층과 수지층을 가진 피복층이 코팅되게 하는 강관 피복장치.The method of claim 1, wherein the discharge control member 170 is configured to be movable by pressing the outer peripheral surface of the discharge control member 170, the end of the adjustment screw 180 is fastened to the body member 110 in the circumferential direction. A steel pipe coating apparatus for coating a coating layer having an adhesive layer and a resin layer.
KR2020050031357U 2005-11-04 2005-11-04 An adhesion layer and resin layer the device which covers a Covering layer clothing steel pipe KR200406129Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020050031357U KR200406129Y1 (en) 2005-11-04 2005-11-04 An adhesion layer and resin layer the device which covers a Covering layer clothing steel pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020050031357U KR200406129Y1 (en) 2005-11-04 2005-11-04 An adhesion layer and resin layer the device which covers a Covering layer clothing steel pipe

Publications (1)

Publication Number Publication Date
KR200406129Y1 true KR200406129Y1 (en) 2006-01-20

Family

ID=41757860

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020050031357U KR200406129Y1 (en) 2005-11-04 2005-11-04 An adhesion layer and resin layer the device which covers a Covering layer clothing steel pipe

Country Status (1)

Country Link
KR (1) KR200406129Y1 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100822147B1 (en) 2007-01-26 2008-04-15 주식회사 이니텍기계 Metal tubing clothing system
KR101056466B1 (en) 2009-07-03 2011-08-11 주식회사 이니텍기계 Steel pipe coating method and device
KR101113745B1 (en) 2010-07-30 2012-02-15 주식회사 신정스틸 a device for making the coating-layer of pipe
KR101554885B1 (en) 2015-04-21 2015-09-22 (주) 케이 앤 지 스틸 Of the outer diameter in the double coating and method of producing a steel pipe having an epoxy resin coating layer that coats the outer diameter at the same time
KR101554883B1 (en) 2015-04-21 2015-09-22 (주) 케이 앤 지 스틸 Of the outer diameter in the double coating and, at the same time the outer diameter of the steel tube manufacturing apparatus having the epoxy resin coating layer that coats
WO2019035553A1 (en) * 2017-08-17 2019-02-21 주식회사 엘지화학 Slot die coater for changing coating form of electrode active material slurry through movement of slots
CN110049824A (en) * 2017-08-17 2019-07-23 株式会社Lg化学 Pass through the slot-form die coating machine of the coated form of the mobile change electrode active material slurry of slit
KR102319639B1 (en) * 2021-04-12 2021-10-29 김상탁 Apparatus for manufacturing double wall corrugated pipe with different materials
KR20220149130A (en) * 2021-04-30 2022-11-08 우한기 Aluminum pipe resin coating apparatus with jig

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100822147B1 (en) 2007-01-26 2008-04-15 주식회사 이니텍기계 Metal tubing clothing system
KR101056466B1 (en) 2009-07-03 2011-08-11 주식회사 이니텍기계 Steel pipe coating method and device
KR101113745B1 (en) 2010-07-30 2012-02-15 주식회사 신정스틸 a device for making the coating-layer of pipe
KR101554885B1 (en) 2015-04-21 2015-09-22 (주) 케이 앤 지 스틸 Of the outer diameter in the double coating and method of producing a steel pipe having an epoxy resin coating layer that coats the outer diameter at the same time
KR101554883B1 (en) 2015-04-21 2015-09-22 (주) 케이 앤 지 스틸 Of the outer diameter in the double coating and, at the same time the outer diameter of the steel tube manufacturing apparatus having the epoxy resin coating layer that coats
WO2019035553A1 (en) * 2017-08-17 2019-02-21 주식회사 엘지화학 Slot die coater for changing coating form of electrode active material slurry through movement of slots
CN110049824A (en) * 2017-08-17 2019-07-23 株式会社Lg化学 Pass through the slot-form die coating machine of the coated form of the mobile change electrode active material slurry of slit
US11161140B2 (en) 2017-08-17 2021-11-02 Lg Chem, Ltd. Slot die coater for changing coating form of electrode active material slurry through movement of slots
KR102319639B1 (en) * 2021-04-12 2021-10-29 김상탁 Apparatus for manufacturing double wall corrugated pipe with different materials
KR20220149130A (en) * 2021-04-30 2022-11-08 우한기 Aluminum pipe resin coating apparatus with jig
KR102540905B1 (en) * 2021-04-30 2023-06-07 우한기 Aluminum pipe resin coating apparatus with jig

Similar Documents

Publication Publication Date Title
KR200406129Y1 (en) An adhesion layer and resin layer the device which covers a Covering layer clothing steel pipe
IL206193A (en) Process for the production of a cylindrical heat source
PL1963690T3 (en) Screw nut, method of production thereof and corresponding tool
EP2184767A3 (en) Micro-extrusion system with airjet assisted bead deflection
CN107008603A (en) A kind of sheet material multi-surface spray painting processing unit (plant)
KR101609284B1 (en) Method for Coating Pipe in a Manner of Single Process for Adhesion and Coating and Coating Die for the Same
RU2015116457A (en) SYSTEMS AND METHODS FOR COOLING EXTRUDED MATERIALS
KR101267033B1 (en) Inner coating steel pipe with epoxy powder coating and a method of manufacturing the same
CA2556874A1 (en) Calibration basket for a calibration station
CN108525931A (en) A kind of sand paper production flannelette sand paper sizer and its working method
KR101267035B1 (en) Inner coating steel pipe with epoxy powder coating
RU2019128909A (en) EXTRUSION HEAD FOR MULTI-COMPONENT EXTRUSION, SYSTEM FOR MULTI-COMPONENT EXTRUSION AND METHOD FOR MANUFACTURING COMPOSITE PIPE
FI95787C (en) Device for continuous gluing of wood chips
CA2017171C (en) Apparatus for manufacturing reinforced polymeric tubing
CN107042182A (en) A kind of Spray painting tool of elongated automotive upholstery
DE502007006568D1 (en) APPARATUS FOR BELEVING FIBERS FOR THE MANUFACTURE OF FIBER PLATES, IN PARTICULAR MDF PLATES OR SIMILAR WOOD WORKTOP PLATES
SE444533B (en) DEVICE FOR MANUFACTURING ONE OF ATMINSTONE TWO LAYERS OF DIFFERENT MATERIALS CONSISTING HOSE, WHICH WALL THICKNESS IN VARIOUS INTERVALS IS THUNDER AND THICKER
EP1837155A4 (en) Extrusion feed device for composite resin and composite resin lump
KR101113745B1 (en) a device for making the coating-layer of pipe
CN109248846A (en) A kind of locally sprayed method of aviation fasteners internal screw thread
CN104792126B (en) A kind of fertiliser granulates drying device using brush sweeper
JP2010526658A (en) Articulated nozzle and method of attaching a strip of viscoelastic material using this nozzle
KR20090059460A (en) The coating device of pipe
CN204159433U (en) Slag vertical-mill and material water injection system thereof
DK1893327T3 (en) Device for guiding a gas for devices for treating granular material by drying, film coating or coating, in particular an air supply unit, and method of such device

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
FPAY Annual fee payment

Payment date: 20130107

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20131121

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20150106

Year of fee payment: 10

EXPY Expiration of term