KR20040074721A - Pro-environmatal electric pole safe from lightening and distributing method using the same - Google Patents

Pro-environmatal electric pole safe from lightening and distributing method using the same Download PDF

Info

Publication number
KR20040074721A
KR20040074721A KR1020030010107A KR20030010107A KR20040074721A KR 20040074721 A KR20040074721 A KR 20040074721A KR 1020030010107 A KR1020030010107 A KR 1020030010107A KR 20030010107 A KR20030010107 A KR 20030010107A KR 20040074721 A KR20040074721 A KR 20040074721A
Authority
KR
South Korea
Prior art keywords
pole
neutral
wire
neutral wire
lightning protection
Prior art date
Application number
KR1020030010107A
Other languages
Korean (ko)
Other versions
KR100725382B1 (en
Inventor
권세원
Original Assignee
대원전기 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대원전기 주식회사 filed Critical 대원전기 주식회사
Priority to KR1020030010107A priority Critical patent/KR100725382B1/en
Publication of KR20040074721A publication Critical patent/KR20040074721A/en
Application granted granted Critical
Publication of KR100725382B1 publication Critical patent/KR100725382B1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G17/00Conveyors having an endless traction element, e.g. a chain, transmitting movement to a continuous or substantially-continuous load-carrying surface or to a series of individual load-carriers; Endless-chain conveyors in which the chains form the load-carrying surface
    • B65G17/06Conveyors having an endless traction element, e.g. a chain, transmitting movement to a continuous or substantially-continuous load-carrying surface or to a series of individual load-carriers; Endless-chain conveyors in which the chains form the load-carrying surface having a load-carrying surface formed by a series of interconnected, e.g. longitudinal, links, plates, or platforms
    • B65G17/067Conveyors having an endless traction element, e.g. a chain, transmitting movement to a continuous or substantially-continuous load-carrying surface or to a series of individual load-carriers; Endless-chain conveyors in which the chains form the load-carrying surface having a load-carrying surface formed by a series of interconnected, e.g. longitudinal, links, plates, or platforms the load carrying surface being formed by plates or platforms attached to more than one traction element
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G17/00Conveyors having an endless traction element, e.g. a chain, transmitting movement to a continuous or substantially-continuous load-carrying surface or to a series of individual load-carriers; Endless-chain conveyors in which the chains form the load-carrying surface
    • B65G17/30Details; Auxiliary devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2812/00Indexing codes relating to the kind or type of conveyors
    • B65G2812/02Belt or chain conveyors
    • B65G2812/02267Conveyors having endless traction elements
    • B65G2812/02277Common features for chain conveyors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2812/00Indexing codes relating to the kind or type of conveyors
    • B65G2812/02Belt or chain conveyors
    • B65G2812/02267Conveyors having endless traction elements
    • B65G2812/02415Conveyors having endless traction elements with load-carrying surfaces supported by traction means
    • B65G2812/02425Continuous or uninterrupted load-carrying surfaces
    • B65G2812/02455Continuous or uninterrupted load-carrying surfaces the surfaces being above, between or beside the traction means
    • B65G2812/02485Continuous or uninterrupted load-carrying surfaces the surfaces being above, between or beside the traction means the load-carrying surfaces being fixed or non-movably linked to the traction means
    • B65G2812/02495Continuous or uninterrupted load-carrying surfaces the surfaces being above, between or beside the traction means the load-carrying surfaces being fixed or non-movably linked to the traction means load-carrying surfaces using platforms or grids

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Catching Or Destruction (AREA)

Abstract

PURPOSE: A pro-environmental electric pole and a distributing method are provided to reduce costs and loads by permitting the electric pole to use a single power line serving as an overhead earth wire and a neutral line. CONSTITUTION: A neutral line support(3) connected to a neutral line(2) is mounted on the top of an electric pole(1). A cross arm(6) equipped with a plurality of insulators(7) connected to a power line(5) is mounted on the lower portion of the electric pole underneath the neutral line support. The neutral line support and the cross arm are arranged to be adjustable in such a manner that the insulators and the power line are disposed in the lightning shield angle of the neutral line during a lightning strike.

Description

낙뢰보호 및 친환경 기능을 구비한 전주 및 이를 이용한 배전공법 {Pro-environmatal electric pole safe from lightening and distributing method using the same}Electric pole with lightning protection and eco-friendly function and power distribution method using it {Pro-environmatal electric pole safe from lightening and distributing method using the same}

본 발명은 별도의 가공지선을 설치하지 않고, 중성선을 전주의 최상단에 설치하여 가공지선의 역할을 동시에 수행할 수 있도록 하고, 낙뢰로부터 보호받을 수 있는 범위를 확대하며, 정전사고의 위험이 없는 곳에 조류둥지의 조성공간을 제공하므로서, 낙뢰로부터 애자 및 전력선을 보호하고, 외물접촉 사고를 방지하면서도,소요자재를 최소화하며 폐기되는 자원을 재활용하므로서 막대한 경제적 이익을 얻을 수 있는 획기적인 환경친화적 배전설비로 바꾸어 주는 낙뢰보호 및 친환경 기능을 구비한 전주 및 이를 이용한 배전공법에 관한 것이다.The present invention is to install a neutral wire at the top of the pole without installing a separate processing wire, so that the role of the processing ground can be performed at the same time, to extend the range to be protected from lightning, and there is no risk of power failure accident By providing a nesting space for bird nests, it is transformed into a breakthrough environment-friendly power distribution facility that can protect insulators and power lines from lightning strikes, prevent foreign contact accidents, minimize waste materials, and recycle waste resources. The state relates to electric poles with lightning protection and eco-friendly functions, and power distribution methods using the same.

전기는 우리의 생활에 필수 수단으로서 문명의 발전과 더불어 현대사회는 시대적으로 고품질의 전력을 요구하고 있어 작업정전은 물론이고 순간적인 불시정전도 국민생활에 큰 불편과 기업생산 활동에도 막대한 지장을 초래하고 있어 정전을 방지하고자 국가적인 차원의 노력을 하고 있는 실정이다.As electricity is an essential means of our lives, with the development of civilization, modern society demands high-quality electric power in the times, and the instantaneous power failure as well as the work interruption causes great inconvenience to people's life and corporate production activities. As a result, national efforts are being made to prevent power outages.

이러한 정전사고 방지노력의 일환으로 전국의 호당 평균정전시간이 년간 100분대에서 19분대로 매우 크게 감소하여 현재에 이르고 있으나,As part of these efforts to prevent power outages, the average blackout time per house in the country has been greatly reduced from 100 minutes to 19 minutes per year.

첫째로 가장 큰 비중을 차지하던 작업정전은 무정전공법의 개발과 적용으로 해결되었고,First, work outages, which accounted for the largest proportion, were solved by the development and application of the method.

둘째로 기자개불량으로 인한 정전을 고품질의 자재개발 및 보급으로 크게 감소되었으며,Second, power outages caused by poor press release have been greatly reduced by the development and supply of high quality materials.

셋째는 외물 접촉으로 인한 정전인데 이는 선로의 절연화 및 단순 조류고장회피형 장주[점퍼선 하향장주 및 L.H.C 시공법 등]과 구제(驅除 : 까치를 총으로 쏘아 죽이는 방법)로 다소나마 해소되었으나, 아직도 순간정전의 원인으로 추정되며, 또한 환경보호단체의 민원도 무시할 수 없는 현실이며,Third, the blackout caused by external contact, which has been resolved somewhat by the insulation of the track and simple tide avoidance type (jumper downlink and LHC construction method) and relief (驅除: how to shoot magpies). It is assumed that it is the cause of the cease-fire, and the complaints of environmental protection organizations cannot be ignored.

넷째는 낙뢰로 인한 정전사고로서 이는 1990. 2. 7 한국전력공사의 설계기준[3800] 배전선내뢰기준[잠정]을 제정운영하여 배전선로의 낙뢰방지를 위한 배전선로의 내뢰대책은 유도뢰뿐만 아니라 직격뢰도 보호대상으로 하여 가공지선 설치를 기본으로 하고, 공급신뢰도를 높이기 위해서 피뢰기 등의 설치를 병행함으로서 크게 해결되었다.Fourth, a blackout accident caused by lightning strikes was established and operated by the Korea Electric Power Corporation's design standard [3800] distribution line tolerant standard [provisional]. The direct lightning protection was based on the installation of overhead lines, and in order to increase the reliability of supply, the installation of lightning arresters and the like was greatly solved.

다섯째는 기타 정전사고가 태풍, 수해등의 자연재해와 고객설비 불량, 일반인과실, 작업자과실, 원인불명 등이 차지하고 현실이다.Fifth, other blackout accidents are caused by natural disasters such as typhoons and floods, customer equipment defects, public errors, worker errors, and unknown reasons.

상기에서 열거한 바와 같이 아직도 정전사고 방지를 위하여 해결해야 할 산적한 문제점들이 아주 많다는 사실을 알 수 있다.As enumerated above, it can be seen that there are still many cumulative problems to be solved in order to prevent a power failure.

그 중에서, 첫째는 아직도 "까치와의 전쟁"을 치러야 하는 현실과 원인 불명이라고 치부하는 사고의 대부분이 조류로 인한 외물접촉사고로 추정되고 있는 현실이며, 단순 조류고장 회피형 장주설치로 인하여 구조역학적으로 지지물과 전선의 설치를 불완전하게 하중이 편심되게 시공하거나 낙뢰차폐 보호각을 벗어나는 시공으로 인하여 태풍과 수해등의 자연재해에 구조 역학적 취약성을 드러낸 상황에 처한 것이다.Among them, the first is that the reality of having to fight the war with magpies and the fact that most of the accidents are unknown are estimated to be foreign-contact accidents caused by birds. The installation of the support and the wire is in a situation where structural dynamics are exposed to natural disasters such as typhoons and floods due to incomplete load eccentricity or construction beyond the lightning protection angle.

둘째는 한국전력공사에서 전력품질향상을 위하여 1990. 2. 7. 배전선내뢰기준을 제정하고, 배전선로의 낙뢰사고 방지를 위한 배전선로의 내뢰대책을 유도뢰 뿐만 아니라 직격뢰까지도 보호대상으로 하여 가공지선 설치를 기본으로 변경하여 시행였으나 기존의 배전선로에 가공지선을 추가로 시공하기 위하여 부득이 전주위에 완금으로 계주(전주와 완금을 묶어서 연장함)하여 가공지선을 설치하게 되었고, 또한 가공지선지지대(소형 강판주)를 개발하여 전주를 잇는 공법을 계속하여 사용함으로서 이어 올린 완금이나 강판주가 기초 안전율이 부족한 경우에는 지선등에 의하여 안전율을 보지할 수 있도록 보강하여야 하나 이에 미흡하여, 태풍과 같은 재해에 쉽게 붕괴되는 취약성이 있다.Second, KEPCO enacted the distribution line tolerant standards for improvement of power quality, and processed the mines as well as direct lightning strikes to protect the distribution lines from lightning strikes to prevent lightning strikes on the distribution lines. It was implemented by changing the installation of the ground wire to the basic, but in order to construct additional overhead wire on the existing distribution line, it was unavoidable to relay the wires around the circumference (extended by tying the poles and the complete wire) to install the overhead wires. Small steel plates) are developed and used continuously to connect the poles. If the finished steel sheets or steel sheets lack the basic safety factor, they should be reinforced so that the safety factor can be maintained by branch lines, etc. There is a vulnerability to collapse.

이는, 과거 자금이 부족한 경제개발시대의 어려운 환경에서 필요한 지상고를 얻기 어려운 경우에 할 수 없이 사용하던 단계주나 인형주의 구시대적인 시공법을 경제력이 있는 현재에도 누더기처럼 사용하는 현실일 뿐만 아니라 편출용 가공지지대까지 개발하여 전선로에 적용하고 있으나 완전편출장주에는 낙뢰보호 차폐각을 확보하지 못하는 한계가 있는 등 이들 문제점을 모두 해결할 더욱 견고하고 완벽한 공법을 필요로 하게 되었다.This is not only the reality of using the step-by-step or puppet old-fashioned construction methods, which were used in times of difficulty in the difficult environment of the economic development era in which past funds were scarce, but also as rags in the economically present day. Although it has been developed and applied to the electric cable line, it requires a more robust and perfect method to solve all of these problems, such as the limitation of not being able to secure the lightning protection shielding angle in the complete cable owner.

또한 정전사고 중 까치의 산란기에 발생하는 외물접촉사고와 원인불명사고가전체고장의 약 43%를 차지하고 있으나, 사고방지 노력에도 불구하고 사고는 줄지 않고 있으며 방지대책 또한 엽사를 동원하여 까치를 구제하는 환경생태계 보호에 역행하는 방법과, 배전선로의 시공방법(일명 L.H.C. 공법, 하향점퍼시공) 또한 충분한 과학적 검토 없이 무분별한 시공으로 인하여 오히려 위해설비를 확대하고 있는 실정이며, 새로운 기자재의 개발과 더불어 재활용이 가능한 철거자재를 무조건 폐기함으로서 자원의 낭비는 물론이고 환경오염을 부채질하고 있고, 22.9KV 다중접지 방식에서 가공지선과 중성선은 같은 기능으로 중복 투자되고 있어 불필요한 가공지선 설비로 지지물에 하중을 증가시킬 뿐만 아니라, 계주방식의 시공으로 불안정한 전력시설물로 자연재해에 취약하며 지지물의 지상고 확보에도 문제점이 있다.In addition, foreign contact accidents and unknown causes that occur during the blackout's spawning period account for about 43% of total failures.However, despite efforts to prevent accidents, accidents are not reduced. The method of reversing the protection of the environmental ecosystem and the construction method of distribution lines (aka LHC method, down jumper construction) are also expanding the hazardous facilities due to indiscriminate construction without sufficient scientific review. By disposing of the demolition materials unconditionally, it not only wastes resources but also pollutes the environment.In the 22.9KV multi-grounding method, overhead wires and neutral wires are being invested in the same function, which increases the load on the support with unnecessary overhead wires. Rather, it is unstable power facility due to relay construction. Vulnerable to disasters, and there is a problem in the ground to secure the support.

상기와 같은 종래의 전주 및 이를 이용한 배전선로를 살펴보면 도 4 및 도 5의 도시와 같이, 상단에 가공지선 지지대(22)가 설치되고, 그 하측에는 다수의 애자(24)를 구비한 완금(23)이 설치되며, 그 하부에 랙크(26)가 설치된 전주(1)를 지면에 다수 설치하고, 가공지선 지지대(22) 상단에는 가공지선(21)을 연결하고, 완금(23)의 애자(24)에는 전력선(25)을 연결하며, 랙크(26)에는 중성선(20)을 결합한 것이다.Looking at the conventional electric pole and the distribution line using the same as described above, as shown in Figs. 4 and 5, the processing line support 22 is installed on the upper end, the lower portion 23 provided with a plurality of insulators 24 ) Is installed, a plurality of poles (1) having a rack (26) is installed on the bottom of the ground, and the processing line support 21 is connected to the processing line support 22, the insulator (24) of the stub 23 ) Is connected to the power line 25, the rack 26 is a combination of the neutral wire (20).

상기와 같이 구성된 종래의 전주 및 이를 이용한 배전공법의 문제점을 상세히 설명하면 다음과 같다.Referring to the problems of the conventional electric pole constructed as described above and the power distribution method using the same in detail as follows.

첫째로 불안정한 조류고장 회피형 시공으로 전력시설물이 취약하게 되어 자연 재해 피해가 확대되는 데 그 이유를 상세히 설명하면 다음과 같다.Firstly, unstable bird failure avoidance construction makes power facilities vulnerable and damages to natural disasters are explained in detail.

우리나라의 배전선로는 각종 공학적, 과학적 근거에 따라 한국전력공사에서 1975. 7. 1. 부터 배전분야 설계기준을 제정하여 공사품질을 확보하고, 자연재해에 충분히 견딜 수 있도록 설계, 시공, 검사에 다음과 같이 적용하고 있는데, 전선로의 지지물로 사용하는 콘크리트주와 완철류의 강도는 가섭선(가설하여 당겨지는 힘을 받는 전선)의 외경합계, 경간 및 풍압 하중에 따라 적정 설계하중의 것을 선정한다는 것이 바로 그것이며, 이 경우 장래의 회선증가, 장체, 절연화에 의한 전선의 외경합계의 증가를 고려해야 하며, 각 부재에 대한 이들의 하중 중 그 부재에 큰 응력이 생기는 부분의 하중을 채택하도록 하고 있다.According to various engineering and scientific grounds, Korea's power distribution line established the design standards for power distribution field from July 1, 1975 to secure the construction quality and to design, construct, and inspect to fully endure natural disasters. The strength of concrete column and finished steel used as support of cable line is to select proper design load according to outer diameter, span and wind pressure load of reinforcement line (wire under tension). That is, in this case, consideration should be given to the increase in the outer diameter of the electric wire due to the future line increase, the length, and the insulation, and to adopt the load of the part of the load that causes a large stress on the member. .

또한, 풍압이 전선로 직각의 방향에 가해지는 경우의 하중은 수직하중 및 수평 횡하중이 동시에 가해지는 것으로 하며, 풍압이 전선로의 방향에 가해지는 경우의 하중은 수직하중, 수평종하중 및 수평각하중이 동시에 가해지는 것으로 하고, 지지물에서 가섭선의 배치가 비대칭인 경우에는 수직편심 하중도 가산하고 인류주, 내장주에는 염력(비틀림의 힘)에 의한 하중도 가산해야 하며, 전선로에는 다음과 같은 각종 하중이 작용하고 있다.In the case where wind pressure is applied in the direction perpendicular to the wire, the vertical load and the horizontal lateral load are applied simultaneously.In the case where the wind pressure is applied in the direction of the wire, the vertical load, horizontal longitudinal load and horizontal angular load are applied. At the same time, if the arrangement of the subwire is asymmetrical in the support, the vertical eccentric load must be added, and the load due to the torsion (torsional force) must be added to the human and internal pillars. It's working.

1. 수직하중1. Vertical load

가) 주체, 완철류, 애자장치 및 가섭선의 중량A) the weight of the main body, cast iron, insulator and

나) 수직 각도가 큰 경우에는 가섭선 장력의 수직분력B) If the vertical angle is large, the vertical component of the line tension

다) 지선장력에 의한 수직분력C) Vertical component by branch tension

2. 수평횡하중2. Horizontal Lateral Load

가) 주체, 애자장치 및 가섭선에 가해지는 풍압하중A) wind pressure on the main body, insulator and substation line;

나) 전선로에 수평각도가 있을 경우 가섭선의 상정최대장력에 의하여 생기는 수평횡분력(이하, 수평각하중이라 함).B) The horizontal lateral force produced by the assumed maximum tension of the subsurface when there is a horizontal angle in the line (hereinafter referred to as the horizontal angular load).

3. 수평종하중3. Horizontal longitudinal load

가) 주체, 애자장치 및 완철류에 가해지는 풍압하중A) wind pressure applied to the main body, insulator and steel

나) 인류주에서 가섭선 상정최대장력과 같은 불평균 장력B) non-average tension equal to the assumed maximum tension

다) 내장주에서는 가섭선 상정최대장력의 1/3의 불평균장력C) the mean tension of one-third of the maximum tension assumed

라) 보강주에서는 가섭선 상정최대장력의 1/6의 불평균장력D) in the reinforcement column, the average tension of 1/6 of the maximum tension assumed

그러나, 이와 같은 각종 하중의 작용을 고려하지 않고 단순히 조류로 인한 외물 접촉사고만을 방지할 목적으로 점퍼선 하향장주 및 L.H.C.[LONG(멀리), High(높이), Cover(덮개)] 시공방법을 모든 배전선로에 적용하고 있으나, 가섭선의 배치를 비대칭으로 시공할 때에는 더 많은 종류의 하중에 대하여 추가로 보강해야 함에도 불구하고 이를 고려하지 않고 시공하여 매우 취약한 배전선로를 전국에 만들어 놓아 태풍이나 수해 등의 자연재해에 쉽게 붕괴되고 엄청난 피해가 발생하여 국가적으로 큰 경제적손실을 보게 되는 것이다.However, the jumper wire down pole and LHC [LONG, High, Cover] construction methods are all used for the purpose of simply preventing external accidents caused by algae without considering the effects of various loads. Although it is applied to the distribution line, when constructing the subsidiary line asymmetrically, although additional reinforcement is required for more kinds of loads, it is constructed without considering this, so that the very weak distribution line is made throughout the country, such as typhoons and floods. Natural disasters are easily collapsed and devastatingly damaged, resulting in large national economic losses.

또한, 전기한 바와 더불어 배전기자재 불량으로 인한 정전사고 방지의 노력으로 우수한 새로운 기자재가 개발되어 기존의 현수애자와 라인포트애자 등이 신개발 자재로 교체되면서 엄청난 물량의 자재가 폐기물 처리되는 상황으로 재활용이 가능함에도 불구하고 폐기물 처리되어 폐기물로 인한 환경파괴와 자원이 낭비되는 문제점이 있다.In addition to the foregoing, excellent new equipment has been developed in an effort to prevent power failure due to poor distribution equipment, and the existing suspension and line port insulators have been replaced with newly developed materials. Although possible, there is a problem in that waste is disposed of and environmental damage and resources are wasted.

또한, 종래의 단순 조류고장 회피형 장주설치는 각종 하중을 고려하지 않고 단순히 조류로 인한 외물 접촉사고만을 방지할 목적으로 시공함으로서 다음과 같은 문제점이 도출되었다.In addition, the conventional simple bird failure avoidance type pole installation has been derived for the purpose of simply preventing the external contact due to the algae without considering various loads, the following problems were derived.

첫째로 편심하중 문제로서 점퍼선을 하향으로 시공하기 위해서는 현수애자 장주를 전주의 중심부에 설치하지 못하고 전주를 피하기 위해서 일측으로 편심되게 현수애자를 걸어 가섭선의 염력하중이 크게 작용할 뿐만 아니라 점퍼선이 전주의 측부로 가까이 하향 통과하여 태풍과 같은 바람으로 전주에 접촉되는 사고가 빈발하며 특히, 2단 선로의 경우에 상하단의 이격거리가 부족하여 표준이격거리보다 크게 설치하다 보니 전주장척이 더 크고, 중하중용 전주를 추가로 설치해야 한다.First of all, in order to construct the jumper line downward as a problem of eccentric load, it is impossible to install the suspension insulator in the center of Jeonju. There are frequent accidents that come into contact with Jeonju due to winds such as typhoons, passing downward close to the side of the bridge. Especially, in case of the two-stage track, the distance between the top and bottom is not enough, so the installation is larger than the standard distance. Additional poles should be installed.

둘째는 단순회피형 장주의 대표격으로 L.H.C.[LONG(멀리), High(높이), Cover(덮개)] 시공방법을 모든 배전선로에 적용하고 있으나, 이는 가섭선의 배치가 비대칭으로 시공된 상태에서 가섭선을 지지물로부터 더 멀리 시공하여 편심하중과 비틀림 하중 등이 더욱 가중되고 거리가 멀어져 인력시공이 어려워져서 안전사고위험이 있고, 점퍼선을 더 높이 시공함으로서 가공지선 차폐각을 벗어날 뿐만 아니라 수평횡하중 등의 악영향과 시공의 어려움만 가중시키면서 전주를 중하중용으로 사용하여 공사원가를 상승시키고, 무분별한 카바류시공으로 선로유지보수 점검만 어렵게 하는 결과 등으로 공사원가를 상승시키는 문제가 있다.Secondly, LHC [LONG, High, Cover] construction method is applied to all distribution lines as the representative of simple avoidance type, but this is because the subsidiary line is constructed asymmetrically. Construction farther from the support increases eccentric loads and torsional loads, and distance increases the difficulty of manpower construction.There is a risk of safety accidents.The jumper wires are constructed higher to escape the shielding angle of the processing line and adversely affect the horizontal load. Increasing the construction cost by using Jeonju as a heavy load while increasing the difficulty of construction and construction, and increasing the construction cost due to the indiscriminate Kabaryu construction, which makes it difficult to check the track maintenance.

셋째는 신개발자재로 조류고장 방지용 단일형 내장완금의 사용인데 이것은 단순회피형 시공방법이 아니라 적극회피형 시공방법으로서 상기에 열거한 모든 문제점을 내포하고 있어 효과가 없음은 물론이고 우리나라 배전선로의 완철금구류의 자재규격을 모두 변경시켜야 되는 심각한 문제와 주상작업자는 자재가 무겁고 작업이 어려워 안전사고 위험이 있고 전선로의 각종하중 등을 고려하지 않아 국가적 예산낭비와 엄청난 손실을 가져오게 되는 것이다.Third, as a new developer material, the use of a single built-in block for preventing bird failure is not a simple avoidance method but an active avoidance method. It contains all the problems listed above. Serious problems that require changes to all material standards and the owners of the materials are heavy and difficult to work, which leads to risk of safety accidents and does not consider various loads on the cable line, resulting in national budget waste and enormous losses.

또한, 종래의 공법은 동일 기능의 전선로 병렬운영으로 중복투자에 의한 공사원가 상승의 문제점이 있으며 그 이유는 다음과 같다.In addition, the conventional construction method has the problem of rising construction cost due to overlapping investment due to parallel operation of the wire of the same function, for the following reasons.

전력품질향상을 위하여 배전선로의 낙뢰사고 방지를 위한 배전선로의 내뢰대책을 유도뢰 뿐만 아니라 직격뢰까지도 보호대상으로 하여 가공지선 설치를 기본으로 현재의 가공지선은 전주 상단 등에 설치하고, 가공지선의 차폐각도는 45°로 하고 있으며, 장경간 개소 등 혼촉의 우려가 있는 곳은 이격거리를 증가시키고 있으며, 가공지선의 지지대로 지지하며 공사상 부득이할 경우에는 완철(랙크에 저압애자로 지지)을 계주하여 시공하고 있다.Based on the installation of overhead lines, the current overhead line is installed on the top of the pole, and the overhead lines of the distribution line to prevent lightning strikes on the distribution lines are protected. The shielding angle is 45 °, and the distance between the long span and the place where there is a fear of mixing is increasing the separation distance. It is relayed and constructed.

가공지선의 접지는 매 200m 이내마다 중성선과 공용하여 접지저항을 5OΩ이하로 접지하고 매 전주마다 가공지선과 중성선을 상호 접속하여 사용하고 있다.The ground of overhead wire is shared with neutral wire within 200m, and grounding resistance is less than 50Ω, and the overhead wire and neutral wire are connected to each pole.

여기에서, 가공지선과 중성선이 공용하여 사용되고 있음을 알 수 있다.Here, it can be seen that the processing branch wire and the neutral wire are used in common.

특고압(또는 고압)의 다중접지된 중성선은 동일계통의 저압중성선 또는 접지측 전선과 공용하며, 이 경우 공용중성선의 굵기 선정은 특고압 중성선 굵기와 저압중성선 굵기 중 큰 것으로 하면 되는 것으로서 가공지선을 중성선으로 공용하여 사용할 수 있으므로 동일 기능의 배전선로의 중복투자로 공사원가가 상승되고 있는것이다.The multi-grounded neutral wire of extraordinary high pressure (or high pressure) is shared with the low voltage neutral wire of the same system or the ground side wire.In this case, the thickness of the common neutral wire is the larger of the extra high neutral wire thickness and the low pressure neutral wire. Since it can be used as a neutral cable, the cost of construction is rising due to the overlapping investment of distribution lines with the same function.

또한, 엽사를 동원한 까치 구제로 자연생태계 파괴의 문제가 발생된다.In addition, the problem of destruction of the natural ecosystem occurs due to the magpie relief mobilized by the leaves.

은혜에 보은 한다는 전설의 새 까치, 기쁜 소식을 전해준다는 까치를 2000년에는 환경부에서 유해조수로 지정하여 수렵협회 엽사들까지 동원한 청부살해로 무참히 학살하고 있다. 이것은 분명한 환경 생태계의 파괴로 이어질 수 있다.In 2000, the magpie, the legendary magpie that delivers good grace, and the magpie that delivers the good news, was designated as an ideological assistant by the Ministry of Environment. This can lead to obvious environmental ecosystem destruction.

분명한 것은 인간이 자연을 파괴하면 알지 못하는 사이에 큰 재앙을 받는다는 사실이다.What is clear is that when humans destroy nature, they are devastated without knowing.

전력설비 관리기관에서 까치를 엽사를 동원한 청부살해를 하면서 자체적으로 수렵허가를 받아 연중 내내 수렵기간 및 장소의 제한을 받지 않고 항상 무기를 휴대하여 언제 어디서든지 즉시 사살하는 상황으로서, 일부 지역에서는 엽사가 오발로 사망하는 사고가 발생하고, 일부지역에서는 밀렵하다가 검찰에 적발되어 조사를 받는 등 항상 위험하고 사회적으로 물의가 확산되고 있다.In the power facility management agency, the magpie kills magpies with its own hunters and receives hunting permits, and carries weapons and kills anytime and anywhere immediately regardless of the hunting period and location throughout the year. Accidental deaths occur in some areas, poaching in some areas, caught by prosecutors and investigated, and there is always a dangerous and social spread.

다음은 종래 배전공법의 전력설비 관리기관 측면에서의 문제점을 알아본다.The following describes the problems in terms of power facility management agency of the conventional distribution method.

L.H.C.공법은 단순 조류고장 회피형 환경배타적 배전공법으로서 전선로의 각종하중을 고려하지 않고 단순히 조류로 인한 외물접촉사고를 회피할 목적으로 환경배타적으로 시공함으로서 다음과 같이 문제점이 도출되었다.The L.H.C. method is an environmentally exclusive distribution method for avoiding tide of birds, and the following problems have been derived by constructing them exclusively for the purpose of simply avoiding foreign contact accidents caused by algae without considering various loads on the cables.

첫째로 점퍼선을 하향으로 시공하기 위해서 전주중심부에 일측으로 편심되게 현수애자를 걸어 가섭선의 염력하중이 크게 작용할 뿐만 아니라 점퍼선이 전주의 측부로 가까이 하향 통과하여 전주에 접촉되는 사고가 빈발하며 2단 선로의 상하단의 이격거리 부족으로 전주장척이 더 크고 중하중용 전주를 설치해야 되고,First of all, in order to construct the jumper line downward, the torsion insulator hangs eccentrically to one side in the center of Jeonju. Due to the lack of separation distance between the upper and lower ends of the single track, the Jeonjujang is bigger and a heavy load electric pole must be installed.

둘째는 가섭선의 배치가 비대칭으로 시공된 상태에서 가섭선을 지지물로부터 더 멀리 시공하여 편심하중과 비틀림 하중 등이 더욱 가중되고 거리가 멀어져 인력시공이 어려워져서 안전사고위험이 있다.Secondly, in the state where the arrangement of the subwire is asymmetrically constructed, the subwire is constructed farther from the support, thereby increasing the eccentric load and the torsional load and increasing the distance.

셋째는 LP 3호핀을 사용한 공법은 가공지선의 낙뢰 보호 차폐각을 벗어나는 문제점이 있는데, 이는 점퍼선을 더 높이 시공함으로서 가공지선 낙뢰보호 차폐각을 벗어날 뿐만 아니라 수평횡하중에 견디지 못하고 위험한 상태가 되어 더 굵고 무거운 LP4호핀으로 보강하여 시공하는 등 악영향과 더불어 시공의 어려움만 가중시키면서 전주를 중하중용으로 사용하여 공사원가를 상승시키고, 무분별한 카바류 시공으로 선로 유지보수 점검만 어렵게 하는 결과 등으로 공사원가를 상승시키는 문제가 있다.Thirdly, the method using LP No. 3 pin has a problem of exceeding the lightning protection shield angle of the processing ground wire, which not only escapes the processing ground lightning protection shield angle by constructing the jumper wire higher, but also withstands horizontal horizontal load and becomes dangerous. The construction cost is increased due to the bad impact such as reinforcement with the thick and heavy LP4 hoffin and increasing the construction cost by increasing the difficulty of construction, and increasing the cost of construction by indiscriminate construction of the tracks. There is a problem with ascension.

특히, 배전선로의 시공방법(일명 : L.H.C 공법, 하향점퍼시공)을 충분히 과학적 검토 없이 무분별하게 시공하므로서 오히려 위해설비를 확대하고 유지보수를 위한 이중투자를 하고 있는 실정이다.In particular, the construction method of distribution lines (aka L.H.C construction, down jumper construction) is constructed indiscriminately without scientific review, but rather, it is making double investment for expansion of risk facilities and maintenance.

본 발명은 상기와 같은 문제점을 해결하기 위하여 안출된 것으로서,The present invention has been made to solve the above problems,

가공지선과 중성선을 하나의 전력선으로 사용할 수 있는 전주를 구성하므로서, 중성선으로 가공지선 역할을 겸용하여 공사비 원가절감 및 선로의 단순화로 지지물의 하중을 경감시키고 중성선의 지상고 미달등을 해소함은 물론,중성선에 조류둥지 공간부를 친환경적으로 형성하고 하단 전력선에는 조류둥지 유도핀을 설치하여 조류둥지를 전력선으로부터 가장 멀고 안전한 곳으로 유도하여 정전사고를 방지하면서도 조류를 보호할 수 있고, 폐기물처리되는 현수애자를 재활용하여 자원을 절약하고 환경오염을 방지할 수 있으며, 보다 안전하고 편리한 낙뢰보호 차폐각의 확보로 낙뢰에 의한 사고를 방지하고, 태풍이나 수해 등의 자연 재해에 대비한 견고한 배전시설과 외물접촉으로 인한 원인불명의 정전사고를 방지할 수 있는 낙뢰보호 및 친환경 기능을 구비한 전주 및 이를 이용한 배전공법을 제공함에 본 발명의 목적이 있다.By constructing electric pole that can use processed ground wire and neutral wire as a single power line, it also serves as a neutral wire, reducing the cost of construction cost and simplifying the line by reducing the cost of construction and eliminating the ground height of the neutral wire. Forming a bird nest space part in an environment-friendly way, and installing a bird nest induction pin on the lower power line leads the bird nest to the farthest and safest place from the power line to prevent bird outages while protecting birds and recycling suspended insulators that are disposed of waste. It saves resources and prevents environmental pollution, and prevents accidents caused by lightning strikes by securing a safer and more convenient lightning protection shielding angle, and provides a solid power distribution facility and external contact against natural disasters such as typhoons and floods. Lightning protection and eco-friendly to prevent unknown power failure A pole and distribution method using the same having the function there is an object of the present invention to provide.

도 1 은 본 발명 전주의 설치상태를 도시한 사시도.1 is a perspective view showing an installation state of the present invention pole.

도 2 는 본 발명의 실시예도로서,2 is an embodiment of the present invention,

도 2a는 핀장주의 신공법장주를 도시한 것이고,Figure 2a shows the new law owner of the pinjangju,

도 2b는 내장주의 신공법장주,Figure 2b is a new law of the built-in liquor,

도 2c는 편출핀장주의 신공법장주,Figure 2c is a new law of liquor pinjangju,

도 2d는 편출 내장주의 신공법장주를 도시한 것이다.Figure 2d shows the new construction of liquor embedded liquor.

도 3 은 본 발명의 전주에 의한 낙뢰보호 상태를 도시한 설명도.3 is an explanatory diagram showing a lightning protection state by electric pole of the present invention;

도 4 는 종래 전주에 의한 배전상태를 도시한 사시도.4 is a perspective view showing a state of distribution by a conventional pole.

도 5 는 종래 전주의 낙뢰보호범위를 도시한 설명도.5 is an explanatory diagram showing a lightning protection range of a prior art pole.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

1 : 전주 2 : 중성선1: pole 2: neutral wire

3 3'3": 중성선 지지구 4 : 점퍼선3 3'3 ": neutral wire support 4: jumper wire

5 : 전력선 6 : 완금5: power line 6: complete

7 : 애자 8 : 완금7: insulator 8: complete

9,9' : 조류둥지유도핀 10 : 암타이9,9 ': Bird nest induction pin 10: Amtai

11 : 랙크11: rack

이하, 본 발명의 바람직한 실시 예를 첨부된 도면을 참조하여 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1 은 본 발명 전주의 설치상태를 도시한 사시도이다.1 is a perspective view showing an installation state of the present invention pole.

전주(1)의 상단에 중성선(2)이 연결되는 중성선 지지구(3)를 설치하고, 중성선 지지구(3)의 하측 전주(1)상에 전력선(5)이 연결되는 다수의 애자(7)가 구비된 완금(6)을 이격설치하되,A plurality of insulators 7 having a neutral wire support 3 to which the neutral wire 2 is connected to an upper end of the pole pole 1, and a power line 5 connected to the lower pole 1 of the neutral wire support 3. ) Is provided with spaced apart complete (6),

하부에 설치되는 애자(7) 및 전력선(5)의 설치상황에 따라 낙뢰시 중성선(2)의 낙뢰보호 차폐각내에 위치되도록 완금(8)을 전력선(5) 및 애자(7)가 있는 쪽으로 편출등의 방법으로 조절 시공하여 차폐각을 유지한다.According to the installation situation of the insulator 7 and the power line 5 installed in the lower part, the incomplete 8 is pushed toward the power line 5 and the insulator 7 so as to be located within the lightning protection shielding angle of the neutral line 2 during a lightning strike. Adjust the construction by the method such as to maintain the shielding angle.

도2a는 랙크가 설치된 핀장주 신공법장주를 도시한 것으로서, 중성선지지구(3)를 랙크(11)로 구성하고, 완금(6)의 상면 일측에는 외주면에 다수의 핀이 돌설된 조류둥지유도핀(9)을 설치한 것이다.Figure 2a is a pinjangju new construction method of the rack is installed, the neutral support (3) consisting of the rack (11), a bird nest induction pin with a plurality of pins on the outer peripheral surface on one side of the top 6 (9) is installed.

도2b는 완금이 설치된 내장주 신공법장주를 도시한 것으로서, 중성선 지지구(3)를 점퍼선이 구비된 완금(8)으로 구성하고, 전력선(5)이 연결된 완금(6)의 상면 일측에 다수의 핀이 돌설된 조류둥지유도핀(9)을 설치한 것이다.Figure 2b shows a built-in jangju construction method installed with a complete, the neutral wire support (3) consisting of a finish (8) with a jumper wire, the power line (5) is connected to a large number on one side of the finish (6) The pins of the tide bird nest guide pin (9) is installed.

도2c는 완금이 설치된 편출핀장주 신공법장주를 도시한 것으로서, 중성선(2)이 연결된 완금(8)과 전력선(5)이 연결된 완금(6)을 전주의 일측으로 편출되게 설치하고, 완금(6)(8)과 전주(1)를 암타이(10)로 지지하며, 하측 완금(6)의 전주(1) 연결부 양측 상면에 조류둥지유도핀(9)(9')을 설치하되, 그 중 일측의 조류둥지유도핀(9)은 퇴치를 또 다른 일측의 조류둥지 유도핀(9')은 유도하는 방법으로 설치하는 것이다.Figure 2c shows the unloading pinjangju new construction method installed with a complete, the complete (8) connected to the neutral wire (2) and the complete (6) connected to the power line (5) to be installed to one side of the pole of Jeonju, complete (6 (8) and the pole (1) to support the arm tie (10), and the bird nest guide pins (9) (9 ') on the upper surface of both sides of the connecting pole (1) of the lower end (6), of which One side of the bird's nest induction pin (9) is to install another way to induce the bird's nest guide pin (9 ').

도2d는 완금이 설치된 편출내장주 신공법장주를 도시한 것으로서 중성선(2)이 연결된 완금(8)과 전력선(5)이 연결된 완금(6)을 전주의 일측으로 편출되게 설치하고, 완금(6)(8)과 전주(1)를 암타이(10)로 지지하며, 하측 완금(6)의 전주(1) 연결부 일측 상면에 조류둥지유도핀(9)을 퇴치를 목적으로 설치하는 것이다.Figure 2d shows the unloading built-in liquor construction method is installed with a fully-completed, the complete (8) connected to the neutral line (2) and the complete (6) connected to the power line (5) to be installed to one side of the pole, the complete (6) (8) and the pole (1) is supported by the arm tie (10), and the bird nest guide pin (9) on the upper surface of one side of the pole (1) connection portion of the lower rim (6) to install the purpose of combating.

상기와 같이 구성된 본 발명의 전주를 이용하여 배전선 가선시 에는 도2a 상단에 랙크(11)나 도2c, 도2d 완금(8)으로 구성되고 도2a 중성선 지지구(3) 도2b 중성선 지지구(3') 또는 도2c 중성선 지지구(3")가 구비되는, 그 하측에 다수의 애자(7)와 조류둥지유도핀(9)(9')이 구비된 완금(6)을 설치하여 구성한 전주(1)를 지면에 다수 설치하고, 상단의 중성선 지지구(3)(3')(3")에는 중성선(2)을 연결하여 가공지선 및 중성선의 역할을 동시에 수행토록하고, 완금(6)상의 애자(7)에는 전력선(5)을 연결하고, 도2a, 도2b 및 도2c, 도2d의 전력선(5)과 애자(7)를 설치하되 도 3에 중성선(2)의 낙뢰보호 차폐각(??)을 벗어나지 않토록 중성선 지지구(3)(3')(3")를 완금(6)과 애자(7)의 형태에 따라 맞추어 시공할수 있는 것을 특징으로 하는 낙뢰보호 및 친환경 기능을 구비한 전주를 이용한 배전공법이다.When the distribution line is wired using the electric pole of the present invention configured as described above, the rack 11, 2c, and 2d in the upper part of Fig. 2a is composed of 8, and Fig. 2a neutral wire support (3) and Fig. 2b neutral wire support ( 3 ') or FIG. 2c neutral pole support (3 "), the pole is provided with a plurality of insulators (7) and a bird (6) provided with a bird nest guide pin (9) (9') A large number of (1) is installed on the ground, and the neutral wire support (3) (3 ') (3 ") at the top is connected to the neutral wire (2) to simultaneously perform the roles of the processing ground wire and the neutral wire, and the completion (6) The power line 5 is connected to the insulator 7 on the upper part, and the power line 5 and the insulator 7 of FIGS. 2A, 2B, 2C, and 2D are installed, but the lightning protection shield angle of the neutral line 2 is shown in FIG. 3. Lightning protection and eco-friendly functions, which can be constructed according to the shape of the complete (6) and insulator (7), neutral wire support (3) (3 ') (3 ") so as not to escape the (??) Boat using electric pole It is a major method.

상기와 같이 구성된 전주를 이용하여 전선을 설치하게 되면, 도1의 도시와 같이 전주(1)의 최상단을 연결하는 중성선(2)이 종래의 가공지선의 역할을 함께 수행하게 되므로 가공지선설치 공사시 소요되는 재료비가 절감됨은 물론, 점퍼선과 전주간의 접촉사고를 방지하고, 편심하중과 비틀림하중을 없애며, 시공이 쉽고도 안전하며 사고위험을 제거할 수 있는 것이다.When the electric wire is installed using the electric pole constructed as described above, since the neutral wire 2 connecting the top end of the electric pole 1 plays the role of the conventional processing ground wire as shown in FIG. In addition to reducing the cost of materials, it prevents contact accidents between jumper wires and poles, eliminates eccentric and torsional loads, and makes construction easier and safer and eliminates the risk of accidents.

또한, 도2a의 도시와 같이 전력선(5)이 설치되는 완금(6)상에 외주면에 다수의 핀이 돌설된 둥지유도핀(9)(9')을 설치하거나, 도2b 및 도2c의 도시와 같이 전력선(5)이 설치되는 완금(6)에 조류둥지유도핀(9)(9')을 설치하고, 중성선 연결부에도 완금(8)에 의한 조류둥지 공간부를 형성하므로서, 정전사고 위험이 없는 안전한 위치에 조류가 둥지를 지을 수 있는 공간을 제공하여 조류를 보호함과 동시에 하단의 전력선 쪽으로 조류둥지 유도핀(9)(9')의 유도 작용으로 외물접촉으로 인한 순간 정전사고 까지 방지할 수 있도록 하는 것이다.In addition, as shown in Fig. 2a, a nest-inducing pin 9, 9 'with a plurality of pins protruding on the outer circumferential surface is provided on the finishing 6, on which the power line 5 is installed, or as shown in Figs. 2b and 2c. By installing the bird nest guide pins (9) and (9 ') in the finishing (6) where the power line (5) is installed, and forming a bird nest space part by the finishing (8) in the neutral wire connection, there is no risk of power failure By providing a space for birds to nest in a safe location, the birds can be protected and at the same time, the bird's nest guide pins (9) and (9 ') can be prevented from momentary power failure due to foreign contact. To ensure that

한편, 본 발명의 전주는 도3의 도시와 같이 전력선(5)이 설치되는 애자(7) 및 완금(6)이 낙뢰시 중성선(2)에 의해 보호받을 수 있는 거리만큼 이격되어 편리하게 조절하여 시공할 수 있으므로 낙뢰 시에도 전력선을 안전하게 보호하므로서 정전사고를 방지할 수 있는 것이다.On the other hand, the electric pole of the present invention as shown in Figure 3, the insulator (7) and the complete 6, the power line 5 is installed is spaced apart by a distance that can be protected by the neutral line (2) during lightning strike and conveniently adjusted Because it can be installed, the power line can be safely protected even during lightning strikes to prevent power outages.

이하, 본 발명의 작용 및 효과를 상세히 설명한다.Hereinafter, the operation and effects of the present invention will be described in detail.

현재의 배전선로는 가공지선과 중선선이 서로 연결되어 공용하고 있어 가공지선에 직격뢰를 받아도 중성선에 직격뢰를 받은 상태와 같으며 전기공학 기술적으로 중성선과 가공지선이 따로 있어야 한다면 가공지선과 중성선의 연결을 분리해야 하고, 모든 접지는 중성선 접지와 가공지선 접지가 분리되어야 한다.The current distribution line is connected to the processing line and the midline, so it is the same as if it is directly hit by the neutral line even if it is directly hit by the processing line. The ground connection shall be disconnected and all grounds shall be separated from the neutral ground and overhead ground.

그러나, 배전선로의 가공지선과 중성선은 형식적으로 역할이 낙뢰보호와 특고압중성선 및 저압중성선으로 역할 분담되어 있지만 사실상 위치만 다르지 전기적으로 병렬 운전하고 있는 것으로서 같은 기능을 하는 동일 전선이 이중으로 설치되어 있는 것이기 때문에 기존의 중성선을 가공지선 위치에 가설하고 가공지선을 중성선으로 대체하여 가공지선과 중성선 겸용으로 선로를 운영하여도 전기 기술상 전혀 문제가 없는 것이다.However, although the processing ground wire and the neutral wire of the distribution line formally share the roles of lightning protection, special high pressure neutral wire, and low pressure neutral wire, they are electrically operated in parallel but differ in their positions. Since the existing neutral line is installed at the processing branch line and the processing branch line is replaced by the neutral line, there is no problem in the electric technology even if the track is operated by the processing line and the neutral line.

그러므로, 현재 배전선로는 가공지선과 중성선은 매전주마다 상호접속되어 공용하고 있어 이중으로 설비가 갖추어진 상태로서 중성선을 가공지선 위치에 가선을 하면 중성선이 가공지선과 중성선 역할을 동시에 함으로서 공사비 원가절감 및 선로의 단순화로 지지물의 하중을 경감시키고 중성선의 지상고 미달등을 해소한다.Therefore, at present, distribution lines and neutral lines are interconnected and shared by every pole, so the facility is doubled. When the neutral line is wired to the processing line position, the neutral line acts as the processing line line and the neutral line to reduce the cost of construction cost. And the simplification of the track reduces the load on the support and eliminates the ground clearance of the neutral wire.

또한, 본 고안은 순간정전 및 일시고장의 43%를 차지하고 있는 까치로 인한 정전사고를 엽사를 동원한 구제 및 인원을 동원하여 까치집을 제거하는 등의 기존방법과는 달리 지능형 환경친화적 배전공법으로서 까치의 특성을 지능적으로 해석하고 까치가 둥지를 틀 때 가장 여건이 좋은 장소를 선택하는 것을 이용하여 중성선에는 접지가 되어 있어 정전사고와는 무관하므로 중성선 겸용 가공지선에 신기술 장주로 시공하여 둥지를 틀 수 있는 환경을 제공하여 주는 것이다.In addition, unlike the existing methods such as blackout accidents caused by magpies, which occupy 43% of momentary power failures and temporary failures, and removal of magpies by mobilizing personnel, the present invention is an intelligent environmentally friendly power distribution method. By intelligently interpreting the characteristics and selecting the most favorable place when the magpie nests, the neutral wire is grounded and irrelevant to the blackout accident. It provides an environment.

또한, 하단 전력선의 장주는 하중이 편심되지 않는 견고한 표준장주로 시공하되 양쪽 가에 있는 상은 점퍼를 하향으로 내리고 가운데 상은 완금의 끝쪽으로 우회하여 시공하고 점퍼선이 우회한 반대쪽으로 둥지유도핀(9)핀을 설치하고 가운데 상의 현수애자 또는 폴리머애자에 B.A.P.(Bird Accident Protect)판을 설치하여 조류의 둥지를 전력선으로부터 접촉을 방지하고 안전한 먼 곳으로 유도하여 만일의 상황에 대비하여 혹시 확률적으로 1%이하에 불과하지만 전력선 부근에서 둥지를 틀어도 정전사고가 발생하지 않도록 미연에 방지하는 것이다.In addition, the poles of the lower power line should be constructed as a solid standard pole which is not eccentric in load, but the phases on both sides will be lowered by the jumper, and the center phase will be constructed by bypassing the end of the finish and the nest guide pin (9) Install a pin and install a BAP (Bird Accident Protect) plate on the suspension or polymer insulator in the middle to prevent the bird's nest from contacting the power line and lead it to a safe place. It is less than%, but it prevents power failure even if nests near power lines do not occur.

또한, 본 발명은 폴리머 현수애자의 개발로 인하여 재사용 가능한 현수애자가 폐기되어 자원낭비 및 환경오염을 부추기고 있어 폐기되는 현수애자를 중성선에 사용하고 또한 이를 이용한 내오손 애자를 개발하여 기존의 내오손애자 대용으로 사용하여 자원의 낭비를 줄이고 자재비 절감과 더불어 자재 품질향상에 기여할 수 있는 것이다.In addition, the present invention is a reusable suspension insulator due to the development of the polymer suspension insulators and is a waste of resources and environmental pollution to encourage the use of discarded suspension insulators in the neutral wire and also to develop a conventional insulator by using the same It can be used as a substitute for insulators, reducing waste of resources, reducing material costs, and improving material quality.

이상과 같이 본 발명은 가공지선과 중성선을 공용으로 사용할 수 있는 전주를 구성하므로서, 중성선으로 가공지선 역할을 겸용하여 공사비 원가절감 및 선로의 단순화로 지지물의 하중을 경감시키고 중성선의 지상고 미달등을 해소함은 물론, 중성선에 친환경적인 조류둥지 조성공간을 제공하고 하단의 전력선에는 조류둥지 유도핀을 설치하여 조류둥지를 전력선에 접촉될 위험이 없는 안전한 곳으로 유도하여 정전사고를 방지하면서도 조류를 보호할 수 있고, 폐기물처리되는 현수애자의 재활용으로 자원을 절약하고 환경오염을 방지할 수 있으며, 보다 편리하고 안전한 낙뢰보호 차폐각의 확보로 낙뢰에 의한 사고를 방지하고, 태풍이나 수해 등의 자연 재해에 대비한 견고한 배전시설물과 외물접촉으로 인한 원인불명 정전사고를 방지할 수 있는 획기적 효과가 있는 것이다.As described above, the present invention constitutes a pole that can be used in common with the processing ground wire and the neutral wire, and serves as the processing ground wire with the neutral wire to reduce the cost of the construction cost and simplify the track, thereby reducing the load of the support and eliminating the ground height of the neutral wire. Of course, it provides environment-friendly bird nesting space on the neutral line and installs bird nest induction pin on the lower power line to guide the bird nest to a safe place where there is no danger of contact with the power line to prevent the power failure and protect birds. It can save resources and prevent environmental pollution by recycling suspended insulators that are disposed of waste, prevent accidents caused by lightning strikes by securing a more convenient and safe lightning protection shield angle, and prepare for natural disasters such as typhoons and floods. It is possible to prevent unknown power failure due to a solid power distribution facility and external contact. It is a miracle that effect.

Claims (6)

전주(1)의 상단에 중성선(2)이 연결되는 중성선 지지구(3)를 설치하고, 중성선 지지구(3)의 하측 전주(1)상에 전력선(5)이 연결되는 다수의 애자(7)가 구비된 완금(6)을 이격설치하되,A plurality of insulators 7 having a neutral wire support 3 to which the neutral wire 2 is connected to an upper end of the pole pole 1, and a power line 5 connected to the lower pole 1 of the neutral wire support 3. ) Is provided with spaced apart complete (6), 낙뢰시 중성선(2)의 낙뢰보호 차폐각내에 애자(7) 및 전력선(5)이 위치되도록 중성선 지지구(3)와 완금(8)을 편리하게 조정하여 설치할 수 있는 것을 특징으로 하는 낙뢰보호 및 조류둥지 공간부를 형성하는 낙뢰보호 및 친환경 기능을 구비한 전주.Lightning protection, characterized in that the neutral wire support (3) and the arm (8) can be conveniently adjusted and installed so that the insulator (7) and power line (5) is located within the lightning protection shield angle of the neutral wire (2) during lightning strikes and Jeonju with lightning protection and eco-friendly functions to form a bird nest space. 제 1 항에 있어서,The method of claim 1, 중성선 지지구(3)를 랙크(11)로 구성하고, 완금(6)의 상면 일측에는 외주면에 다수의 핀이 돌설된 조류둥지유도핀(9)을 설치함을 특징으로 하는 낙뢰보호 및 친환경 기능을 구비한 전주.Lightning protection and eco-friendly function characterized in that the neutral wire support (3) consisting of a rack (11), the bird's nest guide pin (9) with a plurality of pins protruding on the outer peripheral surface on one side of the top (6) Jeonju equipped with. 제 1 항에 있어서,The method of claim 1, 중성선 지지구(3")를 점퍼선이 구비된 완금(8)으로 구성하고, 전력선(5)이 연결된 완금(6)의 상면 일측에 다수의 핀이 돌설된 조류둥지유도핀(9)을 설치함을특징으로 하는 낙뢰보호 및 친환경 기능을 구비한 전주.Neutral wire support (3 ") is composed of a stud 8 with a jumper wire, and a bird nest guide pin (9) with a plurality of pins protruding on one side of the upper surface of the stub (6) to which the power line (5) is connected Jeonju is equipped with lightning protection and eco-friendly functions. 제1 항에 있어서,According to claim 1, 중성선(2)이 연결된 완금(8)과 전력선(5)이 연결된 완금(6)을 전주의 일측으로 편출되게 설치하고, 완금(6)(8)과 전주(1)를 암타이(10)로 연결하며, 하측 완금(6)의 전주(1) 연결부 양측 상면에 조류둥지유도핀(9)(9')을 설치함을 특징으로 하는 낙뢰보호 및 친환경 기능을 구비한 전주.The complete wire (8) to which the neutral wire (2) is connected and the complete wire (6) to which the power line (5) is connected are installed to one side of the pole, and the finish (6) and the pole (1) are transferred to the arm tie (10). A pole equipped with lightning protection and eco-friendly functions, characterized in that the bird nest guide pins (9) (9 ') are installed on both sides of the pole (1) of the lower pole (6). 제1 항에 있어서,According to claim 1, 중성선(2)이 연결된 완금(8)과 전력선(5)이 연결된 완금(6)을 전주의 일측으로 편출되게 설치하고, 완금(6)(8)과 전주(1)를 암타이(10)로 연결하며, 하측 완금(6)의 전주(1) 연결부 일측 상면에 조류둥지유도핀(9)을 설치함을 특징으로 하는 낙뢰보호 및 친환경 기능을 구비한 전주.The complete wire (8) to which the neutral wire (2) is connected and the complete wire (6) to which the power line (5) is connected are installed to one side of the pole, and the finish (6) and the pole (1) are transferred to the arm tie (10). The electric pole with lightning protection and eco-friendly functions, characterized in that the bird nest guide pin (9) is installed on the upper side of the pole (1) connecting portion of the lower end (6). 상단에 랙크(11)나 완금(8) 또는 중성선 지지구(3)(3')(3")가 구비되고, 그 하측에 다수의 애자(7)와 조류둥지유도핀(9)(9')이 구비된 완금(6)을 설치하여 구성한 전주(1)를 지면에 다수 설치하고, 상단의 중성선 지지구(3)(3')(3")에는 중성선(2)을 연결하여 가공지선 및 중성선의 역할을 동시에 수행토록하고, 완금(6)상의 애자(7)에는 전력선(5)을 연결하고, 전력선(5)과 애자(7)를 설치하되, 중성선(2)의 낙뢰보호 차폐각(??)을 벗어나지 않토록 중성선 지지구(3)(3')(3")를 완금(6)과 애자(7)의 형태에 따라 맞추어 시공함을 특징으로 하는 낙뢰보호 및 친환경 기능을 구비한 전주를 이용한 배전공법.A rack 11, a slab 8 or a neutral support 3, 3 ', 3 "is provided at the top, and a plurality of insulators 7 and bird nest guide pins 9, 9' are provided on the lower side thereof. ), A plurality of poles (1) formed by installing the complete (6) provided with the ground, and connecting the neutral wire (2) to the neutral wire support (3) (3 ') (3 "of the upper end of the processing branch line and To perform the role of the neutral wire at the same time, to connect the power line (5) to the insulator (7) on the complete (6), install the power line (5) and insulator (7), the lightning protection shield angle of the neutral line ( Lightning protection and eco-friendly functions characterized by constructing the neutral support (3) (3 ') (3 ") according to the shape of the finish (6) and insulator (7) so as not to deviate. Distribution method using electric pole.
KR1020030010107A 2003-02-18 2003-02-18 Wiring system of electric pole having overhead earth wire combined with neutral line and distributing method using the same KR100725382B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020030010107A KR100725382B1 (en) 2003-02-18 2003-02-18 Wiring system of electric pole having overhead earth wire combined with neutral line and distributing method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030010107A KR100725382B1 (en) 2003-02-18 2003-02-18 Wiring system of electric pole having overhead earth wire combined with neutral line and distributing method using the same

Publications (2)

Publication Number Publication Date
KR20040074721A true KR20040074721A (en) 2004-08-26
KR100725382B1 KR100725382B1 (en) 2007-06-07

Family

ID=37361357

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030010107A KR100725382B1 (en) 2003-02-18 2003-02-18 Wiring system of electric pole having overhead earth wire combined with neutral line and distributing method using the same

Country Status (1)

Country Link
KR (1) KR100725382B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100760680B1 (en) 2005-12-30 2007-09-20 엘지전자 주식회사 Apparatus and method for removing image sticking, and plasma display panel having function of removing image sticking

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101077083B1 (en) * 2010-10-29 2011-10-26 대원전기 주식회사 Multi-cap for installing overrhead earth wire combined with neutral line
WO2014021482A1 (en) * 2012-08-01 2014-02-06 대원전기 주식회사 Power-distribution line having optical-fibre composite neutral wire for communication network construction in overhead neutral ground wire distribution line serving both as overhead ground wire and as extra-high-voltage neutral wire
KR101394095B1 (en) 2014-03-19 2014-05-14 운장전력 주식회사 Wiring system using overhead earth wire combined with neutral line

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000041069A (en) * 1998-12-21 2000-07-15 정재기 Circular grounded electrode of a concrete pole
KR100361201B1 (en) * 1999-05-18 2002-11-18 정재기 Concrete electric pole having inner or outer type earth electrode

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100760680B1 (en) 2005-12-30 2007-09-20 엘지전자 주식회사 Apparatus and method for removing image sticking, and plasma display panel having function of removing image sticking

Also Published As

Publication number Publication date
KR100725382B1 (en) 2007-06-07

Similar Documents

Publication Publication Date Title
CN214887020U (en) Fracturing wellsite system
KR101077083B1 (en) Multi-cap for installing overrhead earth wire combined with neutral line
KR20120133766A (en) Method for installing overhead earth wire which severs as distribution line by earthing every utility pole
KR20040074721A (en) Pro-environmatal electric pole safe from lightening and distributing method using the same
CN110444919A (en) A kind of permanent embedded grounding body of urban distribution network and its construction method
KR101205710B1 (en) Multi-cap for installing overrhead earthwire combined with neutral line
CN102227077A (en) Tower arrangement structure at cable terminal
CN103741588A (en) Precast box girder transverse prestress steel bar mounting structure of plate girder bridge
KR101600240B1 (en) Y-type support to protect structure
CN211666388U (en) Efficient multi-functional transmission of electricity power tower
KR101124965B1 (en) Integral ground manhole structure
CN204871518U (en) A safety device for hull hatch
KR20130014732A (en) Distribution line having optical fiber complex neutral line
KR101238683B1 (en) Slim multi-cap for installing overhead earthwire combined with neutral line having band-type clamp and high strength elastic bar
KR101205711B1 (en) Multicap for intalling overhead neutral earth wire having fixing clamp and flange-type connector
CN208690196U (en) A kind of crane structure with lightning protection function
CN205846395U (en) Lifting vehicle earthing of casing line apparatus
CN205153689U (en) A protection network for site operation transformer
CN207513310U (en) A kind of assembly type security protection cover bar in power plant and station onsite application
CN202004400U (en) Cable terminal support arrangement structure
CN106450824B (en) Grounded screen
CN205135080U (en) Anti -climb signal tower
KR200368828Y1 (en) Horizontal Lightning Rod for Distribution Pole
CN215255023U (en) Lightning protection transmission line steel construction iron tower
GB2476127A (en) Strengthening an antenna tower

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130110

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140102

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20161220

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20171221

Year of fee payment: 12