KR20040064070A - Tunnel water leakage repair method - Google Patents

Tunnel water leakage repair method Download PDF

Info

Publication number
KR20040064070A
KR20040064070A KR1020030001340A KR20030001340A KR20040064070A KR 20040064070 A KR20040064070 A KR 20040064070A KR 1020030001340 A KR1020030001340 A KR 1020030001340A KR 20030001340 A KR20030001340 A KR 20030001340A KR 20040064070 A KR20040064070 A KR 20040064070A
Authority
KR
South Korea
Prior art keywords
tunnel
waterproof
leak
concrete
repair method
Prior art date
Application number
KR1020030001340A
Other languages
Korean (ko)
Inventor
강호경
강영석
이용찬
이창호
Original Assignee
주식회사 케이티
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 케이티 filed Critical 주식회사 케이티
Priority to KR1020030001340A priority Critical patent/KR20040064070A/en
Publication of KR20040064070A publication Critical patent/KR20040064070A/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F11/00Arrangements for sealing leaky tubes and conduits
    • F28F11/02Arrangements for sealing leaky tubes and conduits using obturating elements, e.g. washers, inserted and operated independently of each other
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F2230/00Sealing means

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

PURPOSE: A leakage repair method of a tunnel is provided to minimize the inflow of underground water into a structure and to reduce the repair amount, the repair time and the repair cost by separating the defective portion of a waterproof sheet from the other part of the structure. CONSTITUTION: A drain pipe to guide underground water to a collector well is turned off to seize the leaked position exactly in a concrete tunnel(100). The leaked positions are sequentially checked through a field research(200). Plural waterproof partitions are formed by injecting a waterproof seal between a concrete lining and a waterproof sheet through a circumference of a tunnel section from the initial leaked position(300). A waterproof is performed by injecting the waterproof seal in the leaked position to be separated from the waterproof partitions(400).

Description

터널누수 보수공법{TUNNEL WATER LEAKAGE REPAIR METHOD}Tunnel Leakage Repair Method {TUNNEL WATER LEAKAGE REPAIR METHOD}

본 발명은 콘크리트 터널의 누수를 보수하는 공법에 관한 것으로, 더욱 상세하게는 콘크리트 터널 내에서 발생하는 누수를 보다 근본적으로 방지하는 가운데저렴한 비용과 간단하고도 신속하게 보수할 수 있는 터널누수 보수공법에 관한 것이다.The present invention relates to a method for repairing a leak in a concrete tunnel, and more particularly, to a tunnel leak repair method that can be repaired inexpensively and simply and quickly while preventing a leak occurring in a concrete tunnel more fundamentally. It is about.

일반적으로 터널 방수 공법에는 여러 가지가 있으나 대표적으로는 부직포와 방수시트를 터널 구조물 외곽에 설치하여 지하수가 터널 구조물 내부로 들어오지 못하도록 하는 방법이 대표적이다.In general, there are many ways of tunnel waterproofing, but typically, non-woven fabric and waterproof sheet are installed outside the tunnel structure to prevent groundwater from entering the tunnel structure.

도 1은 일반적으로 암반이 많은 지하에 설치되는 콘크리트 터널의 방수 구조도로서, 터널(1)의 외곽을 이루는 콘크리트 라이닝(2)이 설치되고, 콘크리트 라이닝(2)의 외측으로 방수 목적의 방수시트(3)와 부직포(4)가 설치된다. 그리고 숏크리트(5)의 하면에 유공관(6)이 설치된다. 유공관(6)은 터널이 완공되기 전에 지하수가 구조물에 수압을 가하거나 유입되는 것을 방지하기 위해 지하수를 집수정으로 유도하여 외부로 배출시킬 수 있도록 하는 것으로, 터널이 완공된 후에는 유공관(6)을 잠그는 것이 원칙이나, 실제로는 유공관(6)을 잠글 경우 누수가 발생할 것을 우려하여 유공관(6)을 잠그지 않는 경우가 대부분이다.1 is a waterproof structural diagram of a concrete tunnel generally installed underground with a lot of rock, the concrete lining (2) forming the outer periphery of the tunnel (1) is installed, the waterproof sheet for the purpose of waterproofing to the outside of the concrete lining ( 3) and the nonwoven fabric 4 are installed. And the hole hole 6 is installed in the lower surface of the shotcrete 5. The perforated pipe (6) is to allow the groundwater to be guided to the sump to discharge the groundwater to prevent the groundwater to be applied to the structure or to prevent the inflow before the tunnel is completed, after the tunnel is completed, the perforated pipe (6) The principle is to lock the hole, but in practice, most of the cases in which the hole is not to be locked because the leak occurs when the hole is closed.

상기와 같은 터널의 방수 공법은 시공이 완벽하게 이루어질 경우 방수 성능을 발휘하는데 아무런 문제가 없으나, 현실적으로는 시공 시 여러 가지 요인에 의해 방수시트(3)가 찢어지거나, 방수시트(3)와 방수시트(3)의 접합 시 틈이 생겨 누수가 발생하는 경우가 많이 있다.The waterproofing method of the tunnel as described above has no problem in exhibiting waterproof performance when the construction is completed perfectly, but in reality, the waterproof sheet 3 is torn due to various factors during construction, or the waterproof sheet 3 and the waterproof sheet In the case of joining (3), there are many cases where a leak occurs due to a gap.

이와 같은 이유로 인해 누수가 발생하는 경우 이를 보수하기 위하여 기존에는 누수가 발생하고 있는 부위에 우레탄이나 각종 방수용 씰을 주입하여 누수를 차단하도록 하고 있다. 기존의 공법을 좀 더 자세히 살펴보면, 누수가 발생하고 있는부위의 구조물에 작은 구멍을 뚫고 이 구멍 사이로 우레탄이나 방수 씰을 주입하게 되는데, 이와 같은 방법으로 시공을 하게 되면 일단 구멍이 막혀 지하수가 들어오는 것을 막을 수 있는 것이다.If a leak occurs due to this reason, in order to repair it, the urethane or various waterproof seals are injected into a leaking part to block the leak. If you look at the existing method in more detail, you make a small hole in the structure where the leak occurs and inject a urethane or waterproof seal between the holes. It can be prevented.

하지만 이 공법은 누수가 발생하는 근본 원인인 방수 시트 층의 불량에 대해서는 아무런 대책 없이 단순히 구조물 부위의 결함만을 메꾸게 되어, 일단 한쪽 결함 부위를 메꾼다 해도 지하수가 다른 결함 부위를 통해 구조물 내로 들어오게 되어 있어 보수 공사량이 계속해서 늘어날 수도 있으며, 이에 따라 공사비용도 계속해서 증가하게 되며, 지하수 누수에 의한 피해가 엉뚱한 곳에서 발생하게 되어 예기치 못한 문제를 일으킬 수도 있다. 또한 이와 같은 누수 보수 공법은 장기적으로 보았을 때, 우레탄이나 방수 씰이 콘크리트와의 점착성을 유지하지 못하고 떨어지기 쉬워 처음 누수가 발생했을 때와 마찬가지로 다시 시공을 하여야 하는 문제점이 있었다.However, this method simply fills the defects of the structure part without any countermeasure against the failure of the waterproof sheet layer, which is the root cause of the leak, so that even if one defect part is filled, the groundwater enters the structure through the other defect part. As a result, the amount of repair work may continue to increase, and accordingly, the cost of construction may continue to increase, and damage caused by groundwater leakage may occur in the wrong place, causing unexpected problems. In addition, such a leak repair method has a problem in that in the long term, urethane or waterproof seals do not maintain adhesiveness with concrete and are easy to fall off, so that the construction must be performed again as when the first leak occurs.

따라서 본 발명은 이와 같은 종래의 문제점을 해결하기 위한 것으로, 누수의 근본적인 원인인 방수시트의 결함 부위를 다른 구조물 부위와 격리시켜 지하수가 구조물로 유입될 수 있는 가능성을 최대한 없애고 누수 보수 공사의 공사량과 공사 기간, 공사비용을 단축한 터널누수 보수공법을 제공하는데 그 목적이 있다.Therefore, the present invention is to solve such a conventional problem, to isolate the defect site of the waterproof sheet, which is the root cause of the leak from other structure parts to eliminate the possibility of groundwater flow into the structure as much as possible, The purpose is to provide a tunnel leak repair method that shortens the construction period and cost.

이와 같은 목적을 실현하기 위한 본 발명은 콘크리트 터널의 터널누수 보수공법에 있어서, 상기 콘크리트 터널내에서 누수 발생 위치를 정확히 파악하기 위하여 지하수를 집수정으로 유도하는 유공관을 잠그는 단계와; 상기 유공관을 잠근후, 현장 조사를 통하여 누수가 발생하는 위치를 순서대로 체크하는 단계와; 최초 누수가 발생한 부위부터 일정 구간에 걸쳐서, 방수씰을 콘트리트 라이닝과 방수시트 사이에 터널 단면의 원주를 따라 주입하여 복수의 방수 격벽을 형성하는 단계와; 상기 방수 격벽으로 격리된 구간의 누수 발생 부위에 방수씰을 주입하여 방수를 하는 단계로; 이루어지는 것을 특징으로 하는 터널누수 보수공법을 제공한다.In the tunnel leakage repair method of the concrete tunnel to achieve the above object, the step of locking the perforated pipe leading the groundwater to the sump well in order to accurately identify the location of the leakage in the concrete tunnel; Checking the position of the leak in order through the site survey after locking the perforated pipe; Forming a plurality of waterproof partition walls by injecting a waterproof seal along a circumference of a tunnel cross section between the concrete lining and the waterproof sheet from a site where an initial leak occurs; Injecting a watertight seal into a water leakage generating part of the section separated by the watertight partition wall to waterproof the watertight partition; It provides a tunnel leak repair method, characterized in that made.

도 1은 일반적인 콘크리트 터널의 방수 구조도이고,1 is a waterproof structure diagram of a typical concrete tunnel,

도 2는 본 발명에 따른 콘크리트 터널의 단면도이고,2 is a cross-sectional view of a concrete tunnel according to the present invention,

도 3은 본 발명에 따른 터널누수 보수공법이 시공되는 콘크리트 터널의 개략도이고,3 is a schematic view of a concrete tunnel in which the tunnel leak repair method is constructed according to the present invention;

도 4는 본 발명에 따른 터널누수 보수공법의 공정을 도시한 블록도이다.Figure 4 is a block diagram showing a process of the tunnel leak repair method according to the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

10 : 터널 12 : 콘크리트 라이닝10 tunnel 12 concrete lining

13 : 방수시트 14 : 부직포13: waterproof sheet 14: non-woven fabric

15 : 숏크리트 16 : 유공관15: shotcrete 16: merit pipe

17 : 집수정 20 : 방수격벽17: sump 20: bulkhead

22 : 방수씰22: waterproof seal

이하, 첨부된 도면을 참조하여 본 발명의 일실시 예를 상세하게 설명한다.Hereinafter, with reference to the accompanying drawings will be described an embodiment of the present invention;

도 2는 본 발명에 따른 콘크리트 터널의 단면도이고, 도 3은 본 발명에 따른 터널누수 보수공법이 시공되는 콘크리트 터널의 개략도이고, 도 4는 본 발명에 따른 터널누수 보수공법의 공정을 도시한 블록도이다.Figure 2 is a cross-sectional view of a concrete tunnel according to the present invention, Figure 3 is a schematic diagram of a concrete tunnel in which the tunnel leak repair method according to the present invention, Figure 4 is a block showing the process of the tunnel leak repair method according to the present invention It is also.

먼저, 도 2에 도시된 바와 같이, 터널(10)의 구성은 터널의 외곽을 이루는 콘크리트 라이닝(12)이 설치되고, 콘크리트 라이닝(12)의 외측으로 방수 목적의 방수시트(13)와 부직포(14)가 설치된다. 그리고 부직포(14)의 외측으로 숏크리트(15)가 설치되고 그 하면에는 유공관(16)이 설치된다. 그리고 터널(10)의 양측부에 직교 방향 하부로 집수정(17)이 설치된다. 집수정(17)은 터널(10)의 일정 구간마다 터널(10) 내의 물이 모이는 일종의 우물(井)로서, 이곳에 모인 물은 양수기를 이용하여 밖으로 빼내게 된다.First, as shown in Figure 2, the configuration of the tunnel 10 is a concrete lining 12, which forms the outer periphery of the tunnel is installed, the waterproof sheet 13 and the non-woven fabric for waterproof purposes to the outside of the concrete lining 12 ( 14) is installed. And the shotcrete 15 is provided in the outer side of the nonwoven fabric 14, and the hole hole 16 is installed in the lower surface. And the collecting well 17 is provided in the lower portion orthogonal direction in both side portions of the tunnel (10). The sump 17 is a kind of well where the water in the tunnel 10 collects at certain intervals of the tunnel 10, and the water collected therein is drawn out using a water pump.

상기와 같은 터널에 누수가 발생하면 본 발명에 따른 터널누수 보수공법을 이용한다. 도 4를 참조하면, 누수 발생 위치를 정확히 파악하기 위하여 지하수를 집수정(17)으로 유도하는 유공관(16)을 잠그는 단계와, 유공관(16)을 잠근 후 현장조사를 통하여 누수가 발생하는 위치를 순서대로 체크하는 단계(200)와, 최초 누수가 발생한 부위부터 일정 구간에 차례로 방수씰(22)을 콘트리트 라이닝(12)과 방수시트(13) 사이에 터널 단면의 원주를 따라 주입하여 방수 격벽(20)을 형성하는 단계(300)와, 방수 격벽(20)으로 격리된 구간의 누수 발생 부위에 방수씰(22)을 주입하는 단계(400)로 이루어진다.If a leak occurs in the tunnel as described above, the tunnel leak repair method according to the present invention is used. Referring to Figure 4, in order to accurately identify the location of the leak to lock the perforated pipe 16 leading the groundwater to the sump (17), and after the lock the perforated pipe 16 the location where the leak occurs through the field survey Checking step 200 and the watertight seal 22 is sequentially injected along the circumference of the tunnel section between the concrete lining 12 and the watertight seat 13 in a predetermined section from the site where the first leak occurs. 20) and a step (400) of injecting the watertight seal (22) into the leak generating portion of the section separated by the watertight partition wall (20).

이와 같이 구성된 본 발명에 따른 터널누수 보수공법의 작용은 다음과 같다.The operation of the tunnel leakage repair method according to the present invention configured as described above is as follows.

우선, 터널 구조물 내 누수가 발생할 수 있는 결함 부위를 정확히 파악하기 위하여 유공관(16)을 잠근다. 유공관(16)을 잠근면 유공관(16)을 따라 집수정(17)으로 흘러가던 지하수가 방수시트(13)의 결함부위를 타고 콘크리트 라이닝(12)과 방수시트(13) 사이로 들어가 가장 가까운 구조물 결함 부위를 통해 누수가 발생하게 되며, 유입되는 지하수가 이 빈틈에서 분출될 수 있는 양보다 많을 경우 이 부위를 지나 다음 결함 부위에서 누수가 발생된다. 경우에 따라 구조물의 밀실한 정도에 따라 지하수 누수량이 달라지게 된다. 따라서, 최초로 누수가 발생하는 지점을 확인하거나, 가장 먼저 누수가 발생한 지역을 확인할 수 없을 경우 누수가 최대로 발생하는 지점의 순서를 정한다.First, the perforated pipe 16 is locked in order to accurately identify a defect site in which a leak in the tunnel structure may occur. Surface of the perforated pipe 16 The groundwater flowing along the perforated pipe 16 to the sump well 17 enters between the concrete lining 12 and the waterproof seat 13 through the defective part of the waterproof sheet 13, and the closest structure defect. A leak occurs through the site, and if the incoming groundwater is more than can be ejected from this gap, a leak occurs past this site and at the next defective site. In some cases, the amount of groundwater leakage will vary depending on the tightness of the structure. Therefore, when the first leak is identified or the area where the leak occurs first cannot be identified, the order of the maximum leak is determined.

상기와 같이 누수를 확인함으로써 방수 시트(13)의 결함이 발생한 부위를 예측할 수 있고, 최대로 누수가 발생한 위치를 확인함으로써 구조물의 밀실 정도를 확인할 수 있는 것이다.By confirming the leak as described above, it is possible to predict the site where the defect of the waterproof sheet 13 occurs, and to confirm the tightness of the structure by confirming the position where the leak occurs to the maximum.

그리고 최초로 누수가 발생한 지점을 중심으로 누수가 발생한 지점을 방수 격벽(20)으로 차단한다. 방수격벽(20)은 도 2 및 도 3에 도시된 바와 같이,터널(10) 단면의 원주면을 따라 천공을 다수개 형성하고, 그 천공부를 통하여 방수씰(22)을 주입하면 터널 구조물 외곽의 콘트리트 라이닝(12)과 방수시트(13) 사이에 일종의 격벽층을 형성하게 된다. 상기 최초 방수격벽(20)을 중심으로 길이 방향으로 다수개를 형성시킨다.And the first time the leak occurs around the point where the leak occurs by blocking the waterproof partition wall (20). As shown in FIGS. 2 and 3, the waterproof partition wall 20 forms a plurality of perforations along the circumferential surface of the cross section of the tunnel 10, and when the waterproof seal 22 is injected through the perforated portion, the outside of the tunnel structure is formed. A kind of partition layer is formed between the concrete lining 12 and the waterproof sheet 13. It forms a plurality in the longitudinal direction around the first waterproof partition wall (20).

다수개의 방수격벽(20)을 설치한 후, 일정 시간 바람직하게는 2시간 내지 3시간동안 경과한 누수 진행 상황을 관찰하여, 다음 방수 위치를 선정하게 된다.After the installation of a plurality of waterproof bulkheads 20, the progress of water leakage for a predetermined time, preferably 2 to 3 hours is observed, and the next waterproof location is selected.

이 때, 방수격벽(20)으로 격리가 이루어진 구간 내의 임의 지점에서 콘크리트의 시공 불량 등으로 누수가 발생하는 것으로 확인되면, 그 해당 부위에 방수씰(22)을 주입하여 누수 보수를 한다.At this time, if it is confirmed that the leak occurs due to poor construction of the concrete at any point in the section that is separated by the waterproof partition 20, the waterproof seal 22 is injected into the corresponding portion to repair the leak.

이처럼 일정 구간에 걸쳐 방수가 완료되면 다른 구간으로 이동하여 위와 같은 단계로 공법을 진행하게 된다.As such, when the waterproofing is completed over a certain section, the method moves to another section and proceeds with the above steps.

따라서 누수가 발생하는 부위를 최소한으로 줄여서 방수격벽(20)으로 격리시킨 후, 방수씰(22)을 이용하여 근본적인 누수 원인 부위를 보수하여 누수 보수 공사 비용과 기간을 최대한 단축할 수 있다.Therefore, by reducing the leakage occurs to a minimum to the water barrier bulkhead 20, by using a water-tight seal 22 to repair the area of the underlying leak cause can be reduced the cost and period of the water leak repair construction as possible.

이상, 상기 내용은 본 발명의 바람직한 일실시 예를 단지 예시한 것으로 본 발명의 당업자는 본 발명의 요지를 변경시킴이 없이 본 발명에 대한 수정 및 변경을 가할 수 있음을 인지해야 한다.In the above description, it should be understood that those skilled in the present invention can only make modifications and changes to the present invention without changing the gist of the present invention as merely illustrative of a preferred embodiment of the present invention.

상술한 바와 같이 본 발명에 따른 터널누수 보수공법은, 누수의 근본적인 원인인 방수시트의 결함 부위를 다른 구조물 부위와 격리시켜 지하수가 구조물로 유입될 수 있는 가능성을 최대한 방지하는 공법으로써, 보수 공사의 공사량과 누수 보수비용이 감소되며 시공 기간을 단축하는 효과가 있다.As described above, the tunnel leakage repair method according to the present invention is a method for preventing the possibility of groundwater flowing into the structure by isolating the defective part of the waterproof sheet, which is the root cause of the leak, from other structure parts. The amount of construction and leakage repair cost is reduced, and the construction period is shortened.

Claims (1)

콘크리트 터널의 터널누수 보수공법에 있어서,In tunnel leakage repair method of concrete tunnel, 상기 콘크리트 터널에서 누수 발생 위치를 정확히 파악하기 위하여 지하수를 집수정으로 유도하는 유공관을 잠그는 단계와;Locking the perforated pipe leading the groundwater to the sump to accurately identify the location of the leak in the concrete tunnel; 상기 유공관을 잠근 후, 현장 조사를 통하여 누수가 발생하는 위치를 순서대로 체크하는 단계와;Checking the position of the leak in order through the site survey after locking the perforated pipe; 최초 누수가 발생한 부위부터 일정 구간에 걸쳐서, 방수씰을 콘트리트 라이닝과 방수시트 사이에 터널 단면의 원주를 따라 주입하여 복수의 방수 격벽을 형성하는 단계와;Forming a plurality of waterproof partition walls by injecting a waterproof seal along a circumference of a tunnel cross section between the concrete lining and the waterproof sheet from a site where an initial leak occurs; 상기 방수 격벽으로 격리된 구간의 누수 발생 부위에 방수씰을 주입하여 방수를 하는 단계로; 이루어지는 것을 특징으로 하는 터널누수 보수공법.Injecting a watertight seal into a water leakage generating part of the section separated by the watertight partition wall to waterproof the watertight partition; Tunnel leakage repair method, characterized in that made.
KR1020030001340A 2003-01-09 2003-01-09 Tunnel water leakage repair method KR20040064070A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020030001340A KR20040064070A (en) 2003-01-09 2003-01-09 Tunnel water leakage repair method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030001340A KR20040064070A (en) 2003-01-09 2003-01-09 Tunnel water leakage repair method

Publications (1)

Publication Number Publication Date
KR20040064070A true KR20040064070A (en) 2004-07-16

Family

ID=37354742

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030001340A KR20040064070A (en) 2003-01-09 2003-01-09 Tunnel water leakage repair method

Country Status (1)

Country Link
KR (1) KR20040064070A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105041345A (en) * 2015-08-18 2015-11-11 山东大学 Life-cycle treatment method of water inrush in tunnel
CN113356881A (en) * 2021-07-15 2021-09-07 上海地铁维护保障有限公司工务分公司 Segment deep grouting method for treating tunnel leakage diseases

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105041345A (en) * 2015-08-18 2015-11-11 山东大学 Life-cycle treatment method of water inrush in tunnel
CN105041345B (en) * 2015-08-18 2016-04-06 山东大学 Dash forward water burst life cycle management administering method in a kind of tunnel
CN113356881A (en) * 2021-07-15 2021-09-07 上海地铁维护保障有限公司工务分公司 Segment deep grouting method for treating tunnel leakage diseases

Similar Documents

Publication Publication Date Title
RU2536720C2 (en) Safety element, concrete element and method to make concrete element
KR101925597B1 (en) Underground continuous wall grouting waterproofing method
JP2016173003A (en) Water leakage countermeasure construction method for tunnel constructed using natm construction method
KR101925598B1 (en) Underground continuous wall grouting waterproofing method
KR20080082892A (en) A circular structure supported by the segment with a drainage structure and method constructing the shield tunnel
JP4493699B2 (en) Water-permeable segment and tunnel using this water-permeable segment
JP3753729B1 (en) Tunnel waterproof structure
KR20150040588A (en) Reinforced direct boring attached imbedded bit at head steelpipe and one shot grouting in tunneling method
JP3241344B2 (en) Tunnel waterproof structure and its construction method
KR20040064070A (en) Tunnel water leakage repair method
CN106677821B (en) A kind of pin-connected panel tunnel-liner behind circle draining construction and its implementation method
CN208702422U (en) Shield composite lining water-conveyance tunnel with discharge structure between interior outer lining
KR100901804B1 (en) Tunnel leakage controlling method
KR100454605B1 (en) High-density and pressurization repair method about new/old concrete joint part
KR100701630B1 (en) Center Wall of Two Arch Tunnel
CN112593981B (en) Water leakage treatment method for segment splicing seam of shield section
CN104878772A (en) Treating method for foundation slab leakage of deep foundation pit
JP2002220991A (en) Partition wall installed in main-tunnel shield tunnel and construction method therefor
KR20100042441A (en) Inducing waterproof structure of underground diaphragm wall
JP2002242283A (en) Sealing method for precast member
KR20130122466A (en) Packing unit for grouting well
KR20150048375A (en) Drain Apparatus for Preventing leakage of basement Wall in Multi-Unit dwelling and Establishing method for thereof
JP2002242284A (en) Sealing structure for precast member
KR102593946B1 (en) A two-arch tunnel having a dedicate drainage case inside the upper girder of the central wall and its construction method
KR102207179B1 (en) Reinforced structure of water conveyance tunnel

Legal Events

Date Code Title Description
WITN Withdrawal due to no request for examination