KR20040026071A - Triangle Support Post of Bridge Deck Maintenance and Using Maintenance and Reinforce Method Thereof - Google Patents

Triangle Support Post of Bridge Deck Maintenance and Using Maintenance and Reinforce Method Thereof Download PDF

Info

Publication number
KR20040026071A
KR20040026071A KR1020020056590A KR20020056590A KR20040026071A KR 20040026071 A KR20040026071 A KR 20040026071A KR 1020020056590 A KR1020020056590 A KR 1020020056590A KR 20020056590 A KR20020056590 A KR 20020056590A KR 20040026071 A KR20040026071 A KR 20040026071A
Authority
KR
South Korea
Prior art keywords
bridge
wire
top plate
triangular column
formwork
Prior art date
Application number
KR1020020056590A
Other languages
Korean (ko)
Other versions
KR100463073B1 (en
Inventor
배석동
Original Assignee
배석동
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 배석동 filed Critical 배석동
Priority to KR10-2002-0056590A priority Critical patent/KR100463073B1/en
Publication of KR20040026071A publication Critical patent/KR20040026071A/en
Application granted granted Critical
Publication of KR100463073B1 publication Critical patent/KR100463073B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE: A triangular post for repair and reinforcement of a floor slab is provided to prevent water pollution and to repair and reinforce a floor slab rapidly with low expenses. CONSTITUTION: The triangular post for repair and reinforcement of a floor slab contains a support(11) provided with one or more wire fitting holes and a rail(13), one or more poles(14) coupled to the rail(13) and provided with a roller(15), a height adjust bar(16) coupled to the pole(14) and a reciprocating guide(17), and a roller(18) installed on the lower part of a wire fitting hole.

Description

교량의 상판 보수 보강용 삼각지주와 이를 이용한 교량의 상판 보수 보강 공법{Triangle Support Post of Bridge Deck Maintenance and Using Maintenance and Reinforce Method Thereof }Triangle support post of bridge deck maintenance and using maintenance and reinforce method thereof}

본 발명은 교량의 상판 보수 보강용 삼각지주와 이를 이용한 교량의 상판 보수 보강 공법에 관한 것으로, 특히 교량의 상판을 보수 보강할 때 간편하게 설치 및 해체할 수 있는 삼각지주와, 이러한 지주를 이용하여 교량의 상판을 상판 보수 보강하는 공법에 관한 것이다.The present invention relates to a triangular column for the reinforcement of the upper plate of the bridge and a method for reinforcing the upper plate of the bridge using the same, in particular, a triangular column that can be easily installed and dismantled when reinforcing the upper plate of the bridge, and the bridge using such a pillar It relates to a construction method to reinforce the top plate of the top plate.

주지하는 바와 같이 교량의 상판이 노후화나 과하중 차량의 통행으로 인하여 파손되면 이를 긴급히 보수, 보강하여야 하는 바, 이러한 상판 보수 보강 공법을 첨부한 도면 도 1로 도시하였다.As is well known, if the top plate of the bridge is damaged due to aging or traffic of an overloaded vehicle, it must be urgently repaired and reinforced.

이에 의하면 먼저, 교량 상판(100)의 파손된 부분을 철거하여야 하는 바 이러한 과정에서 발생되는 폐기물이 낙하하여 작업자나 통행차량, 통행인, 주위의 건축물등에 손상을 입히는 등의 위험 발생 요인이 있으며, 폐기물이 수중으로 낙하하는 경우에는 수중 오염의 일 요인이 되는 등의 문제점이 있는 것이다. 또한, 철거된 상판(100) 하측에 거푸집(102)을 설치하되, 거푸집(102)하방에 지지대(101)와 다수의 폴(103)을 설치하여 거푸집(102)이 지지대(101)와 폴(103)에 의하여 지지되도록 하였다.According to this, first, the damaged portion of the bridge top plate 100 has to be demolished. There is a risk factor such as the waste generated in this process falls and damages workers, traffic vehicles, passers-by, surrounding buildings, etc. When falling into this water, there is a problem such as being a cause of water pollution. In addition, the formwork 102 is installed on the lower side of the demolition top plate 100, but the support 102 and the plurality of poles 103 are installed below the formwork 102 to support the support 101 and pole ( 103).

이어서 철거된 부분에 철근(104)을 배설하거나 보수하고 콘크리트를 타설 양생한 다음, 폴(103)과 거푸집(102), 지지대(101)을 철거하는 것이다.Subsequently, the reinforcement 104 is excreted or repaired in the demolished portion, and the concrete is poured and cured, and then the pole 103, the formwork 102, and the support 101 are removed.

그러므로 상판(100)을 보수 보강하기 위하여 다수의 폴(103)들을 설치하고 해체하는데 많은 시간과 노력이 필요하여 이에 따라 작업공정이 더디게 됨과 아울러 비용이 상승되는 문제와, 거푸집(102)을 설치하기 전에 상판(100)의 손상된 부분을 철거하는 과정에서 나오는 콘크리트 조각들을 회수하는데 많은 시간과 비용이 소요되며, 일부는 하천으로 떨어져 수중 환경을 오염시키는 등의 문제가 있으며, 시공된 다수개의 폴(103)중 어느 하나가 쓰러지거나 위치 이탈되는 경우 커다란 위험이 발생할 뿐만 아니라, 거푸집(102)을 지지하는 구조가 흐트러져 양호한 보수 시공 상태를 얻을 수 없게 되는 문제점이 있는 것이다.Therefore, a lot of time and effort is required to install and dismantle the plurality of poles 103 in order to repair and reinforce the top plate 100, thus slowing down the work process and increasing the cost, and installing the formwork 102. It takes a lot of time and money to recover the concrete fragments coming from the process of removing the damaged portion of the top plate 100, and some fall into the river to contaminate the underwater environment, such as a plurality of poles 103 If any one of the collapsed or out of position is not only a great risk occurs, there is a problem that the structure supporting the formwork 102 is disturbed to obtain a good repair condition.

본 발명의 목적은 상기와 같은 종래의 문제를 감안하여 파손된 교량의 상판을 보수 보강할 때 거푸집을 지지하는 지주가 안전하고 용이하게 설치될 수 있도록 하고, 철거되는 콘크리트 조각들을 용이하게 회수할 수 있도록 함으로써, 교량 상판의 상판 보수 보강 작업을 저렴한 비용으로 용이하게 하며, 수중 환경을 오염시키지 않는 교량의 상판 보수 보강용 삼각지주와 이를 이용한 교량의 상판 보수 보강 공법을 제공함에 있다.It is an object of the present invention to provide a support for formwork safely and easily when repairing and reinforcing a deck of a damaged bridge in view of the conventional problems as described above, and to easily recover the pieces of concrete to be removed. In this way, the top plate reinforcement work of the bridge top plate can be easily carried out at low cost, and to provide a triangular column for the top plate reinforcement reinforcement of the bridge that does not pollute the underwater environment, and to provide a top plate reinforcement method of the bridge using the same.

도 1은 종래 교량의 상판 보수 보강 공법을 도시한 설명도.1 is an explanatory diagram showing a top plate repair reinforcing method of a conventional bridge.

도 2는 본 발명에 사용되는 상판 보수용 삼각지주를 도시한 설명도.Figure 2 is an explanatory diagram showing the upper plate for maintenance triangular column used in the present invention.

도 3 내지 도 4는 본 발명에 의한 삼각지주에 의하여 교량 상판 보수 보강공정을 도시한 설명도.3 to 4 is an explanatory view showing the bridge top plate reinforcement step by the triangular column according to the present invention.

*도면의 주요 부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

10 : 삼각지주 11 : 받침대 12 : 와이어 삽입공10: tripod 11: pedestal 12: wire insertion hole

13 : 레일 14 : 폴 15,18 : 로울러13: rail 14: pole 15,18: roller

16 : 높이조절봉 17 : 가이드 19 : 교량16: height adjustment rod 17: guide 19: bridge

20 : 교각 21 : 거더 22 : 상판20: pier 21: girder 22: top plate

23 : 거푸집 24 : 지지대 25 : 와이어23 formwork 24 support 25 wire

26 : 철근26: rebar

이러한 목적을 달성하기 위한 본 발명은 교량 상판의 하측에 거푸집을 대고 이를 지지하도록 하되, 받침대에 하나 이상의 와이어 삽입공과 레일을 형성하고, 상기 레일에 결합되어 슬라이드되는 로울러를 폴의 상측에 형성하며, 높이조절봉의 가이드가 상기 폴에 결합되어 승, 하강되도록 하는 삼각지주를 제안한다.The present invention for achieving this object is to form a support on the lower side of the bridge top plate and to support it, to form at least one wire insertion hole and rail on the pedestal, and to form a roller coupled to the rail slides on the upper side of the pole, A guide of the height adjustment rod is coupled to the pole to propose a triangular support to be raised, lowered.

또한, 이러한 삼각지주를 교량 상판의 하측에 설치하고 상기 상판의 상측에 지지대를 설치한 다음, 와이어로 삼각지주와 지지대를 연결하며, 파손된 상판의 해당 부위를 철거한 후 철근을 보수, 배설하고 콘크리트를 타설 양생하여서 되는 삼각지주를 이용한 교량의 상판 보수 보강 공법을 제안한다.In addition, the triangular girder is installed on the lower side of the bridge top plate, and the support is installed on the upper side of the top plate, and then the triangular girdle and the support are connected by wire, and after removing the corresponding part of the damaged top plate, repair and excrete the reinforcing bars. We propose a repair and reinforcement method for the tops of bridges using a triangular column that is made by pouring concrete.

이에 따라 본 발명은 파손된 교량의 상판을 신속하게 보수, 보강함은 물론, 철거되는 콘크리트 조각들을 신속하게 회수할 수 있어 교량의 상판 보수, 보강 작업이 용이하고 비용이 저렴하며 수중 환경의 오염을 방지한다.Accordingly, the present invention can not only quickly repair and reinforce the top plate of the damaged bridge, but also quickly recover the demolished concrete pieces so that the top plate repair and reinforcement of the bridge is easy and inexpensive, and the pollution of the underwater environment is avoided. prevent.

상기와 같은 본 발명의 구성 및 작용을 첨부한 도면에 의거 상세히 설명하면 다음과 같다.Referring to the configuration and operation of the present invention as described above in detail as follows.

도 2는 본 발명에 의한 삼각지주를 도시한 설명도이고, 도 3 내지 도 4는 본 발명에 의한 삼각지주에 의하여 교량을 상판 보수 보강하는 공정을 도시한 설명도이다.2 is an explanatory diagram showing a triangular brace according to the present invention, and FIGS. 3 to 4 are explanatory diagrams showing a step of repairing and reinforcing a bridge by a triangular brace according to the present invention.

본 발명은 받침대(11)에 하나 이상의 와이어 삽입공(12)을 형성하고 상기 받침대(11)의 저면에 레일(13)을 형성하며, 상기 받침대(11)에 결합되는 하나 이상의 폴(14)을 형성하되, 상기 폴(14)의 상측 단부에 로울러(15)를 형성하고, 이러한 로울러(15)가 레일(13)에 결합되어 습동되도록 한다.The present invention forms one or more wire insertion holes 12 in the pedestal 11 and the rail 13 on the bottom of the pedestal 11, the one or more poles 14 coupled to the pedestal 11 The roller 15 is formed at the upper end of the pawl 14, and the roller 15 is coupled to the rail 13 to slide.

아울러 폴(14)에 결합되어 승, 하강되는 가이드(17)가 양측에 형성된 높이조절봉(16)을 형성하여 삼각지주를 구비하며, 이때 와이어 삽입공(12) 하측에 로울러(18)를 설치할 수 있다.In addition, the guide 17, which is coupled to the pole 14, is raised and lowered to form a height adjustment rod 16 formed on both sides to have a triangular circumference, and at this time install a roller 18 under the wire insertion hole 12 Can be.

이러한 삼각지주(10)를 이용하여 파손된 교량(19)의 상판(19)을 상판 보수 보강하는 공법은 먼저, 교량(19)의 파손된 상판(22) 해당 부위 상측에 지지대(24)를 설치하고 상기 상판(22)의 하측에 삼각지주(10)를 설치하며 삼각지주(10)의 상측에 거푸집(23)을 설치하는 공정과, 높이조절봉(16)과 폴(14)의 상측에 각각 와이어(25)의 일측을 체결하고 상기 와이어(25)의 타측은 와이어 삽입공(12)에 삽입 관통시킨후 지지대(24)에 체결하는 공정과, 와이어(25)를 당겨 삼각지주(10)의 상측과 거푸집(23)을 상승시키고 상판(22)의 파손된 부분을 철거하는 공정과, 철거시킨 폐기물이 거푸집(23)위에 놓여져 있으므로 안정하게 들어 내어 외부로 반출시킴으로써 폐기물 낙하로 인한 위험의 발생이나 수중 오염을 방지하면서 폐기물을 제거하는 공정과, 와이어(25)를 더욱 당겨 삼각지주(10)의 상측과 거푸집(23)이 상승하여 보수 보강될 상판 해당 부분의 하부에 밀착 고정시키는 공정과, 상판의 보수 보강될 부분에 철근(26)을 배설하거나 보수, 보강하고 콘크리트를 타설 양생하는 공정과, 양생 완료후 와이어(25)를 절단하고 지지대(24)를 철거하는 공정과, 노면포장 후 삼각지주(10)와 거푸집(23)을 철거하는 공정으로 된다.In the method of repairing the upper plate 19 of the damaged bridge 19 using the triangular column 10, the support plate 24 is first installed on an upper portion of the damaged upper plate 22 of the bridge 19. And installing the triangular column 10 on the lower side of the upper plate 22 and the step of installing the formwork 23 on the upper side of the triangular column 10, respectively, on the upper side of the height adjustment rod 16 and the pole 14 Fastening one side of the wire 25 and the other side of the wire 25 is inserted into the wire insertion hole 12 and then fastened to the support 24, and pulling the wire 25 of the triangular column 10 Raising the upper side and the formwork 23 and removing the damaged part of the top plate 22, and since the demolished waste is placed on the formwork 23, it stably lifts it out and takes it out to the outside. Process of removing waste while preventing water pollution, and by pulling wire 25 further, triangle (10) the upper side and the formwork (23) is raised and fixed to the lower portion of the upper part of the upper part to be repaired reinforcement, and the reinforcing bar 26 to the part to be repaired and reinforced, the reinforcement (26) to pour concrete And a step of cutting the wire 25 and removing the support 24 after completion of curing, and a step of removing the triangular column 10 and the formwork 23 after the road surface packaging.

이러한 공정을 보다 상세하게 설명하면, 먼저 교량(19)의 상판(22)에 파손된 부분이 있을 경우, 상기 파손된 부분의 상측에 지지대(24)를 설치하고, 하측에 하나 이상의 삼각지주(10)를 설치한다.In more detail, this process will be described in detail. First, when there is a broken portion in the upper plate 22 of the bridge 19, a support 24 is installed above the broken portion, and at least one triangular column 10 is disposed below. Install).

이때 삼각지주(10)는 일정 간격으로 배열하고, 폴(14) 하단은 교각(20)이나 거더(21)에 고정시키며, 받침대(11)에 거푸집(23)을 설치한다.At this time, the triangular column 10 is arranged at regular intervals, the lower end of the pole 14 is fixed to the piers 20 or girders 21, the formwork 23 is installed on the pedestal (11).

이어서 높이조절봉(16)과 폴(14)의 상측에 각각 와이어(25)의 일측을 체결하고, 상기 와이어(25)의 타측은 와이어 삽입공(12)에 삽입 관통시킨 후 지지대(24)에 체결한 다음, 와이어(25)를 잡아 당겨 거푸집(23)과 삼각지주(10)의 상측이 상판(22)측으로 승강되도록 한다.Subsequently, one side of the wire 25 is fastened to the upper side of the height adjusting rod 16 and the pawl 14, and the other side of the wire 25 is inserted through the wire insertion hole 12 and then to the support 24. After fastening, the wire 25 is pulled so that the upper side of the formwork 23 and the triangular column 10 is elevated to the upper plate 22 side.

이때, 승강되는 높이는 상판(22)을 철거하는데 지장이 없으며 콘크리트 조각들이 다른 곳으로 떨어지지 않고 거푸집(23)으로 모두 떨어질 수 있는 정도의 적당한 높이로 한다.At this time, the height of the lifting is not a problem to dismantle the top plate 22, and the concrete pieces to a suitable height that can fall to the formwork 23 without falling to other places.

이어서 파손된 상판(22)을 철거하고 거푸집(23)으로 떨어진 콘크리트 조각들을 모두 회수하여 안전하게 폐기한 다음, 와이어(25)를 더욱 당겨 거푸집(23)과 삼각지주(10)의 상측이 상판(22)의 상판 보수 보강될 부분 하측에 완전 밀착되도록 하여 고정시키며, 이어서 상판 보수 보강될 부분에 철근을 배설, 보수, 보강하고 콘크리트를 타설 양생시킨다.Subsequently, the damaged top plate 22 is demolished and all the pieces of concrete dropped to the formwork 23 are recovered and disposed of safely. Then, the upper side of the formwork 23 and the triangular column 10 is pulled further to the top plate 22. The top plate is to be fixed so as to be in close contact with the lower part of the reinforcement part, and then the reinforcing bar is excreted, repaired and reinforced, and the concrete is cured.

이와 같이 하여 콘크리트의 양생이 완료되면 와이어(25)를 절단하여 제거하고 지지대(24)를 철거하며, 와이어(25)로 인하여 콘크리트가 타설되지 못한 부분을 콘크리트나 모르타르로 메꾸고, 이어서 노면으로 포장한 후 삼각지주(10)와 거푸집(23)을 철거한다.When the curing of the concrete is completed in this way, the wire 25 is cut and removed, and the support 24 is demolished, and the portion where concrete is not poured due to the wire 25 is filled with concrete or mortar, and then paved with road surface. After removing the triangular column (10) and formwork (23).

이러한 본 발명은 상판(22)의 일부분을 보수, 보강함에 있어서, 종래의 것과 같이 다수의 폴을 설치하고 이러한 폴이 쓰러지지 않도록 서로 연결하여 결속시키는 불편함 없이, 단지 대략 3∼4개 정도의 삼각지주(10)를 일정 간격으로 배열하고 그 위에 거푸집(23)을 설치하면 되므로 거푸집(23)을 지지하는 수단의 가설이 용이하고, 삼각지주(10)의 높이를 필요에 따라 자유자재로 조절할 수 있어 작업이 용이하며, 파손된 상판(22)의 철거시 나오는 콘크리트 조각들이 다른 곳으로 떨어지지 않고 전량 거푸집(23)으로 떨어져 회수가 가능하므로 작업의 안전성 및 편리성이 증진되고 수중 환경의 오염이 방지된다.In the present invention, in repairing and reinforcing a part of the upper plate 22, a triangular of only about 3 to 4 pieces is provided without the inconvenience of installing a plurality of poles and connecting them to each other so that the poles do not fall as in the prior art. Arrange the struts 10 at regular intervals and install the formwork 23 thereon, so that the construction of the means for supporting the formwork 23 is easy, and the height of the tripod 10 can be freely adjusted as necessary. Since it is easy to work, and the concrete pieces coming out of the demolition of the damaged top plate 22 can be recovered by falling into the formwork 23 without falling to other places, the safety and convenience of the work is enhanced and the pollution of the underwater environment is prevented. do.

상기와 같은 본 발명은 받침대에 와이어 삽입공과 레일을 형성하고, 상기 레일에 결합되어 슬라이드되는 로울러를 폴에 형성하며, 높이조절봉의 가이드가 상기 폴에 결합되어 승, 하강되도록 하는 삼각지주를 구비하고, 이러한 삼각지주를 교량 상판의 하측에 설치하고 상기 상판의 상측에 지지대를 설치한 다음, 와이어로 삼각지주와 지지대를 연결하며, 파손된 상판을 철거한 후 철근을 배설하고 콘크리트를 타설 양생하여서 교량의 상판을 상판 보수 보강하는 것으로, 상판 철거시 나오는 콘크리트 조각들 전량을 용이하게 회수할 수 있어 수중의 환경이 오염되는 것을 방지할 수 있음은 물론, 삼각지주와 거푸집의 설치 및 해체가 용이하여 저렴한 비용으로 신속하게 교량의 상판을 상판 보수 보강할 수 있는 등의 유용한 효과가 있다.The present invention as described above forms a wire insertion hole and a rail in the pedestal, the roller is coupled to the rail to form a roller, and the triangular column to the guide of the height adjustment rod is coupled to the pole to move up and down Install the tripod on the lower side of the bridge top plate, and install the support on the top side of the top plate, connect the tripod and the support with wires, remove the broken top plate, excrete the reinforcing bars and pour concrete to bridge the bridge. By reinforcing and repairing the top plate, it is possible to easily recover the entire amount of concrete fragments coming out of the top plate, preventing pollution of the underwater environment, and easy to install and dismantle the delta and formwork. There is a useful effect such that the top plate of the bridge can be quickly repaired and reinforced at a cost.

Claims (3)

교량(19)의 상판(22)을 보수, 보강하기 위하여 상판(22)의 하측에 다수의 폴을 설치되어 상판(22)을 지지하도록 한 공지의 것에 있어서,In the known one in which a plurality of poles are provided below the upper plate 22 to support and repair the upper plate 22 in order to repair and reinforce the upper plate 22 of the bridge 19, 하나 이상의 와이어 삽입공(12)이 형성되고 저면에 레일(13)이 형성된 받침대(11)와, 상기 레일(13)에 결합되어 습동되는 로울러(15)가 상측 단부에 형성된 하나 이상의 폴(14)과, 상기 폴(14)에 결합되어 승, 하강되는 가이드(17)가 양측에 형성된 높이조절봉(16)으로 구성됨을 특징으로 하는 교량의 상판 보수 보강용 삼각지주.At least one pole 14 having at least one wire insertion hole 12 formed therein and a base 11 having a rail 13 formed on its bottom surface, and a roller 15 coupled to the rail 13 and sliding at an upper end thereof. And, coupled to the pole 14, the guide plate 17 is raised and lowered, the upper plate maintenance reinforcement of the bridge characterized in that consisting of a height adjustment rod (16) formed on both sides. 제 1 항에 있어서,The method of claim 1, 와이어 삽입공(12) 하측에 로울러(18)를 설치함을 특징으로 하는 교량의 상판 보수 보강용 삼각지주.A triangular column for repairing and reinforcing the upper plate of a bridge, wherein a roller 18 is provided below the wire insertion hole 12. 교량(19)의 상판(22)파손 부위 상측에 지지대(24)를 설치하고 상기 상판(22)의 파손 부위 하측에 삼각지주(10)를 설치하며 삼각지주(10)의 상측에 거푸집(23)을 설치하는 공정과, 높이조절봉(16)과 폴(14)의 상측에 각각 와이어(25)의 일측을 체결하고 상기 와이어(25)의 타측은 와이어 삽입공(12)에 삽입 관통시킨 후 지지대(24)에 체결하는 공정과, 와이어(25)를 당겨 삼각지주(10)의 상측과 거푸집(23)을 상승시키고 상판(22)의 파손된 부분을 철거하는 공정과, 손상 부위의 철거과정에서 폐기물이 상판(22)위에 낙하하고, 이를 안전하게 외부로 반출하는 공정과,와이어(25)를 당겨 삼각지주(10)의 상측과 거푸집(23)을 상판 보수 보강될 부분의 하부에 밀착 고정시키는 공정과, 상판 보수 보강될 부분에 철근(26)을 배설, 보수, 보강하고 콘크리트를 타설한후 양생하는 공정과, 와이어(25)를 절단하고 지지대(24)를 철거하는 공정과, 노면포장 후 삼각지주(10)와 거푸집(23)을 철거하는 공정으로 됨을 특징으로 하는 삼각지주를 이용한 교량의 상판 보수 보강 공법.The support plate 24 is installed above the damaged part of the upper plate 22 of the bridge 19, and the triangular column 10 is installed below the damaged part of the upper plate 22, and the formwork 23 is disposed above the triangular column 10. The process of installing the, and fastening the one side of the wire 25 to the upper side of the height adjustment rod 16 and the pole 14, respectively, the other side of the wire 25 is inserted through the wire insertion hole 12 and then the support In the process of fastening to (24), the process of pulling up the wire (25) to raise the upper side of the triangular column (10) and the formwork (23) and to remove the damaged portion of the upper plate 22, and the process of removing the damaged site A process of dropping the waste onto the top plate 22 and safely transporting it to the outside; and pulling the wire 25 to fix the upper side of the triangular column 10 and the formwork 23 to the bottom of the portion to be reinforced with the top plate. And, the process of excreting, repairing, reinforcing the reinforcing bar 26 in the portion to be repaired reinforcement of the top plate and pouring after curing the concrete, Repairing the top plate of the bridge using a triangular column, characterized in that the step of cutting the wire 25 and removing the support 24, and the process of removing the triangular column (10) and the formwork (23) after the road surface packaging.
KR10-2002-0056590A 2002-09-17 2002-09-17 Triangle Support Post of Bridge Deck Maintenance and Using Maintenance and Reinforce Method Thereof KR100463073B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2002-0056590A KR100463073B1 (en) 2002-09-17 2002-09-17 Triangle Support Post of Bridge Deck Maintenance and Using Maintenance and Reinforce Method Thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2002-0056590A KR100463073B1 (en) 2002-09-17 2002-09-17 Triangle Support Post of Bridge Deck Maintenance and Using Maintenance and Reinforce Method Thereof

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0029075U Division KR200337850Y1 (en) 2003-09-09 2003-09-09 Triangle Support Post of Bridge Deck Maintenance

Publications (2)

Publication Number Publication Date
KR20040026071A true KR20040026071A (en) 2004-03-27
KR100463073B1 KR100463073B1 (en) 2004-12-23

Family

ID=37328641

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2002-0056590A KR100463073B1 (en) 2002-09-17 2002-09-17 Triangle Support Post of Bridge Deck Maintenance and Using Maintenance and Reinforce Method Thereof

Country Status (1)

Country Link
KR (1) KR100463073B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101413240B1 (en) * 2012-11-08 2014-06-27 구근회 Three Dimensions STRUCTURE
CN113550233A (en) * 2021-08-20 2021-10-26 南通路桥工程有限公司 Triangular bracket structure for bridge and construction method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101711890B1 (en) * 2016-08-09 2017-03-03 이혁준 Bridge demolition apparatus

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3171627A (en) * 1962-04-19 1965-03-02 Union Metal Products Inc Extensible shoring device
GB1297040A (en) * 1969-08-15 1972-11-22
JPS5121328A (en) * 1974-08-15 1976-02-20 Toyo Seisakusho Kk KYORYOYOKONKURIITOCHIKATAWAKUKOSETSUHOHOOYOBISOCHI
JPS5613379Y2 (en) * 1975-08-15 1981-03-28
JPS5930460U (en) * 1982-08-23 1984-02-25 旭化成株式会社 ALC version opening reinforcement frame for construction
JPH042274Y2 (en) * 1984-12-18 1992-01-27
US4880203A (en) * 1988-10-19 1989-11-14 Holcomb Grove R Adjustable form brace
US5085398A (en) * 1988-10-19 1992-02-04 Holcomb Grove R Adjustable form brace
US5271596A (en) * 1988-10-19 1993-12-21 Holcomb Grove R Method and apparatus for bracing elevated concrete forms
JP3047208B2 (en) * 1994-11-11 2000-05-29 三井造船株式会社 Floor slab reinforcement structure
JP2671199B2 (en) * 1995-07-26 1997-10-29 ショーボンド建設株式会社 Bridge floor slab dismantling method and device
JP3469527B2 (en) * 1999-08-30 2003-11-25 英敏 森岡 Shoring for fixed formwork on concrete floor slab
KR100544318B1 (en) * 2002-06-18 2006-01-23 (주) 선암기술연구소 Corrugated Board Type Deck Plate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101413240B1 (en) * 2012-11-08 2014-06-27 구근회 Three Dimensions STRUCTURE
CN113550233A (en) * 2021-08-20 2021-10-26 南通路桥工程有限公司 Triangular bracket structure for bridge and construction method thereof

Also Published As

Publication number Publication date
KR100463073B1 (en) 2004-12-23

Similar Documents

Publication Publication Date Title
CN107090975B (en) Formwork erecting construction method for ultrahigh large-span concrete cast-in-place beam bailey truss
JP5047680B2 (en) Construction method of continuous viaduct
KR100949601B1 (en) Method for broadening width of existing bridge without Temporary road
CN110682433A (en) Prefabricated stand column construction scheme
KR20110127629A (en) Hanger type temporary resources for cantilever and method for construction of cantilever part of bridge using the temporary resources
KR100556219B1 (en) A method for changing plate-girder bridge of railway bridge into slab bridge by using temporary construction bents.
CN109594581B (en) River-crossing pipeline structure and installation method thereof
KR102227878B1 (en) Construction Method of Long Span Bridge Using PSC Girder
KR101082418B1 (en) mold apparatus for forming concrete slab of bridge
KR100892751B1 (en) Bridge repairng method by upper structure lifting and hinge typeed temporary bridge construction
KR101701220B1 (en) Road expansion structure and construction method thereof
KR100463073B1 (en) Triangle Support Post of Bridge Deck Maintenance and Using Maintenance and Reinforce Method Thereof
CN110424746B (en) Method for installing roof truss and pavement in venue
CN106592438A (en) Two-column pier and middle tie beam construction method employing integral movement of trusses
CN114457708B (en) Construction method for dismantling bracket system of expressway widening overpass group
KR200337850Y1 (en) Triangle Support Post of Bridge Deck Maintenance
KR20120117363A (en) The installation and dismantlement method of main girder for bridge temporary
KR100377868B1 (en) pier construction method using Pier scaffolding
CN113235470A (en) Large-radian overflow surface complex-structure reinforced concrete bridge and demolition method
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
JP7134133B2 (en) Bridge railing construction method
KR910007424B1 (en) Method for construction t - beam on the bridge
CN208858150U (en) A kind of close rib building roof mold
KR100729842B1 (en) Repair work of railroad bridge and that structure
KR200402793Y1 (en) Rail and roller Type device for hanging scaffold of bridge slab

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120613

Year of fee payment: 8

LAPS Lapse due to unpaid annual fee