KR200376613Y1 - Joint structure for unit pannel of underground new diaphragm wall - Google Patents

Joint structure for unit pannel of underground new diaphragm wall Download PDF

Info

Publication number
KR200376613Y1
KR200376613Y1 KR20-2004-0034160U KR20040034160U KR200376613Y1 KR 200376613 Y1 KR200376613 Y1 KR 200376613Y1 KR 20040034160 U KR20040034160 U KR 20040034160U KR 200376613 Y1 KR200376613 Y1 KR 200376613Y1
Authority
KR
South Korea
Prior art keywords
plate
unit
bars
main beam
connection structure
Prior art date
Application number
KR20-2004-0034160U
Other languages
Korean (ko)
Inventor
박길석
Original Assignee
박길석
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박길석 filed Critical 박길석
Priority to KR20-2004-0034160U priority Critical patent/KR200376613Y1/en
Application granted granted Critical
Publication of KR200376613Y1 publication Critical patent/KR200376613Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

본 고안은 차단 플레이트 사이의 중간위치에 내부공간을 구획하는 메인 빔이 위치되고, 각 측면 위치에는 빔 플레이트가 탈부착 가능하게 설치되며, 상기 차단 플레이트와 빔 플레이트가 형성하는 내부공간 안쪽에 보강 철근이 설치된 구조로 조립 구성된 지하연속벽 시공을 위한 단위 판넬간 연결구조체에 관한 것이다. 이러한 본 고안의 각 연결구조체를 단위 판넬간 연결부 위치에 설치한 뒤, 그 측면을 구성하는 빔 플레이트를 제거하고, 이어 빔 플레이트의 제거로 개방되는 연결구조체의 내부공간과 단위 판넬의 시공 공간에 걸쳐 철근망을 설치한 다음, 상기 공간에 콘크리트를 함께 타설하게 되면, 단위 판넬 및 연결구조체가 철근망 및 콘크리트에 의해 일체가 될 수 있게 된다.In the present invention, the main beam partitioning the inner space is located at an intermediate position between the blocking plates, and the beam plate is detachably installed at each side position, and reinforcing bars are provided inside the inner space formed by the blocking plate and the beam plate. The present invention relates to an inter-panel connection structure for the construction of underground continuous walls constructed of installed structures. After installing each connecting structure of the present invention at the position between the unit panels, the beam plate constituting the side is removed, and then the inner space of the connecting structure opened by the removal of the beam plate and the construction space of the unit panel. After installing the reinforcing bar network, when concrete is poured together in the space, the unit panel and the connecting structure can be integrated by the reinforcing bar network and concrete.

이와 같이 본 고안에 의하면, 각 단위 판넬들이 상기 연결구조체를 매개로 구조적으로 일체화 될 수 있는 바, 토압 등 외력작용에 의해 각 단위 판넬이 서로 다르게 거동하는 종래의 구조적 문제점을 해소할 수 있게 된다. 또한, 시공 후 차단 플레이트가 단위 판넬간 연결부위를 완전 밀폐시키므로 종래와 같은 단위 판넬간 연결부위의 누수문제 및 그로 인한 결로문제 등이 해결될 수 있다.Thus, according to the present invention, each unit panel can be structurally integrated through the connection structure bar, it is possible to solve the conventional structural problem that each unit panel behaves differently by external force action such as earth pressure. In addition, since the blocking plate completely seals the connection portions between the unit panels after construction, leakage problems and condensation problems due to the connection portions between the unit panels as described above can be solved.

Description

지하연속벽 시공을 위한 단위 판넬간 연결구조체{Joint structure for unit pannel of underground new diaphragm wall} Joint structure for unit pannel of underground new diaphragm wall}

본 고안은 지하연속벽 시공을 위한 단위 판넬간 연결구조체에 관한 것으로서, 더욱 상세하게는 차단 플레이트 사이의 중간위치에 내부공간을 구획하는 메인 빔이 위치되고, 각 측면 위치에는 빔 플레이트가 탈부착 가능하게 설치되며, 상기 차단 플레이트와 빔 플레이트가 형성하는 내부공간 안쪽에 보강 철근이 설치된 구조의 지하연속벽 시공을 위한 단위 판넬간 연결구조체에 관한 것이다.The present invention relates to the inter-panel connection structure for the construction of the continuous continuous wall, more specifically, the main beam is partitioned in the intermediate position between the blocking plate is located, the beam plate is detachable at each side position The present invention relates to a connection structure between unit panels for underground continuous wall construction of a structure where reinforcing bars are installed in an inner space formed by the blocking plate and the beam plate.

일반적으로, 지하연속벽 등과 같은 구조물은 일정한 폭과 너비로 지반을 수직으로 굴착한 후, 이렇게 조성한 연속 굴착공에 각각의 단위 판넬이 일렬로 연속 배치되는 구조를 가질 수 있게 벤토나이트(안정액) 속에 철근망을 건입하고, 이어 콘크리트를 타설하는 방법으로 시공한다. In general, structures such as underground continuous walls are excavated vertically with a constant width and width, and then reinforced in bentonite (stable fluid) so that each unit panel can be arranged in a row in a continuous excavation hole thus constructed. It is constructed by putting in a net and then pouring concrete.

도 1은 위와 같은 방법으로 시공된 종래 지하연속벽 구조물의 횡단면 구조를 도시한 것으로서, 일 예로, 각각의 독립적인 철근망(10)을 갖는 단위 판넬(11)을 일렬로 배치하는 지하연속벽의 시공방법을 보여주고 있다.1 illustrates a cross-sectional structure of a conventional underground continuous wall structure constructed in the above manner, for example, of an underground continuous wall arranging unit panels 11 having respective independent rebar networks 10 in a row. The construction method is shown.

그러나, 이러한 지하연속벽 구조물의 경우, 각 단위 판넬(11)이 콘트리트 타설을 통해 연속으로 붙어있는 구조를 보이고 있으나, 단위 판넬(11)별로 분리 시공이 이루어지기 때문에 단위 판넬(11)간 연결부위가 무근 콘크리트 타설 형태로 시공되고, 이로 인하여 토압이 작용하게 되면 각 단위 판넬(11)이 서로 다르게 거동할 수 있는 구조적인 문제점을 갖고 있다.However, in the case of such a continuous wall structure, each unit panel 11 shows a structure that is continuously attached through concrete pouring, but the connection between the unit panels 11 because the separate construction is made for each unit panel (11) Is constructed in the form of concrete-free concrete pouring, and thus has a structural problem that each unit panel 11 behaves differently when the earth pressure is applied.

도 1을 참조하면, 내부의 철근망(10)도 단위 판넬(11)별로 완전 분리된 구조임을 볼 수 있다.Referring to FIG. 1, it can be seen that the internal reinforcing bar 10 also has a completely separated structure for each unit panel 11.

또한, 방수재(water stop)를 넣지 않는 방식이거나, 지하연속벽 구조물 시공시에 방수재를 삽입하는 방식이 수중 트렌치(trench) 속에서 시공되는 방식, 즉 육안으로 볼 수 없는 트렌치 내에서 시공되는 방식이기 때문에 정확한 시공을 수행할 수 없고, 이에 지하연속벽 시공 후 특히 판넬 연결부위의 누수문제 및 그로 인한 심한 결로문제가 발생할 수 있으며, 이 문제들을 해결하기 위하여 추가로 벽체 내벽 방수시공은 물론 내부 조적 벽돌쌓기를 해야 하는 등 경제적인 측면이나 공간적인 측면에서 불리한 점이 있다.In addition, the method does not put a water stop (water stop), or the method of inserting the waterproof material when the construction of the underground continuous wall structure is a method that is installed in an underwater trench (that is, a method that is installed in a trench not visible to the naked eye). Therefore, it is impossible to carry out the exact construction, and after this, the construction of underground continuous walls may cause leakage problems of the panel connection part and severe condensation.Therefore, in order to solve these problems, additional waterproofing of the inner wall of the wall, as well as internal masonry bricks, may occur. There are disadvantages in terms of economy and space, such as stacking.

따라서, 본 고안은 상기와 같은 문제점을 해결하기 위하여 고안한 것으로서, 단위 판넬의 각 연결부 위치에 시공되어 단위 판넬들을 구조적으로 일체화시킴으로써 토압 등 외력작용에 의해 단위 판넬들이 서로 다르게 거동하는 종래의 구조적 문제점을 해소할 수 있게 되고, 시공 후 단위 판넬간 연결부위를 밀폐시켜 연결부위의 누수문제 및 그로 인한 결로문제 등을 해결할 수 있는 지하연속벽 시공을 위한 단위 판넬간 연결구조체를 제공하는데 그 목적이 있다. Therefore, the present invention is designed to solve the above problems, the conventional structural problem that the unit panels behave differently by external force action such as earth pressure by constructing the unit panels structurally integrated at each connection position of the unit panel. It is possible to solve the problem, and to provide a connection structure between unit panels for underground continuous wall construction that can solve the leakage problem and condensation problem due to sealing the connection part between unit panels after construction. .

이하, 첨부한 도면을 참조하여 본 고안을 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings.

본 고안에 따른 지하연속벽 시공을 위한 단위 판넬간 연결구조체는, 그 일 실시예로서,The connection structure between unit panels for the construction of the continuous underground wall according to the present invention, as an embodiment,

I 형강 또는 H 형강으로 이루어지고, 하기 양측의 차단 플레이트 사이에 위치되어 차단 플레이트와 하기 빔 플레이트에 의해 형성된 내부공간을 좌우 양측으로 구획하는 메인 빔과; A main beam made of an I-beam or an H-beam and positioned between the blocking plates on both sides below to divide the internal space formed by the blocking plate and the beam beams on both the left and right sides;

상기 메인 빔의 양 측면부쪽에 설치되고, 메인 빔을 사이에 두고 평행 배치되어 메인 빔 길이방향을 따라 연속된 형태의 전면벽과 후면벽을 형성하는 양측의 차단 플레이트와; Two side blocking plates provided at both side portions of the main beam and arranged in parallel with the main beam interposed therebetween to form a front wall and a rear wall of a continuous shape along the main beam longitudinal direction;

I 형강으로 구비되어 상기 양측의 차단 플레이트와 함께 좌우 양 측면 위치에서 밀폐된 내부공간을 형성하도록 설치되고, 측면 위치에서 각 측면부가 가이드 부재에 끼워지는 형태로 설치되어 탈착 가능하게 된 빔 플레이트와; A beam plate provided with an I-beam and installed with the blocking plates on both sides to form a sealed inner space at left and right lateral positions, each side portion being fitted to the guide member at the lateral position and being detachable;

상기 차단 플레이트와 빔 플레이트가 형성하여 상기 메인 빔에 의해 구획된 양측 내부공간에 설치되는 보강 철근;Reinforcing bars formed by the blocking plate and the beam plate and installed in both inner spaces partitioned by the main beam;

을 포함하여 조립 구성되고, 단위 판넬간 각 연결부 위치에 수직 시공되어, 상기 빔 플레이트의 제거로 측면 개방된 상기 양측 내부공간과 양측 단위 판넬 공간에 걸쳐 시공된 철근망 및 콘크리트에 의해 단위 판넬과 일체화되는 것을 특징으로 한다.It is assembled, including the unit panel, and vertically installed at each connection position between the unit panels, integrated with the unit panel by the reinforcing bar and concrete constructed over the both sides of the inner space and the side unit panel space opened side by the removal of the beam plate It is characterized by.

여기서, 상기 보강 철근이, 그 일 실시예로서,Here, the reinforcing bar, as an embodiment thereof,

상기 메인 빔 중앙부에서 양 측면부쪽 인근의 양측 위치에 메인 빔 길이방향을 따라 등간격 형성된 각 관통공에 횡방향으로 관통 설치되는 다수개의 수평인장철근과;A plurality of horizontal tensile bars installed transversely in each of the through holes formed at equal intervals along the longitudinal direction of the main beam at both sides of the main beam center at both side portions near the side portions;

이 수평인장철근에 대하여 횡방향 배치되어 상기 메인 빔 길이방향을 따라 길게 설치되는 다수개의 수직주철근;A plurality of vertical cast iron bars disposed transversely with respect to the horizontal tensile bars and installed in the longitudinal direction of the main beam;

으로 이루어진 것을 특징으로 한다.Characterized in that consisting of.

그리고, 상기 보강 철근이, 그 다른 실시예로서,And, as the other reinforcing bar,

직사각형 구조로 구비되어 메인 빔에 의해 구획된 상기 양측 내부공간에서 각각 메인 빔 길이방향을 따라 반복 설치되고, 각 내부공간에서 양측 차단 플레이트 내측면에 인접되게 횡방향 배치되어 일측과 타측이 각각 상기 메인 빔과 가이드 부재에 용접됨으로써 고정되는 다수개의 수평인장철근과;It is provided in a rectangular structure is repeatedly installed along the longitudinal direction of the main beam in each of the two inner space partitioned by the main beam, and disposed in the transverse direction adjacent to the inner surface of the two side blocking plate in each inner space, one side and the other side is the main A plurality of horizontal tensile bars fixed by welding to the beam and the guide member;

이 수평인장철근 안쪽에서 수평인장철근에 대하여 횡방향 배치되어 상기 메인 빔 길이방향을 따라 길게 설치되는 다수개의 수직주철근;A plurality of vertical cast iron bars disposed transversely with respect to the horizontal tensile bars in the horizontal tensile bars and installed in the longitudinal direction of the main beam;

으로 이루어진 것을 특징으로 한다.Characterized in that consisting of.

그리고, 상기 보강 철근이, 그 또 다른 실시예로서,And, as another embodiment of the reinforcing bar,

양 단부가 절곡 형성된 'ㄷ'자 구조로 구비되어 메인 빔에 의해 구획된 상기 양측 내부공간에서 각각 메인 빔 길이방향을 따라 반복 설치되고, 각 내부공간에서 양측 차단 플레이트 내측면에 인접되게 횡방향 배치되어 일단부가 상기 차단 플레이트 내측면 또는 상기 가이드 부재에 용접되는 동시에 타단부가 상기 메인 빔에 용접됨으로써 고정되는 다수개의 수평인장철근과, The two ends are bent in a 'c' shaped structure and are repeatedly installed along the longitudinal direction of the main beam in each of the two inner spaces partitioned by the main beam, and disposed in the transverse direction adjacent to the inner side surfaces of both blocking plates in the respective inner spaces. A plurality of horizontal tensile bars whose one end is welded to the inner surface of the blocking plate or the guide member and the other end is fixed by welding to the main beam;

이 수평인장철근에 대하여 횡방향 배치되어 상기 메인 빔 길이방향을 따라 길게 설치되는 다수개의 수직주철근;A plurality of vertical cast iron bars disposed transversely with respect to the horizontal tensile bars and installed in the longitudinal direction of the main beam;

으로 이루어진 것을 특징으로 한다.Characterized in that consisting of.

그리고, 상기 차단 플레이트가 상기 메인 빔 측면부에 횡방향 설치된 소정 간격의 레일부재에 슬라이드식으로 끼워지는 복수개의 단위 플레이트들로 조립 구성되고, 상기 각 레일부재의 양 단부 안쪽면에는 상기 가이드 부재가 메인 빔 길이방향으로 배치되어 레일부재들을 연결하는 형태로 용접 설치되는 것을 특징으로 한다.In addition, the blocking plate is composed of a plurality of unit plates that are slidably fitted to the rail member at a predetermined interval horizontally installed in the side portion of the main beam, the guide member is main on both inner sides of each rail member The beam is arranged in the longitudinal direction is characterized in that the welding is installed in the form of connecting the rail members.

또한, 본 고안에 따른 지하연속벽 시공을 위한 단위 판넬간 연결구조체는, 그 다른 실시예로서,In addition, the connection structure between the unit panels for the construction of the underground continuous wall according to the present invention, as another embodiment,

요철구조의 단면구조를 가지면서 일방향으로 길게 형성된 판재로 이루어져 하기 양측의 차단 플레이트 사이에 위치되어 차단 플레이트와 하기 빔 플레이트에 의해 형성된 내부공간을 좌우 양측으로 구획하는 방수판과; A waterproof plate having a cross-sectional structure of a concave-convex structure and positioned in one direction to be disposed between the blocking plates on both sides to partition the inner space formed by the blocking plate and the beam plate below on both sides;

상기 방수판을 사이에 두고 평행 배치되어 방수판의 길이방향을 따라 연속된 형태의 전면벽과 후면벽을 형성하는 양측의 차단 플레이트와; Two blocking plates arranged in parallel with the waterproof plate interposed therebetween to form a front wall and a rear wall of a continuous shape along the longitudinal direction of the waterproof plate;

I 형강으로 구비되어 상기 양측의 차단 플레이트와 함께 좌우 양 측면 위치에서 밀폐된 내부공간을 형성하도록 설치되고, 측면 위치에서 각 측면부가 가이드 부재에 끼워지는 형태로 설치되어 탈착 가능하게 된 빔 플레이트와; A beam plate provided with an I-beam and installed with the blocking plates on both sides to form a sealed inner space at left and right lateral positions, each side portion being fitted to the guide member at the lateral position and being detachable;

상기 차단 플레이트와 빔 플레이트가 형성하여 상기 메인 빔에 의해 구획된 양측 내부공간에 설치되어 상기 방수판 고정 역할을 동시에 수행하는 보강 철근;Reinforcing bars formed by the blocking plate and the beam plate and installed in both inner spaces partitioned by the main beam to simultaneously perform the role of fixing the waterproof plate;

을 포함하여 조립 구성되고, 단위 판넬간 각 연결부 위치에 수직 시공되어, 상기 빔 플레이트의 제거로 측면 개방된 상기 양측 내부공간과 양측 단위 판넬 공간에 걸쳐 시공된 철근망 및 콘크리트에 의해 단위 판넬과 일체화되는 것을 특징으로 한다.It is assembled, including the unit panel, and vertically installed at each connection position between the unit panels, integrated with the unit panel by the reinforcing bar and concrete constructed over the both sides of the inner space and the side unit panel space opened side by the removal of the beam plate It is characterized by.

여기서, 상기 보강 철근이,Here, the reinforcing bar,

상기 방수판에서 상기 양측의 차단 플레이트 인근 위치에 방수판 길이방향을 따라 등간격 형성된 각 관통공에 횡방향으로 관통 설치되는 다수개의 수평인장철근과; A plurality of horizontal tension reinforcing bars installed transversely in each of the through holes formed at equal intervals along the longitudinal direction of the waterproof plate at positions adjacent to the blocking plates on both sides of the waterproof plate;

이 수평인장철근에 대하여 횡방향 배치되어 상기 메인 빔 길이방향을 따라 길게 설치되는 다수개의 수직주철근과; A plurality of vertical cast iron bars disposed transversely with respect to the horizontal tensile bars and installed in the longitudinal direction of the main beam;

상기 양측 차단 플레이트쪽으로 설치된 두 수평인장철근을 횡으로 연결하도록 설치되되, 방수판 양쪽면으로 설치되어 방수판을 지지함과 동시에 위치 고정시키는 고정철근;Fixing reinforcing bar is installed to connect the two horizontal tension reinforcing bars installed on both sides of the blocking plate in the transverse direction, is installed on both sides of the waterproof plate to support the waterproof plate and at the same time fixed position;

으로 이루어진 것을 특징으로 한다.Characterized in that consisting of.

그리고, 상기 차단 플레이트가 상기 방수판 길이방향 소정 간격으로 횡방향 배치된 레일부재에 슬라이드식으로 끼워지는 복수개의 단위 플레이트들로 조립 구성되고, 상기 각 레일부재의 양 단부 안쪽면에는 상기 가이드 부재가 메인 빔 길이방향으로 배치되어 레일부재들을 연결하는 형태로 용접 설치되는 것을 특징으로 한다.The blocking plate is assembled by a plurality of unit plates slideably fitted to the rail members disposed transversely at predetermined intervals in the waterproof plate in a longitudinal direction, and the guide members are provided on both inner surfaces of each of the rail members. The main beam is arranged in the longitudinal direction is characterized in that the welding is installed in the form of connecting the rail members.

이하, 첨부한 도면을 참조하여 본 고안을 더욱 상세히 설명하면 다음과 같다.Hereinafter, the present invention will be described in more detail with reference to the accompanying drawings.

본 고안은 지하연속벽의 시공시에 일렬로 연속된 구조가 되도록 시공되는 단위 판넬간의 각 연결부 위치에 설치되는 연결구조체에 관한 것으로서, 이를 이용하여 지하연속벽을 시공할 경우 상기 연결구조체를 각 연결부 위치에 우선 설치한 후 이를 연결부위로 하여 각 단위 판넬 시공을 하게 된다.The present invention relates to a connection structure which is installed at each connection location between unit panels that are constructed to be a continuous structure in a row in the construction of the underground continuous wall, when using the same to connect the connection structure to each connection structure After installation at the position first, each unit panel is constructed by using this as a connection part.

이러한 본 고안의 각 연결구조체를 단위 판넬간 연결부 위치에 설치한 뒤, 그 측면을 구성하는 빔 플레이트를 제거하고, 이 빔 플레이트의 제거로 개방되는 연결구조체의 내부공간과 단위 판넬의 시공 공간에 걸쳐 철근망을 설치한 후, 상기 공간에 콘크리트를 함께 타설함으로써, 단위 판넬 및 연결구조체가 철근망 및 콘크리트에 의해 일체가 될 수 있게 된다.After installing each connecting structure of the present invention at the position of the inter-panel connection part, the beam plate constituting the side is removed, and the inner space of the connecting structure opened by the removal of the beam plate and the construction space of the unit panel. After installing the reinforcing bar network, by placing concrete together in the space, the unit panel and the connecting structure can be integrated by the reinforcing bar network and concrete.

도 2a ~ 도 2j는 본 고안의 연결구조체를 사용하여 지하연속벽을 시공하는 과정을 설명하기 위한 도면으로, 각 공정시 상태를 단계별로 도시한 횡단면도이다. 2A to 2J are diagrams for explaining a process of constructing a continuous underground wall by using a connection structure of the present invention, and are cross-sectional views showing states during each process step by step.

지하연속벽은 각각의 단위 판넬(100)이 일렬로 연속된 구조가 되도록 하여 시공되는데, 지하연속벽을 구성하는 각 단위 판넬의 시공에 앞서 단위 판넬간 연결부 위치에 본 고안의 연결구조체(110)를 시공한다.The underground continuous wall is constructed so that each unit panel 100 has a continuous structure in a row, and the connection structure 110 of the present invention at the connection portion between the unit panels prior to the construction of each unit panel constituting the underground continuous wall. Construct it.

먼저, 본 고안의 연결구조체(110)를 시공하기 위하여, 도 2a에 도시한 바와 같이, 일렬로 연속되게 시공되는 단위 판넬(100)간의 연결부 위치에 일정한 폭과 너비로 지반을 수직으로 굴착하여 상기 연결구조체가 수직으로 삽입되는 공간인 트렌치(1)를 형성시킨다.First, in order to construct the connection structure 110 of the present invention, as shown in Figure 2a, by excavating the ground vertically with a constant width and width at the position of the connection between the unit panel 100 to be constructed in a row in series A trench 1 is formed, which is a space in which the connecting structure is inserted vertically.

이때, 굴착된 트렌치(1)의 폭과 너비는 현장 조건에 따라 설계되며, 수직 삽입되는 연결구조체(110)의 주변으로 어느 정도의 여유공간이 존재할 수 있도록 약간 넓게 굴착한다.At this time, the width and width of the excavated trench 1 is designed according to the site conditions, and excavated slightly wide so that a certain amount of free space may exist around the connection structure 110 is vertically inserted.

또한, 이때 사용하는 굴착장비는 통상의 지반 굴착시와 마찬가지로 트렌치 커터 시스템(trench cutter system) 등과 같은 범용장비를 사용할 수 있으며, 지반을 굴착하면서 형성된 트렌치가 붕괴되지 않도록 하기 위하여 굴착 후에는 안정액, 즉 벤토나이트(bentonite)를 청수에 혼합하여 투입한다.In addition, the excavation equipment used at this time may use a general-purpose equipment, such as a trench cutter system as in the case of the conventional ground excavation, and stabilize the liquid after excavation, that is, to avoid collapse of the trench formed while excavating the ground Bentonite is mixed with fresh water.

이후, 상기와 같이 단위 판넬간 연결부 위치에 시공한 트렌치(1) 내에 본 고안의 연결구조체(110)를 수직으로 건입하고(도 2b 참조), 트렌치(1) 내에서 연결구조체(110) 주변의 공간에는 벤토나이트 회수와 더불어 적정의 배합비로 혼합하여 만든 충전재를 채운다(도 2c 참조).Subsequently, the connection structure 110 of the present invention is vertically inserted into the trench 1 constructed at the connection position between the unit panels as described above (see FIG. 2B), and the connection structure 110 around the connection structure 110 is formed in the trench 1. The space is filled with bentonite recovery and a filler made by mixing at an appropriate mixing ratio (see FIG. 2C).

여기서, 충전재는 물:벤토나이트:슬라임(slime) 또는 모래를 1:0.1:0.1의 배합비로 하여 혼합한 것을 사용하거나, 시멘트를 추가로 사용할 경우 배합비를 조정하여 물:벤토나이트:슬라임 또는 모래:시멘트를 1:0.1:0.02:0.2의 배합비로 하여 혼합한 것을 사용한다.Here, the filler is a mixture of water: bentonite: slime or sand in a ratio of 1: 0.1: 0.1, or when additional cement is used, the mixture is adjusted to adjust water: bentonite: slime or sand: cement. A mixture of 1: 0.1: 0.02: 0.2 is used.

이때, 시멘트를 사용하지 않은 경우에서 슬라임 또는 모래의 비율을 상기 배합비보다 낮게 할 경우 연결구조체의 구속이 안되는 문제가 있게 된다.In this case, when the cement is not used, if the ratio of slime or sand is lower than the compounding ratio, there is a problem that the connection structure is not restrained.

또한, 시멘트를 사용한 경우에서도 시멘트의 비율을 상기 배합비보다 높게 할 경우 추후 빔 플레이트의 제거가 어렵고, 너무 낮출 경우 연결구조체의 구속이 안되는 문제가 있게 된다.In addition, even when cement is used, if the ratio of cement is higher than the compounding ratio, it is difficult to remove the beam plate later, and if it is too low, there is a problem that the connection structure is not restrained.

이와 같이 연결구조체(110)의 시공시 단위 판넬 위치를 기준으로 하여 반대쪽 연결부 위치에도 앞서 설명한 동일한 방법으로 또 다른 연결구조체를 동시 또는 순차 시공한다.As such, when the construction of the connection structure 110 is performed, the other connection structure is simultaneously or sequentially constructed in the same manner as described above with respect to the position of the opposite connection portion based on the unit panel position.

이하, 다음의 공정을 설명하기에 앞서, 본 고안의 연결구조체에 대하여 다음의 각 도면을 참조하여 상세히 설명하기로 하며, 그 이후의 공정은 연결구조체를 설명한 후 도 2d를 참조하여 후술하기로 한다.Hereinafter, before describing the following process, the connection structure of the present invention will be described in detail with reference to the following drawings, and the subsequent steps will be described later with reference to FIG. 2D after explaining the connection structure. .

본 고안의 연결구조체를 나타내는 도면으로, 도 3a는 본 고안에 따른 연결구조체의 각 구성을 보이기 위한 분리사시도이고, 도 3b는 본 고안에 따른 연결구조체의 조립사시도이다.3A is an exploded perspective view for showing each configuration of the connection structure according to the present invention, and FIG. 3B is an assembled perspective view of the connection structure according to the present invention.

또한, 첨부한 도 4a 내지 도 4f는 본 고안에 따른 연결구조체의 각 실시예를 나타내는 횡단면도이다. 4A to 4F are cross-sectional views illustrating respective embodiments of the connection structure according to the present invention.

여기서, 도 3a와 도 3b는 도 4a에 예시한 보강 철근(17) 구조를 가지는 연결구조체(110)를 도시한 것이며, 도 4b 내지 도 4f의 각 실시예에 대한 분리사시도 및 조립사시도는 제시한 횡단면 구조를 통해 도 3a와 도 3b로부터 충분히 유추할 수 있는 것이므로 생략하기로 한다.3A and 3B illustrate the connecting structure 110 having the reinforcing bar 17 structure illustrated in FIG. 4A, and the separated perspective view and the assembled perspective view of each embodiment of FIGS. 4B to 4F are shown. Since it can be sufficiently inferred from FIGS. 3a and 3b through the cross-sectional structure will be omitted.

본 고안의 연결구조체(110)는 지하연속벽을 구성하는 단위 판넬(100)간 각 연결부 위치에 선시공되는 것으로, 특히 두 단위 판넬(100) 사이에 위치하여 양측의 단위 판넬(100)과 철근망(102) 및 콘크리트에 의해 일체로 연결되는 바, 단위 판넬과 함께 지하연속벽을 구성하면서 양측의 두 단위 판넬을 구조적으로 일체화시키는 역할을 하며, 특히 두 단위 판넬(100)간 연결부위에서 누수가 발생하지 않도록 차단 플레이트(113)를 통해 차폐하는 역할을 한다(도 4f 참조). The connection structure 110 of the present invention is pre-constructed at the position of each connection between the unit panel 100 constituting the underground continuous wall, in particular located between the two unit panel 100 and the unit panel 100 and the rebar network on both sides (102) and integrally connected by concrete, forming a basement continuous wall together with the unit panel serves to structurally unite the two unit panels on both sides, in particular leak occurs in the connection between the two unit panels (100) It serves to shield through the blocking plate 113 so as not to (see Fig. 4f).

상기와 같은 본 고안의 연결구조체(110)는 단위 판넬 시공시 제거하게 되는 빔 플레이트(116)를 제외하고는 지하연속벽 내에 매입되는 영구 구조체가 된다. The connection structure 110 of the present invention as described above is a permanent structure embedded in the continuous underground wall except for the beam plate 116 to be removed during the construction of the unit panel.

그 구성을 보면, 상기 연결구조체(110)는 I 형강 또는 H 형강으로 실시되고 후술하는 차단 플레이트(113) 및 빔 플레이트(116)에 의해 형성되는 내부공간을 중간위치에서 좌우 양측으로 구획하게 되는 메인 빔(111)을 포함한다.In view of the configuration, the connection structure 110 is made of I-shaped steel or H-shaped steel and the main space which divides the internal space formed by the blocking plate 113 and the beam plate 116 which will be described later from the middle position to both left and right sides. Beam 111.

그리고, 상기 메인 빔(111)의 양 측면부(111b)에는 연결구조체(110)에서 메인 빔 길이방향을 따라 연속된 형태의 전면벽과 후면벽을 형성(도 4a 내지 도 4f의 횡단면 구조에서 상부벽과 하부벽을 형성)하는 차단 플레이트(113)가 메인 빔(111)을 사이에 두고 서로 평행하게 고정 설치된다.In addition, both side portions 111b of the main beam 111 form a front wall and a rear wall of a continuous shape along the longitudinal direction of the main beam in the connecting structure 110 (the upper wall in the cross-sectional structure of FIGS. 4A to 4F). And a blocking plate 113 forming a lower wall) are fixedly installed in parallel with each other with the main beam 111 interposed therebetween.

상기 두 차단 플레이트(113)는 후술하는 바와 같이 양측의 두 단위 판넬(100)간 연결부위를 차폐하는 역할을 하며, 중간위치의 메인 빔(111)에 의해 고정되어, 좌우 양 측면 위치에 설치되는 빔 플레이트(116)와 함께 소정의 내부공간을 형성하게 된다.The two blocking plates 113 serve to shield the connection between the two unit panels 100 on both sides as described below, and are fixed by the main beam 111 at an intermediate position, and are installed at both left and right side positions. Together with the beam plate 116 to form a predetermined internal space.

여기서, 상기 각 차단 플레이트(113)는 상하 배치되는 복수개의 단위 플레이트(113a)가 조립된 구조로 실시될 수 있으며, 이때 메인 빔(111)의 양 측면부(111b)에 설치된 레일부재(114)에 의해 단위 플레이트(113a)들이 조립된다. Here, each of the blocking plates 113 may be implemented in a structure in which a plurality of unit plates 113a disposed up and down are assembled, and at this time, the rail members 114 installed on both side portions 111b of the main beam 111. The unit plates 113a are assembled by this.

좀더 상세하게는, 상기 메인 빔(111)의 양 측면부(111b)에는 단위 플레이트(113a)가 측방에서 수평으로 슬라이드식으로 끼워질 수 있게 된 플레이트 설치용 레일부재(114)가 메인 빔(111)의 길이방향에 대하여 좌우 횡방향으로 길게 배치되어 용접 설치된다. More specifically, the plate mounting rail member 114, which allows the unit plate 113a to be slidably mounted horizontally from the side, is provided at both side portions 111b of the main beam 111 of the main beam 111. Longitudinally and horizontally arrange | positioned with respect to a longitudinal direction is installed by welding.

상기 레일부재(114)는 단위 플레이트(113a)가 측방에서 슬라이드식으로 끼워져 조립되는 고정틀 역할을 하는 것으로, 상기 레일부재(114)들은 각 단위 플레이트(113a)의 상하 각 테두리 부분이 끼워질 수 있는 상하 간격을 두어 나란하게 설치된다.The rail member 114 serves as a fixing frame in which the unit plate 113a is slidably fitted from the side, and the rail members 114 may be fitted with upper and lower edge portions of each unit plate 113a. It is installed side by side with a vertical gap.

상기 레일부재(114)로는 각 단위 플레이트(113a)의 테두리 부분이 끼워져 슬라이드될 수 있도록 'ㄷ'자 단면구조를 가지는 형강이 사용될 수 있다.As the rail member 114, a section steel having a 'c' cross-sectional structure may be used so that an edge portion of each unit plate 113a may be inserted and slide.

물론, 연결구조체(110)의 맨 상단과 하단에 설치되는 레일부재는 한쪽방향으로 개구된 'ㄷ'자 형강이 사용될 수 있으며, 두 단위 플레이트(113a)의 경계부분에 설치되는 레일부재의 경우 상하 양쪽으로 단위 플레이트(113a)가 끼워질 수 있는 구조, 즉 두 개의 'ㄷ'자 형강이 서로 반대로 배치되어 용접 결합된 구조이거나 '' 단면구조의 형강이 사용될 수 있다.Of course, the rail members installed at the top and bottom of the connecting structure 110 may be used in the 'c'-shaped steel opening in one direction, in the case of the rail member is installed on the boundary of the two unit plates 113a The unit plate 113a can be fitted to both sides, that is, a structure in which two 'c'-shaped steels are arranged opposite to each other and welded to each other. 'Sectional steel can be used.

상기 차단 플레이트(113)를 구성하는 각 단위 플레이트(113a)로는 철판이나 합판, 적정 강도의 플라스틱 판이나 스티로폼, 압착판넬 등이 사용될 수 있다.Each unit plate 113a constituting the blocking plate 113 may be an iron plate, plywood, a plastic plate or styrofoam, a crimping panel of appropriate strength, and the like.

한편, 상기 각 레일부재(114)의 양 단부 안쪽면에는 역시 레일구조로 된 가이드 부재(115)가 용접 설치되는데, 상기 각 가이드 부재(115)가 메인 빔(111)의 길이방향으로 길게 배치되어 레일부재(114)들을 연결하는 형태로 각 레일부재들에 용접된다. On the other hand, the both ends of the inner side of each rail member 114, the guide member 115 also has a rail structure is welded, each guide member 115 is arranged long in the longitudinal direction of the main beam 111 It is welded to each rail member in the form of connecting the rail members 114.

상기 가이드 부재(115)는 I 형강으로 실시되는 빔 플레이트(116)가 연결구조체(110)의 좌우 양 측면 위치에 탈착 가능하게 설치될 수 있도록 하기 위한 구조로서, 상기 빔 플레이트(116)는 레일부재(114)에 대하여 같은 방향으로 설치된 한 쌍의 가이드 부재(115)에 양 측면부(116a)가 삽입된 상태로 하여 슬라이드식으로 끼워지게 되어 있다.The guide member 115 is a structure for allowing the beam plate 116, which is made of I-shaped steel, to be detachably installed at the left and right sides of the connecting structure 110, and the beam plate 116 is a rail member. The side surface portions 116a are inserted into the pair of guide members 115 provided in the same direction with respect to 114 so as to slide together.

여기서, 한 쌍의 가이드 부재(115)는 레일부재(114) 내측으로 서로 대향된 위치에 나란히 설치되며, 이러한 가이드 부재(115) 쌍이 메인 빔(111)을 중심으로 하여 레일부재(114) 양 단부쪽에 각각 설치된다. Here, the pair of guide members 115 are installed side by side in a position opposite to each other inside the rail member 114, such a pair of guide members 115, both ends of the rail member 114 around the main beam 111 It is installed on each side.

상기 빔 플레이트(116)는 메인 빔(111)과 같이 연결구조체(110)의 상하 높이방향(메인 빔의 길이방향)으로 길게 설치되어 연결구조체의 측면을 구성하게 되는 부재로서, 연결구조체(110)의 상단쪽에서 각 측면부(116a)를 측면 위치에 설치된 각 가이드 부재(115) 쌍에 끼운 뒤 밀어 넣는 방식으로 설치된다.The beam plate 116 is a member that is installed in the vertical direction (longitudinal direction of the main beam) of the connecting structure 110 as the main beam 111 to form a side of the connecting structure 110, the connecting structure 110 At the upper end of each side portion 116a is installed in such a way that it is inserted into each guide member 115 pair installed in the side position and then pushed.

이와 같이 빔 플레이트(116)는 두 차단 플레이트(113)간에 설치되어 측면을 구성하게 되며, 또한 가이드 부재(115)에서 슬라이드식으로 빼내는 경우 간단히 제거될 수 있게 되어 있다.As such, the beam plate 116 is installed between the two blocking plates 113 to form a side surface, and can be easily removed when the guide plate 115 slides out.

결국, 상기 차단 플레이트(113)와 양 측면 위치의 빔 플레이트(116)는 조립상태에서 내부공간을 형성하여 폐단면구조를 이루게 되고, 상기 내부공간 중앙에는 메임 빔(111)이 공간을 구획하는 형태로 위치하게 된다. As a result, the blocking plate 113 and the beam plate 116 at both side positions form an inner space in an assembled state to form a closed cross-sectional structure, and the main beam 111 divides the space at the center of the inner space. Will be located.

그리고, 상기 연결구조체(110)의 내부공간에는 보강을 위한 철근(17)이 소정 배치구조로 설치된다.In addition, reinforcing bars 17 for reinforcement are installed in an internal space of the connection structure 110 in a predetermined arrangement structure.

이러한 구조의 연결구조체 구조에서, 상기 메인 빔(111)은 양측의 차단 플레이트(113)와 양 측면 위치의 빔 플레이트(116)가 형성하는 내부공간을 구획하는 역할을 하는데, 후술하는 바와 같이 빔 플레이트(116)가 제거된 상태에서 메인 빔(111)을 중심으로 구획된 각 내부공간과 해당 단위 판넬 시공 공간에 걸쳐 철근망이 설치된 후 콘크리트가 함께 타설되어짐으로써, 본 고안의 연결구조체(110)는 양측의 두 단위 판넬과 구조적으로 일체화 될 수 있게 되어 있다. In the structure of the connection structure of this structure, the main beam 111 serves to partition the internal space formed by the blocking plate 113 on both sides and the beam plate 116 on both side positions, as will be described later In the state where the 116 is removed, after the reinforcing bar network is installed over each of the inner space partitioned around the main beam 111 and the corresponding unit panel construction space, concrete is poured together, so that the connecting structure 110 of the present invention It can be structurally integrated with two unit panels on both sides.

한편, 도 4a 내지 도 4f는 내부의 철근 설치구조에 따른 바람직한 각 실시예를 도시한 횡단면도로서, 이를 설명하면 다음과 같다.On the other hand, Figures 4a to 4f is a cross-sectional view showing each preferred embodiment according to the internal reinforcing bar installation structure, it will be described as follows.

도 4a는 차단 플레이트(113), 보다 명확히는 단위 플레이트(113a)로 철판이 사용된 경우에 철근이 설치되는 구조의 일 실시예를 도시한 것이다.4A illustrates an embodiment of a structure in which reinforcing bars are installed when an iron plate is used as the blocking plate 113, more specifically, a unit plate 113a.

이에 도시한 바와 같이, 메인 빔(111)의 중앙부(111a)에서 각 측면부(111b)쪽 인근의 양측 위치에 메인 빔의 길이방향을 따라 등간격으로 다수개의 관통공(111c)을 형성하고, 각 관통공(111c)에 수평인장철근(118)을 횡방향으로 관통 설치한 것으로, 특히 관통공(111c)에 고무 O-링(112)을 끼운 후 이 고무 O-링에 수평인장철근(118)을 삽입 설치한 것이다.As shown in the drawing, a plurality of through-holes 111c are formed at equal intervals along the longitudinal direction of the main beams at both sides of the central portion 111a of the main beam 111 near each side portion 111b. The horizontal tensile reinforcing bars 118 are installed in the through holes 111c in the transverse direction. In particular, the rubber o-rings 112 are inserted in the through holes 111c, and the horizontal tensile reinforcing bars 118 are attached to the rubber o-rings. Will be installed.

여기서, 상기 고무 O-링(112)은 메인 빔(111)의 관통공(111c)과 수평인장철근(118) 사이에 개재되는 것으로, 이는 관통공 차단재 역할을 하는 바, 수평인장철근(118)이 끼워진 상태로 메인 빔(111)에 의해 구획된 도면상의 좌우 양측 공간 사이에서 반대쪽 공간으로 물이나 벤토나이트가 유입되지 않도록 차단하는 역할을 하게 된다. Here, the rubber O-ring 112 is interposed between the through-hole 111c and the horizontal tensile reinforcing bar 118 of the main beam 111, which serves as a through-hole blocking material, the horizontal tensile reinforcing bar 118 In such a fitted state, it serves to block water or bentonite from flowing into the opposite space between the left and right spaces on the drawing partitioned by the main beam 111.

또한, 상기 각 수평인장철근(118)은 양 단부를 적절히 절곡하여 차단 플레이트(단위 플레이트)(113) 내측면에 용접함으로써 고정된다.In addition, the horizontal tension reinforcing bars 118 are fixed by bending both ends appropriately to the inner surface of the blocking plate (unit plate) 113.

이와 같이 다수개의 수평인장철근(118)이 등간격으로 나란히 반복 설치된 상태에서 양측 수평인장철근(118)의 내부공간으로는 각각 연결구조체(110)의 상하 높이방향(메인 빔의 길이방향)으로 길게 수직주철근(119)이 설치된다. As described above, in the state where the plurality of horizontal tensile bars 118 are repeatedly installed side by side at equal intervals, each of the horizontal tensile bars 118 is long in the vertical direction of the connecting structure 110 in the vertical direction (the longitudinal direction of the main beam). Vertical cast iron 119 is installed.

도 4a를 참조하면, 각 차단 플레이트(113)와 각 수평인장철근(118)이 형성하는 공간 안쪽으로 다수개의 수직주철근(119)이 수평인장철근(118)과 횡방향으로 설치됨을 볼 수 있다. Referring to FIG. 4A, it can be seen that a plurality of vertical cast irons 119 are installed in the transverse direction with the horizontal tensile bars 118 into the space formed by the blocking plates 113 and the horizontal tensile bars 118.

또한, 도 4b는 철근 연결 커플러(121)가 사용된 실시예를 보여주고 있는 바, 이는 플레이트(113)상의 용접을 위하여 각 수평인장철근(118)의 양 단부가 크게 절곡되어 메인 빔(111)의 관통공(111c)에 끼우기가 곤란할 경우 실시 가능한 예로서, 각 수평인장철근(118)을 두 부분으로 분리 구성하여 한쪽의 철근을 관통공(111c)에 삽입한 후 양쪽의 두 철근을 커플러(121)로 연결시킨 구조이다. In addition, Figure 4b shows an embodiment in which the reinforcing bar coupler 121 is used, which is largely bent at both ends of the horizontal tensile reinforcing bars 118 for welding on the plate 113, the main beam 111 For example, if it is difficult to fit in the through hole 111c, the horizontal tensile reinforcing bars 118 are divided into two parts, and one bar is inserted into the through hole 111c. 121).

여기서, 수평인장철근(118)과 관통공(111c) 사이에는 역시 차단재 역할의 고무 O-링(112)이 개재되고, 커플러(121)로 연결시킨 양쪽 철근의 각 단부가 각 차단 플레이트(113)의 내측면에 용접되며, 수평인장철근(118)의 안쪽으로 수직주철근(119)이 설치되는 것은 도 4a의 실시예와 같다.Here, a rubber O-ring 112, which also serves as a blocking material, is interposed between the horizontal tension reinforcing bar 118 and the through hole 111c, and each end of each of the reinforcing bars connected by the coupler 121 is each blocking plate 113. It is welded to the inner side of the, the vertical cast iron 119 is installed inward of the horizontal tensile reinforcing bars 118 is the same as the embodiment of Figure 4a.

또한, 도 4c는 메인 빔(111)에 관통공을 설치하지 않고 수평인장철근(118)을 직접 용접 설치한 구조로서, 메인 빔(111)에 의해 구획된 양쪽 내부공간에 도면상의 좌우, 상하 대칭된 구조로 하여 직사각형 구조의 수평인장철근(118)이 배치되어 용접 설치된다.In addition, FIG. 4C is a structure in which the horizontal tensile reinforcing bars 118 are directly welded without installing through holes in the main beam 111, and are symmetrically left and right on the drawing in both inner spaces partitioned by the main beam 111. In this structure, a horizontal tensile rebar 118 having a rectangular structure is arranged and welded.

여기서, 메인 빔(111)의 중앙부(111a)에서 측면부(111b) 인근 위치의 양쪽 면에 도면상의 좌우 대칭되게 배치된 양측 수평인장철근(118)의 일측부를 직접 구조 용접하여 고정한다.Here, one side of both horizontal tension reinforcing bars 118 arranged symmetrically on both sides of the central portion 111a of the main beam 111 near the side portion 111b is fixed by direct structural welding.

또한, 중앙의 메인 빔(111)에 의해 구획된 동일 공간 내에서 각 수평인장철근(118)은 도면상의 상하로 위치된 양측 차단 플레이트(113)의 내측면에 인접되게 배치되어 상하 대칭되게 설치되는데, 이때 각 수평인장철근(118)의 타측부가 가이드 부재(115)에 용접된다. In addition, in the same space partitioned by the central main beam 111, each of the horizontal tension reinforcing bars 118 is disposed adjacent to the inner surface of the two side blocking plate 113 positioned up and down on the drawing is installed symmetrically up and down In this case, the other side of each horizontal tension reinforcing bar 118 is welded to the guide member 115.

상기 수평인장철근(118)은 도 4c의 횡단면 배치구조로 하여 메인 빔(111)의 길이방향을 따라 등간격으로 반복 설치되며, 각 수평인장철근(118)의 안쪽으로는 역시 수직주철근(119)이 횡방향, 즉 연결구조체(110)의 상하 높이방향(메인 빔의 길이방향)으로 길게 삽입 설치된다.The horizontal tensile reinforcing bars 118 are repeatedly installed at equal intervals along the longitudinal direction of the main beam 111 in the cross-sectional arrangement structure of FIG. 4C, and also vertical cast reinforcing bars 119 inside the horizontal tensile reinforcing bars 118. It is inserted into and installed in the transverse direction, that is, in the vertical direction of the connecting structure 110 in the vertical direction (the longitudinal direction of the main beam).

도 4c의 실시예는 철판은 물론 용접이 불가능한 기타 재질의 차단 플레이트가 사용된 경우에 모두 적용 가능한 구조이다. The embodiment of Figure 4c is a structure that can be applied to both the steel plate as well as the case when the blocking plate of other materials that are not weldable.

또한, 도 4d의 실시예는 도 4a의 실시예와 비교할 때 수평인장철근(118)의 단부가 용접 설치되는 부분이 차단 플레이트(113)가 아닌 빔 플레이트(116)가 끼워지는 가이드 부재(115)라는 점을 제외하고는 동일한 구조이며, 이 역시 철판은 물론 용접이 불가능한 기타 재질의 차단 플레이트가 사용된 경우에 모두 적용 가능한 구조이다. In addition, the embodiment of Figure 4d is compared with the embodiment of Figure 4a is a guide member 115 in which the beam plate 116 is fitted into the portion where the end of the horizontal tensile reinforcing bars 118 is welded, not the blocking plate 113 Except that it is the same structure, this also applies to the case of using a steel plate, as well as the blocking plate of other materials that can not be welded.

한편, 도 4e의 실시예는 도 4c의 실시예와 비교할 때 직사각형 구조가 아닌 전체적으로 볼 때 'ㄷ'자 형태가 되게 절곡시켜 구비한 수평인장철근(118)을 사용한 실시예로서, 각 수평인장철근(118)이 도 4c의 실시예와 동일한 위치에 고정 설치되나, 수평인장철근(118)의 일단부를 가이드 부재(115)에 용접하는 동시에 타단부를 메인 빔(111)에 용접하여 고정하고, 특히 수평인장철근(118)의 안쪽으로 설치되는 수직주철근(119)에 스페이서(122)를 설치한 구조로 되어 있다.On the other hand, the embodiment of Figure 4e is an embodiment using a horizontal tensile reinforcing bars 118 provided by bending to form a 'c' shape as a whole when compared to the embodiment of Figure 4c, not a rectangular structure, each horizontal tensile rebar 4 is fixedly installed at the same position as the embodiment of FIG. 4C, but welds one end of the horizontal tension reinforcing bar 118 to the guide member 115 while simultaneously fixing the other end to the main beam 111, in particular. The spacer 122 is provided in the vertical cast iron 119 which is installed inward of the horizontal tension reinforcing bar 118.

여기서, 상기 수평인장철근(118)은 도 4e의 횡단면 배치구조로 하여 메인 빔(111)의 길이방향을 따라 등간격으로 반복 설치되며, 각 수평인장철근(118)의 안쪽으로는 역시 수직주철근(119)이 횡방향으로 길게 삽입 설치된다.Here, the horizontal tensile reinforcing bars 118 are repeatedly installed at equal intervals along the longitudinal direction of the main beam 111 in the cross-sectional arrangement structure of Figure 4e, also inside the vertical tensile reinforcing bars 118 (vertical cast iron ( 119 is inserted into and installed in the transverse direction.

상기 스페이서(122)는 각 차단 플레이트(113)의 내측면에서 끝단부가 수직주철근(119)에 결합되어 해당 수직주철근을 차단 플레이트로부터 일정 간격으로 유지 및 지지하는 역할을 하며, 이는 도 4c의 실시예를 제외한 각 실시예에 모두 적용이 가능하다.The spacer 122 is coupled to the vertical cast iron 119 at the inner side of each blocking plate 113 to serve to maintain and support the vertical cast steel at regular intervals from the blocking plate, which is the embodiment of FIG. 4C. All can be applied to each embodiment except.

여기서, 스페이서(122)는 수직주철근(119)의 길이상에서 수평인장철근(118)이 설치된 위치에 설치될 수 있으며, 이때 같은 횡단면상의 모든 수직주철근(119)에 설치될 필요는 없고, 소정 갯수의 수평인장철근(118) 만큼 걸러서 설치할 수 있다.Here, the spacer 122 may be installed at the position where the horizontal tensile reinforcing bars 118 are installed on the length of the vertical cast iron 119, and it is not necessary to be installed in all vertical cast steel 119 in the same cross section, and the predetermined number of It can be installed by filtering as the horizontal tension reinforcing bar 118.

예를 들면, 도 4e의 횡단면에서는 도면상 상측의 수직주철근(119)들 중 우측에서 두번째와 하측의 수직주철근(119)들 중 좌측에서 첫번째 수직주철근에 스페이서(122)가 설치되고 있으나, 그 바로 아래쪽 수평인장철근 위치에서는 상측의 수직주철근들 중 우측에서 세번째와 하측의 수직주철근들 중 좌측에서 두번째 수직주철근에 스페이서가 설치될 수 있으며, 이와 같이 각 수평인장철근 위치마다 상이한 위치의 수직주철근에 스페이서가 설치될 수 있다.For example, in the cross-sectional view of FIG. 4E, the spacer 122 is installed on the first vertical reinforcing bar on the left side of the second and lower vertical reinforcing bar 119 on the right side of the upper vertical rebars 119 on the drawing. In the lower horizontal tension reinforcement position, spacers may be installed on the third vertical reinforcing bar on the right side and the second vertical reinforcing bar on the left side of the vertical reinforcing bars in the upper side. Can be installed.

도 4e의 실시예는 철판은 물론 용접이 불가능한 기타 재질의 차단 플레이트가 사용된 경우에 모두 적용 가능한 구조이며, 차단 플레이트로서 철판이 적용되는 경우 상기 수평인장철근의 일단부는 철판에 용접될 수도 있다. The embodiment of Figure 4e is a structure that can be applied to the case of using a steel plate, as well as the blocking plate of other materials that can not be welded, one end of the horizontal tensile reinforcing bar may be welded to the steel plate when the steel plate is applied as the blocking plate.

또한, 도 4e의 실시예는 도 4c의 실시예와 더불어 수평인장철근(118)이 메인 빔(111)을 관통하지 않는 구조이기 때문에, 메인 빔에 의해 구획된 좌우측 두 내부공간이 완전 밀폐되는 구조인 바, 양측 두 내부공간 사이에서 한쪽 내부공간으로 반대쪽 내부공간의 물 또는 벤토나이트가 유입되지 않는다는 장점이 있다.In addition, since the embodiment of FIG. 4E has a structure in which the horizontal tensile reinforcing bar 118 does not penetrate the main beam 111, as well as the embodiment of FIG. 4C, the two inner spaces partitioned by the main beam are completely sealed. In bar, there is an advantage that water or bentonite of the opposite inner space does not flow into one inner space between two inner spaces on both sides.

또한, 도 4f의 실시예는 메인 빔을 대체하여 같은 위치에 방수판(123)이 설치된 구조로서, 메인 빔이 삭제되기 때문에 각 단위 플레이트(113a)가 끼워지는 레일부재(114)와 빔 플레이트(116)가 끼워지는 가이드 부재(115)가 단순히 격자 형태로 용접 조립되고, 메인 빔의 위치에 방수판(123)이 설치된 구조이다.In addition, the embodiment of Figure 4f is a structure in which the waterproof plate 123 is installed in the same position to replace the main beam, since the main beam is deleted, each rail plate 114 and the beam plate (140) is fitted The guide member 115 to which the 116 is fitted is simply weld-assembled in a lattice form, and the waterproof plate 123 is installed at the position of the main beam.

상기 방수판(123)은 요철구조의 단면구조를 가지면서 메인 빔과 같이 일방향으로 길게 형성된 판재로서, 적정 강도의 벤토나이트 판넬 또는 PVC 판넬, 우레탄 판넬 등이 사용될 수 있으며, 단면구조상 양측의 두 차단 플레이트(113) 사이에 횡방향 배치되고, 연결구조체(110)의 상하 높이방향을 따라 길게 설치된다.The waterproof plate 123 has a cross-sectional structure of concave-convex structure and is formed in one direction as long as the main beam. Bentonite panel, PVC panel, urethane panel, etc. of appropriate strength may be used, and two blocking plates on both sides in cross-sectional structure. It is disposed transversely between the 113, and is installed long along the vertical direction of the connecting structure 110.

그리고, 상기 방수판(123)에서 양측 차단 플레이트(113) 인근 위치에 방수판의 길이방향을 따라 등간격으로 다수개의 관통공(123a)이 형성되고, 각 관통공(123a)에는 수평인장철근(118)이 횡방향으로 관통 설치된다.In addition, a plurality of through-holes 123a are formed at equal intervals along the longitudinal direction of the waterproof plate at positions adjacent to both side blocking plates 113 in the waterproof plate 123, and each through hole 123a has a horizontal tensile reinforcing bar ( 118 is penetrated in the transverse direction.

또한, 도 4a 또는 도 4d의 실시예와 마찬가지로, 상기 각 수평인장철근(118)은 양 단부를 적절히 절곡하여 차단 플레이트(단위 플레이트)(113)가 철판인 경우 그 내측면에 용접하여 고정하고, 철판이 아닌 경우 가이드 부재(115)에 용접하여 고정한다.In addition, similar to the embodiment of Figure 4a or 4d, each of the horizontal tension reinforcing bars 118 is bent at both ends appropriately, if the blocking plate (unit plate) 113 is an iron plate by welding to the inner surface, and fixed, If it is not the iron plate is fixed by welding to the guide member (115).

도 4f는 각 수평인장철근(118)의 양 단부가 가이드 부재(115)에 용접된 예를 보여주고 있다. 4F shows an example in which both ends of each horizontal tensile bar 118 are welded to the guide member 115.

또한, 도면으로 나타내지는 않았지만, 각 수평인장철근(118)은 도 4b의 실시예와 같이 두 부분으로 분리 구성할 수 있는 바, 마찬가지로 방수판(123)의 관통공(123a)에 삽입한 후 분리된 두 부분을 커플러(도 4b의 도면부호 121임)로 연결 조립한다. In addition, although not shown in the drawings, each of the horizontal tensile bar 118 can be separated into two parts as in the embodiment of Figure 4b, likewise inserted into the through hole 123a of the waterproof plate 123 and then separated The two parts are assembled by a coupler (reference numeral 121 of FIG. 4B).

또한, 상기와 같이 다수개의 수평인장철근(118)이 등간격으로 나란히 반복 설치된 상태에서 양측 수평인장철근(118)의 안쪽으로는 다른 실시예와 마찬가지로 연결구조체(110)의 상하 높이방향(방수판의 길이방향)으로 길게 수직주철근(119)이 설치된다. In addition, in the state where the plurality of horizontal tensile reinforcing bars 118 are repeatedly installed side by side at equal intervals as described above, the upper and lower height directions of the connecting structure 110 (waterproof plate) as in the other embodiments inside The vertical cast iron 119 is installed long in the longitudinal direction of).

또한, 상기 방수판(123)의 위치가 고정되도록 하기 위하여, 방수판(123) 양쪽면으로는 방수판을 지지하면서 위치 고정시키는 고정철근(124)이 설치되며, 이는 양측 차단 플레이트(113)쪽의 두 수평인장철근(118)을 횡으로 연결하도록 설치된다.In addition, in order to fix the position of the waterproof plate 123, both sides of the waterproof plate 123 is provided with a fixed reinforcing bar 124 for fixing the position while supporting the waterproof plate, which is the side blocking plate 113 side It is installed to connect the two horizontal tensile reinforcing bars (118) laterally.

전술한 각 실시예의 연결구조체(110)에서, 내부의 각 수평인장철근(118)이 차단 플레이트(단위 플레이트)(113)에 직접 용접되지 않는 구조의 경우, 내부의 각 철근(수평인장철근 및 수직주철근)을 설치한 뒤, 각 단위 플레이트(113)를 레일부재(114)에 끼우고, 이어 맨 마지막으로 빔 플레이트(116)를 끼우는 방식으로 조립을 완료할 수 있다. In the connecting structure 110 of each of the above-described embodiments, in the case of the structure in which each horizontal tension reinforcing bar 118 therein is not directly welded to the blocking plate (unit plate) 113, each internal reinforcing bar (horizontal tension bar and vertical) After the installation of the main reinforcing bar, each unit plate 113 can be fitted to the rail member 114, and then finally the beam plate 116 can be fitted in the manner of completing the assembly.

또한, 각 수평인장철근(118)이 차단 플레이트(단위 플레이트)(113)에 직접 용접되는 구조의 경우, 하나의 단위 플레이트(113a)를 설치한 뒤 그 안쪽의 각 수평인장철근(118)들을 용접하고, 이어 그 상측 또는 하측의 단위 플레이트(113a)를 설치한 뒤 그 안쪽의 각 수평인장철근(118)들을 용접하는 방식으로 하여, 상기 과정을 반복한 후 맨 마지막으로 빔 플레이트(116)를 끼우는 방식으로 조립을 완료할 수 있다.In addition, in the case of the structure in which each horizontal tension reinforcing bar 118 is directly welded to the blocking plate (unit plate) 113, after installing one unit plate 113a, each horizontal tension reinforcing bar 118 is welded therein. Then, the upper or lower unit plate 113a is installed, and then the respective horizontal tensile bars 118 are welded therein, and the beam plate 116 is finally inserted after repeating the above process. Assembly can be completed in a manner.

물론, 조립순서는 여건에 맞추어 적절히 변경이 가능하다.Of course, the assembly order can be changed appropriately according to the conditions.

이와 같이 하여, 본 고안의 연결구조체에 대하여 상술하였으며, 앞서 본 고안의 연결구조체를 사용한 시공방법을 도 2c의 공정까지 설명하였는 바, 그 이후의 공정, 즉 각 단위 판넬의 양측 연결부 위치에 연결구조체를 시공한 이후부터 이루어지는 각 공정을 도 2d ~ 도 2j를 참조로 하여 설명하기로 한다. As described above, the connection structure of the present invention was described above, and the construction method using the connection structure of the present invention was described to the process of FIG. 2C, and the subsequent steps, that is, the connection structure at the position of both connection portions of each unit panel. Each process performed after the construction will be described with reference to FIGS. 2D to 2J.

먼저, 도 2c와 같이 연결구조체(110)의 시공이 완료되면, 두 연결구조체(110) 사이에서 일정한 폭과 너비로 지반을 수직으로 굴착하여 단위 판넬이 시공될 공간인 트렌치(2)를 형성시킨다(도 2d 참조). First, when the construction of the connection structure 110 is completed, as shown in FIG. 2c, the ground is vertically excavated with a predetermined width and width between the two connection structures 110 to form a trench 2 which is a space in which the unit panel is to be constructed. (See FIG. 2D).

이후, 좌우 양측의 각 연결구조체(110)에서 단위 판넬이 시공되는 쪽의 빔 플레이트(116) 주변에 채워진 충전재를 제거하며(도 2e 참조), 또한 지반을 굴착하면서 형성된 트렌치(2)가 붕괴되지 않도록 하기 위하여 트렌치 내에 안정액, 즉 벤토나이트(bentonite)를 청수에 혼합하여 투입한다(도 2f 참조).Then, the filling material around the beam plate 116 on the side where the unit panel is constructed is removed from each of the left and right connecting structures 110 (see FIG. 2E), and the trench 2 formed while digging the ground is not collapsed. In order to avoid this, a stabilizer, that is, bentonite, is mixed with fresh water in the trench (see FIG. 2F).

상기 충전재 제거시에는 와이어 브러쉬 및 에어컴프레서 등을 이용하여 제거한 후 물청소로 잔여 충전재를 완전히 제거한다When removing the filler, remove it using a wire brush, air compressor, etc., and then completely remove the remaining filler by water cleaning.

이어, 각 연결구조체(110)에서 단위 판넬이 시공되는 쪽의 빔 플레이트(116)를 위에서 슬라이드식으로 잡아 빼내어 제거하며, 이후 단위 판넬의 시공 공간이 되는 트렌치(2) 내에 트레미관(tremie pipe)(104) 시공 및 철근망(102)을 건입한다(도 2g). Subsequently, the beam plate 116 of the side in which the unit panel is constructed in each connection structure 110 is slid out and removed from above, and thereafter, in the trench 2 which becomes the construction space of the unit panel, a drill pipe is provided. (104) Construction and the reinforcing bar network 102 are built in (FIG. 2G).

여기서, 상기 철근망(102)은 양측 두 연결구조체(110)에서 빔 플레이트(116)의 제거로 측면 개방되는 차단 플레이트(113) 안쪽의 일측 내부공간과 단위 판넬의 시공 공간인 트렌치(2)에 걸쳐 설치한다.Here, the reinforcing bar network 102 is formed in the trench 2 which is a construction space of the inner space of one side and the unit panel inside the blocking plate 113 which is laterally opened by the removal of the beam plate 116 from the two connecting structures 110 on both sides. Install over.

즉, 도 2g에 나타낸 바와 같이, 상기 철근망(102)의 양 측부가 측면이 개방된 두 연결구조체(110)의 내부공간에 삽입되도록 하여 설치하게 되는 것이다.That is, as shown in Figure 2g, both side portions of the reinforcing bar network 102 is to be installed so as to be inserted into the interior space of the two connection structure 110 is open side.

이후, 상기 철근망(102)이 설치된 공간, 즉 양측 두 연결구조체(110)의 일측 내부공간과 단위 판넬 시공을 위한 트렌치(2) 내에 콘크리트를 타설한다(도 2h 참조).Subsequently, the concrete is placed in a space in which the reinforcing bar network 102 is installed, that is, one interior space of two connection structures 110 on both sides and a trench 2 for unit panel construction (see FIG. 2H).

이후, 상기 각 연결구조체(110)의 반대쪽 내부공간과 이웃 시공된 또 다른 연결구조체의 일측 내부공간을 이용하여 상기와 같이 이루어지는 단위 판넬 시공과정을 지하연속벽 전체 구간에 걸쳐 반복하게 된다.Subsequently, the unit panel construction process as described above is repeated over the entire section of the underground continuous wall by using the inner space on the opposite side of each of the connecting structures 110 and the inner space of one side of the other connected structures.

결국, 본 고안에 의한 지하연속벽 구조에서는 상기 각 연결구조체(110)의 빔 플레이트(116)를 제외한 나머지 구성이 지하연속벽 내부에서 각 단위 판넬(100)을 구조적으로 연결하는 구조체로서 영구 매입된다.As a result, in the underground continuous wall structure according to the present invention, the remaining components except for the beam plate 116 of each connection structure 110 are permanently embedded as a structure for structurally connecting each unit panel 100 inside the underground continuous wall. .

도 2i는 양측의 단위 판넬(100a,100b)과 그 사이의 연결구조체(110)가 철근망(102) 및 콘크리트에 의해 일체화된 구조를 보여주고 있다.FIG. 2i shows a structure in which the unit panels 100a and 100b on both sides and the connecting structure 110 therebetween are integrated by the reinforcing bar network 102 and concrete.

이와 같이 본 고안에 따르면, 빔 플레이트의 제거로 개방되는 연결구조체(110)의 내부공간과 단위 판넬의 시공 공간에 걸쳐 철근망(102)을 설치한 후 상기 공간에 콘크리트를 함께 타설함으로써, 선행 판넬(100a) 및 후행 판넬(100b), 그리고 그 사이에 위치된 연결구조체(110)가 철근망(102) 및 콘크리트에 의해 구조적으로 일체화 될 수 있게 시공할 수 있는 바, 결국 토압 등 외력작용에 의해 각 단위 판넬이 서로 다르게 거동하는 종래의 구조적 문제점을 해소할 수 있게 된다.As such, according to the present invention, after installing the reinforcing bar network 102 over the internal space of the connecting structure 110 and the unit space of the unit panel to be opened by the removal of the beam plate, by placing concrete together in the space, the preceding panel (100a) and the trailing panel (100b), and the connecting structure 110 located therebetween can be constructed to be structurally integrated by the reinforcing bar network 102 and concrete bar, by the external force action such as earth pressure It is possible to solve the conventional structural problem that each unit panel behaves differently.

또한, 본 고안의 연결구조체에 따르면, 시공 후 차단 플레이트(113)가 단위 판넬(100)간 연결부위를 완전 밀폐시키므로 종래와 같은 연결부위의 누수문제가 해결될 수 있게 된다. In addition, according to the connection structure of the present invention, the blocking plate 113 after construction completely seals the connection between the unit panel 100 can be solved the problem of leakage of the connection portion as in the prior art.

이상에서 설명한 바와 같이, 본 고안에 따른 지하연속벽 시공을 위한 단위 판넬간 연결구조체에 의하면, 빔 플레이트의 제거로 개방되는 연결구조체의 내부공간과 단위 판넬의 시공 공간에 걸쳐 철근망을 설치한 후 상기 공간에 콘크리트를 함께 타설함으로써, 선행 판넬 및 후행 판넬, 그리고 그 사이에 위치된 연결구조체가 철근망 및 콘크리트에 의해 구조적으로 일체화 될 수 있게 시공할 수 있는 바, 결국 토압 등 외력작용에 의해 각 단위 판넬이 서로 다르게 거동하는 종래의 구조적 문제점을 해소할 수 있게 된다.As described above, according to the inter-panel connection structure for the construction of the continuous wall of the underground according to the present invention, after installing the rebar network over the interior space of the connection structure and the construction space of the unit panel open by removing the beam plate By placing concrete together in the space, the preceding panel and the following panel, and the connecting structure located therebetween can be constructed so that they can be structurally integrated by the reinforcing bar network and concrete. It is possible to solve the conventional structural problem that the unit panels behave differently.

또한, 시공 후 차단 플레이트가 단위 판넬간 연결부위를 완전 밀폐시키므로 종래와 같은 단위 판넬간 연결부위의 누수문제 및 그로 인한 결로문제가 해결될 수 있으며, 결국 벽체 내벽 방수시공은 물론 내부 조적 벽돌쌓기 등이 삭제 가능하여 경제적 측면이나 공간적 측면에서 유리한 장점이 있게 된다.In addition, since the blocking plate completely seals the connection area between the unit panels after construction, the leakage problem and condensation problem of the connection area between the unit panels as in the prior art can be solved. Consequently, waterproofing the inner wall of the wall as well as internal masonry stacking This can be deleted, which is advantageous in terms of economy and space.

도 1은 종래 지하연속벽의 횡단면도,1 is a cross-sectional view of a conventional underground continuous wall,

도 2a ~ 도 2i는 본 고안의 연결구조체를 사용하여 지하연속벽을 시공하는 과정을 설명하기 위한 공정도,Figure 2a to 2i is a process diagram for explaining the process of constructing the underground continuous wall using the connection structure of the present invention,

도 3a는 본 고안에 따른 연결구조체의 각 구성을 보이기 위한 분리사시도,Figure 3a is an exploded perspective view for showing each configuration of the connecting structure according to the present invention,

도 3b는 본 고안에 따른 연결구조체의 조립사시도,Figure 3b is an assembled perspective view of the connecting structure according to the present invention,

도 4a 내지 도 4f는 본 고안에 따른 연결구조체의 각 실시예를 나타내는 횡단면도.Figures 4a to 4f is a cross-sectional view showing each embodiment of the connecting structure according to the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

1 : 트렌치 2 : 트렌치1: trench 2: trench

100 : 단위 판넬 102 : 철근망100: unit panel 102: rebar network

110 : 연결구조체 111 : 메인 빔110: connecting structure 111: main beam

111c : 관통공 112 : 고무 O-링111c: through hole 112: rubber O-ring

113 : 차단 플레이트 113a : 단위 플레이트113: blocking plate 113a: unit plate

114 : 레일부재 115 : 가이드 부재114: rail member 115: guide member

116 : 빔 플레이트 117 : 보강 철근116: beam plate 117: rebar

118 : 수평인장철근 119 : 수직주철근118: horizontal tensile steel 119: vertical cast steel

121 : 커플러 122 : 스페이서121: coupler 122: spacer

123 : 방수판 123a : 관통공123: waterproof plate 123a: through hole

124 : 고정철근124: fixed rebar

Claims (18)

I 형강 또는 H 형강으로 이루어지고, 하기 양측의 차단 플레이트 사이에 위치되어 차단 플레이트와 하기 빔 플레이트에 의해 형성된 내부공간을 좌우 양측으로 구획하는 메인 빔과; A main beam made of an I-beam or an H-beam and positioned between the blocking plates on both sides below to divide the internal space formed by the blocking plate and the beam beams on both the left and right sides; 상기 메인 빔의 양 측면부쪽에 설치되고, 메인 빔을 사이에 두고 평행 배치되어 메인 빔 길이방향을 따라 연속된 형태의 전면벽과 후면벽을 형성하는 양측의 차단 플레이트와; Two side blocking plates provided at both side portions of the main beam and arranged in parallel with the main beam interposed therebetween to form a front wall and a rear wall of a continuous shape along the main beam longitudinal direction; I 형강으로 구비되어 상기 양측의 차단 플레이트와 함께 좌우 양 측면 위치에서 밀폐된 내부공간을 형성하도록 설치되고, 측면 위치에서 각 측면부가 가이드 부재에 끼워지는 형태로 설치되어 탈착 가능하게 된 빔 플레이트와; A beam plate provided with an I-beam and installed with the blocking plates on both sides to form a sealed inner space at left and right lateral positions, each side portion being fitted to the guide member at the lateral position and being detachable; 상기 차단 플레이트와 빔 플레이트가 형성하여 상기 메인 빔에 의해 구획된 양측 내부공간에 설치되는 보강 철근;Reinforcing bars formed by the blocking plate and the beam plate and installed in both inner spaces partitioned by the main beam; 을 포함하여 조립 구성되고, 단위 판넬간 각 연결부 위치에 수직 시공되어, 상기 빔 플레이트 제거시 측면 개방된 상기 양측 내부공간과 양측 단위 판넬 공간에 걸쳐 시공된 철근망 및 콘크리트에 의해 단위 판넬과 일체화되는 것을 특징으로 하는 지하연속벽 시공을 위한 단위 판넬간 연결구조체. It is assembled and configured to include, and is vertically installed at each connection position between the unit panel, and integrated with the unit panel by the reinforcing bar and concrete constructed over the both sides of the inner space and both sides of the unit panel space open when removing the beam plate Connection structure between unit panels for underground continuous wall construction, characterized in that. 청구항 1에 있어서,The method according to claim 1, 상기 보강 철근이,The rebar, 상기 메인 빔 중앙부에서 양 측면부쪽 인근의 양측 위치에 메인 빔 길이방향을 따라 등간격 형성된 각 관통공에 횡방향으로 관통 설치되는 다수개의 수평인장철근과;A plurality of horizontal tensile bars installed transversely in each of the through holes formed at equal intervals along the longitudinal direction of the main beam at both sides of the main beam center at both side portions near the side portions; 이 수평인장철근에 대하여 횡방향 배치되어 상기 메인 빔 길이방향을 따라 길게 설치되는 다수개의 수직주철근;A plurality of vertical cast iron bars disposed transversely with respect to the horizontal tensile bars and installed in the longitudinal direction of the main beam; 으로 이루어진 것을 특징으로 하는 지하연속벽 시공을 위한 단위 판넬간 연결구조체.Connection structure between unit panels for the construction of continuous underground wall, characterized in that consisting of. 청구항 2에 있어서, The method according to claim 2, 상기 관통공에는 차단재 역할을 하는 고무 O-링이 상기 수평인장철근과의 사이에 설치되는 것을 특징으로 하는 지하연속벽 시공을 위한 단위 판넬간 연결구조체. The through-hole connecting structure between unit panels for the construction of the continuous underground wall, characterized in that the rubber O-ring serving as a barrier between the horizontal tensile reinforcing bar is installed between. 청구항 2에 있어서,The method according to claim 2, 상기 각 수평인장철근이 분리 구성되어 분리된 부분이 커플러에 의해 연결 조립되는 구조인 것을 특징으로 하는 지하연속벽 시공을 위한 단위 판넬간 연결구조체.Connection structure between unit panels for underground continuous wall construction, characterized in that the horizontal tensile reinforcing bars are separated and configured to be assembled by a coupler. 청구항 2에 있어서,The method according to claim 2, 상기 보강 철근의 수직주철근에는 차단 플레이트의 내측면과의 사이에서 끝단부가 수직주철근에 결합되어 해당 수직주철근을 차단 플레이트로부터 일정 간격으로 유지 및 지지하는 스페이서가 설치되는 것을 특징으로 하는 지하연속벽 시공을 위한 단위 판넬간 연결구조체.Underground continuous wall construction, characterized in that the vertical reinforcing bars of the reinforcing bar is provided with a spacer between the end of the reinforcing bars and the inner surface of the blocking plate is coupled to the vertical main bars to maintain and support the vertical cast iron at a predetermined interval from the blocking plate. Inter-panel connection structure for unit. 청구항 1 내지 5 중 어느 한 항에 있어서,The method according to any one of claims 1 to 5, 상기 보강 철근의 각 수평인장철근이, Each horizontal tensile bar of the reinforcing bar, 양 단부가 절곡 형성되어 상기 차단 플레이트의 내측면에 용접됨으로써 고정되는 것을 특징으로 하는 지하연속벽 시공을 위한 단위 판넬간 연결구조체.Connection structure between unit panels for underground continuous wall construction, characterized in that both ends are bent and fixed by welding to the inner surface of the blocking plate. 청구항 1 내지 5 중 어느 한 항에 있어서,The method according to any one of claims 1 to 5, 상기 보강 철근의 각 수평인장철근이, Each horizontal tensile bar of the reinforcing bar, 양 단부가 절곡 형성되어 상기 가이드 부재에 용접됨으로써 고정되는 것을 특징으로 하는 지하연속벽 시공을 위한 단위 판넬간 연결구조체.Interconnection between unit panels for underground continuous wall construction, characterized in that both ends are bent and fixed by welding to the guide member. 청구항 1에 있어서,The method according to claim 1, 상기 보강 철근이,The rebar, 직사각형 구조로 구비되어 메인 빔에 의해 구획된 상기 양측 내부공간에서 각각 메인 빔 길이방향을 따라 반복 설치되고, 각 내부공간에서 양측 차단 플레이트 내측면에 인접되게 횡방향 배치되어 일측과 타측이 각각 상기 메인 빔과 가이드 부재에 용접됨으로써 고정되는 다수개의 수평인장철근과;It is provided in a rectangular structure is repeatedly installed along the longitudinal direction of the main beam in each of the two inner space partitioned by the main beam, and disposed in the transverse direction adjacent to the inner surface of the two side blocking plate in each inner space, one side and the other side is the main A plurality of horizontal tensile bars fixed by welding to the beam and the guide member; 이 수평인장철근 안쪽에서 수평인장철근에 대하여 횡방향 배치되어 상기 메인 빔 길이방향을 따라 길게 설치되는 다수개의 수직주철근;A plurality of vertical cast iron bars disposed transversely with respect to the horizontal tensile bars in the horizontal tensile bars and installed in the longitudinal direction of the main beam; 으로 이루어진 것을 특징으로 하는 지하연속벽 시공을 위한 단위 판넬간 연결구조체.Connection structure between unit panels for the construction of continuous underground wall, characterized in that consisting of. 청구항 1에 있어서,The method according to claim 1, 상기 보강 철근이,The rebar, 양 단부가 절곡 형성된 'ㄷ'자 구조로 구비되어 메인 빔에 의해 구획된 상기 양측 내부공간에서 각각 메인 빔 길이방향을 따라 반복 설치되고, 각 내부공간에서 양측 차단 플레이트 내측면에 인접되게 횡방향 배치되어 일단부가 상기 차단 플레이트 내측면 또는 상기 가이드 부재에 용접되는 동시에 타단부가 상기 메인 빔에 용접됨으로써 고정되는 다수개의 수평인장철근과, The two ends are bent in a 'c' shaped structure and are repeatedly installed along the longitudinal direction of the main beam in each of the two inner spaces partitioned by the main beam, and disposed in the transverse direction adjacent to the inner side surfaces of both blocking plates in the respective inner spaces. A plurality of horizontal tensile bars whose one end is welded to the inner surface of the blocking plate or the guide member and the other end is fixed by welding to the main beam; 이 수평인장철근에 대하여 횡방향 배치되어 상기 메인 빔 길이방향을 따라 길게 설치되는 다수개의 수직주철근;A plurality of vertical cast iron bars disposed transversely with respect to the horizontal tensile bars and installed in the longitudinal direction of the main beam; 으로 이루어진 것을 특징으로 하는 지하연속벽 시공을 위한 단위 판넬간 연결구조체.Connection structure between unit panels for the construction of continuous underground wall, characterized in that consisting of. 청구항 9에 있어서,The method according to claim 9, 상기 보강 철근의 수직주철근에는 차단 플레이트의 내측면과의 사이에서 끝단부가 수직주철근에 결합되어 해당 수직주철근을 차단 플레이트로부터 일정 간격으로 유지 및 지지하는 스페이서가 설치되는 것을 특징으로 하는 지하연속벽 시공을 위한 단위 판넬간 연결구조체.Underground continuous wall construction, characterized in that the vertical reinforcing bars of the reinforcing bar is provided with a spacer between the end of the reinforcing bars and the inner surface of the blocking plate is coupled to the vertical main bars to maintain and support the vertical cast iron at a predetermined interval from the blocking plate. Inter-panel connection structure for unit. 청구항 1에 있어서,The method according to claim 1, 상기 차단 플레이트가 상기 메인 빔 측면부에 횡방향 설치된 소정 간격의 레일부재에 슬라이드식으로 끼워지는 복수개의 단위 플레이트들로 조립 구성되고, 상기 각 레일부재의 양 단부 안쪽면에는 상기 가이드 부재가 메인 빔 길이방향으로 배치되어 레일부재들을 연결하는 형태로 용접 설치되는 것을 특징으로 하는 지하연속벽 시공을 위한 단위 판넬간 연결구조체.The blocking plate is composed of a plurality of unit plates that are slide-fitted to the rail members at predetermined intervals horizontally installed on the side surface of the main beam, wherein the guide member is formed on both inner sides of each rail member. Connection structure between unit panels for underground continuous wall construction, characterized in that the installation is arranged in the direction to connect the rail members welded. 요철구조의 단면구조를 가지면서 일방향으로 길게 형성된 판재로 이루어져 하기 양측의 차단 플레이트 사이에 위치되어 차단 플레이트와 하기 빔 플레이트에 의해 형성된 내부공간을 좌우 양측으로 구획하는 방수판과; A waterproof plate having a cross-sectional structure of a concave-convex structure and positioned in one direction to be disposed between the blocking plates on both sides to partition the inner space formed by the blocking plate and the beam plate below on both sides; 상기 방수판을 사이에 두고 평행 배치되어 방수판의 길이방향을 따라 연속된 형태의 전면벽과 후면벽을 형성하는 양측의 차단 플레이트와; Two blocking plates arranged in parallel with the waterproof plate interposed therebetween to form a front wall and a rear wall of a continuous shape along the longitudinal direction of the waterproof plate; I 형강으로 구비되어 상기 양측의 차단 플레이트와 함께 좌우 양 측면 위치에서 밀폐된 내부공간을 형성하도록 설치되고, 측면 위치에서 각 측면부가 가이드 부재에 끼워지는 형태로 설치되어 탈착 가능하게 된 빔 플레이트와; A beam plate provided with an I-beam and installed with the blocking plates on both sides to form a sealed inner space at left and right lateral positions, each side portion being fitted to the guide member at the lateral position and being detachable; 상기 차단 플레이트와 빔 플레이트가 형성하여 상기 메인 빔에 의해 구획된 양측 내부공간에 설치되어 상기 방수판 고정 역할을 동시에 수행하는 보강 철근;Reinforcing bars formed by the blocking plate and the beam plate and installed in both inner spaces partitioned by the main beam to simultaneously perform the role of fixing the waterproof plate; 을 포함하여 조립 구성되고, 단위 판넬간 각 연결부 위치에 수직 시공되어, 상기 빔 플레이트 제거시 측면 개방된 상기 양측 내부공간과 양측 단위 판넬 공간에 걸쳐 시공된 철근망 및 콘크리트에 의해 단위 판넬과 일체화되는 것을 특징으로 하는 지하연속벽 시공을 위한 단위 판넬간 연결구조체. It is assembled and configured to include, and is vertically installed at each connection position between the unit panel, and integrated with the unit panel by the reinforcing bar and concrete constructed over the both sides of the inner space and both sides of the unit panel space open when removing the beam plate Connection structure between unit panels for underground continuous wall construction, characterized in that. 청구항 12에 있어서,The method according to claim 12, 상기 보강 철근이,The rebar, 상기 방수판에서 상기 양측의 차단 플레이트 인근 위치에 방수판 길이방향을 따라 등간격 형성된 각 관통공에 횡방향으로 관통 설치되는 다수개의 수평인장철근과; A plurality of horizontal tension reinforcing bars installed transversely in each of the through holes formed at equal intervals along the longitudinal direction of the waterproof plate at positions adjacent to the blocking plates on both sides of the waterproof plate; 이 수평인장철근에 대하여 횡방향 배치되어 상기 메인 빔 길이방향을 따라 길게 설치되는 다수개의 수직주철근과; A plurality of vertical cast iron bars disposed transversely with respect to the horizontal tensile bars and installed in the longitudinal direction of the main beam; 상기 양측 차단 플레이트쪽으로 설치된 두 수평인장철근을 횡으로 연결하도록 설치되되, 방수판 양쪽면으로 설치되어 방수판을 지지함과 동시에 위치 고정시키는 고정철근;Fixing reinforcing bar is installed to connect the two horizontal tension reinforcing bars installed on both sides of the blocking plate in the transverse direction, is installed on both sides of the waterproof plate to support the waterproof plate and at the same time fixed position; 으로 이루어진 것을 특징으로 하는 지하연속벽 시공을 위한 단위 판넬간 연결구조체.Connection structure between unit panels for the construction of continuous underground wall, characterized in that consisting of. 청구항 13에 있어서,The method according to claim 13, 상기 각 수평인장철근이 분리 구성되어 분리된 부분이 커플러에 의해 연결 조립되는 구조인 것을 특징으로 하는 지하연속벽 시공을 위한 단위 판넬간 연결구조체.Connection structure between unit panels for underground continuous wall construction, characterized in that the horizontal tensile reinforcing bars are separated and configured to be assembled by a coupler. 청구항 13에 있어서,The method according to claim 13, 상기 보강 철근의 수직주철근에는 차단 플레이트의 내측면과의 사이에서 끝단부가 수직주철근에 결합되어 해당 수직주철근을 차단 플레이트로부터 일정 간격으로 유지 및 지지하는 스페이서가 설치되는 것을 특징으로 하는 지하연속벽 시공을 위한 단위 판넬간 연결구조체.Underground continuous wall construction, characterized in that the vertical reinforcing bars of the reinforcing bar is provided with a spacer between the end of the reinforcing bars and the inner surface of the blocking plate is coupled to the vertical main bars to maintain and support the vertical cast iron at a predetermined interval from the blocking plate. Inter-panel connection structure for unit. 청구항 12 내지 15 중 어느 한 항에 있어서,The method according to any one of claims 12 to 15, 상기 보강 철근의 각 수평인장철근이, Each horizontal tensile bar of the reinforcing bar, 양 단부가 절곡 형성되어 상기 차단 플레이트의 내측면에 용접됨으로써 고정되는 것을 특징으로 하는 지하연속벽 시공을 위한 단위 판넬간 연결구조체.Connection structure between unit panels for underground continuous wall construction, characterized in that both ends are bent and fixed by welding to the inner surface of the blocking plate. 청구항 12 내지 15 중 어느 한 항에 있어서,The method according to any one of claims 12 to 15, 상기 보강 철근의 각 수평인장철근이, Each horizontal tensile bar of the reinforcing bar, 양 단부가 절곡 형성되어 상기 가이드 부재에 용접됨으로써 고정되는 것을 특징으로 하는 지하연속벽 시공을 위한 단위 판넬간 연결구조체.Interconnection between unit panels for underground continuous wall construction, characterized in that both ends are bent and fixed by welding to the guide member. 청구항 12에 있어서,The method according to claim 12, 상기 차단 플레이트가 상기 방수판 길이방향 소정 간격으로 횡방향 배치된 레일부재에 슬라이드식으로 끼워지는 복수개의 단위 플레이트들로 조립 구성되고, 상기 각 레일부재의 양 단부 안쪽면에는 상기 가이드 부재가 메인 빔 길이방향으로 배치되어 레일부재들을 연결하는 형태로 용접 설치되는 것을 특징으로 하는 지하연속벽 시공을 위한 단위 판넬간 연결구조체.The blocking plate is composed of a plurality of unit plates that are slide-fitted to the rail member arranged in the transverse direction at a predetermined interval in the longitudinal direction of the waterproof plate, wherein the guide member is provided on both inner surfaces of each rail member. Connection structure between unit panels for underground continuous wall construction, characterized in that the longitudinally arranged is welded in the form of connecting the rail members.
KR20-2004-0034160U 2004-12-02 2004-12-02 Joint structure for unit pannel of underground new diaphragm wall KR200376613Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2004-0034160U KR200376613Y1 (en) 2004-12-02 2004-12-02 Joint structure for unit pannel of underground new diaphragm wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2004-0034160U KR200376613Y1 (en) 2004-12-02 2004-12-02 Joint structure for unit pannel of underground new diaphragm wall

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020040097748 Division 2004-11-26 2004-11-26

Publications (1)

Publication Number Publication Date
KR200376613Y1 true KR200376613Y1 (en) 2005-03-11

Family

ID=43678377

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0034160U KR200376613Y1 (en) 2004-12-02 2004-12-02 Joint structure for unit pannel of underground new diaphragm wall

Country Status (1)

Country Link
KR (1) KR200376613Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102269744B1 (en) 2020-12-18 2021-06-28 (주)범양이엔씨 Excavator for building continuous wall panel with a groove

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102269744B1 (en) 2020-12-18 2021-06-28 (주)범양이엔씨 Excavator for building continuous wall panel with a groove

Similar Documents

Publication Publication Date Title
KR101037774B1 (en) Joint structure for diaphragm wall and method of constructing diaphragm wall using the same
KR100694633B1 (en) Joint structure for unit pannel of underground new diaphragm wall and construction method of underground diaphragm wall using the same
KR101640795B1 (en) Furlable earth retaining structure for provisional facilities and construction method thereof
KR102153902B1 (en) Slurry wall, construction method for the same and wire mesh assembly
KR101676814B1 (en) CFT pile Construction Method and the Shoring Method using the same file
KR20220012525A (en) Slurry wall, construction method for the same and wire mesh assembly
KR100758504B1 (en) Method of construction for underground diaphragm wall and underground diaphragm wall structure
KR200376613Y1 (en) Joint structure for unit pannel of underground new diaphragm wall
JP3896351B2 (en) Construction method of underground wall and construction method of underpass
US5871307A (en) Pre-cast concrete panel wall
KR101913630B1 (en) Reverse t-type steel composite vertical member for outer wall of the underground structure and the construction method using the same
KR20220065461A (en) WIRE STRUCTURE FOR STAGGERED LAPPING IN SLURRY WALL, SLURRY WALL and CONSTRUCTION METHOD FOR THE SAME
KR101923973B1 (en) Outer wall construction method of underground structure using the reverse t-type steel composite vertical member
JP2018040151A (en) Construction method of underground continuous wall and underground continuous wall
KR102240488B1 (en) Connecting box for underground continuous wall and construction method using them same
KR20170091829A (en) Complex Steel Pipe Structure for Underground Wall and the Construction Method Using the Same
KR102371284B1 (en) Slurry wall, construction method for the same and wire mesh assembly
EP1964981A1 (en) Reinforcement elements for in-situ cast walls and method to excavate in situ cast walls
KR102341511B1 (en) Retaining wall construction method using box type pile assembly
KR102439239B1 (en) Connecting box for underground continuous wall and construction method using them same
JPS606417B2 (en) Underground continuous wall structure
JPH0363313A (en) Construction of underground continuous wall utilizing half pc board
JP5360658B2 (en) Retaining wall made of precast concrete
JP2605941B2 (en) Construction method for underground structures
KR20230155347A (en) Buried box structure for staggered lapping and method for construction of slurry wall using the same

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20130312

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20140313

Year of fee payment: 10

EXPY Expiration of term