KR200376272Y1 - Measurement apparatus for underground construction of smooth's ground - Google Patents
Measurement apparatus for underground construction of smooth's ground Download PDFInfo
- Publication number
- KR200376272Y1 KR200376272Y1 KR20-2004-0027495U KR20040027495U KR200376272Y1 KR 200376272 Y1 KR200376272 Y1 KR 200376272Y1 KR 20040027495 U KR20040027495 U KR 20040027495U KR 200376272 Y1 KR200376272 Y1 KR 200376272Y1
- Authority
- KR
- South Korea
- Prior art keywords
- ground
- soft ground
- measuring
- settlement
- scale
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D1/00—Investigation of foundation soil in situ
- E02D1/08—Investigation of foundation soil in situ after finishing the foundation structure
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B5/00—Measuring arrangements characterised by the use of mechanical techniques
- G01B5/30—Measuring arrangements characterised by the use of mechanical techniques for measuring the deformation in a solid, e.g. mechanical strain gauge
Abstract
본 고안은, 연약 지반 지하 구조물 침하 계측 구조에 관한 것으로서, 특히 연약 지반에 설치되는 하수도 구조물의 침하를 확인할 수 있도록 시공 초기에 설치하는 연약 지반 지하 구조물 침하 계측 구조에 관한 것이다.The present invention relates to a structure for measuring settlement of soft ground underground structures, and more particularly, to a structure for settlement of soft ground underground structures installed at the initial stage of construction so that the settlement of sewage structures installed in the soft ground can be confirmed.
본 고안은, 연약 지반에 길이방향으로 다수개가 연결되도록 매설되는 하수관의 침하 상태를 확인하기 위한 장치에 있어서, 상기 연약 지반에 매설되는 하수관에는 그 둘레를 둘러싸도록 앵커 고리가 설치되고, 상기 앵커 고리에는 상부에 체결 고리가 형성되어 계측 몸체의 하부로 형성된 계측줄의 후크부가 체결 고리에 고정되어 하수관의 침하에 따라 계측 몸체도 하부로 침하되도록 형성되며, 상기 계측 몸체에는 중앙 상부로 나사홈이 형성되어 눈금대 하부가 볼트 체결되고, 상기 눈금대의 눈금을 계측 기기로 읽어 처음의 지반 표면과의 침하후 지반의 높이차를 측정하여 연약 지반층의 침하 상태를 측정할 수 있도록 구성됨을 특징으로 하는 연약 지반 지하 구조물 침하 계측장치를 제공한다.The present invention, in the device for checking the sinking state of the sewer pipe buried in the longitudinal direction to connect the plurality in the soft ground, the sewer pipe embedded in the soft ground is provided with an anchor ring to surround the circumference, the anchor ring The hook is formed in the upper part of the upper part of the measuring line hook formed in the lower part of the measuring body is fixed to the fastening ring is formed so that the measuring body is also lowered in accordance with the sinking of the sewer pipe, the measuring body is formed with a screw groove in the center And the bottom of the scale is bolted, and the scale of the scale is read by a measuring device to measure the height difference of the ground after subsidence with the surface of the first ground. Provides ground subsidence settlement measuring device.
Description
본 고안은, 연약 지반 지하 구조물 침하 계측 구조에 관한 것으로서, 특히 연약 지반에 터파기 후 설치되는 하수도 구조물의 침하를 확인할 수 있도록 하수관, 앵커 고리, 계측 몸체를 시공시 함께 초기에 매설한 후, 나중에 연약 지반의 침하 상태를 계측대 및 계측 기기를 이용하여 계측할 수 있는 구조를 가지는 연약 지반 지하 구조물 침하 계측 장치에 관한 것이다.The present invention relates to the measurement structure of subsidence of soft ground underground structure, and in particular, the sewer pipe, anchor ring, and measurement body were initially buried together at the time of construction so as to confirm the settlement of sewage structures installed after digging in the soft ground. It relates to a soft ground underground structure settlement measuring device having a structure that can measure the settlement state of the soft ground using a measuring table and a measuring instrument.
일반적으로 하수도 구조물을 설치하는 경우, 지반에 대한 터파기를 시행한 후, 콘크리트 흄관을 소켓 방식으로 체결하여 길이방향으로 연결하게 되고, 상기 하수관 연결이 완료되면 하수관 상부에 토사를 덮어 매설 작업을 완료하게 되는게 일반적인 하수관의 설치 방법이다.In general, in the case of installing the sewerage system, after discharging the ground, the concrete fume pipe is fastened by the socket method and connected in the longitudinal direction, and when the sewer pipe connection is completed, cover the soil on the sewage pipe to complete the laying work. The most common way is to install the sewer pipes.
그러나, 상기 하수관이 연약 지반에 설치되는 경우, 지반 침하가 많이 일어나는 관계로, 지반 침하를 방지하기 위해 섬유 마대를 설치하거나 터파기한 장소에 기초 콘크리트를 타설하는 등 다양한 지반 침하에 대한 영향을 적게 받을 수 있게 하수관이 매설된다.However, when the sewage pipe is installed in the soft ground, since the ground subsidence occurs a lot, it is less susceptible to various ground subsidences, such as installing fiber sacks to prevent ground subsidence or placing the foundation concrete at the dig site. Sewer pipe is buried so that it is possible.
하지만, 이러한 연약 지반의 상부로 도로 등이 시공되는 경우, 지반 침하는 더욱 많이 일어나게 되어 도시된 도 2와 같이 지반 표면의 높이차가 발생된다.However, when roads or the like are constructed on top of such soft ground, ground subsidence occurs more and the height difference of the ground surface is generated as shown in FIG.
이러한 지반 침하에 따른 새로운 연약 지반의 침하 방지를 위한 새로운 개선 구조 및 연약 지반의 효율적인 관리를 위한 개선책이 우리에게는 필요한 실정이라 할 수 있다.We need a new improvement structure to prevent settlement of new soft ground and improvement measures for efficient management of soft ground.
본 고안은 상술한 문제점을 감안하여, 본 고안은, 연약 지반에 매설된 하수관의 침하 상태를 계측하여 연약 지반의 지반 침하 상태를 확인할 수 있도록 하며, 침하 상태를 파악하여 효율적인 연약 지반의 관리를 할 수 있도록 하는 연약 지반 지하 구조물 침하 계측 장치를 제공함을 그 목적으로 한다.The present invention, in view of the above problems, the present invention, it is possible to check the subsidence state of the soft ground by measuring the sedimentation state of sewage pipes embedded in the soft ground, and to manage the effective soft ground by grasping the subsidence state It is an object of the present invention to provide a measurement device for settlement of soft ground underground structures.
본 고안은 상술한 목적 달성을 위해, 본 고안은, 연약 지반에 길이방향으로 다수개가 연결되도록 매설되는 하수관의 침하 상태를 확인하기 위한 장치에 있어서, 상기 연약 지반에 매설되는 하수관에는 그 둘레를 둘러싸도록 앵커 고리가 설치되고, 상기 앵커 고리에는 상부에 체결 고리가 형성되어 계측 몸체의 하부로 형성된 계측줄의 후크부가 체결 고리에 고정되어 하수관의 침하에 따라 계측 몸체도 하부로 침하되도록 형성되며, 상기 계측 몸체에는 중앙 상부로 나사홈이 형성되어 눈금대 하부가 볼트 체결되고, 상기 눈금대의 눈금을 계측 기기로 읽어 처음의 지반 표면과의 침하후 지반의 높이차를 측정하여 연약 지반층의 침하 상태를 측정할 수 있도록 구성됨을 특징으로 하는 연약 지반 지하 구조물 침하 계측장치를 제공한다.The present invention, in order to achieve the above object, the present invention, in the device for confirming the settlement state of the sewer pipe buried so that the plurality in the longitudinal direction is connected to the soft ground, the sewage pipe embedded in the soft ground surrounds the circumference An anchor ring is installed so that the anchor ring is formed at the upper part of the anchor ring so that the hook part of the measuring line formed as a lower part of the measuring body is fixed to the fastening ring so that the measuring body is also lowered according to the sedimentation of the sewer pipe. A screw groove is formed in the upper part of the measuring body, and the lower part of the scale bar is bolted, and the scale of the scale is read by the measuring device to measure the height difference of the ground after sinking with the first surface of the ground. It provides a soft ground subsidence measurement device, characterized in that configured to measure.
이하, 첨부 도면을 참조하여 본 고안의 구성을 설명한다.Hereinafter, with reference to the accompanying drawings will be described the configuration of the present invention.
도 1은 본 고안의 연약 지반 지하 구조물 침하 계측 구조의 분해 상세도이고, 도 2는 본 고안의 연약 지반 지하 구조물 침하 계측 구조의 사용 상태도이다.1 is an exploded view of the soft ground underground structure settlement measurement structure of the present invention, Figure 2 is a state diagram used in the soft ground underground structure settlement measurement structure of the present invention.
지반층(100)은 일반층과 연약 지반층이 연결된 경우, 일반층과 연약 지반층의 터파기한 위치에는 하수관(200)이 소켓 방식에 의해 길이방향으로 연결되고, 상기 연약 지반(G)층의 하수관(200)에는 길이방향 중앙에 앵커 고리(300)가 하수관의 외경을 감싸도록 결합된다.When the ground layer 100 is connected to the general layer and the soft ground layer, the sewage pipe 200 is connected in the longitudinal direction by the socket method at the trench position of the general layer and the soft ground layer, the soft ground (G) of the layer The sewer pipe 200 is coupled to the anchor ring 300 in the longitudinal center to surround the outer diameter of the sewer pipe.
상기 앵커 고리(300)에는 상부에 체결 고리가 형성되어 계측 몸체(400)의 하부로 형성된 계측줄(420)의 후크부가 체결 고리에 고정된다.A fastening ring is formed at an upper portion of the anchor ring 300 so that the hook portion of the measuring line 420 formed at the bottom of the measuring body 400 is fixed to the fastening ring.
즉, 상기 하수관(200)에는 앵커 고리(300)가 체결되고, 상기 앵커 고리(300)에는 계측 몸체(400)의 계측줄(420)이 고정되어 하수관(200)의 침하에 따라 계측 몸체(400)도 하부로 침하하게 된다.That is, the anchor ring 300 is fastened to the sewage pipe 200, and the measuring line 420 of the measuring body 400 is fixed to the anchor ring 300 to measure the body 400 according to the settlement of the sewer pipe 200. ) Will also sink to the bottom.
상기 계측 몸체(400)에는 중앙 상부로 나사홈(440)이 형성되어 눈금대(500)의 하부가 볼트 체결되고, 상기 눈금대(500)에는 눈금이 표식되어 있어 계측 기기(700)를 통해 눈금을 읽어 처음의 지반 표면과의 높이차를 측정하므로 연약 지반층의 침하 상태를 확인하게 된다.A screw groove 440 is formed at the center of the measuring body 400 so that the lower part of the scale 500 is bolted, and the scale 500 is marked on the scale 500 to measure the scale through the measuring device 700. Read and measure the difference in height with the first ground surface to determine the subsidence of the soft ground layer.
상술한 연약 지반에 매설되는 하수관(200)의 침하 상태를 상부에서 확인할 수 있는 구조를 가지는 안전 진단 계측 구조를 제공하므로, 시공후 연약 지반에 대한 정밀한 시공을 위한 사전 조사에 따른 연약 지반용 하수관의 시공 구조를 개선할 수 있게 된다.Since it provides a safety diagnostic measurement structure having a structure capable of confirming the settlement state of the sewer pipe 200 buried in the soft ground from above, after the construction of the soft ground sewage pipe according to the preliminary survey for precise construction of the soft ground The construction structure can be improved.
즉, 연약 지반(G)에 매설되는 하수관(200)마다 앵커 고리(300)를 설치하여 계측 몸체(400)의 계측줄(420)을 앵커 고리(300)에 체결함과 아울러, 상기 계측 몸체(400)의 나사홈(440)에 계측 기기(700)를 통해 침하후 지반 상태를 적절하게 계측할 수 있도록 눈금대(500)가 체결되는 관계로, 작업자들은 간단하게 지반 침하의 상태를 확인할 수 있게 된다.That is, by installing the anchor ring 300 for each sewage pipe 200 embedded in the soft ground (G) to fasten the measuring line 420 of the measuring body 400 to the anchor ring 300, the measuring body ( Since the scale table 500 is fastened to the screw groove 440 of the 400 through the measuring device 700 so as to properly measure the ground state, the workers can easily check the state of the ground subsidence. do.
이때 상기 계측 몸체(400)의 나사홈(440)에는 도면에 미도시되었지만 토사 등과 같은 이물질에 의한 막힘을 방지하기 위해 스폰지 또는 고무 재질로 제작된 마개를 결합하여 사용할 수 있음은 당연하다 할 것이다.In this case, although not shown in the drawing, the screw groove 440 of the measuring body 400 may be used in combination with a stopper made of a sponge or rubber material to prevent clogging due to foreign matter such as earth and sand.
상술한 본 고안의 구성에 따른 효과를 설명한다.The effect according to the configuration of the present invention described above will be described.
본 고안은, 연약 지반에 매설되는 하수관에, 앵커 고리, 계측줄과 나사홈을 갖는 계측 몸체, 눈금대 및 계측 기기를 통해 기존 지반과 침하후 지반의 상태를 확인할 수 있게 되므로, 하수관의 침하 정도를 손쉽게 파악하여 사후 관리를 철저하게 행할 수 있음은 물론, 상기 사후 관리에서 얻어지는 자료를 이용하여 연약 지반에 대한 철저한 사전 조사 데이터를 확보할 수 있게 되어 효율적인 관리를 이룰 수 있는 효과를 갖는다. The present invention, the sewer pipe embedded in the soft ground, the anchor ring, the measuring body having a measuring line and threaded grooves, through the measuring rod, and the measuring instrument can determine the state of the existing ground and ground after subsidence, It can be easily grasped to thoroughly carry out the follow-up management, as well as to obtain a thorough pre-investigation data on the soft ground by using the data obtained in the post-management to have an efficient management.
도 1은 본 고안의 연약 지반 지하 구조물 침하 계측 장치의 분해 상세도.1 is an exploded detailed view of a settlement for measuring the soft ground substructure of the present invention.
도 2는 본 고안의 연약 지반 지하 구조물 침하 계측 장치의 사용 상태도.Figure 2 is a state of use of the soft ground underground structure settlement measurement device of the present invention.
< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>
100: 지반층 200: 하수관100: ground layer 200: sewer pipe
300: 앵커 고리 400: 계측 몸체300: anchor ring 400: measuring body
420: 계측줄 500: 눈금대420: measuring line 500: graticule
700: 계측 기기 G : 연약 지반700: measuring device G: soft ground
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2004-0027495U KR200376272Y1 (en) | 2004-09-24 | 2004-09-24 | Measurement apparatus for underground construction of smooth's ground |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2004-0027495U KR200376272Y1 (en) | 2004-09-24 | 2004-09-24 | Measurement apparatus for underground construction of smooth's ground |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200376272Y1 true KR200376272Y1 (en) | 2005-03-10 |
Family
ID=43678051
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2004-0027495U KR200376272Y1 (en) | 2004-09-24 | 2004-09-24 | Measurement apparatus for underground construction of smooth's ground |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200376272Y1 (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100655866B1 (en) | 2006-05-08 | 2006-12-08 | (주)테스콤엔지니어링 | Measuring instrument for the sinking degree of the ground |
KR100667585B1 (en) | 2006-09-15 | 2007-01-11 | 주식회사 한국종합기술 | The instrumentation apparatus waterwork pipe |
KR100667581B1 (en) | 2006-09-16 | 2007-01-11 | 주식회사 한국종합기술 | Measurement apparatus for underground water supply pipe of smooth ground |
KR100715275B1 (en) | 2006-11-18 | 2007-05-08 | (주) 장맥엔지니어링 | Measure apparatus of back-filling construction |
KR100723013B1 (en) | 2006-11-18 | 2007-05-30 | (주) 장맥엔지니어링 | The instrumentation structure of underground-device |
KR100948657B1 (en) | 2009-09-22 | 2010-03-18 | 주식회사 다산컨설턴트 | Marking nail of water supply pipe line |
KR20150000887U (en) * | 2013-08-20 | 2015-03-03 | 대우조선해양 주식회사 | Apparatus for Incline experiment of ship |
KR102319786B1 (en) * | 2021-04-06 | 2021-11-01 | (주)비아이티 | Structure for sewer pipe of staff geodetic surveying |
-
2004
- 2004-09-24 KR KR20-2004-0027495U patent/KR200376272Y1/en not_active IP Right Cessation
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100655866B1 (en) | 2006-05-08 | 2006-12-08 | (주)테스콤엔지니어링 | Measuring instrument for the sinking degree of the ground |
KR100667585B1 (en) | 2006-09-15 | 2007-01-11 | 주식회사 한국종합기술 | The instrumentation apparatus waterwork pipe |
KR100667581B1 (en) | 2006-09-16 | 2007-01-11 | 주식회사 한국종합기술 | Measurement apparatus for underground water supply pipe of smooth ground |
KR100715275B1 (en) | 2006-11-18 | 2007-05-08 | (주) 장맥엔지니어링 | Measure apparatus of back-filling construction |
KR100723013B1 (en) | 2006-11-18 | 2007-05-30 | (주) 장맥엔지니어링 | The instrumentation structure of underground-device |
KR100948657B1 (en) | 2009-09-22 | 2010-03-18 | 주식회사 다산컨설턴트 | Marking nail of water supply pipe line |
KR20150000887U (en) * | 2013-08-20 | 2015-03-03 | 대우조선해양 주식회사 | Apparatus for Incline experiment of ship |
KR200486663Y1 (en) * | 2013-08-20 | 2018-06-20 | 대우조선해양 주식회사 | Apparatus for Incline experiment of ship |
KR102319786B1 (en) * | 2021-04-06 | 2021-11-01 | (주)비아이티 | Structure for sewer pipe of staff geodetic surveying |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101684669B (en) | Submersed type inspection well construction method | |
CN103485320B (en) | U-shaped inclinometer and mounting and embedding method thereof | |
KR200376272Y1 (en) | Measurement apparatus for underground construction of smooth's ground | |
CN106988305A (en) | A kind of pile-column pier construction method of underground integrated molding | |
CN107462211A (en) | A kind of road foundation settlement monitoring sensor for being suitable for having half/rigid structural layer | |
KR100686954B1 (en) | Vertical degree measurement construction of pier for bridge | |
CN101141054A (en) | Compaction grouting method for preventing land subsidence after non-digging horizontal drilling | |
CN110512594A (en) | The simple and easy method of churning driven opportunity cavity pore-forming | |
JPS63181819A (en) | Fitting of measuring bar for settlement of object buried under ground | |
JP6542587B2 (en) | Manhole levitation prevention method | |
CN210400674U (en) | 45-degree right-angle strain flower | |
CN110485223B (en) | Ballast track subgrade settlement monitoring device and ballast track subgrade settlement monitoring method | |
KR100524136B1 (en) | Basic bottom permanent drainage structure using trench and drainage member and it's construction method | |
CN205776301U (en) | Docking formula bedrock survey mark | |
KR200354888Y1 (en) | Construction of smooth ground | |
KR101597933B1 (en) | Resistance method of sliding slope using flexible pipe without slip for soil-cement layer | |
KR200336460Y1 (en) | foundation bottom permanent drainage structure using trench and drainage member | |
JP2908764B2 (en) | Repair method around concrete structures | |
CN105862901A (en) | Docked type bed rock measuring marker and construction method thereof | |
CN213773478U (en) | Four-way cable shaft | |
Sama et al. | Vertical pressures produced by controlled low strength material (CLSM) poured into pipe trenches | |
JP2985063B2 (en) | Caisson prefabricated manhole and its construction method | |
JP2953843B2 (en) | Pipe line laying method by non-cutting propulsion method | |
JPH0452301Y2 (en) | ||
Terri | Third Dimension Simplifies Earth Retention at the Calumet Plant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
REGI | Registration of establishment | ||
T201 | Request for technology evaluation of utility model | ||
T701 | Written decision to grant on technology evaluation | ||
FPAY | Annual fee payment |
Payment date: 20111207 Year of fee payment: 8 |
|
LAPS | Lapse due to unpaid annual fee |