KR200376272Y1 - Measurement apparatus for underground construction of smooth's ground - Google Patents

Measurement apparatus for underground construction of smooth's ground Download PDF

Info

Publication number
KR200376272Y1
KR200376272Y1 KR20-2004-0027495U KR20040027495U KR200376272Y1 KR 200376272 Y1 KR200376272 Y1 KR 200376272Y1 KR 20040027495 U KR20040027495 U KR 20040027495U KR 200376272 Y1 KR200376272 Y1 KR 200376272Y1
Authority
KR
South Korea
Prior art keywords
ground
subsidence
soft ground
measuring
formed
Prior art date
Application number
KR20-2004-0027495U
Other languages
Korean (ko)
Inventor
박영복
Original Assignee
(주)테스콤엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)테스콤엔지니어링 filed Critical (주)테스콤엔지니어링
Priority to KR20-2004-0027495U priority Critical patent/KR200376272Y1/en
Application granted granted Critical
Publication of KR200376272Y1 publication Critical patent/KR200376272Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ
    • E02D1/08Investigation of foundation soil in situ after finishing the foundation structure
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B5/00Measuring arrangements characterised by the use of mechanical means
    • G01B5/30Measuring arrangements characterised by the use of mechanical means for measuring the deformation in a solid, e.g. mechanical strain gauge

Abstract

본 고안은, 연약 지반 지하 구조물 침하 계측 구조에 관한 것으로서, 특히 연약 지반에 설치되는 하수도 구조물의 침하를 확인할 수 있도록 시공 초기에 설치하는 연약 지반 지하 구조물 침하 계측 구조에 관한 것이다. The subject innovation is related to a soft ground underground structure subsidence measuring structure, to a particularly soft ground, construction of soft ground underground structure to the initial installation in the structure subsidence measurement to confirm the structure subsidence of the sewers provided in the.
본 고안은, 연약 지반에 길이방향으로 다수개가 연결되도록 매설되는 하수관의 침하 상태를 확인하기 위한 장치에 있어서, 상기 연약 지반에 매설되는 하수관에는 그 둘레를 둘러싸도록 앵커 고리가 설치되고, 상기 앵커 고리에는 상부에 체결 고리가 형성되어 계측 몸체의 하부로 형성된 계측줄의 후크부가 체결 고리에 고정되어 하수관의 침하에 따라 계측 몸체도 하부로 침하되도록 형성되며, 상기 계측 몸체에는 중앙 상부로 나사홈이 형성되어 눈금대 하부가 볼트 체결되고, 상기 눈금대의 눈금을 계측 기기로 읽어 처음의 지반 표면과의 침하후 지반의 높이차를 측정하여 연약 지반층의 침하 상태를 측정할 수 있도록 구성됨을 특징으로 하는 연약 지반 지하 구조물 침하 계측장치를 제공한다. The subject innovation, in the device for confirming the settlement status of the sewage pipe is buried such that multiple dog connection in the longitudinal direction in the soft ground, the sewage pipe is embedded in the soft ground, and the anchor ring provided so as to surround the circumference, and the anchor ring There is a screw groove formed in a central upper portion is fixed to the additional hook of the measurement line is formed in the fastening ring on an upper formed of a lower part of the measuring body fastening ring and formed such that in accordance with the depression of the sewage pipe measuring body also sink to the bottom, wherein the measuring body is weak, characterized by configured to scale to-bottom is bolted, measure the sinking state and the scale band scale reading in measurement instruments measure the height of the ground tea after subsidence of the first ground surface of the soft ground layer It provides a ground subsidence measuring apparatus underground structures.

Description

연약 지반 지하 구조물 침하 계측 장치{MEASUREMENT APPARATUS FOR UNDERGROUND CONSTRUCTION OF SMOOTH'S GROUND} Soft ground underground structure subsidence measuring apparatus {MEASUREMENT APPARATUS FOR UNDERGROUND CONSTRUCTION OF SMOOTH'S GROUND}

본 고안은, 연약 지반 지하 구조물 침하 계측 구조에 관한 것으로서, 특히 연약 지반에 터파기 후 설치되는 하수도 구조물의 침하를 확인할 수 있도록 하수관, 앵커 고리, 계측 몸체를 시공시 함께 초기에 매설한 후, 나중에 연약 지반의 침하 상태를 계측대 및 계측 기기를 이용하여 계측할 수 있는 구조를 가지는 연약 지반 지하 구조물 침하 계측 장치에 관한 것이다. The subject innovation is soft ground relates to a underground structure subsidence measuring structure, in particular, after the buried initially together during the construction of sewer piping, the anchor ring, the measurement body to determine the depression of the sewer structure, which is installed after termination site on soft ground, later relates to a soft ground underground structure subsidence measuring apparatus has a structure that can be measured by using the soft ground subsidence measuring the state of and for measuring equipment.

일반적으로 하수도 구조물을 설치하는 경우, 지반에 대한 터파기를 시행한 후, 콘크리트 흄관을 소켓 방식으로 체결하여 길이방향으로 연결하게 되고, 상기 하수관 연결이 완료되면 하수관 상부에 토사를 덮어 매설 작업을 완료하게 되는게 일반적인 하수관의 설치 방법이다. In general, if you install the sewer construction a, after it performed an teopa to the ground, and to connect the concrete hyumgwan in the longitudinal direction by fastening the socket manner, when the sewer connection is completed to complete the laying operation covers the earth and sand in sewage upper doeneunge a method of installing a common sewer.

그러나, 상기 하수관이 연약 지반에 설치되는 경우, 지반 침하가 많이 일어나는 관계로, 지반 침하를 방지하기 위해 섬유 마대를 설치하거나 터파기한 장소에 기초 콘크리트를 타설하는 등 다양한 지반 침하에 대한 영향을 적게 받을 수 있게 하수관이 매설된다. However, the sewer is soft when it is installed on the ground, ground subsidence is much happens relationship to install the fiber Sack to prevent ground subsidence or receive less influence on a variety of ground subsidence, such as pouring the base concrete in teopa date place this can allow drainpipe is embedded.

하지만, 이러한 연약 지반의 상부로 도로 등이 시공되는 경우, 지반 침하는 더욱 많이 일어나게 되어 도시된 도 2와 같이 지반 표면의 높이차가 발생된다. However, when the road construction, etc. to the upper portion of such soft ground, ground subsidence is to occur more and more is generated the difference in height of the ground surface, as shown FIG.

이러한 지반 침하에 따른 새로운 연약 지반의 침하 방지를 위한 새로운 개선 구조 및 연약 지반의 효율적인 관리를 위한 개선책이 우리에게는 필요한 실정이라 할 수 있다. New and improved structural improvements for the efficient management of the soft ground to prevent the subsidence of a new soft ground subsidence due to such circumstances as may be necessary for us.

본 고안은 상술한 문제점을 감안하여, 본 고안은, 연약 지반에 매설된 하수관의 침하 상태를 계측하여 연약 지반의 지반 침하 상태를 확인할 수 있도록 하며, 침하 상태를 파악하여 효율적인 연약 지반의 관리를 할 수 있도록 하는 연약 지반 지하 구조물 침하 계측 장치를 제공함을 그 목적으로 한다. The subject innovation is to solve the aforementioned problems, the subject innovation is to weak measuring the depression state of the sewage pipe buried in the ground, and to verify the subsidence state of the soft soil, to identify the settlement conditions to the administration of an effective soft ground to provide a soft ground subsidence measuring apparatus of an underground structure and to that purpose.

본 고안은 상술한 목적 달성을 위해, 본 고안은, 연약 지반에 길이방향으로 다수개가 연결되도록 매설되는 하수관의 침하 상태를 확인하기 위한 장치에 있어서, 상기 연약 지반에 매설되는 하수관에는 그 둘레를 둘러싸도록 앵커 고리가 설치되고, 상기 앵커 고리에는 상부에 체결 고리가 형성되어 계측 몸체의 하부로 형성된 계측줄의 후크부가 체결 고리에 고정되어 하수관의 침하에 따라 계측 몸체도 하부로 침하되도록 형성되며, 상기 계측 몸체에는 중앙 상부로 나사홈이 형성되어 눈금대 하부가 볼트 체결되고, 상기 눈금대의 눈금을 계측 기기로 읽어 처음의 지반 표면과의 침하후 지반의 높이차를 측정하여 연약 지반층의 침하 상태를 측정할 수 있도록 구성됨을 특징으로 하는 연약 지반 지하 구조물 침하 계측장치를 제공한다. The subject innovation is to accomplish the above object, the present design is characterized in that in the device for confirming the settlement status of the sewage pipe is buried such that multiple dog connection in the longitudinal direction in the soft ground, sewer piping embedded in the soft ground, the surrounding its circumference so that the anchor ring is provided, formed such that the anchor ring, the top view sink to the bottom measuring body is fixed to the hook portion fastening ring of the measurement line formed by the lower part of the measuring body is formed in a coupling ring according to the settlement of the sewage in the measuring body has been entered into the to-bottom is a screw groove formed in a central upper grid bolt, the scale band scale reading in measuring equipment after subsidence of the first ground surface to measure a difference in height of the ground a depression state of the soft soil layer It provides a soft ground underground structure subsidence measuring apparatus, characterized by configured to measure.

이하, 첨부 도면을 참조하여 본 고안의 구성을 설명한다. With reference to the accompanying drawings will be described a configuration of the present invention;

도 1은 본 고안의 연약 지반 지하 구조물 침하 계측 구조의 분해 상세도이고, 도 2는 본 고안의 연약 지반 지하 구조물 침하 계측 구조의 사용 상태도이다. Figure 1 is an exploded detail of the soft ground, underground structure subsidence measuring structure of the present design, and Fig. 2 is a soft ground subsidence underground structure using state diagram of a measuring structure of the present invention;

지반층(100)은 일반층과 연약 지반층이 연결된 경우, 일반층과 연약 지반층의 터파기한 위치에는 하수관(200)이 소켓 방식에 의해 길이방향으로 연결되고, 상기 연약 지반(G)층의 하수관(200)에는 길이방향 중앙에 앵커 고리(300)가 하수관의 외경을 감싸도록 결합된다. Ground layer 100 is a common layer with the soft, if the ground layer is connected, regular layer of soft ground layer teopa date location sever 200 to be connected in the longitudinal direction by a socket manner, the soft ground (G) layer of sewage pipe 200 has an anchor ring (300) in the center longitudinal direction are coupled to surround the outer diameter of the sewer piping.

상기 앵커 고리(300)에는 상부에 체결 고리가 형성되어 계측 몸체(400)의 하부로 형성된 계측줄(420)의 후크부가 체결 고리에 고정된다. The anchor ring 300 is fixed to the fastening ring hook portion of the measurement are formed in an upper fastening ring formed with a lower portion of the measuring body 400 in line 420.

즉, 상기 하수관(200)에는 앵커 고리(300)가 체결되고, 상기 앵커 고리(300)에는 계측 몸체(400)의 계측줄(420)이 고정되어 하수관(200)의 침하에 따라 계측 몸체(400)도 하부로 침하하게 된다. That is, the sewage pipe 200 has an anchor ring 300 is engaged, the measurement line 420, the measuring body (400 in accordance with the depression of the fixed sewer piping (200) of the anchor, the measuring body 400 in ring 300 ) it will sink to the bottom Fig.

상기 계측 몸체(400)에는 중앙 상부로 나사홈(440)이 형성되어 눈금대(500)의 하부가 볼트 체결되고, 상기 눈금대(500)에는 눈금이 표식되어 있어 계측 기기(700)를 통해 눈금을 읽어 처음의 지반 표면과의 높이차를 측정하므로 연약 지반층의 침하 상태를 확인하게 된다. Said measurement body 400 has been entered into the bottom of a central upper screw hole 440 is formed on the grid for 500 volts, the scale board (500) making it graduated markings scale through the measuring equipment 700 Since the read measure the height difference between the first surface of the ground will determine the depression status of the soft soil layer.

상술한 연약 지반에 매설되는 하수관(200)의 침하 상태를 상부에서 확인할 수 있는 구조를 가지는 안전 진단 계측 구조를 제공하므로, 시공후 연약 지반에 대한 정밀한 시공을 위한 사전 조사에 따른 연약 지반용 하수관의 시공 구조를 개선할 수 있게 된다. It provides a safety check measurement structure has a structure that can determine the depression status of the drainpipe 200, which is embedded in the above-described soft ground at the top, in the soft ground sewage pipe according to the pre-irradiation for precise construction for a soft ground after the construction it is possible to improve the installation structure.

즉, 연약 지반(G)에 매설되는 하수관(200)마다 앵커 고리(300)를 설치하여 계측 몸체(400)의 계측줄(420)을 앵커 고리(300)에 체결함과 아울러, 상기 계측 몸체(400)의 나사홈(440)에 계측 기기(700)를 통해 침하후 지반 상태를 적절하게 계측할 수 있도록 눈금대(500)가 체결되는 관계로, 작업자들은 간단하게 지반 침하의 상태를 확인할 수 있게 된다. That is, the addition and also entered into a measuring line 420 of the soft ground measuring body 400 by installing the anchor ring (300) for each sewage pipe 200 is embedded in the (G) to the anchor ring (300), the measuring body ( 400) in relation to which the screw hole 440, the scale board (500 to properly measure the ground state after the depression by the measuring device 700 in) engaged, the operator may be able simply determine the status of ground subsidence do.

이때 상기 계측 몸체(400)의 나사홈(440)에는 도면에 미도시되었지만 토사 등과 같은 이물질에 의한 막힘을 방지하기 위해 스폰지 또는 고무 재질로 제작된 마개를 결합하여 사용할 수 있음은 당연하다 할 것이다. In this case can be used a combination of a stopper made of sponge or rubber material in order to prevent the screw holes 440 is clogged with foreign matter such as a not shown but the soil in the figures of the measured body 400 will be granted.

상술한 본 고안의 구성에 따른 효과를 설명한다. It will be described the effects of the configuration of the aforementioned present invention;

본 고안은, 연약 지반에 매설되는 하수관에, 앵커 고리, 계측줄과 나사홈을 갖는 계측 몸체, 눈금대 및 계측 기기를 통해 기존 지반과 침하후 지반의 상태를 확인할 수 있게 되므로, 하수관의 침하 정도를 손쉽게 파악하여 사후 관리를 철저하게 행할 수 있음은 물론, 상기 사후 관리에서 얻어지는 자료를 이용하여 연약 지반에 대한 철저한 사전 조사 데이터를 확보할 수 있게 되어 효율적인 관리를 이룰 수 있는 효과를 갖는다. Since the present design is soft to sewers are embedded in the ground, the anchor ring, the measurement through the measuring body, the scale for and measurement device having a line and threaded able to determine the state of the then existing ground and the depression soil, degree subsidence of the sewers a it can be thoroughly carried out by a follow-up easily understand, of course, has the effect that can achieve a thorough prep efficient management to be able to obtain the data for the soft ground using data obtained from the follow-up.

도 1은 본 고안의 연약 지반 지하 구조물 침하 계측 장치의 분해 상세도. 1 is an exploded detail of the soft ground, underground structure subsidence measuring apparatus according to the present invention;

도 2는 본 고안의 연약 지반 지하 구조물 침하 계측 장치의 사용 상태도. Figure 2 is a state of use of the soft ground, underground structure subsidence measuring apparatus according to the present invention;

< 도면의 주요 부분에 대한 부호의 설명 > <Description of the Related Art>

100: 지반층 200: 하수관 100: Ground layer 200: sewers

300: 앵커 고리 400: 계측 몸체 300: the anchor ring 400: measuring body

420: 계측줄 500: 눈금대 420: Measuring line: 500 scale for

700: 계측 기기 G : 연약 지반 700: measurement device G: Soft Ground

Claims (1)

  1. 연약 지반에 길이방향으로 다수개가 연결되도록 매설되는 하수관의 침하 상태를 확인하기 위한 장치에 있어서, An apparatus for checking the state of the sink sewage pipe is buried such that multiple dog connected to the lengthwise direction of weakness in the ground,
    상기 연약 지반에 매설되는 하수관(200)에는 그 둘레를 둘러싸도록 앵커 고리(300)가 설치되고, 상기 앵커 고리(300)에는 상부에 체결 고리가 형성되어 계측 몸체(400)의 하부로 형성된 계측줄(420)의 후크부가 체결 고리에 고정되어 하수관(200)의 침하에 따라 계측 몸체(400)도 하부로 침하되도록 형성되며, Sewage pipe 200 is buried in the soft ground, there is an anchor ring 300 is provided so as to surround the circumference, and the anchor ring 300, the measurement is formed in the fastening ring on an upper formed of a lower part of the measuring body 400 in line according to the subsidence measuring body 400 of the hook portion is fixed to the fastening ring sewage pipe 200 of the section 420 are also formed so as to sink to the bottom,
    상기 계측 몸체(400)에는 중앙 상부로 나사홈(440)이 형성되어 눈금대(500) 하부가 볼트 체결되고, 상기 눈금대(500)의 눈금을 계측 기기(700)로 읽어 처음의 지반 표면과의 침하후 지반의 높이차를 측정하여 연약 지반층의 침하 상태를 측정할 수 있도록 구성됨을 특징으로 하는 연약 지반 지하 구조물 침하 계측장치. It said measurement body 400 has been fastened to the central upper screw hole 440 is formed in the lower scale for 500 volts, the ground surface of the reading the graduation of the scale board (500) to the measuring device 700, the first and of soft ground underground structure subsidence measuring apparatus, characterized by configured to measure a settlement status of the soft soil layer by measuring the difference in height of the ground after the settlement.
KR20-2004-0027495U 2004-09-24 2004-09-24 Measurement apparatus for underground construction of smooth's ground KR200376272Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2004-0027495U KR200376272Y1 (en) 2004-09-24 2004-09-24 Measurement apparatus for underground construction of smooth's ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2004-0027495U KR200376272Y1 (en) 2004-09-24 2004-09-24 Measurement apparatus for underground construction of smooth's ground

Publications (1)

Publication Number Publication Date
KR200376272Y1 true KR200376272Y1 (en) 2005-03-10

Family

ID=43678051

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0027495U KR200376272Y1 (en) 2004-09-24 2004-09-24 Measurement apparatus for underground construction of smooth's ground

Country Status (1)

Country Link
KR (1) KR200376272Y1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100655866B1 (en) 2006-05-08 2006-12-04 (주)테스콤엔지니어링 Measuring instrument for the sinking degree of the ground
KR100667585B1 (en) 2006-09-15 2007-01-11 주식회사 한국종합기술 The instrumentation apparatus waterwork pipe
KR100667581B1 (en) 2006-09-16 2007-01-11 주식회사 한국종합기술 Measurement apparatus for underground water supply pipe of smooth ground
KR100715275B1 (en) 2006-11-18 2007-04-30 (주) 장맥엔지니어링 Measure apparatus of back-filling construction
KR100723013B1 (en) 2006-11-18 2007-05-22 (주) 장맥엔지니어링 The instrumentation structure of underground-device
KR100948657B1 (en) 2009-09-22 2010-03-18 주식회사 다산컨설턴트 Marking nail of water supply pipe line
KR20150000887U (en) * 2013-08-20 2015-03-03 대우조선해양 주식회사 Apparatus for Incline experiment of ship

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100655866B1 (en) 2006-05-08 2006-12-04 (주)테스콤엔지니어링 Measuring instrument for the sinking degree of the ground
KR100667585B1 (en) 2006-09-15 2007-01-11 주식회사 한국종합기술 The instrumentation apparatus waterwork pipe
KR100667581B1 (en) 2006-09-16 2007-01-11 주식회사 한국종합기술 Measurement apparatus for underground water supply pipe of smooth ground
KR100715275B1 (en) 2006-11-18 2007-04-30 (주) 장맥엔지니어링 Measure apparatus of back-filling construction
KR100723013B1 (en) 2006-11-18 2007-05-22 (주) 장맥엔지니어링 The instrumentation structure of underground-device
KR100948657B1 (en) 2009-09-22 2010-03-18 주식회사 다산컨설턴트 Marking nail of water supply pipe line
KR20150000887U (en) * 2013-08-20 2015-03-03 대우조선해양 주식회사 Apparatus for Incline experiment of ship
KR200486663Y1 (en) * 2013-08-20 2018-06-20 대우조선해양 주식회사 Apparatus for Incline experiment of ship

Similar Documents

Publication Publication Date Title
CA2206589C (en) Manhole adjusting extension member
US4925337A (en) Manhole covering
US4498807A (en) Drainage channel with means for maintaining proper slope during installation
Breysse et al. A generic approach to soil–structure interaction considering the effects of soil heterogeneity
US6036401A (en) Roadway access device and method of using same
JP3436916B2 (en) Iron manhole
US5216767A (en) Drainage enhancer for double seepage drains
EP0875006B1 (en) Sewage system with electronic marker
US6311433B1 (en) Adjustable manhole/catch basin structure
US20080168727A1 (en) Drain installation system and method
KR101023660B1 (en) Retaining Wall using Anchor and Concrete Panel and its Construction Method
US5154024A (en) Floor sink/drain installation method and apparatus
US4050839A (en) Process for raising manholes
Deen Performance of a Reinforced Concrete Pipe Culvert Under Rock Embankment
JP5514846B2 (en) Simple lining board
CN1123866A (en) Construction method and apparatus against gap leakage between panel and pipe
US3156490A (en) Pipe connector construction
KR100673548B1 (en) Verticality measure apparatus of pier for bridge
US4243068A (en) Sewer chimney
US5582477A (en) Finned container bases
US20100133159A1 (en) Floor drain assembly
CN100501004C (en) Reinforced concrete pavement member
JP3347866B2 (en) Walking floor laying method of the tunnel
US5189861A (en) Sewer chimney coupling and method of building a sewer chimney
KR100654632B1 (en) A water turning method of powerless drain pipe and apparatus thereof

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
FPAY Annual fee payment

Payment date: 20111207

Year of fee payment: 8

LAPS Lapse due to unpaid annual fee