KR200369333Y1 - Boring machine work deck of side wall in tunnel - Google Patents
Boring machine work deck of side wall in tunnel Download PDFInfo
- Publication number
- KR200369333Y1 KR200369333Y1 KR20-2004-0026106U KR20040026106U KR200369333Y1 KR 200369333 Y1 KR200369333 Y1 KR 200369333Y1 KR 20040026106 U KR20040026106 U KR 20040026106U KR 200369333 Y1 KR200369333 Y1 KR 200369333Y1
- Authority
- KR
- South Korea
- Prior art keywords
- tunnel
- work
- workbench
- drilling
- side wall
- Prior art date
Links
- 238000005553 drilling Methods 0.000 claims abstract description 28
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 abstract description 11
- 238000000034 method Methods 0.000 abstract description 4
- 238000003973 irrigation Methods 0.000 description 2
- 230000002262 irrigation Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- ZZUFCTLCJUWOSV-UHFFFAOYSA-N furosemide Chemical compound C1=C(Cl)C(S(=O)(=O)N)=CC(C(O)=O)=C1NCC1=CC=CO1 ZZUFCTLCJUWOSV-UHFFFAOYSA-N 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61D—BODY DETAILS OR KINDS OF RAILWAY VEHICLES
- B61D15/00—Other railway vehicles, e.g. scaffold cars; Adaptations of vehicles for use on railways
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/40—Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F13/00—Transport specially adapted to underground conditions
- E21F13/006—Equipment transport systems
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Geochemistry & Mineralogy (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mechanical Engineering (AREA)
- Transportation (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
- Earth Drilling (AREA)
Abstract
본 고안은 수평 터널 내부의 측벽부 천공작업 수행시 작업대의 높이 조절이 가능하고 작업대의 이동도 용이할 뿐만 아니라 타공정과 병행작업도 가능한 터널 내 측벽부 천공장비 작업대에 관한 것으로, 이동수단과 고정 지그 및 천공 시추기를 적재하는 작업 받침대를 갖추어 이루어진 터널내 측벽부 천공장비 작업대에 있어서, 상기 고정 지그(1)가 하부 실린더(2)에 장착되고, 이 하부 실린더(2)에는 상부 실린더(3)가 고정 받침 브라켓트(4)를 매개로 실린더들이 이중으로 설치되어 있으며, 상기 상부 실린더(3) 들 사이에는 승·하강이 자유롭게 이루어지는 천공 시추기를 적재하는 작업 받침대(5)가 장착되되, 이 작업 받침대(5)의 하부쪽에는 이동용 무한궤도(6)가 설치되어 이루어진 구조로 되어 있다.The present invention relates to a workbench of the side wall perforation equipment in the tunnel that can adjust the height of the workbench and facilitate the movement of the workbench when performing the perforation work of the sidewall part in the horizontal tunnel, and can be parallel to other processes. In a tunnel sidewall perforation equipment workbench provided with a work stand for loading a jig and a drilling rig, the fixing jig 1 is mounted to the lower cylinder 2, and the lower cylinder 2 has an upper cylinder 3 The cylinders are installed in double via the fixed support bracket (4), and between the upper cylinders (3) is equipped with a work pedestal (5) for loading the drilling bores freely lifting and lowering is mounted, this work pedestal The lower end of (5) has a structure in which a moving track 6 is provided.
Description
본 고안은 수평 터널 내부의 측벽부 천공작업 수행시 작업대의 높이 조절이 가능하고 작업대의 이동도 용이할 뿐만 아니라 타공정과 병행작업도 가능한 터널 내 측벽부 천공장비 작업대에 관한 것이다.The present invention relates to a workbench of the side wall drilling equipment in the tunnel that can adjust the height of the workbench when performing the drilling of the side wall inside the horizontal tunnel, and the worktable can be easily moved as well as in parallel with other processes.
통상 터널은 그 용도에 따라 철도·도로와 같은 교통용 터널과, 수력발전 관개 등을 위한 수로용 터널, 상·하수도·전선로 등의 관로용 터널 및, 이 밖의 지하 발전소·변전소·석유 저장용 공동 등도 포함되는데, 이중 수력발전·관개 등을위한 수로용 터널의 굴착단면은 지압에 견딜 수 있는 말굽형으로 되어 있으면서 콘크리트 등으로 피복하여 소정의 내공 단면을 갖는 복공 작업으로 마무리하도록 되어 있다.Normally, tunnels are used for traffic tunnels such as railroads and roads, water tunnels for hydroelectric irrigation, pipeline tunnels for water, sewerage and power lines, and other underground power plants, substations and oil storage. The excavation section of the channel tunnel for hydro power generation, irrigation, etc., is made of horseshoe-shaped to withstand acupressure while being covered with concrete and finished with a perforation work having a predetermined hole cross section.
이와 같이 굴착된 터널의 복공 작업시 측벽부는 도 1과 같이 천공장비를 이용하여 보링 구멍(101)들을 천공한 다음, 버럭처리 작업과 콘크리트 타설 작업이 이루어지게 되어 있다.As described above, the sidewall portion of the excavated tunnel is drilled through the boring holes 101 by using the drilling equipment as shown in FIG. 1, and then the buckle treatment work and the concrete pouring work are performed.
한편, 종래 터널 측벽부의 천공 작업시 이용되는 천공장비 작업대는 천공 작업시 차량교행이 불가능하여 긴터널 내에서 작업자들의 전·출입에 상당한 애로점이 있었으며, 작업시 콘크리트와 같은 타공정과의 병행 작업도 불가능하여 자연히 건설공기가 지연되는 문제점이 있었다.On the other hand, the drilling equipment work table used in the conventional tunnel side wall drilling work has a considerable difficulty in transferring and entering workers in the long tunnel because it is impossible to cross the vehicle during the drilling work, and also parallel work with other processes such as concrete during the work There was a problem that construction air is delayed because it is impossible.
또한, 천공장비를 보유 지지하는 작업대가 구배진 터널 바닥면에서 불안정 작업상태 위치를 유지함에 따라 작업대의 안정된 작업 위치 확보에 많은 시간을 소요하게 되는 단점도 있었다.In addition, as the workbench holding the drilling equipment maintains the unstable work position at the bottom of the gradient tunnel, it takes a long time to secure a stable work position of the workbench.
이에 본 고안은 상기와 같은 종래 문제점을 해결하기 위해 안출된 것으로, 작업대의 측면으로 차량통행이 가능하면서 천공각도별 작업대의 높이 조절이 가능하면서 용이한 이동과 안정된 작업위치를 확보할 수 있는 개선된 터널내 측벽부 천공장비 작업대를 제공함에 그 목적이 있다.The present invention has been devised to solve the conventional problems as described above, it is possible to pass the vehicle to the side of the workbench while being able to adjust the height of the workbench according to the drilling angle and improved to ensure easy movement and stable working position The purpose is to provide a perforated work platform in the tunnel sidewall.
상기와 같은 목적을 달성하기 위한 본 고안은 이동수단과 고정 지그 및 천공 시추에는 적재하는 작업 받침대를 갖추어 이루어진 터널내 측벽부 천공장비 작업대에 있어서, 상기 고정 지그가 하부 실린더에 장착되고 이 하부 실린더에는 상부 실린더가 고정 받침 브라켓트를 매개로 실린더들이 이중으로 설치되어 있으며, 상기 상부 실린더 사이에는 승·하강이 자유롭게 이루어지는 천공 시추기를 적재하는 작업 받침대가 장착되되, 이 작업 받침대의 하부 쪽에는 이동용 무한궤도가 설치되어 있다.The present invention for achieving the above object is in a tunnel side wall perforation equipment workbench having a moving means, a fixed jig and a drilling pedestal for loading the drilling drilling, the fixing jig is mounted to the lower cylinder and the lower cylinder The upper cylinder is provided with double cylinders via a fixed support bracket, and between the upper cylinders is equipped with a work pedestal for loading a drilling bore, which is free to move up and down, and the lower end of the work pedestal It is installed.
도 1은 본 고안이 터널 내에 설치된 정면도이고,1 is a front view of the present invention installed in a tunnel,
도 2는 도 1에서 작업 받침대가 하강한 상태를 보여주는 측면도이다.FIG. 2 is a side view illustrating a state in which the work base is lowered in FIG. 1.
-도면의 주요 부분에 대한 부호의 설명-Explanation of symbols on main parts of drawing
1 : 고정 지그, 2 : 하부 실린더,1: fixed jig, 2: lower cylinder,
3 : 상부 실린더, 4 : 고정 받침 브라켓트,3: upper cylinder, 4: fixed base bracket,
5 : 작업 받침대, 6 : 무한궤도.5: work base, 6: track.
이하, 본 고안을 첨부된 예시도면에 의거 상세히 설명한다.Hereinafter, the present invention will be described in detail based on the accompanying drawings.
도 1은 터널(100) 내에 본 고안이 설치된 정면도이고, 도 2는 도 1의 측면도이다.1 is a front view of the present invention installed in the tunnel 100, Figure 2 is a side view of FIG.
본 고안은 도면에 도시된 바와 같이 터널(100)내 측벽부에 보링 구멍(101) 들을 천공하는 천공장비를 싣는 작업대로서, 이동수단과 고정 지그 및 천공 시추기를 적재하는 작업 받침대를 갖추어 이루어진 터널 내 측벽부 천공장비 작업대에 있어서, 상기 고정 지그(1)가 하부 실린더(2)에 장착되고, 이 하부 실린더(2)에는 상부 실린더(3)가 고정 받침 브라켓트(4)를 매개로 실린더들이 이중으로 설치되어 있으며, 상기 상부 실린더(3)들 사이에는 승·하강이 자유롭게 이루어지는 천공 시추기를 적재하는 작업 받침대(5)가 장착되되, 이 작업 받침대(5)의 하부 쪽에는 이동용 무한궤도(6)가 설치되어 이루어진 구조로 되어 있다.The present invention is a workbench for mounting the drilling equipment for drilling the boring holes 101 in the side wall in the tunnel 100, as shown in the drawing, a tunnel having a work stand for loading the moving means and fixing jig and drilling drilling machine In the side wall drilling rig work platform, the fixing jig 1 is mounted on the lower cylinder 2, and the lower cylinder 2 has the upper cylinder 3 doubled through the fixing base bracket 4, It is installed, and between the upper cylinder (3) is equipped with a work pedestal (5) for loading the drilling bore, which is free to move up and down, the lower end of the work pedestal (5) is a movable track (6) It is made of structure.
그리고 도면중 미설명 부호 7은 보호용 난간대이다.In the drawings, reference numeral 7 denotes a guardrail.
이와 같이 이루어진 본 고안은 상기 무한궤도(6) 상부 쪽에 장착된 작업 받침대(5)에다 공지의 천공 시추기를 싣고서 천공작업 위치로 손쉽게 이동할 수 있는바, 즉 본 고안의 작업대가 이동할 때에는 상부 실린더(3)에 설치된 작업 받침대(5)를 하강시키게 되면 이동용 무한궤도(6)는 도 1의 상태에서 도 2의 상태로 하강하게 되어 고정 지그(1)를 들어올리게 된다.The present invention made as described above can be easily moved to the drilling work position by loading a well-known drilling drill on the work pedestal 5 mounted on the upper side of the caterpillar 6, that is, the upper cylinder ( When the work stand 5 installed in the 3) is lowered, the movable track 6 is lowered from the state of FIG. 1 to the state of FIG. 2 to lift the fixing jig 1.
그러면 천공 시추기를 적재한 작업대는 원하는 작업 위치로 손쉽게 이동할 수 있다.The worktable loaded with the drilling rig can then be easily moved to the desired work position.
한편 터널(100) 측벽부 천공 작업시, 상기 이동용 무한궤도(6)를 상부 실린더(3)를 이용하여 들어올리게 되면, 본 고안의 작업대는 도 1의 상태와 같이 터널(100)의 바닥면에 하부 실린더(2)에 장착된 고정 지그(1)들에 의해 안정되고 견고하게 보유 지지됨에 따라 공지의 천공 시추기를 이용하여 터널(100)의 측벽부에 보링 구멍(101) 들을 천공할 수 있다.On the other hand, when the tunnel 100 is drilled in the side wall portion, when the movable track 6 is lifted using the upper cylinder 3, the work table of the present invention is located on the bottom surface of the tunnel 100 as shown in FIG. As it is stably and firmly held by the fixing jigs 1 mounted on the lower cylinder 2, boring holes 101 can be drilled in the side wall of the tunnel 100 using a well-known drilling drill.
상기와 같이 본 고안에 따른 터널내 측벽부 천공장비 작업대는 그 크기를 축소하여 작업대의 측면으로 차량 교행이 가능하여 타공정과의 병행작업이 가능하며, 천공 각도별 작업대의 높이 조절이 이중 실린더에 의해 간편하게 이루어지고, 작업대의 용이한 이동 뿐만 아니라 고정도 안정되고 견고하게 수행되는 잇점 등이 있다.As described above, the workbench equipment workbench in the tunnel side wall according to the present invention can be reduced in size to allow the vehicle to run on the side of the workbench, so that the work can be performed in parallel with other processes, and the height adjustment of the workbench for each drilling angle can be achieved in the double cylinder. It is made by a simple, as well as the easy movement of the workbench there is an advantage that the fixed and stable performance.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2004-0026106U KR200369333Y1 (en) | 2004-09-10 | 2004-09-10 | Boring machine work deck of side wall in tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2004-0026106U KR200369333Y1 (en) | 2004-09-10 | 2004-09-10 | Boring machine work deck of side wall in tunnel |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020040052369A Division KR100592929B1 (en) | 2004-07-06 | 2004-07-06 | Workbench on the side wall of tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200369333Y1 true KR200369333Y1 (en) | 2004-12-04 |
Family
ID=49442105
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2004-0026106U KR200369333Y1 (en) | 2004-09-10 | 2004-09-10 | Boring machine work deck of side wall in tunnel |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200369333Y1 (en) |
-
2004
- 2004-09-10 KR KR20-2004-0026106U patent/KR200369333Y1/en not_active IP Right Cessation
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2014133732A (en) | FOLDING SHOULDER BASE FOR MOBILE DRILLING RIG | |
CN103669351A (en) | Full-stroke hole-leading hydraulic static pile driver | |
RU2010134363A (en) | METHOD AND DEVICE FOR DRILLING AUXILIARY PITS | |
CN201635652U (en) | Double-guide rail drill carriage for coalmine | |
CN110259381A (en) | One kind hanging brill all-in-one machine | |
CN106284333B (en) | A kind of fast positioning pile extension platform and pile extension method | |
CN209025600U (en) | A kind of crawler-type engineering drilling machine | |
CN2900788Y (en) | Tunnelling and drilling integrated tunnelling machine | |
KR100592929B1 (en) | Workbench on the side wall of tunnel | |
KR200369333Y1 (en) | Boring machine work deck of side wall in tunnel | |
CN203050529U (en) | Drilling machine rack | |
WO2016033707A1 (en) | Walker-type traveling rotary drilling rig | |
CN102425168A (en) | Asymmetric walking type walking chassis for SMW (soil mixing wall) method pile driver | |
CN210858762U (en) | Roofbolter that tunnel or culvert construction was used | |
JP2005240517A (en) | Rock bolt driving machine | |
CN103147437A (en) | Section steel soil cement mixing pile with longitudinal displacement mechanism | |
CN210509060U (en) | Movable engineering drilling rig platform | |
KR200372292Y1 (en) | Boring machine work deck of crown in tunnel | |
JPH07217392A (en) | Working apparatus for tunnel construction | |
JP4844934B2 (en) | Drilling leader vertical adjustment mechanism | |
CN205349388U (en) | Multi -arm anchor rod drilling carriage that suspension beam formula is mining | |
KR20060003474A (en) | Boring machine work deck of crown in tunnel | |
CN207700189U (en) | A kind of pile-grafting machine with monitoring function | |
CN215672029U (en) | Deep-buried culvert pipe center ditch construction equipment | |
CN205684759U (en) | A kind of portable driller bed of pair of drill bit structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
U107 | Dual application of utility model | ||
REGI | Registration of establishment | ||
FPAY | Annual fee payment |
Payment date: 20051121 Year of fee payment: 3 |
|
EXTG | Extinguishment |