KR200367747Y1 KR20-2004-0024990U KR20040024990U KR200367747Y1 KR 200367747 Y1 KR200367747 Y1 KR 200367747Y1 KR 20040024990 U KR20040024990 U KR 20040024990U KR 200367747 Y1 KR200367747 Y1 KR 200367747Y1
Authority
KR
South Korea
Prior art keywords
bolt
pillar
support
coupling structure
column
Prior art date
Application number
KR20-2004-0024990U
Other languages
Korean (ko)
Inventor
권오성
윤형중
Original Assignee
권오성
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 권오성 filed Critical 권오성
Priority to KR20-2004-0024990U priority Critical patent/KR200367747Y1/en
Application granted granted Critical
Publication of KR200367747Y1 publication Critical patent/KR200367747Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

본 고안은 기둥의 결합구조에 관한 것으로서, 보다상세하게는 지면으로 매설한 지지체와 건축물등의 기둥을 견고하게 연결할수 있는 기둥의 결합구조에 관한 것이다.The present invention relates to a coupling structure of a column, and more particularly, to a coupling structure of a column that can be firmly connected to a pillar such as a support and a building embedded in the ground.

Description

기둥의 결합구조{MIDDLE PART SUPPOPRTER OF POLE ASSEMBLY}Combined Structure of Columns {MIDDLE PART SUPPOPRTER OF POLE ASSEMBLY}

본 고안은 기둥의 결합구조에 관한 것으로서, 보다상세하게는 지면으로 매설한 지지체와 건축물등의 기둥을 견고하게 연결할수 있는 기둥의 결합구조에 관한 것이다.The present invention relates to a coupling structure of a column, and more particularly, to a coupling structure of a column that can be firmly connected to a pillar such as a support and a building embedded in the ground.

일반적으로 집이나 방가로등의 건축물을 시공하기 위하여는 기본적으로 집의 뼈대가 되는 기둥을 견고하게 세운 후 이 기둥을 지지하여 건축을 하는 것이 일반적인 시공방법으로, 기둥을 견고하게 지지하는 것은 건축의 기초가 되며 매우 중요한 시공이다.In general, in order to construct a building such as a house or a street, it is a general construction method to build a pillar that is a skeleton of a house, and then support the pillar. It is a very important construction.

상기와 같은 이유에서 종래기술로는 기둥을 세울 지면을 일정깊이로 파고 그 위로 콘크리트나 목재로 형성된 기둥을 위치시키고 주위에 콘크리트를 타설한 후 양생하는 방법이 주로 실시되고 있으나 상기의 방법은 콘크리트를 타설하고 콘트리트가 양생될 때 까지는 작업의 진행을 할 수 없음으로 전체 작업기일이 오래걸리는 문제가 있으며 이로서 건축비용이 많이드는 문제가 발생하였다.For the same reason as above, a conventional method of digging the ground to erect a column to a certain depth, placing a pillar formed of concrete or wood on top of it, and placing concrete around it is mainly carried out a method of curing. There is a problem that the whole work period takes a long time because the work cannot be progressed until it is poured and the concrete is cured. This causes a problem of high construction cost.

또한, 다른 문제점으로는 콘크리트, 물, 삽등의 작업에 필요한 자재들이 많이 들게되여 작업자거 자재들을 이동시키기 힘든 문제점이 있어 건축자재를 조립식으로 형성하여 작업이 쉽고 작업시간을 단축시킬 수 있는 자재들이 절실히 요구되고 있는 실정이다.In addition, other problems include a lot of materials required for work such as concrete, water, and shovel, which makes it difficult for workers to move materials. Therefore, materials that can be easily assembled and shorten working time by forming building materials are desperately needed. It is a required situation.

본 고안은 상기와 같은 문제를 해소하기 위하여 안출한 것으로서 본 고안의 목적은 지면으로 매설되는 매설체를 형성하고 이 매설체와 경고하면서도 쉽게 조립식으로 연결함으로서 견고하고 짧은 시간에 기둥을 형성할 수 있는 구조를 가진 조립식 기둥을 제공하는데 목적이 있다.The present invention has been devised to solve the above problems, and the object of the present invention is to form a buried body buried in the ground and to form a pillar in a sturdy and short time by connecting with the buried body easily and prefabricated easily. The purpose is to provide a prefabricated column with a structure.

도 1은 본 고안에 따른 기둥의 결합구조에 따른 분해 사시도.1 is an exploded perspective view of the coupling structure of the pillar according to the present invention.

도 2는 본 고안에 따른 기둥의 결합구조의 결합단면도.Figure 2 is a cross-sectional view of the coupling structure of the column according to the present invention.

도 3은 본 고안에 따른 기둥의 결합구조의 다른 실시예를 나타낸 분해 사시도.Figure 3 is an exploded perspective view showing another embodiment of the coupling structure of the pillar according to the present invention.

도 4는 본 고안에 따른 기둥의 결합구조의 다른 실시예의 결합단면도.Figure 4 is a cross-sectional view of another embodiment of the coupling structure of the column according to the present invention.

본 고안에 따른 바람직한 실시예를 첨부한 도면을 참조하여 상세히 설명하면 다음과 같다.When described in detail with reference to the accompanying drawings a preferred embodiment according to the present invention.

도 1은 본 고안에 따른 기둥의 결합구조에 따른 분해 사시도이고, 도 2는 본고안에 따른 기둥의 결합구조의 결합단면도이며, 도 3은 본 고안에 따른 기둥의 결합구조의 다른 실시예를 나타낸 분해 사시도이고, 도 4는 본 고안에 따른 기둥의 결합구조의 다른 실시예의 결합단면도이다.1 is an exploded perspective view of the coupling structure of the pillar according to the present invention, Figure 2 is a cross-sectional view of the coupling structure of the pillar according to the present invention, Figure 3 is an exploded view showing another embodiment of the coupling structure of the pillar according to the present invention 4 is a perspective view showing a coupling cross section of another embodiment of the coupling structure of the pillar according to the present invention.

도 1과 도 2에 도시한 바와 같이 하단의 지면으로 매설되는 매설체(10)의 상단으로 형성된 지지관(11)의 내측으로, 중앙으로 기둥(30)의 하단부가 삽입되는 삽입홈(21)이 형성된 지지대(22)가 형성되고 이 지지대(22)의 양측면으로 여러개의 구멍(22a)이 형성되며 이 지지대(22)의 하단으로는 지지관(11)의 내측면으로 밀착되게 형성되는 삽입부(23)가 형성되고 상단으로는 기둥(30)의 내측면에 밀착되게 형성되며 끝단이 갈라지게 형성된 밀착부(24)를 형성하여 결착부재(100)를 형성한다.As shown in FIGS. 1 and 2, an insertion groove 21 into which a lower end of the pillar 30 is inserted into the center of the support tube 11 formed as an upper end of the buried body 10 embedded in the lower ground. The formed support 22 is formed and a plurality of holes (22a) are formed on both sides of the support 22, the lower end of the support 22 is formed in close contact with the inner surface of the support tube 11 23 is formed and is formed to be in close contact with the inner surface of the column 30 to the upper end and to form a binding member 100 by forming a close contact portion 24 formed to be divided end.

또한, 상기 결착부재(100)의 내측으로는 상기 지지대(22)의 중앙으로 관통공(미도시)이 형성되고 이 관통공의 하단으로 너트(24a)가 부착되여 형성되며 이 너트(24a)와 결합되며 일측으로 볼트머리(25a)가 형성되고 타측으로 지름이 다른 볼트(25b)가 일체로 형성되는 중길이볼트(25)가 결합되여 상하로 회전하며 이동가능하게 형성되고 이 볼트(25)의 상단부(25b)로 내부로 암나사(26a)가 형성된 돌기(26)가 결합되여 형성되고 이 돌기(26)의 외측으로 사각의 쇄기(27)에 형성된 T홈(27a)에 삽입되어 형성된다.In addition, a through hole (not shown) is formed in the center of the support member 22 and the nut 24a is attached to the lower end of the through hole. Coupled to form a bolt head (25a) on one side and the other side of the length of the bolt (25b) is formed integrally formed of the bolt (25b) is combined to be formed to move up and down and move the bolt 25 of A protrusion 26 having a female thread 26a formed therein is coupled to the upper end 25b and inserted into a T-groove 27a formed in a square wedge 27 to the outside of the protrusion 26.

또한, 상기 지지대(22)의 양측으로는 관통공(22a)이 형성되여 이 관통공(22a)에 볼트를 관통시켜 기둥(30)의 하단으로 형성된 구멍(30a)에 볼트가 결합하여 보조적으로 기둥을 지지할 수 있는 것이다.In addition, through holes 22a are formed at both sides of the support 22 to allow the bolts to penetrate the through holes 22a to be coupled to the holes 30a formed as the lower ends of the columns 30 to assist the pillars. I can support it.

상기와 같이 구성된 본 고안에 따른 기둥의 결합구조의 작용을 도면을 참조하여 상세하게 설명한다.The action of the coupling structure of the column according to the present invention configured as described above will be described in detail with reference to the drawings.

먼저 지지대(22)의 하단으로 형성된 너트(24a)의 중앙으로 일측에 볼트머리(25a)가 형성되고 타측으로는 지름이 작은 볼트(25b)가 일체로 형성된 된 중길이볼트(25)의 나사를 삽입하여 회전시켜 지름이 작은 볼트(25b)를 지지대(22)의 상단으로 형성된 밀착부(24)의 상단까지 이동시킨다.First, the bolt head 25a is formed at one side to the center of the nut 24a formed as the lower end of the support 22, and the other side of the bolt of the medium length bolt 25 in which the small diameter bolt 25b is integrally formed. By inserting and rotating, the small diameter bolt 25b is moved to the upper end of the contact portion 24 formed as the upper end of the support 22.

상기와 같이 이동된 상태에서 지름이 다른 볼트(25b)에 내측으로 암나사(26a)가 형성된 돌기(26)를 삽입하여 일체로 형성한 후 이 돌기(26)의 외측으로 T자형의 홈(27a)이 형성된 쇄기(27)를 삽입하여 형성한 후 다시 중길이볼트(25)를 회전 결합된 쇄기(27)를 하강시켜 쇄기(27)의 양측면 일부가 밀착부(24)의 상단부로 밀착되게 형성시켜 결착부재(100)를 완성시킨다.In the state moved as described above, the projection 26 having the female thread 26a formed therein is formed integrally with the bolt 25b having a different diameter and formed integrally, and then the T-shaped groove 27a toward the outside of the projection 26. After forming the formed wedges (27) by inserting the medium length bolt 25 is rotated by lowering the wedges (27) rotated coupled to form a portion of both sides of the wedges (27) in close contact with the upper end of the contact portion 24 Complete the binding member 100.

한편, 상기의 중길이볼트(25)와 지름이다른 볼트(25b)는 나사의 방향이 서로 반대로 형성되여 중길이볼트(25)를 회전시켜도 상단의 돌기는 이탈되지 않는 것이다.On the other hand, the above-mentioned medium length bolt 25 and the different diameter bolt (25b) is formed in the direction of the screw opposite to each other, even if the middle length bolt 25 is rotated is the projection of the upper end is not separated.

상기와 같이 완성된 결착부재(100)의 밀착부(24)를 기둥의 내측으로 삽입하여 기둥(30)의 끝단이 지지대(22)에 형성된 삽입홈(21)에 삽입되도록 형성하고 삽입부(23)의 내측으로 형성된 볼트머리(25a)를 회전시켜 상단의 쇄기(27)를 하강시키면 쇄기(27)가 하강하면서 밀착부(24)의 상단을 벌리게 되고 이로서 상기 밀착부(24)와 기둥(30)의 내면은 견고하게 밀착되는 것이다.Inserting the close contact portion 24 of the binding member 100 completed as described above to the inside of the pillar is formed so that the end of the pillar 30 is inserted into the insertion groove 21 formed in the support 22 and the insertion portion 23 Rotating the bolt head (25a) formed in the inner side of the lower wedge 27 lowers the wedge 27 is lowered while opening the upper end of the contact portion 24, thereby the contact portion 24 and the pillar 30 The inner surface of) is tightly pressed.

상기와 같이 결착부재(100)와 기둥(30)을 밀착고정시킨 상태에서 하단의 삽입부(23)의 외면으로 에폭시를 도포하고 이 삽입부(23)를 지지관(11)의 내측으로 삽입하여 구지(拘持)시킴으로서 기둥의 지면에 견고하게 세울 수 있는 것이다.In the state where the binding member 100 and the pillar 30 are tightly fixed as described above, epoxy is applied to the outer surface of the lower insertion portion 23, and the insertion portion 23 is inserted into the support tube 11. By gujiji can be built firmly on the ground of the pillar.

한편, 도 3과 도 4에는 본 고안에 따른 기둥의 결합구조의 다른 실시예가 도시되여 있는데 도시한 바와 같이 기둥(30)의 형상이 원형일 경우 중길이볼트(25)의 일측끝단에 지름이 작은 볼트(25b)와 타측으로 볼트머리(25a)를 일체로 형성하고 이 지름이 작은 볼트(25b)에 내측중앙으로 암나사(27a)가 형성된 역원뿔형의 쇄기(27)가 삽입되여 형성되며 상단에 설명한 바와 같이 이 쇄기(27)가 중길이볼트(25)의 회전에 의하여 하강하며 밀착부(24)의 상단을 외부측으로 밀게되고 이로서 기둥(30)의 내측과 밀착부(24)는 견고하게 밀착되는 것이다.On the other hand, Figure 3 and Figure 4 shows another embodiment of the coupling structure of the column according to the present invention, when the shape of the column 30 is circular, as shown in the small diameter at one end of the middle length bolt 25 The inverted conical wedge 27 is formed by inserting the bolt head 25a integrally with the bolt 25b and the other side, and the internal thread 27a is formed in the inner center of the small diameter bolt 25b. As the wedge 27 is lowered by the rotation of the medium-length bolt 25, the upper end of the contact portion 24 is pushed to the outside, whereby the inner side and the contact portion 24 of the column 30 are tightly adhered. will be.

또한, 하단으로 형성된 삽입부(23)가 상기와 동일하게 외부면에 에폭시가 도포되여 지지관(11) 내부로 삽입되여 기둥이 견고하게 지지되는 것이다.In addition, the insertion portion 23 formed at the lower end is coated with epoxy on the outer surface in the same manner as described above, and is inserted into the support tube 11 so that the pillar is firmly supported.

이상에서와 같이 본 고안에 따른 기둥의 결합구조에 의하여 시공하면 기존에 제작되여있는 기둥을 쉽고 간편하게 세울 수 있고 숙련공이 아닌 작업자도 수월하게 작업할 수 있어 제작비용을 현저하게 줄일 수 있는 효과가 있으며 또한, 작업에 소요되는 자재들을 최소화 하여 작업을 효율적으로 시행할 수 있는 효과 또한 있는 것이다.As described above, if the construction by the combined structure of the column according to the present invention can be easily and simply erect the existing pole and can be easily worked by non-skilled workers can significantly reduce the production cost. In addition, it is also effective to minimize the materials required for the work can be carried out efficiently.

Claims (2)

지면으로 매설되어 형성되며 상단으로 지지관이 형성되는 매설체와 상단에서 삽착형성되는 기둥에 있어서,In the buried body and the pillar to be inserted and formed at the upper end is formed buried in the ground and the support tube is formed at the top, 상기 기둥(30)과 지지관(11) 사이로 형성되며 중앙으로 삽입홈(21)이 형성되며 여러개의 구멍(22a)이 형성된 지지대(22)가 형성되며 이 지지대(22)의 상단으로는 기둥(30)의 내측면으로 삽입되며 상단이 갈라지게 형성된 밀착부(24)가 형성되고 하단으로는 지지관(11)의 내측으로 삽입되는 삽입부(23)이 형성되는 결착부재(100)의 내부로는 지지대(22)의 중앙으로 형성된 구멍(미도시)과 이 구멍의 하단으로 형성된 너트(24a)와 결합되며 하단으로 볼트머리(25a)와 상단으로 지름이 다른 볼트(25b)가 일체로 형성되는 중길이 볼트(25)가 결합되여 형성되며 지름이 작은 볼트(25b)로 돌기(26)가 결합되어 형성되며 이 돌기(26)의 외부측으로 사각뿔형의 쇄기(27)의 내측으로 형성된 홈(27a)에 끼워져 형성됨을 특징으로 하는 기둥의 결합구조.The support 30 is formed between the pillar 30 and the support tube 11, and an insertion groove 21 is formed in the center thereof, and a support 22 having a plurality of holes 22a is formed. It is inserted into the inner side of the 30 and the upper portion is formed in the close contact portion 24 is formed, the lower end into the interior of the binding member 100 is formed with the insertion portion 23 is inserted into the support tube 11 Is coupled to a hole (not shown) formed in the center of the support 22 and a nut 24a formed at the bottom of the hole, and the bolt head 25a at the bottom and a bolt 25b having a different diameter at the top are integrally formed. The medium length bolt 25 is formed by the coupling, and the protrusion 26 is formed by the bolt 25b having a small diameter. The groove 27a is formed on the inner side of the square pyramid wedge 27 to the outside of the protrusion 26. The coupling structure of the pillar, characterized in that formed in the). 청구항 1항에 있어서,The method according to claim 1, 지름이 다른 볼트(25b)는 중길이볼트(25)와 나사의 방향을 반대로 형성함을 특징으로 하는 기둥의 결합구조.Bolts of different diameters (25b) is a coupling structure of the column, characterized in that the opposite direction of the medium-length bolt 25 and the screw.
KR20-2004-0024990U 2004-09-01 2004-09-01 Middle part suppoprter of pole assembly KR200367747Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2004-0024990U KR200367747Y1 (en) 2004-09-01 2004-09-01 Middle part suppoprter of pole assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2004-0024990U KR200367747Y1 (en) 2004-09-01 2004-09-01 Middle part suppoprter of pole assembly

Publications (1)

Publication Number Publication Date
KR200367747Y1 true KR200367747Y1 (en) 2004-11-12

Family

ID=49441095

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0024990U KR200367747Y1 (en) 2004-09-01 2004-09-01 Middle part suppoprter of pole assembly

Country Status (1)

Country Link
KR (1) KR200367747Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101251173B1 (en) * 2011-09-01 2013-04-04 주식회사 디유에이엔아이 Assembling type pillar for platform and pillar installing method thereby
KR102285053B1 (en) * 2021-04-02 2021-08-03 주식회사 정산업 Traffic lane restriction pole using spring

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101251173B1 (en) * 2011-09-01 2013-04-04 주식회사 디유에이엔아이 Assembling type pillar for platform and pillar installing method thereby
KR102285053B1 (en) * 2021-04-02 2021-08-03 주식회사 정산업 Traffic lane restriction pole using spring

Similar Documents

Publication Publication Date Title
AU682721B2 (en) Connector, connector unit and connected connector comprising same
KR102075437B1 (en) Composite phc pile for soil retaining wall
KR200367747Y1 (en) Middle part suppoprter of pole assembly
KR102130526B1 (en) Anchor bolt to be used first for formwork
JP2008095499A (en) Column and beam connecting structure
KR101565154B1 (en) Screw pile for supporting
KR200359071Y1 (en) Pile of tree root type
JP2012087586A (en) Foundation structure of column of car port or terrace or the like, construction method of foundation of column and precast concrete block
KR200257289Y1 (en) The concrete form constructed basic concrete structure of pole in electric railroads
KR101967274B1 (en) Construction Method for Foundation Pillar
KR200295161Y1 (en) A support for ground fixation of wood post
JP6767552B1 (en) Wood fence straight pin construction method
KR102123666B1 (en) Implant pile installer in architecture foundation system and a universal implant pile method
CN217580102U (en) Assemble room ground stake
JP2008511772A (en) How to install pile foundations for rubber balloons for structures, pile foundations and enlarged bottom panels
KR200490017Y1 (en) Connecting member for precast concrete
AU2010257353B2 (en) Building foundation structure, foundation construction method, and anchor bolt installation jig
KR20060091930A (en) Construction method of wood pillars for building
KR200257292Y1 (en) The concrete form constructed basic concrete structure of pole in electric railroads
KR102452899B1 (en) Method of manufacturing fence grounding stone and fence grounding stone manufactured thereby
JPH076302B2 (en) Self-supporting utility pole and its construction method
KR102627996B1 (en) Micro-Pile, and Constructing Method thereof
KR200257288Y1 (en) The concrete form constructed basic concrete structure of pole in electric railroads
KR200257290Y1 (en) The concrete form constructed basic concrete structure of pole in electric railroads
KR200383860Y1 (en) Stay apparatus of wood pillars for building

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
LAPS Lapse due to unpaid annual fee