KR200361540Y1 - Truss beam mount structure of power transmission tower f0r high electric - Google Patents
Truss beam mount structure of power transmission tower f0r high electric Download PDFInfo
- Publication number
- KR200361540Y1 KR200361540Y1 KR20-2004-0018345U KR20040018345U KR200361540Y1 KR 200361540 Y1 KR200361540 Y1 KR 200361540Y1 KR 20040018345 U KR20040018345 U KR 20040018345U KR 200361540 Y1 KR200361540 Y1 KR 200361540Y1
- Authority
- KR
- South Korea
- Prior art keywords
- truss
- transmission tower
- chain block
- prefabricated
- coupled
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
- E04H12/10—Truss-like structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
- E04H12/344—Arrangements for lifting tower sections for placing additional sections under them
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Materials Engineering (AREA)
- Wood Science & Technology (AREA)
- Electric Cable Installation (AREA)
Abstract
본 고안은 고압 전기 현수식 송전탑 상부 구조에 관한 것으로서, 특히 고압 전기 현수식 송전탑 상부 구조물을 육상 조립하고 체인 블럭 감속 기어 도르래를 이용하여 안전하게 설치가능하며, 그로 인해 송전탑 공사중 발생되는 추락 사고를 예방할 수 있도록 하는 고압 전기 현수식 송전탑 상부 트러스보 설치구조에 관한 것이다.The present invention relates to a high-voltage electric suspension transmission tower superstructure, in particular, the high-voltage electric suspension transmission tower superstructure can be assembled on land and securely installed using a chain block reduction gear pulley, thereby preventing a fall accident occurring during transmission tower construction. The present invention relates to a structure for installing a top truss of a high voltage electric suspension transmission tower.
본 고안은, 기초 콘크리트, 송전탑 트러스 기둥 및 트러스 보를 포함하는 고압 전기 현수식 송전탑 상부 트러스보 설치구조에 있어서, 상기 송전탑 트러스 기둥(200)에는 각각 상단부에 2단으로 설치되며, 트러스형 구조물로, 체결 클립 볼트(400)와 너트(410)로 체결되는 조립식 트러스 박스(600)(600'); 상기 조립식 트러스 박스(600)의 안착대(620)에 안착되는 한편, 일측이 절곡된 격자형 봉 부재로, 절곡된 곳과 대향된 위치에 2개의 원형 단턱부(310)와 원형링(350)이 형성된 체인 블럭 걸이대(300); 상기 조립식 트러스 박스(600)(600')와 체인 블럭 걸이대(300)를 너트(410)를 사용하여 상호 체결시키는 체결 클립 볼트(400); 상기 체인 블럭 걸이대(300)에는 원형링(350)에 상부 후크부(530)가 결합되는 한편, 하부의 감속 체인(510)의 끝에 형성된 하부 후크부(512)에 트러스 보(700)의 길이방향 양측이 결합되어 상부로 이동시키는 감속기어 도르래(500); 및 상기 감속기어 도르래(500)에 의해 트러스 보(700)가 송전탑 트러스 기둥(200)의 상부 측면에 체결완료되는 한편, 트러스 보(700)의 하부에 다수개가 결합되는 현수식 애자(800);로 구성된 고압 전기 현수식 송전탑 상부 트러스보 설치구조를 제공한다.The present invention, in the high-tension electric suspension transmission tower top truss installation structure including a foundation concrete, transmission tower truss column and truss beam, the transmission tower truss column 200 is installed in two stages at the upper end, respectively, as a truss-like structure, Prefabricated truss boxes 600 and 600 ′ fastened by fastening clip bolts 400 and nuts 410; While seated on the mounting table 620 of the prefabricated truss box 600, one side is a lattice-shaped rod member, two circular step portion 310 and the circular ring 350 in a position opposite to the bent Chain block hanger 300 is formed; A fastening clip bolt 400 for fastening the prefabricated truss boxes 600, 600 'and the chain block hanger 300 to each other using a nut 410; The chain block hanger 300 is coupled to the upper hook portion 530 to the circular ring 350, while the length of the truss beam 700 to the lower hook portion 512 formed at the end of the lower deceleration chain 510 A reduction gear pulley 500 which is coupled to both sides and moves upward; And a suspension insulator 800 in which a plurality of truss beams 700 are fastened to the upper side of the transmission tower truss pillar 200 by the reduction gear pulley 500, and a plurality of truss beams are coupled to the lower part of the truss beams 700. It provides a high-voltage electric suspension transmission tower top truss installation structure consisting of.
Description
본 고안은 고압 전기 현수식 송전탑 상부 구조에 관한 것으로서, 특히 고압전기 현수식 송전탑 상부 구조물을 육상 조립하고 체인 블럭 감속 기어 도르래를 이용하여 안전하게 설치가능하며, 그로 인해 송전탑 공사중 발생되는 추락 사고를 예방할 수 있도록 하는 고압 전기 현수식 송전탑 상부 트러스보 설치구조에 관한 것이다.The present invention relates to a high-voltage electric suspension transmission tower superstructure, in particular, the high-voltage electric suspension transmission tower superstructure can be assembled on land and safely installed using a chain block reduction gear pulley, thereby preventing a fall accident occurring during transmission tower construction. The present invention relates to a structure for installing a top truss of a high voltage electric suspension transmission tower.
일반적으로 고압 전기용 현수식 송전탑은, 트러스형 구조물로 설치되고 있고, 특히 상부 수평 배열 설치시는 수평 비계 가시설이 설치되어 이용된다.In general, a high-voltage electric suspension transmission tower is installed in a truss-type structure, and in particular, when the upper horizontal arrangement is installed, horizontal scaffolding equipment is installed and used.
도 1은 종래의 현수식 송전탑을 설치시 발생되는 문제점을 나타내는 도면으로서, 기초 콘크리트(10)에는 상부에 송전탑 트러스트 기둥(20)이 설치되고, 상기 송전탑 트러스트 기둥(20)에는 상부에 트러스 보(50)가 설치된다.1 is a view showing a problem occurring when installing a conventional suspended transmission tower, the foundation concrete 10, the transmission tower trust pillar 20 is installed on the top, the transmission tower trust pillar 20 on the top of the truss beam ( 50) is installed.
상기 트러스 보(50)가 설치시는, 도시된 바와 같이, 수평하게 설치되는 바, 안전 추락 사고가 빈번하게 발생되는 문제점이 있다.When the truss beam 50 is installed, as shown, it is installed horizontally, there is a problem that a safety fall accident frequently occurs.
본 고안은 상술한 문제점을 감안하여, 본 고안은, 고압 전기 현수식 송전탑 상부 구조물을 육상 조립하고 체인 블럭 감속 기어 도르래를 이용하여 안전하게 설치가능하며, 그로 인해 송전탑 공사중 발생되는 추락 사고를 예방할 수 있도록 하는 고압 전기 현수식 송전탑 상부 트러스보 설치구조를 제공함을 그 목적으로 한다.The present invention in view of the above problems, the present invention, the high-voltage electric suspension transmission tower upper structure can be safely installed using the chain block reduction gear pulley, thereby preventing the fall accidents occurring during transmission tower construction An object of the present invention is to provide a high-tension electric suspension transmission tower top truss installation structure.
도 1은 종래의 현수식 송전탑을 설치시 발생되는 문제점을 나타내는 도면.1 is a view showing a problem occurring when installing a conventional suspended transmission tower.
도 2는 본 고안의 송전탑 기둥 설치 단계를 나타내는 도면.2 is a view showing a transmission tower pillar installation step of the present invention.
도 3은 본 고안의 송전탑 상부 트러스보의 인양 단계를 나타내는 도면.Figure 3 is a view showing the lifting step of the upper truss transmission tower of the present invention.
도 4는 본 고안의 송전탑 상부 트러스보 설치단계의 분해 상태 도면.Figure 4 is an exploded view of the transmission tower top truss installation step of the present invention.
도 5는 본 고안의 송전탑 상부 트러스보가 체결되는 상태를 나타내는 도면.5 is a view showing a state in which the transmission tower upper truss of the present invention is fastened.
도 6은 본 고안의 송전탑 트러스보 설치완료 단계를 나타내는 도면.Figure 6 is a view showing a completed transmission tower trussing step of the present invention.
< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>
100: 기초 콘크리트 200: 송전탑 트러스트 기둥100: foundation concrete 200: transmission tower trust pillar
300: 체인블럭 걸이대 400: 체결 클립300: chain block hanger 400: fastening clip
500: 감속기어 도르래 600,600': 조립식 트러스 박스500: reduction gear pulley 600,600 ': prefabricated truss box
700: 트러스 보 800: 현수식 애자700: truss 800: suspension insulator
본 고안은 상술한 목적 달성을 위해, 본 고안은, 기초 콘크리트, 송전탑 트러스 기둥 및 트러스 보를 포함하는 고압 전기 현수식 송전탑 상부 트러스보 설치구조에 있어서, 상기 송전탑 트러스 기둥에는 각각 상단부에 2단으로 설치되는 조립식 트러스 박스; 상기 조립식 트러스 박스의 안착대에 안착되어 체결되는 체인 블럭 걸이대; 상기 조립식 트러스 박스와 체인 블럭 걸이대를 너트를 사용하여 상호 체결시키는 체결 클립 볼트; 상기 체인 블럭 걸이대에는 원형링에 상부 후크부가 결합되는 감속기어 도르래; 및 상기 감속기어 도르래에 의해 트러스 보가 송전탑 트러스 기둥의 상부 측면에 체결완료된 후 트러스 보의 하부에 설치되는 현수식 애자;로 구성된 고압 전기 현수식 송전탑 상부 트러스보 설치구조를 제공한다.The present invention to achieve the above object, the present invention, in the high-voltage electric suspension transmission tower top truss installation structure including the foundation concrete, transmission tower truss column and truss beam, each of the transmission tower truss pillars are installed in two stages at the upper end Prefabricated truss box; A chain block hanger seated and fastened to a seating table of the prefabricated truss box; A fastening clip bolt for fastening the assembled truss box and the chain block hanger to each other using nuts; The chain block hanger has a reduction gear pulley coupled to the upper hook portion to the circular ring; And a suspension insulator installed on the lower side of the truss beam after the truss beam is fastened to the upper side of the transmission tower truss column by the reduction gear pulley.
이하, 첨부 도면을 참조하여 본 고안의 구성을 설명한다.Hereinafter, with reference to the accompanying drawings will be described the configuration of the present invention.
도 1은 종래의 현수식 송전탑을 설치시 발생되는 문제점을 나타내는 도면이고, 도 2는 본 고안의 송전탑 기둥 설치 단계를 나타내는 도면이며, 도 3은 본 고안의 송전탑 상부 트러스보의 인양 단계를 나타내는 도면이고, 도 4는 본 고안의 송전탑 상부 트러스보 설치단계의 분해 상태 도면이며, 도 5는 본 고안의 송전탑 상부 트러스보가 체결되는 상태를 나타내는 도면이고, 도 6은 본 고안의 송전탑 트러스보 설치완료 단계를 나타내는 도면이다.1 is a view showing a problem occurring when installing a conventional suspended transmission tower, Figure 2 is a view showing the transmission tower pillar installation step of the present invention, Figure 3 is a view showing the lifting step of the transmission tower upper truss of the present invention 4 is an exploded state diagram of a transmission tower upper trussbo installation step of the present invention, and FIG. 5 is a view showing a state where the transmission tower upper trussbo of the present invention is fastened, and FIG. 6 is a transmission tower trussbo installation completion step of the present invention. It is a figure which shows.
기초 콘크리트(100)에는 상부에 송전탑 트러스 기둥(200)이 입설되고, 상기 송전탑 트러스 기둥(200)에는 상단부에 조립식 트러스 박스(600)(600')가 2단으로 설치되며, 상기 조립식 트러스 박스(600)(600')에는 상부에 체인 블럭 걸이대(300)가 체결 클립 볼트(400)로 체결되어 너트(410)로 고정되고, 상기 체인 블럭 걸이대(300)에는 원형링(350)에 감속기어 도르래(500)의 상부 후크부(530)가 체결되며, 상기 감속기어 도르래(500)에는 하부의 감속 체인(510)에 트러스 보(700)의길이방향 양측이 결합되어 상부로 이동시키게 된다.In the base concrete 100, a transmission tower truss column 200 is installed at the top, and the transmission tower truss column 200 is provided with two stages of prefabricated truss boxes 600 and 600 'at the upper end, and the prefabricated truss box ( The chain block hanger 300 is fastened to a fastening clip bolt 400 on the upper part 600 and 600 ', and is fixed by a nut 410, and the chain block hanger 300 is connected to the circular ring 350 on the reduction gear pulley. The upper hook portion 530 of the 500 is fastened, and both side lengths of the truss beam 700 are coupled to the reduction gear pulley 500 so as to move upward.
상기 송전탑 트러스 기둥(200)과 트러스 보(700)는, 트러스형 구조물로, 채널 등을 이용하여 제작된다.The transmission tower truss column 200 and the truss beam 700 is a truss-shaped structure, and is manufactured using a channel or the like.
상기 체인 블럭 걸이대(300)는, 일측이 절곡된 격자형 봉 부재로, 절곡된 곳과 대향된 위치에 2개의 원형 단턱부(310)와 원형링(350)이 형성되어 조립식 트러스 박스(600)의 안착대(620)에 안착되어 체결 클립 볼트(400)와 너트(410)로 체결된다.The chain block hanger 300 is a lattice-shaped rod member having one side bent, and two circular stepped portions 310 and a circular ring 350 are formed at positions opposite to the bent portion, and thus the prefabricated truss box 600 is formed. It is seated on the mounting table 620 is fastened with a fastening clip bolt 400 and the nut 410.
상기 감속기어 도르래(500)는, 일반적인 기술 사항이라 상세한 설명은 생략하기로 하며, 감속 체인(510)의 끝에 형성된 하단 후크부(512)에 트러스 보(700)가 결합되어 감속 체인(510)에 의하여 상부로 트러스 보(700)를 이동시키게 된다.Since the reduction gear pulley 500 is a general technical matter, a detailed description thereof will be omitted, and the truss beam 700 is coupled to the lower hook portion 512 formed at the end of the reduction chain 510 to the reduction chain 510. As a result, the truss beam 700 is moved upward.
상기 조립식 트러스 박스(600)(600')는, 사각형 형태로 제작되어 송전탑 트러스 기둥(200)의 상단에 2단으로 체결 클립 볼트(400)로 체결되는 한편, 상기 조립식 트러스 박스(600)는 상부에 안착대(620)가 반원형 형태로 형성되어 체인 블럭 걸이대(300)가 안착되어 유동이 방지된다.The prefabricated truss boxes 600 and 600 'are manufactured in a quadrangular shape and fastened to the top of the transmission tower truss pillar 200 by fastening clip bolts 400 in two stages, while the prefabricated truss box 600 is upper part. Mounting table 620 is formed in a semi-circular shape so that the chain block hanger 300 is seated to prevent the flow.
상기 송전탑 트러스 기둥(200)에는 트러스 보(700)가 체결 볼트로 체결 완료된 후, 상기 트러스 보(700)에는 하부에 다수개의 현수식 애자(800)가 설치된다.After the truss beam 700 is fastened to the transmission tower truss pillar 200 by the fastening bolts, the truss beam 700 is provided with a plurality of hanging insulators 800 at the bottom thereof.
상술한 구성과 같이, 상기 송전탑 트러스 기둥(200)에는 트러스 보(700)를 체결시키는 경우, 송전탑 트러스 기둥(200)의 상단에 2단으로 조립식 트러스 박스(600)(600')가 체결되고, 상기 조립식 트러스 박스(600)의 상부에 체인 블럭 걸이대(300)가 U자형 형태로 형성된 체결 클립 볼트(400)로 체결되며, 상기 체인블럭 걸이대(300)와 결합된 감속기어 도르래(500)를 이용하여 트러스 보(700)를 이동하여 송전탑 트러스 기둥(200)의 상부 측면에 체결 볼트로 체결시키는 바, 종래와는 다르게 작업성의 향상 및 시공의 안전성을 확보할 수 있게 된다.As described above, when fastening the truss beam 700 to the transmission tower truss pillar 200, the prefabricated truss box 600, 600 'is fastened in two stages to the top of the transmission tower truss pillar 200, The block block rack 300 is fastened to the upper portion of the prefabricated truss box 600 by a fastening clip bolt 400 formed in a U-shape, and uses a reduction gear pulley 500 coupled with the chain block rack 300. By moving the truss beam 700 to fasten the fastening bolt to the upper side of the transmission tower truss column 200, unlike in the prior art it is possible to secure the workability and construction safety.
상기 송전탑 트러스 기둥(200)에는 트러스 보(700)가 설치되는 경우, 그 밀착면에 볼트 체결 받침대(750)가 설치되어 지지된다.When the truss beam 700 is installed on the transmission tower truss pillar 200, the bolt fastening pedestal 750 is installed and supported on the contact surface thereof.
상술한 본 고안의 구성에 의한 효과를 설명한다.The effect by the structure of this invention mentioned above is demonstrated.
본 고안의 트러스 보 설치 구조는, 고압 전기 현수식 송전탑 상부 구조물을 육상 조립하고 체인 블럭 감속 기어 도르래를 이용하여 안전하게 설치가능한 관계로 송전탑 공사중 발생되는 추락 사고를 예방할 수 있어 안전 사고를 미연에 방지하는 효과를 얻을 수 있다.The truss beam mounting structure of the present invention can prevent falling accidents occurring during construction of transmission towers because the high-voltage electric suspension transmission tower upper structure can be assembled on land and safely installed using a chain block reduction gear pulley, thereby preventing safety accidents. The effect can be obtained.
또한, 송전탑 트러스 기둥의 상부에 조립식 트러스 박스를 2단으로 설치하고 상기 조립식 트러스 박스에 체인 블럭 걸이대를 체결 클립 볼트로 체결하며, 상기 체인 블럭 걸이대에 감속기어 도르래를 결합하여 트러스 보를 이동시키는 관계로, 시공의 용이성을 얻을 수 있는 효과를 얻을 수 있다.In addition, since the prefabricated truss box is installed in two stages on the top of the transmission tower truss column, the chain block hanger is fastened to the prefabricated truss box with a fastening clip bolt, and the reduction gear pulley is coupled to the chain block hanger to move the truss beam. Therefore, the effect which can acquire the ease of construction can be acquired.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2004-0018345U KR200361540Y1 (en) | 2004-06-29 | 2004-06-29 | Truss beam mount structure of power transmission tower f0r high electric |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2004-0018345U KR200361540Y1 (en) | 2004-06-29 | 2004-06-29 | Truss beam mount structure of power transmission tower f0r high electric |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200361540Y1 true KR200361540Y1 (en) | 2004-09-14 |
Family
ID=49349921
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2004-0018345U KR200361540Y1 (en) | 2004-06-29 | 2004-06-29 | Truss beam mount structure of power transmission tower f0r high electric |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200361540Y1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101881325B1 (en) * | 2017-08-03 | 2018-08-27 | (주)지용금속 | Apparatus for modular structure foundation |
-
2004
- 2004-06-29 KR KR20-2004-0018345U patent/KR200361540Y1/en not_active IP Right Cessation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101881325B1 (en) * | 2017-08-03 | 2018-08-27 | (주)지용금속 | Apparatus for modular structure foundation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4716948B2 (en) | Safety rope support bracket | |
KR102049630B1 (en) | Scaffolding equipment for aggregate smokestack dismantling and dismantling method for aggregate smokestack using same equipment | |
KR200361540Y1 (en) | Truss beam mount structure of power transmission tower f0r high electric | |
RU179913U1 (en) | Traverse for fastening self-supporting insulated wires to the support of an overhead power line | |
KR200226626Y1 (en) | Bracket for Supporting Flooring Slab Form of Bridge | |
CN110159051B (en) | Power transformation framework | |
KR100865074B1 (en) | Power cable space for power transmission tower | |
KR101185578B1 (en) | Temporary Construction Bracket | |
RU2354793C1 (en) | Bearing for overhead power transmission line of high and extra high voltage and for multiple circuits | |
CN2509281Y (en) | Adjustable bearing structure for overhead floors | |
KR200361539Y1 (en) | Mount structure of underground anchor for electric pole | |
JP2004083264A (en) | Beam attaching device | |
RU2302502C1 (en) | Support structure for overhead high-voltage and super-voltage transmission line | |
CN111877390A (en) | Large-scale tower crane basis fixing device | |
KR200232750Y1 (en) | Construction for preventing from upset of prestressed concrete beam | |
RU136249U1 (en) | SUPPORT WITH INSULATING BARS | |
CN219960048U (en) | Metal wire slot hanging bracket | |
KR200262098Y1 (en) | A Safety Support for Pipe Type Tower Arm | |
CN114263313B (en) | Photovoltaic module mounting structure for hollowed-out roof and construction method thereof | |
KR102622595B1 (en) | A Supporting bar for Traffic light | |
KR200347029Y1 (en) | Jacket for installing bridge inspection platform | |
CN218668421U (en) | Building beam frame | |
CN212836964U (en) | Power transformation framework | |
RU44720U1 (en) | SUPPORT FOR HIGH AND ULTRA HIGH VOLTAGE ELECTRIC TRANSMISSION LINES AND FOR MULTI-CHAIN ELECTRIC TRANSMISSION LINES | |
CN218912505U (en) | Enclose fender of steel construction for attic |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
REGI | Registration of establishment | ||
T201 | Request for technology evaluation of utility model | ||
T701 | Written decision to grant on technology evaluation | ||
FPAY | Annual fee payment |
Payment date: 20120806 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20130820 Year of fee payment: 10 |
|
EXPY | Expiration of term |