KR200358930Y1 KR20-2004-0014275U KR20040014275U KR200358930Y1 KR 200358930 Y1 KR200358930 Y1 KR 200358930Y1 KR 20040014275 U KR20040014275 U KR 20040014275U KR 200358930 Y1 KR200358930 Y1 KR 200358930Y1
Authority
KR
South Korea
Prior art keywords
pile
steel
rock
pilot
pipe
Prior art date
Application number
KR20-2004-0014275U
Other languages
Korean (ko)
Inventor
장경희
Original Assignee
김상진
이상익
장경희
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김상진, 이상익, 장경희 filed Critical 김상진
Priority to KR20-2004-0014275U priority Critical patent/KR200358930Y1/en
Application granted granted Critical
Publication of KR200358930Y1 publication Critical patent/KR200358930Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/24Placing by using fluid jets

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

암반착공에 있어서 고강도 특수강판(외르뎅강)의 재질로된 일정길이의 강시반, H형강, 강관의 선단에 수십개의 고경도 보턴칩을 메워 채운 특수치구 후단들과 각각 일치하는 통상의 강시반, H형강 강관형의 철강재 파일(말뚝)을 각각의 후단과 용접하여 일체화시킨 말뚝에 강시반 및 H형강, 강관형의 철강재 말뚝을 각각의 후단과 용접화시킨 일체화시킨 파일에 강시반 및 H형강에는 내측면(홈)에 길이방향으로 강관에는 외측면(관외면)의 길이방향으로 노즐을 구비한 여러개의 도수관을 각각 밀착용접시켜서 된 JV 파이로트 공법용 파일에 관한 것이다.Ordinary steel panels, which correspond to the rear end of special fixtures filled with dozens of high hardness button chips on the ends of steel pipes, H-shaped steel, and steel pipes of high-strength special steel plates (Erden steel), Steel pile and pile of H-shaped steel pipe (steel pile) welded to each rear end and integrated. Steel plate and H-shaped steel, Steel pipe-shaped steel pile and welded pile and steel pile. The steel pipe in the longitudinal direction to the inner surface (groove) relates to a pile for the JV pilot method by welding a plurality of water pipes with nozzles in the longitudinal direction of the outer surface (pipe outer surface).

Description

암반착공 제이브이 파이로트 공법용 파일{JV pilot pile for digging rock}Rock crusher Jeep pilot file {JV pilot pile for digging rock}

본 고안은 암반착공 JV 파이로트 공법(선항굴착공법)에 사용되는 파일에 관한 것으로 보다 상세하게는 고강도 특수강판(강도 500~600㎏ gf/㎠, 외르뎅강)을 모재로한 비교적 짧은 일정길이의 강시반(시트파일), H형강, 강관의 일측선단에 고강도 보턴칩(경도 HRC 90~91)을 기술적으로 적당한 위치에 배열하여 메워 채운 특수치구 타측단을 각각에 일치하는 동일치수의 강시반, H형강, 강관의 일측단부에 용접하여 연장일체화시킨 파일(말뚝)에 파일 길이방향으로 도수관을 용접시킨 JV 파이로트 공법용 파일로서 이 파일을 진동식 바이브로 함마와 고압 대용량제타(압력 150㎏ f/㎠, 토출량 800ℓ/min 이상)를 병용하므로서 암반을 선착공후 파일을 끌어올리고 같은 위치에 형성된 굴착공에 지수, 흙막음용 가설파일 또는 지지용파일을 삽입하여 진동식 바이브로 함마에 의하여 설계심도까지 박아 넣기 타설하며이 작업을 반복해서 계속적으로 행하는 것에 의하여 암반층(일축압축강도: 300~600㎏ gf/㎠)에 대한 각종 말뚝의 박아 넣기 타설을 가능케 하는 암반착공 JV 파이로트 공법용 파일에 관한 것이다.The present invention relates to a pile used in rock drilling JV pilot method (line drill excavation method), more specifically, a relatively short constant length based on a high-strength special steel plate (strength 500 ~ 600㎏ gf / ㎠, Oerden steel) Steel plate of the same size that matches the other end of the special jig which is filled by arranging the high-strength button chip (hardness HRC 90 ~ 91) on the one end of the steel sheet (sheet pile), H-shaped steel, and steel pipe in a technically proper position, A pile for JV pilot method in which a water pipe is welded in the longitudinal direction of a pile (pile) welded to one end of an H-section steel and a steel pipe. The pile is a vibrating vibr hammer and a high-pressure large-capacity zeta (pressure 150 kg f /). ㎠, discharge amount 800ℓ / min or more), the rock is raised after the first hole, the pile is pulled up, and the index, earth clogging hypothesis or support pile is inserted into the excavation hole formed at the same position to be a vibrating vibr. Rock-implanted JV pilot method that enables the drilling of various piles to rock bed (uniaxial compressive strength: 300 ~ 600㎏ gf / ㎠) by repeatedly carrying out this work. It's about files.

최근 진동식 항타기(바이브로함마)와 고압제트 분사펌프(고압제타)를 병용사용하는 「JV공법이 일반적으로 보급되어 단단하고 점성이 높은 어려운 지반에 각종 말뚝을 타설시공하는 것에 있어서 자주 사용하게 되었지만 이 원리는 점토같은 점성도가 높은 지층이거나 단단한 자갈층에 있어서는 바이브로함마에 의한 진동을 이용한 진동타설 공법만으로는 점토질층에 있어서 흙의 조성상의 특성에서 진동에 의한 액상화 현상이 일어나지 않고 오히려 조성입자끼리 진동에 의해 더욱 딱딱하게 응고되는 현상을 일으키고 말뚝선단 말뚝주위의 마찰저항을 높게 하고만다.Recently, the JV method, which uses a combination of a vibrating hammer (vibrohamma) and a high-pressure jet injection pump (high pressure jetta), has been widely used in the construction of various piles on hard and viscous difficult grounds. The principle is that in the viscous laying method using vibration by vibrohamma in clay or hard gravel layer such as clay, liquefaction due to vibration does not occur in the composition of soil in clay layer but rather by vibration of composition particles It causes harder solidification and increases the frictional resistance around the pile tip piles.

또한 자갈층에 있어서는 지하수위가 낮거나 지하수의 양이 적은 경우는 지반의 습윤성이 낮게되므로서 이러한 지반에 진동을 가하면 역으로 진동에 의해서 지반이 단단하게 굳게되고 말뚝선단 주위 저항이 높게된다.In addition, in the gravel layer, when the groundwater level is low or the amount of groundwater is low, the ground wettability is low. When the vibration is applied to the ground, the ground is firmly hardened by the vibration and the resistance around the pile tip is high.

그밖에 전석, 알돌이 많이 혼재한 지층에 있어서는 말뚝진동과 바이브로함마의 기진력만으로는 전석, 알돌을 옆으로 밀어내지 못하고 역시 단단하게 굳게된다.In addition, in the strata where a lot of stones and aldols are mixed, the vibrations of the pile vibration and Vibrohamma alone do not push the stones and aldols to the side and are firmly solid.

위와 같은 현상이 발생하기 때문에 알돌에 박아 넣는 것이 불가능하게 된다. 이것을 해결하기 위하여 바이브로함마와 병용하여 고압제타를 사용해서 지반에 대량의 물과 고압의 수류(제트분사수류)를 뿜어 보냄으로서 바이브로함마의 기진력과 고압대량의 제트분류수의 상승작용을 만들어 내고 지반을 연약화시키므로서 곤란하고 시공이 어려운 지반에서도 말뚝을 박아 넣을 수 있게한 공법이 JV공법이다.As this happens, it becomes impossible to drive it into aldol. In order to solve this problem, by using high pressure zeta in combination with Vibrohamma, a large amount of water and high pressure water (jet jetting water) are sprayed on the ground, thereby increasing the vibrating force of Vibrohamma and the high pressure jet jet water. The JV method is a method that allows piles to be embedded in difficult and difficult grounds by creating and softening the ground.

하지만 이 JV공법에 의해서도 풍화암을 포함한 암반층(250㎏f/㎠ 이상)에는 말뚝을 박아 넣는 것은 불가능했었다.However, even with this JV method, it was impossible to drive a pile into a rock layer (250 kgf / cm 2 or more) including weathered rock.

이것을 가능하게 하기 위해서는 우선고압제트 분류수의 압력이 암반의 강도 이상이어야 하고 또 수량이 많지 않으면 안되는 것이기 때문이다. 이러한 초고압 대용량 제타를 제작하는 것은 기술적으로는 가능하지만 완성후 장비가격이 엄청나기 때문에 시공단가 상이나 경제적인 측면에서 보아도 받아들이지 못하게 되므로 실제로는 제작하지 못하는 것이다. 이런 사정때문에 전술한 어려운 암반층에 대한 말뚝타설 공사에 있어서는 시공단가가 현저히 비싸게 되고 소음, 진동 등의 환경공해가 있으며 본 말뚝의 허용지지력 확보가 어려운 다운쟈 에이함마를 사용한 비트에 의한 천공작업과 같은 다른 시공법에 의하여 행하여 왔던 경우가 있다.In order to make this possible, first, the pressure of the jet jet water must be greater than or equal to the strength of the rock and the quantity must be large. It is technically possible to manufacture such a high pressure large-capacity zeta, but because of the enormous price of equipment after completion, it cannot be accepted even in view of construction unit price or economic aspect. Due to this situation, the construction cost for the above-mentioned difficult rock foundation is significantly high, and there is environmental pollution such as noise and vibration, and drilling by bit using downjaer Ahamma, which is difficult to secure the bearing capacity of the pile, It may have been performed by another construction method.

본 고안은 종래 암반착공 공법들의 문제점을 보완 해결할 수 있는 암반착공 JV 파이로트 공법(선항굴착공법)에 사용되는 특수치구를 용접한 파일을 제공함에 있으며 시공단가를 크게 줄여 경제적 타당성을 확보할 수 있고 소음, 진동, 지반침하에 따른 환경공해를 저감시킬 수 있으며 적어도 250~700㎏ f/㎠의 강도를 갖는 암반층에 박아 넣기를 가능케 할 수 있고 종래 빗트에 의한 선항굴착으로 지지말뚝, 지수벽, 흑막공에 이용되는 가설말뚝 등 본 말뚝의 타설에서 빗트에 의하여 천공된 과대구멍으로 발생하는 문제점을 여러형태의 파일 단면 형상과 비슷한 구멍을 형성하게 됨으로 지지기반상에서 확보되는 말뚝의 선단지지력에 더하여 파일 주위 마찰력에 의한 마찰 지지력을 충분히 확보할 수 있으며 전체적으로 파일이가져야 하는 허용지지력을 확실히 보지할 수 있게 하는 암반착공 JV 파이로트 공법용(선항굴착공법) 파일을 제공함에 목적을 두고 있다.The present invention provides a pile welded special jig used for rock drilling JV pilot method (ship excavation method) that can solve the problems of conventional rock drilling methods and can significantly reduce the construction cost and secure economic feasibility. Environmental pollution due to noise, vibration, and ground subsidence can be reduced, and it can be embedded in a rock layer having a strength of at least 250 to 700 kg f / ㎠. The problem caused by excessive holes drilled by bites in the placing of this pile, such as temporary piles used in the ball, forms holes similar to the cross-sectional shape of various types of piles, and in addition to the tip bearing capacity of the piles secured on the support base, It is possible to secure enough friction support by friction and to confirm the allowable bearing capacity of the pile as a whole. The Hebrews can not see the rock construction that allows the pilot process for the JV (seonhang Excavation Method) file aims to provide.

도 1a는 본 고안에 따른 강시반(시트파일)파이로트 말뚝을 나타낸 사시도Figure 1a is a perspective view showing a steel plate (sheet pile) pilot pile according to the present invention

도 1b는 본 고안에 따른 H형강 파이로트 말뚝을 나타낸 사시도Figure 1b is a perspective view of the H-shaped steel pilot pile according to the present invention

도 1c는 본 고안에 따른 강판 파이로트 말뚝을 나타낸 사시도Figure 1c is a perspective view showing a steel sheet pilot pile according to the present invention

본 고안에 의한 암반착공 JV 파이로트 공법용 파일은 고강도 특수강판(외르뎅강)의 재질로된 일정길이의 강시반(시트파일), H형강, 강관의 일측단면에 경도 HR 90-91인 수십개의 보턴칩을 메워 채운 특수치구 후단들과 각각 단면이 일치하는 통상의 철강 강시반(시트파일), H형강, 강관의 철강파일(말뚝)을 각각 치구의 후단과 용접하여 일체화시킨 파일로서 강시반 및 H형강에는 내측(홈)면의 길이방향으로, 강관에는 외측면(관외면)의 길이방향으로 노즐을 구비한 여러개의 도수관을 각각 밀착 용접시켜서된 암반착공 JV 파이로트 공법용 파일(말뚝)이라 할 수 있다.Rock pile for JV pilot method according to the present invention is a dozen pieces of hardness HR 90-91 on one side of steel sheet, H-shaped steel, steel pipe of constant length It is a pile in which ordinary steel sheet (sheet pile), H-shaped steel, and steel pile (pile) of steel pipes, which have the same cross-section with the rear end of special fixtures filled with button chips, are integrated by welding with the rear ends of the jig. H-steels are piled in close contact with several water pipes with nozzles in the longitudinal direction of the inner (groove) surface and in the longitudinal direction of the outer surface (outer surface) of the steel pipe. can do.

이상을 도면으로 나타내면 도 1a, 도 1b, 도 1c와 같이 강시반(시트파일) JV 파이로트 파일(A), H형강 JV 파이로트 파일(B), 강관 JV 파이로트 파일(C)으로 각각 나타낼 수 있고 부호 A1, B1, C1은 각각의 치구이고, A2, B2, C2는 보턴칩, A3, B3, C3는 노즐, A4, B4, C4는 각각의 노즐에 연결된 도수관, A5, B5, C5는 용접부 A6, B6, C6는 강시반(시트파일), H형강 및 강관의 철강파일(말뚝)이다.As shown in the drawings, as shown in Figs. 1A, 1B, and 1C, the steel sheet (sheet file) JV pilot file (A), H-beam steel JV pilot file (B), and steel pipe JV pilot file (C) will be respectively shown. A1, B1, C1 are each jig, A2, B2, C2 is button chip, A3, B3, C3 is nozzle, A4, B4, C4 is water pipe connected to each nozzle, A5, B5, C5 is Welds A6, B6 and C6 are steel piles (piles) of steel plates (sheet piles), H-beams and steel pipes.

이상에 도수관(A4, B4, C4)은 각 파일의 후단부로 연장되어 대용량 고압펌프에 연결되며 도수관에 연결된 노즐(A3, B3, C3) 선단부를 HF800으로 육성한 후 그 위에 단가로이(Tangalloyo : 초경합금)로 육성하고 노즐의 선단부는 암반의 특성 강도 등에 따라서 치구의 선단보다 5㎝~10㎝ 정도 뒤쪽으로 위치해 있고 강시반 특수치구(A1), H형강 특수치구(B1), 강관형 특수치구(C1)의 일측선단에 형성된 보턴칩 또한 경도 HR 90-91인 초경합금 재질로 되어 있으며 암의 강도에 따라서 보턴칩의 간격을 조정하므로서 보턴칩의 개수는 다소 유동적이라 할 수 있다.Above, the water pipes (A4, B4, C4) are extended to the rear end of each pile and connected to the high-capacity high-pressure pump, and the tip of the nozzles (A3, B3, C3) connected to the water pipe is raised with HF800, and then Tangalloyo: cemented carbide is placed thereon. ), The tip of the nozzle is located 5cm ~ 10cm behind the tip of the jig according to the characteristic strength of the rock, and the special jig (A1), H-beam special jig (B1), and steel pipe-type jig (C1) Button chip formed at one end of the) is also made of cemented carbide material with hardness HR 90-91, and the number of button chips is somewhat flexible by adjusting the distance of button chips according to the strength of the arm.

이상의 파일로서 JV 파이로트 공법으로 시공하면 보턴칩을 메워 채운 특수치구가 시트파일 하단 선단부에 용접되어 있는 파일로서 진동타격 됨으로 암반의 금(크랙)은 금과 금 사이에 강한 타격을 받는 것에 인하여 암반을 굴착하고 충격파에 인해서 절리의 개구를 더욱 진전시키고 선명화하게 한다.As a result of the above pile, when the JV pilot method is used, the special jig filled with the button chip is welded to the lower end of the sheet pile and is vibrated and the gold of the rock is cracked due to the strong impact between the gold and the gold. Excavation and shock wave make the opening of the joint more advanced and sharper.

또 이때 일정간격으로 메워 채운 보턴칩에 의하여 진동 점타격을 행하게 됨으로 암반 내(면)에 타격력의 강약 즉 충격파의 강약대가 생기고 절리의 개구 선명화에 크게 영향을 주는 것으로 이를 요약하면In this case, the vibration point strike is performed by the button which is filled at a certain interval, and thus, the strength of the impact force, that is, the impact wave intensity band, is generated in the rock (surface).

●암의 균열이 타격력과 충격파에 인해서 더욱 개구를 크게 하고 잠재균열을 선명화시킨다.The cracks in the arm make the opening larger and sharpen the potential cracks due to the impact force and shock wave.

●고압제트 분류가 암의 갈라지는 간극에 들어가되 고압의 분류압으로 암 쇄편을 불어 날려 버리고 더 선명화된 균열을 확대시킨다. 이는 고압분류수의 쐐기 효과라 할 수 있다.High pressure jets enter the gap between the arms, but blow off the rock fragments with high pressure jets to enlarge the sharper cracks. This can be referred to as the wedge effect of the high-pressure fractionated water.

●보턴칩과 보턴칩 사이 부분은 돌기상 암면 부분으로서 남게되나 이 부분은 모재인 외르뎅강이 용이하게 타격 파쇄하게 된다.● The part between the button and the button chip remains as a rocky part of the protrusion, but this part is easily broken by the mother-in-law, the Jardin River.

●보턴칩을 사용하여 적당한 간격으로 배열 메워 채운 것으로 인하여 암의 평면에 대한 점타격이 가능하게 되어 암의 평면 내부에 타격력과 충격파의 강약대가 생기고 이 힘의 강약 차이가 암의 갈라진 금을 더욱 크게 확대하고 또는 선명화시키는 작용을 하게 된다.By filling the array at proper intervals using the button chip, it is possible to make a point strike on the plane of the arm, creating a strong and weak band of impact force and shock wave in the plane of the arm. It works to enlarge or sharpen.

또 암면이 타격에 의해서 요철상태가 되므로서 돌기부분을 때리게 되는 외르뎅강 모재 파쇄 능력을 현저하게 상승시킨다.In addition, the rock wool becomes uneven by hitting, thereby significantly increasing the ability to break the Oderden steel base material that hits the protrusions.

이상과 같은 기능과 작용을 갖는 진동 타격의 반복실시로 인하여 JV 파이로트 말뚝은 연암층을 파쇄 굴착하고 암반상(내)에 파일 단면형상의 구멍을 용이하게 착공할 수 있게 되는 것이다.Due to the repeated implementation of the vibration hitting having the above functions and actions, the JV pilot pile is able to crush and excavate the soft rock layer and easily start drilling holes in the cross-sectional shape in the rock (inside).

또 본 고안에 의한 파일로 암반착공함에 있어서 얻을 수 있는 또 다른 기능을 종래의 파일 타설방법과 비교해보면In addition, when compared with the conventional pile placing method, another function that can be obtained in rock drilling with the pile according to the present invention

㉮ 지지말뚝의 경우㉮ In case of supporting pile

●빗트를 사용한 다운쟈에 에어함마에 의한 타설(종래공법)● Pasting (conventional method) by air hammer to downjaer using the bit

이는 종래의 일반적인 공법이나 파일로서 착공할 수 없을 때 고강도의 암반굴착 방법으로 비트에 의해서 천공하게 됨으로써 천공된 구멍은 말뚝보다도 굉장히 크게 형성되고 이 때문에 말뚝 주위 마찰력이 적게 될 염려가 있다. 또 강관 내부가 공동상태로 되었음으로 지지력의 보지, 강관의 내압 강도 보지를 위해서 본 말뚝을 세워 넣은 후 본 말뚝 내부에 다시 토사를 메워 채워야 한다. 또 천공과정에 있어서 함마에서 방출 된 고압대량의 에어배기에 의하여 공벽 붕괴가 일어나고 천공 후, 구멍바닥에 토사가 떨어져 쌓여 지지기반까지 본 말뚝을 타설 할 수 없는 상태가 발생하여 말뚝의 허용지지력 확보가 어렵게 된다. 이것을 보존하기 위해서 공벽 붕괴방지 약액 분사라던가 본 말뚝 하단 선단 부분에 그라우트 주입을 행하지 않으면 안되게 된다.This can be drilled by a bit with a high-strength rock excavation method when it can not be ground with a conventional general construction method or pile, so that the perforated hole is formed much larger than the pile, and there is a concern that the friction around the pile is reduced. In addition, since the inside of the steel pipe is in a common state, the pile must be piled up for the holding of the bearing capacity and the pressure-bearing strength of the steel pipe, and the soil must be filled again in the pile. In addition, during the drilling process, the collapse of the hollow wall occurs due to the high-pressure air exhaust emitted from the hammer, and after the drilling, the soil piles up on the bottom of the hole and the pile cannot be placed up to the support base. Becomes difficult. In order to preserve this, grout injection must be performed at the tip of the pile at the bottom of the pile to prevent the collapse of the empty wall.

●JV파이로트 말뚝에 의한 타설 :Poured by JV Pilot Pile:

본 고안에 의한 강관지지 말뚝을 타설하면 지하 지반 내에 설계심도까지 확실히 타설되는 것과 동시에 강관 말뚝의 선단 단면 형상에 비슷한 구멍이 착공 형성되게 됨으로 지지기반 상에서 확보되는 말뚝의 선단 지지력에 더하여 말뚝 주위 마찰력에 인한 마찰 지지력을 충분히 얻을 수 있고, 종합적으로 말뚝이 가져야 하는 허용지지력을 확실히 보지 할 수 있게 된다.When the steel pipe supporting piles are cast, the design depth is firmly placed in the underground, and holes similar to the tip cross-sectional shape of the steel pipe piles are grounded, and in addition to the end bearing capacity of the piles secured on the support base, Due to this, the frictional bearing capacity can be sufficiently obtained, and it is possible to reliably hold the allowable bearing force that the pile must have overall.

㉯지수벽, 흙 막공에 이용되는 가설말뚝의 경우경우 In the case of temporary piles used for exponential walls and earthwork

다양한 말뚝의 용법, 용도가 있는 안에서 여기에선 특히 하천 내에서 시공되는 건조물용, 지수벽 닫음 가설공사를 예를 들고자 한다.Here are examples of the usage and usage of various piles, especially for the construction of waterworks and closed wall temporary construction for construction in rivers.

왜냐하면 시공상 많은 문제가 선명화 되서 볼 수 있었기 때문이다. 이 지수벽 닫음 가설공사에 있어서 요구되는 포인트는Because many problems in construction can be seen clearly. The point required for the construction of the exponential wall closing construction is

●지수가 확실히 행하여지는 것● Index being done surely

●외부수압(수동수압)에 대한 내압지지력을 지수벽이 확보되어 있는 것 등등이다.● The exponential walls have a bearing wall for external hydraulic pressure (manual hydraulic pressure).

이 두 가지 요구 포인트를 달성하기 위해서는To achieve these two demand points

① 말뚝을 박아 넣을 때 가능한 한 말뚝을 수직으로 박아 넣는 일이 중요하다. 왜냐하면 말뚜의 수직정도를 높게 하는 것에 인해서 말뚝의 개수(인터로킹)저항이 낮게 되어, 개수분의 열에 인한 용해를 막을 수 있음으로 닫은 후 외부에서의 물이 새는 것을 막을 수 있게 된다. 또 개수와 개수의 맞물림을 정확하게 할 수 있으므로 벽의 내압 지지력을 확실하게 보지 할 수 있게 된다.① When driving a pile, it is important to drive the pile as vertically as possible. Because of the increase in the verticality of the pile, the number of the piles (interlocking) resistance is low, it can prevent the melting of the heat of the water to close the water can be prevented from leaking after closing. In addition, since the number and the engagement of the number can be accurately, it is possible to reliably hold the pressure-bearing capacity of the wall.

② 지수벽 닫음 후 내부의 물을 배출하게 되는데 이 때 말뚝 하단 선단부에있어서 외부로부터의 물의 역 유입, 즉 히빙현상이 일어나지 않도록 최하단부 외주에 토사로 방수 막(방어 층)이 형성되어야 한다.② After closing the exponential wall, the internal water is discharged. At this time, a waterproof membrane (protective layer) should be formed on the outer periphery of the lowermost part to prevent reverse inflow of water from the outside, that is, hebbing phenomenon.

이상의 두 가지가 시공법상 확보 되느냐, 안되느냐가 중요한 포인트로 될 것이다.Whether the above two are secured or not in the construction method will be an important point.

[빗트를 사용하여 다운쟈에어 함마에 의해서 시공한 경우 : 종래공법][When applied by Downjaair hammer using bit: Conventional method]

VI형의 시트파일을 타설할 때는 함마의 비트 직경을 Φ530으로 하여 천공하게 됨으로서 시트파일의 단면적과 천공후의 구멍의 단면적을 단순히 비교해도 110㎠ 대 1,165㎠로 되고, 실제로 필요하게 되는 구멍 단면적의 약15배 정도의 커다란 구멍을 뚫게 되고 만다. 따라서 이러한 쓸데없는 커다란 구멍 속으로 말뚝을 세워 넣게 되는 것이다. 이결과When pouring sheet VI of type VI, the hole diameter of hammer is Φ530, so that the cross section area of the sheet pile and the hole after drilling is 110 cm2 vs 1,165 cm2, and the actual hole cross-sectional area required 15 times as large holes are made. Thus, the pile is built up into these useless large holes. This result

① 말뚝 및 지수벽이 자립 또 내압지지력의 보지에 문제가 생긴다.① Pegs and water walls are self-reliant and have problems with holding pressure bearings.

② 히빙 방지를 위한 방수, 방어 층의 형성이 어렵게 된다.② It becomes difficult to form waterproofing and protective layer to prevent hibing.

이러한 상기 문제점을 보완하기 위해선 말뚝을 타설 후 천공된 막대한 공간에 대량의 토사를 매워 넣고 공간을 메워 채워야 하고 게다가 말뚝 최하단 선단부에는 반드시 크라우드 주입을 행하여 보관을 하지 않으면 설계가 요구하고 있는 목적을 확실히 달성할 수 없게 된다.In order to compensate for the above problems, after laying the pile, a large amount of earth and sand should be filled in the perforated huge space, and the bottom end of the pile must be crowd-filled to achieve the purpose required by the design. You will not be able to.

[JV 파이로트 파일에 의해서 타설하는 경우][When pouring by the JV pilot file]

파이로트 말뚝에 인해서 박아 넣기 착공된 구멍은 본 말뚝의 단면적의 약 2배 이하 정도이고, 게다가 착공된 구멍현상은 본 말뚝의 단면형상에 비슷한 것으로 됨으로 본 말뚝의 타설을 위한 작업공정을 다음과 같이 행하는 것으로 인하여 설계가 요구한 목적을 용이하게 달성할 수 있게 되며 구체적 기능은The hole drilled by the pilot pile is about 2 times less than the cross-sectional area of the pile, and the ground hole phenomenon is similar to the cross-sectional shape of the pile, so the work process for placing the pile is as follows. Can easily achieve the purpose required by the design.

●본 말뚝을 박아 넣을 대의 말뚝이 선단 저항, 주위 마찰 저항 및 개수관 저항이 격감함으로 말뚝을 수직으로 박아 넣을 수 있게 되고 수직 정도를 높게 보지 할 수 있게 된다.● As the pile of the base into which this pile is driven is reduced in the tip resistance, the surrounding friction resistance and the water pipe resistance, the pile can be driven vertically and the vertical degree can be kept high.

●본 말뚝 박아 넣기 시간이 크게 단축됨으로 개수관 마찰열에 인한 개수의 용해를 막을 수 있게 된다.● The pile driving time is greatly shortened, which prevents the dissolution of water due to the frictional heat of the water pipe.

●착공된 구멍과 세워 넣게 된 본 말뚝과의 사이 공간(간격)이 적음으로As there is little space (interval) between the hole which I started and the pile which I built up

① 착공시 제트 분사 수에 인해서 날려 흩어진 토사, 암쇠 편 등이 구멍 안에 저장되어 있던 압력대가 상실하는 것에 따라서 자동적으로 압력의 공백원리에 인하여 끌어당기게 되고 공간을 메워 채우게 된다.① When the construction starts, the scattered soil and the crushed pieces, which are blown off by jet jet water, are automatically pulled due to the pressure gap and filled to fill the space as the pressure band stored in the hole is lost.

② 본 말뚝 타설 후 토사 등이 물의 흐름을 타서 자연유입하여 공간 및 개수관의 간격을 메워 채운 것으로 된다.② After the pile is poured, the soil is filled with the flow of water to fill the gap between the space and the water pipe.

●따라서 말뚝 및 지수벽의 확실한 자립(내압 지지력의 보지)와 말뚝의 하단부에서는 방수, 방어 막이 용이하게 형성되어 확실한 허빙 방지 효과와 지수 효과를 얻을 수 있게 된다.Therefore, the self-reliance of the pile and the index wall (holding pressure-bearing capacity) and the lower part of the pile are easily formed waterproof and protective film, it is possible to obtain a clear anti-hub effect and index effect.

본 고안에 의한 JV 파이로트 공법용 파일은 종래 빗트를 사용한 다운쟈 에어함마에 의한 착공방법 이외의 어떠한 파일 착공방법으로도 해결할 수 없는 고강도 연암층을 착공할 수 있으며 동시에 고강도 연암층의 굴착이 가능한 빗트를 사용한 다운쟈 에어함마에 의한 착공방법의 문제점을 해결하여 본 파일(본 말뚝)에 알맞는굴착공을 타설 형성할 수 있어 토사 메립, 공벽 붕괴방지, 약액분사, 그라우트 주입 등 불필요한 작업이 생략됨을 물론 본 파일(말뚝)의 선단 지지력에 더하여 말뚝 주위 마찰력에 인한 마찰지지력을 충분히 얻을 수 있는 등 종합적으로 말뚝이 가져야 하는 허용지지력을 확실히 확보할 수 있게 된다.JV pilot method pile according to the present invention can be grounded high strength soft rock layer that can not be solved by any pile construction method other than the conventional method of drilling by downja air hammer using a bit, and at the same time excavation of high strength soft rock layer Solve the problem of the drilling method by the downjaer air hammer using the bit, and can form the excavation hole suitable for the pile (bone pile), eliminating unnecessary work such as earth and sand burial, prevention of collapse of the wall, injection of chemical liquid, grout, etc. Of course, in addition to the support of the tip of the pile (pile), it is possible to secure a sufficient bearing capacity due to the pile, such as enough to obtain the frictional support due to the frictional force around the pile.

그밖에도 공기단축, 공사경비절감 등 경제적 잇점이 있고 소음, 진동 등의 공해발생과 분진 등에 인한 대기오염 등의 환경공해를 크게 저감시킬 수 잇는 암반착공 JV 파이로트 공법용 파일이라 할 수 있다.In addition, it can be called a pile for rock foundation JV pilot method, which can economically reduce air pollution, reduce construction expenses, and greatly reduce environmental pollution such as air pollution caused by noise and vibration and dust.

Claims (2)

고강도 특수강판(외르뎅강)의 재질로된 비교적 짧은 일정길이의 강시반(시트파일), H형강, 강관의 일측단면에 경도 HR 90-91인 수십개의 보턴칩을 메워 채운 특수치구 후단들과 각각 단면이 일치하는 통상의 철강 강시반, H형강, 강관의 철강파일(말뚝)의 일단을 용접하여 일체화시킨 파일로서 강시반 및 H형강에는 내측(홈)면의 길이방향으로 강관에는 외측면(관외면)의 길이방향으로 노즐을 구비한 여러개의 도수관을 각각 밀착용접시켜서 된 암반착공 JV 파이로트 공법용 파일(말뚝)Relatively short length of steel plate (sheet pile), H-shaped steel made of high-strength steel plate (Earden steel), and special jig rear end filled with dozens of button chips with hardness HR 90-91 The steel plate, H-shaped steel, and the end of the steel pile (pile) of the steel pipe welded together to integrate the cross-section.The steel plate and the H-shaped steel have the inner side (groove) surface in the longitudinal direction, and the steel pipe has an outer surface (pipe). Pile for piles (JV pilot method) for rock adhesion by welding several water pipes with nozzles in the longitudinal direction of the outer surface) 청구항 1에 있어서 보턴칩 및 노즐의 재질이 초경합금임을 특징으로 하는 암반착공 JV 파이로트 공법용 파일The pile for rock adhesion JV pilot method according to claim 1, wherein the button chip and the nozzle are made of cemented carbide.
KR20-2004-0014275U 2004-05-22 2004-05-22 JV pilot pile for digging rock KR200358930Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2004-0014275U KR200358930Y1 (en) 2004-05-22 2004-05-22 JV pilot pile for digging rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2004-0014275U KR200358930Y1 (en) 2004-05-22 2004-05-22 JV pilot pile for digging rock

Publications (1)

Publication Number Publication Date
KR200358930Y1 true KR200358930Y1 (en) 2004-08-11

Family

ID=49435468

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2004-0014275U KR200358930Y1 (en) 2004-05-22 2004-05-22 JV pilot pile for digging rock

Country Status (1)

Country Link
KR (1) KR200358930Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020037858A (en) * 2018-08-30 2020-03-12 Jfeスチール株式会社 Construction method of steel pipe pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020037858A (en) * 2018-08-30 2020-03-12 Jfeスチール株式会社 Construction method of steel pipe pile

Similar Documents

Publication Publication Date Title
Smoltczyk Geotechnical Engineering Handbook, Procedures
Verfel Rock grouting and diaphragm wall construction
US20080193223A1 (en) Slotted Mandrel for Lateral Displacement Pier and Method of Use
JP5932124B1 (en) Steel pipe pile construction method
US20080159813A1 (en) Method of and apparatus for providing a rammed aggregate pier
CN203174607U (en) Pipe-inside impacting hammer broken earth vibration crushing and expanding immersed tube pile machine
KR100762991B1 (en) Precast piling method injected with high-strength mortar
JP2008057184A (en) Method of constructing underground wall by using h-shaped pc pile
CN114108654A (en) Construction method for removing obstacles in foundation pit area invaded by pressure-bearing water dock
JP2008297864A (en) Construction method of cast-in-place pile
EP1600560B1 (en) A method and device for forming a pile
KR102131823B1 (en) Method of excavation
CN105019917B (en) Impact drilling type advanced jet grouting pipe shed construction device and construction method
KR100963880B1 (en) Excavating method for underground plaza using steel casing retaining wall
KR200358930Y1 (en) JV pilot pile for digging rock
JPS59161516A (en) Fixing of anchor for sheet pile wall in rock layer
JP3735225B2 (en) Method of driving steel pipe piles into bedrock
KR102464394B1 (en) Driving rod for forming reinforced part of piles
KR100835597B1 (en) filling method by blasting and groutting
KR100573083B1 (en) The bottom of the sea foundation improvement method air-hammer make use of adhesion excavator
KR101031603B1 (en) Method and apparatus for drilling road of rotate discharge
CN104153356B (en) The constructing device of concrete-pile and construction method thereof
KR20050102173A (en) Jv pilot method of constructure for digging rock
KR100507983B1 (en) Method for piling sheet in the base rock
Brown Recent advances in the selection and use of drilled foundations

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
G701 Publication of correction
FPAY Annual fee payment

Payment date: 20120517

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20130603

Year of fee payment: 10

EXPY Expiration of term