KR200351429Y1 - Electric meter box - Google Patents
Electric meter box Download PDFInfo
- Publication number
- KR200351429Y1 KR200351429Y1 KR20-2004-0004530U KR20040004530U KR200351429Y1 KR 200351429 Y1 KR200351429 Y1 KR 200351429Y1 KR 20040004530 U KR20040004530 U KR 20040004530U KR 200351429 Y1 KR200351429 Y1 KR 200351429Y1
- Authority
- KR
- South Korea
- Prior art keywords
- meter
- breaker
- meter box
- mounting portion
- sleeve terminal
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R11/00—Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
- G01R11/02—Constructional details
- G01R11/04—Housings; Supporting racks; Arrangements of terminals
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R1/00—Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
- G01R1/02—General constructional details
- G01R1/04—Housings; Supporting members; Arrangements of terminals
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R22/00—Arrangements for measuring time integral of electric power or current, e.g. electricity meters
- G01R22/06—Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
- G01R22/061—Details of electronic electricity meters
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Distribution Board (AREA)
Abstract
본 고안은 전기 계량기 함에 관한 것으로, 더욱 상세하게는 계량기 함 내부에 계량기 및 차단기를 보다 안전하고 견고하게 설치하면서도 컴팩트화하여 계량기함의 크기를 축소시킬 수 있는 전기 계량기 함에 관한 것이다.The present invention relates to an electric meter box, and more particularly, to an electric meter box capable of compactly reducing the size of the meter box by installing a meter and a breaker inside the meter box more safely and securely.
본 고안에 따른 전기 계량기 함은 케이스(10)와, 상기 케이스(10) 바닥면에 설치되는 부착판(20)과, 상기 부착판(20)에 설치되는 계량기(40) 및 차단기(50)와, 전선들을 분기하며 전류점검구(32)가 형성된 슬리브 단자(30)가 구비되는 전기 계량기 함에 있어서, 상기 부착판(20)은, 계량기 장착부(21)와 차단기 장착부(22)가 단차지게 연결 형성하되, 상기 계량기 장착부(21)와 차단기 장착부(22)가 연결된 중앙 내부에 슬리브 단자(30)가 위치될 수 있도록 공간부(24)가 개방 형성되고, 상기 전선이 통과될 수 있도록 상단과 하단이 소통된 전선통과구(25)가 형성된 것을 특징으로 한다.Electric meter box according to the present invention is a case 10, the attachment plate 20 is installed on the bottom surface of the case 10, the meter 40 and the breaker 50 is installed on the attachment plate 20 and In the electrical meter box is provided with a sleeve terminal 30 is formed to branch the wires and the current check hole 32, the mounting plate 20, the meter mounting portion 21 and the breaker mounting portion 22 is formed to be stepped The space part 24 is formed to be open so that the sleeve terminal 30 can be positioned inside the center in which the meter mounting part 21 and the breaker mounting part 22 are connected, and the upper and lower ends communicate with each other so that the wire can pass. It is characterized in that the wire passing through the formed 25.
Description
본 고안은 전기 계량기 함에 관한 것으로, 더욱 상세하게는 계량기 함 내부에 계량기 및 차단기를 보다 안전하고 견고하게 설치하는 한편 컴팩트화하여 계량기함의 크기를 축소시킬 수 있는 전기 계량기 함에 관한 것이다.The present invention relates to an electric meter box, and more particularly, to an electric meter box that can reduce the size of the meter box by compactly installing the meter and the breaker inside the meter box more safely and securely.
일반적으로 전기 계량기 함은 전기 사용량을 측정하기 위한 설비로서, 아파트나 주택 등의 건물 벽에 설치되며 그 내부에는 전기 사용량을 표시하는 전기 계량기와 과전류가 흐르거나 누전될 때 자동으로 전원을 차단하여 화재를 방지하는 차단기가 설치되어 있고 이들은 전선으로 서로 연결되어 있다.In general, the electricity meter box is a facility for measuring the electricity consumption.It is installed on the wall of an apartment or a house, and the electricity meter indicating the electricity usage inside is automatically cut off the power when an over current flows or a short circuit occurs. Circuit breakers are installed and they are connected to each other by wires.
종래에 사용된 전기 계량기 함에서 상기 부품들이 설치되는 구조를 살펴보면, 차단기와 계량기를 함에 직접 부착하여 설치하기 때문에 실내와 실외의 온도차이로 인해 벽체에 매입된 계량기함의 내부에는 결로현상이 발생하여 접지 및 단락 사고의 위험성이 있고, 현장에서 상기 부품들을 하나하나 직접 설치하는 작업을 해야 하므로 작업성이 까다롭고 작업시간도 많이 소요되어 작업능률이 저하되는 문제점이 있었다.Looking at the structure in which the components are installed in the conventional electricity meter box, because the circuit breaker and the meter is installed directly attached to the box, condensation occurs in the interior of the meter box embedded in the wall due to the temperature difference between indoor and outdoor. And there is a risk of short-circuit accident, because the work to install the parts one by one directly in the field has a problem that the workability is difficult and takes a lot of work time and the work efficiency is lowered.
본 출원인은 이러한 문제점을 해소하기 위하여 차단기와 계량기가 설치되는 부착판을 구비하고 이 부착판에는 차단기와 계량기의 원활한 설치를 위하여 단을 형성시킨 전기 계량기 함을 창안하여 실용신안 출원 제2002-17346호로 출원한 바 있다.In order to solve such a problem, the present applicant is provided with an attachment plate on which a breaker and a meter are installed, and the attachment plate has an electric meter box in which a stage is formed for smooth installation of the breaker and the meter. It has been filed.
상기 실용신안 출원은 계량기 함의 부착판에 계량기 및 차단기를 보다 안전하고 견고하게 설치할 수 있을 뿐만 아니라 별도의 장소에서 미리 계량기와 차단기가 부착된 이 부착판을 함에 설치하면 되므로 작업성이 향상되는 이점이 있었다. 그러나 전선 통로 및 슬리브 단자가 계량기와 계량기 사이에 설치됨으로 인하여 계량기 함의 크기를 축소하여 컴팩트화 하는데는 한계가 있는 문제점이 있었다.The utility model application is not only to install the meter and the breaker more securely and securely to the attachment plate of the meter box, but also to install the attachment plate attached to the meter and the breaker in advance in a separate place, the workability is improved there was. However, since the wire passage and the sleeve terminal are installed between the meter and the meter, there is a limit in reducing the size of the meter box and making it compact.
본 고안은 상기와 같은 문제점을 해소하기 위하여 창안한 것으로, 본 고안의 목적은 전기 계량기 함 내부에 계량기 및 차단기를 보다 안전하고 견고하게 설치하면서도 컴팩트화하여 크기를 보다 축소 시킬 수 있는 전기 계량기 함을 제공하는데 있다.The present invention was devised to solve the above problems, and an object of the present invention is to install a meter and a breaker inside the electricity meter box more safely and securely, while compactly reducing the size of the electric meter box To provide.
도 1은 본 고안에 따른 전기 계량기 함의 분해 사시도1 is an exploded perspective view of an electric meter box according to the present invention
도 2는 본 고안에 따른 전기 계량기 함의 결합된 상태의 평면도2 is a plan view of the combined state of the electricity meter box according to the present invention
*도면의 주요부분에 대한 부호 설명* Explanation of symbols on the main parts of the drawings
10 : 케이스 11,26 : 장착홀10: case 11, 26: mounting hole
12 : 전선 인입인출구 20 : 부착판12: wire entry and exit port 20: mounting plate
21 : 계량기 장착부 22 : 차단기 장착부21: meter mounting portion 22: breaker mounting portion
23 : 장착 플랜지 24 : 공간부23: mounting flange 24: space
25 : 전선 통과구 30 : 슬리브 단자25: wire through hole 30: sleeve terminal
31 : 전선 통과공 32 : 전류점검구31: wire through hole 32: current check
40 : 계량기 50 : 차단기40: meter 50: breaker
60 : 메인 전선 61 : 분기 전선60: main wire 61: branch wire
상기된 바와 같은 목적을 달성하기 위한 본 고안은, 케이스와, 상기 케이스 바닥면에 설치되는 부착판과, 상기 부착판에 설치되는 계량기 및 차단기와, 전선들을 분기하며 전류점검구가 형성된 슬리브 단자가 구비되는 전기 계량기 함에 있어서, 상기 부착판은, 계량기 장착부와 차단기 장착부가 단차지게 연결 형성하되, 상기 계량기 장착부와 차단기 장착부가 연결된 중앙 내부에 상기 슬리브 단자가 위치될 수 있도록 공간부가 개방 형성되고, 상기 전선이 통과될 수 있도록 상단과 하단이 소통된 전선 통과구가 형성된 것을 특징으로 한다.The present invention for achieving the object as described above, the case, the attachment plate is installed on the bottom surface of the case, the meter and the breaker is installed on the attachment plate, the sleeve terminal for branching the electric wire and the current check hole is provided In the electric meter box, the mounting plate, the meter mounting portion and the breaker mounting portion is formed to be stepped, the space portion is formed so that the sleeve terminal is located inside the center connected to the meter mounting portion and the breaker mounting portion, the wire It is characterized in that the wire passing through the top and bottom communication hole is formed so that it can pass.
또한, 상기 차단기 장착부의 폭은 상기 계량기 장착부의 폭보다 작게 형성된 것을 특징으로 한다.In addition, the width of the breaker mounting portion is characterized in that formed smaller than the width of the meter mounting portion.
이하, 본 고안의 바람직한 실시예를 첨부 도면에 의거하여 상세히 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.
도 1은 본 고안에 따른 전기 계량기 함의 분해 사시도이고, 도 2는 본 고안에 따른 전기 계량기 함의 결합된 상태의 평면도이다.1 is an exploded perspective view of an electric meter box according to the present invention, Figure 2 is a plan view of the combined state of the electric meter box according to the present invention.
본 고안에 따른 전기 계량기 함은 케이스(10)와, 케이스(10) 바닥면에 설치되는 부착판(20)과, 상기 부착판(20)에 설치되는 복수 개의 계량기(40) 및 차단기(50)와, 부착판(20)의 내부로 통과되는 전선들을 분기하며 전류점검구(32)가 형성된 슬리브 단자(30)로 크게 구성된다.Electric meter box according to the present invention is the case 10, the mounting plate 20 is installed on the bottom surface of the case 10, a plurality of meters 40 and the breaker 50 is installed on the mounting plate 20 And a sleeve terminal 30 branching electric wires passing through the attachment plate 20 and having a current check hole 32 formed therein.
상기 구성들을 세부적으로 살펴보면, 상기 부착판(20)은 상부에 케이스(10)의 벽면과 소정 간격을 두면서 계량기(40)가 설치될 수 있도록 계량기(40)의 설치 개수에 적합한 폭을 가지는 계량기 장착부(21)가 형성되고, 상기 계량기 장착부(21) 아래로 계량기 장착부(21)의 위치보다 낮은 단으로 연장 형성하여 케이스(10)의 바닥면과 소정 간격을 두고 차단기(50)가 장착될 수 있도록 차단기 장착부(22)가 형성된다. 상기 차단기 장착부(22)의 폭은 차단기(50)의 설치 개수에 적합한 폭으로 설정하며 보다 바람직하게는 계량기 장착부(21) 폭보다 작게 형성된다.Looking at the above configuration in detail, the mounting plate 20 is a meter mounting portion having a width suitable for the number of installation of the meter 40 so that the meter 40 can be installed at a predetermined distance from the wall surface of the case 10 on the top 21 is formed and extends below the meter mounting portion 21 to a stage lower than the position of the meter mounting portion 21 so that the breaker 50 can be mounted at a predetermined distance from the bottom surface of the case 10. The breaker mounting portion 22 is formed. The width of the circuit breaker mounting portion 22 is set to a width suitable for the number of installation of the circuit breaker 50, and more preferably is smaller than the width of the meter mounting portion 21.
상기 계량기 장착부(21)와 차단기 장착부(22)의 연결된 부분인 부착판(20)의 중앙 내부에는 슬리브 단자(30)가 위치될 수 있도록 공간부(24)가 전후방으로 개방 형성된다.In the center of the attachment plate 20, which is a connecting portion of the meter mounting part 21 and the breaker mounting part 22, the space part 24 is formed to be opened in the front and rear directions so that the sleeve terminal 30 can be positioned.
보다 바람직하게 설명하면, 상기 부착판(20)에서 케이스(10) 바닥과 접하는 후방은 개방되며, 이 후방을 통하여 상기 부착판(20) 내부의 공간부(24)에 슬리브 단자(30)가 위치되고, 이 슬리브 단자(30)는 전면이 상기 부착판 공간부(24)의 개방된 전방을 통하여 노출되는 형상이다.More preferably, the rear contacting the bottom of the case 10 in the attachment plate 20 is opened, and the sleeve terminal 30 is positioned in the space 24 in the attachment plate 20 through the rear side. The sleeve terminal 30 has a shape in which the front surface is exposed through the open front of the attachment plate space 24.
이와같이 상기 슬리브 단자(30)의 전면을 부착판(20) 전방으로 노출시키는 이유는 슬리브 단자(30)의 전면에 형성된 전류점검구(32)에 휴대용 전기측정기를이용하여 전류의 소통 유무 등을 용이하게 점검하기 위한 것이다.As such, the reason for exposing the front surface of the sleeve terminal 30 to the front of the attachment plate 20 is to easily communicate the presence or absence of current by using a portable electric meter on the current checking hole 32 formed on the front surface of the sleeve terminal 30. To check.
즉 슬리브 단자(30)는 수직으로 연장된 메인 전선(60)으로부터 계량기(40)로 연결되는 분기 전선(61)을 접촉시키는 역할을 가지는 것으로 이 슬리브 단자(30)에서 각종 전기상태를 점검할 때 상기 케이스(10) 바닥면에 설치되는 부착판(20)이나 슬리브 단자(30)의 분해과정이 필요없이 부착판(20) 전방으로 노출된 슬리브 단자(30)의 전류점검구(32)에 전기측정기의 점검핀을 삽입하여 용이하게 전류 상태를 파악할 수 있는 것이다.In other words, the sleeve terminal 30 has a role of contacting the branch wire 61 connected to the meter 40 from the main wire 60 extending vertically. An electrical measuring instrument in the current check hole 32 of the sleeve terminal 30 exposed to the front of the mounting plate 20 without the disassembly of the mounting plate 20 or the sleeve terminal 30 installed on the bottom surface of the case 10. You can easily check the current state by inserting the check pin.
그래서 상기 부착판 공간부(24)에서 전방으로 개방된 크기는 적어도 상기 슬리브 단자(30)의 전류점검구(32)들이 전부 노출될 수 있는 크기로 설정해야 된다.Thus, the size of the mounting plate space 24 that is opened forward should be set to a size that at least the current check holes 32 of the sleeve terminal 30 can be completely exposed.
그리고 상기 부착판(20)에는 메인 전선(60)이 통과될 수 있도록 상단과 하단을 소통시킨 전선 통과구(25)가 형성된다. 이는 상기 슬리브 단자(30)에 연결되는 메인 전선(60)이 수직으로 연장되어 있으므로 이 슬리브 단자(30)가 상기 부착판(20)의 공간부(24)에 위치되었을 때 상기 전선 통과구(25)에 메인 전선(60)이 위치되도록 하기 위함이다.In addition, the attachment plate 20 is formed with a wire through hole 25 communicating the upper and lower ends so that the main wire 60 can pass. This is because the main wire 60 connected to the sleeve terminal 30 extends vertically when the sleeve terminal 30 is located in the space 24 of the attachment plate 20. This is to ensure that the main wire 60 is located in).
또한 상기 부착판(20)의 외곽에는 상기 케이스(10)의 바닥면에 부착판(20)을 고정시킬 수 있도록 하는 장착 플랜지(23)가 여러 개소 형성된다. 즉 상기 케이스(10)의 바닥면에 형성된 장착홀(11)과 상기 장착 플랜지(23)를 나사 등에 의해 결합시킴으로써 상기 부착판(20)은 케이스(10)에 단단히 고정된다.In addition, a plurality of mounting flanges 23 are formed at the outer side of the attachment plate 20 to fix the attachment plate 20 to the bottom surface of the case 10. That is, the attachment plate 20 is firmly fixed to the case 10 by coupling the mounting hole 11 formed in the bottom surface of the case 10 with the mounting flange 23 by screws or the like.
또한, 계량기 장착부(21) 및 차단기 장착부(22) 전면에도 계량기(40)와 차단기(50)를 설치하기 위한 장착홀(26)이 다수 형성된다.In addition, a plurality of mounting holes 26 for installing the meter 40 and the breaker 50 are formed in front of the meter mounting part 21 and the breaker mounting part 22.
그래서 이와같이 형성된 본 고안에 따른 전기 계량기함에서 케이스(10), 슬리브 단자(30), 부착판(20)의 결합과정을 설명하면, 케이스(10) 상단 및 하단의 전선 인입인출구(12)로 통과된 메인 전선(60)이 상기 슬리브 단자(30)의 전선 통과공(31)으로 경유하여 연결되고 이 슬리브 단자(30)를 케이스(10) 바닥면 중앙에 나사 고정시키며, 이 슬리브 단자(30)가 부착판(20)의 공간부(24)에 위치되도록 상기 부착판(20)을 케이스(10) 바닥면에 나사 고정시킴으로써 상기 슬리브 단자(30) 전면이 부착판 공간부(24)의 전방으로 노출되는 결합구조이다.So, when describing the coupling process of the case 10, sleeve terminal 30, the attachment plate 20 in the electric meter box according to the present invention formed as described above, the case 10 passes through the wire inlet and outlet 12 of the top and bottom The main wire 60 is connected via the wire through hole 31 of the sleeve terminal 30 to screw the sleeve terminal 30 to the center of the bottom surface of the case 10, and the sleeve terminal 30 The sleeve terminal 30 in front of the attachment plate space 24 by screwing the attachment plate 20 to the bottom surface of the case 10 so that the mounting plate 20 is positioned in the space 24 of the attachment plate 20. The bonding structure is exposed.
상기의 결합과정에서 현장조립 설치를 효율적으로 하기 위하여 부착판(20)에는 계량기(40) 및 차단기(50)가 다른 장소에서 미리 조립된 상태로 상기 케이스(10)에 부착판(20)이 설치되며, 그리고 전선들의 분기 및 각 세대로 연결되는 과정은 공지의 연결방법에 의하므로 자세한 설명은 생략한다. 또한 케이스(10)의 전면에는 계량기 함의 개폐문이 여닫을 수 있도록 결합되나 미도시 되었다.In order to efficiently install on-site assembly during the coupling process, the attachment plate 20 is installed on the case 10 in a state where the meter 40 and the breaker 50 are pre-assembled in another place. And, the branching of the wires and the process of connecting to each generation is by a known connection method so detailed description is omitted. In addition, the front of the case 10 is coupled to the opening and closing door of the meter box, but not shown.
본 고안의 전기 계량기 함은 부착판에 계량기 및 차단기가 설치되도록 함으써 전기적인 안전성과 견고성이 향상되고 상기 계량기와 차단기가 미리 부착된 부착판을 설치하면 되므로 작업성이 향상되는 이점이 있다. 또한 부착판 내부의 공간부에 슬리브 단자가 위치되도록 하고 상기 슬리브 단자에 연결되는 전선들이 상기 부착판의 내부를 통과하는 구조로 형성됨으로써 컴팩트화 되어 전체적으로 전기 계량기 함의 크기가 축소되고 내부적으로 간결화 되는 이점이 있다.The electric meter box of the present invention has an advantage that the meter and the breaker are installed on the attachment plate, thereby improving electrical safety and robustness, and the workability is improved because the meter and the breaker are installed in advance. In addition, the sleeve terminal is located in the space inside the mounting plate and the wires connected to the sleeve terminal is formed by a structure that passes through the inside of the mounting plate is compact and the overall size of the electricity meter compartment is reduced and internally simplified There is this.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2004-0004530U KR200351429Y1 (en) | 2004-02-20 | 2004-02-20 | Electric meter box |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR20-2004-0004530U KR200351429Y1 (en) | 2004-02-20 | 2004-02-20 | Electric meter box |
Publications (1)
Publication Number | Publication Date |
---|---|
KR200351429Y1 true KR200351429Y1 (en) | 2004-05-24 |
Family
ID=49430775
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR20-2004-0004530U KR200351429Y1 (en) | 2004-02-20 | 2004-02-20 | Electric meter box |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR200351429Y1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100626884B1 (en) * | 2004-07-16 | 2006-09-20 | 강재석 | Electricity meter box |
CN115334817A (en) * | 2022-07-28 | 2022-11-11 | 云南电网有限责任公司曲靖供电局 | Monitor for preventing fraudulent use of electricity |
-
2004
- 2004-02-20 KR KR20-2004-0004530U patent/KR200351429Y1/en not_active IP Right Cessation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100626884B1 (en) * | 2004-07-16 | 2006-09-20 | 강재석 | Electricity meter box |
CN115334817A (en) * | 2022-07-28 | 2022-11-11 | 云南电网有限责任公司曲靖供电局 | Monitor for preventing fraudulent use of electricity |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20100001124U (en) | Electric Watt Meter Box for Cable Tray | |
JP4025591B2 (en) | Housing for outdoor equipment | |
KR100647489B1 (en) | Terminal unit for street lamp | |
KR200351429Y1 (en) | Electric meter box | |
KR200254299Y1 (en) | The structure of a withdrawal box for a street light | |
JP2001044482A (en) | Wiring fixing structure of photovoltaic power generation system | |
CN206697880U (en) | A kind of High-Voltage Cable Branching Case | |
KR101171700B1 (en) | The method of installing electric watt meter box for cable tray | |
KR100672800B1 (en) | Electric terminal box for ceiling of apartment house | |
KR200306070Y1 (en) | Housings for gauge | |
CN107990411B (en) | Indoor unit and air conditioner applying same | |
KR101230136B1 (en) | Power distribution panel | |
CN220456784U (en) | Novel wire connection structure inside and outside casing | |
KR200288013Y1 (en) | Electric gauge case | |
CN107532816A (en) | Ventilation fan | |
CN220873354U (en) | Maintenance-free efficient oil-immersed transformer | |
CN220122415U (en) | Metering box | |
KR20060007938A (en) | Digital watt-hour meter for multi-households | |
CN220357949U (en) | Voltage transformer with rain-proof formula secondary terminal box | |
CN215931973U (en) | Base of ammeter case | |
CN209487982U (en) | A kind of high-low voltage electric power distribution cabinet of easy access | |
CN216085853U (en) | Quick access box on low-voltage column | |
CN220120881U (en) | Novel ammeter case with inside protective structure | |
CN209622507U (en) | A kind of fixed intelligence point pixel lamp of upper cover | |
CN114243466B (en) | Comprehensive power distribution device for street lamp post |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
REGI | Registration of establishment | ||
T201 | Request for technology evaluation of utility model | ||
J210 | Request for trial for objection to revocation decision | ||
EXTG | Extinguishment | ||
T601 | Decision on revocation of utility model registration | ||
J301 | Trial decision |
Free format text: TRIAL DECISION FOR APPEAL AGAINST DECISION OF CANCELLATION REQUESTED 20050617 Effective date: 20070313 |
|
FPAY | Annual fee payment |
Payment date: 20070425 Year of fee payment: 4 |
|
J302 | Written judgement (patent court) |
Free format text: JUDGMENT (PATENT COURT) FOR APPEAL AGAINST DECISION OF CANCELLATION REQUESTED 20070418 Effective date: 20071207 |