KR200327585Y1 - hydraulic jack for bridge bearing exchange - Google Patents

hydraulic jack for bridge bearing exchange Download PDF

Info

Publication number
KR200327585Y1
KR200327585Y1 KR20-2003-0017710U KR20030017710U KR200327585Y1 KR 200327585 Y1 KR200327585 Y1 KR 200327585Y1 KR 20030017710 U KR20030017710 U KR 20030017710U KR 200327585 Y1 KR200327585 Y1 KR 200327585Y1
Authority
KR
South Korea
Prior art keywords
hydraulic jack
replacing
bracket
lower portion
support bracket
Prior art date
Application number
KR20-2003-0017710U
Other languages
Korean (ko)
Inventor
문지훈
Original Assignee
주식회사 다인건설
문지훈
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 다인건설, 문지훈 filed Critical 주식회사 다인건설
Priority to KR20-2003-0017710U priority Critical patent/KR200327585Y1/en
Application granted granted Critical
Publication of KR200327585Y1 publication Critical patent/KR200327585Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F3/00Devices, e.g. jacks, adapted for uninterrupted lifting of loads
    • B66F3/24Devices, e.g. jacks, adapted for uninterrupted lifting of loads fluid-pressure operated
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges

Abstract

본 고안은 교좌장치 교체용 유압잭을 이용하여 교좌장치 및 상부구조물의 인상과 고정작업이 동시에 이루어지므로 공사비 및 공기를 단축할 수 있으며, 정확한 유압잭의 잭킹기준의 설정이 가능하며, 부착용 브라켓 내부에 유압잭을 삽입하기 때문에 협소한 작업공간에서도 부피 및 중량에 영향을 받지 않고 기존 교량 구조물의 손상을 최소화하면서 시공할 수 있도록 한 교좌장치 교체용 유압잭을 제공하는데 그 목적이 있다.This design can reduce the construction cost and air, because the lifting and fixing work of the chair and the upper structure is made at the same time by using the hydraulic jack for the replacement of the chair, it is possible to set the jacking standard of the hydraulic jack and the hydraulic jack inside the mounting bracket. The purpose of the present invention is to provide a hydraulic jack for replacing a bridge device that can be installed with minimal damage to the existing bridge structure without being affected by volume and weight even in a narrow work space.

본 고안은 상부구조물을 인상시키기 위해 교각 또는 교대의 측면에 고정 부착되는 지지브라켓과; 상기 지지브라켓의 상면 중앙에 배치되는 유압잭과; 상기 유압잭의 외주면을 에워싸면서 지지브라켓의 상면 외주연에 밀착 고정되는 고정브라켓으로 구성됨으로써, 교좌장치 교체용 유압잭을 이용하여 고정부를 확보하고, 그 시공과정의 일체화로 인하여 공사비가 절감될 뿐만 아니라 공기가 단축되는 이점이 있다.The present invention includes a support bracket fixedly attached to the side of the piers or shifts to raise the upper structure; A hydraulic jack disposed at the center of the upper surface of the support bracket; By surrounding the outer circumferential surface of the hydraulic jack and consisting of a fixed bracket that is tightly fixed to the outer periphery of the upper surface of the support bracket, to secure the fixed portion by using a hydraulic jack for replacing the device, construction cost is reduced only by the integration of the construction process. But there is an advantage that the air is shortened.

Description

교좌장치 교체용 유압잭{hydraulic jack for bridge bearing exchange}Hydraulic jack for bridge bearing replacement

본 고안은 교좌장치 교체용 유압잭에 관한 것으로, 특히 유압잭을 이용하여 교좌장치의 인상과 고정작업이 동시에 이루어지므로 공사비 및 공기를 단축할 수 있으며, 정확한 유압잭의 잭킹기준의 설정이 가능하며, 부착용 브라켓 내부에 유압잭을 삽입하기 때문에 협소한 작업공간에서도 부피 및 중량에 영향을 받지 않고 기존 교량 구조물의 손상을 최소화하면서 시공할 수 있도록 한 교좌장치 교체용 유압잭에 관한 것이다.The present invention relates to a hydraulic jack for the replacement of the bridge device, in particular, the lifting and fixing work of the bridge device is made at the same time using the hydraulic jack can reduce the construction cost and air, it is possible to set the jacking standards of the exact hydraulic jack, the mounting bracket Since the hydraulic jack is inserted inside, it is related to the hydraulic jack replacement bridge that can be installed with minimal damage to the existing bridge structure without being affected by volume and weight even in a narrow work space.

일반적으로 대부분의 교좌장치 교체 공사시 대개 교통을 차단함이 없이 시행하고 있으며, 일반 유압잭의 경우에는 미세한 유압의 빠짐 현상이 발생되기 때문에대형사고의 위험성이 상존하고 있는 실정이다.In general, most of the replacement device installation work is carried out without blocking traffic, and in the case of general hydraulic jack, there is a risk of a large accident because fine hydraulic leakage occurs.

또한, 교량의 교좌장치 보수는 그 보수할 부위가 좁은 부위에서 이루어지고, 단시간에 작업이 이루어져야 하는 요인들의 문제점을 안고 있으며, 유압잭 설치시 별도로 추상대 또는 지지대가 필요로 하기 때문에 공사비 및 공기가 과다하게 발생될 뿐만 아니라 기존의 유압잭은 부피 및 중량이 커서 시공하는데 많은 장애가 발생되는 문제점이 있다.In addition, the repair of the bridge device of the bridge is made in a narrow area to be repaired, has a problem of factors that must be done in a short time, and the construction cost and air is excessive because the abstract stand or support is required when installing the hydraulic jack. As well as the existing hydraulic jack has a problem that a large number of obstacles occur in the construction of large volume and weight.

이에, 본 고안은 상기한 바와 같은 제문제점을 해결하기 위해 안출된 것으로써, 유압잭을 이용하여 교좌장치 및 상부구조물의 인상과 고정작업이 동시에 이루어지므로 공사비 및 공기를 단축할 수 있으며, 정확한 유압잭의 잭킹기준의 설정이 가능하며, 부착용 브라켓 내부에 유압잭을 삽입하기 때문에 협소한 작업공간에서도 부피 및 중량에 영향을 받지 않고 기존 교량 구조물의 손상을 최소화하면서 시공할 수 있도록 한 교좌장치 교체용 유압잭을 제공하는데 그 목적이 있다.Therefore, the present invention was devised to solve the problems as described above, it is possible to reduce the construction cost and air because the lifting and fixing work of the chair and the upper structure is made at the same time by using the hydraulic jack, the accurate hydraulic jack It is possible to set the jacking standard, and the hydraulic jack is inserted inside the mounting bracket so that the hydraulic jack for the replacement of the bridge device can be installed with minimal damage to the existing bridge structure without being affected by the volume and weight even in a narrow work space. Its purpose is to.

도 1은 본 고안에 따른 교좌장치 교체용 일체형 유압잭의 인상전 상태를1 is a state before the impression of the integrated hydraulic jack for replacing the device according to the present invention

도시한 사시도,Illustrated Perspective,

도 2는 본 고안에 따른 교좌장치 교체용 일체형 유압잭의 인상후 상태를Figure 2 shows the state after the lifting of the integrated hydraulic jack for replacing the device according to the present invention

도시한 사시도,Illustrated Perspective,

도 3은 본 고안에 따른 교좌장치 교체용 일체형 유압잭이 인상후 설치 완료Figure 3 is installed after the lifting unit integrated hydraulic jack for replacing the device according to the present invention

된 상태를 도시한 사시도,Perspective view showing the state,

도 4는 본 고안에 따른 교좌장치 교체용 일체형 유압잭이 설치된 상태를 도시Figure 4 shows a state in which the integrated hydraulic jack for replacing the teaching apparatus according to the present invention is installed

한 예시도1,An example 1,

도 5는 본 고안에 따른 교좌장치 교체용 일체형 유압잭이 설치된 상태를 도시Figure 5 shows a state in which the integrated hydraulic jack for replacing the device according to the present invention is installed

한 예시도2,One example 2,

도 6은 본 고안에 따른 교좌장치 교체용 분리형 유압잭의 인상전 상태를Figure 6 is a state before the lifting of the removable hydraulic jack for replacing the teaching apparatus according to the present invention

도시한 사시도,Illustrated Perspective,

도 7은 본 고안에 따른 교좌장치 교체용 분리형 유압잭의 인상후 상태를7 is a state after the lifting of the removable hydraulic jack for replacing the device according to the present invention

도시한 사시도,Illustrated Perspective,

도 8은 본 고안에 따른 교좌장치 교체용 분리형 유압잭의 인상후 설치 완료된8 is installed after the lifting of the separation-type hydraulic jack for replacing the device according to the present invention

상태를 도시한 예시도,An illustration showing the state,

도 9는 본 고안에 따른 교좌장치 교체용 분리된 유압잭이 설치된 상태를 도시9 is a view showing a state in which a separate hydraulic jack for replacing the teaching apparatus according to the present invention is installed

한 예시도1,An example 1,

도 10은 본 고안에 따른 교좌장치 교체용 일체형 유압잭이 설치된 상태를 도10 is a state in which the integrated hydraulic jack for replacing the device according to the present invention is installed

시한 예시도2.Time Example 2.

-도면의 주요부분에 대한 부호의 설명-Explanation of symbols on the main parts of the drawing

10 : 지지브라켓 12 : 상협부10: support bracket 12: business partner

14 : 하광부 16 : 경사부14 downlight portion 16 inclined portion

18 : 연장부 18a : 볼트공18: extension part 18a: bolt hole

20 : 유압잭 22 : 상단부20: hydraulic jack 22: upper portion

30 : 고정브라켓 32 : 상협부30: fixing bracket 32: upper part

34 : 하광부 36 : 경사부34: downlight part 36: inclined part

40 : 절개부 40a : 단턱40: incision 40a: step

50 : 박스브라켓 51 : 본체부50: box bracket 51: main body

52 : 요입부 53 : 관통부52: concave part 53: through part

54 : 장공 55 : 지지부54: long hole 55: support

56 : 볼트공 57 : 지지판56: bolt hole 57: support plate

60 : 덮개 62 : 몸체60: cover 62: body

63 : 관통부 64 : 격판63: penetrating portion 64: diaphragm

66 : 좌우측판 68 : 장공66: left and right side plates 68: long hole

70 : 교량 80 : 교좌장치70: bridge 80: bridge device

90 : 교대 100 : 교각90: shift 100: pier

B : 볼트 N : 너트B: Bolt N: Nut

상기한 목적을 달성하기 위한 본 고안에 따른 교좌장치 교체용 유압잭은 상부구조물을 인상시키기 위해 교각 또는 교대의 측면에 고정 부착되는 지지브라켓과; 상기 지지브라켓의 상면 중앙에 배치되는 유압잭과; 상기 유압잭의 외주면을 에워싸면서 지지브라켓의 상면 외주연에 밀착 고정되는 고정브라켓으로 구성됨을특징으로 한다.Hydraulic jack for replacing the device according to the present invention for achieving the above object and a support bracket fixedly attached to the side of the piers or shift to raise the upper structure; A hydraulic jack disposed at the center of the upper surface of the support bracket; The outer peripheral surface of the hydraulic jack is characterized in that it is composed of a fixing bracket which is fixed in close contact with the outer peripheral edge of the upper surface of the support bracket.

이하, 본 고안을 첨부한 예시도면을 참조하여 상세히 설명한다.Hereinafter, with reference to the accompanying drawings of the present invention will be described in detail.

도 1은 본 고안에 따른 교좌장치 교체용 일체형 유압잭의 인상전 상태를 도시한 사시도이며, 도 2는 본 고안에 따른 교좌장치 교체용 일체형 유압잭의 인상후 상태를 도시한 사시도이며, 도 3은 본 고안에 따른 교좌장치 교체용 일체형 유압잭이 인상후 설치 완료된 상태를 도시한 사시도이며, 도 4는 본 고안에 따른 교좌장치 교체용 일체형 유압잭이 설치된 상태를 도시한 예시도1이며, 도 5는 본 고안에 따른 교좌장치 교체용 일체형 유압잭이 설치된 상태를 도시한 예시도2이다.1 is a perspective view showing a state before the lifting of the integrated hydraulic jack for replacing the teaching device according to the present invention, Figure 2 is a perspective view showing a state after the lifting of the integrated hydraulic jack for replacing the teaching apparatus according to the present invention, Figure 3 4 is a perspective view illustrating a state in which an integrated hydraulic jack for replacing a device according to the present invention is installed after lifting, and FIG. 4 is an exemplary view illustrating a state in which the integrated hydraulic jack for replacing a device according to the present invention is installed, and FIG. Figure 2 is an exemplary view showing a state in which the integrated hydraulic jack for replacing the teaching apparatus according to the installed.

이들 도면에 도시된 바와 같이, 본 고안에 따른 교좌장치 교체용 유압잭은 상부구조물을 인상시키기 위해 교각(100) 또는 교대(90)의 측면에 고정 부착되는 지지브라켓(10)과; 상기 지지브라켓(10)의 상면 중앙에 배치되는 유압잭(20)과; 상기 유압잭(20)의 외주면을 에워싸면서 지지브라켓(10)의 상면 외주연에 밀착 고정되는 고정브라켓(30)으로 구성된다.As shown in these figures, the hydraulic jack for replacing the device according to the present invention is a support bracket (10) fixedly attached to the side of the piers (100) or shifts (90) to raise the upper structure; A hydraulic jack 20 disposed at the center of the upper surface of the support bracket 10; The outer surface of the hydraulic jack 20 while surrounding the outer peripheral surface of the support bracket 10 is composed of a fixed bracket 30 that is fixed in close contact.

여기서, 상기 지지브라켓(10)은 전체적으로 사다리꼴 형상으로 일체로 이루어지되, 상부에 배치됨과 동시에 평활면을 갖는 상협부(12)와; 상기 상협부(12)와 일정한 간격을 두고 하부에 배치됨과 동시에 평활면을 갖는 하광부(14)와; 상기 상협부(12)의 양측단으로부터 일정한 각도로 하광부(14)까지 하향 경사지게 형성된 경사부(16)와; 상기 하광부(14)로부터 외측으로 연장 형성됨과 동시에 볼트공(18a)이 형성된 연장부(18)로 구성된다.Here, the support bracket 10 is made integrally in a trapezoidal shape as a whole, the upper and lower portions 12 having a smooth surface and disposed at the top; A lower portion 14 disposed at a lower portion at regular intervals from the upper and lower portions 12 and having a smooth surface; An inclined portion 16 formed to be inclined downward from the opposite side ends of the upper and lower portions 12 to the lower portion 14 at a predetermined angle; Consists of an extension portion 18 extending from the lower portion 14 to the outside and formed with a bolt hole 18a.

또한, 상기 고정브라켓(30)은 전체적으로 사다리꼴 형상으로 일체로 이루어지되, 상부에 배치됨과 동시에 평활면을 갖는 상협부(32)와; 상기 상협부(32)와 일정한 간격을 두고 하부에 배치됨과 동시에 평활면을 갖는 하광부(34)와; 상기 상협부(32)의 양측단으로부터 일정한 각도로 하광부(34)까지 하향 경사지게 형성된 경사부(36)와; 상기 경사부(36)의 내측면이 타원형상으로 절개 형성된 절개부(40)와; 상기 절개부(40)의 내측에는 위, 아래로 소정의 간격을 두고 형성된 단턱(40a)으로 구성된다.In addition, the fixing bracket 30 is integrally formed in a trapezoidal shape as a whole, and is arranged on the upper portion and having a smooth surface 32 having a smooth surface; A lower portion 34 disposed at a lower portion with a predetermined distance from the upper and lower portions 32 and having a smooth surface; An inclined portion 36 formed to be inclined downward from the opposite side ends of the upper narrow portion 32 to the lower portion 34 at a predetermined angle; An incision 40 formed with an inner surface of the inclined portion 36 cut in an elliptical shape; Inside the cutout 40 is configured as a step (40a) formed at a predetermined interval up and down.

상기한 바와 같은 구성으로 이루어진 본 고안을 이용한 교좌장치의 교체에 대해서 설명한다.It will be described for the replacement of the teaching apparatus using the present invention made of the configuration as described above.

본 고안에 따른 교좌장치 교체용 유압잭을 이용한 교좌장치 교체방법은 교량(70)의 상부구조물을 인상시키기 위해 교각(100) 또는 교대(90)의 측면에 지지브라켓(10)을 볼트로 고정 부착하는 단계; 상기 지지브라켓(10)의 상면 중앙에 유압잭(20)을 설치하는 단계; 상기 유압잭(20)을 잭업하여 적절한 높이로 유압잭(20)을 설정하는 단계; 교좌장치(80)의 보수 또는 교체를 하는 교량(70) 유지 보수단계; 상기 교량(70) 유지 보수후 유압잭(20)의 외주면을 에워싸면서 유압잭(20)의 상단부(22)와 고정브라켓(30)의 단턱을 밀착 고정시키는 단계; 상기 지지브라켓(10) 및 고정브라켓(30)의 표면을 방청처리 및 주변을 정리하는 마감단계로 이루어진다.The method of replacing the device using the hydraulic jack for replacing the device according to the present invention is to fix and attach the support bracket 10 to the side of the bridge 100 or the bridge 90 with bolts to raise the upper structure of the bridge 70. step; Installing a hydraulic jack 20 in the center of the upper surface of the support bracket (10); Jacking up the hydraulic jack 20 to set the hydraulic jack 20 to an appropriate height; Bridge 70 maintenance step of repairing or replacing the bridge device (80); After the bridge 70 maintenance, surrounding the outer circumferential surface of the hydraulic jack 20 and fixing the upper end 22 of the hydraulic jack 20 and the stepped portion of the fixing bracket 30 in close contact; The surface of the support bracket 10 and the fixing bracket 30 is made of a rust prevention treatment and finishing step to clean up the periphery.

즉, 상기 지지브라켓(10) 부착단계는 교각(100) 또는 교대(90)의 측면에 볼트로 부착하여, 교량(70)의 상부구조물 및 교좌장치(80)를 인상시키기 위한 단계이다.That is, the step of attaching the support bracket 10 is a step for raising the upper structure and the bridge device 80 of the bridge 70 by attaching a bolt to the side of the bridge 100 or shift 90.

이어서, 상기 유압잭(20) 설치단계는 상기 지지브라켓(10)의 상면 중앙에 설치하여 교량(70)의 상부구조물 및 교좌장치(80)를 인상시키기 위해 잭업을 하는 유압잭(20)을 설치하는 단계이다.Subsequently, the installing of the hydraulic jack 20 includes installing the hydraulic jack 20 to be jacked up to raise the upper structure of the bridge 70 and the teaching device 80 by installing in the center of the upper surface of the support bracket 10. to be.

그리고, 상기 유압잭(20) 설정단계는 교량(70)의 상부구조물 및 교좌장치(80)를 적절한 높이로 인상시키기 위한 잭업을 실시하는 단계이다.In addition, the setting of the hydraulic jack 20 is a step of jacking up to raise the upper structure and the bridge device 80 of the bridge 70 to an appropriate height.

이어서, 상기 유압잭(20)의 잭업이 진행된 상태에서 교좌장치(80)의 보수 또는 교체를 하는 일련의 교량(70)을 유지 보수하는 단계이다.Subsequently, in the state where the jack up of the hydraulic jack 20 is in progress, the maintenance of a series of bridges 70 for repairing or replacing the bridge device 80 is performed.

그리고, 상기 고정브라켓(30) 부착단계는 상기한 바와 같이 교량(70)에 필요한 유지 보수작업후 잭업 설정된 유압잭(20)을 고정브라켓(30)으로 감싸 영구 설치하는 단계로, 유압잭(20)의 외주면을 고정브라켓(30)의 절개부(40)로 에워싸면서 유압잭(20)의 상단부(22)를 고정브라켓(30)의 단턱(40a)에 밀착 고정시키는 단계이다.In addition, the fixing bracket 30 attaching step is a step of permanently installing the hydraulic jack 20 wrapped up with the fixed bracket 30 after the maintenance work required for the bridge 70 as described above, and the permanent jack 30 of the hydraulic jack 20. Surrounding the outer circumferential surface with the cutout portion 40 of the fixing bracket 30, the upper end 22 of the hydraulic jack 20 is fixed to the stepped portion 40a of the fixing bracket 30.

마지막으로, 상기 마감단계는 상기 지지브라켓(10) 및 고정브라켓(30)의 표면을 방청처리하여 우수로부터 구조물이 녹이 스는 것을 방지하며, 기타 필요한 도색작업 및 주변을 정리하는 단계이다.Finally, the finishing step is to prevent the structure from rust from rainwater by cleaning the surface of the support bracket 10 and the fixing bracket 30, and to clean other necessary painting work and surroundings.

[실시예]EXAMPLE

이하, 본 고안을 실시예를 예로 들어 좀 더 상세히 설명한다.Hereinafter, the present invention will be described in more detail with reference to Examples.

도 6은 본 고안에 따른 교좌장치 교체용 분리형 유압잭의 인상전 상태를 도시한 사시도이며, 도 7은 본 고안에 따른 교좌장치 교체용 분리형 유압잭의 인상후 상태를 도시한 사시도이며, 도 8은 본 고안에 따른 교좌장치 교체용 분리형 유압잭의 인상후 설치 완료된 상태를 도시한 예시도이며, 도 9는 본 고안에 따른 교좌장치 교체용 분리된 유압잭이 설치된 상태를 도시한 예시도1이며, 도 10은 본 고안에 따른 교좌장치 교체용 일체형 유압잭이 설치된 상태를 도시한 예시도2이다.Figure 6 is a perspective view showing the state before the lifting of the removable hydraulic jack for replacing the teaching apparatus according to the present invention, Figure 7 is a perspective view showing the state after the lifting of the removable hydraulic jack for replacing the teaching apparatus according to the present invention, Figure 8 9 is an exemplary view showing a state in which the installation of the separated hydraulic jack for replacing the replacement device according to the present invention, Figure 9 is an exemplary view showing a state in which the separated hydraulic jack for replacing the replacement device according to the present invention is installed, Figure 10 is 2 is an exemplary view showing a state in which the integrated hydraulic jack for replacing the teaching device according to the present invention is installed.

이들 도면에 도시된 바와 같이, 본 고안에 따른 교좌장치 교체용 유압잭은 교량(70)의 상부구조물을 인상시키기 위해 교각(100) 또는 교대(90)의 측면에 고정 부착되는 박스브라켓(50)과; 상기 박스브라켓(50)의 내측면 중앙에 배치되는 유압잭(20)과; 상기 유압잭(20)의 상면과 마주댐과 동시에 박스브라켓(50)의 상면을 삽입/탈착되는 덮개(60)로 구성된다.As shown in these figures, the hydraulic jack for replacing the bridge device according to the present invention and the box bracket 50 is fixedly attached to the side of the pier 100 or the shift 90 to raise the upper structure of the bridge (70) and ; A hydraulic jack 20 disposed at the center of the inner surface of the box bracket 50; At the same time as facing the upper surface of the hydraulic jack 20 is composed of a cover (60) for inserting / removing the upper surface of the box bracket (50).

여기서, 상기 박스브라켓(50)은 전체적으로 상하가 트인 육면체 박스형상으로 이루어지는 본체부(51)와; 상기 본체부(51)의 전면 상단으로부터 하향으로 소정의 크기로 요입 형성된 요입부(52)와; 상기 요입부(52)로부터 일정한 간격을 두고 본체부(51)의 전면에 사각형상으로 관통 형성된 관통부(53)와; 상기 본체부(51)의 양측면에 두 개가 한 조를 이루도록 타원형상으로 형성된 장공(54)과; 상기 본체부(51)의 배면이 연장 형성되는 지지부(55)로 구성된다.Here, the box bracket 50 includes a main body portion 51 formed of a hexahedral box shape having a top and bottom openings as a whole; A concave concave portion 52 formed to have a concave in a predetermined size downward from an upper end of the front surface of the main body portion 51; A through part 53 formed in a rectangular shape on the front surface of the main body part 51 at regular intervals from the concave inlet part 52; A long hole 54 formed in an elliptical shape so as to form a pair of two on both sides of the main body portion 51; The back surface of the main body portion 51 is composed of a support portion 55 is formed.

또한, 상기 지지부(55)는 그 면의 좌우측에 각각 종방향으로 일정한 간격을 두고 천공 형성된 볼트공(56)과; 상기 좌우측에 형성된 볼트공(56)의 내측으로 일측은 본체부(51)의 하면과 맞댐과 동시에 타측에 밀착 형성되는 지지판(57)으로 구성된다.In addition, the support 55 is a bolt hole 56 formed at regular intervals in the longitudinal direction on the left and right sides of the surface; The inner side of the bolt hole 56 formed on the left and right sides is composed of a support plate 57 which is in close contact with the lower surface of the body portion 51 and is formed in close contact with the other side.

상기한 바와 같은 구성으로 이루어진 본 고안을 이용한 교좌장치의 교체에 대해서 설명한다.It will be described for the replacement of the teaching apparatus using the present invention made of the configuration as described above.

본 고안에 따른 교좌장치 교체용 유압잭을 이용한 교좌장치 교체방법은 교량(70)의 상부구조물을 인상시키기 위해 교각(100) 또는 교대(90)의 측면에 박스브라켓(50)을 볼트(B)로 고정 부착하는 단계; 상기 박스브라켓(50)의 내측면 중앙에 유압잭(20)을 설치하는 단계; 상기 박스브라켓(50)의 상단을 덮개(60)로 덮는 단계; 상기 박스브라켓(50)내의 유압잭(20)을 잭업하여 적절한 높이로 유압잭(20)을 설정하는 단계; 상기 유압잭(20)의 잭업후 박스브라켓(50)의 측면의 장공(54)에 볼트(B)와 너트(N)로 고정하여 덮개(60)의 위치를 고정하는 단계; 상기 덮개(60)의 위치를 고정시킨 후 박스브라켓(50)내의 유압잭(20)을 제거하는 단계; 상기 박스브라켓(50)과 덮개(60)의 표면을 방청처리 및 주변을 정리하는 마감단계로 이루어진다.The method for replacing the device using the hydraulic jack for replacing the device according to the present invention is to raise the upper structure of the bridge 70 to the box bracket 50 on the side of the bridge 100 or the shift 90 with the bolt (B) Fixedly attaching; Installing a hydraulic jack 20 in the center of the inner surface of the box bracket (50); Covering the top of the box bracket 50 with a cover 60; Setting up the hydraulic jack 20 to an appropriate height by jacking up the hydraulic jack 20 in the box bracket 50; Fixing the position of the cover (60) by fixing the bolt (B) and the nut (N) to the long hole (54) of the side of the box bracket (50) after the jack-up of the hydraulic jack (20); Removing the hydraulic jack 20 in the box bracket 50 after fixing the position of the cover 60; The surface of the box bracket 50 and the cover 60 is made of a rust prevention treatment and finishing step to clean up the periphery.

즉, 상기 박스브라켓(50) 부착단계는 교량(70)의 상부구조물을 인상시키기 위해 교각(100) 또는 교대(90)의 측면에 박스브라켓(50)을 볼트(B)로 고정 부착하는 단계이다.That is, the step of attaching the box bracket 50 is a step of fixing and attaching the box bracket 50 to the side of the pier 100 or the shift 90 with bolts B to raise the upper structure of the bridge 70. .

이어서, 상기 유압잭(20) 설치단계는 상기 박스브라켓(50)의 내측면 중앙에 유압잭(20)을 설치하는 단계이다.Subsequently, the installation of the hydraulic jack 20 is a step of installing the hydraulic jack 20 at the center of the inner surface of the box bracket 50.

그리고, 덮개(60) 설치단계는 상기 유압잭(20)의 상면과 상기 박스브라켓(50)의 상단을 동시에 덮개(60)로 덮는 단계이다.In addition, the cover 60 is a step of covering the upper surface of the hydraulic jack 20 and the upper end of the box bracket 50 with the cover 60 at the same time.

이어서, 상기 유압잭(20) 설정단계는 상기 박스브라켓(50)내의 유압잭(20)을 잭업하여 교량(70)의 상부구조물이나 교좌장치(80)의 보수를 위한 적절한 높이로 유압잭(20)을 설정하는 단계이다.Subsequently, the setting of the hydraulic jack 20 jacks up the hydraulic jack 20 in the box bracket 50 to set the hydraulic jack 20 to an appropriate height for repairing the upper structure of the bridge 70 or the device 80. It's a step.

그리고, 상기 덮개(60) 설정단계는 상기 유압잭(20)을 적절한 높이로 잭업한 후 덮개(60)의 하부에 위치된 박스브라켓(50)의 측면의 장공(54)에 볼트(B)와 너트(N)로 고정하여 덮개(60)의 설정위치를 고정하는 단계이다.Then, the cover 60 setting step is bolted to the nut (B) and the nut in the hole 54 of the side of the box bracket 50 located in the lower portion of the cover 60 after jacking up the hydraulic jack 20 to the appropriate height Fixing with (N) is a step of fixing the set position of the cover (60).

그 후, 상기 유압잭(20) 제거단계는 상기 덮개(60)의 위치를 고정시킨 후 박스브라켓(50)내의 유압잭(20)을 박스브라켓(50)으로부터 제거하는 단계이다.Thereafter, the removing of the hydraulic jack 20 is a step of removing the hydraulic jack 20 in the box bracket 50 from the box bracket 50 after fixing the position of the cover 60.

마지막으로, 상기 마감단계는 상기 박스브라켓(50)과 덮개(60)의 표면을 방청처리하여 구조물이 녹이 스는 것을 방지토록 하며, 기타 필요한 도색작업 및 주변을 정리하는 단계이다.Finally, the finishing step is to prevent the structure from rusting by rusting the surface of the box bracket 50 and the cover 60, and to clean other necessary painting work and surroundings.

이상에서 설명한 바와 같이, 본 고안에 따른 교좌장치 교체용 유압잭은 다음과 같은 효과가 있다.As described above, the hydraulic jack for replacing the device according to the present invention has the following effects.

첫째, 본 고안에 따른 교좌장치 교체용 유압잭은 유압잭을 이용하여 고정부를 확보하고, 그 시공과정의 일체화로 인하여 공사비가 절감될 뿐만 아니라 공기가 단축되는 이점이 있다.First, the hydraulic jack for replacing the device according to the present invention secures the fixed part by using the hydraulic jack, there is an advantage that the construction cost is reduced and the air is shortened due to the integration of the construction process.

둘째, 본 고안에 따른 교좌장치 교체용 유압잭은 정확한 유압잭 잭킹 기준의 설정 및 부착용 브라켓 내부의 유압잭을 이용하여 협소한 작업공간, 부피, 중량에 영향을 받지 않고 시공이 가능한 이점이 있다.Second, the hydraulic jack replacement device according to the present invention has the advantage that can be installed without being affected by the narrow working space, volume, weight by using the hydraulic jack inside the bracket for setting and mounting the exact hydraulic jack jacking standards.

셋째, 본 고안에 따른 교좌장치 교체용 유압잭은 기존의 교량 구조물의 손상을 최소화하여 경제적이고 지속적인 교량의 유지관리가 가능하며 교통의 통제 없이교좌장치 교체 및 상부구조물을 보강할 수 있는 이점이 있다.Third, the hydraulic jack for replacing the bridge device according to the present invention is economical and sustainable bridge maintenance is possible by minimizing damage to the existing bridge structure, there is an advantage that can replace the bridge device and reinforce the superstructure without control of traffic.

Claims (7)

상부구조물을 인상시키기 위해 교각 또는 교대의 측면에 고정 부착되는 지지브라켓과; 상기 지지브라켓의 상면 중앙에 배치되는 유압잭과; 상기 유압잭의 외주면을 에워싸면서 지지브라켓의 상면 외주연에 밀착 고정되는 고정브라켓으로 구성됨을 특징으로 하는 교좌장치 교체용 유압잭.A support bracket fixedly attached to the side of the piers or shifts to raise the superstructure; A hydraulic jack disposed at the center of the upper surface of the support bracket; The hydraulic jack for replacing a device, characterized in that it consists of a fixing bracket which is fixed close to the outer circumference of the upper surface of the support bracket while surrounding the outer peripheral surface of the hydraulic jack. 제 1항에 있어서,The method of claim 1, 상기 지지브라켓은 전체적으로 사다리꼴 형상으로 일체로 이루어지되, 상부에 배치됨과 동시에 평활면을 갖는 상협부와; 상기 상협부와 일정한 간격을 두고 하부에 배치됨과 동시에 평활면을 갖는 하광부와; 상기 상협부의 양측단으로부터 일정한 각도로 하광부까지 하향 경사지게 형성된 경사부와; 상기 하광부로부터 외측으로 연장 형성됨과 동시에 볼트공이 형성된 연장부로 구성됨을 특징으로 하는 교좌장치 교체용 유압잭.The support bracket is made integrally in a trapezoidal shape as a whole, and is arranged on the upper portion and having a smooth surface at the same time; A lower portion disposed at a lower portion with a predetermined distance from the upper and lower portions and having a smooth surface; An inclined portion formed to be inclined downward from the both side ends of the upper narrow portion to the lower portion at a predetermined angle; The hydraulic jack for replacing the device, characterized in that consisting of an extension formed in the bolt hole is formed extending from the lower portion to the outside. 제 1항에 있어서,The method of claim 1, 상기 고정브라켓은 전체적으로 사다리꼴 형상으로 일체로 이루어지되, 상부에 배치됨과 동시에 평활면을 갖는 상협부와; 상기 상협부와 일정한 간격을 두고 하부에 배치됨과 동시에 평활면을 갖는 하광부와; 상기 상협부의 양측단으로부터 일정한 각도로 하광부까지 하향 경사지게 형성된 경사부와; 상기 경사부의 내측면이 타원형상으로 절개 형성된 절개부와; 상기 절개부의 내측에는 위, 아래로 소정의 간격을 두고 형성된 단턱으로 구성됨을 특징으로 하는 교좌장치 교체용 유압잭.The fixing bracket is integrally formed in a trapezoidal shape as a whole, and is arranged on the upper portion and having a smooth surface at the same time; A lower portion disposed at a lower portion with a predetermined distance from the upper and lower portions and having a smooth surface; An inclined portion formed to be inclined downward from the both side ends of the upper narrow portion to the lower portion at a predetermined angle; An incision formed on the inner surface of the inclined portion in an elliptical shape; The hydraulic jack for replacing a device, characterized in that the inner part of the cutout is configured as a step formed at a predetermined interval up and down. 상부구조물을 인상시키기 위해 교각 또는 교대의 측면에 고정 부착되는 박스브라켓과; 상기 박스브라켓의 내측면 중앙에 배치되는 유압잭과; 상기 유압잭의 상면과 마주댐과 동시에 박스브라켓의 상면을 삽입/탈착되는 덮개로 구성됨을 특징으로 하는 교좌장치 교체용 유압잭.A box bracket fixedly attached to the side of the piers or shifts to raise the superstructure; A hydraulic jack disposed at the center of the inner side of the box bracket; The hydraulic jack for replacing the device, characterized in that it consists of a cover for inserting / removing the upper surface of the box bracket at the same time as facing the upper surface of the hydraulic jack. 제 4항에 있어서,The method of claim 4, wherein 상기 박스브라켓은 전체적으로 상하가 트인 육면체 박스형상으로 이루어지는 본체부와; 상기 본체부의 전면부 상단으로부터 하향으로 소정의 크기로 요입 형성된 요입부와; 상기 요입부로부터 일정한 간격을 두고 본체부의 전면에 사각형상으로 관통 형성된 관통부와; 상기 본체부의 양측면에 두 개가 한 조를 이루도록 타원형상으로 형성된 장공과; 상기 본체부의 배면이 연장 형성되는 지지부로 구성됨을 특징으로 하는 교좌장치 교체용 유압잭.The box bracket includes a main body part having a hexahedral box shape having a top and bottom openings as a whole; A concave indentation formed in a predetermined size downward from an upper end of the front portion of the main body; A through part formed in a rectangular shape on a front surface of the main body part at regular intervals from the concave part; A long hole formed in an elliptical shape to form a pair of two on both sides of the main body; The hydraulic jack for replacing the device, characterized in that consisting of a support portion extending from the back of the main body portion. 제 5항에 있어서,The method of claim 5, 상기 지지부는 그 면의 좌우측에 각각 종방향으로 일정한 간격을 두고 천공 형성된 볼트공과; 상기 좌우측에 형성된 볼트공의 내측으로 일측은 본체부의 하면과 맞댐과 동시에 타측은 밀착 형성되는 지지판으로 구성됨을 특징으로 하는 교좌장치 교체용 유압잭.The support portion bolt holes formed at regular intervals in the longitudinal direction on the left and right sides of the surface; The hydraulic jack for replacing the device, characterized in that the one side is in the inner side of the bolt hole formed on the left and right side and the other side is in close contact with the bottom of the body portion is formed in close contact. 제 4항에 있어서,The method of claim 4, wherein 상기 덮개는 전체적으로 육면체 박스형상으로 이루어지는 몸체와; 상기 몸체의 전면이 이등분됨과 동시에 상하에 관통부가 형성된 격판과; 상기 몸체의 좌우측에 배치되는 좌우측판과; 상기 좌우측판에 두 개가 한조를 이루도록 타원형상으로 형성된 장공으로 구성됨을 특징으로 하는 교좌장치 교체용 유압잭.The cover and the body made of a hexahedral box shape as a whole; A diaphragm having a front portion of the body divided into two portions and a through portion formed at an upper portion and a lower portion thereof; Left and right side plates disposed on left and right sides of the body; The hydraulic jack for replacing the device, characterized in that consisting of a long hole formed in an oval shape to form a pair of two on the left and right side plates.
KR20-2003-0017710U 2003-06-05 2003-06-05 hydraulic jack for bridge bearing exchange KR200327585Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2003-0017710U KR200327585Y1 (en) 2003-06-05 2003-06-05 hydraulic jack for bridge bearing exchange

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2003-0017710U KR200327585Y1 (en) 2003-06-05 2003-06-05 hydraulic jack for bridge bearing exchange

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR10-2003-0036339A Division KR100477387B1 (en) 2003-06-05 2003-06-05 The method using hydraulic jack for bridge bearing exchange, and this of replacing bridge bearing

Publications (1)

Publication Number Publication Date
KR200327585Y1 true KR200327585Y1 (en) 2003-09-22

Family

ID=49415670

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0017710U KR200327585Y1 (en) 2003-06-05 2003-06-05 hydraulic jack for bridge bearing exchange

Country Status (1)

Country Link
KR (1) KR200327585Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100876328B1 (en) 2007-07-11 2008-12-31 (주)신행건설 Dismantling device of upper part of the device and dismantling method using the same
KR101532410B1 (en) * 2013-10-23 2015-06-30 이봉환 Device for bridge dismantle using the lifting member and its methode

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100876328B1 (en) 2007-07-11 2008-12-31 (주)신행건설 Dismantling device of upper part of the device and dismantling method using the same
KR101532410B1 (en) * 2013-10-23 2015-06-30 이봉환 Device for bridge dismantle using the lifting member and its methode

Similar Documents

Publication Publication Date Title
JP3092197U (en) A hole to prevent the lid from falling off
JP3112401U (en) Gutter repair material
KR100964729B1 (en) Bridge lifting apparatus for changing bridge bearings
KR102111779B1 (en) Finger-type expansion joint device without drain sheet
KR20130139509A (en) Expansion joint of bridge and its execution method
KR100477387B1 (en) The method using hydraulic jack for bridge bearing exchange, and this of replacing bridge bearing
KR200327585Y1 (en) hydraulic jack for bridge bearing exchange
KR100876328B1 (en) Dismantling device of upper part of the device and dismantling method using the same
KR20200085573A (en) Gravity type leveling method for precast members including expansion joint
KR100214386B1 (en) Jack supproting apparatus in raising the bridge super structure
KR19990001958A (en) Jack restraint device for raising upper structure of bridge and repairing method using the same
KR200227911Y1 (en) Assembling bracket to lift up upper structure
JP2649782B2 (en) A device that supports a fixed level without removing the rubber bearing.
KR100348632B1 (en) Apparatus bridge beam using the opposite direction temporary construction bracket and thereof method
KR200175366Y1 (en) Manhole movable up-down
KR200410784Y1 (en) Screw mobil jack
KR20210033652A (en) Expansion joints for bridge decks that can be easily replaced without using concrete in the field
KR102595633B1 (en) Hydraulic jack for bridge seat replacement and method for replacing bridge seat using the same
KR200341114Y1 (en) A bridge lifting system
KR20020012899A (en) Assembling bracket to lift up upper structure
KR100530026B1 (en) Laying gap insurance apparatus for insuring laying gap in end side of the upper structure of a bridge and laying gap insurance coustruction method using the apparatus
CN220161598U (en) Be used for multiple form support welding paint protector
JP3321764B2 (en) Manhole cover receiving frame
JP2595466B2 (en) Manhole cover frame removal equipment and removal method
KR200379806Y1 (en) Cover of manhole capable of controlling the height thereof

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
G701 Publication of correction
EXTG Ip right invalidated