KR200308999Y1 - A sheeting apparatus for bridge slab - Google Patents

A sheeting apparatus for bridge slab Download PDF

Info

Publication number
KR200308999Y1
KR200308999Y1 KR20-2002-0037709U KR20020037709U KR200308999Y1 KR 200308999 Y1 KR200308999 Y1 KR 200308999Y1 KR 20020037709 U KR20020037709 U KR 20020037709U KR 200308999 Y1 KR200308999 Y1 KR 200308999Y1
Authority
KR
South Korea
Prior art keywords
bridge
formwork
yoke
steel
coupled
Prior art date
Application number
KR20-2002-0037709U
Other languages
Korean (ko)
Inventor
김호연
Original Assignee
주식회사 삼덕토건
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 삼덕토건 filed Critical 주식회사 삼덕토건
Priority to KR20-2002-0037709U priority Critical patent/KR200308999Y1/en
Application granted granted Critical
Publication of KR200308999Y1 publication Critical patent/KR200308999Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

본 고안은 지간의 넓이와 헌치의 형태가 각각 다른 여러 개소의 슬라브에 동시에 적용이 용이할 수 있도록 함으로써, 종래기술의 문제점에 따른 재료의 손실과 인력의 과다투입을 방지시켜 시공원가의 절감과 공기단축의 효과를 이룰 수 있는The present invention can be easily applied to several slabs having different widths and types of haunches at the same time, thereby preventing the loss of materials and over-injection of manpower due to the problems of the prior art, thereby reducing city park area and air. Can achieve the effect of shortening

교량 슬라브의 거푸집 장치에 관한 것이다.It relates to the formwork of bridge slabs.

이에 따른 본 고안의 구성은, 강상형교나 피씨빔교 등의 교량의 각 스틸박스 사이에 슬라브 공사를 위한 거푸집 장치에 있어서, 상기 각 스틸박스의 길이반대방향에서 서로 마주보게 고정설치되고, 길이방향의 장공이 형성된 매달기 틀과;Accordingly, the configuration of the present invention, in the formwork for slab construction between each steel box of the bridge, such as steel beam bridge, PC beam bridge, fixedly installed to face each other in the longitudinally opposite direction of each steel box, A hanging frame in which a long hole is formed;

상기 매달기 틀의 장공 상에 습동결합되고, 수직방향으로 위치변위가 가능한 높이조절볼트가 구비된 받침틀과; 상기 받침틀의 각 높이조절볼트의 상단에 각각 지지되고, 임의 길이조절이 가능하도록 두 개의 빔부재가 슬라이딩결합된 멍에재용 빔과; 상기 멍에재용 빔의 상부에 일정한 간격으로 그 멍에재용 빔과 직교되게 설치되는 장선재; 및 상기 장선재의 상부에 얹혀져 헌치부를 포함한 스틸박스 사이의 공간을 메우는 거푸집 널;을 포함하여 구성된 것이다.A support frame slidably coupled to the long hole of the hanging frame and provided with a height adjustment bolt capable of position displacement in a vertical direction; A yoke beam for each of the height adjustment bolts of the support frame, each of which is coupled to a yoke beam having two beam members slidingly coupled to each other to enable arbitrary length adjustment; Jang Sunjae is installed perpendicular to the yoke beam at regular intervals on the yoke beam; And formwork boards that are placed on top of the Jangsunjae to fill the space between the steel boxes including the haunches.

Description

교량 슬라브의 거푸집장치{A SHEETING APPARATUS FOR BRIDGE SLAB}Formwork of bridge slabs {A SHEETING APPARATUS FOR BRIDGE SLAB}

본 고안은 교량 슬라브의 거푸집장치에 관한 것으로서, 더욱 상세하게는 강상형교나 피씨빔교에서와 같이 헌치의 형태와 지간의 넓이가 다양한 교량 슬라브에 콘크리트를 타설하기 위한 거푸집의 설치를 보다 용이하게 적용할 수 있도록 한 거푸집 장치에 관한 것이다.The present invention relates to a formwork for a bridge slab, and more specifically, to install a formwork for placing concrete on a bridge slab having various shapes and widths of haunches, such as a steel bridge or a PC beam bridge. It is about a formwork device.

일반적으로 강상형교나 피씨빔교는 교량의 넓이에 따라 지간의 폭이 다양할 뿐 아니라 교량 상부의 횡구배와 거더의 위치에 따라 헌치의 높이와 폭이 변화되는 구조로 되어 있다.Generally, the width of the bridge varies depending on the width of the bridge, as well as the height and width of the haunch depending on the position of the lateral gradient and the girder.

이러한 구조에서 종래에는 지간의 넓이에 맞추어 멍에재를 절단하고, 헌치의 높이에 따라 장선재를 직각으로 가공하여 사용하거나 별도의 고임재를 이용하여 왔다.In such a structure, the yoke material is conventionally cut according to the width of the span, and the long wire material is processed at right angles according to the height of the haunch, or a separate high wage material has been used.

따라서 한번 절단된 멍에재는 다른 교량에 별도의 가공없이 재사용하기 어렵고, 헌치의 높이와 폭에 맞추기 위한 장선재의 가공 및 고임은 많은 인력낭비와 재료의 손실을 가져오게 되었다.Therefore, once cut yoke is difficult to reuse without additional processing on other bridges, the processing and holding of the wire rod to fit the height and width of the haunch has caused a lot of labor and material loss.

따라서 본 고안은 상기의 제반문제를 해결하기 위해 창출된 것으로서 그 목적은 지간의 넓이와 헌치의 형태가 각각 다른 여러 개소의 슬라브에 동시에 적용이 용이할 수 있도록 함으로써, 종래기술의 문제점에 따른 재료의 손실과 인력의 과다투입을 방지시켜 시공원가의 절감과 공기단축의 효과를 이룰 수 있는 교량 슬라브의 거푸집 장치를 제공함에 있다.Therefore, the present invention was created to solve the above problems, and its purpose is to facilitate the simultaneous application to various slabs having different widths and forms of haunches. It is to provide the formwork of bridge slab that can prevent the loss and over-injection of manpower, which can save the city park area and reduce the air shortage.

도 1 은 강상형교의 교량에서 본 고안의 거푸집장치가 적용된 상태의 사시도.1 is a perspective view of the formwork device of the present invention applied to the bridge of the steel bridge.

도 2 는 도 1 의 A - A선 확대 단면도.FIG. 2 is an enlarged sectional view taken along the line AA of FIG. 1. FIG.

도 3 은 도 2 의 부분 확대 사시도.3 is a partially enlarged perspective view of FIG. 2;

도 4 는 도 2 의 평면 구성도.4 is a plan view of FIG. 2.

도 5 는 도 4 의 B - B선 단면도.FIG. 5 is a cross-sectional view taken along the line BB of FIG. 4. FIG.

도 6 은 본 고안의 교량 슬라브의 거푸집장치에서 헌치부 받침대가 추가 구성된 상태의 확대 단면도.Figure 6 is an enlarged cross-sectional view of the haunch portion support is further configured in the formwork of the bridge slab of the present invention.

도 7 은 본 고안의 다른 실시예로서, 헌치부가 있는 피씨빔교에 적용된 상태의 측단면 구성도.7 is a side cross-sectional view of another embodiment of the present invention, a state applied to the PC beam bridge with the haunch.

도 8 은 본 고안의 또 다른 실시예로서, 헌치부가 없는 피씨빔교에 적용된 상태의 측단면 구성도.8 is a side cross-sectional view of another embodiment of the present invention, a state applied to the PC beam bridge without the haunch.

*** 도면의 주요부분에 대한 부호의 설명 ****** Explanation of symbols for main parts of drawing ***

1: 교각, 2: 스틸박스,1: pier, 2: steel box,

3: 크로스 빔, 4: 스트링거,3: cross beam, 4: stringer,

5: 매달기 너트, 6: 평철,5: hanging nut, 6: flat iron,

7: 매달기 볼트, 10: 매달기 틀,7: hanging bolt, 10: hanging frame,

11: 장공, 12: ㄱ형강,11: long, 12: a-beam,

13: 높이조절볼트, 14: 고정너트,13: height adjusting bolt, 14: fixing nut,

15: 위치고정볼트, 16: 받침틀,15: position fixing bolt, 16: support frame,

17: 멍에재용 빔, 18: 장선재,17: yoke beam, 18: Jang Sunjae,

19: 헌치부, 20: 거푸집 널,19: haunting department, 20: die board,

21: 받침편, 22: 헌치부 받침대,21: base, 22: pedestal base,

23: 피씨빔,23: PC beam,

상기 목적을 달성하기 위한 본 고안은 강상형교나 피씨빔교 등의 교량의 각 스틸박스 사이에 슬라브 공사를 위한 거푸집 장치에 있어서,The present invention for achieving the above object in the formwork for the slab construction between each steel box of the bridge, such as steel beam bridge, PC beam bridge,

상기 각 스틸박스의 길이반대방향에서 서로 마주보게 고정설치되고, 길이방향의 장공이 형성된 매달기 틀과,Hanging frame and fixedly installed facing each other in the opposite length direction of each steel box, the long hole in the longitudinal direction,

상기 매달기 틀의 장공상에 습동결합되고, 수직방향으로 위치변위가 가능한 높이조절볼트가 구비된 받침틀과,A support frame slidably coupled to the long hole of the hanging frame and provided with a height adjusting bolt capable of position displacement in a vertical direction;

상기 받침틀의 각 높이조절볼트의 상단에 각각 지지되고, 임의 길이조절이가능하도록 두 개의 빔부재가 슬라이딩결합된 멍에재용 빔과,Yoke beams are respectively supported on the top of each height adjustment bolt of the support frame, the two beam members slidingly coupled to allow any length adjustment,

상기 멍에재용 빔의 상부에 일정한 간격으로 그 멍에재용 빔과 직교되게 설치되는 장선재 및Jang Seonjae installed perpendicular to the yoke beam at regular intervals on the yoke beam;

상기 장선재의 상부에 얹혀져 헌치부를 포함한 스틸박스 사이의 공간을 메우는 거푸집 널을 포함하여 구성된 특징을 갖는다.It is mounted on the upper portion of the Jangjaejae has a feature consisting of a formboard to fill the space between the steel box including the haunch.

이하 본 고안의 실시예를 첨부한 도면에 의거 보다 상세하게 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1 은 강상형교의 교량에서 본 고안의 거푸집장치가 적용된 상태의 사시도이고, 도 2 는 도 1 의 A - A선 확대 단면도이며, 도 3 은 도 2 의 부분 확대 사시도이고, 도 4 는 도 2 의 평면 구성도이고, 도 5 는 도 4 의 B - B선 단면도이며, 도 6 은 본 고안의 교량 슬라브의 거푸집장치에서 헌치부 받침대가 추가 구성된 상태의 확대 단면도이고, 도 7 은 본 고안의 다른 실시예로서, 헌치부가 있는 피씨빔교에 적용된 상태의 측단면 구성도이며, 도 8 은 본 고안의 또 다른 실시예로서, 헌치부가 없는 피씨빔교에 적용된 상태의 측단면 구성도이다.Figure 1 is a perspective view of the formwork device of the present invention applied to the bridge of the steel bridge, Figure 2 is an enlarged cross-sectional view of the line A-A of Figure 1, Figure 3 is a partially enlarged perspective view of Figure 2, Figure 4 4 is a cross-sectional view taken along line B-B of FIG. 4, FIG. 6 is an enlarged cross-sectional view of a state where a haunch supporter is additionally configured in a formwork of a bridge slab according to the present invention, and FIG. 7 is another view of the present invention. As an example, a side cross-sectional configuration diagram of a state applied to a PC beam bridge having a haunch portion, and FIG. 8 is a side cross-sectional configuration diagram of a state applied to a PC beam bridge without a haunch portion, as another embodiment of the present invention.

도 1 에 도시된 바와 같이 본 고안의 구성은 일 실시예의 강상형교에 적용될 수 있다. 강상형교는 기본적으로 교각(1)위에 서로 마주보는 형태로 스틸박스(2)가 나란히 설치되고, 그 사이에 크로스 빔(3)과 스트링거(4)가 부착됨으로서 거푸집 널()로 타설되는 슬라브 콘크리트를 지지해주는 강구조가 이루어진다.As shown in FIG. 1, the configuration of the present invention may be applied to the steel beam bridge of one embodiment. The steel girder bridge is basically a slab concrete that is placed on the pier (1) facing each other in the form of steel box (2) side by side, with a cross beam (3) and a stringer (4) is attached between them slab concrete () Steel structure supporting is achieved.

도 2 내지 도 4 에 도시된 바와 같이 본 고안의 상세구성은 다음과 같다.As shown in Figures 2 to 4 the detailed configuration of the subject innovation is as follows.

상기 스틸박스(2)의 내측 가장자리 및 스트링거(4)의 내측 가장자리에 일정한 간격으로 서로 마주보는 형태로 매달기 너트(5)가 고정된 평철(6)이 용접된다.The flat iron 6 to which the hanging nut 5 is fixed is welded to the inner edge of the steel box 2 and the inner edge of the stringer 4 at regular intervals.

상기 평철(6)의 매달기 너트(5)에는 매달기 볼트(7)의 나사결합에 의해 상기 스틸박스(2)의 길이반대방향을 갖도록 서로 마주보게 설치되고, 또환 길이방향의 장공(11)이 형성된 매달기 틀(10)이 구비된다.The hanging nut 5 of the flat iron 6 is installed to face each other so as to have the lengthwise opposite direction of the steel box 2 by screwing the hanging bolt 7, and the long hole 11 of the ring length direction. The formed hanging frame 10 is provided.

상기 매달기 너트(5)와 매달기 볼트(7)에 고정되는 매달기 틀(10)과 스틸박스(2) 사이에는 후술되는 헌치부(19)의 하단부분에 접하는 거푸집 널(20)의 처짐에 따른 공극발생을 막기위한 ㄱ형강(12)을 삽입하여 용접 설치하며,Deflection of the formwork board 20 in contact with the lower end of the haunting portion 19 to be described later between the hanging frame 10 and the steel box 2 fixed to the hanging nut 5 and the hanging bolt 7. Insert the welding a-beam (12) to prevent the occurrence of voids according to the installation,

또한 상기 매달기 틀(10)의 장공(11)상에 습동결합되고, 나사결합방식에 의해 수직방향으로 위치변위가 가능한 높이조절볼트(13)와 위치조절이 끝난 조정위치를 고정하기 위한 고정너트(14)와 장공(11)상에서 수평이동되는 매달기 틀(5)의 조정위치를 고정하기 위해 매달기 틀(5)의 배면에 위치고정볼트(15)가 구비된 받침틀(16)이 설치된다.In addition, the fixed nut for sliding the height adjustment bolt 13 and the position adjustment has been adjusted on the long hole 11 of the hanging frame 10, the position shift in the vertical direction by the screw coupling method A support frame 16 provided with a position fixing bolt 15 is installed on the rear surface of the hanging frame 5 to fix the adjustment position of the hanging frame 5 which is horizontally moved on the 14 and the long hole 11. .

또한 상기 받침틀(16)의 각 높이조절볼트(13)의 상단에 각각 지지되고, 임의 길이조절이 가능하도록 두 개의 빔부재가 슬라이딩결합된 멍에재용 빔(17)이 구비된다.In addition, each of the height adjustment bolts 13 of the support frame 16 is supported on each of the top, and is provided with a yoke beam 17, the two beam members are slidingly coupled to enable any length adjustment.

또한 상기 멍에재용 빔(17)의 상부에 일정한 간격으로 그 멍에재용 빔(17)과 직교되게 설치되는 장선재(18)가 구비되며,In addition, the yoke rod 18 is provided on the upper portion of the yoke beam 17 at regular intervals is installed orthogonally with the yoke beam 17,

마지막으로 상기 장선재(18)의 상부에 얹혀져 헌치부(19)를 포함한 스틸박스(2)와 스트링거(4) 사이의 공간을 메우는 거푸집 널(20)이 설치되는 구성을 갖는다.Finally, the formwork board 20 is mounted on the upper part of the wire rod 18 to fill a space between the steel box 2 including the haunch 19 and the stringer 4.

또한 도 5 에 도시된 바와 같이 스틸박스(2)와 스트링거(4)간의 직교방향인크로스 빔(3)간에는 헌치부(19)에서 발생될 수 있는 휨모멘트가 적기 때문에 ㄱ형강(12)에 맞닿게 거푸집 널(20)을 설치하고, 상기 ㄱ형강(12)을 받쳐주기 위해 매달기 너트(5)와 매달기 볼트(7) 사이에 별도의 받침편(21)을 구성할 수 있다.In addition, as shown in FIG. 5, there is less bending moment that may be generated in the haunting portion 19 between the orthogonal cross beam 3 between the steel box 2 and the stringer 4 so as to fit the a-beam 12. To install the formwork board 20 to contact, and to support the a-beam 12 can be configured a separate support piece 21 between the hanging nut 5 and the hanging bolt (7).

한편, 도 6 에 도시된 바와 같이 헌치부(19)의 폭이 길 경우, 처짐을 방지하기 위해 받침틀(16)의 상부측에 슬라이딩결합되는 헌치부 받침대(22)를 더 구비할 수 있다.On the other hand, as shown in Figure 6, when the width of the haunting unit 19 is long, it may further include a haunting unit pedestal 22 which is slidingly coupled to the upper side of the support frame 16 to prevent sagging.

참고로, 스틸박스(2)와 스트링거(4)를 지점으로 볼 때 그 사이를 지간의 넓이라고 하고, 양 지점부에서 크게 작용하는 휨모멘트에 대항하기 위해 그 단면을 넓게 확대시킨 부분을 헌치라고 한다.For reference, when the steel box 2 and the stringer 4 are viewed as a point, the space between them is referred to as a space, and a portion where the cross section is enlarged to counteract the bending moment that acts greatly at both points is called a haunch. do.

상기의 구성은 강상형교에 적용되는 실시예를 설명한 것이며, 도 7 에 도시된 바와 같이 피씨빔(23)을 지지단으로 하는 피씨빔교에서도 적용이 가능하다.(동일부호에 대해서는 상기의 부호를 따름)The above configuration has described an embodiment applied to the steel girder bridge, and can be applied to the PC beam bridge having the PC beam 23 as the supporting end as shown in FIG. 7. )

또한 본 고안은 도 8 에 도시된 바와 같이 헌치부가 없는 피씨빔교에서도 동일하게 적용할 수 있다.(동일한 부품번호에 대해서 상기의 부호를 따름)In addition, the present invention can be equally applied to a PC beam bridge without a haunch as shown in FIG. 8 (following the above reference for the same part number).

상기와 같이 구성된 본 고안의 작동상태를 설명하면 다음과 같다.Referring to the operating state of the subject innovation configured as described above are as follows.

먼저 일측단부에 매달기 너트(5)가 용접된 평철(6)을 스틸박스(2)와 스트링거(4)의 내측 가장자리 임의 위치에 서로 마주보는 형태로 용접 설치한 다음 매달기 틀(10)을 매달기 볼트(7)를 이용하여 스틸박스(2)와 스트링거(4)에 각각 고정시킨다.First, the flat iron (6) welded with a hanging nut (5) at one end is welded to the steel box (2) and the inner edges of the stringers (4) so as to face each other, and then the hanging frame (10) is installed. Fixing to the steel box (2) and the stringer (4) by using the hanging bolt (7).

또한 스틸박스(2)와 매달기 틀(10), 스트링거(4)와 매달기 틀(10) 사이에는헌치부(19)의 하단부분에 접하는 거푸집 널(20)의 처짐에 따른 공극발생을 막기위한 ㄱ형강(12)을 삽입하여 설치하고, 헌치부(19)의 폭에 맞게 매달기 틀(10)의 장공(11)을 통하여 받침틀(16)을 좌우로 이동시킨 다음 위치세팅을 위해 위치고정볼트(15)를 죄어 상기 받침틀(16)의 위치를 고정한다.In addition, between the steel box (2) and the hanging frame (10), the stringer (4) and the hanging frame (10) to prevent the occurrence of voids due to the sagging of the formwork board 20 in contact with the lower portion of the hunt portion (19) Insert the a-beam (12) for the installation, and move the support frame (16) from side to side through the long hole (11) of the hanging frame (10) to fit the width of the haunting portion (19) and then fix the position for setting The bolt 15 is tightened to fix the position of the support frame 16.

한편, 횡구배에 따른 헌치부(19)의 높이를 맞추기 위해 높이조절볼트(13)를 조정하여 멍에재용 빔(17)의 횡구배를 정한 다음 지간의 넓이에 따라 길이조정이 가능한 멍에재용 빔(17)을 알맞게 늘려서 그 높이조절볼트(13)의 상단에 거치시켜 놓고, 그 위에 장선재(18)를 적당한 간격으로 설치한 뒤 거푸집 널(20)을 덮는 과정으로 거푸집 설치공사를 시행한다.On the other hand, to adjust the height adjustment bolt 13 to match the height of the haunting portion 19 according to the lateral gradient to determine the lateral gradient of the yoke beam (17) and then yoke beam that can be adjusted in length according to the width of the area ( 17) is appropriately stretched to be mounted on the top of the height adjustment bolt (13), and the installation of the formwork in the process of covering the formwork board (20) after the installation of the joseonjae (18) at an appropriate interval thereon.

거푸집 설치후 철근 배근과 콘크리트 타설이 진행되고 콘크리트의 양생이 완료되면 나사결합상태의 높이조절볼트(13)를 해제시켜 멍에재용 빔(17)과 장선재(18), 거푸집 널(20)을 순차적으로 해체하고, 매달기 볼트(7)를 분리시켜 상기 매달기 틀(10)과 ㄱ형강(12) 및 헌치부(19)의 거푸집 널(20)을 해체하는 방법으로 거푸집 해체공사를 시행한다.After the formwork is installed, reinforcement and concrete pour proceeds and the curing of the concrete is completed, release the height adjustment bolt (13) of the screw coupling state yoke material beam (17), Jang wire (18), formwork board (20) in sequence Dismantling, by removing the hanging bolt (7) is carried out the form dismantling work by dismantling the formwork board (20) of the hanging frame (10) and the a-beam (12) and the haunch (19).

이러한 상기 거푸집 설치 및 해체과정은 본 고안의 다른 실시예인 피씨빔교에서도 동일하게 적용된다.This formwork installation and dismantling process is equally applicable to other embodiments of the PC beam bridge.

이상에서 설명한 본 고안은 전술한 실시예 및 첨부된 도면에 의해 한정되는 것이 아니고, 본 고안의 기술적 사상을 벗어나지 않는 범위 내에서 여러 가지 치환, 변형 및 변경이 가능하다는 것이 본 고안이 속하는 기술분야에서 통상의 지식을 가진 자에게 있어 명백할 것이다.The present invention described above is not limited to the above-described embodiment and the accompanying drawings, and various substitutions, modifications, and changes are possible in the art without departing from the technical spirit of the present invention. It will be clear to those of ordinary knowledge.

이상과 같은 본 고안을 적용하게 되면, 길이조절이 가능한 멍에재용 빔에 의해 다양한 형태의 교량 슬라브 단면에 설치 적용할 수 있으며, 자재의 재사용횟수를 연장시킴에 따른 재료비의 절감과 지간의 넓이, 헌치의 폭과 높이에 따라 용이하게 조정 설치가 가능함에 따라 재료비 및 인건비의 감소와 공기의 단축 효과를 동시에 기대할 수 있다.When the present invention is applied as described above, it can be installed and applied to various types of cross section of bridge slabs by the yoke material beam which can be adjusted in length. As it can be easily adjusted and installed according to the width and height of the tooth, the material cost and labor cost can be reduced and the air shortening effect can be expected simultaneously.

Claims (2)

강상형교나 피씨빔교 등의 교량의 각 스틸박스 사이에 슬라브 공사를 위한 거푸집 장치에 있어서,In the formwork for the slab construction between each steel box of the bridge, such as steel beam bridge, PC beam bridge, 상기 각 스틸박스의 길이반대방향에서 서로 마주보게 고정설치되고, 길이방향의 장공이 형성된 매달기 틀과;A hanging frame fixedly installed to face each other in the longitudinally opposite directions of the respective steel boxes, and having a long hole in the longitudinal direction; 상기 매달기 틀의 장공 상에 습동결합되고, 수직방향으로 위치변위가 가능한 높이조절볼트가 구비된 받침틀과;A support frame slidably coupled to the long hole of the hanging frame and provided with a height adjustment bolt capable of position displacement in a vertical direction; 상기 받침틀의 각 높이조절볼트의 상단에 각각 지지되고, 임의 길이조절이 가능하도록 두 개의 빔부재가 슬라이딩결합된 멍에재용 빔과;A yoke beam for each of the height adjustment bolts of the support frame, each of which is coupled to a yoke beam having two beam members slidingly coupled to each other to enable arbitrary length adjustment; 상기 멍에재용 빔의 상부에 일정한 간격으로 그 멍에재용 빔과 직교되게 설치되는 장선재; 및Jang Sunjae is installed perpendicular to the yoke beam at regular intervals on the yoke beam; And 상기 장선재의 상부에 얹혀져 헌치부를 포함한 스틸박스 사이의 공간을 메우는 거푸집 널;을 포함하여 구성됨을 특징으로 하는 교량 슬라브의 거푸집장치.Formwork board of the bridge slab, characterized in that it comprises a; formwork board to fill the space between the steel box including the hauncheon mounted on the upper portion of the Jangjae. 청구항 1 에 있어서, 헌치부의 폭이 길 경우, 처짐을 방지하기 위해 받침틀의 상부측에 슬라이딩결합되는 헌치부 받침대를 더 구비함을 특징으로 하는 교량 슬라브의 거푸집장치.The formwork of the bridge slab according to claim 1, further comprising: a haunting unit pedestal slidingly coupled to the upper side of the supporting frame to prevent sagging when the width of the haunting unit is long.
KR20-2002-0037709U 2002-12-18 2002-12-18 A sheeting apparatus for bridge slab KR200308999Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2002-0037709U KR200308999Y1 (en) 2002-12-18 2002-12-18 A sheeting apparatus for bridge slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2002-0037709U KR200308999Y1 (en) 2002-12-18 2002-12-18 A sheeting apparatus for bridge slab

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020020011796A Division KR20030072666A (en) 2002-03-06 2002-03-06 A sheeting apparatus for bridge slab

Publications (1)

Publication Number Publication Date
KR200308999Y1 true KR200308999Y1 (en) 2003-03-31

Family

ID=49332329

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2002-0037709U KR200308999Y1 (en) 2002-12-18 2002-12-18 A sheeting apparatus for bridge slab

Country Status (1)

Country Link
KR (1) KR200308999Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101777790B1 (en) * 2017-05-23 2017-09-13 (주)대우건설 Transformable formwork system for dealing with various curvature change and lateral gradient change in precast bridge deck

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101777790B1 (en) * 2017-05-23 2017-09-13 (주)대우건설 Transformable formwork system for dealing with various curvature change and lateral gradient change in precast bridge deck

Similar Documents

Publication Publication Date Title
KR200308999Y1 (en) A sheeting apparatus for bridge slab
KR20030072666A (en) A sheeting apparatus for bridge slab
KR200226626Y1 (en) Bracket for Supporting Flooring Slab Form of Bridge
KR101116345B1 (en) Holder for preventing conduction of beam bridge and maintaining spaces and method for constructing bridge using thereof
JP2677893B2 (en) Pillar formwork construction method
JPH0280747A (en) Girder structure
KR20080104534A (en) Form support beam
KR200351989Y1 (en) Concrete slab sheeting apparatus For P.C beam girder bridge
JP2001140221A (en) Repair method for overhanging floor slab, and support construction for form
KR910007423B1 (en) Method for construction p.c - beam on the bridge
KR100715695B1 (en) Slab formwork for PC beam bridge
JP2550836B2 (en) PC cable stayed bridge construction equipment
JPH09317188A (en) Erection adjusting jig
KR20040028221A (en) Support construction for slab of prestressed concrete beam of bridge
KR0128140B1 (en) Scratch machine for pc slab
KR20020082966A (en) The construction method and device for slab panel which can instal psc bridge beam
JP3019138U (en) Formwork structure for making cotters on top of girders
JP2002235403A (en) Prestressing steel wire supporting spacer
JPH0728310Y2 (en) Receiving metal fitting for PC steel wire
JP4321947B2 (en) Ladder equipment
JPH0633119Y2 (en) Floating formwork support
CN117052121A (en) Super-large ground warehouse post-pouring belt hanging die construction die and mounting method
JPH06307081A (en) Beam receiving bracket and its usage
JPH06248742A (en) Rc floor slab
JPH08170430A (en) Formwork device for column

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
LAPS Lapse due to unpaid annual fee