KR20030046283A - Waterproofing system of fabricated parking lot - Google Patents

Waterproofing system of fabricated parking lot Download PDF

Info

Publication number
KR20030046283A
KR20030046283A KR1020010076784A KR20010076784A KR20030046283A KR 20030046283 A KR20030046283 A KR 20030046283A KR 1020010076784 A KR1020010076784 A KR 1020010076784A KR 20010076784 A KR20010076784 A KR 20010076784A KR 20030046283 A KR20030046283 A KR 20030046283A
Authority
KR
South Korea
Prior art keywords
waterproofing
parking lot
prefabricated
same
sealing
Prior art date
Application number
KR1020010076784A
Other languages
Korean (ko)
Inventor
문경명
김홍규
Original Assignee
강남화성 (주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 강남화성 (주) filed Critical 강남화성 (주)
Priority to KR1020010076784A priority Critical patent/KR20030046283A/en
Publication of KR20030046283A publication Critical patent/KR20030046283A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/64Insulation or other protection; Elements or use of specified material therefor for making damp-proof; Protection against corrosion
    • E04B1/644Damp-proof courses
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B32LAYERED PRODUCTS
    • B32BLAYERED PRODUCTS, i.e. PRODUCTS BUILT-UP OF STRATA OF FLAT OR NON-FLAT, e.g. CELLULAR OR HONEYCOMB, FORM
    • B32B27/00Layered products comprising a layer of synthetic resin
    • B32B27/40Layered products comprising a layer of synthetic resin comprising polyurethanes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B32LAYERED PRODUCTS
    • B32BLAYERED PRODUCTS, i.e. PRODUCTS BUILT-UP OF STRATA OF FLAT OR NON-FLAT, e.g. CELLULAR OR HONEYCOMB, FORM
    • B32B2307/00Properties of the layers or laminate
    • B32B2307/70Other properties
    • B32B2307/726Permeability to liquids, absorption
    • B32B2307/7265Non-permeable

Abstract

PURPOSE: A waterproofing method of a prefabricated parking lot is provided to prevent the environmental pollution in a construction site, to intercept a scatter of dust, noise, stinks, the fire, etc. in advance, to manage construction wastes easily, and to prevent the pollution in an assembly site for a parking lot. CONSTITUTION: The waterproofing method of a prefabricated parking lot comprises the steps of forming a waterproofing film on a structure and assembling in a construction site, sealing up a joint between structures where a waterproofing film is formed with sealants, sanding, shorting and grinding the surface, filling up gaps of the surface with an admixture of minute silica sand, calcium carbonate, inorganic and organic matters, and inorganic and organic compounds, then waterproofing.

Description

조립식 주차장의 방수공법{Waterproofing system of fabricated parking lot}Waterproofing system of fabricated parking lot

본 발명은 조립식 주차장의 방수공법에 관한 것으로, 조립식 구조물(철판, 아연도금강판, 기타 합금강판, 콘크리트 구조물)에 직접 생산공장에서 방수처리 완료 후 현장에서 조립하고 실행처리 작업하여 마무리하는 것을 특징으로 하는 방수공법에 관한 것이다.The present invention relates to a waterproof construction method of a prefabricated parking lot, and to the prefabricated structure (iron plate, galvanized steel sheet, other alloy steel sheet, concrete structure) directly after the completion of the waterproof treatment in the production plant, characterized in that the assembly and the execution process in the field finish. It relates to a waterproof method.

종래 기술의 주차장 방수공법은 주차장 조립 및 설치 완료 후, 시이트방수, 우레탄방수, 고무계, 아크릴계, 고무아스팔트계, 발수재, 에폭시계, 기타 방수재를 사용하여 방수하였다. 그러나 이들 방법들에 있어서는 여러 가지 문제점이 있다. 비노출 방수공법의 경우, 제1도에서와 같이 방수작업 완료 후 후작업 공정인 콘크리트 및 아스콘 등으로 몰탈 작업이 적용되어져야 하므로 구조물에 하중이 가해지는 문제점이 있고, 노출 방수공법의 경우에 있어서는 제2도에서와 같이 반복된 수축, 팽창에 의해 약한 부위에서 크랙이 발생되고, 끝단부에서 수축에 의해 접착력이 약화되어 말림현상이 발생하여 방수의 목적을 상실하게되는 문제점이 있다. 또한 공통적으로 작업완료 시간의 소요가 많으며, 시공장소의 환경오염, 방수작업시 민원발생의 요인인 분진의 비산, 소음, 냄새, 화재 등의 문제가 발생된다.In the parking lot waterproofing method of the prior art, after the parking lot is assembled and installed, waterproofing is performed using sheet waterproofing, urethane waterproofing, rubber, acrylic, rubber asphalt, water repellent, epoxy, and other waterproofing materials. However, there are various problems with these methods. In the case of the non-exposed waterproofing method, as shown in FIG. 1, after the completion of the waterproofing work, the mortar work should be applied to concrete and asphalt concrete, which is a post-working process. Therefore, a load is applied to the structure. As shown in FIG. 2, cracks are generated at weak areas due to repeated contraction and expansion, and adhesive strength is weakened by shrinkage at ends, resulting in curling and losing the purpose of waterproofing. In addition, it takes a lot of time to complete the work in general, and problems such as dust pollution, noise, smell, fire, etc., which are factors of civil pollution during waterproofing and water pollution work at city plants.

본 발명에 있어서는 구조물에 하중이 가해지는 문제점, 크랙의 발생, 끝단부에서 말림현상, 시간의 소요가 많은 문제점, 환경오염, 방수작업시 인접 주민들의 민원발생에 따른 문제 등을 해결하기 위하여 제3도에서와 같이 조립식 구조물 자재인 철판, 아연도금강판, 기타 합금강판, 콘크리트 구조물을 생산공장에서 직접 방수처리 후 현장에서 조립, 실링작업하여 마무리하는 것을 특징으로 하는 방수공법을 개발하였고, 접착력을 향상시키기 위하여 구조물 표면처리에 있어, 구조물이 철판, 아연도금강판, 기타 합금강판, 콘크리트구조물인 경우에는 표면을 쇼트 및 샌딩, 그라인딩을 하였고, 콘크리트 구조물인 경우에는 샌딩 및 그라인딩 작업을 한 후 부자재로 1액형 및 2액형 프라이머와 200~1,000㎛의 미세 규사, 탄산칼슘, 시멘트, 기타 무기물과 유기물, 무기유기 혼합물을 혼합하여 표면의 공극을 메꾼 후 방수처리하는 것을 특징으로 한 방수처리 공법을 발명하였다.In the present invention, in order to solve the problem that the load is applied to the structure, the occurrence of cracks, curling phenomenon at the end, a lot of time consuming problem, environmental pollution, the problems caused by civil complaints of neighboring residents during waterproofing work, etc. As shown in the drawing, we developed a waterproofing method characterized in that the steel plate, galvanized steel sheet, other alloy steel sheet, and concrete structure, which are prefabricated structure materials, are directly waterproofed at the production plant, and then assembled and sealed at the site. In order to make the surface of the structure, in the case of steel plate, galvanized steel, other alloy steel, concrete structure, the surface was shorted, sanded, ground, and in the case of concrete structure, after sanding and grinding work 1 Liquid and two-component primers, 200-1,000 ㎛ fine silica, calcium carbonate, cement, other inorganic and oil After a mixture of water, an organic inorganic mixture mekkun the pores of the surface and invented a water treatment method characterized in that it waterproof.

본 발명에 사용되는 프라이머는 폴리우레탄수지, 폴리우레탄-폴리우레아수지, 폴리우레아계수지를 주재료로 하고, 구조물 사이의 이음부는 폴리우레탄계, 폴리우레탄-폴리우레아계, 폴리우레아계, 아크릴계, SBR계, 아크릴우레탄계, 실리콘계, 변성실리콘계, 부틸고무계, 폴리설파이드계 실링재를 사용하였다.The primer used in the present invention is a polyurethane resin, polyurethane-polyurea resin, polyurea resin as the main material, the joints between the structure is polyurethane, polyurethane-polyurea, polyurea, acrylic, SBR, Acrylic urethane, silicone, modified silicone, butyl rubber and polysulfide sealing materials were used.

이하 본 발명에 의해 제조된 방수공법을 실시 예로서 설명한다.Hereinafter, the waterproof method manufactured by the present invention will be described as an example.

[실시예1]Example 1

조립식 주차장용으로 사용되는 철판을 표면처리 함에 있어서 표면을 쇼트 및 샌딩, 그라인딩을 한 후 에어브로잉 및 용제세척을 하였다. 이후 공정으로 프라이머 작업은 재료로써 프라이덱(PLYADEK) T-117(강남화성주식회사의 프라이머)에 시멘트를 중량비 1:1로 배합하여 교반한 후 사용하였고, 경화 확인 후 방수도막층 형성 재료로써는 프라이덱(PLYADEK) PF-359/E-145(강남화성주식회사의 방수도막재)를 사용하여 방수도막을 형성한 후 현장으로 운반, 조립완료 하였으며, 구조물과 구조물 사이의 이음부를 우레탄계 실링재료 케이실(K-SEAL)KC-300A/KC-330B(강남화성주식회사의 실링재)로 작업 완료한 후 문제점을 관찰한 결과를 '표1' 에 나타내었다.In the surface treatment of the steel plate used for the prefabricated parking lot, the surface was shorted, sanded and ground, followed by air blowing and solvent cleaning. Subsequently, the primer work was used after mixing and mixing cement in a weight ratio of 1: 1 to PLYADEK T-117 (primary of Gangnam Hwasung Co., Ltd.) as a material. (PLYADEK) PF-359 / E-145 (Gangnam Hwaseong Co., Ltd. waterproof coating material) was formed and transported and assembled to the site, and the joints between the structures and the urethane-based sealing material ksil (K) -SEAL) KC-300A / KC-330B (Sealing material of Gangnam Hwaseong Co., Ltd.) After completing the work, the problems observed after the results are shown in Table 1.

[실시예2]Example 2

조립식 주차장용으로 사용되는 콘크리트 구조물의 표면처리에 있어서 샌딩 및 그라인딩 작업을 한 후 에어브로잉을 하였다. 이후 공정으로 프라이머 작업전에 표면의 공극을 메우기 위하여 미세 규사를 사용하여 메꿈작업을 완료한 다음 경화를 확인 후 붙어있는 미세 규사를 솔, 스파츄라 및 에어브로잉 등으로 제거했다. 메워지지 않는 공극을 메우고 접착력을 향상시키기 위해 프라이덱(PLYADEK) T-117에 시멘트를 중량비 1:1로 배합하여 교반 한 후 사용하였고, 경화 확인 후 방수도막층 형성 재료로서는 [실시예1] 과 동일한 재료를 사용하여 방수도막을 형성 한 후 현장으로 운반, 조립완료 하였으며, [실시예1] 과 동일한 실링재료로 실링하여작업을 완료한 후 문제점을 관찰한 결과를 '표1' 에 나타내었다.In the surface treatment of the concrete structure used for the prefabricated parking lot, air blowing was performed after sanding and grinding work. After the completion of the plowing operation using fine silica sand to fill the voids on the surface before the primer work in the process, after confirming the curing, the attached fine silica sand was removed by brush, spatula and air blowing. In order to fill the voids that do not fill up and to improve adhesion, the mixture was used after mixing and mixing cement in a PLYADEK T-117 in a weight ratio of 1: 1. After the waterproofing film was formed using the same material and transported to the site, the assembly was completed. The result of observing the problem after completing the work by sealing with the same sealing material as [Example 1] is shown in 'Table 1'.

[실시예3]Example 3

[실시예1] 과 동일한 철판를 사용하고 [실시예1] 과 동일한 표면처리 및 프라이머작업 완료 후 방수도막층 형성 재료로서는 속경화 스프레이 코팅재료인 스텔라코트() KA-690/KR-690(강남화성주식회사의 스프레이 방수도막재)를 사용하여 방수도막을 형성한 후 현장으로 운반, 조립완료 하였으며, [실시예1] 과 동일한 실링재료로 실링하여 작업완료 한 후 문제점을 관찰한 결과를 '표1' 에 나타내었다.After using the same iron plate as in [Example 1] and completing the same surface treatment and primer work as in [Example 1], Stella coat which is a fast curing spray coating material as a waterproof coating layer forming material ( ) KA-690 / KR-690 (Gangnam Hwaseong Co., Ltd. spray waterproofing coating material) was formed and transported and assembled to the site. Sealing with the same sealing material as [Example 1] was completed. The result of observing the problem is shown in Table 1.

[실시예4]Example 4

[실시예2] 와 동일한 콘크리트 구조물에 [실시예2] 와 동일한 표면처리 및 프라이머작업 완료 후 [실시예3] 과 동일한 재료를 사용하여 방수도막을 형성한 후 현장으로 운반, 조립완료 하였으며, [실시예1] 과 동일한 실링재료로 실링하여 작업완료 한 후 문제점을 관찰한 결과를 '표1' 에 나타내었다.After completing the same surface treatment and primer work as in [Example 2] on the same concrete structure as in [Example 2], a waterproof coating was formed using the same material as in [Example 3], and then transported and assembled to the site. Example 1] The result of observing the problem after sealing work with the same sealing material as shown in [Table 1] is shown.

[비교예1]Comparative Example 1

[실시예1] 과 동일한 철판으로 조립, 설치, 완료된 주차장에 [실시예1] 과 동일한 표면처리 공정 및 프라이머 처리, [실시예1] 과 동일한 재료로 방수도막형성 완료 후 [실시예1] 과 동일한 실링재료로 실링하여 작업완료 한 후 문제점을 관찰한 결과를 '표1' 에 나타내었다.[Example 1] After the assembly, installation and completion of the same iron plate in the parking lot, the same surface treatment process and primer treatment as in [Example 1], and after the formation of the waterproof coating film with the same material as [Example 1] and [Example 1] Table 1 shows the results of observing the problem after the work is completed by sealing with the same sealing material.

[비교예2]Comparative Example 2

[실시예2] 와 동일한 콘크리트 구조물로 설치, 완료된 주차장에 [실시예2]와 동일한 표면처리 공정 및 프라이머 처리, [실시예1] 과 동일한 재료로 방수도막형성 완료 후 [실시예1] 과 동일한 실링재료로 실링하여 작업완료 한 후 문제점을 관찰한 결과를 '표1' 에 나타내었다.[Example 2] The same surface treatment process and primer treatment as in [Example 2] and the same parking lot as [Example 1] after completion of waterproof coating film formation with the same material as in [Example 1] Table 1 shows the results of observing the problem after sealing the sealing material.

[비교예3]Comparative Example 3

[실시예1] 과 동일한 철판으로 조립, 설치, 완료된 주차장에 [실시예1] 와 동일한 표면처리 및 프라이머작업 완료 후 [실시예3] 과 동일한 재료를 사용하여 방수도막형성 완료 후 [실시예1] 과 동일한 실링재료로 실링하여 작업완료 한 후 문제점을 관찰한 결과를 '표1' 에 나타내었다.[Example 1] After completion of the same surface treatment and primer work as [Example 1] in the parking lot assembled, installed, and completed with the same iron plate [Example 3] After the completion of the waterproof coating film formation using the same material as [Example 3] [Example 1 ] The result of observing the problem after sealing with the same sealing material is shown in 'Table 1'.

[비교예4]Comparative Example 4

[실시예2] 와 동일한 콘크리트 구조물로 설치, 완료된 주차장에 [실시예2] 와 동일한 표면처리 공정 및 프라이머 처리, [실시예3] 과 동일한 재료를 사용하여 방수도막형성 완료 후 [실시예1] 과 동일한 실링재료로 실링하여 작업완료 한 후 문제점을 관찰한 결과를 '표1' 에 나타내었다.[Example 2] After the installation of the same concrete structure, the same parking treatment and primer treatment as in [Example 2] in the completed parking lot, using the same material as [Example 3] after the waterproofing film formation completed [Example 1] The result of observing the problem after the work is completed by sealing with the same sealing material as shown in 'Table 1'.

[비교예5]Comparative Example 5

[실시예1] 과 동일한 철판으로 조립, 설치, 완료된 주차장에 시중에서 방수용으로 판매되는 시이트 방수재중 KSF-4917B종2류 적합품을 철판에 부직포 토치방법으로 접착시킨 후 아스콘몰탈을 사용하여 누름몰탈 5cm로 시공 완료 후 문제점을 관찰한 결과를 '표1' 에 나타내었다.[Example 1] KSF-4917B class 2 suitable product of the sheet waterproofing material sold for waterproofing in the parking lot assembled, installed and completed in the same parking lot is bonded to the iron plate by non-woven torch method and then pressed mortar using ascon mortar The result of observing the problem after the completion of construction at 5cm is shown in 'Table 1'.

[비교예6]Comparative Example 6

[실시예2] 와 동일한 콘크리트 구조물로 설치, 완료된 주차장에 [비교예5]와 동일한 재료 및 방법으로 시공 완료 후 문제점을 관찰한 결과를 '표1' 에 나타내었다.The results of observing the problems after completing the construction by the same materials and methods as [Comparative Example 5] in the parking lot installed and completed with the same concrete structure as [Example 2] are shown in Table 1.

[표1] 실시 예 및 비교 예에 따른 결과[Table 1] Results according to Examples and Comparative Examples

이때 시공면적은 100㎡/두께3mm를 기준으로 하였고, 비노출용 방수작업시 몰탈의 두께는 5cm이며 몰탈의 양생기간을 포함하였다.At this time, the construction area was based on 100㎡ / thickness 3mm, and the thickness of mortar was 5cm and the curing period of mortar was included during waterproofing for non-exposure.

제1도는 종래의 비노출방수공법 평면도1 is a plan view of a conventional non-exposed waterproofing method

제2도는 종래의 노출방수공법시 하자 사진2 is a defect photograph in the conventional exposure waterproof method

제3도는 본 발명의 조립식 주차장의 방수공법 공정도3 is a waterproof process chart of the assembled parking lot of the present invention

..

이상에서 상술한 바와 같이 본 발명은, 종래 기술의 조립식 주차장 방수공법에 비해 조립식구조물 생산공장에서 직접 구조물에 방수도막을 형성하여 건축시공 현장에서 조립, 실링처리작업을 마무리함으로써 구조물에 하중을 가하지 않으며, 공사기간을 많이 단축시킬 수 있어 경제성 면에서도 우수하다. 또한 수축, 팽창에 의해 약한 부위에서 크랙발생을 차단시킬 수 있고, 끝단부에서 말림현상이 발생하여 방수의 목적을 상실하게되는 문제점이 없게되었다. 시공 장소의 환경오염을 미연에 방지시킬 수 있고, 작업시 분진의 비산, 소음, 냄새, 화기 등을 미연에 차단시킬 수 있으며, 시공 자재폐기물이 구조물 생산공장에 집중되어 있으므로 관리가 용이하고, 주차장 조립현장의 오염을 차단시킬 수 있다.As described above, the present invention does not apply a load to the structure by forming a waterproof coating on the structure directly in the prefabricated parking lot waterproofing method of the prior art, finishing the assembly and sealing treatment work at the construction site. In addition, it is excellent in terms of economic efficiency as it can shorten the construction period. In addition, it is possible to block the occurrence of cracks in weak areas by shrinkage, expansion, and there is no problem that the end of the waterproofing is lost due to curling phenomenon occurs at the end. The environmental pollution of the construction site can be prevented in advance, and the scattering of the dust, noise, smell, fire, etc. can be prevented in advance, and the construction materials waste is concentrated in the structure production plant for easy management and parking. It can block the contamination of the assembly site.

Claims (3)

조립식주차장 방수공법에 있어서, 조립식 구조물의 생산공장에서 직접 방수도막을 형성하여 건축시공 현장에서 조립, 실링처리 작업하여 마무리하는 것을 특징으로 하는 조립식주차장의 방수공법.In the prefabricated parking lot waterproofing method, the waterproofing method of the prefabricated parking lot, characterized in that to form a waterproof coating directly in the production plant of the prefabricated structure, assembly and sealing treatment at the construction site. 청구 1항에 있어서, 접착력을 향상시키기 위하여 구조물 표면처리에 있어, 구조물이 금속인 경우에는 표면을 쇼트 및 샌딩, 그라인딩을 하고, 콘크리트 구조물인 경우에는 샌딩 및 그라인딩 작업을 한 후 우레탄계 프라이머와 미세규사, 탄산칼슘, 시멘트 및 기타 유,무기 혼합물을 혼합하여 표면의 공극을 메운 후 시공함을 특징으로 하는 조립식주차장의 방수공법.The method according to claim 1, in order to improve the adhesion to the surface of the structure, if the structure is a metal short and sanding, grinding the surface, in the case of a concrete structure after sanding and grinding the urethane-based primer and fine silica Waterproofing method of prefabricated parking lot, characterized in that the filling after filling the pores of the surface by mixing, calcium carbonate, cement and other organic and inorganic mixtures. 청구 1항에 있어서, 방수도막이 형성된 구조물과 구조물 사이의 이음부를 우레탄계 실링재료를 사용함을 특징으로하는 조립식 주차장의 방수공법.The method of claim 1, wherein the joint portion between the structure and the waterproofing coating film is formed using a urethane-based sealing material.
KR1020010076784A 2001-12-05 2001-12-05 Waterproofing system of fabricated parking lot KR20030046283A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020010076784A KR20030046283A (en) 2001-12-05 2001-12-05 Waterproofing system of fabricated parking lot

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020010076784A KR20030046283A (en) 2001-12-05 2001-12-05 Waterproofing system of fabricated parking lot

Publications (1)

Publication Number Publication Date
KR20030046283A true KR20030046283A (en) 2003-06-12

Family

ID=29573289

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020010076784A KR20030046283A (en) 2001-12-05 2001-12-05 Waterproofing system of fabricated parking lot

Country Status (1)

Country Link
KR (1) KR20030046283A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100969955B1 (en) * 2008-02-14 2010-07-15 주식회사 아키벤 Method for waterproofing on a slope metal roof used with quick spray type liquid membrane
KR101013031B1 (en) * 2010-11-09 2011-02-14 가원건설 주식회사 Method for preventing a salt damage and carbonation of concrete structure

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR950009610A (en) * 1993-09-15 1995-04-24 배순훈 Reel Drive of Tape Recorder
US5599599A (en) * 1995-07-06 1997-02-04 University Of Central Florida Fiber reinforced plastic ("FRP")-concrete composite structural members
KR19980014056A (en) * 1996-08-07 1998-05-15 박광진 Construction method of assembly building and its assembly member
JPH1193185A (en) * 1997-09-18 1999-04-06 Kajima Corp Pit construction method for parking facilities and the like
KR200147119Y1 (en) * 1996-08-01 1999-06-15 조성호 Braced wall board of foundation pits
JP2000309925A (en) * 1999-04-26 2000-11-07 Maeda Corp Cofferdam method
KR20010097140A (en) * 2000-04-20 2001-11-08 오상근 Waterproofing method using plastic panels
JP2002242283A (en) * 2001-02-19 2002-08-28 Ohbayashi Corp Sealing method for precast member
KR20030040687A (en) * 2001-11-15 2003-05-23 송규열 panel for external underground wall of building, structure and construction method using the same

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR950009610A (en) * 1993-09-15 1995-04-24 배순훈 Reel Drive of Tape Recorder
US5599599A (en) * 1995-07-06 1997-02-04 University Of Central Florida Fiber reinforced plastic ("FRP")-concrete composite structural members
KR200147119Y1 (en) * 1996-08-01 1999-06-15 조성호 Braced wall board of foundation pits
KR19980014056A (en) * 1996-08-07 1998-05-15 박광진 Construction method of assembly building and its assembly member
JPH1193185A (en) * 1997-09-18 1999-04-06 Kajima Corp Pit construction method for parking facilities and the like
JP2000309925A (en) * 1999-04-26 2000-11-07 Maeda Corp Cofferdam method
KR20010097140A (en) * 2000-04-20 2001-11-08 오상근 Waterproofing method using plastic panels
JP2002242283A (en) * 2001-02-19 2002-08-28 Ohbayashi Corp Sealing method for precast member
KR20030040687A (en) * 2001-11-15 2003-05-23 송규열 panel for external underground wall of building, structure and construction method using the same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100969955B1 (en) * 2008-02-14 2010-07-15 주식회사 아키벤 Method for waterproofing on a slope metal roof used with quick spray type liquid membrane
KR101013031B1 (en) * 2010-11-09 2011-02-14 가원건설 주식회사 Method for preventing a salt damage and carbonation of concrete structure

Similar Documents

Publication Publication Date Title
KR102000461B1 (en) A minerals high elasticity filler for repairing cracks at the crack site where a waterproof coating Waterproof coating is formed when painting outer wall of a concrete building, and a method of repairing and reinforcing cracks using the same
CN103790357A (en) Manufacturing method of hardened and wear-resisting floor system
CN112144581B (en) Large integral underground space waterproof construction structure and construction method thereof
EP1451128A1 (en) Method for coating a cement-containing molding piece
KR101902836B1 (en) Concrete repair and joint construction method using organic and inorganic hybrid water proofing material laminated self-adhesive seal reinforcing and waterproofing sheet
CN112408851A (en) Anti-radiation semi-permanent nano-penetration crystallization sealing compacting agent and use method thereof
KR20030046283A (en) Waterproofing system of fabricated parking lot
KR102072273B1 (en) Construction Method of Water Proof Sheet Having Elasticity
KR20190100082A (en) A repair unit for repairing a detachment site or a crack site of a concrete building, and a repair or detachment site using the repair unit
KR20040018003A (en) Method for making watertight
KR20010100040A (en) Renewal and reform method for detrioration area at exposured reinforced steel concrete
KR100831087B1 (en) Section repair material and section repair method using the mma resins for slab of concrete bridge
JP7085440B2 (en) Repair structure and repair method for underground concrete structures
KR100412783B1 (en) Method of restoring section with polymer cement mortar by spray method
JP6095842B1 (en) Bridge floor slab water stop, floor slab waterproof structure
KR0185286B1 (en) Repairing construction of bridge deck and road
JP4726437B2 (en) How to improve foundation concrete
KR100916179B1 (en) An improved waterproofing method
JPH08333816A (en) Waterproofing method and waterproofing method of thickness increase method of concrete floor slab
KR200192773Y1 (en) Top-morta exposed film waterproof structure
JPH03137305A (en) Paving method
JPH0649719Y2 (en) Base material for construction
KR102135871B1 (en) Repair method for ultra rapid hardening multi-composite waterproof pavement with a guss-latexphalt capable of restoring cross sections
JP2838409B2 (en) Method for producing aggregate of concrete building
KR20010085238A (en) method for mending of slab connection in bridge and structure the same

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E601 Decision to refuse application