KR200300435Y1 - The multi-layer vertical breakwater - Google Patents

The multi-layer vertical breakwater Download PDF

Info

Publication number
KR200300435Y1
KR200300435Y1 KR20-2002-0027255U KR20020027255U KR200300435Y1 KR 200300435 Y1 KR200300435 Y1 KR 200300435Y1 KR 20020027255 U KR20020027255 U KR 20020027255U KR 200300435 Y1 KR200300435 Y1 KR 200300435Y1
Authority
KR
South Korea
Prior art keywords
breakwater
hollow block
stacked
upright
stage
Prior art date
Application number
KR20-2002-0027255U
Other languages
Korean (ko)
Inventor
원 회 양
Original Assignee
원 회 양
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 원 회 양 filed Critical 원 회 양
Priority to KR20-2002-0027255U priority Critical patent/KR200300435Y1/en
Application granted granted Critical
Publication of KR200300435Y1 publication Critical patent/KR200300435Y1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

본 고안은 직립제 방파제의 개량형인바, 직립제 방파제는 대형 중량물인 케이슨(casson)을 해저기초단 상면에 수직,수평을 유지하도록 거치고정해야함에 따라대형 크레인 등이 동원되어야하고, 대형이어서 정밀한 수직, 수평을 잡는 시공이 매우 어렵고, 공사비용이 과다하게 소요되는 문제점이 있어, 이를 해결하기 위하여 상측으로 갈수록 방파제(1) 폭방향으로 길이가 짧아지는 중공블럭을 계단식으로 적층하여서되는 직립 방파제의 구조에 대한 고안이다.The present invention is an improvement of the upright breakwater, the upright breakwater must be fixed to maintain the vertical and horizontal on the upper surface of the base of the large weight casson (casson) to be mobilized large cranes, such as large, precise vertical, There is a problem that the construction of the leveling is very difficult and excessively expensive construction costs, to solve this problem in the structure of an upright breakwater by stacking hollow blocks shorter in the width direction toward the top of the breakwater. It is devised for.

Description

다층 직립식 방파제 {The multi-layer vertical breakwater}Multi-layer vertical breakwater}

본 고안은 방파제체 구조에 대한 고안으로서, 방파제는 외해로부터 밀려오는 파랑을 저지하여 항내의 정온을 유지하고 항내수역의 각종 시설물을 보호하기 위한 항만외곽시설로써, 방파제의 위치나 항만의 규모 또는 해저지질조건 및 방파제체 구축용 자재구입의 용이성, 시공성 등을 고려하여 직립제, 사석제, 혼성제 등의 제체중에서 선택하여 시공하게 된다.The present invention is designed for the breakwater structure, and the breakwater is a port outside facility for maintaining the calmness in the harbor by protecting the blue waves coming from the open sea and protecting the various facilities in the harbor area. In consideration of the geological conditions and the ease of construction, construction, etc. for building materials for the construction of breakwaters, construction is carried out by selecting from a mixture of uprights, sandstones, and hybrids.

본 고안은 직립제 방파제의 개량형인 바, 직립제의 케이슨 구조는 일반적으로 자체가 대형이고, 대형장비의 동원이 필요하나, 케이슨 구조형식도 높이의 한계성으로 기초마운드(기초사석층)를 조정하여 시공함으로 비경제적 측면과 많은 기초사석이 소요되는 문제점이 있다.This design is an improved type of upright breakwater, and the caisson structure of the upright is generally large in size and requires the mobilization of large equipment, but the caisson structure type also has a height limit and adjusts the foundation mound (basis). There is a problem in that non-economic aspects and many basic seats are required by construction.

도 1 은 본 고안상으로 실시구성되는 다층 직립식 방파제 단위 구조체 사시도1 is a perspective view of a multi-layer upright breakwater unit structure constructed according to the present invention

도 2 는 도 1 에서의 A-A'선 단면도FIG. 2 is a cross-sectional view taken along the line A-A 'in FIG. 1

<도면의 주요부분에 대한 부호설명><Code Description of Main Parts of Drawing>

1. 다층 직립식 방파제 2. 해저면 3,3a. 사석1. Multilayer upright breakwater 2. Bottom 3,3a. riprap

4. 기초단 10. 기초블럭 11. 해수면4. Foundation 10. Foundation Block 11. Sea Level

12. 암키 13. 숫키 14. 차단판12. Rocky 13. Male 14. Block

15. 캡콘크리트 16. 함입선단15. Cap Concrete 16. Drilling Tip

본 고안상으로 실시되는 다층 직립식 방파제(1)의 구조는 기초마운드를 최소화하고 대형 케이슨 대신 소형 중공블럭으로 대체함에 있어, 다단적치에 따른 불안정 및 불실시공성 등을 고려하여 탑(塔)형태의 구조로 구축하는 바, 본 고안상으로 실시되는 방파제(1)의 구조는 해저면(2)상면에 소정의 높이와 폭으로 사석(3)을 포설하여 기초단(4)을 형성하고, 이러한 기초단(4) 상면에 상측부로 갈수록 방파제(1) 폭방향으로 길이가 짧아지는 중공블럭(10)을 수직으로 계단식으로 만조시의 해수면(11) 상측부로 노출되는 높이로 적층, 조적하되 각 중공블럭의 좌, 우측벽 상,하 중도면에 각각 암키(12)와 숫키(13)을 형성하여 계합되게 적층하므로써, 중공블럭(10)과 블럭의 변위를 방지하고, 이러한 중공블럭(10) 내부공간에 사석(3a)을 충전하고 중공블럭(10)(10a)(10b)의 각 단 노출부에는 사석(3a)이 파랑에 유실되지 못하도록 차단판(14)으로 차폐하며, 최상단 중공블럭(10b) 상면에는 캡콘크리트(15)를 타설양생하여서 본 고안상으로 실시구성되는 다층 직립식 방파제(1)의 구조가 구성된다.The structure of the multi-layer upright breakwater (1) implemented in accordance with the present invention is to minimize the foundation mound and replace it with a small hollow block instead of a large caisson, in consideration of the instability and unworkability due to the multi-stage value of the tower (塔) type The structure of the breakwater (1) implemented according to the present invention is to construct the foundation stage (4) by laying the sandstone (3) at a predetermined height and width on the upper surface of the sea bottom (2), The hollow block 10 whose length is shorter in the width direction of the breakwater 1 is vertically cascaded and stacked to a height exposed to the upper surface of the sea level 11 during high water, and each hollow block The female key 12 and the male key 13 are formed on the left and right side walls of the upper and lower middle surfaces of the left and right walls, respectively, so that the hollow blocks 10 and the blocks are prevented from being displaced. Filling the dead stone (3a) of the hollow blocks (10) (10a) (10b) Each stage exposed portion is shielded with a blocking plate 14 so that the dead stone (3a) is not lost to the blue, and the upper surface of the hollow block (10b) by pouring cap concrete (15) in a multi-layer erect The structure of the type breakwater 1 is comprised.

도면 중 미설명 부호(16)은 각 중공블럭 적층시 좌,우측벽이 부딪히지 않도록 함입한 좌,우측벽 상부선단의 함입선단을 나타낸다.In the drawings, reference numeral 16 denotes a recessed tip of an upper left end of the left and right walls, which is embedded so that the left and right walls do not collide when the hollow blocks are stacked.

상기와 같이 구성된 본 고안상으로 실시구축되는 방파제는 직립식으로서, 중공블럭을 사용하면서도 상측부로 갈수록 폭방향으로 길이가 짧은 중공블럭을 계단식으로 적층하므로써, 종래 케이슨식 방파제체 구축시보다 공사가 용이하고, 안정성이 탁월하며, 공사비용이 저감되는 등의 효과가 있다.The breakwater implemented and implemented according to the present invention configured as described above is an upright type, and a hollow block having a short length in the width direction toward the upper side while using a hollow block is laminated in a stepwise manner, making construction easier than when constructing a conventional caisson type breakwater body. It is excellent in stability, and construction cost is reduced.

Claims (1)

다층 직립식 방파제(1)의 구조를 구성함에 있어서, 해저면(2)상면에 소정의 높이와 폭으로 사석(3)을 포설하여 기초단(4)을 형성하고, 이러한 기초단(4) 상면에 상측부로 갈수록 방파제(1) 폭방향으로 길이가 짧아지는 중공블럭(10)을 수직으로 계단식으로 만조시의 해수면(11) 상측부로 노출되는 높이로 적층, 조적하되 각 중공블럭의 좌, 우측벽 상,하 중도면에 각각 암키(12)와 숫키(13)을 형성하여 계합되게 적층하고, 중공블럭(10) 내부공간에 사석(3a)을 충전하며, 중공블럭(10)(10a)(10b)의 각 단 노출부에는 사석(3a)이 파랑에 유실되지 못하도록 차단판(14)으로 차폐하며, 최상단 중공블럭(10b) 상면에는 캡콘크리트(15)를 타설양생하여서 됨을 특징으로 하는 다층 직립식 방파제.In constructing the structure of the multi-layer upright breakwater (1), sandstones (3) are laid on the seabed (2) upper surface with a predetermined height and width to form the foundation stage (4), and the foundation stage (4) upper surface The hollow block 10, which becomes shorter in the width direction of the breakwater 1, is stacked vertically and stacked at a height exposed to the upper surface of the sea level 11 during high water, and is left and right of each hollow block. The female key 12 and the male key 13 are formed on the upper and lower mid-planes, respectively, and are stacked in a manner of being stacked. The hollow blocks 10, 10a, and 10b are filled with the dead stone 3a in the inner space of the hollow block 10. Multi-layered upright type is characterized in that the shielding section 14a is shielded with a blocking plate 14 so that the dead stone 3a is not lost to blue at each stage exposed portion, and the cap concrete 15 is cast on the upper surface of the uppermost hollow block 10b. breakwater.
KR20-2002-0027255U 2002-09-11 2002-09-11 The multi-layer vertical breakwater KR200300435Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR20-2002-0027255U KR200300435Y1 (en) 2002-09-11 2002-09-11 The multi-layer vertical breakwater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR20-2002-0027255U KR200300435Y1 (en) 2002-09-11 2002-09-11 The multi-layer vertical breakwater

Publications (1)

Publication Number Publication Date
KR200300435Y1 true KR200300435Y1 (en) 2003-01-14

Family

ID=49398414

Family Applications (1)

Application Number Title Priority Date Filing Date
KR20-2002-0027255U KR200300435Y1 (en) 2002-09-11 2002-09-11 The multi-layer vertical breakwater

Country Status (1)

Country Link
KR (1) KR200300435Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050015392A (en) * 2003-08-05 2005-02-21 원 회 양 Breakwater substructure in area that unevenness is serious
KR100529116B1 (en) * 2002-08-20 2005-11-15 주식회사 혜인이엔씨 Seawater exchange breakwater of area that the difference between the rise and fall of the tide is large

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100529116B1 (en) * 2002-08-20 2005-11-15 주식회사 혜인이엔씨 Seawater exchange breakwater of area that the difference between the rise and fall of the tide is large
KR20050015392A (en) * 2003-08-05 2005-02-21 원 회 양 Breakwater substructure in area that unevenness is serious

Similar Documents

Publication Publication Date Title
KR100684072B1 (en) Assembly type breakwater
US9695563B1 (en) Bricks and a method for using such bricks to build dikes in water
US5129756A (en) Apparatus for and method of coastal erosion control using massive sea block system
KR200300435Y1 (en) The multi-layer vertical breakwater
KR20150061712A (en) Water proof structure of Bank
CN113638359B (en) Protection device for preventing coast erosion and construction process thereof
KR100374177B1 (en) The structure of breakwater in deep sea
KR200224547Y1 (en) Assembling structure of embankment having multi-terraced incline
JP5234415B2 (en) Sea area control structure
KR200197779Y1 (en) A vertical breakwater using shell block
KR100491556B1 (en) Coastal levee structure that is constructed by concrete mouldings
KR200212552Y1 (en) The structure of breakwater in deep sea
KR200317703Y1 (en) A vertical breakwater which has a seawater exchange and a removing wave
KR200324521Y1 (en) foundation treatment structure of composite breakwater
JPS63181804A (en) Breakwater and its construction and concrete caisson therefor
KR100586637B1 (en) Breakwater structure of deep sea
KR200288522Y1 (en) Coastal levee structure that is constructed by concrete mouldings
KR100708895B1 (en) Stack-type block, multistage stack-type civil work structure and construction method thereof
CN105780725A (en) Overwater embankment building method
KR100619574B1 (en) The breakwater structure that mix upright breakwater and composite breakwater
KR200284920Y1 (en) Breakwater for seawater exchange
KR200204437Y1 (en) Guay wall structure which is piled up blocks equipped with facilities to absorb shock in the middle class
KR200240478Y1 (en) Breakwater structure built in cell block laying under the ground foundations.
KR200180809Y1 (en) A constructed structure of upright quay which is used caisson
KR100368621B1 (en) Guay wall structure which is piled up blocks equipped with facilities to absorb shock in the middle class

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
FPAY Annual fee payment

Payment date: 20040611

Year of fee payment: 3

LAPS Lapse due to unpaid annual fee