KR20030036283A - The integrated solution for gas pipeline planning & design - Google Patents

The integrated solution for gas pipeline planning & design Download PDF

Info

Publication number
KR20030036283A
KR20030036283A KR1020030009239A KR20030009239A KR20030036283A KR 20030036283 A KR20030036283 A KR 20030036283A KR 1020030009239 A KR1020030009239 A KR 1020030009239A KR 20030009239 A KR20030009239 A KR 20030009239A KR 20030036283 A KR20030036283 A KR 20030036283A
Authority
KR
South Korea
Prior art keywords
construction
gas
technical review
database
approval
Prior art date
Application number
KR1020030009239A
Other languages
Korean (ko)
Inventor
장승용
Original Assignee
(주)카프나
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)카프나 filed Critical (주)카프나
Priority to KR1020030009239A priority Critical patent/KR20030036283A/en
Publication of KR20030036283A publication Critical patent/KR20030036283A/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PURPOSE: A construction design integrated solution of a gas piping network is provided to reduce managing loads of construction companies by constructing a database capable of being updated continuously based on related law and regulations and to reduce a time and a cost by executing a computing process of a document job being used from an estimate to a completion of construction. CONSTITUTION: A construction company manages counting information and processes price information using a counting management and price information system(10). When a construction company calculates an equipment and a cost used in a construction by a consumer who wants to use a gas, an estimate system(20) supplies an automatic estimate. A technique examination and completion approval system(30) compares a rule of a gas business with a result calculated through a piping network interpretation system(40) based on construction plan of a user, and checks a security of a constructed equipment. A documentation system(50) prepares an electronic document including data necessary for a user based on obtained results. A database system(60) constructs a database based on technique data, a price, rules of a gas business, etc. A drawing managing system(70) manages drawings necessary for a construction design. An exterior connection application program interface(80) is provided for a linked word of application programs. An output system(90) outputs an obtained result through the estimate system(20) and data necessary for a user with a drawing adapted to a corresponding document format.

Description

가스배관망 시공설계 통합 솔루션 {The integrated solution for gas pipeline planning & design}Gas pipeline network construction design integrated solution {The integrated solution for gas pipeline planning & design}

천연가스는 공해가 거의 없는 청정에너지로서 이미 그 소비량이 급격히 증가하고 있는 실정이다. 이에 따라 도시가스사를 비롯한 가스시공업체, 가스설비업체 등 관련업체들이 지속적으로 증가하고 있으나 도시가스사를 제외한 1,2종 설비, 시공업체들은 대부분 영세업체들로서 가스공급시설의 시공에서 최종소비자의 사용 단계까지 안전성, 배관망 해석 및 관련법규에 대한 전문 지식이 매우 부족한 실정이다.Natural gas is a clean energy with little pollution, and its consumption is already rapidly increasing. As a result, related companies such as city gas companies, gas construction companies, and gas equipment companies are continuously increasing. However, most of the 1,2 type facilities and construction companies except city gas companies are small companies. Until the stage of use, there is a lack of expertise in safety, pipe network analysis and related regulations.

이런 문제점과 안전성 확보를 위해 가스안전공사에서 도시가스사업법에 의거하여 1,2차 설비 시공업체들을 대상으로 시공 전 '기술검토' 및 시공 후 '완공검사'를 실시하고 있으나 해당 업체들의 전문지식 결여로 인해 많은 비용적, 시간적 부담이 가중되고 있고 또한 데이터의 정확성과 신뢰성 및 일관성 결여 등 큰 문제점을 가지고 있다. 따라서 정확하고 신뢰성 있는 기술검토 및 완공검사와 설비시공업체들의 주기적인 안전교육만이 가스사고를 시공 초기에서부터 미연에 방지하고 사고 발생을 최소화할 수 있다.In order to secure these problems and safety, the Gas Safety Corporation conducts 'Technical Review' and 'Completion Inspection' before and after construction for the first and second facilities builders in accordance with the City Gas Business Act. This adds a lot of cost and time burden, and also has great problems such as lack of data accuracy, reliability and consistency. Therefore, only accurate and reliable technical review and completion inspection and periodic safety training of facility builders can prevent gas accidents from the beginning of construction and minimize the occurrence of accidents.

본 발명은 가스설비시공업체들의 시공견적에서부터 안전교육까지의 과정을 통합한 시스템으로 정확한 기술검토 및 완공검사 결과를 제공하며 가스 설비 시공 및 사용시 안전에 대한 신뢰성을 확고히 하는데 그 목적이 있다.The present invention is a system that integrates the process from construction estimates to safety training of gas equipment construction companies to provide accurate technical review and completion inspection results, and to ensure the reliability of the safety of gas equipment construction and use.

국내에는 비교적 짧은 가스 산업의 역사로 인해 가스설비 및 가스배관망 해석에 대한 연구 개발이 극히 미약하며 특히 가스 배관망의 시공설계를 위한 통합 솔루션은 아직 개발된 바 없다. 유럽, 미국, 일본 등 가스 산업의 역사가 길고 지속적인 연구개발이 진행된 국가들에서는 가스 관련 기술력을 상당부분 확보하고 있으나 일반적으로 설계, 도면 등의 건축학적인 부분 또는 배관망해석 부분만을 국한하여 개발되었으며, 본 발명에서 나타내는 시공 견적, 설계, 배관망해석, 안전교육 등을 포함한 가스 배관망 시공설계 통합 솔루션은 아직 없는 것으로 판단된다.Due to the relatively short history of gas industry in Korea, the research and development of gas facilities and gas pipeline network analysis is very weak. In particular, no integrated solution has been developed for the construction design of gas pipeline network. In the countries where the gas industry has long history and continuous R & D, such as Europe, the United States, and Japan, the gas-related technology has been secured to a large extent. It seems that there is no integrated solution for gas pipe network design, including construction estimation, design, pipe network analysis, and safety training.

따라서 본 발명은 가스 시공설계의 기술검토 및 완공검사의 정확성 및 신뢰성을 확보하여 가스사고를 초기에 예방할 수 있으며, 일관된 자료 관리를 통하여 기술검토 및 완공검사의 표준화를 부가적으로 달성할 수 있으리라 본다.Therefore, the present invention can prevent gas accidents early by securing the accuracy and reliability of technical review and completion inspection of gas construction design, and additionally standardize technical review and completion inspection through consistent data management. .

본 발명은 가스 배관망 시공설계를 통합적으로 관리하는 솔루션으로 시공업체들이 관리하기 어려운 관련법규를 지속적인 업데이트가 가능하도록 데이터베이스화하여 시공업체들의 관리 부담을 줄이고자 하며, 견적에서부터 완공 승인까지 사용되는 많은 서류 작업을 전산처리가 가능하도록 함으로써 시간적, 비용적인 부담을 크게 줄일 수 있다. 또한 배관망해석 시스템을 통합솔루션에 포함함으로써 복잡하지 않은 간단한 국지적인 배관들의 안전성을 검증할 수 있다.The present invention is a solution that manages the gas pipe network construction design to reduce the management burden of construction companies by continuously updating related laws that are difficult to manage by contractors, and many documents used from quotation to completion approval. Computation of work can greatly reduce the time and cost burden. In addition, by including a pipe network analysis system in the integrated solution, it is possible to verify the safety of simple, uncomplicated local pipes.

자체적으로 간단하게 회계 정보 및 부품들에 대한 물가 정보를 구축하여 시세에 맞는 견적을 제공할 수 있도록 하였다.It simply built up accounting information and price information on parts so that quotes could be provided for the market.

이러한 작업들을 일괄적으로 처리하여 정확하고 신뢰성 있으며, 일관성 있는 시공설계가 가능하도록 하는 데에 그 목적이 있다.Its purpose is to process these tasks in a batch to enable accurate, reliable and consistent construction design.

제1도는 발명의 전체 시스템 구성도이다.1 is an overall system configuration of the invention.

제2도는 본 발명의 수행 흐름도이다.2 is a flowchart of the present invention.

본 발명의 장점, 특징, 바람직한 실례는 첨부한 도면을 참조하여 상세히 설명한다.Advantages, features, and preferred examples of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 발명의 전체 시스템 구성도이다.1 is an overall system configuration diagram of the invention.

본 발명의 전체 시스템은 회계관리 및 물가정보 시스템(10)과 견적시스템(20)과 기술검토 및 완공승인 시스템(30)과 배관망 해석 시스템(40)과 문서화 시스템(50)과 데이터베이스 시스템 (60)과 도면관리 시스템(70)과 외부연결 응용프로그램 인터페이스(80)와 출력시스템(90)으로 구성된다.The overall system of the present invention is an accounting management and price information system (10), a quotation system (20), a technical review and completion system (30), a pipe network analysis system (40), a documentation system (50), and a database system (60). And a drawing management system 70, an external connection application program interface 80, and an output system 90.

회계관리 및 물가 정보 시스템(10)은 시공업체 자체적으로 회계 정보를 관리하거나 부품 및 자재들에 대한 시세 정보를 처리할 수 있다.The accounting management and price information system 10 may manage accounting information by the contractor itself or process price information on parts and materials.

견적시스템(20)은 시공업체가 가스를 사용하고자 하는 수요자의 요청에 의해 시공에 사용되는 설비 및 비용을 산정하고자 할 때 자동 견적을 제공하는 시스템으로 전문가시스템을 도입하여 초보자라도 기초 상식만을 가지고 있으면 쉽게 발주업체에 견적을 제공할 수 있도록 설계되어 있다. 기초가 되는 설비정보는 데이터베이스 시스템 내에 저장된 데이터와 연동되어 사용자가 직접 입력할 필요가 없으며 해당 설비의 가격정보는 데이터베이스 시스템 또는 해당업체의 회계관리시스템과 연동이 되도록 설계되어 있다.Estimate system 20 is a system that provides automatic estimates when a contractor wants to estimate the equipment and cost used for construction at the request of a consumer who wants to use gas. It is designed to make it easy to quote the order. The basic equipment information is linked with the data stored in the database system so that the user does not need to input it directly. The price information of the equipment is designed to be linked with the database system or the accounting management system of the company.

기술검토 및 완공승인 시스템(30)은 사용자의 시공계획 입력자료를 기준으로 하여 데이터베이스 시스템 내에 표준화 되어 저장된 도시가스사업법의 규정 및 배관망해석시스템(40)을 통하여 산출된 결과와 비교하여 시공된 설비의 안전성의 이상 유무와 기술검토 결과를 화면상에 보여준다. 기술검토결과 적정으로 판단되고 시공이 완료되면 해당업체의 설비시공완료 입력자료를 기준으로 완공승인에 대한 결과를 시뮬레이션하여 완공승인 가능 여부를 판단할 수 있다.Technical review and completion approval system 30 is standardized in the database system based on the user's construction plan input data and compared with the results calculated through the regulations of the city gas business law and pipe network analysis system 40, The safety abnormality and technical review result are displayed on the screen. If it is judged as appropriate as the result of technical review and the construction is completed, it can be judged whether the completion approval is possible by simulating the result of the completion approval based on the facility construction completed input data of the relevant company.

배관망해석시스템(40)은 설치될 가스배관망의 안전성 확보에 가장 중요한 역할을 담당하는 시스템으로서 사용자는 배관망의 안전성에 기초하는 배관설계 결과를 볼 수 있다.Pipeline network analysis system 40 is a system that plays the most important role in ensuring the safety of the gas pipe network to be installed, the user can see the pipe design results based on the safety of the pipe network.

문서화 시스템(50)은 견적시스템, 기술검토 및 완공승인 시스템을 통하여 얻어진 결과를 해당 업체 또는 가스안전공사의 문서양식에 맞추어 사용자가 필요로 하는 데이터만을 선택하여 도면관리시스템의 도면을 포함한 모든 내용을 전자 문서화 할 수 있도록 개발된 시스템이다.The documenting system 50 selects only the data required by the user according to the document form of the relevant company or the gas safety construction company, based on the results obtained through the estimation system, the technical review and the completion approval system, and displays all contents including the drawings of the drawing management system. It is a system developed for electronic documentation.

데이터베이스 시스템(60)은 설비의 기술자료, 가격, 도시가스사업법에 의한 규정 등을 데이터베이스화하여 자료의 효율적인 참조 및 보관을 할 수 있도록 설계된 시스템이다.The database system 60 is a system designed to efficiently refer to and store data by making a database of technical data, price, regulations of the city gas business law, and the like.

도면관리시스템(70)은 시공설계를 위하여 사용되는 모든 도면과 도시가스회사와 연계된 GIS 도면을 기술검토 및 완공승인 시스템에 맞추어 효율적으로 관리할 수 있도록 설계된 시스템으로 사용자는 별도의 도면을 출력하여 보관할 필요가 없다.The drawing management system 70 is a system designed to efficiently manage all drawings used for construction design and GIS drawings associated with a city gas company in accordance with a technical review and approval system. There is no need to keep it.

외부연결 응용프로그램 인터페이스(80)는 도면관리 시스템(70)에서 사용되는 설계 도면에 대한 GIS 및 AutoCAD와 같은 응용프로그램들이 연계되어 작업할 수 있도록 하는 별도의 인터페이스이다.The external connection application program interface 80 is a separate interface that allows applications such as GIS and AutoCAD to work in conjunction with design drawings used in the drawing management system 70.

출력시스템(90)은 견적시스템, 기술검토 및 완공승인 시스템을 통하여 얻어진 결과를 해당 업체 또는 가스안전공사의 문서양식에 맞추어 사용자가 필요로 하는 데이터만을 선택하여 도면관리시스템의 도면을 포함한 모든 내용을 한 번에 자동 출력할 수 있도록 개발된 시스템이다The output system 90 selects all the data including the drawings of the drawing management system by selecting only the data required by the user according to the document form of the relevant company or the gas safety corporation based on the results obtained through the estimation system, technical review, and the completion approval system. This system was developed to print automatically at one time.

도 2는 본 발명에 의한 "가스 배관망 시공설계통합 솔루션" 의 수행 흐름도이다. 여기서 S는 스텝을 나타낸다.Figure 2 is a flow chart of the "gas pipeline network construction design integrated solution" according to the present invention. Where S represents a step.

도시된 바와 같이, 회계 및 물가 정보를 이용하여 견적 시스템에 제공하는 단계(S1)와 견적 시스템을 기초로 기술 검토를 거치는 단계(S2)와 기술 검토가 끝나 완공 승인을 하는 완공승인 단계(S3)에서 국지적인 배관망에 대한 안전성을 평가하는 단계(S3-1)와 설계에 필요한 도면을 관리하는 도면관리단계(S3-2) 및 서류 작성 단계(S3-3)단계를 거치면 최종적으로 완공승인이 결정된 후 문서 출력을 하는 단계(S4)가 이루어진다.As shown, the step of providing to the quotation system using the accounting and inflation information (S1) and the step of undergoing the technical review based on the quotation system (S2) and the completion approval step (S3) for the completion of the technical review is completed. In step S3-1, the drawing management step (S3-2) and the document preparation step (S3-3), which manage the drawings required for the design, are finally approved. After step S4 of outputting the document is performed.

이상에서 상술한 본 발명 '가스 배관망 시공설계 통합 솔루션' 에 따르면 전문지식과 비용 및 시간이 부족한 영세한 설비시공업체들에 비용적, 시간적 부담을 줄이고 또한 정확한 기술검토 및 완공검사 결과를 제공함으로써 가스 설비 시공 및 사용 시 안전에 대한 신뢰성을 확고히 할 수 있으며 궁극적으로 작업 표준화를 이룰 수 있다.According to the above-mentioned 'gas pipe network construction design integrated solution' of the present invention as described above, it is possible to reduce the cost and time burden to small equipment builders who lack expertise, cost and time, and also provide accurate technical review and completion inspection results. Safety and reliability in the construction and use of the facility can be secured, and ultimately work standardization can be achieved.

Claims (6)

가스배관망 시공 설계 통합 솔루션에 있어서, 회계관리 및 물가정보 시스템과 견적 시스템과 기술검토 및 완공 승인 시스템과 배관망 해석 시스템과 데이터베이스 시스템과 문서화 시스템과 도면 관리 시스템과 외부 연결 응용프로그램 인터페이스와 출력 시스템을 포함하는 통합 시스템The integrated solution for gas pipeline network design includes accounting and price information system, quotation system, technical review and completion approval system, pipeline network analysis system, database system, documentation system, drawing management system, external application program interface and output system. Integrated system 제 1항에 있어서 상기 통합 시스템은, 전문가 시스템을 도입하여 기초 상식만으로도 쉽게 발주업체에 견적을 제공할 수 있는 견적시스템과;The system of claim 1, further comprising: an estimating system that can easily provide a quotation to the ordering company with basic common sense by introducing an expert system; 상기 제공된 견적을 이용하여 기술검토 및 완공 승인에 사용하는 시스템System used for technical review and completion approval using the quote provided above 제 1항에 있어서 상기 통합 시스템은, 사용자의 시공계획 입력자료를 기준으로 하여 데이터베이스 시스템 내에 표준화 되어 저장된 관련법규를 사용하여 시공된 설비의 안전성의 이상유무와 기술검토 결과를 화면상에 보여주는 기술 검토 및 완공승인 시스템과;According to claim 1, The integrated system, based on the input data of the construction plan of the user based on the standardized and stored in the database system using the relevant laws and regulations on the safety of the equipment constructed and technical review results showing the results of the technical review on the screen A completion approval system; 배관망 해석 시스템을 통하여 산출된 결과와 비교하여 시공된 설비의 안전성의 이상유무와 기술검토 결과를 화면상에 보여주는 기술 검토 및 완공승인 시스템.Technical review and approval system that shows on the screen whether there are any abnormalities in the safety of the installed equipment and the results of technical review compared to the results calculated through the pipe network analysis system 설치될 가스배관망의 안전성을 검증하는 배관망해석을 수행하는 배관망해석 시스템과;A pipe network analysis system for performing pipe network analysis for verifying safety of a gas pipe network to be installed; 시공설계를 위하여 사용되는 모든 도면과 도시가스회사와 연계된 GIS 도면을 기술검토 및 완공승인 시스템에 맞추어 효율적으로 관리할 수 있도록 설계된 문서화 시스템Documentation system designed to efficiently manage all drawings used for construction design and GIS drawings linked with city gas companies in accordance with technical review and approval system GIS 및 AutoCAD에서 작성된 도면을 기술 검토 및 완공승인시스템에 맞추어 효율적으로 관리할 수 있도록 설계된 도면관리시스템과;A drawing management system designed to efficiently manage drawings created in GIS and AutoCAD according to a technical review and approval system; 설비의 기술자료, 가격, 도시가스사업법에 의한 규정 등을 데이터베이스 화하여 자료의 효율적인 참조 및 보관을 할 수 있도록 설계된 데이터베이스 시스템.Database system designed to efficiently refer to and store data by making database of technical data, price, and regulations of city gas business law. 상기 1항의 시스템에서 문서화된 시스템에 의해 작성된 문서와 도면관리시스템의 정보를 사용자가 원하는 형태로 출력하기 위한 출력시스템과;An output system for outputting a document created by a system documented in the system of claim 1 and information of a drawing management system in a form desired by a user; 상기 1항의 시스템에서 외부 도면정보시스템으로부터 데이터를 변환하여 도면 관리시스템에 전달하는 외부연결 응용프로그램인터페이스를 포함하는 가스배관망 시공설계 통합솔루션.The gas piping network construction design integrated solution comprising an external connection application program interface for converting data from the external drawing information system to the drawing management system in the system of claim 1.
KR1020030009239A 2003-02-13 2003-02-13 The integrated solution for gas pipeline planning & design KR20030036283A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020030009239A KR20030036283A (en) 2003-02-13 2003-02-13 The integrated solution for gas pipeline planning & design

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030009239A KR20030036283A (en) 2003-02-13 2003-02-13 The integrated solution for gas pipeline planning & design

Publications (1)

Publication Number Publication Date
KR20030036283A true KR20030036283A (en) 2003-05-09

Family

ID=29578514

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030009239A KR20030036283A (en) 2003-02-13 2003-02-13 The integrated solution for gas pipeline planning & design

Country Status (1)

Country Link
KR (1) KR20030036283A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100981044B1 (en) * 2003-05-22 2010-09-09 두산중공업 주식회사 Integration Draw up Method Of Pipe Manufacture Drawing
KR101988040B1 (en) 2018-07-20 2019-06-10 (주)해인엔지니어링 건축사 사무소 Method for managing water feed pipelines, computer readable medium for performing the method
CN112308971A (en) * 2020-11-20 2021-02-02 上海燃气工程设计研究有限公司 Gas pipeline tracing method combined with three-dimensional visualization

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100981044B1 (en) * 2003-05-22 2010-09-09 두산중공업 주식회사 Integration Draw up Method Of Pipe Manufacture Drawing
KR101988040B1 (en) 2018-07-20 2019-06-10 (주)해인엔지니어링 건축사 사무소 Method for managing water feed pipelines, computer readable medium for performing the method
CN112308971A (en) * 2020-11-20 2021-02-02 上海燃气工程设计研究有限公司 Gas pipeline tracing method combined with three-dimensional visualization

Similar Documents

Publication Publication Date Title
Lin et al. A user-centered information and communication technology (ICT) tool to improve safety inspections
e Costa et al. Facilitating bid evaluation in public call for tenders: a socio-technical approach
Boehm Software engineering economics
Thal Jr et al. Estimation of cost contingency for air force construction projects
Marsh et al. Tackling uncertainty in life cycle assessments for the built environment: A review
Salama et al. Semantic modeling for automated compliance checking
Khoshnava et al. Potential application of BIM in construction dispute and conflict
Weshah et al. Factor analysis of the interface management (IM) problems for construction projects in Alberta
Lee et al. Simulation-based planning system for shipbuilding
Rathnayake et al. Systematic review of the literature on construction productivity
Petroutsatou et al. Road tunnels construction cost estimation: a structural equation model development and comparison
Wong et al. Modeling and forecasting construction labor demand: Multivariate analysis
Olsina et al. Towards a reusable repository for web metrics
KR20030036283A (en) The integrated solution for gas pipeline planning & design
KR102103970B1 (en) Automatic calculation server and method of piping quantity
Liu et al. Holistic framework for highway construction cost index development based on inconsistent pay items
Kim et al. Improvement of facility condition assessment processes using BIM data
Lam et al. Framework procurement for highways maintenance in the UK: can it offer value for money for public-sector clients?
GóMEZ et al. Data defects in material flow networks—classification and approaches
KR20080036471A (en) The management method of safety evaluation procedure in nuclear power plants facilities
Kehily et al. Linking effective whole life cycle cost data to parametric building information models using BIM technologies
Johnston et al. Implementation of a property standard index
Rees Environmental Product Declarations-The importance of climate-based metrics for production and purchasing
Martina et al. Design of evaluation tool used to improve the production process
Azhar et al. Development of an Integrated Cost Estimation and Cost Control System for Construction Projects