KR20030014002A - Construction method and apparatus for enforcement of bridge beam - Google Patents

Construction method and apparatus for enforcement of bridge beam Download PDF

Info

Publication number
KR20030014002A
KR20030014002A KR1020010048315A KR20010048315A KR20030014002A KR 20030014002 A KR20030014002 A KR 20030014002A KR 1020010048315 A KR1020010048315 A KR 1020010048315A KR 20010048315 A KR20010048315 A KR 20010048315A KR 20030014002 A KR20030014002 A KR 20030014002A
Authority
KR
South Korea
Prior art keywords
bracket
bridge
bridge beam
saddle
brackets
Prior art date
Application number
KR1020010048315A
Other languages
Korean (ko)
Other versions
KR100440622B1 (en
Inventor
박재만
Original Assignee
박재만
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박재만 filed Critical 박재만
Priority to KR10-2001-0048315A priority Critical patent/KR100440622B1/en
Publication of KR20030014002A publication Critical patent/KR20030014002A/en
Application granted granted Critical
Publication of KR100440622B1 publication Critical patent/KR100440622B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Abstract

PURPOSE: A reinforcing method of a bridge beam is provided to simplify reinforcing works without damaging the existing bridge structure. CONSTITUTION: The reinforcing method of a bridge beam comprises the steps of: installing a steel plate joint bracket(50) on both outer sides of adjacent outer bridge beams(3,4); installing saddle brackets(7,8) to both inner sides of the bridge beams(3,4) respectively; installing saddle brackets(7,8) to both sides of adjacent inner bridge beams(3,4); fastening the facing saddle brackets(7,8) with steel bars(16); installing support brackets to the middle lower end of the bridge beams(3,4); installing a sheath pipe to the steel pipe joint bracket(50) and the saddle brackets(7,8) through the support brackets; interposing a steel wire in the sheath pipe; and tensioning both ends of the steel wire to compensate deflection.

Description

교량빔의 보강공법 및 그 장치{CONSTRUCTION METHOD AND APPARATUS FOR ENFORCEMENT OF BRIDGE BEAM}Bridge beam reinforcement and its device {CONSTRUCTION METHOD AND APPARATUS FOR ENFORCEMENT OF BRIDGE BEAM}

본 발명은 교량빔의 보강공법 및 그 장치에 관한 것으로서 특히, 강판의 양단에 용접된 브라켓을 갖는 강판이음브라켓과 새들 브라켓을 이용하여 교량을 구성하는 교량빔의 양측을 고정하고, 새들브라켓에는 강봉을 끼워 고정함으로써 충분한 인장력을 견딜 수 있도록 하고, 아울러 기존의 교량 구조물에 손상을 주지않는 상태로 보강작업을 간단 용이하게 할 수 있도록 한 것이다.The present invention relates to a bridge beam reinforcement method and apparatus thereof, in particular, by fixing both sides of the bridge beam constituting the bridge by using a steel plate joint bracket and a saddle bracket having a bracket welded to both ends of the steel sheet, a steel bar to the saddle bracket It is to make it easy to endure the reinforcement work without damaging the existing bridge structure by inserting and fixing it.

일반적으로 교량은 설치 된 후에 여러 가지 외적 요인(단면부족에 따른 처짐변형, 차량의 대형화, 통행량의 급증, 교량빔의 노후화)에 따라 그 수명이 단축되거나 설치된 교량이 끊어지는 사고가 발생하고 있다.In general, after the bridge is installed, the life of the bridge is shortened or the installed bridge is broken due to various external factors (sag deflection due to lack of cross section, vehicle size increase, traffic volume increase, and age of bridge beam).

이러한 사고를 방지하고, 교량의 수명을 연장시키기 위한 수단으로 보수하고자 하는 교량빔의 양측에 관통공을 천공하여 철근을 매설하고, 노출된 철근의 양측에 다른 철근이 교차되도록 역어 콘크리트가 타설된 지지부를 구비한 다음 지지부에 장착구를 구비하여 여러 가닥의 강선을 고정한 후 인장장치를 이용하여 처진 교량빔이 수평상태가 유지되도록 인장시키는 보수방법이 있다.As a means to prevent such accidents and to extend the life of the bridge, the reinforcing bars are embedded by drilling through-holes on both sides of the bridge beam to be repaired, and the supporting part on which the reinforcing concrete is poured so that the other bars cross on both sides of the exposed rebar. After fixing the steel wire of several strands with a mounting hole in the support portion there is a repair method to tension the sagging bridge beam to maintain the horizontal state using a tensioning device.

상기한 보수방법은 교량빔의 양측에 관통공을 천공하여 철근을 삽입하고, 양측으로 노출된 철근에 다른 철근을 역어 콘크리트를 타설시키는 과정에서 많은 인력과 시공 기간이 길어지는 원인이 있었고, 관통공을 천공하는 과정에서 내부에 구비된 철근이나 강선이 끊어지거나 파손됨으로써 교량빔의 강성이 낮아지는 또 다른 문제점이 있었다.The above repair method caused a lot of manpower and construction period in the process of placing concrete by drilling through-holes on both sides of the bridge beam, and placing concrete on the rebars exposed to both sides. In the process of drilling, there was another problem that the rigidity of the bridge beam is lowered by breaking or breaking the reinforcing bars or steel wires provided therein.

이러한 교량빔의 보수방법에 문제점을 해소하기 위한 수단으로 본 출원인이 개발한 등록특허 제0141551호의 " 교량 빔의 보수방법 및 보수장치"가 제안되었다.As a means for solving the problems in the method of repairing the bridge beam has been proposed a "repair method and repair device for the bridge beam" of the Patent No. 0141551 developed by the present applicant.

제안된 교량 빔의 보수방법은 처짐 변형의 보정 및 강성을 보강하는 교량빔의 길이 방향 양단부에 철제 지지 브래키트를 각각 설치하는 단계와, 교량빔의 중간부 및 그 양측부에 복수개의 중간지지 브래키트를 설치하는 중간지지 브래키트 설치단계와, 상기 중간지지 브래키트에 강연선의 중간부를 지지 안내시키고 강연선의 양단부를 상기 철제 지지 브래키트에 고정되는 정착부재를 통하여 관출 지지시키는 강연선 설치단계와, 상기 강연선의 양단부를 인장시켜 교량빔의 처짐을 보정하는 처짐 보정단계로 구성되어 있다.The proposed bridge beam repair method includes the steps of installing steel support brackets on both ends of the bridge beam in the longitudinal direction of the bridge beam to correct the deflection deformation and reinforce the rigidity, and a plurality of intermediate support brackets in the middle of the bridge beam and both sides thereof. An intermediate support bracket installation step of installing a kit, and a strand support installation step of guiding and supporting the intermediate part of the stranded wire to the intermediate support bracket and observing and supporting both ends of the stranded wire through the fixing member fixed to the steel support bracket; It consists of a deflection correction step of correcting deflection of the bridge beam by tensioning both ends of the strand.

또한 교량빔의 보수장치는 교량빔의 양단부에 고정되는 철제 지지 브래키트와, 교량빔의 중간부 하측에 고정되는 복수개의 철제 중간지지 브래키트와, 상기 철제 지지 브래키트에 고정 설치되는 정착부재와, 상기 중간지지 브래키트의 중간부에 지지되고 그 양단부가 상기 철제 지지 브래키트에 설치된 정착부재에 의해 긴장상태로 고정되는 강연선으로 구성되어 있다.In addition, the repair device for the bridge beam includes an iron support bracket fixed to both ends of the bridge beam, a plurality of iron intermediate support brackets fixed below the middle of the bridge beam, and a fixing member fixed to the iron support bracket. And a stranded wire which is supported at an intermediate portion of the intermediate supporting bracket, and both ends thereof are fixed in a tensioned state by a fixing member provided in the steel supporting bracket.

그러나 이러한 교량 빔의 보수방법 및 보수장치는 교량빔에 가로보가 없는 경우와 단순보의 형태에는 적용하기가 매우 효과적이나, 철제지지 브래키트를 설치하는 과정에서 연속화된 교량 빔의 경우에는 교량빔과 교량빔 사이에 연속화된 콘크리트 부분을 제거 하여야 하므로 교량 구조물이 심하게 파손됨으로써 교량 빔의 수명을 단축시키는 문제점이 있었고, 또한 교량빔과 교량빔 사이에 가로보가 구비된 경우에는 가로보가 심하게 파손됨으로써 교량빔의 강도가 낮아져 사고 위험이 높아지고, 공사기간이 길어져 공사비가 증가되는 또 다른 문제점이 있었다.However, the repair method and the repairing device of the bridge beams are very effective to apply to the beam beams without cross beams and simple beams. However, in the case of the bridge beams that are continuous in the process of installing the steel support brackets, Since the concrete parts between the bridge beams must be removed, the bridge structure is severely damaged, which shortens the life of the bridge beam, and in the case where the cross beam is provided between the bridge beam and the bridge beam, the cross beam is severely broken so that the bridge beam is damaged. There was another problem that the intensity of the accident is lowered, the risk of accidents are increased, and the construction period is increased, thereby increasing the cost of construction.

본 발명은 이와 같은 문제점을 해소하기 위해 안출한 것으로서 강판의 양단에 용접된 브라켓을 갖는 강판이음브라켓을 교량빔의 양단 외측에 고정하고, 새들브라켓을 교량빔의 양단 내측에 각각 고정하여 기존 교량 구조물에 손상을 거의 주지않는 상태로 보강작업을 용이하게 하도록 하여 교량빔의 수명을 연장 시키도록 하고, 이로인한 공사기간과 공사비를 줄여 효율적인 작업을 위한 교량빔의 보강공법 및 그 장치를 제공하는데 그 목적이 있다.The present invention has been made in order to solve such a problem as fixing the steel plate joint bracket having a bracket welded to both ends of the steel sheet on the outside of both ends of the bridge beam, and fixing the saddle bracket on both sides of the bridge beam inside the existing bridge structure The purpose of the present invention is to provide a bridge beam reinforcement method and a device for efficient work by reducing the construction period and construction cost by making the bridge beam easy to extend the lifespan of the bridge beam. have.

이와 같은 목적을 달성하기 위한 본 발명은 교량빔의 양단에 철제 지지 브래키트를 설치하는 단계와, 중간부 및 그 양측부에 중간지지 브래키트를 설치하는 단계와, 상기 중간지지 브래키트와 양단 지지 브래키트에 고정되는 장착부재를 통하여 관출 지지시키는 강연선을 설치하는 단계와, 상기 강연선의 양단을 인장시켜 빔의 처짐을 보정하는 처짐 보정단계로 구성된 교량빔의 보강공법에 있어서,The present invention for achieving the object of the present invention comprises the steps of installing the iron support brackets on both ends of the bridge beam, the intermediate portion and the intermediate support brackets on both sides thereof, the intermediate support brackets and both ends support In the bridge beam reinforcement method comprising the step of installing a strand to support the support through the mounting member fixed to the bracket and the deflection correction step of correcting the deflection of the beam by tensioning both ends of the strand,

강판의 양측단에 제 1,2브라켓을 용접이음한 강판이음브라켓을 설치하는 단계와; 새들 브라켓을 설치하는 단계와; 새들 브라켓을 강봉으로 체결하는 단계와; 강판이음브라켓과 새들 브라켓에 에폭시를 주입하는 단계와; 받침 브라켓을 설치하는 단계와; 교량빔의 하단부에 받침 브라켓을 고정하는 단계와; 가로보에 관통공을 천공하여 새들 브라켓 사이로 강봉을 체결하는 단계와; 받침브라켓을 경유하여 강판이음브라켓과 새들 브라켓에 쉬스관을 설치하는 단계와; 쉬스관 내에 강연선을 삽입하는 단계와; 강연선의 양단부를 인장시켜 교량빔의 처짐을 보정하는 단계로 구성된 것을 특징으로 하는 교량빔의 보강공법을 제공함에 달성된다.Installing steel plate fitting brackets welded to the first and second brackets at both ends of the steel sheet; Installing a saddle bracket; Fastening the saddle bracket with a steel bar; Injecting epoxy into the steel plate bracket and the saddle bracket; Installing a support bracket; Fixing a support bracket to a lower end of the bridge beam; Fastening a steel bar between the saddle brackets by drilling a through hole in the cross beam; Installing a sheath tube on the steel plate fitting bracket and the saddle bracket via the support bracket; Inserting the strand into the sheath tube; It is achieved by providing a method for reinforcing a bridge beam, characterized in that it comprises a step of correcting the deflection of the bridge beam by tensioning both ends of the strand.

도 1은 본 발명에 따른 보강장치가 설치된 교량빔의 정면도.1 is a front view of a bridge beam is installed reinforcement device according to the invention.

도 2는 본 발명에 따른 보강장치가 설치된 교량빔의 평면도.2 is a plan view of a bridge beam is installed reinforcement device according to the invention.

도 3은 본 발명에 따른 보강장치가 교량빔의 외측면에 설치된 상태를 도시한 요부 확대 정면도.Figure 3 is an enlarged front view of the main portion showing a state in which the reinforcing device according to the present invention is installed on the outer surface of the bridge beam.

도 4는 본 발명에 따른 교량빔의 외측면에 설치된 보강장치의 분해 사시도.Figure 4 is an exploded perspective view of the reinforcement device installed on the outer surface of the bridge beam according to the present invention.

도 5는 본 발명에 따른 보강장치가 교량빔의 내측면에 설치된 상태를 도시한 요부 확대 배면도.Figure 5 is an enlarged rear view of the main portion showing a state in which the reinforcing device according to the present invention is installed on the inner surface of the bridge beam.

도 6은 본 발명에 따른 교량빔의 내측면에 설치된 보강장치의 분해 사시도.Figure 6 is an exploded perspective view of the reinforcement device installed on the inner surface of the bridge beam according to the present invention.

도 7은 본 발명에 따른 다른 보강장치가 설치된 상태를 도시한 교량빔의 평면도.7 is a plan view of a bridge beam showing a state in which another reinforcing device is installed according to the present invention.

<도면의 주요 부분에 대한 부호의 간단한 설명><Brief description of symbols for main parts of the drawings>

3.4:교량빔 5,6:제 1,2브라켓3.4: bridge beams 5, 6: 1 and 2 bracket

7,8:새들 브라켓 9:작업관통공7,8: Saddle Bracket 9: Work Through

10:고정볼트 11,12,13:받침 브라켓10: Fixing bolt 11, 12, 13: Support bracket

14:가로보 15:관통공14: Garbo 15: Through-through

16:제 1강봉 17:에폭시 수지16: First steel bar 17: Epoxy resin

18:쉬스관 19:강선18: Sheath Building 19: Steel wire

50:강판이음브라켓 60,61:새들 브라켓50: Steel joint bracket 60, 61: Saddle bracket

이하 본 발명의 실시예를 첨부 도면을 참조하여 설명하면 다음과 같다.Hereinafter, an embodiment of the present invention will be described with reference to the accompanying drawings.

본 발명에 따른 교량빔의 보강장치(1)는 도 1 내지 도 6에 도시된 바와 같이 교각(2)의 윗부분에 안착된 교량빔(3)(4)의 양단을 외측에서 고정하는 강판이음브라켓(50)과, 강판이음브라켓(50)과 마주하는 교량빔(3)(4)의 내측에 고정된 새들 브라켓(7)(8)과, 상기 강판이음브라켓(50)과 새들 브라켓(7)(8)을 교량빔(3)(4)에 작업관통공(9)을 이용하여 양측에서 동시에 고정하도록 지지력을 확보하는 고정수단인 고정볼트(10)와, 교량빔(3)(4)의 중앙부 하측에 소정 간격을 갖도록 고정된 다수의 받침 브라켓(11)(12)(13)과, 가로보(14)에 천공된 관통공(15)에 삽입되어 새들 브라켓(7)(8)의 양측에 고정된 제 1강봉(16)과, 강판이음브라켓(50)과 새들 브라켓(7)(8)의 부식을 방지하고 동시에 고착력을 높이도록 주입되는 에폭시수지(17)와, 받침브라켓(11)(12)(13)을 경유하여 강판이음브라켓(50)과 새들 브라켓(7)(8)에 설치된 쉬스관(18)과, 상기 쉬스관(18)에 삽입되는 강연선(19)으로 구성되며 쉬스관에는 방청 및 윤활을 위하여 구리스가 주입된다.Reinforcement device 1 of the bridge beam according to the present invention is a steel plate bracket for fixing both ends of the bridge beam (3) (4) seated on the upper portion of the bridge (2) as shown in Figs. (50), a saddle bracket (7) (8) fixed inside the bridge beam (3) (4) facing the steel plate fitting bracket (50), the steel plate fitting bracket (50) and the saddle bracket (7) Fixing bolt 10, which is a fixing means for securing the support force to secure (8) to the bridge beam (3) (4) at the same time on both sides by using a working through hole (9), and the bridge beam (3) (4) It is inserted into a plurality of support brackets 11, 12, 13 fixed to a predetermined distance below the center portion and through holes 15 drilled in the cross beams 14 on both sides of the saddle brackets 7, 8, respectively. Epoxy resin 17, which is injected to prevent the corrosion of the fixed first steel bar 16, the steel plate fitting bracket 50 and the saddle bracket (7) (8) and at the same time to increase the fixing force, and the support bracket (11) (12) (13) Steel plate joints via Sheath pipe (18) installed in the jacket 50 and saddle bracket (7) (8) and the strand wire (19) inserted into the sheath pipe (18), the sheath pipe is injected with grease for rust prevention and lubrication. .

여기에서 상기 강판이음브라켓(50)은 도 4에 도시된 바와 같이 소정 면적을갖는 강판(20)의 양단에 제 1,2브라켓(5)(6)이 용접이음으로 일체로 구비된 것으로서, 가변되는 교량빔(3)(4)의 사이 간격에 따라 강판(20)의 길이를 조절하여 적절하게 연결시킬 수 있도록 되어 있다.Here, the steel plate fitting bracket 50, as shown in Figure 4, as the first and second brackets 5, 6 are integrally provided as a welded joint at both ends of the steel plate 20 having a predetermined area, variable The length of the steel sheet 20 can be adjusted according to the distance between the bridge beams 3 and 4 to be properly connected.

또한 제 1브라켓(5)은 외측으로 노출되는 측면에 길이를 달리하는 삼각형태를 갖는 다수의 제 1보강부재(21)가 마주보도록 구비되어 있고, 방향을 달리하는 제 1보강부재(21)의 사이에는 제 1걸림공(22)이 형성된 제 1지지부재(23)가 일체로 구비되어 있다.In addition, the first bracket 5 is provided with a plurality of first reinforcing members 21 having a triangular shape with a different length on the side exposed to the outside, the first reinforcing members 21 of different directions Between the first supporting member 23 is formed integrally with the first locking hole (22).

그리고 제 1보강부재(21)가 구비된 제 1브라켓(5)의 전면에는 다수의 구멍(24)이 형성되어 있어 앵커볼트(25)를 이용하여 교량빔(3)(4)의 측면에 견고하게 고정되도록 구비되어 있다.In addition, a plurality of holes 24 are formed on the front surface of the first bracket 5 provided with the first reinforcing member 21, so that the anchor bolt 25 is used to secure the side surfaces of the bridge beams 3 and 4. It is provided to be fixed.

또한 제 1브라켓(5)의 자유단측으로는 상기 고정볼트(10)가 삽입되는 삽입공(26)이 일체로 형성되어 있고, 이러한 동일한 형태를 갖는 제 2브라켓(6)이 강판(20) 중앙을 기준으로 대칭되도록 구비되어 있다.In addition, an insertion hole 26 into which the fixing bolt 10 is inserted is integrally formed at the free end side of the first bracket 5, and the second bracket 6 having the same shape is formed in the center of the steel plate 20. It is provided to be symmetrical with respect to.

상기 새들 브라켓(7)(8)은 도 6에 도시된 바와 같이 직사각형의 형태를 갖는 패널(27)의 일측면에 길이를 달리하는 삼각형태를 갖는 다수의 제 2보강부재(28)가 마주보도록 구비되어 있고, 제 2보강부재(28) 사이는 제 2걸림공(29)이 형성된 제 2지지부재(30)와 고정볼트 삽입공(27a)이 일체로 구비되어 있다.As shown in FIG. 6, the saddle brackets 7 and 8 face a plurality of second reinforcing members 28 having triangular shapes with different lengths on one side of the panel 27 having a rectangular shape. It is provided, between the second reinforcing member 28 is provided with a second support member 30 and the fixing bolt insertion hole (27a) is formed integrally with the second locking hole (29).

또한 제 2보강부재(28)가 구비된 패널(27)의 전면에는 다수의 구멍(31)이 형성되어 있어 앵커볼트(32)를 이용하여 교량빔(3)(4)의 측면에 견고하게 고정되도록 구비되어 있다.In addition, a plurality of holes 31 are formed on the front surface of the panel 27 provided with the second reinforcing member 28 so as to be firmly fixed to the side surfaces of the bridge beams 3 and 4 using the anchor bolts 32. It is provided to be.

그리고 제2지지부재(30)와 마주보는 방향으로 제 3보강부재(33)와 이를 연결하는 제 3걸림공(34)이 형성된 제 3지지부재(35)가 구비되어 있다.The third support member 35 is provided with a third reinforcing member 33 and a third catching hole 34 connecting the second reinforcing member 33 in a direction facing the second support member 30.

상기 제 1강봉(16)은 양측단에 너트(36)를 결합시키기 위한 수단으로 소정의 길이를 갖는 나사부(37)가 일체로 형성되어 있다.The first steel bar 16 is a means for coupling the nut 36 to both ends is formed integrally with a screw portion 37 having a predetermined length.

이러한 제 1강봉(16)은 상기 새들 브라켓(7)을 구성하는 제 3지지부재(35)의 제 3걸림공(34)에 삽입된 상태로 너트(36)를 조여 교량빔(3)(4)을 측면에서 고정하도록 구비되어 있고, 이때 교량빔(3)(4)의 내측면에 가로보(14)가 구비된 경우에는 관통공(15)을 천공하여 제 1강봉(16)이 설치되도록 구비되어 있다.The first steel bar 16 is the bridge beam (3) (4) by tightening the nut 36 in the state inserted into the third catching hole 34 of the third support member 35 constituting the saddle bracket (7) ) Is fixed to the side, and when the cross beam 14 is provided on the inner surface of the bridge beam (3) (4), the through hole 15 is drilled so that the first steel bar (16) is installed. It is.

상기 고정볼트(10)는 양측단에 소정의 길이를 갖는 나사산(38)이 구비되어 있어 교량빔(3)(4)에 인양등 작업을 위한 작업관통공(9)이 설치 된 곳에 삽입한 다음 제 1브라켓(5)의 삽입공(26)과 패널(27)의 삽입공(27a)을 끼운 후 와셔(39)와 너트(40)를 이용하여 견고하게 고정하는 기능을 갖도록 구비되어 있다.The fixing bolt 10 is provided with a thread 38 having a predetermined length at both ends thereof, and then inserted into the bridge beams 3 and 4 where the work through holes 9 for lifting work are installed. After inserting the insertion hole 26 and the insertion hole 27a of the panel 27 of the first bracket 5 is provided to have a function of firmly fixing using the washer 39 and the nut 40.

상기 강판이음브라켓(50)의 제 1걸림공(22)과, 새들 브라켓(7)(8)의 제 2걸림공(29)에 설치된 쉬스관(18)에 삽입된 강연선은 인장된 후 정착부재(41)에서 정착된다.The strand wire inserted into the sheath pipe 18 installed in the first catching hole 22 of the steel plate fitting bracket 50 and the second catching hole 29 of the saddle brackets 7 and 8 is tensioned and then a fixing member. It is settled at 41.

이와 같이 구성된 본 발명에 따른 교량빔의 보강공법 및 그장치는 다음과 같다.Bridge beam reinforcement method and the device according to the present invention configured as described above are as follows.

먼저 보강하고자 하는 교량의 교량빔의 처짐 정도를 측정한 다음 측정된 값을 바탕으로 외측면에 길이를 달리하는 삼각형태를 갖는 다수의 제 1보강부재(21) 사이로 제 1걸림공(22)이 형성된 제 1지지부재(23) 및 전면에 삽입공(26)과 다수의제 1구멍(24)이 구비된 제 1,2브라켓(5)(6)을 소정 길이의 강판(20)의 양측단에 용접작업을 통해 강판이음브라켓(50)을 준비한다.First, the degree of deflection of the bridge beam of the bridge to be reinforced is measured, and then, based on the measured value, the first catching hole 22 is interposed between the plurality of first reinforcing members 21 having a triangular shape with different lengths on the outer surface. The first and second brackets 5 and 6 having the first supporting member 23 and the insertion hole 26 and the plurality of first holes 24 formed on the front surface are formed at both ends of the steel sheet 20 having a predetermined length. Prepare the steel plate fitting bracket 50 by welding.

다음 패널(27)의 일측면에 다수의 제 2보강부재(28) 사이에 제 2걸림공 (29)이 형성된 제 2지지부재(30)와 삽입공(27a)이 일체로 구비되어 있고, 삼각형태를 갖는 제 3보강부재(33)와 이를 연결하는 제 3걸림공(34)이 형성된 제 3지지부재 (35)가 일체로 구비된 새들 브라켓(7)(8)을 준비한다.Next, the second support member 30 and the insertion hole 27a having the second catching hole 29 formed between the plurality of second reinforcing members 28 on one side of the panel 27 are integrally provided, A saddle bracket (7) (8) having a third reinforcing member (33) having a shape and a third supporting member (35) having a third catching hole (34) connecting the same is prepared.

그리고 교량빔(3)(4)의 하단부에 고정되는 받침 브라켓(11)(12)(13)을 준비한다.Then, the support brackets 11, 12, 13 are prepared to be fixed to the lower end of the bridge beam (3) (4).

다음 외부 교량빔(3)(4)에 작업관통공(9)을 이용하여 고정볼트(10)로 강판이음브라켓 (50)은 교량빔(3)(4)의 외측에, 새들 브라켓(7)(8)을 교량빔(3)(4)의 내측에 고정하도록 한다.Next, the steel plate fitting bracket 50 is fixed to the outside of the bridge beams 3 and 4 by the fixing bolt 10 using the working through holes 9 to the outside bridge beams 3 and 4, and the saddle brackets 7. (8) is fixed to the inside of the bridge beam (3) (4).

다음 외부교량빔의 양단 외측에 강판이음브라켓(50)을 고정하고 외부교량빔의 내측에는 새들 브라켓(7)(8)을 각각 앵커볼트(25)(32)로 견고하게 고정시키고, 다음 가로보(14)에 관통공(15)을 천공하여 새들 브라켓(7)(8)의 제 3지지부재(35)에 형성된 제 3걸림공(34) 사이로 연결용 제 1강봉(16)을 끼운 후 너트(36)로 조여 고정한다. 다음 브라켓에 에폭시 수지를 주입하여 부식을 방지하고 고착력을 높힌다.Next, the steel plate fitting brackets 50 are fixed to the outside of both ends of the outer bridge beam, and the saddle brackets 7 and 8 are firmly fixed to the anchor bolts 25 and 32, respectively, inside the outer bridge beam. 14 and the first steel bar 16 for connection between the third locking hole 34 formed in the third support member 35 of the saddle bracket (7) (8) by drilling the through hole (15). Tighten with 36) to fix. Next, epoxy resin is injected into the bracket to prevent corrosion and increase adhesion.

교량빔(3)(4)의 중간 하단부에 준비된 받침 브라켓 (11)(12)(13)을 고정시킨다.Fix the support brackets (11) (12) (13) prepared in the middle lower end of the bridge beam (3) (4).

내부 교량빔(3)(4)에도 브라켓 설치 작업을 하게 되는데 내부 교량빔(3)(4)에는 가로빔(14)이 형성되어 있으므로 강판이음브라켓(50)을 사용 할 수 없고 새들 브라켓(7)(8) 만을 이용하여 상기와 같은 작업을 하게 된다.Bracket installation is also performed on the inner bridge beams (3) and (4). Since the horizontal beams (14) are formed on the inner bridge beams (3) and (4), the steel plate joint brackets (50) cannot be used and the saddle brackets (7). Only with (8) will the above operation.

다음 받침브라켓을 경유하여 강판이음브라켓(50)의 제 1지지부재(23)에 형성된 제 1걸림공(22)과 새들 브라켓(7)(8)에 구비된 제 2걸림공(29)을 갖는 제 2지지부재(30)에 쉬스관(18)을 설치한다.Next, the first catching hole 22 formed in the first supporting member 23 of the steel plate fitting bracket 50 and the second catching hole 29 provided in the saddle brackets 7 and 8 via the support bracket. The sheath tube 18 is installed in the second support member 30.

다음 쉬스관 내에 강연선(19)을 삽입하고 방청과 윤활을 위하여 구리스를 주입한다.Next, the strand wire 19 is inserted into the sheath tube and grease is injected for rust prevention and lubrication.

강연선(19)이 설치된 상태에서 강연선(19)의 양단부를 인장시켜 교량빔(3)(4)의 처짐을 보정하는 것으로 작업이 완료된다.The work is completed by correcting the deflection of the bridge beams 3 and 4 by tensioning both ends of the strand 19 in the state where the strand 19 is installed.

이웃하는 교량빔(3)(4)의 양단에 강판이음브라켓(50) 및 새들 브라켓(7)(8)을 설치하고 강연선(19)의 양단부를 인장시켜 처짐을 보정 한 후에는 교량빔에 압축력이 작용하고 브라켓의 앵커볼트에는 인장력이 작용하게 되는데 교량빔(3)(4)의 양단에 브라켓이 설치되어 있으므로 브라켓에서 양쪽 인장의 힘이 상쇄 되므로서 앵커볼트(25)(32)를 적게 사용 할 수가 있으므로 교량빔 단부의 손상이 적다.After installing the steel plate fitting brackets 50 and the saddle brackets 7 and 8 at both ends of the adjacent bridge beams 3 and 4 and tensioning both ends of the strand 19, the deflection force is applied to the bridge beams. This acts and the tensioning force is applied to the anchor bolts of the bracket. Since the brackets are installed at both ends of the bridge beams (3) and (4), the anchor bolts (25) (32) are used less because the tension of both tensions in the bracket is canceled. As a result, damage to the bridge beam end is less likely.

또한 인장작업을 통해 교량빔의 저침을 보정한 다음, 기간이 경과되어 다시 처짐이 생겼을 경우, 강연선이 쉬스관 내에 삽입되어 있고 쉬스관 내에는 구리스가 주입되어 있으므로 강연선에 녹이 생기지 않아 다시 보정이 가능함으로써 교량의 수명을 그 만큼 연장시킬 수 있게 된다.In addition, after correcting the low beam of bridge beam through tensioning, if the deflection occurs after a period of time, the strand is inserted into the sheath tube and grease is injected into the sheath tube so that the strand cannot be rusted. As a result, the life of the bridge can be extended by that much.

한편 본 발명에서는 교량빔의 외측에 강판으로 연결된 강판이음브라켓(50)을 사용하였으나 도 7에 도시된 바와 같이 교량빔의 내측에 구비되는 새들 브라켓을교량빔(3)(4)의 외측에 각각 설치하고 강봉으로 체결하여 사용할 수 있다.Meanwhile, in the present invention, a steel plate fitting bracket 50 connected to the outside of the bridge beam is used. However, as illustrated in FIG. 7, saddle brackets provided on the inside of the bridge beam are disposed on the outside of the bridge beams 3 and 4, respectively. It can be installed and fastened with steel rods.

이는 교량빔(3)(4)의 내,외측에 고정된 새들 브라켓(60)(61)과, 교량빔(3)(4)의 양측단 중앙으로 부터 외측방향으로 소정 간격을 갖도록 고정된 미도시한 받침 브라켓과, 교량빔(3)(4) 내측의 가로보(14)에 천공된 제 4관통공(55)에 삽입되어져 새들 브라켓(60)에 고정된 제 2강봉(56)과, 교량빔(3)(4)의 외측에 구비된 새들 브라켓(61)에 고정된 제 3강봉(57)과, 새들 브라켓(60)(61)에 주입된 에폭시 수지(58)와, 받침브라켓을 경유하여 새들 브라켓(60)(61)에 설치된 쉬스관(59)과, 쉬스관(59) 내에 삽입된 미도시한 강연선으로 구성된다.This is a saddle bracket (60) 61 fixed to the inside and the outside of the bridge beam (3) (4), and the United States fixed so as to have a predetermined distance in the outward direction from the center of both ends of the bridge beam (3) (4) A second steel bar 56 inserted into the supporting bracket and the fourth through hole 55 perforated in the cross beam 14 inside the bridge beam 3 and 4 and fixed to the saddle bracket 60; Via the third steel bar 57 fixed to the saddle bracket 61 provided on the outside of the beam (3) (4), the epoxy resin 58 injected into the saddle bracket (60) (61), and the support bracket It consists of a sheath pipe (59) installed in the saddle brackets (60, 61), and a strand not shown inserted into the sheath pipe (59).

또한 이러한 새들 브라켓(60)(61)을 이용하여 교량빔(3)(4)을 보정하는 방법은 전기한 바와 같은 새들 브라켓(60)(61)과 받침 브라켓(11)(12)(13)을 설치한 다음 교량빔(3)(4)에 설치된 작업관통공(70)에 고정볼트(53)로 새들 브라켓(60)(61)을 교량빔(3)(4)의 내외측에 고정하도록 하고, 각각의 새들 브라켓(60)(61)을 앵커볼트(62)로 고정시킨다.In addition, the method for calibrating the bridge beam (3) (4) by using the saddle bracket (60), 61, saddle bracket (60) 61 and the support bracket (11) (12) (13) as described above And then fix the saddle brackets 60 and 61 to the inside and outside of the bridge beams 3 and 4 with fixing bolts 53 in the working through holes 70 installed in the bridge beams 3 and 4. And, each saddle bracket 60, 61 is fixed with an anchor bolt 62.

가로보(14)에 제 4관통공(55)을 구비하여 새들 브라켓(60) 사이로 제 2강봉(56)을 설치한다.Fourth through holes 55 are provided in the cross beams 14 to install second steel bars 56 between the saddle brackets 60.

다음 새들 브라켓(60)(61)에 에폭시 수지(58)를 주입하고, 받침브라켓을 경유하여 새들 브라켓(60)(61)에 쉬스관(59)을 설치한다.Next, the epoxy resin 58 is injected into the saddle brackets 60 and 61, and the sheath pipe 59 is installed in the saddle brackets 60 and 61 via the support bracket.

그리고 쉬스관(59) 내에 강연선으로 삽입하고, 삽입된 강연선의 양단부를 인장시켜 교량빔(3)(4)의 처짐을 보정하는 것으로 완료된다.And it inserts in a sheath line in the sheath tube 59, and complete | finished by correcting the deflection of the bridge beams 3 and 4 by tensioning the both ends of the inserted strand.

이상에서 살펴 본 바와 같이 본 발명은 강판의 양단에 용접된 브라켓을 갖는 강판이음브라켓과 새들 브라켓을 연속화된 교량을 구성하는 교량빔의 양측에 고정수단으로 고정하고, 교량빔 시공시 새들 브라켓에 강봉을 끼워 고정함으로써 기존에 설치된 교량을 구성하는 가로보 등 교량 구조물에 큰 손상을 주지않은 상태로 보강작업을 용이하게 할 수 있도록 하고, 또 이웃하는 교량빔의 양단에 강판이음브라켓 및 새들브라켓을 설치하고 강봉으로 체결하고, 또는 이웃하는 교량빔의 양단에 새들 브라켓을 각각 설치하고 강봉으로 체결 하므로서, 강연선의 양단부를 인장시켜 처짐을 보정 한 후에는 교량빔에는 압축력이 작용하고 반면에 교량빔의 양단에 고착된 브라켓의 앵커볼트에는 인장력이 발생하므로 브라켓에서 양쪽 인장의 힘이 상쇄 되므로서 브라켓을 고정하는 앵커볼트를 적게 사용할 수 있으므로 교량빔 단부에 손상이 적게 되며, 또한 강연선이 쉬스관 내에 삽입되어 있고 쉬스관 내에는 구리스가 주입되어 있으므로 강연선에 녹이 생기지 않고 윤활성이 좋아 일정한 기간이 경과된 후 다시 보정이 가능함으로써 교량의 수명을 그 만큼 연장시킬 수 있게 된다.As described above, the present invention fixes the steel plate fitting bracket and the saddle bracket to the both sides of the bridge beam constituting the continuous bridge by the fixing means, the steel rod to the saddle bracket when the bridge beam construction To secure the reinforcement work without damaging the bridge structures such as cross beams constituting the existing bridge, and installing steel plate brackets and saddle brackets on both ends of neighboring bridge beams. Or by installing steel saddle brackets at both ends of neighboring bridge beams and fastening them with steel bars, after tensioning both ends of the strand to compensate for sag, compressive force is applied to the bridge beams, while fixing to both ends of the bridge beams. Since the tension is generated at the anchor bolt of the bracket, the tension of both tensions in the bracket is canceled. Since less anchor bolts can be used to fix the bracket, there is less damage at the end of the bridge beam. In addition, since the strand is inserted in the sheath tube and grease is injected into the sheath tube, no rust occurs in the strand and the lubricity is good. Once it is corrected, it can be recalibrated to extend the bridge life.

Claims (8)

이웃하는 외부 교량빔의 양단 외측에 강판이음브라켓을 설치하는 단계와;Installing steel plate fitting brackets at both ends of neighboring outer bridge beams; 상기 교량빔의 양단 내측에 새들브라켓을 각각 설치하는 단계와;Respectively installing saddle brackets on both ends of the bridge beam; 이웃하는 내부 교량빔의 양단 양측에 새들브라켓을 각각 설치하는 단계와;Installing saddle brackets on both sides of neighboring inner bridge beams, respectively; 상기 마주보는 새들브라켓을 강봉으로 체결하는 단계와;Fastening the facing saddle bracket with a steel bar; 교량빔의 중간 하단부에 받침브라켓을 설치하는 단계와;Installing a support bracket at an intermediate lower end of the bridge beam; 받침브라켓을 경유하여 강판이음브라켓 및 새들브라켓에 쉬스관을 설치하는 단계와;Installing a sheath tube on the steel plate fitting bracket and the saddle bracket via the support bracket; 쉬스관 내에 강연선을 삽입하는 단계와;Inserting the strand into the sheath tube; 강연선의 양단부를 인장시켜 처짐 보정단계로 이루어지는 것을 특징으로 하는 교량빔의 보강공법.Reinforcing method of the bridge beam, characterized in that the deflection correction step by tensioning both ends of the strand. 이웃하는 교량빔의 양단 양측에 새들브라켓을 각각 설치하는 단계와;Installing saddle brackets on both sides of neighboring bridge beams, respectively; 상기 마주보는 새들브라켓을 강봉으로 체결하는 단계와;Fastening the facing saddle bracket with a steel bar; 교량빔의 중간 하단부에 받침브라켓을 설치하는 단계와;Installing a support bracket at an intermediate lower end of the bridge beam; 받침브라켓을 경유하여 새들브라켓에 쉬스관을 설치하는 단계와;Installing a sheath tube on the saddle bracket via the support bracket; 쉬스관 내에 강연선을 삽입하는 단계와;Inserting the strand into the sheath tube; 강연선의 양단부를 인장시켜 처짐 보정단계로 이루어지는 것을 특징으로 하는 교량빔의 보강공법.Reinforcing method of the bridge beam, characterized in that the deflection correction step by tensioning both ends of the strand. 제1항 또는 제2항에 있어서,The method according to claim 1 or 2, 상기 브라켓이 설치된 곳에는 에폭시 수지를 주입하는 것을 특징으로 하는 교량빔의 보강공법.Where the bracket is installed, the bridge beam reinforcement method characterized in that the epoxy resin is injected. 제1항 또는 제2항에 있어서,The method according to claim 1 or 2, 상기 강봉은 가로보가 설치된 경우 가로보를 천공하여 설치되는 것을 특징으로 하는 교량빔의 보강공법.The steel bar reinforcement method of the bridge beam, characterized in that the horizontal beam is installed when the horizontal beam is installed. 이웃하는 외부 교량빔의 양단 외측에 설치되는 강판이음브라켓과;A steel plate fitting bracket installed at both ends of the neighboring outer bridge beams; 상기 교량빔의 양단 내측에 각각 설치되는 새들브라켓과;Saddle brackets are respectively provided inside both ends of the bridge beam; 이웃하는 내부 교량빔의 양단 양측에 설치되는 새들브라켓과;Saddle brackets are provided on both sides of the neighboring inner bridge beam; 상기 마주보는 새들브라켓을 체결하는 강봉과;A steel rod for fastening the facing saddle bracket; 교량빔의 중간 하단부에 설치되는 받침브라켓과;A support bracket installed at the middle lower end of the bridge beam; 받침브라켓을 경유하여 강판이음브라켓 및 새들브라켓에 설치되는 쉬스관과;Sheath pipe installed in the steel plate fitting bracket and saddle bracket via the support bracket; 쉬스관 내에 삽입되는 강연선과;A strand inserted into the sheath tube; 강연선의 양단부를 인장시켜 처짐을 보정한 후 정착시키는 정착부재로 이루어지는 것을 특징으로 하는 교량빔의 보강장치.Reinforcing device for a bridge beam, characterized in that made of a fixing member to fix the deflection by tensioning both ends of the strand. 이웃하는 교량빔의 양단 양측에 각각 설치되는 새들브라켓과;Saddle brackets are respectively provided on both sides of the adjacent bridge beam; 상기 마주보는 새들브라켓을 체결하는 강봉과;A steel rod for fastening the facing saddle bracket; 교량빔의 중간 하단부에 설치되는 받침브라켓과;A support bracket installed at the middle lower end of the bridge beam; 받침브라켓을 경유하여 새들브라켓에 설치되는 쉬스관과;Sheath tube installed in the saddle bracket via the support bracket; 쉬스관 내에 삽입되는 강연선과;A strand inserted into the sheath tube; 강연선의 양단부를 인장시켜 처짐을 보정한 후 정착시키는 정착부재로 이루어지는 것을 특징으로 하는 교량빔의 보강장치.Reinforcing device for a bridge beam, characterized in that made of a fixing member to fix the deflection by tensioning both ends of the strand. 제5항에 있어서,The method of claim 5, 상기 강판이음브라켓은 강판의 양단에 제1,2브라켓을 용접하여 일체로 이루어지며, 제1,2브라켓은 삼각형태의 마주보는 제1보강부재와 제1보강부재 사이에 걸림공이 형성된 제1지지부재로 되는 교량빔의 보강장치.The steel plate fitting bracket is integrally formed by welding the first and second brackets to both ends of the steel plate, and the first and second brackets have a first support having a catching hole formed between the first and second reinforcing members facing each other in a triangular shape. Bridge beam reinforcement device. 제5항 또는 제6항에 있어서,The method according to claim 5 or 6, 상기 새들 브라켓은 직사각형의 패널 위에 삼각형태를 갖는 다수의 제2보강부재와 제2보강부재 사이에 걸림공이 형성된 제2지지부재와, 제3보강부재에 의해서 지지되며 걸림공이 형성된 제3지지부재로 이루어지는 교량빔의 보강장치.The saddle bracket includes a second support member having a locking hole formed between a plurality of second reinforcing members and a second reinforcing member having a triangular shape on a rectangular panel, and a third supporting member supported by the third reinforcing member and having a locking hole formed therein. Bridge beam reinforcement device.
KR10-2001-0048315A 2001-08-10 2001-08-10 Construction method and apparatus for enforcement of bridge beam KR100440622B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2001-0048315A KR100440622B1 (en) 2001-08-10 2001-08-10 Construction method and apparatus for enforcement of bridge beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2001-0048315A KR100440622B1 (en) 2001-08-10 2001-08-10 Construction method and apparatus for enforcement of bridge beam

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2002-0036739U Division KR200308966Y1 (en) 2002-12-09 2002-12-09 Apparatus for enforcement of bridge beam

Publications (2)

Publication Number Publication Date
KR20030014002A true KR20030014002A (en) 2003-02-15
KR100440622B1 KR100440622B1 (en) 2004-07-21

Family

ID=27718710

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2001-0048315A KR100440622B1 (en) 2001-08-10 2001-08-10 Construction method and apparatus for enforcement of bridge beam

Country Status (1)

Country Link
KR (1) KR100440622B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105970837A (en) * 2016-05-31 2016-09-28 西安公路研究院 Unbounded prestress and steel plate-concrete combined reinforcing design method of T-type beam
CN106087778A (en) * 2016-05-31 2016-11-09 西安公路研究院 The prestressing without bondn of box beam and steel plate concrete composite reinforcement method for designing

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100860796B1 (en) 2007-11-26 2008-09-29 노윤근 Continuationization method by which psc which used upper and lower symmetry or asymmetric fixed bracket

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR0141551B1 (en) * 1994-07-15 1999-02-18 박재만 Repairing method of bridge beam and apparatus therefor
JPH0933718A (en) * 1996-07-18 1997-02-07 Toshiba Corp Color filter substrate, its production, liquid crystal display device using the color filter substrate, and color filter substrate producing device
KR19990020725U (en) * 1997-11-28 1999-06-25 아끼요시 스즈끼 Failing device
KR100265697B1 (en) * 1998-05-07 2000-09-15 한만엽 Anchoring method and apparatus for improving end bearing structure in external prestress reinforcement
KR200255080Y1 (en) * 1998-07-31 2002-02-28 박재만 Retensioning device of prestressed structure
KR20000018606U (en) * 1999-03-24 2000-10-25 정규성 Apparatus for preventing collapse fo bridge beam
KR200184685Y1 (en) * 1999-12-29 2000-06-01 박재만 Apparatus preventing damage sheath tube of steel wire to restress prestress structure
KR100388078B1 (en) * 1999-12-29 2003-06-25 신특수건설 주식회사 Apparatus to repair and reinforce bridge and thereof method
KR20010064555A (en) * 1999-12-29 2001-07-09 박재만 Apparatus to prevent the negative moment of a bridge and thereof method
KR100383565B1 (en) * 2000-06-09 2003-05-12 한만엽 External Prestressing device and method for continuous bridge
KR100384772B1 (en) * 2000-07-15 2003-05-27 우경건설 주식회사 External prestressing device for tension distribution of continuous bridge
KR200235876Y1 (en) * 2001-03-27 2001-10-10 우경건설 주식회사 Apparatus for reinforcing a beam of single clear span bridge
KR200252591Y1 (en) * 2001-07-06 2001-11-16 정광선 Apparatus for preventing bridge disjunction by earthquake

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105970837A (en) * 2016-05-31 2016-09-28 西安公路研究院 Unbounded prestress and steel plate-concrete combined reinforcing design method of T-type beam
CN106087778A (en) * 2016-05-31 2016-11-09 西安公路研究院 The prestressing without bondn of box beam and steel plate concrete composite reinforcement method for designing
CN106087778B (en) * 2016-05-31 2018-03-16 西安公路研究院 The prestressing without bondn of box beam and steel plate concrete composite reinforcement design method
CN105970837B (en) * 2016-05-31 2018-03-16 西安公路研究院 The prestressing without bondn of T-shaped beam and steel plate concrete composite reinforcement design method

Also Published As

Publication number Publication date
KR100440622B1 (en) 2004-07-21

Similar Documents

Publication Publication Date Title
JP2759755B2 (en) Prestressed bridge reinforcement method using lower cable
JP3037943B2 (en) Prestressed structure re-tensioning device
KR200184683Y1 (en) Apparatus to repair and reinforce bridge
KR0173153B1 (en) Method and apparatus of beam stiffening for bridge
KR100440622B1 (en) Construction method and apparatus for enforcement of bridge beam
KR100414448B1 (en) Reinforcing armature for repair of concrete structure and repair method using thereof
KR100840190B1 (en) I-beam segment connection method equipped with prestress steel synthetic concrete upper flange for continuous bridge
KR20040091350A (en) Prestressed steel girder
KR200308966Y1 (en) Apparatus for enforcement of bridge beam
KR0141551B1 (en) Repairing method of bridge beam and apparatus therefor
KR100400980B1 (en) Method to reinforce pier using steel and thereof apparatus
JP2744955B2 (en) Reinforcement structure and reinforcement method of hinge part of gel bar bridge
KR100370177B1 (en) Compression bracket for external prestressing reinforcement of girder
JP2007092392A (en) Hinge portion repairing structure of concrete construction
KR100414261B1 (en) External steel wire reinforcement method for concrete structure and anchoring method therefor
KR100465439B1 (en) Construction method for reinforcing concrete structures using an apparatus for anchoring reinforcing steel material
KR200241299Y1 (en) External steel wire reinforcement anchoring apparatus for concrete structure
KR100426611B1 (en) Connecting device for enhancing steel wire for a bridge
KR100591006B1 (en) the down load strenthening structure of bridge beam by bolt coupler
KR100549986B1 (en) Fabricated repairing and reinforcing apparatus for reinforcing bearing force of beam in a bridge and construction method using the apparatus
KR100460455B1 (en) Hollow Type I Beam Composite Deck having Transverse Joints and Constructing Method thereof
KR100373522B1 (en) Strand reinforcing method to reinforce steel plate girder bridge depend on composition fixative reinforcing part and there of apparatus
KR100991871B1 (en) Apparatus and method for fixing tendon sheath in concrete form
KR200235876Y1 (en) Apparatus for reinforcing a beam of single clear span bridge
KR100290488B1 (en) Steel box reinforcement system for bridge repair

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130628

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20140707

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20150706

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20160704

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20170703

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20180704

Year of fee payment: 15

FPAY Annual fee payment

Payment date: 20190703

Year of fee payment: 16