KR200295837Y1 - pipeline cleaning apparatus - Google Patents

pipeline cleaning apparatus Download PDF

Info

Publication number
KR200295837Y1
KR200295837Y1 KR2020020025482U KR20020025482U KR200295837Y1 KR 200295837 Y1 KR200295837 Y1 KR 200295837Y1 KR 2020020025482 U KR2020020025482 U KR 2020020025482U KR 20020025482 U KR20020025482 U KR 20020025482U KR 200295837 Y1 KR200295837 Y1 KR 200295837Y1
Authority
KR
South Korea
Prior art keywords
pipe
main
branch
pig
pipe line
Prior art date
Application number
KR2020020025482U
Other languages
Korean (ko)
Inventor
진용환
Original Assignee
(주)아산테크
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)아산테크 filed Critical (주)아산테크
Priority to KR2020020025482U priority Critical patent/KR200295837Y1/en
Application granted granted Critical
Publication of KR200295837Y1 publication Critical patent/KR200295837Y1/en

Links

Landscapes

  • Cleaning In General (AREA)

Abstract

본 고안은 지중에 매설된 메인관로와 분기관로에 탄성피그를 각각 삽입하기 위한 다수개의 피그삽입구를 하나의 맨홀에 설치할 수 있기 때문에, 맨홀 공사비 등의 코스트를 절감할 수 있으면서도 향후의 유지관리가 용이하며, 하나의 주관로 제수변만을 잠그고 관로 세척작업을 수행할 수 있기 때문에, 작업의 신속성과 획일성 등을 기할 수 있도록 된 관로세척장치에 관한 것이다.The present invention can install a plurality of piglet insertion holes for inserting the elastic pigs into the main and branch pipes buried in the ground in one manhole, so that the cost of manhole construction costs can be reduced, and future maintenance is possible. The present invention relates to a pipeline washing apparatus which is easy and can lock the dilution of only one main pipeline and perform a pipeline cleaning operation.

본 고안에 따르면, 지중에 매설되는 메인관로(5) 또는 분기관로(8)에 설치되며 일측으로 관통되는 피그삽입구(35, 40)가 형성된 삽입관체(10)와, 상기 삽입관체(10)와 소정간격 이격되도록 메인관로(5) 또는 분기관로(8)에 설치되며 일측으로 관통되는 피그배출구(24)가 형성된 배출관체(20)로 구성되고, 상기 피그삽입구(14)를 통해 삽입된 탄성피그(3)를 쏘아 피그배출구(24)로 배출시킴으로써, 상기 삽입관체(10)와 배출관체(20) 사이에 형성된 관로(5, 10)의 내부를 세척하도록 된 관로세척장치에 있어서, 상기 삽입관체(10)는 메인관로(5)에 연결되는 메인삽입관체(11a)와 분기관로(8)에 연결되는 분기삽입관체(13a)가 일체로 형성된 분기관 형태로 이루어지며, 상기 메인삽입관체(11a)와 분기삽입관체(13a)에 각각 메인관로(5)와 분기관로(8)에 탄성피그(3a, 3b)를 삽입하기 위한 메인피그 삽입구(35)와 분기피그 삽입구(40)가 형성되어 구성된 것을 특징으로 하는 관로세척장치가 제공된다.According to the present invention, the insertion pipe body (10) and the insertion pipe body (10), which is installed in the main pipe line (5) or branch pipe line (8) embedded in the ground and penetrates to one side, and the insertion pipe body (10) is formed. And a discharge pipe body 20 formed in the main pipe line 5 or the branch pipe line 8 so as to be spaced apart from each other and having a pig outlet port 24 penetrating to one side, and inserted through the pig insertion hole 14. In the pipeline washing device is to clean the inside of the conduit (5, 10) formed between the insertion pipe (10) and the discharge pipe body 20 by shooting the elastic pig (3) to discharge the pig outlet (24), Insertion pipe body 10 is made of a branch pipe formed integrally with the main insertion pipe (11a) connected to the main pipe line (5) and the branch insertion pipe (13a) connected to the branch pipe line (8), the main insert Inserting the elastic piglets 3a and 3b into the main pipe line 5 and the branch pipe line 8 into the pipe body 11a and the branch insertion pipe body 13a, respectively. The pipe cleaning apparatus is provided that is configured by the main pig insertion port 35 and the branch Pigment insertion port 40 is formed in a characteristic.

Description

관로세척장치{pipeline cleaning apparatus}Pipeline cleaning apparatus

본 고안은 관로세척장치에 관한 것으로서, 보다 상세하게는 지중에 매설된 메인관로와 분기관로에 탄성피그를 각각 삽입하기 위한 다수개의 피그삽입구를 하나의 맨홀에 설치할 수 있기 때문에, 맨홀 공사비 등의 코스트를 절감할 수 있으면서도 향후의 유지관리가 용이하며, 하나의 주관로 제수변만을 잠그고 관로 세척작업을 수행할 수 있기 때문에, 작업의 신속성과 획일성 등을 기할 수 있도록 된 관로세척장치에 관한 것이다.The present invention relates to a pipe washing apparatus, and more particularly, since a plurality of pig insertion openings for inserting elastic pigs into the main pipeline and branch pipeline embedded in the ground can be installed in one manhole, The present invention relates to a pipeline washing apparatus that can reduce costs and facilitate future maintenance, and can lock down the waterway of a single main pipeline and perform pipeline cleaning, thereby enabling rapid and uniform work.

종래에 도 1에 도시된 바와 같은 관로세척장치가 알려져 있다. 이러한 관로세척장치는 관로(5)의 소정 부위에 설치되며 그 상면에는 피그삽입구(14)가 형성된 삽입관체(10)와, 이 삽입관체(10)와 소정 간격 이격되도록 상기 관로(5)에 설치되며 그 상면에는 피그배출구(24)가 형성된 배출관체(20)로 구성되어 있다. 이에 따라, 상기 피그삽입구(14)를 통해 포탄형태의 탄성피그(3)를 삽입하고, 압축공기나 가압수를 추진시켜서, 상기 탄성피그(3)를 세척할 관로(5)를 따라 발사하여 피그배출구(24)로 배출함으로써, 상기 관로(5)의 내벽면에 축적된 스케일이나 공사 이물질 등을 완전 제거할 수 있다.Conventionally, a pipeline washing apparatus as shown in FIG. 1 is known. Such a pipe washing device is installed in a predetermined portion of the pipe line 5 and an insertion pipe body 10 having a pig insertion hole 14 formed on the upper surface thereof, and installed in the pipe line 5 so as to be spaced apart from the insertion pipe body 10 by a predetermined interval. The upper surface is composed of a discharge pipe 20 formed with a pig discharge port 24. Accordingly, the shell-shaped elastic pig 3 is inserted through the pig insertion hole 14, and the compressed air or the pressurized water is pushed, and the elastic pig 3 is fired along the pipeline 5 to wash the pig. By discharging to the discharge port 24, the scale, the construction foreign material, etc. which accumulated on the inner wall surface of the said pipe line 5 can be removed completely.

이러한 관로세척장치는 이미 매설된 관로(5)의 중간을 절단하여 설치하거나 관로(5)를 신설할 때 함께 설치된다. 종래에는 도시 계획화나 도로망 정비 등이 없이 관로(5)를 설치한 관계로 새로운 도시 계획이나 도로망 정비 등에 따라서 이미 매설된 메인관로(5)에 도시안된 분기관로를 분기시켜 설치해야 했으며, 상기 분기관로를 세척하기 위해서는 분기관로에 각각 별도의 관로세척장치를 설치해야 했다.Such a pipe washing apparatus is installed by cutting the middle of an already embedded pipe line 5 or installing a pipe line 5 together. Conventionally, since the pipeline 5 was installed without urban planning or road network maintenance, branch lines not illustrated in the main pipeline 5 already buried in accordance with new city planning or road network maintenance had to be branched and installed. In order to clean the trachea, a separate pipe washing device had to be installed in each branch line.

그런데, 이와 같이 메인관로와는 별도로 분기관로마다 제수변과 관로세척장치를 각각 설치하게 되면, 상기 관로세척장치의 삽입관체에 대응되는 수효만큼의 맨홀을 각각 별도로 굴착 시공해야 하므로, 굴착 개소와 맨홀의 수효가 증가하고, 공사비용과 인력의 낭비 등을 초래하는 문제점이 있다. 또한, 이처럼 맨홀의 수효가 늘어나기 때문에, 향후의 유지관리가 어려울 뿐만 아니라, 유지관리 비용이 많이 소요되는 문제점이 있다. 그리고, 상기 관로(5)를 세척할 때에는 각각의 분기관로마다 설치된 제수변을 일일이 잠근 후에 상기 탄성피그(3)를 관로(5)의 내부에 추진시켜야 하므로, 작업이 번거롭고 작업 시간이 많이 소요되는 문제점이 있다.However, when the dividing side and the pipe washing device are installed in each branch line separately from the main pipe line as described above, the number of manholes corresponding to the insertion pipe of the pipe washing device must be separately excavated. There is a problem that increases the number of, causing waste of construction costs and manpower. In addition, since the number of manholes increases in this way, there is a problem that not only the future maintenance is difficult but also the maintenance cost is high. In addition, when washing the pipe line 5, the elastic pig 3 must be pushed into the pipe line 5 after locking the distillation valve installed for each branch line one by one, so that the work is cumbersome and takes a long time. There is a problem.

본 고안은 전술한 바와 같은 문제점에 착안하여 제안된 것으로서, 지중에 매설된 메인관로와 분기관로에 탄성피그를 각각 삽입하기 위한 다수개의 피그삽입구를 하나의 맨홀에 설치할 수 있기 때문에, 맨홀 공사비 등의 유지비와 시공비를 절감할 수 있으면서도 향후의 유지관리가 용이하며, 하나의 주관로 제수변만을 잠그고 관로 세척작업을 수행할 수 있기 때문에, 작업의 신속성 등을 기할 수 있도록 된 관로세척장치를 제공하고자 하는 것이다.The present invention has been proposed in view of the above problems, and since a plurality of pig insertion holes for inserting the elastic pigs into the main and branch pipes buried in the ground can be installed in one manhole, manhole construction cost, etc. Maintenance costs and construction costs can be reduced, but future maintenance is easy, and because only one main channel can be locked and the pipe cleaning can be performed, it is intended to provide a pipeline washing device that can speed up work. will be.

도 1은 종래 관로세척장치의 단면도1 is a cross-sectional view of a conventional pipe washing device

도 2는 본 고안에 의한 관로세척장치의 주요부를 도시한 사시도Figure 2 is a perspective view showing the main part of the pipeline washing apparatus according to the present invention

도 3은 도 1의 A-A 단면도3 is a cross-sectional view taken along the line A-A of FIG.

도 4는 도 1의 B-B 단면도4 is a cross-sectional view taken along line B-B of FIG.

<도면의 주요부분에 대한 부호의 설명><Explanation of symbols for main parts of the drawings>

3a, 3b. 탄성피그 5. 메인관로3a, 3b. Elastic Pigment 5. Main Pipe

8. 분기관로 10. 삽입관체8. Branch pipe 10. Insertion pipe

20. 배출관체 24. 피그배출구20. Outlet tube 24. Pig outlet

35. 메인피그 삽입구 40. 분기피그 삽입구35. Main Pigment Insertion Hole 40. Branch Pigment Insertion Hole

본 고안에 따르면, 지중에 매설되는 메인관로(5) 또는 분기관로(8)에 설치되며 일측으로 관통되는 피그삽입구(35, 40)가 형성된 삽입관체(10)와, 상기 삽입관체(10)와 소정간격 이격되도록 메인관로(5) 또는 분기관로(8)에 설치되며 일측으로 관통되는 피그배출구(24)가 형성된 배출관체(20)로 구성되고, 상기 피그삽입구(14)를 통해 삽입된 탄성피그(3)를 쏘아 피그배출구(24)로 배출시킴으로써, 상기 삽입관체(10)와 배출관체(20) 사이에 형성된 관로(5, 10)의 내부를 세척하도록 된 관로세척장치에 있어서, 상기 삽입관체(10)는 메인관로(5)에 연결되는 메인삽입관체(11a)와 분기관로(8)에 연결되는 분기삽입관체(13a)가 일체로 형성된 분기관 형태로 이루어지며, 상기 메인삽입관체(11a)와 분기삽입관체(13a)에 각각 메인관로(5)와 분기관로(8)에 탄성피그(3a, 3b)를 삽입하기 위한 메인피그 삽입구(35)와 분기피그 삽입구(40)가 형성되어 구성된 것을 특징으로 하는 관로세척장치가 제공된다.According to the present invention, the insertion pipe body (10) and the insertion pipe body (10), which is installed in the main pipe line (5) or branch pipe line (8) embedded in the ground and penetrates to one side, and the insertion pipe body (10) is formed. And a discharge pipe body 20 formed in the main pipe line 5 or the branch pipe line 8 so as to be spaced apart from each other and having a pig outlet port 24 penetrating to one side, and inserted through the pig insertion hole 14. In the pipeline washing device is to clean the inside of the conduit (5, 10) formed between the insertion pipe (10) and the discharge pipe body 20 by shooting the elastic pig (3) to discharge the pig outlet (24), Insertion pipe body 10 is made of a branch pipe formed integrally with the main insertion pipe (11a) connected to the main pipe line (5) and the branch insertion pipe (13a) connected to the branch pipe line (8), the main insert Inserting the elastic piglets 3a and 3b into the main pipe line 5 and the branch pipe line 8 into the pipe body 11a and the branch insertion pipe body 13a, respectively. The pipe cleaning apparatus is provided that is configured by the main pig insertion port 35 and the branch Pigment insertion port 40 is formed in a characteristic.

본 고안의 다른 특징에 따르면, 상기 삽입관체(10)에는 메인피그 삽입구(35)와 분기피그 삽입구(40) 사이에 위치되도록 스톱퍼(45)가 내설되어, 상기 분기피그 삽입구(40)로부터 분기관로(8)의 내부로 전진한 탄성피그(3b)가 후퇴되어 메인관로(5)로 역투입되는 것을 사전에 방지할 수 있도록 된 것을 특징으로 하는 관로세척장치가 제공된다.According to another feature of the present invention, the stopper 45 is built in the insertion pipe 10 so as to be located between the main pig insertion hole 35 and the branch pig insertion hole 40, the branch pipe insertion hole 40 from the branch pipe The pipe washing apparatus is provided, characterized in that it is possible to prevent the elastic pig 3b, which has been advanced into the furnace 8, from being retracted and backflowed into the main pipe line 5 in advance.

이하, 본 고안의 바람직한 실시예를 첨부한 도면에 의거하여 설명하면 다음과 같다.Hereinafter, described with reference to the accompanying drawings, preferred embodiments of the present invention is as follows.

도 2는 본 고안에 의한 관로세척 십자장치의 주요부의 사시도를 도시한 것이고, 도 3은 도 1의 A-A 단면도를 도시한 것이며, 도 4는 도 1의 B-B 단면도를 도시한 것이다. 이를 참조하면, 상기 관로세척 십자장치는 지중에 매설되는 메인관로(5) 또는 분기관로(8)에 설치되는 것으로, 주로 수도관의 제수변 전후에 설치된다. 상기 관로세척 십자장치의 삽입관체(10)는 메인삽입관체(11a)와, 이 메인삽입관체(11a)에서 일체로 분기된 분기삽입관체(13a)로 구성되어 있다. 이러한 삽입관체(10)는, 도 1에 도시된 바와 같이, 상기 메인삽입관체(11a)와 분기삽입관체(13a)가 일체로 형성된 분기관 형태로 이루어져 있다.Figure 2 shows a perspective view of the main part of the pipeline washing cross-section according to the present invention, Figure 3 shows a cross-sectional view A-A of Figure 1, Figure 4 shows a cross-sectional view B-B of FIG. Referring to this, the pipe washing cross device is installed in the main pipe line 5 or branch pipe line 8 embedded in the ground, mainly installed before and after the water side of the water pipe. The insertion tube 10 of the pipeline washing cross device is composed of a main insertion tube 11a and a branch insertion tube 13a which is integrally branched from the main insertion tube 11a. The insertion tube 10, as shown in Figure 1, is formed in the form of branch pipe formed integrally with the main insertion pipe (11a) and the branch insertion pipe (13a).

상기 메인삽입관체(11a)는 메인관로(5)에 연결되고, 상기 분기삽입관체(13a)는 분기관로(8)에 연결된다. 또한, 상기 메인삽입관체(11a)에는 상기 메인관로(5)에 탄성피그(3a)(도 3 및 도 4에 도시됨)를 삽입하기 위한 메인피그 삽입구(35)가 상향 형성되어 있고, 상기 분기삽입관체(13a)에는 분기관로(8)에 탄성피그(3b)(도 3 및 도 4에 도시됨)를 삽입하기 위한 분기피그 삽입구(40)가 상향 형성되어 있다. 이와 같이, 상기 삽입관체(10)는 메인삽입관체(11a)와 분기삽입관체(13a)가 일체화된 분기관 형태로 구성되어 있고, 상기 메인삽입관체(11a)와 분기삽입관체(13a)의 분기지점에는 메인피그 삽입구(35)와 분기피그 삽입구(40)가 서로 근접되도록 형성되어 있다. 이에 따라, 상기 메인피그 삽입구(35)와 분기피그 삽입구(40)가 하나의 맨홀 내부에 설치 가능하다.The main insertion pipe (11a) is connected to the main pipe line (5), the branch insertion pipe (13a) is connected to the branch pipe (8). In addition, the main insertion pipe (11a) is formed with a main pig insertion hole 35 for inserting the elastic pig (3a) (shown in Figures 3 and 4) into the main pipe line 5, the branch The insertion pipe body 13a is provided with a branch pig insertion hole 40 for inserting the elastic piglet 3b (shown in FIGS. 3 and 4) into the branch pipe line 8 upwardly. As described above, the insertion pipe body 10 is configured in the form of a branch pipe in which the main insertion pipe 11a and the branch insertion pipe 13a are integrated, and the branch of the main insertion pipe 11a and the branch insertion pipe 13a. At the point, the main pig insertion hole 35 and the branch pig insertion hole 40 are formed to be close to each other. Accordingly, the main pig insertion hole 35 and the branch pig insertion hole 40 can be installed in one manhole.

특히, 최근에는 도시의 계획화와 도로망 정비 등에 따라 상수관이 계획 정비되기 때문에, 시공시에 상기 메인관로(5)와 분기관로(8)를 미리 정비하여 시공할 수 있다. 따라서, 상기 메인관로(5)와 분기관로(8)의 분기지점에 상기 분기관 형태의 삽입관체(10)를 연결하게 되면, 상기 메인피그 삽입구(35)와 분기피그 삽입구(40)를 하나의 맨홀에 설치하는 것이 가능하다.In particular, in recent years, since the water pipes are planned and maintained in accordance with urban planning and road network maintenance, the main pipe line 5 and the branch pipe line 8 can be maintained in advance during construction. Therefore, when the insertion pipe body 10 of the branch pipe form is connected to the branch point of the main pipe line 5 and the branch pipe line 8, the main pig insertion hole 35 and the branch pig insertion hole 40 It is possible to install in the manhole.

상기 메인피그 삽입구(35)와 분기피그 삽입구(40)의 상면에는 각각 커버판(37a, 37b)이 구비되어 있다. 또한, 상기 커버판(37a, 37b)에는 압축공기나 가압수를 관로(5, 10)의 내부로 추진시켜주는 유입포트(43a, 43b)가 형성되어 있다. 상기 배출관체(20)는 종래와 같이 삽입관체(10)와 소정 간격 이격되도록 메인관로(5)와 각각의 분기관로(8)에 설치되어 있다. 또한, 상기 배출관체(20)의 상면에는 피그배출구(24)와 커버판(46)이 구비되어 있다.Cover plates 37a and 37b are provided on the upper surfaces of the main pig insertion hole 35 and the branch pig insertion hole 40, respectively. In addition, the cover plates 37a and 37b are provided with inlet ports 43a and 43b for pushing compressed air or pressurized water into the pipe lines 5 and 10. The discharge pipe body 20 is installed in the main pipe line 5 and each branch pipe line 8 so as to be spaced apart from the insertion pipe body 10 by a predetermined interval as in the prior art. In addition, the upper surface of the discharge pipe 20 is provided with a pig outlet 24 and the cover plate 46.

이에 따라, 상기 관로(5)에 설치된 주관로 제수변을 잠그고, 도 3 및 도 4에 도시된 바와 같이, 하나의 맨홀에 통합설치된 메인피그 삽입구(35)와 분기피그 삽입구(40)를 통해 메인관로(5)와 분기관로(8)에 각각 탄성피그(3a, 3b)를 삽입한 다음, 상기 유입포트(43a, 43b)를 통해 메인관로(5)와 분기관로(8)의 내부에 압축공기나 가압수를 쏘아주면, 상기 각각의 탄성피그(3a, 3b)가 배출관체(20) 방향으로 이동하여 피그배출구(24)로 배출되므로, 상기 메인관로(5)와 분기관로(8)의 내부에 축적된 스케일이나 공사 이물질 등을 동시에 제거하여 청소 및 세척할 수 있다.Accordingly, the main channel passage is locked to the main pipe line installed in the pipe line 5, and as shown in Figure 3 and 4, the main pipe line through the main pig insertion hole 35 and the branch pig insertion hole 40 integrated in one manhole The elastic piglets 3a and 3b are inserted into the 5 and the branch pipes 8, respectively, and then compressed into the main pipe 5 and the branch pipe 8 through the inflow ports 43a and 43b. When the air or pressurized water is shot, the respective elastic pigs 3a and 3b move toward the discharge pipe 20 and are discharged to the pig discharge port 24, so that the main pipe line 5 and the branch pipe line 8 are discharged. At the same time, it can be cleaned and cleaned by removing scales and construction foreign substances accumulated inside the building.

한편, 종래의 관로세척장치의 경우, 상기 메인관로(5)에 형성된 메인피그 삽입구(35)와 분기관로(8)에 형성된 분기피그 삽입구(40)마다 별도로 맨홀을 설치하는 관계로, 각각의 구간마다 별도의 제수변을 설치해야 했기 때문에, 상기 관로(5, 10)를 세척하기 위해서는 각각의 제수변을 일일이 잠가 주어야 했다.On the other hand, in the case of the conventional pipe washing apparatus, a manhole is separately provided for each of the main pig insertion holes 35 formed in the main pipe line 5 and the branch pig insertion holes 40 formed in the branch pipe line 8. Since a separate dividing valve had to be installed for each section, each dipping valve had to be locked in order to clean the pipes 5 and 10.

그러나, 본 고안의 관로세척 십자장치의 경우, 상기 메인피그 삽입구(35)와 분기피그 삽입구(40)를 하나의 맨홀에 설치하기 때문에, 상기 메인관로(5) 상에 하나의 주관로 제수변만을 설치하고, 이 하나의 주관로 제수변에 의해 메인관로(5)와 분기관로(8)에 유체를 일시에 공급하거나 차단할 수 있다. 이에 따라, 상기 관로(5, 10)를 세척하기 위해서 하나의 주관로 제수변만을 잠그면 되기 때문에, 종래에 비하여 작업의 편리성과 신속성을 기할 수 있게 된다.However, in the pipeline washing crosshair according to the present invention, since the main pig insertion hole 35 and the branch pig insertion hole 40 are installed in one manhole, only one main pipe dividing side is installed on the main pipe line 5. In addition, the fluid can be temporarily supplied to or blocked from the main pipe line 5 and the branch pipe line 8 by this one main pipe dividing side. As a result, only one main pipe is required to lock the dividing water in order to clean the pipes 5 and 10, thereby providing convenience and speed of operation as compared with the related art.

이때, 상기 분기관로(8)가 경사진 언덕의 지중에 설치될 경우, 상기 탄성피그(3)를 쏘아주는 압축공기나 가압수의 압력이 약화될 수 있기 때문에, 상기 분기관로(8)의 내부로 전진한 탄성피그(3)가 후퇴하여, 상기 메인관로(5)로 역투입되어 분실될 염려가 있다. 이에 따라, 도 3 및 도 4에 도시된 바와 같이, 상기 삽입관체(10)에는 메인피그 삽입구(35)와 분기피그 삽입구(40) 사이에 정지하도록 스톱퍼(45)가 수직으로 내설되어 있다. 이에 따라, 상기 분기피그 삽입구(40)로부터 분기관로(8)의 내부로 전진한 탄성피그(3)가 압력이 약하여 후퇴되더라도, 상기 스톱퍼(45)에 탄성피그(3)가 걸려지게 되므로, 상기 분기관로(8)에 삽입된 탄성피그(3)가 메인관로(5)로 역투입되어 분실되는 것을 방지할 수 있게 된다.At this time, when the branch pipe line 8 is installed in the slope of the slope, since the pressure of the compressed air or the pressurized water to shoot the elastic pig 3 may be weakened, the branch pipe line 8 The elastic pig 3 advanced to the inside of the retreat, there is a risk that the back to the main pipe line 5 is lost. Accordingly, as shown in FIGS. 3 and 4, the stopper 45 is vertically embedded in the insertion pipe 10 so as to stop between the main pig insertion hole 35 and the branch pig insertion hole 40. Accordingly, even when the elastic piglet 3, which is advanced from the branch piglet insertion hole 40 into the branching pipe 8, is retracted due to the weak pressure, the elastic piglet 3 is caught by the stopper 45. The elastic piglet 3 inserted into the branch pipe line 8 can be prevented from being lost by being fed back into the main pipe line 5.

이상에서와 같이 본 고안에 의하면, 상기 관로세척 십자장치는 메인관로에연결되는 메인피그 삽입구와 분기관로에 연결되는 분기피그 삽입구를 하나의 맨홀에 설치할 수 있기 때문에, 상기 메인피그 삽입구와 분기피그 삽입구를 각각 수용하기 위하여 별도의 맨홀을 다수개 설치해야 했던 종래와 비교할 때, 굴착개소 감소와 공사비용의 절감을 기할 수 있음은 물론, 인력의 낭비 등을 사전에 방지할 수 있고 향후 유지관리 또한 편리하다. 또한, 메인관로에 설치된 하나의 주관로 제수변만을 잠그고 메인피그 삽입구와 분기피그 삽입구를 통하여 삽입된 탄성피그를 피그배출구로 추진시켜서, 상기 메인관로와 분기관로의 내부를 일시에 세척할 수 있으므로, 작업이 매우 편리하고 작업 시간이 현저히 단축되는 장점이 있다.As described above, according to the present invention, the main pipe washing crosshairs can be installed in one manhole, and the main pig insertion port connected to the main pipe and the branch pig insertion port connected to the branch pipe, the main pig insertion port and the branch pig Compared with the conventional method, which required the installation of a plurality of separate manholes to accommodate the insertion holes, it is possible not only to reduce the excavation site and to reduce the construction cost, but also to prevent the waste of manpower in advance and to maintain the future. It is convenient. In addition, since only one main channel installed in the main pipeline locks the dividing valve and pushes the elastic piglet inserted through the main pig insertion hole and the branch pig insertion hole to the pig discharge outlet, the main pipe and the branch pipe inside can be cleaned at once. The work is very convenient and the work time is significantly shortened.

Claims (2)

지중에 매설되는 메인관로(5) 또는 분기관로(8)에 설치되며 일측으로 관통되는 피그삽입구(35, 40)가 형성된 삽입관체(10)와, 상기 삽입관체(10)와 소정간격 이격되도록 메인관로(5) 또는 분기관로(8)에 설치되며 일측으로 관통되는 피그배출구(24)가 형성된 배출관체(20)로 구성되고, 상기 피그삽입구(14)를 통해 삽입된 탄성피그(3)를 쏘아 피그배출구(24)로 배출시킴으로써, 상기 삽입관체(10)와 배출관체(20) 사이에 형성된 관로(5, 10)의 내부를 세척하도록 된 관로세척장치에 있어서, 상기 삽입관체(10)는 메인관로(5)에 연결되는 메인삽입관체(11a)와 분기관로(8)에 연결되는 분기삽입관체(13a)가 일체로 형성된 분기관 형태로 이루어지며, 상기 메인삽입관체(11a)와 분기삽입관체(13a)에 각각 메인관로(5)와 분기관로(8)에 탄성피그(3a, 3b)를 삽입하기 위한 메인피그 삽입구(35)와 분기피그 삽입구(40)가 형성되어 구성된 것을 특징으로 하는 관로세척장치.It is installed in the main pipe line (5) or branch pipe line (8) which is buried in the ground and the insertion pipe body 10 is formed with pig insertion holes (35, 40) penetrating to one side, so as to be spaced apart from the insertion pipe body (10) by a predetermined interval. It is installed in the main pipe (5) or branch pipe (8) and consists of a discharge pipe body 20 is formed with a pig outlet 24 penetrated to one side, the elastic pig (3) inserted through the pig insertion hole 14 In the pipeline washing device is to clean the inside of the conduit (5, 10) formed between the insertion pipe (10) and the discharge pipe (20) by shooting the discharge to the pig outlet (24), the insertion pipe (10) The main insertion pipe (11a) is connected to the main conduit (5) and the branch insertion pipe (13a) is formed in the form of branch pipes integrally connected to the branch pipe (8), the main insertion pipe (11a) and Main Pigment Insertion for Inserting Elastic Pigments 3a and 3b into the Main Conduit 5 and the Branch Conduit 8 in the Branch Insert Pipe 13a, respectively. Sphere 35 and the branch pig insertion hole 40 is formed, characterized in that the pipe washing apparatus. 제 1 항에 있어서, 상기 삽입관체(10)에는 메인피그 삽입구(35)와 분기피그 삽입구(40) 사이에 위치되도록 스톱퍼(45)가 내설되어, 상기 분기피그 삽입구(40)로부터 분기관로(8)의 내부로 전진한 탄성피그(3b)가 후퇴되어 메인관로(5)로 역투입되는 것을 방지할 수 있도록 된 것을 특징으로 하는 관로세척장치.The stopper 45 is installed in the insertion pipe 10 so as to be positioned between the main pig insertion hole 35 and the branch pig insertion hole 40. 8) The pipe washing apparatus, characterized in that it is possible to prevent the elastic pig (3b) advanced to the inside of the retracted back to the main pipe (5).
KR2020020025482U 2002-08-27 2002-08-27 pipeline cleaning apparatus KR200295837Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020020025482U KR200295837Y1 (en) 2002-08-27 2002-08-27 pipeline cleaning apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020020025482U KR200295837Y1 (en) 2002-08-27 2002-08-27 pipeline cleaning apparatus

Publications (1)

Publication Number Publication Date
KR200295837Y1 true KR200295837Y1 (en) 2002-11-22

Family

ID=73127777

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020020025482U KR200295837Y1 (en) 2002-08-27 2002-08-27 pipeline cleaning apparatus

Country Status (1)

Country Link
KR (1) KR200295837Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20150018180A (en) * 2013-08-09 2015-02-23 영동주식회사 Piping structure of manhole for cleaning pipe
KR102101122B1 (en) 2019-08-13 2020-04-21 주식회사 동해종합기술공사 Apparatus and method thereof for water pipe using low nitrogen

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20150018180A (en) * 2013-08-09 2015-02-23 영동주식회사 Piping structure of manhole for cleaning pipe
KR101583298B1 (en) 2013-08-09 2016-01-07 영동주식회사 Piping structure of manhole for cleaning pipe
KR102101122B1 (en) 2019-08-13 2020-04-21 주식회사 동해종합기술공사 Apparatus and method thereof for water pipe using low nitrogen

Similar Documents

Publication Publication Date Title
US7025532B2 (en) Apparatus and method for transporting water with liner
KR101646154B1 (en) A Non-excavation Repairing Device of the Drainpipe
CZ20004514A3 (en) Process of laying data cables
JP2016173003A (en) Water leakage countermeasure construction method for tunnel constructed using natm construction method
JP4493699B2 (en) Water-permeable segment and tunnel using this water-permeable segment
US20080078585A1 (en) Drainage pipe
KR200295837Y1 (en) pipeline cleaning apparatus
KR101111302B1 (en) Draining guiding apparatus for a drainpipe
KR101488830B1 (en) Branch device including the cylinder valve
KR100641264B1 (en) Radiation type pipe conduit cleaning equipment
KR200211157Y1 (en) Underground Pipe Repair Device
JP3681363B2 (en) Freezing pipe using switching valve
KR200435698Y1 (en) Apparatus for discharge of concrete drainfield
KR200316306Y1 (en) pipeline cleaning apparatus
KR100739858B1 (en) Repair method for drain
KR102577153B1 (en) Soil penetrating structure
KR102584128B1 (en) Pipeline cleaning method for pig continuous launching, and apparatus used therefor
KR102549009B1 (en) Non-excavation total repair method of sewage pipe including a discharge device that discharges condensate and harmful water vapor in the reinforcing tube
KR102432874B1 (en) Multi-function Pipeline cleaning system and Method
KR102645407B1 (en) How to clean the water supply pipe using the floating nozzle connected to the end of the washing hose
JP3160354B2 (en) Pipe line repair method by suction lining
KR200387478Y1 (en) Radiation type pipe conduit cleaning equipment
KR102567293B1 (en) Pipe cleaning and inspection system and method therefor
KR100805951B1 (en) Outlet for sludge of compound drilling method
JPH0813465A (en) Drainage boring method

Legal Events

Date Code Title Description
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20111207

Year of fee payment: 10

EXPY Expiration of term