KR200295287Y1 - Mounting structure of breakout of waterworks or sewerage using hall insert connecting flange - Google Patents

Mounting structure of breakout of waterworks or sewerage using hall insert connecting flange Download PDF

Info

Publication number
KR200295287Y1
KR200295287Y1 KR2020020017593U KR20020017593U KR200295287Y1 KR 200295287 Y1 KR200295287 Y1 KR 200295287Y1 KR 2020020017593 U KR2020020017593 U KR 2020020017593U KR 20020017593 U KR20020017593 U KR 20020017593U KR 200295287 Y1 KR200295287 Y1 KR 200295287Y1
Authority
KR
South Korea
Prior art keywords
connection
pipe
flange
hole
branch
Prior art date
Application number
KR2020020017593U
Other languages
Korean (ko)
Inventor
김정곤
Original Assignee
주식회사 삼덕컨설탄트
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 삼덕컨설탄트 filed Critical 주식회사 삼덕컨설탄트
Priority to KR2020020017593U priority Critical patent/KR200295287Y1/en
Application granted granted Critical
Publication of KR200295287Y1 publication Critical patent/KR200295287Y1/en

Links

Abstract

본 고안은 상,하수도 분기 연결관에 관한 것으로서, 더욱 상세하게는 상수도관을 분기 연결시 플랜지 형태로 제작된 홀주입 연결 플랜지를 4등분으로 제작하여 상,하수도관의 연결 천공홀에 설치하고 그 외부에 고무 개스킷과 연결관을 설치하여 측면부위에 체결볼트로 고정하는 구조를 가지는 홀주입 연결 플랜지를 이용한 상,하수도 분기 연결관 설치구조에 관한 것이다.The present invention relates to a water supply and sewage branch connection pipe, and more specifically, to install a water injection connection flange made in the form of a flange when the water supply pipe is branched into four equal parts and install it in the connection drilling hole of the water and sewage pipe. The present invention relates to a structure for installing a water pipe and a sewage branch connection pipe using a hole injection connection flange having a structure in which a rubber gasket and a connection pipe are installed on the outside, and a fastening bolt is fixed to a side surface thereof.

본 고안은, 기존 상,하수도관에 분기 연결관을 설치하는 구조에 있어서, 기 설치된 상수도관에는 분기 연결관이 설치될 위치에 연결 천공홀이 형성되고, 상기의 연결 천공홀에 홀주입 연결 플랜지를 구성하는 연결 플랜지1,2,3,4가 삽입된 상태에서 체결 볼트로 체결되며, 상기의 홀주입 연결 플랜지가 삽입된 상태에서 그 외측에 연결관이 설치되어 다른 체결 볼트가 홀주입 연결 플랜지의 체결 볼트홀과 연결관의 체결 볼트홀을 관통하여 서로 결합시키는 한편, 상기의 상수도관과 연결관이 밀착되는 위치에 고무 개스킷이 밀착된 상태로 결합되어 분기관을 설치할 수 있는 구조인 것을 특징으로 하는 홀주입 연결 플랜지를 이용한 상,하수도 분기 연결관 설치구조를 제공한다.The present invention, in the existing structure for installing the branch connection pipe in the sewage pipe, the pre-installed water supply pipe is formed in the connection hole is installed in the position where the branch connection pipe is installed, the hole injection connection flange in the connection hole Connection flanges 1, 2, 3, and 4, which are configured to be fastened with fastening bolts, are inserted in the state in which the hole injection connection flange is inserted, and a connection pipe is installed on the outside thereof so that the other fastening bolts are hole injection connection flanges. While the fastening bolt hole of the connection and the fastening bolt hole of the connection pipe are coupled to each other, the water gasket and the connection pipe is in close contact with the rubber gasket in close contact with the structure that can install a branch pipe It provides the installation structure of water and sewage branch connection pipe using hole injection connection flange.

Description

홀주입 연결 플랜지를 이용한 상,하수도 분기 연결관 설치구조{MOUNTING STRUCTURE OF BREAKOUT OF WATERWORKS OR SEWERAGE USING HALL INSERT CONNECTING FLANGE}Installation structure of water and sewage branch connection pipe using hole injection connection flange {MOUNTING STRUCTURE OF BREAKOUT OF WATERWORKS OR SEWERAGE USING HALL INSERT CONNECTING FLANGE}

본 고안은 상,하수도관의 분기 연결관에 관한 것으로서, 더욱 상세하게는 상수도관과 하수도관에 플랜지 형태로 제작된 홀주입 연결 플랜지를 4등분으로 제작하여 상,하수도관의 연결 천공홀에 결합설치하고 그 외부에 고무 개스킷과 연결관을 설치하여 측면부위에 체결볼트로 고정하는 구조로 상,하수도관에 분기 연결관을 설치할 수 있어 시공 기간 및 작업의 효율화를 도모할 수 있도록 하는 홀주입 연결 플랜지를 이용한 상,하수도 분기 연결관 설치구조에 관한 것이다.The present invention relates to a branch connection pipe of the water and sewage pipes, and more specifically, a hole injection connection flange made in the form of a flange in the water supply pipe and the sewage pipe is made in four equal parts and connected to the connection drilling hole of the water and sewage pipe. It installs and installs rubber gaskets and connecting pipes on the outside, and fastens them with fastening bolts on the side parts. It can install branch connecting pipes on the upper and lower sewer pipes, so that the construction period and work efficiency can be improved. It relates to the installation structure of the water supply and sewage branch connection pipe using a flange.

일반적으로 기존 상수도관에 대한 분기 연결관을 설치하는 경우 압륜 고정과 플랜지 접합에 의한 방식으로 분기 연결관을 설치하게 되고, 또한 기존 하수도관에 대한 분기 연결관을 설치하는 경우 하수도관에 플랜지 접합을 하여 분기관을 설치하게 되는데, 특히 상,하수도관은 절단한 뒤에 분기관을 설치하는 경우가 많아 작업의 효율화 및 시공의 정밀도를 고려한 상태에서 분기 연결관을 설치하게 된다.In general, in case of installing the branch connection pipe for the existing water supply pipe, the branch connection pipe is installed by the method of fixing the ring and the flange connection, and in the case of the installation of the branch connection pipe for the existing sewer pipe, the flange connection to the sewer pipe is performed. In order to install the branch pipes, especially the water pipes and sewer pipes are often installed after cutting the branch pipes to install the branch connection pipe in consideration of the efficiency of work and construction accuracy.

도 1은 종래의 상수도관 분기연결 작업의 순서를 나타내는 흐름도로서, 먼저 기존 상수도관(10)은 분기 연결관이 설치될 위치를 절단하게 되고, 상기의 일측 상수도관(10)에 분기연결 T형관(20)을 결합하게 되며, 이때 상기의 상수도관(10)과 분기연결 T형관(20)이 밀착된 외주면에 압륜을 이용하여 체결 볼트로 고정한다.1 is a flow chart showing the sequence of the conventional water pipe branch connection work, first, the existing water pipe 10 is to cut the position where the branch connection pipe is to be installed, the branch connection T-shaped pipe to one side of the water pipe (10) 20 is to be coupled, and the water supply pipe 10 and the branch connection T-shaped pipe 20 is fixed to the outer peripheral surface in close contact with a fastening bolt using a pressure wheel.

또한, 상기의 분기연결 T형관(20)이 결합된 일측에 연결관(40)을 설치하고, 다른 상수도관(50)에 이음관(60)을 설치하며, 이때 상기의 분기연결 T형관(20)과연결관(40) 및 이음관(60)이 접하는 위치에 압륜(70)(80)(90)을 이용하여 기존 상수도관(10)(50)에 분기연결 T형관(20)을 고정하게 된다.In addition, the connection pipe 40 is installed on one side to which the branch connection T-shaped pipe 20 is coupled, and the joint pipe 60 is installed on the other water supply pipe 50, wherein the branch connection T-shaped pipe 20 The branch connection T-type tube 20 is fixed to the existing water supply pipes 10 and 50 by using the pressure rings 70, 80, and 90 at the position where the connecting tube 40 and the fitting tube 60 are in contact with each other. .

또한, 상기의 상수도관(10)(50)의 연결과 마찬가지로 하수도관을 설치하는 경우에는 분기연결 T형관(20)을 설치시 분기연결 T형관(20)이 설치될 위치를 절단한 뒤 플랜지 접합 방식에 의해 하수도관에 분기되는 분기연결 T형관(20)을 설치하게 된다.(상기의 하수도관에 대한 자세한 연결 설치구조는 생략하기로 한다)In addition, in the case of installing the sewer pipes as in the connection of the water pipes 10 and 50 above, when installing the branch connection T-type pipe 20, cut the position where the branch connection T-type pipe 20 is to be installed and flange joints. The branch connection T-shaped pipe 20 branched to the sewer pipe is installed by the method. (The detailed connection installation structure for the sewer pipe will be omitted.)

상술한 일반적인 분기연결 T형관(20)을 연결하는 분기 작업은, 시공이 까다롭고 공사기간이 과다하게 소요되어 상,하수도관을 사용하는 사용자들에게 오랜시간 사용하지 못하는 불편함을 초래하는 단점이 있다.The branching operation of connecting the general branch connection T-shaped pipe 20 described above has a disadvantage in that it is difficult to use for a long time to users who use water and sewage pipes because construction is difficult and excessive construction period is required. have.

본 고안은 상술한 문제점을 해결하기 위하여, 상,하수도 분기연결시 신속하게 분기작업을 실시할 수 있어 분기 연결관에 대한 작업의 공사기간 및 공사비를 절감할 수 있고, 상,하수도를 이용하는 사용자들의 편익을 향상시킬 수 있도록 하는 홀주입 연결 플랜지를 이용한 상,하수도 분기 연결관 설치구조를 제공함을 그 목적으로 한다.In order to solve the above problems, the present invention can be quickly branched when connecting the water and sewage branch can reduce the construction period and construction cost of the work for the branch connection pipe, users of water and sewage The object of the present invention is to provide an installation structure for water and sewage branch connection pipes using hole injection connection flanges to improve convenience.

도 1은 종래의 상수도관 분기연결 작업의 순서를 나타내는 흐름도.1 is a flow chart showing the sequence of conventional water pipe branch connection operation.

도 2는 본 고안의 상수도관 분기연결 작업의 순서를 나타내는 흐름도.Figure 2 is a flow chart showing the sequence of water pipe branch connection operation of the present invention.

도 3은 본 고안의 상수도관 분기연결 작업의 분해 상태를 나타내는 도면.Figure 3 is a view showing an exploded state of the water pipe branch connection work of the present invention.

도 4는 본 고안의 상수도관 분기연결 작업된 상태를 나타내는 사시도.Figure 4 is a perspective view showing a state in which the water pipe branch connection work of the present invention.

도 5는 도 4의 A-A부 절단된 상태를 나타내는 도면.5 is a view illustrating a cut state of the A-A portion of FIG.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

100 : 상수도관 110 : 연결 천공홀100: water pipe 110: connection hole

200 : 홀주입 연결 플랜지 210 : 연결 플랜지1200: hole injection connection flange 210: connection flange 1

220 : 연결 플랜지2 230 : 연결 플랜지3220: connection flange 2 230: connection flange 3

240 : 연결 플랜지4 250 : 라운딩부 몸체240: connection flange 4 250: rounding body

260 : 측면 플랜지부 270 : 밀착단부260: side flange portion 270: close end

280,350 : 체결 볼트홀 290,340 : 관통홀280,350: fastening bolt hole 290,340: through hole

300 : 연결관 330,330' : 플랜지부300: connector 330,330 ': flange portion

400 : 고무 개스킷400: Rubber Gasket

본 고안은 상술한 목적을 달성하기 위하여, 본 고안은 기존 상,하수도관에 분기 연결관을 설치하는 구조에 있어서, 기 설치된 상수도관에는 분기 연결관이 설치될 위치에 연결 천공홀이 형성되고, 상기의 연결 천공홀에 홀주입 연결 플랜지를 구성하는 연결 플랜지1,2,3,4가 삽입된 상태에서 체결 볼트로 체결되며, 상기의 홀주입 연결 플랜지가 삽입된 상태에서 그 외측에 연결관이 설치되어 다른 체결 볼트가 홀주입 연결 플랜지의 체결 볼트홀과 연결관의 체결 볼트홀을 관통하여 서로 결합시키는 한편, 상기의 상수도관과 연결관이 밀착되는 위치에 고무 개스킷이 밀착된 상태로 결합되어 분기관을 설치할 수 있는 구조인 것을 특징으로 하는 홀주입 연결 플랜지를 이용한 상,하수도 분기 연결관 설치구조를 제공한다.The present invention, in order to achieve the above object, the present invention has a structure for installing a branch connection pipe in the existing water and sewage pipe, the pre-installed water pipe is formed in the connection hole is installed at the position where the branch connection pipe is installed, The connecting flanges 1, 2, 3, and 4, which form the hole injection connection flange, are inserted into the connection drilling holes, and are fastened with a fastening bolt, and the connection pipe is disposed outside the hole injection connection flange. While the other fastening bolts are coupled to each other through the fastening bolt holes of the hole injection connection flange and the fastening bolt holes of the connection pipe, the rubber gasket is coupled in close contact with the water supply pipe and the connection pipe. It provides a water supply and sewage branch connection pipe installation structure using a hole injection connection flange, characterized in that the structure that can be installed in the branch pipe.

이하, 첨부 도면을 참조하여 본 고안의 구성과 작동 상태를 설명한다.Hereinafter, with reference to the accompanying drawings will be described the configuration and operating state of the present invention.

도 2는 본 고안의 상수도관 분기연결 작업의 순서를 나타내는 흐름도이고, 도 3은 본 고안의 상수도관 분기연결 작업의 분해 상태를 나타내는 도면이다.Figure 2 is a flow chart showing the sequence of the water pipe branch connection work of the present invention, Figure 3 is a view showing an exploded state of the water pipe branch connection work of the present invention.

기존의 상수도관(100)의 관로에 분기 연결관이 설치될 위치에 연결 천공홀(110)을 형성한 뒤 상기의 연결 천공홀(110)을 통해 4부분으로 제작된 홀주입 연결 플랜지(200)를 상수도관(100)의 내측에 삽입시키고, 상기의 홀주입 연결 플랜지(200)의 외부에 연결관(300)을 설치하게 된다.After forming the connection punching hole 110 at the position where the branch connection pipe is to be installed in the pipeline of the existing water supply pipe 100, the hole injection connecting flange 200 made of four parts through the connection punching hole 110 Is inserted into the inside of the water pipe 100, and the connection pipe 300 is installed outside the hole injection connection flange 200.

상술한 설명과 같이, 상기의 상수도관(100)에는 연결 천공홀(110)이 형성되고 상기의 연결 천공홀(110)을 통해 홀주입 연결 플랜지(200)가 삽입되는데, 이때 상기의 홀주입 연결 플랜지(200)는 4개의 연결 플랜지1,2,3,4(210)(220)(230)(240)로 제작된 구조가 일체로 연결 천공홀(110)의 내측에 삽입된 상태로 고정된다.As described above, the connection pipe hole 110 is formed in the water supply pipe 100 and the hole injection connection flange 200 is inserted through the connection hole 100, wherein the hole injection connection The flange 200 is fixed in a state in which a structure made of four connection flanges 1, 2, 3, 4 (210) (220) (230) and (240) is integrally inserted into the connection drilling hole (110). .

이때, 상기의 연결 플랜지1,2,3,4(210)(220)(230)(240)는 굴곡지게 형성된 라운딩부 몸체(250)의 양측면에 측면 플랜지부(260)가 형성되고 하부에 밀착단부(270)가 일체로 형성된 형태이다.At this time, the connecting flanges 1, 2, 3, 4 (210) (220) (230) (240) have side flanges (260) formed on both side surfaces of the rounded body (250) formed to bend and closely adhere to the bottom. End portion 270 is formed integrally.

상기의 연결 플랜지1,2,3,4(210)(220)(230)(240)의 라운딩부 몸체(250)에는체결 볼트홀(280)이 형성되고 상기의 연결 플랜지1,2,3,4(210)(220)(230)(240)의 측면 플랜지부(260)에는 다수개의 관통홀(290)이 형성된다.A fastening bolt hole 280 is formed in the rounding part body 250 of the connection flanges 1, 2, 3, 4 (210) 220, 230, and 240, and the connection flanges 1, 2, 3, A plurality of through holes 290 are formed in the side flange portions 260 of the four 210, 220, 230, and 240.

이때, 상기의 상수도관(100)의 연결 천공홀(110)에 삽입된 홀주입 연결 플랜지(200)를 구성하는 각각의 연결 플랜지1,2,3,4(210)(220)(230)(240)는 체결 볼트(310)로 체결된 상태에서 그 외측에 연결관(300)이 설치되어 상호 결합되어 고정된다.At this time, each of the connection flanges 1, 2, 3, 4 (210) (220) 230 (composing the hole injection connection flange 200 inserted into the connection drilling hole 110 of the water pipe 100 above) 240 is coupled to each other by fixing the connection pipe 300 is installed on the outside in the state fastened by the fastening bolt 310.

상기의 연결관(300)은 길이방향의 양측에 각각 플랜지부(330)(330')가 형성되고 그 플랜지부중 상부에 설치되는 플랜지부(330)에 다수개의 관통홀(340)이 형성되며, 상기의 연결관(300)에는 몸체에 체결 볼트홀(350)이 형성되어 다른 체결 볼트(360)로 연결 플랜지1,2,3,4(210)(220)(230)(240)과 연결관(300)을 체결하여 고정하게 된다.The connecting pipe 300 has flange portions 330 and 330 'formed on both sides of the longitudinal direction, and a plurality of through holes 340 are formed in the flange portion 330 installed on the upper portion of the flange portion. , The connection pipe 300 is formed with a fastening bolt hole 350 in the body is connected to the other fastening bolt 360, flange 1, 2, 3, 4 (210) (220) 230 (240) The pipe 300 is fastened by fixing.

이때, 상기의 홀주입 연결 플랜지(200)의 외측을 감싸도록 설치되는 연결관(300)은 상수관(100)과 밀착시 사이에 고무 개스킷(400)이 설치된다.At this time, the connection pipe 300 is installed to surround the outside of the hole injection connection flange 200, the rubber gasket 400 is installed between the water pipe 100 and when in close contact.

도 4는 본 고안의 상수도관 분기연결 작업된 상태를 나타내는 사시도이고, 도 5는 도 4의 A-A부 절단된 상태를 나타내는 도면이다.Figure 4 is a perspective view showing a state in which the water pipe branch connection work of the present invention, Figure 5 is a view showing a cut state A-A of FIG.

상기의 상수도관(100)에는 연결 천공홀의 외측에 고무 개스킷(400)이 밀착된 상태로 연결관(300)이 밀착되고 체결 볼트(360)에 의해 내측에 설치된 연결 플랜지1,2,3,4를 견고하게 고정하게 된다.The connection pipes 300 are in close contact with the water supply pipe 100 in a state in which the rubber gasket 400 is in close contact with the outside of the connection hole, and the connection flanges 1, 2, 3, and 4 installed inward by the fastening bolts 360. It will be fixed firmly.

즉, 상기의 상수도관(100)에는 분기관이 설치되는 경우, 그 연결 천공홀에 4개의 부재로 제작된 홀주입 연결 플랜지(200)가 삽입된 상태에서 상기의 홀주입 연결 플랜지(200)의 외측에 연결관(300)이 설치될 때 연결관(300)과 상수도관(100)이 밀착되는 부분에 고무 개스킷(400)이 설치되어 상수도관(100)의 사용시 누수가 발생되지 않도록 형성된다.That is, when the branch pipe is installed in the water supply pipe 100, the hole injection connection flange 200 made of four members is inserted into the connection drilling hole of the hole injection connection flange 200 When the connection pipe 300 is installed on the outside, the rubber gasket 400 is installed at a portion in which the connection pipe 300 and the water supply pipe 100 are in close contact with each other, so that a leak does not occur when the water supply pipe 100 is used.

상술한 상수도관(100)의 구성에 대한 설명과 같이, 기존 하수도관의 경우도 분기 연결관이 설치될 장소에 연결 천공홀을 형성한 뒤 그 연결 천공홀을 통해 4개의 부재로 제작된 홀주입 연결 플랜지를 하수도관의 내측에 삽입한 상태에서 그 홀주입 연결 플랜지의 외측에 연결관을 설치하여 체결 볼트로 체결하여 상수도관과 동일하게 분기 연결관을 설치할 수 있다.As described for the configuration of the water pipe 100 described above, in the case of the existing sewer pipe also formed a connection drilling hole in the place where the branch connection pipe will be installed through the hole injection made of four members through the connection drilling hole In the state where the connection flange is inserted into the sewer pipe, the connection pipe may be installed on the outside of the hole injection connection flange and fastened with a fastening bolt to install a branch connection pipe in the same manner as the water supply pipe.

상술한 본 고안의 구성과 작동 상태에 따른 효과를 설명한다.The effect of the configuration and operation of the present invention described above will be described.

본 고안의 홀주입 연결 플랜지를 이용한 상,하수도 분기 연결관 설치구조는, 상,하수도관에 분기관을 연결하는 경우 그 상,하수도관에 연결 천공홀을 형성하고 상기의 연결 천공홀을 통해 홀주입 연결 플랜지를 삽입하며, 상기의 홀주입 연결 플랜지의 외측에 연결관을 설치하여 체결 볼트로 홀주입 연결 플랜지와 연결관을 결합하여 분기 연결관을 설치하는 관계로 종래와 같이 불필요한 작업없이 간단한게 분기 연결관을 체결할 수 있어 작업의 효율화를 도모할 수 있고, 그로인하여 신속하게 분기작업을 할 수 있어 공사기간의 단축 및 공사비를 최대한 절감할 수 있는 효과를 얻을 수 있다.The installation structure of the water and sewage branch connection pipe using the hole injection connection flange of the present invention, when connecting the branch pipe to the water and sewage pipes, form a connection hole in the water and sewage pipe, and the hole through the connection hole Insert the injection connection flange and install the connection pipe on the outside of the hole injection connection flange, and connect the hole injection connection flange and the connection pipe with the fastening bolt to install the branch connection. The branch connection pipe can be tightened to improve the work efficiency, and thus, the branch work can be performed quickly, thereby reducing the construction period and minimizing the construction cost.

Claims (2)

기존 상,하수도관에 분기 연결관을 설치하는 구조에 있어서,In the structure of installing branch connection pipe in the existing water and sewage pipe, 기 설치된 상수도관(100)에는 분기 연결관이 설치될 위치에 연결 천공홀(110)이 형성되고, 상기의 연결 천공홀(110)에 홀주입 연결 플랜지(200)를 구성하는 연결 플랜지1,2,3,4(210)(220)(230)(240)가 삽입된 상태에서 체결 볼트(310)로 체결되며,In the pre-installed water supply pipe 100, a connection drilling hole 110 is formed at a position at which the branch connection pipe is to be installed, and connection flanges 1 and 2 constituting the hole injection connection flange 200 in the connection drilling hole 110. , 3,4 (210) (220) (230) (240) is fastened with a fastening bolt (310) in the inserted state, 상기의 홀주입 연결 플랜지(200)가 삽입된 상태에서 그 외측에 연결관(300)이 설치되어 다른 체결 볼트(360)가 홀주입 연결 플랜지(200)의 체결 볼트홀(280)과 연결관(300)의 체결 볼트홀(350)을 관통하여 서로 결합시키는 한편,In the state in which the hole injection connection flange 200 is inserted, the connection pipe 300 is installed on the outside thereof, so that another fastening bolt 360 is connected to the fastening bolt hole 280 and the connection pipe of the hole injection connection flange 200 ( While passing through the fastening bolt hole 350 of the 300 and coupled to each other, 상기의 상수도관(100)과 연결관(300)이 밀착되는 위치에 고무 개스킷(400)이 밀착된 상태로 결합되고,The rubber gasket 400 is coupled to a state where the water supply pipe 100 and the connection pipe 300 are in close contact with each other, 또한, 하수도관도 상수도관(100)과 동일한 구조로 분기관이 설치됨을 특징으로 하는 홀주입 연결 플랜지를 이용한 상,하수도 분기 연결관 설치구조.In addition, the sewage pipe is also the same structure as the water supply pipe 100 branch pipe installation structure using the hole injection connection flange, characterized in that the installation pipe. 제 1 항에 있어서,The method of claim 1, 상기의 홀주입 연결 플랜지(200)는 라운딩부 몸체(250)의 양측면에 측면 플랜지부(260)가 형성되고 하부에 밀착단부(270)가 형성된 구조로 연결 플랜지1,2,3,4(210)(220)(230)(240)가 형성되는 한편,The hole injection connection flange 200 has side flange parts 260 formed on both sides of the rounding part body 250, and a close end part 270 is formed at the bottom of the connection flanges 1, 2, 3, and 4 (210). 220, 230, 240 are formed, 상기의 연결 플랜지1,2,3,4(210)(220)(230)(240)의 라운딩부 몸체(250)에는한 개의 체결 볼트홀(280)이 형성되고 상기의 연결 플랜지1,2,3,4(210)(220)(230)(240)의 측면 플랜지부(260)에는 다수개의 관통홀(290)이 형성되어 각각의 연결 플랜지1,2,3,4(210)(220)(230)(240)가 밀착된 상태에서 체결 볼트(310)로 체결되는 구조인 것을 특징으로 하는 홀주입 연결 플랜지를 이용한 상,하수도 분기 연결관 설치구조.One fastening bolt hole 280 is formed in the rounding part body 250 of the connection flanges 1, 2, 3, 4 (210) 220, 230, and 240, and the connection flanges 1, 2, A plurality of through holes 290 are formed in the side flange portions 260 of the 3, 4, 210, 220, 230, and 240 so that the connection flanges 1, 2, 3, 4, 210, 220 are formed. Water supply and sewage branch connection pipe installation structure using a hole injection connection flange, characterized in that the structure is fastened by a fastening bolt 310 in a state in which the 230 (240) is in close contact.
KR2020020017593U 2002-06-10 2002-06-10 Mounting structure of breakout of waterworks or sewerage using hall insert connecting flange KR200295287Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020020017593U KR200295287Y1 (en) 2002-06-10 2002-06-10 Mounting structure of breakout of waterworks or sewerage using hall insert connecting flange

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020020017593U KR200295287Y1 (en) 2002-06-10 2002-06-10 Mounting structure of breakout of waterworks or sewerage using hall insert connecting flange

Publications (1)

Publication Number Publication Date
KR200295287Y1 true KR200295287Y1 (en) 2002-11-21

Family

ID=73124602

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020020017593U KR200295287Y1 (en) 2002-06-10 2002-06-10 Mounting structure of breakout of waterworks or sewerage using hall insert connecting flange

Country Status (1)

Country Link
KR (1) KR200295287Y1 (en)

Similar Documents

Publication Publication Date Title
US20050278841A1 (en) Flexible flange apparatus for connecting conduits and methods for connecting same
US5492372A (en) Split replacement flange for water closet and method of replacing
KR200381579Y1 (en) Branch pipe outlet fitting socket
KR200399662Y1 (en) Connection apparatus for manhole
KR200295287Y1 (en) Mounting structure of breakout of waterworks or sewerage using hall insert connecting flange
KR100770397B1 (en) A connection clamp to prevent separation and pipe connection fitted whit the connection clamp
KR100532193B1 (en) A branch pipe connection structure
KR20160004207U (en) Waterproof connector of sewer concrete pipe joint with socket
KR100779702B1 (en) Pipe Coupling Apparatus capable of adjusting the length
KR200316598Y1 (en) Assembly manhole structure for waterworks to mount valve
KR20020094841A (en) a flange coupling tube
KR200347922Y1 (en) A branch pipe for pipe arrangement
KR100522142B1 (en) Band together structure of a sewage pipe in the ground and a branch pipe
KR101960698B1 (en) Joint structure of underground culvert
CN210739637U (en) Water supply and drainage pipe connecting device
CN219655499U (en) Water supply and drainage pipeline connection structure
KR200269987Y1 (en) A device for coupling the pipe
KR200257366Y1 (en) a
KR100894896B1 (en) Drain-pipe connection structure of manhole
KR200261913Y1 (en) Rounding drain pipe using a high density polyethylene
KR200393539Y1 (en) A branch pipe connection structure
KR20080030812A (en) Rubber connctor for manhole and form of construction work
KR100740589B1 (en) Branch tee of piping
KR20080026750A (en) Pipe connecter having a complex water sealing structure
KR200299131Y1 (en) jointing unit of pipe

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
G701 Publication of correction
FPAY Annual fee payment

Payment date: 20101104

Year of fee payment: 9

LAPS Lapse due to unpaid annual fee