KR200292677Y1 - Wedge panel system for cross beam of pre cast concrete beam - Google Patents

Wedge panel system for cross beam of pre cast concrete beam Download PDF

Info

Publication number
KR200292677Y1
KR200292677Y1 KR2020020020829U KR20020020829U KR200292677Y1 KR 200292677 Y1 KR200292677 Y1 KR 200292677Y1 KR 2020020020829 U KR2020020020829 U KR 2020020020829U KR 20020020829 U KR20020020829 U KR 20020020829U KR 200292677 Y1 KR200292677 Y1 KR 200292677Y1
Authority
KR
South Korea
Prior art keywords
wedge
panel
tapered
formwork
fixed
Prior art date
Application number
KR2020020020829U
Other languages
Korean (ko)
Inventor
이문일
Original Assignee
이문일
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이문일 filed Critical 이문일
Priority to KR2020020020829U priority Critical patent/KR200292677Y1/en
Application granted granted Critical
Publication of KR200292677Y1 publication Critical patent/KR200292677Y1/en

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

본 고안은 피씨빔 공법에 적용되는 크로스빔 콘크리트 타설용 강재거푸집에 관한 것으로, 더욱 상세하게는 양측 피씨빔 사이에 수직되게 설치되는 크로스빔을 제작하기 위한 콘크리트 거푸집에 있어서, 상기 거푸집은 중앙에 위치되어 상측에서 하측으로 자중에 의해 하향 슬라이딩 되고 상광하협 대칭형으로 테이퍼지며 좌우측면은 내측으로 협소하게 테이퍼 형성되어 상호 대향되게 설치되는 웨지패널과; 상기 웨지패널의 좌측면에 내측면이 면접촉 되고 외측면은 외측으로 돌출되게 형성된 상단의 고정턱에 의해 상기 피씨빔의 상면에 안착되어 고정되며 중간부에는 상기 웨지패널의 이탈을 방지하기 위한 채널이 측방에서 슬라이딩 삽입되어 테이퍼핀으로 고정되는 '[' 형상 채널가이드가 외측으로 각각 다수 구비되고 하부에는 일측이 힌지고정되며 타측은 회전되어 접철되는 하부패널이 구비된 한쌍의 좌측패널 어셈블리와, 상기 좌측패널 어셈블리와 대향되게 구비된 우측패널 어셈블리와; 상기 채널가이드 상방에 천공된 제1 삽입공에 수평으로 관통하여 양단이 너트에 의해 고정되며 타설중 발생하는 콘크리트압을 지지하는 웨지형 타이볼트를 포함하여 구성된다. 이러한 본 고안은 테이퍼 형성된 웨지패널에 의해 기설치된 피씨빔의 거리에 상관없이 거푸집을 형성할 수 있어 용이하게 설치할 수 있음은 물론, 상기 웨지패널의 좌우측면이 내측으로 협소하게 테이퍼 형성되어 용이하게 해체할 수 있는 효과를 제공한다.The present invention relates to a steel formwork for cross-beam concrete placing applied to the PC beam method, more specifically in the concrete formwork for producing a cross beam vertically installed between the two PC beam, the formwork is located in the center A wedge panel which slides downward by its own weight from the upper side to the lower side and is tapered in the upper and lower side symmetrical forms, and the left and right sides are tapered inwardly and are installed to face each other; The inner surface is in surface contact with the left side of the wedge panel and the outer surface is fixed to the upper surface of the PC beam by the fixing jaw of the upper end formed to protrude outward, and the channel for preventing the detachment of the wedge panel in the middle part. A pair of left panel assemblies having a plurality of '[' shape channel guides which are inserted into the side and fixed by tapered pins to the outside, each having a lower panel hinged at the lower side and the other side rotated and folded at the lower side, and A right panel assembly provided to face the left panel assembly; It includes a wedge-type tie bolt that penetrates horizontally to the first insertion hole drilled above the channel guide and is fixed by a nut and supports concrete pressure generated during pouring. The present invention can form a die regardless of the distance of the pre-installed PC beam by the tapered wedge panel can be easily installed, as well as the left and right sides of the wedge panel tapered inwards easily dismantled It provides an effect that can be done.

Description

피씨빔 공법에 적용되는 크로스빔 콘크리트 타설용 강재거푸집{WEDGE PANEL SYSTEM FOR CROSS BEAM OF PRE CAST CONCRETE BEAM}WEDGE PANEL SYSTEM FOR CROSS BEAM OF PRE CAST CONCRETE BEAM}

본 고안은 피씨빔 공법에 적용되는 크로스빔 콘크리트 타설용 강재거푸집에 관한 것으로, 보다 상세하게는 피씨빔 사이의 거리에 상관없이 설치되어 크로스빔을 형성할 수 있음은 물론, 설치 및 해체를 용이하게 할 수 있도록 한 피씨빔 공법에 적용되는 크로스빔 콘크리트 타설용 강재거푸집에 관한 것이다.The present invention relates to a steel formwork for cross-beam concrete pouring applied to the PC beam method, more specifically, can be installed irrespective of the distance between the PC beam to form a crossbeam, as well as easy installation and disassembly The present invention relates to a steel formwork for cross beam concrete pouring applied to a PC beam method.

도 1은 종래의 크로스빔 콘크리트 타설용 강재거푸집을 도시한 사시도로서, 일반적으로 교량은 상부구조(미도시)와 하부구조(10)로 나누어진다. 이들 중 상부구조는 통로를 형성하는 바닥구조, 그것을 직접 받치는 바닥판 및 교량의 본체인 주구조로 구성된다. 또한 하부구조(10)는 교각(1)과 교대(2)로 이루어 지는데, 교각(1)은 두 경간 이상의 교량인 경우에 중간 지점을 형성하여 상부구조를 지지하는용도이고, 교대(2)는 교량의 양 끝부분에서 상부구조를 지지하며 뒷면의 토압에도 대항하는 것이다.1 is a perspective view showing a steel formwork for placing a conventional cross-beam concrete, generally a bridge is divided into an upper structure (not shown) and the lower structure (10). Among them, the superstructure is composed of a bottom structure which forms a passage, a bottom plate which directly supports it, and a main structure which is the main body of the bridge. In addition, the substructure 10 is composed of a bridge (1) and the shift (2), the bridge (1) is the use for supporting the superstructure by forming an intermediate point in the case of bridges more than two spans, the shift (2) It supports the superstructure at both ends of the bridge and resists earth pressure on the back.

이때, 상부구조물을 형성하기 위해서는 교각(1) 및 교대(2)의 상단에 상기 상부구조물을 지지하기 위한 피씨빔(PRE-CONCRETE BEAM)(3)이 다수 설치되며, 이들의 사이는 크로스빔(CROSS BEAM)(4)이 설치되어 상기 피씨빔(3)을 구조적으로 지지하게 된다.In this case, in order to form the upper structure, a plurality of PRE-CONCRETE BEAMs 3 for supporting the upper structure are installed on the tops of the piers 1 and the shifts 2, and a cross beam between them. CROSS BEAM) 4 is installed to structurally support the PC beam 3.

상기와 같은 일련의 과정 중에서 크로스빔(4)을 타설하기 위해 종래에는 합판과 같은 보완재(5)를 상기 피씨빔(3) 사이에 다수 삽입시키고 용접 또는 못 등으로 고정하여 거푸집(20)을 형성하였으며, 이후 콘크리트를 타설한 다음 상기 보완재(5)를 분리시키는 방법을 고수해 왔다.In order to pour the cross beam 4 in the above-described process, conventionally, a plurality of complementary materials 5 such as plywood are inserted between the PC beams 3 and fixed by welding or nails to form the formwork 20. After that, after the concrete is poured, the method of separating the supplements 5 has been adhered to.

그러나 상기와 같은 방법은 모두 작업현장에서 보완작업을 해야하므로 현장 작업량이 많아짐은 물론이고, 피씨빔(3) 사이의 폭과 높이 차이에 정확히 맞추어 보완재(5)에 의한 거푸집(20)을 형성한다는 것이 원천적으로 불가능하였다. 즉, 크로스빔(4)을 형성하기 위한 거푸집(20)은 실제현장에서 피씨빔(3)의 높이와 너비가 다른 상황인 스큐된 상황에서는 제대로 대처할 수 없는 문제점이 있었으며, 특히 해체작업을 함에 있어서 보완재(5)가 용접이나 못 등으로 고정되어 있어 이를 해체하는 공정이 아주 불편하였다.However, all of the above methods must be supplemented at the work site, thus increasing the amount of field work, and forming the formwork 20 by the complementary material 5 in accordance with the width and height difference between the PC beams 3. It was originally impossible. That is, the formwork 20 for forming the cross beam 4 has a problem that can not be properly handled in the skewed situation that the height and width of the PC beam 3 is different in the actual site, especially in dismantling work Complementary material (5) is fixed by welding or nails, so the process of dismantling it was very inconvenient.

본 고안은 상술한 바와 같은 종래 기술이 갖는 제반 문제점을 감안하여 이를 해결하고자 안출한 것으로, 피씨빔 사이의 거리에 상관없이 설치되어 크로스빔을형성할 수 있음은 물론, 설치 및 해체를 용이하게 할 수 있도록 한 피씨빔 공법에 적용되는 크로스빔 콘크리트 타설용 강재거푸집을 제공함에 그 목적이 있다.The present invention has been made in view of the above-mentioned problems in the prior art as described above, and can be installed irrespective of the distance between the PC beams to form a cross beam, as well as to facilitate installation and disassembly. The object of the present invention is to provide steel formwork for cross beam concrete pouring, which is applied to the PC beam method.

본 고안의 상술한 목적은 양측 피씨빔 사이에 수직되게 설치되는 크로스빔을 제작하기 위한 콘크리트 거푸집에 있어서, 상기 거푸집은 중앙에 위치되어 상측에서 하측으로 자중에 의해 하향 슬라이딩 되고 상광하협 대칭형으로 테이퍼지며 좌우측면은 내측으로 협소하게 테이퍼 형성되어 상호 대향되게 설치되는 웨지패널과; 상기 웨지패널의 좌측면에 내측면이 면접촉 되고 외측면은 외측으로 돌출되게 형성된 상단의 고정턱에 의해 상기 피씨빔의 상면에 안착되어 고정되며 중간부에는 상기 웨지패널의 이탈을 방지하기 위한 채널이 측방에서 슬라이딩 삽입되어 테이퍼핀으로 고정되는 '[' 형상 채널가이드가 외측으로 각각 다수 구비되고 하부에는 일측이 힌지고정되며 타측은 회전되어 접철되는 하부패널이 구비된 한쌍의 좌측패널 어셈블리와, 상기 좌측패널 어셈블리와 대향되게 구비된 우측패널 어셈블리와; 상기 채널가이드 상방에 천공된 제1 삽입공에 수평으로 관통하여 양단이 너트에 의해 고정되며 타설중 발생하는 콘크리트압을 지지하는 웨지형 타이볼트를 포함하여 구성함에 의해 달성된다.The above-described object of the present invention is a concrete formwork for manufacturing a crossbeam vertically installed between both PC beams, the formwork is located in the center and slides downward by its own weight from the upper side to the lower side and tapered in the upper and lower symmetry type The left and right side surface is formed in a narrow tapered inward wedge panel and installed to face each other; The inner surface is in surface contact with the left side of the wedge panel and the outer surface is fixed to the upper surface of the PC beam by the fixing jaw of the upper end formed to protrude outward, and the channel for preventing the detachment of the wedge panel in the middle part. A pair of left panel assemblies having a plurality of '[' shape channel guides which are inserted into the side and fixed by tapered pins to the outside, each having a lower panel hinged at the lower side and the other side rotated and folded at the lower side, and A right panel assembly provided to face the left panel assembly; It is achieved by including a wedge-shaped tie bolt that penetrates horizontally to the first insertion hole drilled above the channel guide and is fixed by a nut and supports concrete pressure generated during pouring.

도 1은 종래의 크로스빔 콘크리트 타설용 강재거푸집을 도시한 사시도.1 is a perspective view showing a steel formwork for placing a conventional cross-beam concrete.

도 2는 본 발명에 의한 피씨빔 공법에 적용되는 크로스빔 콘크리트 타설용 강재거푸집을 도시한 사시도.Figure 2 is a perspective view showing a steel formwork for cross-beam concrete pouring applied to the PC beam method according to the present invention.

도 3은 본 발명에 의한 피씨빔 공법에 적용되는 크로스빔 콘크리트 타설용 강재거푸집을 도시한 정면도.Figure 3 is a front view showing a steel formwork for cross-beam concrete pouring applied to the PC beam method according to the present invention.

도 4는 본 발명에 의한 피씨빔 공법에 적용되는 크로스빔 콘크리트 타설용 강재거푸집을 도시한 분해 사시도.Figure 4 is an exploded perspective view showing a steel formwork for cross-beam concrete pouring applied to the PC beam method according to the present invention.

도 5는 본 발명에 의한 피씨빔 공법에 적용되는 크로스빔 콘크리트 타설용 강재거푸집을 도시한 좌측면도.Figure 5 is a left side view showing a steel formwork for cross-beam concrete pouring applied to the PC beam method according to the present invention.

도 6은 본 발명에 의한 피씨빔 공법에 적용되는 크로스빔 콘크리트 타설용 강재거푸집을 도시한 평면도.Figure 6 is a plan view showing a steel formwork for cross-beam concrete pouring applied to the PC beam method according to the present invention.

< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>

1: 교각 2: 교대1: pier 2: shift

3: 피씨빔 4: 크로스빔3: PC beam 4: cross beam

5: 보완재 20: 거푸집5: complement 20: formwork

30: 콘크리트 100, 100': 웨지패널30: concrete 100, 100 ': wedge panel

101, 101': 좌우측면 200: 좌측패널 어셈블리101, 101 ': left and right side 200: left panel assembly

200': 우측패널 어셈블리 201: 내측면200 ': right panel assembly 201: inner side

202: 외측면 203: 고정턱202: outer side 203: fixed jaw

204: 고정턱 205: 채널가이드204: fixed jaw 205: channel guide

206: 하부패널 207: 제1 삽입공206: lower panel 207: first insertion hole

208: 제2 삽입공 209: 이송용 고리208: second insertion hole 209: transfer ring

C: 채널C: channel

이하에서는, 본 고안에 따른 바람직한 일 실시예를 첨부도면에 의거하여 보다 상세하게 설명한다.Hereinafter, a preferred embodiment according to the present invention will be described in more detail based on the accompanying drawings.

도 2는 본 발명에 의한 피씨빔 공법에 적용되는 크로스빔 콘크리트 타설용 강재거푸집을 도시한 사시도이고, 도 3은 본 발명에 의한 피씨빔 공법에 적용되는크로스빔 콘크리트 타설용 강재거푸집을 도시한 정면도이며, 도 4는 본 발명에 의한 피씨빔 공법에 적용되는 크로스빔 콘크리트 타설용 강재거푸집을 도시한 분해 사시도이고, 도 5는 본 발명에 의한 피씨빔 공법에 적용되는 크로스빔 콘크리트 타설용 강재거푸집을 도시한 좌측면도이며, 도 6은 본 발명에 의한 피씨빔 공법에 적용되는 크로스빔 콘크리트 타설용 강재거푸집을 도시한 평면도이다.Figure 2 is a perspective view showing the steel formwork for cross-beam concrete placing applied to the PC beam method according to the present invention, Figure 3 is a front view showing the steel formwork for cross-beam concrete placing applied to the PC beam method according to the present invention. 4 is an exploded perspective view illustrating a steel beam for placing a cross beam concrete applied to the PC beam method according to the present invention, and FIG. 5 is a steel form for placing a steel beam for placing a beam of the PC beam method according to the present invention. Figure 6 is a left side view, Figure 6 is a plan view showing a steel formwork for cross-beam concrete pouring applied to the PC beam method according to the present invention.

도 2 내지 도 6에 의하면 본 고안에 의한 피씨빔 공법에 적용되는 크로스빔 콘크리트 타설용 강재거푸집은 크게 웨지패널(100, 100'), 좌측패널 어셈블리(200), 우측패널 어셈블리(200') 및 웨지형 타이볼트(300)로 구성된다.According to Figures 2 to 6 the steel formwork for cross-beam concrete placing applied to the PC beam method according to the present invention is largely wedge panels (100, 100 '), left panel assembly 200, right panel assembly 200' and It is composed of a wedge-type tie bolt (300).

웨지패널(100, 100')은 중앙에 위치되어 상측에서 하측으로 자중에 의해 하향 슬라이딩 되고 상광하협 대칭형으로 테이퍼지며 좌우측면(101, 101')은 내측으로 협소하게 테이퍼 형성되어 상호 대향되게 설치된다. 이때, 좌우측면 사이에는 다수의 보강재가 용접에 의해 설치되어 상기 웨지패널(100, 100')을 구조적으로 지지할 수 있다.Wedge panels 100 and 100 'are positioned in the center and slide downward by their own weight from the upper side to the lower side and are tapered in the upper and lower side symmetry, and the left and right side surfaces 101 and 101' are narrowly tapered inward and installed to face each other. . In this case, a plurality of reinforcing members are installed between the left and right side surfaces by welding to structurally support the wedge panels 100 and 100 '.

좌측패널 어셈블리(200)는 상기 웨지패널(100, 100')의 좌측면(101)에 내측면(201)이 면접촉 되고 외측면(202)은 외측으로 돌출되게 형성된 상단의 고정턱(203)에 의해 상기 피씨빔(3)의 상면에 안착되어 고정되며 중간부에는 상기 웨지패널(100, 100')의 이탈을 방지하기 위한 채널(C)이 측방에서 슬라이딩 삽입되어 테이퍼핀(204)으로 고정되는 '[' 형상 채널가이드(205)가 외측으로 각각 다수 구비되고 하부에는 일측이 힌지고정되며 타측은 회전되어 접철되는 하부패널(206)이 구비된 한쌍으로 이루어진다.The left panel assembly 200 has a top fixing jaw 203 formed so that the inner surface 201 is in surface contact with the left surface 101 of the wedge panels 100 and 100 'and the outer surface 202 protrudes outward. It is seated and fixed on the upper surface of the PC beam (3) and the channel (C) for preventing the separation of the wedge panel (100, 100 ') in the middle portion is inserted into the sliding sliding sideways fixed to the tapered pin 204 A plurality of '[' shaped channel guides 205 are provided on the outside, and a pair of lower panels 206 are provided at one side of which a hinge is fixed and the other side is rotated and folded.

우측패널 어셈블리(200')는 상기 웨지패널(100, 100')의 우측면(101')에 내측면(201')이 면접촉 되고 외측면(202')은 외측으로 돌출되게 형성된 상단의 고정턱(203')에 의해 상기 피씨빔(3)의 상면에 안착되어 고정되며 중간부에는 상기 웨지패널(100, 100')의 이탈을 방지하기 위한 채널(C)이 측방에서 슬라이딩 삽입되어 테이퍼핀(204')으로 고정되는 '[' 형상 채널가이드(205')가 외측으로 각각 다수 구비되고 하부에는 일측이 힌지고정되며 타측은 회전되어 접철되는 하부패널(206')이 구비된 한쌍으로 이루어진다.The right panel assembly 200 'has an upper fixing jaw formed at an inner side surface 201' in contact with the right side 101 'of the wedge panels 100 and 100' and an outer side surface 202 'protruding outward. It is seated and fixed on the upper surface of the PC beam 3 by the (203 ') and the channel (C) for preventing the separation of the wedge panel (100, 100') in the middle portion is inserted into the sliding side tapered pin ( A plurality of '[' shape channel guides 205 'fixed to 204' are provided on the outside, and a pair of lower panels 206 'are provided on one side of which is hinged and the other is rotated and folded.

웨지형 타이볼트(300, 300')는 상기 채널가이드(205, 205') 상방에 천공된 제1 삽입공(207, 207')에 수직으로 관통하여 양단이 너트(301)에 의해 고정되며 타설된 콘크리트압을 지지하게 된다.The wedge-shaped tie bolts 300 and 300 'penetrate perpendicularly to the first insertion holes 207 and 207' bored above the channel guides 205 and 205 'so that both ends are fixed by the nut 301 and placed. Support the concrete pressure.

이러한 구성으로 이루어진 본 고안은 우선 크래인 등의 중장비를 이용하여 이송용 고리(209)에 와이어를 체결시켜 설치될 피씨빔(3) 사이에 안착시킨다. 그리고 상기 피씨빔(3) 사이의 거리에 따라 웨지패널(100, 100')을 좌측패널 어셈블리(200)와 대향되게 구비된 우측패널 어셈블리(200') 사이에서 수직으로 밀착시킨다. 이때 상기 웨지패널(100, 100')은 다수의 채널(205, 205')에 의해 고정되어 있으므로 밖으로 이탈되지 않으며, 좌측패널 어셈블리(200) 및 우측패널 어셈블리(200')은 타이볼트(300)에 의해 지지된다.The present invention made of such a configuration is first seated between the PC beam (3) to be installed by fastening the wire to the transfer ring 209 using heavy equipment such as crane. The wedge panels 100 and 100 ′ are vertically contacted between the right panel assembly 200 ′ provided to face the left panel assembly 200 according to the distance between the PC beams 3. At this time, since the wedge panels 100 and 100 'are fixed by the plurality of channels 205 and 205', they are not separated out, and the left panel assembly 200 and the right panel assembly 200 'are tie bolts 300. Is supported by.

이후 콘크리트(30)를 본 발명에 의한 피씨빔 공법에 적용되는 크로스빔 콘크리트 타설용 강재거푸집 사이에 타설을 한 후 양생시킨다.Thereafter, the concrete 30 is cured after placing between the steel formwork for cross-beam concrete pouring applied to the PC beam method according to the present invention.

그리고 다수의 채널(C)을 채널가이드(205, 205')에서 분리시킨 후 먼저 웨지패널(100, 100')을 분리시키는데, 이때 상기 웨지패널(100, 100')은 좌우측면(101, 101')이 내측으로 협소하게 테이퍼 형성되어 있어 용이하게 상기 좌측패널 어셈블리(200) 및 우측패널 어셈블리(200')에서 분리된다.After separating the plurality of channels C from the channel guides 205 and 205 ', the wedge panels 100 and 100' are first separated, wherein the wedge panels 100 and 100 'have left and right sides 101 and 101. ') Is narrowly tapered inward so that it is easily separated from the left panel assembly 200 and the right panel assembly 200'.

그리고 다수의 타이볼트(300, 300')를 해체한 후 각각의 하부패널(206, 206')에서 상기 좌측패널 어셈블리(200) 및 우측패널 어셈블리(200')를 분리해 내면 된다.After dismantling a plurality of tie bolts 300 and 300 ', the left panel assembly 200 and the right panel assembly 200' may be separated from each of the lower panels 206 and 206 '.

이상에서 상세히 설명한 바와 같이, 본 고안은 테이퍼 형성된 웨지패널에 의해 기설치된 피씨빔의 거리에 상관없이 거푸집을 형성할 수 있어 용이하게 설치할 수 있음은 물론, 상기 웨지패널의 좌우측면이 내측으로 협소하게 테이퍼 형성되어 용이하게 해체할 수 있는 효과를 제공한다.As described in detail above, the present invention can form a die regardless of the distance of the pre-installed PC beam by the tapered wedge panel can be easily installed, as well as the left and right sides of the wedge panel narrowly to the inside It is tapered to provide an effect that can be easily dismantled.

이상에서는, 본 고안을 특정의 바람직한 실시예에 대해서 도시하고 설명하였다. 그러나, 본 고안은 상술한 실시예에만 한정되는 것은 아니며, 본 고안이 속하는 기술 분야에서 통상의 지식을 가진 자라면 이하의 특허청구범위에 기재된 본 발명의 기술적 사상의 요지를 벗어남이 없이 얼마든지 다양하게 변경실시할 수 있을 것이다.In the above, the present invention has been shown and described with respect to certain preferred embodiments. However, the present invention is not limited only to the above-described embodiments, and those skilled in the art to which the present invention pertains may vary without departing from the spirit of the technical idea of the present invention described in the claims below. It may be changed.

Claims (3)

양측 피씨빔(3) 사이에 수직되게 설치되는 크로스빔(4)을 제작하기 위한 콘크리트(30) 거푸집(20)에 있어서,In the formwork 20 of the concrete 30 for producing a crossbeam (4) is installed vertically between the two PC beam (3), 상기 거푸집(20)은 중앙에 위치되어 상측에서 하측으로 자중에 의해 하향 슬라이딩 되고 상광하협 대칭형으로 테이퍼지며 좌우측면(101, 101')은 내측으로 협소하게 테이퍼 형성되어 상호 대향되게 설치되는 웨지패널(100, 100')과;The formwork 20 is located in the center and sliding downward by its own weight from the upper side to the lower side and tapered in the upper and lower side symmetry, and the left and right side surfaces 101 and 101 'are narrowly tapered inward and installed to face each other ( 100, 100 '); 상기 웨지패널(100, 100')의 좌측면(101)에 내측면(201)이 면접촉 되고 외측면(202)은 외측으로 돌출되게 형성된 상단의 고정턱(203)에 의해 상기 피씨빔(3)의 상면에 안착되어 고정되며 중간부에는 상기 웨지패널(100, 100')의 이탈을 방지하기 위한 채널(C)이 측방에서 슬라이딩 삽입되어 테이퍼핀(204)으로 고정되는 '[' 형상 채널가이드(205)가 외측으로 각각 다수 구비되고 하부에는 일측이 힌지고정되며 타측은 회전되어 접철되는 하부패널(206)이 구비된 한쌍의 좌측패널 어셈블리(200)와, 상기 좌측패널 어셈블리(200)와 대향되게 구비된 우측패널 어셈블리(200')와;The PC beam 3 is formed by the upper fixing jaw 203 formed so that the inner surface 201 is in surface contact with the left surface 101 of the wedge panels 100 and 100 'and the outer surface 202 protrudes outward. It is seated and fixed to the upper surface of the () and the middle portion of the channel (C) for preventing the separation of the wedge panel (100, 100 ') is inserted into the sliding sliding sideways' [' shaped channel guide fixed to the tapered pin 204 A pair of left panel assemblies 200 having a plurality of 205s respectively provided to the outside and a lower panel 206 which is hinged and fixed to a lower side thereof, and a lower panel 206 that is rotated and folded on the other side thereof, face the left panel assembly 200. A right panel assembly 200 'provided to be; 상기 채널가이드(205) 상방에 천공된 제1 삽입공(207)에 수평으로 관통하여 양단이 너트(301)에 의해 고정되며 타설중 발생하는 콘크리트압을 지지하는 웨지형 타이볼트(300)를 포함하여 구성되는 것을 특징으로 하는 피씨빔 공법에 적용되는 크로스빔 콘크리트 타설용 강재거푸집.Wedge-shaped tie bolts 300 which penetrate horizontally through the first insertion hole 207 bored above the channel guide 205 and are fixed by nuts 301 and support concrete pressure generated during pouring, are included. Steel formwork for cross-beam concrete pouring applied to the PC beam method characterized in that the configuration. 제1 항에 있어서, 상기 채널가이드(205)의 상면과 하면에는 각각 제2 삽입공(208)이 형성되어 상기 테이퍼핀(204)이 상측에서 하측으로 삽입되어 상기 채널(C)을 고정시키는 것을 특징으로 하는 피씨빔 공법에 적용되는 크로스빔 콘크리트 타설용 강재거푸집.According to claim 1, wherein the upper and lower surfaces of the channel guide 205 has a second insertion hole 208 is formed so that the tapered pin 204 is inserted from the upper side to the lower side to fix the channel (C). Steel formwork for cross beam concrete pouring applied to PC beam method. 제1 항에 있어서, 상기 좌측패널 어셈블리(200)의 상부에는 이송용 고리(209)가 구비된 것을 특징으로 하는 피씨빔 공법에 적용되는 크로스빔 콘크리트 타설용 강재거푸집.According to claim 1, wherein the left panel assembly 200, the steel die for cross-beam concrete pouring applied to the PC beam method, characterized in that the transfer ring 209 is provided on the top.
KR2020020020829U 2002-07-11 2002-07-11 Wedge panel system for cross beam of pre cast concrete beam KR200292677Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020020020829U KR200292677Y1 (en) 2002-07-11 2002-07-11 Wedge panel system for cross beam of pre cast concrete beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020020020829U KR200292677Y1 (en) 2002-07-11 2002-07-11 Wedge panel system for cross beam of pre cast concrete beam

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR10-2002-0040412A Division KR100500979B1 (en) 2002-07-11 2002-07-11 Wedge panel system for cross beam of pre cast concrete beam

Publications (1)

Publication Number Publication Date
KR200292677Y1 true KR200292677Y1 (en) 2002-10-28

Family

ID=73077505

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020020020829U KR200292677Y1 (en) 2002-07-11 2002-07-11 Wedge panel system for cross beam of pre cast concrete beam

Country Status (1)

Country Link
KR (1) KR200292677Y1 (en)

Similar Documents

Publication Publication Date Title
AU2018204385A1 (en) Formwork for performing castings for providing floor slabs
CN109440724B (en) Installation method of cast-in-place beam template suspension support system of high-pile wharf
US5867855A (en) Method for connecting precast concrete girders
KR200292677Y1 (en) Wedge panel system for cross beam of pre cast concrete beam
KR100500979B1 (en) Wedge panel system for cross beam of pre cast concrete beam
KR101297706B1 (en) Construction method for prestressed girder using jack-up beam
JPH0782709A (en) Reinforcing method for concrete structure, employing hollow pc steel bar
KR100565384B1 (en) Structure of continuous PSC beam with connection member and steel cross beam and bridge construction method using the same
KR100450863B1 (en) Method and apparatus for pulling up an upper structure of bridge
KR102490192B1 (en) Bridge upper structure and the method constructing bridge upper structure using the same
KR101690302B1 (en) Floor beam capable of polygonal combination and the contruction method thereof
US6058666A (en) Twin-axis prestressed single-tee beam with lower flange and process of construction
CN112211098A (en) Bolt connection device between prefabricated bridge floor boards of assembled bridge
KR200351989Y1 (en) Concrete slab sheeting apparatus For P.C beam girder bridge
KR101826915B1 (en) Steel composite girder and construction method thereof
CN111455817A (en) Cable-stayed bridge integral steel anchor beam and construction method thereof
KR20020032487A (en) A mold supporting device of slab
KR100622449B1 (en) Hybrid pier and continuity execution method using the hybrid pier
KR102619855B1 (en) Construction method for continuous bridge using single supporter
KR102296206B1 (en) Sectionally devided precast culvert box
JPH03271408A (en) Steel floor bed for repairing bridge and method of attaching thereof
CN108842590A (en) The method and bridge of bridge are built for the stiffness bearer of bridge construction, without bracket
KR100715695B1 (en) Slab formwork for PC beam bridge
KR102670768B1 (en) Steel composite ramen bridge reinforced with section steel supports and crossing rebars and its construction method
JP7217375B1 (en) Floor slab replacement method

Legal Events

Date Code Title Description
U107 Dual application of utility model
REGI Registration of establishment
FPAY Annual fee payment

Payment date: 20031008

Year of fee payment: 3

EXTG Extinguishment