KR200291963Y1 - Laying one's ashes to rest a grave - Google Patents

Laying one's ashes to rest a grave Download PDF

Info

Publication number
KR200291963Y1
KR200291963Y1 KR2020020021832U KR20020021832U KR200291963Y1 KR 200291963 Y1 KR200291963 Y1 KR 200291963Y1 KR 2020020021832 U KR2020020021832 U KR 2020020021832U KR 20020021832 U KR20020021832 U KR 20020021832U KR 200291963 Y1 KR200291963 Y1 KR 200291963Y1
Authority
KR
South Korea
Prior art keywords
slab layer
layer
slab
ashes
vertical support
Prior art date
Application number
KR2020020021832U
Other languages
Korean (ko)
Inventor
주우일
Original Assignee
주식회사 왕릉
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 왕릉 filed Critical 주식회사 왕릉
Priority to KR2020020021832U priority Critical patent/KR200291963Y1/en
Application granted granted Critical
Publication of KR200291963Y1 publication Critical patent/KR200291963Y1/en

Links

Abstract

본 고안은 납골묘에 관한 것으로, 지면에 설치되는 골재층 상부에 시공되는 제 1슬래브과, 상기 제 1슬래브층 상부에 시공되는 내부마감수단과, 상기 내부마감수단 상부에 요입부가 형성되도록 돌출되게 시공된 제 2슬래브층과, 상기 요입부에 결로홈이 형성되도록 시공된 제 3슬래브층으로 이루어진 바닥구조물; 상기 바닥구조물의 제 2슬래브층 상부 내주연으로 수직으로 얹혀져 벽 역할을 하게 되는 수직지지대와, 상기 수직지지대 상부에 적층되어 천정 역할을 하게 되는 수평지지대와, 상기 수평지지대의 중앙 영역에 구비되고, 마감구로써 마감되는 수직통풍구로 이루어진 내부구조; 상기 바닥구조물의 제 2슬래브층 상부 외측에 상기 내부구조물과 적정 간격을 유지하여 얹혀지고, 하단 중앙 영역에 배출홈이 형성된 외부구조물; 상기 내,외부구조물의 일측에 구비되어 출입문이 설치되는 출입문구조물; 및 상기 제 3슬래브층 상부에 상기 수직지지대와 적정 간격을 유지하여 이중구조로 배치되어 유골함이 보관되는 유골보관 선반으로 구성된 것으로, 이는 지면과 외부로부터 발생되는 찬공기, 습기 및 열 등을 완전히 차단하게 되고, 기온 차이에 의하여 석실 내부에서 발생되는 결로(물방울)의 차단 및 배출이 용이한 것이다.The present invention relates to a gravel grave, the first slab is installed on top of the aggregate layer is installed on the ground, the inner finishing means to be installed on the first slab layer, and the construction is projected so as to form a recess in the upper portion A bottom structure including a second slab layer and a third slab layer constructed to form a condensation groove in the recess portion; It is provided in the vertical support that is vertically mounted to the upper inner circumference of the second slab layer of the floor structure to serve as a wall, a horizontal support stacked on the vertical support to serve as a ceiling, and in the central region of the horizontal support, An internal structure consisting of vertical vents closed as finishes; An outer structure mounted on the upper side of the second slab layer of the floor structure at an appropriate interval with the inner structure, and having a discharge groove formed in a lower center region; A door structure provided at one side of the inner and outer structures to install an entrance door; And a ashes storage shelf in which the ashes are stored in a double structure by maintaining a proper distance from the vertical support on the third slab layer, which completely blocks cold air, moisture, and heat generated from the ground and the outside. And it is easy to block and discharge condensation (drops) generated inside the chamber by the temperature difference.

Description

납골묘{LAYING ONE'S ASHES TO REST A GRAVE}Ossuary grave {LAYING ONE'S ASHES TO REST A GRAVE}

본 고안은 납골묘에 관한 것으로, 특히 지면과 외부로부터 발생되는 찬공기, 습기 및 열 등을 완전히 차단하게 되고, 기온 차이에 의하여 석실 내부에서 발생되는 결로(물방울)의 차단 및 배출이 용이하여 유골의 보관이 용이한 납골묘에 관한 것이다.The present invention relates to the gravel grave, in particular, to completely block cold air, moisture and heat generated from the ground and the outside, and easy to block and discharge condensation (water droplets) generated inside the chamber by the temperature difference of the ashes It is related to the gravestone which it is easy to store.

일반적으로 우리나라의 장례문화는 전통적으로 매장을 선호하고 있으며, 오랜 기간에 걸쳐 매장을 해오고 있는 관계로 전국토에서 묘지로 사용할 만한 공간이크게 부족할 뿐만 아니라, 묘지를 형성하는 과정에서 나무와 숲이 훼손되어 자연환경을 크게 악화시키게 되는 실정인 것이다.In general, Korea's funeral culture has traditionally preferred burial, and since it has been buried for a long time, there is not enough space to use as a cemetery in the whole country, and trees and forests are damaged in the process of forming a cemetery. It is a situation that will greatly worsen the natural environment.

따라서, 최근에는 국토의 효율적 이용과 낭비를 최소화하기 위하여 장례문화를 화장으로 바꾸는 사회적인 운동과 많은 사람들이 화장을 원하고 있고, 매장된 유골을 화장하여 납골을 보관하는 방향으로 문화가 바뀌고 있다.Therefore, in recent years, in order to minimize the efficient use of land and waste, social movements that change funeral culture to cremation and many people want cremation, and culture has changed toward cremation by cremating buried remains.

이러한 변화에 따라 다양한 형태의 납골묘 및 납골당이 개발되고 있는 데, 특히 가족이나 문중 단위로 한곳에 유골함을 안치시켜 보관할 수 있고, 봉분 형태태의 묘를 선호하는 정서를 반영하여 중앙에 봉분이 형성되는 구조의 날골묘가 제안되고 있는 것이다.According to these changes, various types of ossuary and ossuary are being developed. In particular, family members or family members can be placed in one place to store the ashes and reflect the sentiment in the form of a bonsai. Sharp bone is proposed.

이러한 납골묘는 내부에 석실이 구비되도록 석물로써 축조되고, 이 석실에는 유골함을 안치하기 위한 유골함 안치 선반이 구비되어 다량의 유골함 보관이 가능하도록 이루어진 것이다.The ossuary is constructed as a stone so that the stone chamber is provided therein, and the stone chamber is provided with ashes settled shelves for placing the ashes in order to enable storage of a large amount of ashes.

그러나, 이와 같은 종래의 납골묘는 그 구조상 지면이나 외부에서 석실 내부로 유입되는 습기와 기온차이에 의해 석실 내부에서 맺히게 되는 결로현상 등을 차단하지 못하게 됨으로써 납골함에 보관중인 유골이 부패하여 곰팡이 및 악취가 발생되었다.However, in the structure of the conventional ossuary, the ashes stored in the ossuary are decayed due to moisture and temperature difference introduced into the silo from the ground or the outside of the silo. Occurred.

본 고안은 이와 같은 종래의 문제점을 해결하기 위하여 안출된 것으로, 본 고안은 지면이나 외부에 석실 내부로 유입되는 습기,열, 결로현상 등을 구조적으로 차단하여 유골을 보관할 수 있는 납골묘를 제공하는 데 그 목적이 있다.The present invention has been devised to solve such a conventional problem, the present invention is to provide a sternum to keep the ashes by structurally blocking the moisture, heat, condensation, etc. flowing into the stone chamber on the ground or outside. The purpose is.

도 1은 본 고안에 따른 납골묘의 전체적인 구조를 도시한 사시도.1 is a perspective view showing the overall structure of the ossuary grave according to the present invention.

도 2는 도 1의 정면도.2 is a front view of FIG. 1;

도 3은 도 1의 저면도.3 is a bottom view of FIG. 1.

도 4는 본 고안에 따른 납골묘의 전체적인 구조를 도시한 단면도.Figure 4 is a cross-sectional view showing the overall structure of the ossuary grave according to the present invention.

도 5는 본 고안에 따른 납골묘의 설치상태를 도시한 단면도.Figure 5 is a sectional view showing an installation state of the crypts according to the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

10 : 바닥구조물 12 : 골재층10: floor structure 12: aggregate layer

20,40,50 : 제 1,2,3슬래브층 30 : 방수부재20,40,50: 1,2,3 slab layer 30: waterproof member

32 : 방수플레이트 34 : 단열부재32: waterproof plate 34: insulation member

42 : 요입부 44 : 공기통로42: concave portion 44: air passage

52 : 결로홈 60 : 내부구조물52: condensation groove 60: internal structure

62 : 수직지지대 64 : 수평지지대62: vertical support 64: horizontal support

65 : 마감구 66 : 수직통풍구65: finish 66: vertical vents

70 : 외부구조물 72 : 배출홈70: external structure 72: discharge groove

80 : 출입문구조물 82 : 출입문80: door structure 82: door

90 : 유골보관 선반 92 : 밀착부90: ashes storage shelf 92: close contact

94 : 칸막이 100 : 방수액94: partition 100: waterproofing

110 : 부직포 120 : 비닐부재110: nonwoven fabric 120: vinyl member

이와 같은 목적을 달성하기 위한 본 고안의 기술적 과제는, 지면에 설치되는 골재층과, 상기 골재층 상부에 시공되는 제 1슬래브과, 상기 제 1슬래브층 상부에 시공되는 내부마감수단과, 상기 내부마감수단 상부에 요입부가 형성되도록 돌출되게 시공된 제 2슬래브층과, 상기 요입부에 결로홈이 형성되도록 시공된 제 3슬래브층으로 이루어진 바닥구조물; 상기 바닥구조물의 제 2슬래브층 상부 내주연으로 수직으로 얹혀져 벽 역할을 하게 되는 수직지지대와, 상기 수직지지대 상부에 적층되어 천정 역할을 하게 되는 수평지지대와, 상기 수평지지대의 중앙 영역에 구비되고, 마감구로써 마감되는 수직통풍구로 이루어진 내부구조; 상기 바닥구조물의 제2슬래브층 상부 외측에 상기 내부구조물과 적정 간격을 유지하여 얹혀지고, 하단 중앙 영역에 배출홈이 형성된 외부구조물; 상기 내,외부구조물의 일측에 구비되어 출입문이 설치되는 출입문구조물; 및 상기 제 3슬래브층 상부에 상기 수직지지대와 적정 간격을 유지하여 이중구조로 배치되어 유골함이 보관되는 유골보관 선반으로 이루어짐으로써 달성된다.Technical problem of the present invention for achieving the above object, the aggregate layer is installed on the ground, the first slab to be installed on the aggregate layer, the internal finishing means to be installed on the first slab layer, and the internal finish A bottom structure comprising a second slab layer protruding to form a concave portion in the upper part of the means, and a third slab layer formed to form a condensation groove in the concave portion; It is provided in the vertical support that is vertically mounted to the upper inner circumference of the second slab layer of the floor structure to serve as a wall, a horizontal support stacked on the vertical support to serve as a ceiling, and in the central region of the horizontal support, An internal structure consisting of vertical vents closed as finishes; An outer structure mounted on the upper side of the second slab layer of the floor structure at an appropriate interval with the inner structure, and having a discharge groove formed in a lower center region; A door structure provided at one side of the inner and outer structures to install an entrance door; And it is achieved by the ashes storage shelf is disposed in a double structure to maintain a proper distance with the vertical support on the third slab layer is stored ashes box.

이하, 첨부된 도면을 참조로 본 고안의 바람직한 실시예를 설명하면 다음과 같다.Hereinafter, preferred embodiments of the present invention with reference to the accompanying drawings as follows.

첨부된 도면중 도 1은 본 고안에 따른 납골묘의 전체적인 구조를 도시한 사시도이고, 도 2은 도 1의 정면도이며, 도 3은 도 1의 저면도이며, 도 4는 본 고안에 따른 납골묘의 전체적인 구조를 도시한 단면도이고, 도 5는 본 고안에 따른 납골묘의 설치상태를 도시한 단면도이다.Figure 1 of the accompanying drawings is a perspective view showing the overall structure of the crypts according to the present invention, Figure 2 is a front view of Figure 1, Figure 3 is a bottom view of Figure 1, Figure 4 is an overall view of the crypts according to the present invention Figure 5 is a cross-sectional view showing the structure, Figure 5 is a cross-sectional view showing an installation state of the crypt bone according to the present invention.

도 1 내지 도 5에 도시된 바와 같이, 본 고안에 따른 납골묘는 지면에 시공되는 바닥구조물(10), 바닥구조물(10) 상부에 얹혀져 석실이 형성되는 내부구조물(60), 바닥구조물(10)에 얹혀지고 내부구조물(60)의 둘레로 위치되는 외부구조물(70)로 이루어진다.As shown in Figures 1 to 5, crypts according to the present invention is the bottom structure 10, the inner structure 60, the bottom structure 10 is placed on the floor structure 10, the upper chamber is formed on the ground structure It consists of an outer structure 70 mounted on and positioned around the inner structure 60.

이를 구체적으로 설명하면, 상기 바닥구조물(10)은 지면을 평탄하게 다진 다음, 배수를 위하여 설치되는 골재층(12)과, 골재층(12) 상부에 콘크리트와 복배근으로 시공되는 제 1슬래브층(20)과, 제 1슬래브층(20) 상부에 시공되는 내부마감수단과, 내부마감수단 상부에 중앙 영역으로 요입부(42)가 형성되도록 돌출되게 콘크리트와 복배근으로 시공된 제 2슬래브층(40)과, 제 2슬래층(40)의 요입부(42) 상부둘레부에 결로홈(52)이 형성되도록 돌출되게 시공된 제 3슬래브층(50)으로 이루어진다.In detail, the floor structure 10 is a flat slab of the ground, the aggregate layer 12 is installed for drainage, and the first slab layer is constructed of concrete and abdominal muscles on the aggregate layer 12 above 20, a second slab layer constructed of concrete and abdominal muscles so as to protrude so that the concave portion 42 is formed in the central region on the first slab layer 20, and the upper portion of the first slab layer 20 is formed. 40 and a third slab layer 50 which is constructed to protrude so that a condensation groove 52 is formed in the upper periphery of the recess 42 of the second slab layer 40.

상기 내부마감수단은 제 1슬래브층(20) 상부에 도포되어 지면으로부터 습기 유입을 방지하기 위한 방수부재(30)와, 방수부재(30) 상부에 설치되어 찬기운의 침투를 방지하기 위한 방습플레이트(32)와, 방습플레이트(32) 상부에 설치되어 단열을 하기 위한 단열부재(34)로 이루어진다.The inner finishing means is coated on the first slab layer 20, the waterproof member 30 to prevent the inflow of moisture from the ground, and installed on the waterproof member 30, the moisture-proof plate for preventing the penetration of cool air ( 32), and is provided on the moisture-proof plate 32 is made of a heat insulating member 34 for heat insulation.

상기 제 2슬래브층(40)은 적정 간격을 유지하여 제 3슬래브층(50)의 결로홈(52)과 연통되게 공기통로(44)가 형성되어 결로홈(52) 내부의 수증기를 건조시키게 된다. 상기 제 3슬래브층(50) 상부에는 석실 내부의 습기방지를 위하여 방수부재(30)을 도포하게 된다.The second slab layer 40 maintains an appropriate interval so that an air passage 44 is formed in communication with the condensation groove 52 of the third slab layer 50 to dry the water vapor in the condensation groove 52. . The waterproof member 30 is coated on the third slab layer 50 to prevent moisture inside the chamber.

상기 내부구조물(60)은 바닥구조물(10)의 제 2슬래브층(40) 상부 내주연으로 얹혀지고, 적정 높이를 유지하여 형성되어 벽 역할을 하게 되는 수직지지대(62)와, 수직지지대(62) 상부에 적층되어 천정 역할을 하게 되는 수평지지대(64)와, 수평지지대(64)의 중앙 영역에 형성되고, 유리재질의 마감구(65)로써 마감되는 수직통풍구(66)로 이루어져 내부에 석실이 형성된다.The internal structure 60 is mounted on the upper inner circumference of the second slab layer 40 of the bottom structure 10, is formed to maintain a proper height vertical support 62 and the vertical support 62 ) It consists of a horizontal support 64 which is stacked on the upper part and serves as a ceiling, and a vertical ventilation hole 66 formed in the central area of the horizontal support 64 and finished with a glass finish 65. Is formed.

이때, 수직지지대(62)는 다각이 유지되도록 제 2슬래브층(40) 상부 내주연으로 얹혀지고, 이 수직지지대(62) 상부에는 다각의 수평지지대(64)가 적층된다.At this time, the vertical support 62 is mounted on the inner circumference of the second slab layer 40 so that the polygon is maintained, the horizontal support 64 of the polygon is stacked on the vertical support 62.

상기 외부구조물(70)은 바닥구조물(10)의 제 2슬래브층(40) 상부 외측에 다각형으로 배치되게 얹혀지고, 하단 중앙영역에 배출홈(72)이 형성되며, 내부구조물(60)과 적정 간격을 유지하게 된다. 즉, 제 2슬래브층(40)의 폭만큼의간격이 내,외부구조물(60)(70) 사이에 발생되어 흙이 채워지게 된다.The outer structure 70 is placed so as to be arranged in a polygonal shape on the outer side of the second slab layer 40 of the bottom structure 10, the discharge groove 72 is formed in the lower central area, the inner structure 60 and appropriate To maintain the spacing. That is, an interval equal to the width of the second slab layer 40 is generated between the inner and outer structures 60 and 70 to fill the soil.

그리고, 내부구조물(60)과 외부구조물(70)의 일측에는 출입문(82)이 설치되는 출입문구조물(80)이 구비된다.And, one side of the inner structure 60 and the outer structure 70 is provided with a door structure 80, the door 82 is installed.

한편, 제 3슬래브층(50) 상부에는 다각형을 유지하고 내부구조물(60)의 수직지지대(62)와 적정 간격을 유지하여 이중구조로 유골함이 보관되는 유골보관 선반(90)이 배치된다. 즉, 수직지지대(62)와 동일한 각을 유지하고, 적정 간격을 유지하여 이중구조로 유골보관 선반(90)을 배치하게 된다.Meanwhile, the ashes storage shelf 90 is disposed on the third slab layer 50 to maintain the polygon and to maintain a proper distance from the vertical support 62 of the internal structure 60 to store the ashes in a dual structure. That is, maintaining the same angle as the vertical support 62, maintaining the appropriate interval to arrange the bone storage shelf 90 in a dual structure.

상기 유골보관 선반(90)은 제 3슬래브층(50)의 결로홈(52)에 밀착되는 밀착부(92)가 하부에 연장 형성되고, 전면으로는 유골함이 보관되는 칸막이(94)가 구비된다.The ashes storage shelf 90 has a close contact portion 92 is formed in the lower portion in close contact with the condensation groove 52 of the third slab layer 50, the partition 94 is provided with the ashes in the front. .

그리고, 내부구조물(60)의 수직지지대(62)와 수직통풍구(66)의 외벽에는 외부마감수단을 구비하게 된다.The outer wall of the vertical support 62 and the vertical vent 66 of the internal structure 60 is provided with external closing means.

상기 외부마감수단은 외부단열을 위하여 도포된 방수액(100)과, 이 방수액(100) 상부에는 습기침투를 방지하기 위하여 부착된 부직포(110)와, 이 부직포(110) 상부에는 습기침투와 방수층을 보호하기 위하여 부착되는 비닐부재(120)로 이루어진다.The external finishing means is a waterproofing liquid 100 applied for external insulation, a non-woven fabric 110 is attached to the top of the waterproofing liquid 100 to prevent moisture infiltration, and a moisture penetration and a waterproof layer on the upper portion of the nonwoven fabric 110. It is made of a vinyl member 120 attached to protect.

한편, 내,외부구조물(60)(70) 사이에는 흙이 덮혀지게 되고, 바닥구조물(10은 흙으로써 완전히 덮혀 은폐되며, 이 흙위에는 잔디로써 마무리 하게 됨으로써 봉분형태를 유지하게 되는 것이다. 이때, 석실 내부의 채광을 위하여 수직통풍구(66)의 마감구(65)와 출입을 위한 출입문구조물(80)은 외부로 노출되는것이다.On the other hand, between the inner and outer structures (60, 70) is covered with soil, the floor structure (10) is completely covered with the soil and concealed, and the soil is finished on the soil by maintaining the shape of the rod. In order to light the interior of the chamber, the exit 65 of the vertical vent 66 and the door structure 80 for the entrance is exposed to the outside.

그리고, 출입문구조물(80) 전방에는 외부장식물(200)이 구비되어 납골묘 주위 외관을 장식하게 된다.And, in front of the door structure 80 is provided with an external decoration 200 to decorate the appearance around the crypt.

이와 같이 구성된 본 고안의 납골묘의 설치상태를 살펴보면, 먼저 지면을 평탄하게 다진 다음, 배수를 위하여 골재층(12)을 설치하고, 이 골재층(12) 상부에는 콘크리트와 복배근으로써 제 1슬래브층(20)을 시공한 다음, 제 1슬래브층(20) 상부에는 지면으로부터 습기 유입을 방지하기 위한 방수부재(30)와 찬기운의 침투를 방지하기 위한 방습플레이트(32)와 단열을 하기 위한 단열부재(34)로 이루어진 내부마감수단을 순차적으로 시공하게 된다.Looking at the installation state of the ossuary gravel of the present invention configured as described above, first ground flat, then install the aggregate layer 12 for drainage, the aggregate layer 12 above the first slab layer by concrete and abdominal muscles After the construction (20), the first slab layer 20, the upper part of the waterproof member 30 to prevent moisture from entering the ground and the moisture-proof plate 32 to prevent the penetration of cold and heat insulating member for thermal insulation The interior finishing means consisting of 34 is sequentially constructed.

이러한 상태에서 내부마감수단의 단열부재(34) 상부 외측 둘레부에 콘크리트와 복배근으로써 제 2슬래브층(40)을 돌출되게 시공하게 되면, 중앙영역으로 유입부(42)가 형성되고, 다수의 공기통로(44)가 형성된 제 2슬래브층(40)의 시공이 완료된다.In this state, when the second slab layer 40 is protruded by the concrete and the abdominal muscles on the upper outer periphery of the heat insulating member 34 of the inner closing means, the inlet portion 42 is formed in the central region. Construction of the second slab layer 40 on which the air passage 44 is formed is completed.

그 다음으로는 제 2슬래층(40)의 요입부(42) 상부 둘레부에 결로홈(52)이 형성되도록 제 3슬래브층(50)을 시공하고, 상부에 방수부재(30)을 도포하면 바닥구조물(10)의 설치가 완료된다.Next, when the third slab layer 50 is constructed such that the condensation groove 52 is formed in the upper circumference of the recess 42 of the second slab 40, and the waterproof member 30 is coated on the upper part of the second slab layer 40. Installation of the bottom structure 10 is completed.

이러한 상태에서 바닥구조물(10)의 제 2슬래브층(40) 상부 내주연으로 적정 높이를 유지하고, 다각으로 수직지지대(62)를 배치하여 벽 역할을 하게 되며, 수직지지대(62) 상부에 수평지지대(64)를 적층하여 천정 역할을 하게 되고, 수평지지대(64) 중앙 영역에는 마감구(65)로써 마감되는 수직통풍구(66)를 구비하게 됨으로써 내부에 석실이 형성되면서 내부구조물(60)의 설치가 완료된다.In this state, the second slab layer 40 of the floor structure 10 maintains a proper height at the inner circumference, and vertically supports 62 in a polygonal manner to serve as a wall, horizontally on the vertical support 62. The support 64 is stacked to serve as a ceiling, and the horizontal support 64 is provided with a vertical vent 66 that is closed by a finisher 65 in the central region, so that a stone chamber is formed therein, and thus the internal structure 60 is formed. The installation is complete.

그 다음으로는 바닥구조물(10)의 제 2슬래브층(40) 상부 외측에 하단 중앙영역에 배출홈(72)이 형성된 다수의 외부구조물(70)을 다각으로 배치하게 된다. 그러면, 외부구조물(70)이 바닥구조물(10)의 제 2슬래브층(40) 상부 외측에 다각형을 유지하여 내부구조물(60)과 적정 간격으로 배치된다.Next, a plurality of external structures 70 having a plurality of discharge grooves 72 formed at a lower central area outside the upper portion of the second slab layer 40 of the bottom structure 10 are arranged in a polygon. Then, the outer structure 70 is disposed at an appropriate distance from the inner structure 60 by maintaining a polygon on the upper outer side of the second slab layer 40 of the bottom structure (10).

이러한 상태에서 내부구조물(60)과 외부구조물(70)의 일측으로는 출입문구조물(80)을 구비하여 출입문(82)을 설치하여 출입이 가능하게 되었으며, 제 3슬래브층(50) 상부에는 내부구조물(60)의 수직지지대(62)와 적정 간격을 유지하여 이중구조로 유골함이 보관되는 유골보관 선반(90)을 배치시키게 된다.In this state, one side of the internal structure 60 and the external structure 70 is provided with a door structure 80 to install the door 82 is allowed to enter, the upper structure of the third slab layer 50 above By maintaining a proper distance with the vertical support 62 of the 60 is placed the ashes storage shelf 90, the ashes are stored in a dual structure.

그 다음으로는 내,외부구조물(60)(70) 사이에 흙을 채우고, 바닥구조물(10)을 흙으로 완전히 은폐시킨 다음, 이 흙위에 잔디로써 마무리 하게 됨으로써 봉분형태를 유지하게 되는 납골묘의 설치가 완료된다. 이때, 석실 내부의 채광을 위하여 수직통풍구(66)의 마감구(65)와 출입을 위한 출입문 구조물(80)은 외부로 노출되는 것이다.Next, fill the soil between the inner and outer structures (60) and (70), completely conceal the bottom structure (10) with soil, and then install the crypts to maintain the shape of the rod by finishing the grass on the soil. Is completed. At this time, the finish 65 of the vertical vents 66 and the door structure 80 for the entrance and exit for the mining inside the stone chamber is exposed to the outside.

이와 같이 설치가 완료된 납골묘는 유골보관 선반(90)의 전면으로 구비된 다수의 칸막이(94)에 유골함을 안치시켜 보관하게 되고, 석실 내부에서 발생되는 결로(물방울)는 유골보관 선반(90)의 후면을 따라 하방으로 내려와 유골보관 선반(90)의 하부의 밀착부(92)을 따라 제 3슬래브층(50)에 형성된 결로홈(52)으로 모어지게 된다.As described above, the completed ossuary gravel is placed and stored in a plurality of partitions 94 provided in front of the ashes storage shelf 90, and condensation (drops) generated in the interior of the ashes storage shelf 90 is maintained. Downwards along the rear surface is collected into the condensation groove 52 formed in the third slab layer 50 along the close contact portion 92 of the lower portion of the ashes storage shelf (90).

이와 같이 결로홈(52)에 유입된 결로는 결로홈(52)과 연통되게 형성된 제 2슬래브층(40)의 공기통로(44)를 통하여 유입되는 공기에 의해 건조된다. 그리고, 수직통풍구(66)의 마감구(65)를 통하여 햇빛이 석실 내부로 유입됨으로써 내부의 결로를 건조시키게 된다.The dew condensation introduced into the condensation groove 52 is dried by air introduced through the air passage 44 of the second slab layer 40 formed in communication with the condensation groove 52. Then, sunlight passes through the finishing opening 65 of the vertical vent 66 to dry the condensation inside.

한편, 내부구조물(60)의 수직지지대(62)와 수직통풍구(66)의 외벽에 방수액(100),부직포(110),비닐부재(120)로 이루어진 외부마감수단을 구비하게 됨으로써 석실 내부로 단열, 습기 및 방수를 하게 되는 것이다.On the other hand, the outer wall of the vertical support 62 and the vertical vent 66 of the internal structure 60 is provided with an external finishing means consisting of a waterproofing liquid 100, a nonwoven fabric 110, a vinyl member 120 to insulate the interior of the stone chamber Moisture, and waterproof.

그리고, 외부구조물(60)의 배출홈(72)을 통하여 봉분의 침술수가 배출되어 석실 내부로 유입되는 것이 차단된다.Then, the acupuncture water of the rod is discharged through the discharge groove 72 of the external structure 60 to be blocked from flowing into the chamber.

그리고, 출입문구조물(80) 전방에는 외부장식물(200)이 구비되어 납골묘 주위 외관을 장식하게 된다.And, in front of the door structure 80 is provided with an external decoration 200 to decorate the appearance around the crypt.

이상에서 상술한 본 고안의 납골묘에 의하면, 바닥구조물의 제 1,2슬래브층 사이에 마감수단을 시공하여 지면에서 발생되는 습기, 찬기운을 석실 내부로 전달되는 것을 차단하게 되었으며, 내부구조물의 외벽으로 외부마감수단을 구비하게 됨으로써 석실 내부로의 습기 및 방수 및 단열을 하게 되었고, 그리고 유골보관 선반이 수직지지대와 이중구조로 배치됨으로써 내부에서 발생되는 결로(물방울)는 석실 바닥의 결로홈을 통하여 모여져 제 2슬래브층의 공기유통공을 통하여 유입되는 외부공기에 의해 건조되고, 수직통풍구의 마감구를 통하여 햇빛이 석실 내부로 유입됨으로써 석실 내부의 결로현상을 방지되었으며, 또한 흙과 잔디로써 덮혀진 봉분에서 발생되는 침출수가 외부구조물의 배출홈을 통하여 배출됨으로써 석실 내부의유골보관 선반에 보관중인 유골을 안전하게 보관하게 되는 효과가 제공된다.According to the crypts of the present invention described above, by constructing a finishing means between the first and second slab layers of the floor structure to prevent the transfer of moisture and cool air generated in the ground into the interior of the chamber, the outer wall of the internal structure Moisture, waterproofing, and heat insulation into the interior of the room are provided by the external finishing means, and condensation (water droplets) generated from the interior of the ash storage shelf is arranged in a double structure with the vertical support and is collected through the condensation groove on the floor of the room. It is dried by the outside air introduced through the air distribution hole of the second slab layer, and sunlight is introduced into the chamber through the end of the vertical vent hole, thereby preventing condensation inside the chamber. Leaching water from the discharge structure is discharged through the discharge groove of the external structure The effect of safely storing the ashes in storage is provided.

Claims (5)

지면에 설치되는 골재층(12)과, 상기 골재층(12) 상부에 시공되는 제 1슬래브층(20)과, 상기 제 1슬래브층(20) 상부에 시공되는 내부마감수단과, 상기 내부마감수단 상부에 요입부(42)가 형성되도록 돌출되게 시공된 제 2슬래브층(40)과, 상기 요입부(42)에 결로홈(52)이 형성되도록 시공된 제 3슬래브층(50)으로 이루어진 바닥구조물(10);Aggregate layer 12 provided on the ground, the first slab layer 20 to be installed on the aggregate layer 12, the internal finishing means to be installed on the first slab layer 20, and the internal finish The second slab layer 40 is formed to protrude so that the concave portion 42 is formed on the upper portion, and the third slab layer 50 is formed so that the condensation groove 52 is formed in the concave portion 42. Floor structure 10; 상기 바닥구조물(10)의 제 2슬래브층(40) 상부 내주연으로 수직으로 얹혀져 벽 역할을 하게 되는 수직지지대(62)와, 상기 수직지지대(62) 상부에 적층되어 천정 역할을 하게 되는 수평지지대(64)와, 상기 수평지지대(64)의 중앙 영역에 구비되고, 마감구(65)로써 마감되는 수직통풍구(66)로 이루어진 내부구조물(60);The vertical support 62 that is vertically mounted on the upper inner circumference of the second slab layer 40 of the floor structure 10 to serve as a wall, and the horizontal support stacked on the vertical support 62 to serve as a ceiling An internal structure (60) formed at a central area of the horizontal support (64) and having a vertical ventilation opening (66) closed with a finish opening (65); 상기 바닥구조물(10)의 제 2슬래브층(40) 상부 외측에 상기 내부구조물(60)과 적정 간격을 유지하여 얹혀지고, 하단 중앙 영역에 배출홈(72)이 형성된 외부구조물(70);An outer structure 70 mounted on the upper side of the second slab layer 40 of the bottom structure 10 at an appropriate interval with the inner structure 60, and having a discharge groove 72 formed at a lower center area thereof; 상기 내부구조물(60)과 상기 외부구조물(70)의 일측에 구비되어 출입문(82)이 설치되는 출입문구조물(80); 및A door structure (80) provided at one side of the internal structure (60) and the external structure (70) to which the door (82) is installed; And 상기 제 3슬래브층(50) 상부에 상기 수직지지대(62)와 적정 간격을 유지하여 이중구조로 배치되어 유골함이 보관되는 유골보관 선반(90);Ashes storage shelf 90 is disposed in a dual structure to maintain an appropriate distance from the vertical support 62 on the third slab layer 50 is stored ashes box; 으로 이루어진 것을 특징으로 하는 납골묘.Ossuary graves, characterized in that consisting of. 제 1항에 있어서, 상기 내부마감수단은The method of claim 1, wherein the inner closing means 상기 제 1슬래브층(20) 상부에 도포되어 지면으로부터 습기 유입을 방지하기 위한 방수부재(30)와,Waterproof member 30 is applied to the first slab layer 20 to prevent moisture from entering the ground, 상기 방수부재(30) 상부에 설치되어 찬기운의 침투를 방지하기 위한 방습플레이트(32)와,Installed on the waterproof member 30, the moisture-proof plate 32 for preventing the penetration of cold air, and 상기 방습플레이트(32) 상부에 설치되어 단열을 하기 위한 단열부재(34)를 포함하는 것을 특징으로 하는 납골묘.The ossuary gravel, characterized in that it is installed on the moisture-proof plate (32) and includes a heat insulating member (34) to insulate. 제 1항에 있어서, 상기 제 2슬래브층(40)은The method of claim 1, wherein the second slab layer 40 상기 제 3슬래브층(50)의 결로홈(52)과 연통되게 공기통로(44)가 형성된 것을 특징으로 하는 납골묘.Ossuary gravel, characterized in that the air passage 44 is formed in communication with the condensation groove (52) of the third slab layer (50). 제 1항에 있어서, 상기 유골보관 선반(90)은 상기 제 3슬래브층(50)의 결로홈(52)에 밀착되는 밀착부(92)가 하부에 연장 형성되고, 전면으로는 유골함이 보관되는 칸막이(94)가 구비된 것을 특징으로 하는 납골묘.According to claim 1, wherein the ashes storage shelf 90 is in close contact with the condensation groove (52) of the third slab layer 50 is formed in the lower portion, the ashes are stored in the front Ossuary gravel, characterized in that the partition 94 is provided. 제 1항에 있어서,The method of claim 1, 상기 내부구조물(60)의 수직지지대(62)와 상기 수직통풍구(66)의 외벽에는 외부마감수단을 시공하되,An external finishing means is installed on the outer wall of the vertical support 62 and the vertical vent 66 of the internal structure 60, 상기 외부마감수단은, 외부단열을 위하여 도포된 방수액(100)과, 상기 방수액(100) 상부에 습기침투를 방지하기 위하여 부착된 부직포(110)와, 상기 부직포(110) 상부에 습기침투와 방수층을 보호하기 위하여 부착되는 비닐부재(120)를 포함하는 것을 특징으로 하는 납골묘.The external finishing means, the waterproofing liquid 100 is applied for external insulation, the non-woven fabric 110 attached to prevent the moisture infiltration on the waterproofing 100, and the moisture permeation and waterproof layer on the non-woven fabric 110 Ossuary, characterized in that it comprises a vinyl member 120 is attached to protect.
KR2020020021832U 2002-07-22 2002-07-22 Laying one's ashes to rest a grave KR200291963Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020020021832U KR200291963Y1 (en) 2002-07-22 2002-07-22 Laying one's ashes to rest a grave

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020020021832U KR200291963Y1 (en) 2002-07-22 2002-07-22 Laying one's ashes to rest a grave

Publications (1)

Publication Number Publication Date
KR200291963Y1 true KR200291963Y1 (en) 2002-10-11

Family

ID=73126442

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020020021832U KR200291963Y1 (en) 2002-07-22 2002-07-22 Laying one's ashes to rest a grave

Country Status (1)

Country Link
KR (1) KR200291963Y1 (en)

Similar Documents

Publication Publication Date Title
JPH07103717B2 (en) Grave
JP2009235697A (en) Joint grave
KR200291963Y1 (en) Laying one&#39;s ashes to rest a grave
JPH0689617B2 (en) Underground cemetery
KR200163430Y1 (en) Charnel house of tradition round shape graveyard
KR200146075Y1 (en) Charnel grave
KR100324996B1 (en) Charnel house and constructing method thereof
KR200383875Y1 (en) A charnel house
KR200201621Y1 (en) Family type of charnal
JPH0318590Y2 (en)
KR200390265Y1 (en) a charnel house
KR100337370B1 (en) A charnel grave of mound style
KR200227287Y1 (en) A prefabricated stone charnel house
KR200179369Y1 (en) Building structure for charnel house
KR100306307B1 (en) A charnel house
JPH085254Y2 (en) Three-dimensional cemetery
KR20090085397A (en) The charnel tomb
KR200211865Y1 (en) A stone tower equipped with charnel house
KR100402655B1 (en) A charnel house
KR200383855Y1 (en) A charnel house
JPH0372179A (en) Underground cemetery park
KR200359006Y1 (en) Charnel tomb having ventilation hole
JP2917011B1 (en) Collective tomb facility
JPH1077752A (en) Multiple wall-face collectively simplified cemetery
KR200297904Y1 (en) A tomb

Legal Events

Date Code Title Description
REGI Registration of establishment
LAPS Lapse due to unpaid annual fee