KR200263956Y1 - Nail device make up of nonmetal - Google Patents

Nail device make up of nonmetal Download PDF

Info

Publication number
KR200263956Y1
KR200263956Y1 KR2020010035219U KR20010035219U KR200263956Y1 KR 200263956 Y1 KR200263956 Y1 KR 200263956Y1 KR 2020010035219 U KR2020010035219 U KR 2020010035219U KR 20010035219 U KR20010035219 U KR 20010035219U KR 200263956 Y1 KR200263956 Y1 KR 200263956Y1
Authority
KR
South Korea
Prior art keywords
nail
grouting
hose
grout
fiber
Prior art date
Application number
KR2020010035219U
Other languages
Korean (ko)
Inventor
정성필
Original Assignee
정성필
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 정성필 filed Critical 정성필
Priority to KR2020010035219U priority Critical patent/KR200263956Y1/en
Application granted granted Critical
Publication of KR200263956Y1 publication Critical patent/KR200263956Y1/en

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

본 고안은 건축, 토목공사시 지반의 침하 및 균열을 예방하기 위해 사용되는 네일부재의 취급과 그라우팅작업을 원할하게 할 수 있도록 비금속재로 된 네일장치에 관한 것으로, 천공홀의 길이로 형성하는 합성수지 그라우팅호스에 토출공과 나선을 형성하여 소정의 간격으로 스페이서를 설치하고, 상기 스페이서가 설치된 합성수지 그라우팅호스에 섬유네일을 씌워 스페이서에 고정하여 충진홀을 형성하고, 상기 섬유네일의 입구 부근에는 연결파이프와 팩커를 결합하는 구성을 제공함에 의하여 네일길이의 제한을 받지 않고, 좌우상하 고소작업을 원할하게 하며 네일의 운반과 설치작업에 편리하며 공사비를 현저하게 절감하게 되는 효과와 특히, 그라우팅시 압력그라우팅으로 네일의 주변의 그라우팅이 완벽하게 이루어져 주위 지반의 안정성과 원할하게 할 수있다.The present invention relates to a nail device made of a non-metallic material for smooth handling and grouting of nail members used to prevent ground subsidence and cracking during construction and civil engineering work. The discharge hole and the spiral are formed in the hose to install the spacer at predetermined intervals, and the filler is formed by covering the synthetic resin grouting hose with the spacer and fixing it to the spacer, and the connecting pipe and the packer near the inlet of the fiber nail. By providing a configuration that combines the effect of reducing the length of the left and right, up and down height, and ease of transport and installation of the nail, and significantly reduce the construction cost without providing a nail length limitation, in particular, the pressure grouting nail The grouting of the surroundings is perfectly done and the stability of the surrounding ground It can be made.

Description

비금속재로 된 네일장치{NAIL DEVICE MAKE UP OF NONMETAL}NAIL DEVICE MAKE UP OF NONMETAL}

본 고안은 건축, 토목공사 시에 지반의 침하, 균열이 발생하지 않도록 사용하는 네일부재의 취급을 용이하게 하고, 네일무게로 인한 작업위치와 운반, 보관의 시공장소의 제한성 없이 네일링작업이 가능하도록 한 비금속재의 네일장치에 관한 것이다.This design facilitates the handling of the nail member used to prevent settlement and cracking of the ground during construction and civil engineering work, and it is possible to do nailing work without limitation of work place, transportation and storage due to nail weight. The present invention relates to a nonmetallic nail device.

종래의 건축, 토목공사 시 연약한 지반을 터파기 하는 경우 그 주변의 지반이 무너지거나, 균열이 발생하는 것을 예방하기 위한 안전조치를 취하였는데, 그중의 하나가 터파기 벽면에 대하여 경사지게 천공을 뚫고 이에 네일을 삽입하여 그라우팅을 실시하며, 그라우트의 응고후에는 네일을 고정하는 작업으로 연약지반의 전단 저항력을 향상시켜 연약지반에서 발생할 수 있는 문제를 사전에 예방하였다.In the case of digging a soft ground in the conventional construction and civil engineering work, safety measures have been taken to prevent the surrounding ground from collapsing or cracking. One of them is to drill a slanted perforated wall against the trench wall. The grouting is performed by inserting the nail. After grouting, the nail is fixed to improve the shear resistance of the soft ground to prevent problems that may occur in the soft ground.

이러한, 종래의 네일링 공법의 순서는 먼저 천공장치를 이용하여 경사지게 홀을 뚫는 공정을 행하고, 철근으로 조립하면서 그라우팅 호스를 측면에 부착한 네일을 상기 경사지게 뚫린 홀로 삽입시키는 공정을 하고, 이후에 그라우팅호스를 통하여 네일이 삽입된 홀에 그라우트를 충진하는 공정과, 그라우트의 충진 후 홀의 입구에 전면판을 시공하여 입구를 폐쇄하여 그라우트가 넘쳐치지 않게 하는 공정과, 전면판의 외부로 노출된 네일에 지압판과 너트를 채우는 공정을 순차적으로 이행하도록 되어있다.In the conventional nailing process, the first step is to drill a hole obliquely using a fabric mill, and then the nail attaching the grouting hose to the side while assembling with a reinforcing bar is inserted into the drilled hole, and then grouting. The grout is filled in the hole where the nail is inserted through the hose, the front plate is installed at the entrance of the hole after filling the grout to close the entrance so that the grout does not overflow, and the nail is exposed to the outside of the front plate. The process of filling the pressure plate and the nut is carried out sequentially.

상기의 네일링 공법에서는 지반에 대하여 먼저 천공작업을 해야 하는 데, 네일링의 원할한 삽입을 위하여 조립완료된 네일의 직경보다 큰 직경으로 천공하도록 되어 있고, 천공작업 후 천공장치를 홀에서 빼낸 후 그라우팅호스가 고정된 네일을 천공된 홀 속으로 삽입하는 작업이 행하여 지는데, 이처럼 홀에서 천공기를 빼내고 네일장치를 삽입하는 작업을 하는 과정에서 홀의 내부에 흙이 떨어지거나 홀속이 붕괴되어 네일의 삽입이 제대로 이루어지지 않는 문제점이 발생하였고, 홀속에 흙이 떨어지거나 부분적으로 붕괴된 상태에서 네일이 삽입되면 그라우팅을 하여도 그라우트가 설계치로 채워지지 않아 정상적으로 그라우트가 공급되지 못한 부분이 구조적으로 매우 취약한 문제점이 있었다.In the above nailing method, it is necessary to drill the ground first. For the smooth insertion of the nailing, it is to be drilled to a diameter larger than the diameter of the assembled nail. After drilling, the mill is removed from the hole and grouted. Inserting the nail fixed with the hose into the drilled hole is performed. In the process of removing the perforator from the hole and inserting the nail device, dirt is dropped inside the hole or the hole is collapsed. When the nail is inserted in the state where soil is dropped or partially collapsed in the hole, the grout is not filled with the designed value even when grouting, so the grout is not structurally supplied. .

이뿐만 아니라 상기와 같은 종래의 네일링장치들은 그 대부분이 금속으로 이루어져 있어서 첫째: 무게와 길이에 의해 취급을 용이하게 하지 못하는 문제점이 있었고, 둘째: 네일링작업 후 주변 지하 지장물이 되는 문제점도 있었다.In addition, the conventional nailing devices as described above are mostly made of metal, the first: there was a problem that can not be easily handled by the weight and length, and the second: the problem that the surrounding underground obstacles after nailing work there was.

본 고안은 이와 같은 종래의 네일링 공정상의 문제점을 해결하여 연약지반의 네일부재의 취급을 효율적으로 하며, 네일링 작업도 원할하게 할 수 있도록 하는 것으로, 네일무게로 인한 운반작업과 네일삽입작업을 용이하게 할 수 있도록 함과, 네일링 후 제거하지 않아도 지하 지장물이 되지 않도록 함을 목적으로 한다.The present invention is to solve the problems of the conventional nailing process such as to efficiently handle the nail member of the soft ground, and to make the nailing work smooth, and to carry and nail insertion work due to the weight of the nail The purpose is to make it easy, and to prevent underground obstacles even if not removed after nailing.

이러한 본 고안의 목적은 천공홀의 길이로 형성하는 합성수지 그라우팅호스에 토출공과 나선을 형성하여 소정의 간격으로 스페이서를 설치하고, 상기 스페이서가 설치된 합성수지 그라우팅호스에 섬유네일을 씌워 스페이서에 고정하여 충진홀을 형성하고, 상기 섬유네일의 입구 부근에는 연결파이프와 팩커를 결합하는 구성을 제공함에 의하여 충분히 달성될 것이다.The object of the present invention is to form a discharge hole and a spiral in the synthetic resin grouting hose formed to the length of the drilling hole to install the spacer at a predetermined interval, and to cover the filling hole by covering the fiber nail on the synthetic resin grouting hose installed with the spacer It will be sufficiently achieved by providing a configuration for forming the coupling pipe and the packer near the inlet of the fiber nail.

도1은 본 고안에 대한 네일장치의 구조를 보인 단면도.Figure 1 is a cross-sectional view showing the structure of the nail device for the present invention.

도2는 본 고안에 대한 네일부재를 시공하는 순서도.Figure 2 is a flow chart for constructing a nail member for the present invention.

* 도면의 주요부분에 대한 부호 설명** Explanation of symbols on main parts of drawings *

100...지반 130...천공홀 200...네일부재100 Ground 130 Drilling hole 200 Nail member

201...네일 201a...홀 203...그라우팅호스201 ... nail 201a ... hole 203 ... grouting hose

204...나선 207...스페이서 208...고정클립204 ... Spiral 207 ... Spacer 208 ... Fix Clip

210...가이드슈 220...연결관 230...팩커210 Shoe guide 220 Connector 230 Packer

도1은 본 고안에 대한 네일장치의 구조를 보인 단면도이고, 도2는 본 고안에 대한 네일부재를 시공하는 순서도이다.1 is a cross-sectional view showing the structure of a nail device according to the present invention, Figure 2 is a flow chart for constructing a nail member according to the present invention.

본 고안의 네일장치는 건축, 토목공사를 하는 지반(100)에 형성하는 천공홀(130)과, 상기 천공홀(130)속으로 삽입하는 네일부재(200)와, 상기 네일부재 (200)의 삽입후 지반의 표면에 행하는 숏크리트층(140)과, 상기 숏크리트작업후 네일부재(200)를 고정하기 위한 지압판(150) 및 너트(160)로 이루어진다.Nail device of the present invention is a drilling hole 130 formed in the ground 100 for construction, civil engineering, nail member 200 to be inserted into the drilling hole 130 and the nail member 200 The shotcrete layer 140 is formed on the surface of the ground after insertion, and the pressure plate 150 and the nut 160 for fixing the nail member 200 after the shotcrete work.

상기 네일부재(200)는 천공홀(130)의 길이로 형성되는 합성수지 그라우팅용호스(203)와, 상기 합성수지 그라우팅용 호스(203)에 소정의 간격으로 설치되는 스페이서(207)와, 상기 합성수지 그라우팅 호스(203) 선단에 끼워지는 고정클립(208)과, 후단에 끼워지는 연결관(220), 그리고, 상기 고정클립(208)에 네일과 함께 고정되어 천공홀속으로 삽입을 안내하는 가이드슈(210)을 결합한다.The nail member 200 is a synthetic resin grouting hose 203 formed to the length of the drilling hole 130, the spacer 207 is installed in the synthetic resin grouting hose 203 at predetermined intervals, and the synthetic resin grouting Fixing clip 208 to be fitted to the front end of the hose 203, the connecting pipe 220 to be fitted to the rear end, and the guide shoe 210 is fixed with the nail to the fixing clip 208 to guide the insertion into the drilling hole ).

상기 합성수지 그라우팅호스(203)에는 스페이서의 위치를 조절하기 위한 나선(204)이 형성되며, 상기 스페이서(207)에는 이에 씌워지는 네일(201)의 고정을 위한 고정밴드(207a)가 별개로 형성되어 결합된다.The synthetic resin grouting hose 203 is formed with a spiral 204 for adjusting the position of the spacer, the fixing band 207a for fixing the nail 201 to be covered therein is formed separately in the spacer 207 Combined.

상기 네일부재(200)의 네일(201)후단에 결합시키는 연결관(220)의 일측에는 팩커(230)와 너트(250)를 체결하기 위한 나선(221)이 형성되고, 연결관의 타측에는 끼워진 네일(201)의 고정을 위한 고정편(222)이 형성된다.On one side of the connecting tube 220 to be coupled to the nail 201 of the nail member 200, a spiral 221 for fastening the packer 230 and the nut 250 is formed, the other side of the connecting tube is fitted A fixing piece 222 for fixing the nail 201 is formed.

상기에서 팩커(230)는 그 외경이 신축되는 구성을 갖추는 것으로, 연결관(220) 또는 영결관에 삽입된 섬유네일(201)을 감싸는 상태에서 내부에 공기 또는 그라우트가 충진되는 충진실을 형성하고, 충진실은 신장 수축 및 공기 또는 그라우트의 저장이 가능한 토목섬유제로 형성하며 그 충진실에 그라우트 호스를 연결한다.The packer 230 has a configuration in which the outer diameter is stretched, and forms a filling chamber in which air or grout is filled in a state surrounding the fiber nail 201 inserted into the connecting pipe 220 or the freezing pipe. The filling chamber is made of geosynthetic material which is capable of contraction of the kidneys and storage of air or grout. The grout hose is connected to the filling chamber.

이러한 구성으로 이루어진 본 고안은 건축, 토목공사를 하는 지반(200)의 천공위치를 선정한다(a). 이후 터파기작업(120)을 하여 천공홀(130)을 수평 또는 경사지게 파내는 작업(b)을 한다.The present invention made of such a configuration selects the drilling position of the ground (200) for building, civil works (a). Thereafter, the digging operation 120 is performed to dig the drilling hole 130 horizontally or inclined (b).

상기 소정의 깊이로 파여진 천공홀(130)속으로 네일부재(200)를 삽입한다 (c). 그리고, 천공홀(130)의 입구를 공기 또는 그라우트의 충진으로 팽창되는 팩커(230)로 막고 압력 그라우팅작업(d)을 한다.The nail member 200 is inserted into the drilling hole 130 dug to the predetermined depth (c). Then, the inlet of the drilling hole 130 is blocked with a packer 230 which is expanded by filling of air or grout, and pressure grouting operation d is performed.

상기 그라우팅작업 후 지반(100)의 표면에 숏크리트(140) 작업을 하고 숏크리트 표면위에 지압판(150)을 끼우고, 노출된 상태의 연결관(220)에 너트(160)를 채워 지압판(150)이 숏크리트(140)에 밀착되도록 조여 네일부재(200)에 인장력을 제공한다.After the grouting operation, the shotcrete 140 works on the surface of the ground 100 and inserts the pressure plate 150 on the shotcrete surface, and fills the nut 160 in the exposed connection pipe 220. Tightening to be in close contact with the shotcrete 140 provides a tension force to the nail member (200).

상기와 같은 네일링공정을 이행하면 합성수지 그라우팅호스(203)를 그라우트공급장치에 연결하여 그라우트 공급을 이루게 한다. 따라서 그라우트는 장치의 압력으로 호스(203)에 뚫린 통공(203b)을 통하여 네일(201)의 홀(201a)에 충진되며, 이때 그라우트 공급장치의 압력에 의해서 네일(201)의 조직사이로 그라우트가 토출되는 작용을 이루게 된다.When the nailing process is performed as described above, the resin grouting hose 203 is connected to the grout supply device to achieve grout supply. Therefore, the grout is filled in the hole 201a of the nail 201 through the through hole 203b drilled in the hose 203 by the pressure of the device, and the grout is discharged between the tissues of the nail 201 by the pressure of the grout supply device. Will work.

이러한 현상은 마치 뿌리가 내리는 형상이며, 이러한 상태로 천공홀(130)속에 그리우트가 채워지면 일부의 그라우트는 지반으로 스며들어 응고된다.This phenomenon is as if the roots are down, and when the grout is filled in the drilling hole 130 in this state, some grout penetrates into the ground and solidifies.

상기와 같이 공급되는 그라우트의 응고 후 연결관(220)에서 너트(160)를 풀러내고, 지압판(150)을 떼어내고 돌출된 연결관을 절단하면 네일링작업은 종료된다.After solidifying the grout supplied as described above, the nut 160 is removed from the connector tube 220, the acupressure plate 150 is removed, and the protruding connector tube is cut to finish the nailing operation.

상기의 작업에서 네일(201)은 토목공사에 알맞도록 된 섬유이므로 취급하기가 금속보다 쉬어 운반과 설치작업에 매우 편리함을 주고, 섬유인관계로 접어 보관이 가능하여 주변공간을 많이 차지 하지 않을 뿐 아니라 천공홀의 길이에 제한을 받지 않는다. 그리고 그라우팅시에는 그리우트가 섬유조직사이로 빠져나가 네일외부에서 구근을 자연스럽게 형성하는 작용으로 그라우팅이 완벽하게 형성하는 작용을 이룬다.In the above work, since the nail 201 is a fiber suitable for civil engineering work, it is easier to handle than metal, which is very convenient for transportation and installation work, and it can be folded and stored in a fiber relationship so that it does not occupy much space. The length of the drilled hole is not limited. In grouting, the grout escapes between the fibrous tissues and naturally forms bulbs on the outside of the nail.

이상에서와 같이 본 고안은 네일을 특수 섬유재로 하므로 천공홀의 길이에 제한받지 않으며, 가벼워서 운반과 취급 그리고 시공위치의 제한을 받지 않는 등의 이 이점이 있으며, 섬유조직에 의해서 그라우팅 작업이 완벽하게 이루어져 시공성이 매우 좋고, 네일링후 제거하지 않아도 섬유 및 합성수지이므로 지하 지장물이 되지 않는 이점이 있는 것이다.As described above, the present invention is not limited to the length of the drilled hole because the nail is made of a special fiber material, and has the advantage of being light and not limited by the transport and handling and the construction location, and the grouting work is perfectly performed by the fiber structure. It is made of very good workability, because it is a fiber and synthetic resin even if not removed after nailing is an advantage that does not become underground obstacles.

Claims (4)

천공홀의 길이로 형성하는 합성수지 그라우팅호스에 토출공과 나선을 형성하여 소정의 간격으로 스페이서를 설치하고, 상기 스페이서가 설치된 합성수지 그라우팅호스에 섬유네일을 씌워서 스페이서에 고정하여 그라우트용 충진홀을 형성하고, 상기 섬유네일의 입구 부근에는 연결파이프와 팩커를 결합하는 구성으로 이루어 진 것을 특징으로하는 비금속재로 된 네일링장치.Discharge holes and spirals are formed in a synthetic resin grouting hose having a length of perforated hole, and spacers are installed at predetermined intervals. Nailing device made of a non-metallic material, characterized in that the connection of the pipe and the packer in the vicinity of the entrance of the fiber nail. 제1항에 있어서, 상기 천공홀 입구와 네일의 연결관 사이에 팽창 수축되는 팩커로 막아 충진되는 그라우트의 압력이 증가하도록 구성한 것을 특징으로하는 비금속재로 된 네일링장치.The nailing device of claim 1, wherein the pressure of the grout filled by blocking the expansion and contraction between the opening of the drill hole and the connection pipe of the nail is increased. 제1항과 제2항 중 어느 한 항에 있어서, 상기 팩커는 연결관 또는 섬유네일을 감싸는 충진실을 형성하고, 상기 충진실의 외부가 공기 또는 그라우트의 충진으로 팽창되는 토목용 섬유재로 이루어지며, 그라우트용 호스가 충진실에 연결되는 구성으로 이루어 진 것을 특징으로 하는비금속재로 이루어진 네일링장치.According to any one of claims 1 to 2, wherein the packer is formed of a civil engineering fiber that forms a filling chamber surrounding the connecting tube or fiber nail, the outside of the filling chamber is expanded by the filling of air or grout Nailing device made of a non-metallic material, characterized in that the grout hose is configured to be connected to the filling room. 제1항에 있어서, 상기 스페이서는 합성수지 그라우팅 호스에 나선식으로 결합되고 외주연에 섬유네일을 관통하는 고정편이 형성되고, 섬유네일의 외면으로 관통된 고정편에 결합시키는 고정밴드로 이루어진 것을 특징으로하는 비금속재로 이루어진 네일링장치.The method of claim 1, wherein the spacer is helically coupled to the synthetic resin grouting hose is formed on the outer periphery through the fiber nail is formed, characterized in that consisting of a fixing band for coupling to the fixing piece penetrated to the outer surface of the fiber nail. Nailing device made of a non-metallic material.
KR2020010035219U 2001-11-16 2001-11-16 Nail device make up of nonmetal KR200263956Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020010035219U KR200263956Y1 (en) 2001-11-16 2001-11-16 Nail device make up of nonmetal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020010035219U KR200263956Y1 (en) 2001-11-16 2001-11-16 Nail device make up of nonmetal

Publications (1)

Publication Number Publication Date
KR200263956Y1 true KR200263956Y1 (en) 2002-02-19

Family

ID=73112511

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020010035219U KR200263956Y1 (en) 2001-11-16 2001-11-16 Nail device make up of nonmetal

Country Status (1)

Country Link
KR (1) KR200263956Y1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101060286B1 (en) * 2008-11-17 2011-08-29 주식회사그라운드이엔씨 Flexible Soil Nail and Flexible Soil Nailing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101060286B1 (en) * 2008-11-17 2011-08-29 주식회사그라운드이엔씨 Flexible Soil Nail and Flexible Soil Nailing

Similar Documents

Publication Publication Date Title
JP4296660B2 (en) Slope stabilization method
CN107060803B (en) Tunnel construction method by utilizing pipe curtain grouting
KR100331969B1 (en) An apparatus and method for multi-step grouting using FRP tube
KR100559978B1 (en) A pile for cofferdam and cofferdam method using it
KR100966148B1 (en) Ground adhering soil nailing structure and ground reinforcement method using the same
JP2001115458A (en) Deep well construction method using earth retaining wall
KR200352267Y1 (en) Slope-reinforcing structure for soil nailing having function of drainage
KR101141526B1 (en) Pressure Grouting Method
KR101078080B1 (en) Earth retaining wall and it's construction method using the precast pile and ground reinforcement
KR20200048265A (en) Steel pipe multi-stage grouting device
KR101005193B1 (en) Pile for cofferdam
KR100313168B1 (en) Nail Removal Method
KR100616359B1 (en) Support-pipe using method of soil nailing
KR102110992B1 (en) Internal packer pressure structure of steel pipe multi-stage grouting device
KR200263956Y1 (en) Nail device make up of nonmetal
KR100823980B1 (en) Drain combination paker type pressurization grouting equipment and the upward method using the same
KR101874464B1 (en) Bottom-up ground reinforcement anchor with Front drain pipe
KR20020021299A (en) An apparatus and method for ground anchor using FRP tube
JP4705468B2 (en) Drainage pipe with deterrent function
KR100400853B1 (en) Removable soil nailing method and its nail assembly
KR100869369B1 (en) The ground reinforcement apparatus and method grouting type using bundle steel pipe
KR100665594B1 (en) Wire draw gear of casket anchor
KR20020012451A (en) apparatus and method for removal anchor using double uneven pipe
KR200203646Y1 (en) Rihforcement fixer for secondary pre-stress
KR101182802B1 (en) a Complex Micro Pile

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
FPAY Annual fee payment

Payment date: 20050727

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee